Tag Archives: Vix self-centering drill bit

2015/10/19 (M) Flashless

Linda was up at 5:45 AM and out the door by 6:15.  I woke up but went back to sleep and finally got up at 7:30 and got dressed.  I turned on the furnace in the garage and turned up the thermostats in the bus and then had breakfast.  Rather than grind up a small quantity of coffee beans and get the coffee maker dirty I had a cup of tea.  I retrieved Butch’s e-mail and called Clyde in Canton to arrange pickup of the antique Sun distributor tester that Butch bought from him last night on Ebay.  I will drive down Friday to pick it up.

Phil showed up around 8:30 AM, unloaded his front loader, and got to work on the French drain.  I went out around 10 AM and talked to him briefly.  I then walked through the southwest corner of our property looking for a corner marker.  I did not find one but I did discover some REALLY big trees with REALLY BIG vines woven through them.  The base of the vines was as big as one of the trees, about 30″ in diameter.  I had never seen a vine root that size.

Back at the house I called John Palmer, of Palmer Energy Systems in Florida, to update him on my recent call to Magnum Energy technical support.  He said he would talk to Tom in the next couple of days and try to get me the connector (terminal block) I need.  We agreed I will call him back on Friday.

Next I called A-1 Upholstery in Elkhart, Indiana and talked to Terry.  I ordered a bolster cushion to fill in the space behind the sofa seat cushions and below the sofa back cushions.  It will be 6″ high x 4-3/4″ deep x 78″ long and will be one density of firm foam rather than a firm center layer with softer outer layers on top and bottom (like the seat cushions).  She will use a plain beige fabric as it will not be visible and so it does not have to match the other sofa cushions.  She said it would be ready in early November, which is plenty of time for us to drive down and get it.  The price was $125, which sounded like a fair price to me.

I got out my old Sunpak DX-8R ring flash and connected it to one of my Quantum high voltage battery packs but the battery pack appeared to be dead.  The two battery packs I have are almost unused but have apparently self-discharged and are now dead.  This also happened to my original battery packs.  The only flash equipment I have is set up to run off these packs but I am not inclined to replace them again as I do not use them enough to keep them charged which makes it hard to justify the cost as they are expensive.  Unfortunately that leaves me, for the moment, without any flash capability for the new Sony SLT-A99V DSLT camera.  Buggers.

I sent a TXT message to Joe to let him know that I did not see any indication of axle/hub seal leaks on the inside of the bus wheels.  I then called Bill in Mexico, Indiana and left him a message regarding the antique Sun distributor tester.  I will drive it at least as far as Elkhart, Indiana when I pick up the bolster from A-1 Upholstery and transfer it to Bill if he can meet me there.  There is also the possibility that I will drive it all the way to Bill’s place in Mexico, Indiana and stop by Jarel Beatty’s cabinetry shop in Logansport to have him cut down the connector on the passenger side HVAC duct cover.  If I do I will also pick up the drawings for the desk, sofa, and pull-out pantry as long as I am there.

Phil checks the grade of the new driveway extension.  The laser level is set up by the utility pole.

Phil checks the grade of the new driveway extension. The laser level is set up by the utility pole.

I went back outside and walked through the layout of the driveway extension with Phil.  He then set up his laser level, took elevation measurements at various points, and made an annotated sketch.  He needed to think about the data and figure out what we could actually do given the change in grade from the existing concrete driveway to the road at the third culvert and the need to flatten out before reaching the culvert to tie in with where the barn will (might) eventually go.

Keith, from Kish Lawn Care, showed up around 11 AM to mow the grass.  I got out our leaf blower and let Phil know that I would be occupied for a little while with yard work.  I blew the leaves off of the rear decks, out from under/around various bushes, and off of the two boulder retaining walls into the yard where Keith could mulch them with his riding lawn mower.

About the time I was done blowing leaves Phil had a plan to discuss.  The elevation drops 7-1/2 feet from the concrete driveway (that goes from the street to the garage) to the street at the third culvert some 200 feet away.  Phil thought that our best bet was to slope down from the driveway over a distance of 40 feet, level out for 40 feet, and then gently slope down for 70 feet to the area in front of the future barn location.  That would leave another 50 feet with a slight drop to get to the street.  Some of the area down there will be close to level, however, so another RV could park down there.

We also discussed running power and agreed that I would buy about 40 feet of plastic conduit to get under the level area and headed towards the southwest corner of the garage.  We would need the conduit first thing tomorrow morning so I decided I would go to Lowe’s this evening.

