Tag Archives: utility closet

2014/09/03 (W) Pine Cone Midden

After breakfast Linda downloaded the Hanks Writer to her iPad2 while I downloaded three app updates to mine.  After checking in on the blogs that I follow, I spread some grass seed around the bare and thin spots in the back and west side of the yard by the house.  I wanted to take care of that while it was cool and the ground was still damp with dew from the overnight lows in the upper 50’s.

Darryll did not call last night, so I did not expect him to be here today.  Our son might be interested in the old window air-conditioner so we moved it to the southeast corner of the garage and plugged it in to make sure it worked.  It did, so I sent him a text message to that effect.

We cleared off the table we have been using to cut drywall and got the 1/4″ birch plywood panel that will be the front of the box that encloses the electrical sub-panel and cables.  We measured carefully, twice, laid out the cut lines, and checked the measurements again.  We got the center cutout very close to correct on the first try and only had to trim it a little bit in one corner to get it to fit around the panel box.  We did not secure it place as we still need to feed the thermostat cable through the wall and put some insulation in the wall cavity to the left of the panel as this is an outside wall.

With the carpentry work done we started cleaning and reorganizing the garage, making sure that Darryll will still have access to things he needs to work on.  We plan to have the storage pod picked up on the 12th or 13th, so even though Darryll is not quite finished, we were anxious to start working on the rest of the garage.

We moved the tools and supplies we’ve been using to the three new shelving units on the east wall of the garage.  We then unloaded two shorter units and two tall units on the west wall and spread everything out on the floor.  We moved the units to the northeast wall, the shorter ones fitting nicely under the low end of the flue where it exits the utility closet wall.  We went through the stuff on the floor and put some of it in the trash, set some of it aside to recycle, designated a few things to go to the Salvation Army, collected RV parts in boxes to take to the GLCC Surplus and Salvage rally next month, and put the rest back on the shelves.

We took a break for lunch and then finished up in the garage for the day.  Linda worked at her desk and I changed out of my construction clothes into something more suitable for working at my desk.  She made marinated baked tofu cubes for dinner, with sautéed green beans and corn-on-the-cob (organic and non-GMO, of course).  We sat on the deck and watched our resident American Red Squirrel gather pine cones and move them under the cluster of three big fir trees where we presume it has a nest and pine cone midden.  These trees have never been trimmed and the lower branches are sizable and long and the ends rest on the ground.  I peeked in there the other day but did not see pine cones piled around any of the trunks like I expected, so I’m not sure where the midden is located.

I was up later than I should have been but I finished reading Big Lake Scandal.  The fifth book in Nick Russell’s Big Lake murder mystery series, it was a good read.  Nick has created an interesting place with interesting characters and reveals a little more about them with each volume.  He is particularly good at capturing the way people might actually talk to one another on a daily basis in a small western town.  He should know; he has spent a lot of time in such places over the years.

 

2014/09/02 (T) No More Painting

After breakfast Linda worked on the financial and membership records for our GLCC RV chapter and I took care of a couple of e-mails.  Keith showed up to cut the grass, which he managed to do in spite of the wet conditions from yesterday’s heavy rains.  After chatting with Keith for a few minutes I started to resume work on “the project” but decided to look for the tub of grass seed and fertilizer we brought from the old house.  I found it rather quickly and we still had a partial bag of grass seed, so I spread it around the front yard by hand filling in the bare and thin spots, of which there were plenty.  Our flock of wild turkeys was back today.  I think they like the grass seed I put out for them.

Wild turkeys gather in and around the fire pit.  No...we do plan to cook them.

Wild turkeys gather in and around the fire pit. No…we do not plan to cook them.

I sanded the drywall compound in the library and applied another thin layer.  I’ve been applying non-overlapping horizontal strips of mud, letting them dry, sanding them smooth while feathering the edges, then repeating the process for the areas in-between, or outside, the previous strips.  I will eventually turn this 90 degrees and apply the strips vertically.  The last set of steps will be to fill around the outside of the opening, feathering everything back to the existing wall surface and sanding it smooth with the central part of the patch.  We don’t want it to be obvious that there was ever a hole in the wall.  Once the drywall patching is done I have to prime the new compound and then paint the entire wall.

