Tag Archives: UPS (Howell MI)

2015/07/23 (R) Wrapping Up Mara

Mara’s plan was to make this the last full day of her visit.  Our day started without her as we had cinnamon raisin toast, juice, and coffee for breakfast.  I got a call from Jarel with clarifying questions and ideas about the desk and the pull-out pantry.  After a thorough discussion we had better ways to approach a few things.  He also had a better feeling for the estimated cost of the project and I agreed to send him 50% as a deposit.

I typed up a short letter and printed off the graph that Steve made of the return loss for the M-302N V/U lightning arrestor.  I packed the unit for shipping to Morgan Manufacturing and included the letter and graph.  Linda wrote out the check for Jarel and got it in an envelope to mail.  She then went to the library, Post Office, and Humane Society where she donated cat and dog paraphernalia that we had accumulated over the years.

While Linda was gone I worked in the bus for a while and Mara worked on travel preparations.  I started by removing the old 3/4″ plywood floor from the refrigerator alcove.  The original plywood bus floor appeared to mostly be in good condition but I will put a new secondary floor in the alcove to keep the refrigerator legs above the level of the new tile floor.  There are a LOT of wires running along the floor of the alcove at the back wall and I may fashion a cover for them and seal up the holes at either end.

I removed the AC dimmer for the living room lights and the DPDT momentary contact DC switch from the floor-mounted walnut box where they were installed.  The DC switch controlled the passenger side sofa footrest.  I had to remove the wires from both switches to get them out.  The AC dimmer was easy but the DC switch had four different color wires with spade connectors.  I made careful note of which terminal each color went to and then pulled the spade connectors off.  With the switches out I was able to remove the box and its mounting cleats from the floor and wall.  This area will be tiled and the box will not be reused.

Out of curiosity I tested the switch with an Ohm meter to see how the terminals were connected internally.  I also checked the wires with a DC volt meter to see how they were being used.  Two of the wires were +12VDC and DC ground and the other two went to a connector that was originally plugged into the footrest.  The switch applied 12VDC to the two load wires in one position and reversed the polarity in the other position, making the footrest go out or in respectively.

Last year I had removed two blank outlet covers on the walnut panel next to the co-pilot seat so I knew that these two switches were originally installed there and subsequently moved to the floor-mounted box.  I unscrewed the 1/4″ walnut veneered plywood panel from the wall to see what was behind it.  What I found was a LOT of wires and it was not a pretty sight.  I re-installed the two switches in their original locations and re-routed some other wires so they went up over the HVAC chase.

There was still a large bundle of wires running along the floor at the base of the HVAC chase that I needed to re-route but I decided not to mess with those today.  They are connected to four different switches and a doorbell and disconnecting everything was going to require careful attention to detail.  I pondered the refrigerator some more and decided there wasn’t anything else I could do with it for now and that I was done working in the bus for today.

There is too much to do at the moment to just sit around so I decided to install the new garage door opener for the small garage door.  New is relative; it has been sitting in the garage in its original packaging since we moved into the house, supplied by the previous owners.  The old one has not worked correctly since we moved in and the previous owners bought the new one but ran out of time to install it.  It turned out to be rather more complicated than I expected, with very comprehensive assembly and installation instructions.  It also turned out to be a two-person project so Linda worked on it with me.

We were working and Mara had started prepping dinner when a UPS truck showed up with four boxes.  The delivery included:  Mara’s refrigerator vent cover; the Cutco knives and scissors, and; the ZioTek track system for wall-mounting the monitors in the ham shack (2 boxes).  The vent cover was due for delivery today but the knives were not due until tomorrow, so we were really glad to see them as two of them were for Mara.  The monitor mounting system was also due for delivery today but I had temporarily forgotten about it.

The north wall of the ham shack/office.  This is where the ZioTek wall-mounted monitor mounting system will go.

The north wall of the ham shack/office. This is where the ZioTek wall-mounted monitor mounting system will go.

Mara was understandably anxious to see if the vent cover fit her base properly.  It was a VentMate and appeared to be identical to the old one.  She climbed up the ladder on the back of her motorhome and I handed parts and tools up to her.  I then climbed up was well.  She removed the old cover and we set the new one in place.  It was a perfect fit!  We put a small amount of putty under each screw head and then ran them down snug and congratulated ourselves on another job completed and well done.