I finally got to work in the bus around 1:30 PM.  I positioned the sofa seat, secured the piano hinge to the stationary backboard with four screws and then drilled all of the other screw holes using my smallest VIX bit.  I installed all of the little screws, dialed back the thermostats, and closed up the bus.  My time-on-task was short but it was a big item to check off of my “list.”

The Sunpak DX-8R ring flash can operate on four AA batteries so I put a set in and connected it to the hot shoe on top of the camera.  The camera was able to trigger the flash (more than once) but the shots were seriously overexposed.  I did not take the time to try and figure out if the flash can be controlled by the camera based on light coming through the lens.  If not it won’t be usable in most situations.

It was a mild day with blue skies and white puffy clouds so I took the new camera outside to capture some images of the work Phil is doing.  I shot a few frames of the more colorful trees in our yard while I was at it.

Linda texted me at 3:40 PM to let me know she was leaving the bakery and stopping at the store on the way home.  Phil continued to find rock, concrete, and brick debris as he dug out the driveway extension.  He used the 30″ toothed bucket on his excavator to sift out the larger pieces and pull them into a pile and then used his front loader to put all of it into his dump truck.  I got a metal tine rake and raked out some of the smaller stuff, not because it needed to be removed but because I needed to do something physical and wanted to smooth it out to get a better idea of how it will look when finished.

Phil started securing his equipment at 5 PM and we were wrapping up our last discussion of the project for the day when Linda got home at 5:30.  After unloading a few groceries she started fixing dinner.  Phil took off and I continued raking for another half hour until dinner was ready.  Linda served the rest of the polenta with puttanesca sauce and steamed sliced parsnips.  I thought we finished the Cupcake Black Forest wine last night but I was pleasantly surprised to find out that we still had enough for our meal this evening.

After dinner I went to The Home Depot looking for a fuel filter for our Cub Cadet lawn tractor.  THD sells Cub Cadet equipment but only had generic fuel filters so I did not buy one.  I went to Lowe’s, where we get a 5% discount on everything we buy! and bought the following:  four 10-foot pieces of 2″ PVC non-conductive conduit, a 90 degree elbow, a coupler, two end caps, 1″ and 1-1/4″ self-drilling screws, an 8′ long pressure treated 4×4′, and a clamp on saw guide.  The saw guide was an impulse purchase but I had a $10 Off card for a total purchase of $50 of more.  We have struggled with makeshift saw guides all summer and fall and I still have more careful cutting to do.  I already have a saw guide but could not find it and should have bought a new one at the beginning of the bus remodeling project.

Phil called the house while I was out so I called him back.  He had figured out that extending the driveway to within 10 feet of the front of the proposed bus barn would add 25% to the cost of the project.  That was more than I was prepared to spend at this time so we will defer that work until we build the barn, probably in summer 2017.  We watched Scorpion and NCIS Los Angeles and then went to bed.

 

2015/08/26 (W) Delux Delay

We were a bit sore last night, and needed a good night’s sleep, so we both took some Advil PM right before going to bed.  As a result we did not wake up until almost 8 AM this morning.  The Advil, combined with the very cool temperatures, made for good sleeping.

Our son had called yesterday to see if Linda could watch Madeline today while he did some work on the rental property that he and Shawna own.  It was Shawna’s house before they got married, and is a nice little place, but with Madeline on the way they wanted a slightly larger place.  They also wanted to be on the other side of Stadium Boulevard in the attendance area for Burns Park Elementary School and walking distance to both the school and adjacent Burns Park without having to cross any major streets.

Ann Arbor is a major rental housing market because of the University of Michigan and the local government is very involved in this market.  Rental properties must be inspected at least every 30 months and meet code requirements.  The rental house was scheduled for inspection on Friday and needed some minor repairs, so Brendan set aside today to take care of things.  What I find interesting about this inspection requirement is that most of the rental houses our son and daughter lived in while at U of M looked to me like they had not been inspected in over a decade.

Linda was due at Brendan and Shawna’s house around 10:30 AM so she left our house at 9:15.  She took the three books of wallpaper samples with her and went directly to Delux Drapery and Shades in Ann Arbor to return them and placed the order for four bolts (double roll packs) of Sellers and Josephson Just Textures Lamar paper.  Not long after she left Delux I got a call at home from the store.  They were looking for Linda to let her know the wallpaper was back ordered until September 11.  (I’m not the least bit superstitious but September 11.  Really.)  To cancel the order we would have to let them know today but I told them to let it ride.  I then texted Linda to let her know and she agreed with my decision.