The paint on the east wall of the garage and the outside of the utility closet looked good and the paint on the inside of the utility closet looked good enough; it is, after all, the inside of a furnace closet.  I was done painting, at least for now, which should have felt like a big deal, but it just meant I could wrap up a couple of things and move on to the next thing.

The first thing was to mount the electrical box on the wall to the left of the library HVAC unit, make all the wiring connections, screw the switch into the box, and put on the cover plate.  I routed the thermostat wire alongside, and zip-tied it to, the armored AC power cable.  The second thing was preparing the mounting holes for the garage furnace thermostat on the outside of the utility closet wall.  I then cut the thermostat cable to the correct length beyond the wall, removed the outer sheath, stripped the ends of the wires, and secured the cable with a zip tie to prevent it from slipping back into the wall.  I did not actually mount the thermostat, however, since I was going to wait for Darryll to connect the wires.

Three adults and three young.  They are large and impressive birds.

Three adults and three young. They are large and impressive birds.

By then it was time for lunch, after which Linda left for her dentist appointment in Dearborn.  I wanted something easy to do, so I assembled the three plastic shelving units I bought at Lowe’s yesterday.  They went together easily, but one was missing the feet, top caps, and wall brackets and another one had a defective top cap.  I put them against the east wall of the garage and the floor was flat enough that they lined up well, so I don’t necessarily need the feet.  But the top caps are important, and it bugs me that I did not get everything I paid for.

The next thing I decided to tackle was the wood box in the utility closet that will enclose the electrical sub-panel and make it appear to be recessed and hide all of the electrical cables.  I cleared off the table we have been using to work on sheets of drywall and stood the scrap pieces of drywall against the back wall.  I got the two 8-foot 1×10’s I bought yesterday, put them on the table, made careful measurements and then marked them.  The two side pieces needed to be 52″ long x 7-1/4″ wide, with notches to create clearance for the top plate, horizontal blocking, and electrical cables passing through holes in studs.  I cut them to length with the Rockwell circular saw, and then ripped them to width using the Craftsman band saw.  The band saw had not been used in years but it had no problem ripping each board.  The notches were made with our Porter-Cable saber saw.  This kind of work is a pleasure when you have the right tools.

I screwed the two side pieces into place and then measured and cut a bottom cross member, and a trim strip to go below it, and installed those with screws.  I then cut a top cross member and a backing strip to go behind it between the two side pieces.  When I was done I had a box that would support a 48″ high by 33″ wide 1/4″ thick plywood panel with the outside face flush with the front edge of the sub-panel once I cut a rectangular opening in the plywood to allow it to fit around the box.  The plywood panel will be secured around the edges with a few screws and the sub-panel cover plate will overlap and cover any gap between the panel box and the opening in the plywood.  I will finish the plywood panel tomorrow or Thursday depending on when Darryll returns and how much I have to work with him to get the power connected to the new A-C compressor.

Jasper the cat in the kitty tent on the deck.  He spends a lot time looking around and sniffing the air when he is out here.

Jasper the cat in the kitty tent on the deck. He spends a lot time looking around and sniffing the air when he is out here.

That was the end of my project work for the day so I took a shower and put on some clean clothes.  Linda poured a couple glasses of wine and we sat on the deck and enjoyed an absolutely beautiful late summer Michigan evening.  We brought the kitty tent out so Jasper could sit outside with us.  Linda threw a green salad together, followed by the leftovers of the penne pasta dish and Italian bread she made for dinner on Saturday.  As twilight set in we moved inside and I decided to go to Lowe’s for some grass seed.  I figured if the soil was still moist first thing tomorrow morning I would spread it around the bare and thin areas in the back and on the west side of the garage, of which there are plenty. Otherwise I will wait until just after the next rain.