With Linda’s help we put Mara’s kayak back in its custom carrier which fits in the receiver on the back of her motorhome (she does not tow a car).  The carrier was built by a welding shop in Mesa, Arizona to Mara’s specifications and is made from 2″ square tubular steel and powder-coated black.  The carrier holds the kayak diagonally across the back of the motorhome from lower left (driver’s side) to upper right.  The nose of the kayak sits in a pocket near the driver side rear corner of the motorhome and the midpoint is nestled in a much larger cradle.  A strap runs from the nose pocket up to the midpoint on one side and across the kayak to the other side where it is attached to a ratchet and has a hook on the end.  With the hook engaged in a ring the strap is ratcheted tight and the kayak is secure for travel.  Mara runs an anti-theft cable through an eyelet near the nose and attaches a lock for safe keeping.  The tail sticks up higher than the top of the roof-mounted air-conditioner covers but does not extend beyond the passenger side wall.  The tip of the kayak is 13′ 2″ from the ground.

We made good progress on the garage door opener but had to stop at the point where we needed to attach the motor housing to the ceiling as I needed to get some parts (angle iron and lag screws) that did not come with the unit.  The front of the track was attached to the header above the door opening and we left the motor assembly resting on top of a 6 foot stepladder.

The pieces of the ZioTek monitor mounting system laid out on the floor of the ham shack/office.

The pieces of the ZioTek monitor mounting system laid out on the floor of the ham shack/office.

While Mara and Linda prepared dinner I unboxed all of the monitor mounting components.  I was curious to see the parts and wanted to make sure everything was there and undamaged, which was the case.

Dinner was Thai vegan spring rolls in rice flour wrappers.  The prep work was in the cutting of lots of veggies (carrots, zucchini, onions, red and yellow peppers, Chinese cabbage, and mushrooms).  Mara made two dipping sauces, one with ginger, hot peppers, and other things and one based on fish sauce (so we passed on that).  Linda selected our bottle of Malvasia Bianco wine from the Heart of the Desert winery in Alamogordo, NM.  It was white, which we thought would go well with the delicate spring rolls, but very sweet with a slightly thick mouthfeel, like a late harvest Riesling or a Sauternes.  Perhaps not the best choice, but we finished the whole bottle anyway.

We chatted for a while after dinner but like most of our evening meals dinner was a drawn out affair with lots of conversation.  Everyone was tired and the women turned in for the night.  I went to my office and answered e-mails from Gary at BCM that I had seen earlier in the day.  I then went to bed and tried to catch up on blog posts for the last few days but could not stay awake long enough to finish them.

 

2015/05/28 (R) Ice Cold Internet

I was up until after 1 AM last night fussing with my computer but the OS was updated and was running better (I think) when I finally went to bed.  I need my beauty rest so I did not get up until 9 AM this morning.  Linda had already made coffee so I checked the temperature of the refrigerator (41.4 degrees F) and then got out the soy creamer.  41 is better than 45 but given where the thermostat was set the temperature in the fresh food compartment should have been 35 degrees or lower.  We had a very late breakfast of homemade granola and small glasses of orange juice to wash down our vitamins.

Because I did not get to upload any blog posts last night I switched up my routine and spent the morning working at my desk.  The weather was very nice so Linda went for a long walk.  My computer was back to normal and I managed to upload nine posts to my blog (May 10 through 18) by 1 PM.

I had an e-mail back from Ken Schramm yesterday letting me know that his “last day at Wayne RESA” gathering would get underway around 3:30 PM at Ashley’s Beer & a Grill at Westland Mall.  Brendan and Shawna’s celebration is from 5 to 8 PM in Ann Arbor so we will be able to attend both events although we might not make it to Ann Arbor until 6 PM.

Today was our friends’ 44th wedding anniversary.  Butch and Fonda were married the same year we were one day before us.  We did not know each other then but are now friends through our mutual passion for converted highway buses.

Brendan called and talked to Linda.  It turns out that tomorrow is grandparents/special friends Shabbat at Madeline’s daycare center and Brendan thought we might want to attend.  It starts at 10:30 AM and includes lunch.  The food at the daycare center is vegetarian but not vegan so we will see how that works out.  Brendan is going to take care of Linda’s plants so we will take these with us and go to his house when we are done at the daycare center.  I will pick up our electric pressure washer while we are there so I can wash the bus on Saturday.  We were going to buy cards today for Ken, Brendan, and Shawna but decided we would do that tomorrow on our way to Ken’s gathering.

Linda made large green salads with chickpeas for lunch.  We both put on a few pounds over the winter and really want/need to take them off.  After lunch I worked in the bus.  I removed the wood trim along the top of the beveled strip mirrors on the wall in hallway.  The strips were glued directly to the wall so I put the trim back on.  If we do not want to see these mirrors we will have to figure out some way to cover them.