I had a feeling this might happen and it’s what we get for waiting so long to look for, select, and finally order a wall covering.  But it is what it is and we were not going to settle for something that wasn’t “right” for our interior just because it was available more quickly.  If the paper actually comes in on the 11th we will have the 12th and 13th to at least install it in a few critical areas before the new seating goes in.  If it doesn’t arrive by then we will deal with it when it does.  Either way the only big issue is that we wanted to paper the wall behind where the desk will go before the desk is installed.  As things stand we will either uninstall/reinstall the desk or paper around it.

The pantry supported by plywood and 2x4s.

The pantry supported by plywood and 2x4s.

There were several small tasks that I could have worked today but the thing that needed to be done was the installation of the pull-out pantry, so that is what I did.  The pantry was already in the coach, which was a good start.  I got two of the small leftover pieces of 3/4″ oak veneered plywood and set them in front of the alcove base.  I then set a 5′ length of 2×4 on the flat in the space where the pantry goes and extending out beyond the alcove by more than the depth of the pantry.  I then set the pantry on the 2×4, pushed it snug to the side of the alcove, and slid it towards the back of the alcove until the front was approximately one inch behind the vertical front edge of the left side panel.

There were two main reasons for using the 2×4.  First, the lowest slide attached to the pantry box extends below the box so the bottom of the box needed to sit on something that was thicker than the amount by which the slide hung down.  Second, a 2×4 on the flat is 1.5″ thick and that turned out to be a good thickness for positioning the pantry vertically in the alcove.

The reveal between the front of the pantry and the front edge of the alcove side panel was wider at the top than the bottom so I placed two wood shims side-by-side under the back end of the 2×4 to raise it slightly and tilt the top of the front out.  I fussed with this for quite a while and each time I adjusted the shims I had to pick the pantry up, set it aside, and put it back.  I eventually got the reveal to be the same along the entire length (height) of the front.

Once I knew where I wanted the pantry to be when it was closed I had to figure out how to mount the slides to the side panel of the alcove.  I pondered this for quite a while.  If nothing else, I have learned that when it is not clear how to proceed the best course of action is to do nothing.  I have also learned that if I ponder long enough I will eventually see a way forward.  Sometimes that takes days or weeks of conscious and subconscious thinking, but luckily the solution came to me relatively quickly.

The pantry box is 27″ deep.  The full extension slides are 26″ deep and they are mounted so they are flush with the front of the pantry box when they are fully closed.  I wanted a 1″ reveal along the front, so I needed to place the back edge of the slides 27″ back from the front edge of the alcove side panel.  With the pantry box out of the alcove I used a metal ruler to measure back at three points and make very fine scratch marks.  I then used the metal ruler to draw a fine pencil line through the three scratch marks.

I returned the pantry to the alcove, pushed it tight to the alcove side panel, and then pulled it out about three inches.  Measuring on the back side outside the alcove I made final adjustments to the shims to get a consistent reveal.  I then pulled each of the nine slides back, carefully aligned the back edge of the slide to the reference line, drilled a hole with a self-centering VIX bit, and secured it with a #6-3/4″ SR (square recessed) screw.  (I was not able to initially secure the bottom slide as the 2×4 was in the way.)  I pulled the pantry out a little farther until the next mounting hole in the top slide was visible and then drilled that hole on all eight slides and secured it with a screw.  I proceeded in this way until all but the bottom slide were attached to the alcove side panel through every available mounting hole; 88 screws in all (11 screws for each slide x 8 slides).

The pantry with the installation boards removed from underneath it.

The pantry with the installation boards removed from underneath it.

To secure the bottom slide I needed to get the 2×4 out from under the pantry.  I slid the pantry all the way in, slid the two pieces of 3/4″ plywood out from under the 2×4, and tried to slide the 2×4 out.  Unfortunately I used a 2×4 that was too long to just slide out as part of the original pantry cabinet is directly across from the pull-out pantry.  So I got my circular saw and cut about 4″ off the end of the 2×4.  Close, but not quite, so I cut off another 2″ and was finally able to slide it out.

With the pantry all the way out I was able to drill and secure the mounting holes for the back half of the bottom slide.  The holes for the front half were a bit tedious as I had to move the box to reveal each one.  To avoid going back and forth between the drill and the screw driver bit I drilled all of the holes first and then put in the screws.  I should also mention that I used the Shop Vac to vacuum up any debris that got in the slides as a result of the drilling.  I also wiped the slides out (carefully, they have sharp edges) with a paper towel.