I started reading Big Lake Scandal last night and continued with it this evening.  It’s the 5th and latest book in the Big Lake murder mystery series by full-time RVer Nick Russell.  Nick is a good writer, but he and his wife, Terry, are personal acquaintances, which makes reading his books that much more fun.

 

2014/08/23 (S) Square Waves

We have so much to do at home and on the bus that we might have skipped the SLAARC (ham radio club) breakfast in South Lyon this morning, but I had agreed to meet Chuck at his shop (bus garage) at 10 AM in Novi and to bring Mike (W8XH) along with his oscilloscope to look at the tachometer signal, or lack thereof.  We had a nice chat with our ham radio friends, discussed having dinner in a week or so with Bruce and Linda, and then headed to Chuck’s shop.

We had two different opinions as to what signal we might find, if any, at the end of the wires that connect to Chuck’s tachometer.  Matt, from Bob’s Speedometer, told me that the signal to both the VDO tachometer and speedometer were variable frequency square waves at 3 to 5 volts peak and that the electronics in the gauge moved the needle in proportion to the frequency.  Mike (W8XH) had talked to Jim (N8KUE), who works in the research lab at Ford Motor Company, and Jim was of the opinion that the input to these gauges was a pulse width modulated signal.  With pulse-width modulation the frequency and amplitude of the waveform are constant but the width of the “pulse” (the “on time” of non-zero voltage) varies from zero to some maximum percentage of the half cycle, up to 100%.  If it is on for the entire half cycle it becomes a square wave.  The longer the pulse (on time percentage) the more energy is transmitted.  The gauge electronics can convert that to a needle position or run a motor faster or slower, such as might drive an odometer.

So which was it?  Well…neither.  What we saw was an alternating current signal that appeared to simply be an impulse (sudden spike in the voltage), one positive and one negative per cycle, with the frequency responding in direct proportion to the engine RPM.  The impulse had a rapid but noticeable decay time that appeared to me to exponential, but we did not have the wires connected to a load and that may have affected the signal. The voltage we were seeing appeared to be in 300 mV range, a far cry from the 3 – 5 volts we expected.

We loaded the cardboard in my car before going to breakfast, so when we were done at Chuck’s we headed directly to Recycle Livingston.  From there we went to pet Supplies Plus for some cat litter and then to Lowe’s for four more sheets of drywall (Sheetrock) and a large tub of better drywall compound.  After fighting with the back wall of the garage recently and having trouble with using the patching and repair compound yesterday, I wanted a drywall compound that would go on easier and smoother.  It could just be my technique, of course; I wasn’t that good at dry-walling 32 years ago, and feel like I have lost what little technique I once had.

Back home we unloaded everything, changed into our work clothes, and had lunch; grilled “cheese” sandwiches with tomatoes and dark leafy greens and fresh peaches, ripened to perfection.

While Linda sanded the drywall compound I applied yesterday I removed the panel from the library side of the opening for the old window A-C unit.  I insulated the cavity, cut and installed a new piece of drywall, and re-taped the seams.  I helped Linda finish the sanding, wiped off the dust with a wrung out sponge, and then applied another coat of drywall compound.  I then applied a first cost of “mud,” as drywall compound is commonly called, to the filler panel in the library.

In preparation for dry-walling the new utility closet we had to do some carpentry to box around the flue and gas pipe where they pass through the west wall.  We also had to box around the supply air duct where it passes above the utility closet door.  Finally, we added some backer boards along the edge of the platform by the west wall.  The purpose of all of this carpentry was to provide backing along all drywall edges so it will be supported and can be secured.  Our final task for the day was to trim a piece of 2×4 to block off the top of the wall cavity where the return air duct is connected next to the door between the library and the garage.