There was a triangular horizontal panel between the upper edges of the J-lounge and the dinette with four switches mounted in it.  Two of those switches no longer control anything but the other two still do.  I secured the panel above the passenger side HVAC chase and blocked it in so it could not move.  I dressed all of the loose wires with cable ties and cable clamps and secured them to the floor.  I cut two grates from a piece of expanded metal and secured them over the two holes in the driver side HVAC chase where the sleeper-sofa was installed.  That sealed up the last of the holes that the cats might get into.  If one of them got into the HVAC system we would have disassemble half the bus to get them out.

I removed all of my tools and miscellaneous parts from the bus and set them on steps leading to the house.  I had put one of our folding chairs inside the bus to sit on and moved it to the location of the passenger chair as a safety barrier after I moved the trash can out yesterday.  I folded it up and put it back in the bay where it is stored.  While Linda vacuumed the inside of the coach with our Shop-Vac I put tools and parts in the garage or back into the appropriate tool boxes.  When she was done we got the Shop-Vac out of the bus and put it in the garage.

There is a maple grab handle on the right side of the entrance stairs (as you enter the bus) attached to a piece of maple trim from the back side.  The finish is worn and the handle is loose.  I wanted to tighten it, which required access to the back of the trim board.  Linda recalled that we had Creative Mobile Interiors (CMI) tighten this handle when we first got the coach so we figured there had to be a way to get to the back of the trim board.

We removed the cockpit HVAC access panel just below the trim board but it did not appear to provide access to the back of the trim board.  I removed the only two screws I could see (at the right end of the trim) but it still would not come loose.  I figured the trim board had to be screwed on somewhere else and the only possible place was under a piece of inset brass finish trim.  This brass trim is used throughout the bus, including around the edges of the Corian counters, and has an adhesive backing.  I have found screws under it in other places so I pried the end up and peeled it out, revealing three screws.

I thought I was on the verge of success until I removed the three screws but still could not get the trim board loose.  I tried prying it at various points with a screwdriver but it would not budge and we finally came to the unhappy conclusion that it was glued on.  Perhaps it is secured from underneath in some manner that we did not see but I will have to return to this when I have more time.  Linda suggested that we cut the handle off and install a new one that can be screwed on from the front.  She’s a clever girl.  As long as the access panel was off we vacuumed out the cockpit HVAC system and then replaced the panel.

About this time a UPS truck went by headed deeper into our neighborhood.  Since we live on a dead end street I knew the truck would be coming back so I waited for it and flagged down the driver.  I explained to the young man that we had two packages delivered to the wrong house in the same week about a month ago and that I had called the 800 number and talked to customer service but I would appreciate it if he would mention it to his colleagues as we will be ordering a lot of stuff starting in the second week of June.  He was very nice and said he would.

Our last bus task for today was the hard one.  We moved the passenger chair from the garage back to the bus using a hand truck so we did not have to carry it.  It is very heavy but with Linda guiding the top and me supporting the base we got it inside and set in position.  We tilted it fore and aft so I could slide the mounting studs into position and line them up with the holes in the base.  I then bolted it down to the support rails by tightening the four nuts.

This was all trickier than it sounds.  The bolts have square flanges that have to engage in the open slot of the channel to keep them from turning while being tightened or loosened.  But that required me to pull up on the studs as the nuts were not going on that easily.  As when I took the nuts off, I had to wedge one of them up with a screwdriver while I got the nut tight enough that the bolt would not spin.  I reconnected the power to the chair and we checked that all of the adjustments still worked, especially the footrest.

With the installation of the passenger seat we were done working on the bus until after GLAMARAMA and have two seats with seatbelts so we can tow the car rather than drive it separately.  This will be much nicer for us and the cats, although I expect the modified interior will freak them out initially.  We will be gone most of Friday but have Saturday to prepare food, reload the coach for the week, and wash the exterior.  Oh the joys of owning a converted coach.

For dinner Linda served the last of the whole wheat capellini with Portobello mushrooms and asparagus and steamed some broccoli.  A piece of whole wheat bread and a small glass of Leelanau Cellars Winter White wine completed the meal.  We had watermelon for dessert later.

I returned to my office after dinner and updated our Rand-McNally RVND 7710 GPS.  I then continued uploading blog posts.  By the time I quit working around 10 PM I had uploaded nine more posts and was caught up!  I think 18 posts in one day may be my all time record.  I did not get to work on articles for BCM, or copy files between our NAS units, but I was satisfied with what we had accomplished today.