The pantry slides all the way in and out but is a little tight the closer it gets to being fully closed.  I know that Jarel was very meticulous in attaching the slides to the pantry box so they were all parallel.  My working hypothesis is that either I did not get them attached to the alcove exactly parallel (entirely likely) and/or there is more drag on them because of the one-sided installation (probably, but no way for me to quantify) than there would be if they were installed on both sides of a drawer.

All of the slides are on the same side, which is not how they are normally used.  A pair of these slides is rated to support 100 pounds when used on both sides of a drawer, so four and a half pairs would, conservatively, support 400 to 450 pounds in a normal application.  Even if they will only support 1/3 that much weight in a single-sided application that is still 133 to 150 pounds for our nine slides.  I think the box weighs about 30 pounds so that leaves at least 100 pounds for stored items and I doubt that we could get 100 pounds of stuff in the pantry even if we loaded it with canned goods.  Because the pantry is narrow and tall with lots of slides I suspect most of the load on the slides is vertical, which is what they are designed for, rather than sideways, which would tend to pull them apart, so I suspect that it can safely carry considerably more than 100 pounds of staples.

The piece of aluminum angle that will prevent the refrigerator from sliding sideways into the pantry.  It is not installed yet as the plywood refrigerator base is not stained yet.

The piece of aluminum angle that will prevent the refrigerator from sliding sideways into the pantry. It is not installed yet as the plywood refrigerator base is not stained yet.

I had just finished installing the pantry and was cleaning up my tools and materials when Linda got home around 3 PM.  I had skipped lunch and she had a PB&J sandwich while she was out so we agreed to have dinner at 5:30 PM.  Linda picked up where she left off yesterday cleaning and waxing the drawer fronts and the woodwork in the bedroom.  I decided that the oak veneered plywood base in the alcove needed to be painted or stained and then sealed so I went to Lowe’s and got a small can of Rustoleum American Walnut stain, a small can of Rustoleum satin finish polyurethane, and two foam brushes.

I brushed the stain on liberally, working in sections, let it sit for two minutes per the instructions, and then wiped it off with a lint-free cloth.  The stain required mineral spirits for cleanup so I threw the brush and cloth away.  The instructions said to wait one hour before applying a finish.  It was 5 O’clock by then so I went to my office to check e-mail while Linda prepared dinner.

She made a nice salad and grilled a couple of vegan burgers and added some vegan cheese.  Mustard, ketchup, pickles, onions, and lettuce on a nice bun made for a tasty sandwich.  Two deer, a doe and her young fawn, came to our deer block while we were eating and a ruby-throated hummingbird stopped at our plants and feeders.  For dessert we had half of a small, very sweet watermelon.

By the time we were done with dinner it was 6:30 PM so I went back out to the bus and applied the polyurethane.  The directions said to apply it sparingly so that is what I tried to do.  They also said that it could take 48 hours to be usably dry and seven days for a full cure.  Drying time was dependent, however, on temperature and humidity, with higher temps and lower relative humidity promoting quicker drying.

I had run the Aqua-Hot earlier in the day and determined that there was still a little too much coolant in the system as the expansion reservoir overflowed into my catch bottle.  I closed the three windows that were open, leaving them just slightly ajar, turned on the Aqua-Hot, turned on all three thermostats, and set them for about 72 degrees Fahrenheit.  I will not be applying a second coat of polyurethane and cannot spare 48 hours for this one to dry.

I had thought that we might get the first sheet of underlayment installed this evening but decided we had done enough for one day.  It will be the only full 4’x8′ sheet we install but it needs a notch cut out of it before it goes in.  I thought it would require several cuts but then realized I had some floor leveling compound that I had not removed.  I got my chisel and mini-sledgehammer and knocked off the big chunks.  I then used the oscillating sander with 50 grit sandpaper to smooth everything out.  It was 7:45 PM and I was done working on the bus for today.

I went to my office and spent a couple of hours dealing with e-mails.  Linda was still up when I turned in at 10 PM but drifted off to sleep as I finished up this post.  She has to go to the bakery tomorrow which means she will be up very early.

 

2015/08/13 (R) Sanding Success

Linda was scheduled to go into the bakery today but knew before we went to bed last night that the visit was postponed.  That was just as well; we were very tired from our long day yesterday and slept in this morning.