For dinner we had leftovers from Thursday:  Koshary and pita bread with vegan garlic “butter.”  Linda read somewhere recently that drier white wines are generally considered (by someone) to go better with Middle Eastern food, but we thought our 2009 Egri Merlot went quite well with dinner.  Of course, Koshary is an Egyptian dish, and so perhaps more Mediterranean than Middle Eastern.  All of that reminded me that there really are no rules about these things; drink what you like and enjoy life.

 

2014/0729 (T) Utility Closet

It was in the mid-40’s when we got up this morning so Linda made oatmeal with walnuts, dates, raisins, cinnamon, and a little brown sugar.  It was a hardy and satisfying breakfast on a chilly morning.  I checked in with some of the blogs I follow using Feedly on my iPad and then, as we were getting ready to work, Steve showed up with four workers (Kyle, Tommy, Spencer, and Mark).  Steve did not stay and work today but Mark operated the excavator and the guys got a lot done.  By the end of the day we were finally able to see how it was all going to come together.

Our focus today was the utility closet in the garage.  Much of what we did required two people, and we made a long day of it.  We finished framing the west wall, stood it up, got it into position, plumbed it, and secured it.  We then framed the south wall with the rough opening for the door.

The installation of the door was challenging.  All the framing was plumb in two directions but our first attempt at installing it resulted in the bottom latch side not closing by almost an inch when the top latch side was seated correctly.  Everything was plumb on both jambs, the door was level and plumb, but something was obviously wrong.

As we started to break for lunch I got a call from Darryll.  He was wondering if we could run the 2” iron gas pipe through the attic from the east end of house to the west side of the garage.  I told him I would check the access and call him back.  While he was on the phone I got clarification on the size and location of the HVAC unit and the ducts for the conditioned air supply and return.  As a result I will have to move a duplex outlet I installed the other day, run a new/longer wire up the sub-panel, put insulation into the lower half of the wall cavities, and install/finish a piece of drywall.

We spent the afternoon trying to figure out what was wrong with the door installation and fix it.  Everything was plumb and we thought everything was square.  It turned out that the two ends of the wall were out of alignment which was forcing the bottom of the door out.  (The inside angle between the west wall and the south wall was less than 90 degrees.)  Once we realized what was wrong we were able to fix it.

We had a green salad and Amy’s roasted vegetable pizza for supper at 6:30 PM.  After relaxing for a while on the deck with a glass of Leelanau Cellars Summer Sunset wine I secured the plywood platform to the base with screws and then caulked the two edges where it met the back and right side walls.

We drove to Lowe’s at 8 PM to get a box of steel cut masonry nails.  I need two or three to secure the free end of the bottom plate of the west wall.  While we were there I got a set of new blades for the Milwaukee Sawzall reciprocating saw but forgot to buy more shims.  We always like to leave a reason for a return trip to the home supply stores.

 

2014/07/28 (M) Reprieve

I was awake early, fell back asleep, and finally got up at 7:30 AM.  By the time I had the coffee made Linda was showered, dressed, and starting to assemble breakfast.  We had barely finished eating when we heard the happy sound of landscape workers.  Steve had five young men on site to do the hand work and was here most of the morning and part of the afternoon running the excavator.  By the time they all left for the day a little before 5 PM they had made a lot of progress with the retaining wall project behind the house in spite of the muddy conditions from yesterday’s rains.  It’s amazing what can be accomplished when people and equipment show up and work all day.  If that happens the rest of the week they might actually get done by Friday.  Linda and I figure it will be Labor Day.

As planned, I resumed work on the utility closet in the garage after breakfast and a brief chat with Steve.  I cut a 48″x48″ piece of 3/4″ plywood down to 46″x40″ and did some minor trimming to get a clean fit on the base we built yesterday.  I then cut the top and bottom plates and the end studs for the west wall from 8′ long 2″x4″s.  I ran out of the 3.5″, 16d nails I needed so I drove to Lowe’s to get a 5 pound box of them.  While I was there I also picked up some primer and paintable caulk.  I assembled the outer pieces of the wall and added an additional stud to the free (south) end but did not cut/install the other three intermediate studs.