Before I even had a chance to make coffee I spotted wild turkeys by the road in our easternmost driveway entrance.  They walked past the east end of the house into our backyard.  They hung around by the deer block for quite a while so we had a good long look at them and I took a few pictures.  There was a big tom, a younger/smaller tom, and a half-dozen hens, one with a surprisingly small chick for this late in the season.  The turkeys eventually moved on and we got back to our normal routine.  While I made the coffee Linda made her own version of raisin, date, walnut oatmeal with some quick oats that she had in the pantry.  It was very good.

We read for a bit but I needed to finish the blog posts for the last several days and Linda needed to return some items to the Howell Library and run a couple other errands.  While working on the blog post for yesterday I realized that we had not loaded all of the pieces for the built-in sofa.  I checked the pieces we had against the drawings, which we should have done yesterday, and confirmed that we were missing the two top pieces (E) for the support boxes (HVAC plenums) and the top piece (H) for the return air plenum.  I texted Jarel and he replied quickly that he would try to take care of it in time for me to drive back down on Wednesday to pick up them up.  It’s a 12-17 hour, 550 mile day, for me and costs about $60 in gasoline, so hopefully he will have the pantry done by then as well.

Linda got word from our son via TXT message that Shawna’s father, Mick, had passed away.  He had an aggressive but non-cancerous brain tumor that did respond to two separate surgeries and was moved to hospice care about two weeks ago.  Brendan, Shawna, and Madeline are cutting their vacation short by a day to head to the Grand Rapids area but are still leaving Tuesday to fly to Denver to visit Shawna’s mother, Carol, and her husband, Cliff.  It appears that a memorial service may be in the works for the weekend of the 22nd and 23rd, in which case we will probably drive over.

My sister tried to call me today.  Linda was on the house phone quite a bit today with bakery-related business so Patty tried my cell phone but did not leave a message.  I was working in the bus at the time, did not have it with me, and Linda could not find it in time when it was ringing.  Being deaf in one ear she cannot locate where sounds are coming from.  She does a little better when she uses her BAHA, but rarely wears it around the house.  I called my sister back and left a message and she eventually called me back and we got to talk.

Our father, who is 90, had been admitted to a hospital near where he lives.  The staff said he appeared to have severe dementia, but he was fine (for his age) just a couple of weeks ago, so I suspected a stroke or some other sudden change.  Patty sent me a text latter that the CAT scan of his brain revealed two recent lesions (last few weeks), the telltale sign of two strokes.  She also said he was being transferred to Missouri Baptist Hospital, which is much closer to where she lives, for further care.

Those two pieces of news certainly put a damper on the day, and may cause an adjustment in my plans if I have to travel to St. Louis.  In the meantime there is stuff that has to get done, so even though it was warm today and I wasn’t really in the humor, I kept working in the bus, off and on.  I vacuumed up loose material, including inside the bases of cabinets, and then cleaned the wiring in the refrigerator alcove with Lysol.  I decided to make a template for the refrigerator alcove plywood base filler panels so I could cut them the right size/shape on the first try.  I then used one of the new ceramic sanding belts on the residual thin-set and mastic, and it worked!  My sense of hope was renewed that I will be able to install the new floor correctly.

By 7 PM I was feeling drained so I wrapped up my work and took a shower.  For dinner Linda made pan-grilled BBQ tofu with caramelized onions and served it open faced on a hamburger bun with a side of fresh steamed asparagus.  It was delicious.

After dinner I went to Lowe’s and The Home Depot in search of several items but only ended up buying another 36 grit sanding belt.  I needed floor leveling compound but was not prepared to choose between their limited options.  I also needed a self-centering drill bit but neither store had them.  Lowe’s and THD really are focused on the tools and materials one needs to work on a house and its surrounding property.  Things like self-centering drill bits, though useful for things like drilling holes for door hinges, are really cabinet-making tools.  As big as these stores are they can’t, and don’t, sell everything.

I talked to Butch on the drive home.  The self-centering drill bit that Jarel recommended for installing the pull-out pantry slides is a Vix and Butch suggested four places where I could buy it:  Rockler, Custom Service Hardware, McFeeley’s, and Grizzly’s.  Before ordering one I need to e-mail or text Jarel and ask him what size screw I need to mount the pull-out pantry extension slides.

Back home I thought of four other things I could have bought while I was out so I added them to my list.  I then went to my office and worked on blog posts, updated the BCM Group page on RVillage, e-mailed Gary Hatt at BCM, responded to an e-mail from Howard (PlayaDog) re: screens for sliding bus windows, and started downloading Adobe Creative Cloud 2015 updates.  Jack Conrad had responded to my earlier e-mail asking if he knew what was going on with the Arcadia rally and I sent him a reply.  By the time I dealt with all that I was ready to recline and rest.