The wall is taller at the north end than the south end because the concrete garage floor drops slightly towards the north wall of the garage.  I stood the wall up to make sure it fit snugly (it did) and to force the top plate into alignment.  I was pleased to see that the free end will plumb quite well in both directions.  I will measure the other three studs tomorrow, lower the wall down to install them, and then stand the wall back up, plumb it, and secure it to the north wall, the platform base, and the ceiling.  Once that is done I will secure the plywood platform to the base using screws and caulk the edges along the north and east walls.  When the caulk has cured, hopefully later in the day, I will prime the plywood and the exposed 2″x12″ base board.

I quit working on the construction around noon, got cleaned up, put a load of laundry in the washing machine, had a bite of lunch, and withdrew to my office.  I searched through my Outlook inboxes for all of the e-mails related to today’s FMCA Education Committee meeting only to discover that the meeting was scheduled for next Monday and would be an informal work session rather than a formal meeting.  That was a lucky reprieve for me and allowed me to catch up on other e-mail and work on the roster and financial records for our FMCA Freethinkers chapter.

I had hoped to spend the evening selecting and processing a few photos and uploading a few blog posts but I ran out of time and did not get to these tasks.  We streamed last week’s episode of Endeavor on our Apple TV device and then turned in for the night.

 

2014/07/23 (R) My Platform

The primary elections are just around the corner but my platform has nothing to do with politics.  My platform is a 46″ x 40″ surface 12″ above the floor in the northeast corner of the garage, or will be once I build it.  This platform will be the base for the new HVAC unit for the library and I need to have it built before the equipment gets here and Darryll shows up to install it.  Once the unit is installed I need to enclose it to isolate it from the garage to prevent explosive vapors or noxious fumes from entering the combustion chamber or fresh air circulation.  That will require the construction of two walls one of which will have an exterior grade door.

John’s chop saw, which I borrowed the other night, allows me to make more accurate cuts (clean and square) than I can with my circular saw.  In the meantime I have some work to do removing/installing a few studs in the north wall of the garage and running some new electrical wire.  I need to run 120V 15A circuits for the furnace portion of the library unit and for the ceiling mounted garage furnace and a 240V 20A circuit for the library air-conditioner.  Eventually I will have a 240V 30A outlet for our radial arm saw, which would be great for the woodworking aspects of this project, but that’s a project for another day.

Three landscapers showed up a little before 8 AM (Tommy, Matt, and Spencer).  Tommy was on the phone with Steve getting their instructions for the day and then they got to work building an additional section of the west retaining wall with medium size boulders and preparing the area under the east end of the deck for a layer of egg rock.  They took off around 9:45 AM for some unknown reason, but the sound of their truck reminded us to put the trash out at the street for pickup.  They were back in a little while, worked until noon, and took their lunch break.  By 3:30 PM they had the boulder wall built, the egg rock placed, a strip of edging set into a small trench, and small boulders placed on the eastern slope below the large boulders.  That certainly looked like progress.

Linda worked at her desk until mid-afternoon and then started working on dinner.  Although simple in presentation at the table, she put a lot of time into our meal.  She made a potato and lentil curry that was very good with deep, complex flavors, and garlic naan bread.  Both were as good as anything I have ever had at an Indian restaurant and the naan was vegan, made with unsweetened soy milk in place of dairy milk and olive oil in place of dairy butter.

I spent most of the day taking the measurements I needed to turn my mental concept for the utility closet into a set of design drawings from which I could produce a material list.  By supper time I had a good set of drawings to guide the carpentry work but was still puzzling over some electrical issues.  By the time Linda had dinner ready I was ready to set thus project aside for the night.

It was after 7 PM by the time we finished eating and cleaned up, but that left us plenty of time to sit on the deck and enjoy a cool northwest breeze and the muted light of scattered clouds.  It eventually got too cool to stay outside so I worked at my computer until bedtime.