Tag Archives: tree trimming

2015/11/02 (M) Driveway Joe

Linda was up at 5:45 AM and off to the bakery at 6:15.  I got up at 6:45 AM, got dressed, and went to the bus to turn on the block heater and Aqua-Hot engine pre-heat loop.  I then made coffee and had breakfast, after which I e-mailed Mike (W8XH) to let him know Joe would be here all day today.  I then reset the clocks in the two digital cameras.

Joe was at Chuck’s a little before 7 AM to change the engine oil and filter and figured it would take one hour.  I started the main engine in our bus at 7:45 AM to warm up the oil and make it easier to drain.  I let it run for 20 minutes on high idle, dropped it to low idle for a minute and shut it down.  The block will hold heat for quite a while.

Chuck texted me at 8:15 AM to let me know that Joe was on his way to our place and Joe called about five minutes later.  He was on our street but called because he wasn’t sure he was in the right place.  He pulled in to our first driveway entrance just before 9 and pulled his van up behind the bus.

I had dumped the air in the suspension yesterday when I put the coach up on stands so Joe had me start the engine and air up the suspension as a safety backup should one of the stands fail.  I raised it up off of all four stands and then set it back down but quit dumping the air as soon as it was on each stand.

The work for today was routine annual chassis and engine maintenance.  Joe needed to have diesel fuel on hand so I drove to the Shell station and bought four gallons.  While I was there I picked up a large coffee for him at the co-located Dunkin Donuts.

When I got back from my errand run Joe was already lubricating everything on the chassis and engine that had a grease fitting using the Mobil 1 synthetic grease I bought yesterday.  He was starting to generate messy trash so I fetched a large plastic trash bag.  He drained the engine oil, removed the old filter, filled the new filter with oil, and spun it on.  He then added six gallons of Chevron Delo 100 SAE 40 Heavy Duty Engine Oil that I bought on Saturday.  I added 2 to 3 more quarts from the reservoir to use up the oil that had been in there for a while.  I then refilled the reservoir as it is very handy for topping up the oil.

Joe removed and replaced both coolant filters while I fetched a bottle of Detroit Diesel PowerCool engine coolant.  He added coolant to the expansion reservoir while I watched the sight glass on the side of the tank and told him when to stop.  He then had me help him with the secondary fuel filter, which we pre-filled with diesel fuel.  Last, but not least, we replaced the filter element in the Racor fuel filter / water separator.  Joe installed the new filter element and gaskets and topped off the fuel in the housing before putting the cover back on.

I started the main engine and let it run for 30 seconds to circulate the oil, coolant, and fuel.  Joe added a little bit more oil to bring the level up to just over half way between the L and H marks on the dipstick.  This is where the engine likes to run and if I fill it to the H mark it will get rid of the extra oil on its own.

With the maintenance on the bus completed we transferred all of the old oil from the drain pan into the one gallon plastic jugs that had contained the new oil and put them back in the 3-jug cardboard boxes for convenient transport.  Our local O’Reilly’s Auto Parts store accepts waste oil and filters so I will take them there for disposal.  Although I had my own bus work to do I hung with Joe until he was done.  I stayed near the bus and trimmed trees when he did not me to assist with things.

Joe offered to come back next year to do our annual service and suggested that we take an extra day to replace as many grease fittings as possible either with better fittings or with small lines running back to one or more conveniently located manifolds.  The manifolds would have an input for grease and a valve for each line allowing most of the chassis and engine to be greased without getting under the bus.  I must say that I liked the sound of that.  It would be a nice upgrade to the bus and would make a good article for Bus Conversion Magazine.

I did NOT have Joe remove driver side front tire so I could get the splash guard off and inspect the area under the tray behind the driver’s seat.  I will have to deal with that on my own.  I also noticed that the fuel tank was down to 3/8ths so I will have to take the bus out and refuel it at some point and may have to turn off the Aqua-Hot and use the electric toe-kick heaters instead until I can refuel.

Keith called at 1 PM to let me know he would not make it out to mow the grass today.  He will be here tomorrow morning, probably for the last time this season.  Joe was packed up and on his way at 1:45 PM.  He was headed to Chicago where he has a house but has not been there in the last 18 months.

After Joe was done I went to Painter’s Supply and Equipment in Howell to buy POR-15 and the POR cleaner/degreaser.  POR is a brand but stands for “Paint Over Rust.”  It reacts chemically with rusted metal to stabilize the metal and prevent further rust.  I bought a can of spray on rubber material to put over it.  The POR-15 was pricey at $33 for a pint, but it is serious stuff and is used by the U. S. Navy.

My next stop was Lowe’s for a foam brush.  I picked up a 4-foot length of angle, four U-bolts, two pulleys, some miscellaneous nuts and bolts, and a 100 foot length of 3/8″ polypropylene rope, all of which was in preparation for ham radio projects tomorrow on the small tower.  After Lowe’s I stopped across the street at O’Reilly’s Auto Parts store to dispose of the oil and filters.  Their parking lot was being seal-coated and I could not get to the disposal bins so I will have to try again tomorrow.

By the time I got home it was 4:30 PM.  Rather than start working on the bus I did a little more trimming on the trees by the road in front of the house and then put the yard tools away.

For dinner Linda made a whole wheat linguini with mushrooms, onions, and sun-dried tomatoes lightly sautéed in EVOO.  We opened the bottle of Frey Natural Red organic/vegan wine.  It was very dry which made it difficult for me judge its other qualities as I do not care for dry wines or wines with noticeable tannins.  Still, it went well with the dish and I finished my glass.  I don’t think I will ever develop a taste, however, for dry wines and/or wines with a lot of tannins.

After dinner I worked on an article for Bus Conversion Magazine (BCM) about our experience on the Habitat for Humanity build we participated in back in July 2013.  The article has been done for a while but the publisher (Gary) had someone (Teresa) proofread it a couple of days ago and she found some minor things that I needed to correct.  Gary and I are also discussing whether to split the article into two parts and/or cut down a bit on the number of photos, which currently number about 60.  I took a break from 8 to 11 PM to watch television with Linda and then returned to working on the article before going to bed.

 

2015/10/27 (T) The Pilot’s Seat

My morning started at 8 AM in its usual fashion.  I fed the cats, made coffee, started a load of laundry, made/ate breakfast (orange/grapefruit juice and granola with fresh blueberries), drank my coffee in the living room with the fireplace on and Jasper at my side, day-dreamed about high quality used Sony alpha lenses, and finally got to work on the bus a little after 10 AM.  Rain is coming tonight and forecast to stick around into Thursday so today would be a good day to do some more trimming, felling, and cutting up of dead trees.  The temperature this morning was still in the 40’s, however, and there is still much to be done in the bus.

A few days ago I installed a new AC outlet on the forward side of the cabinet behind the driver’s seat.  I wired it into the outlet on the aft side of the cabinet and then discovered that the original outlet was cracked.  I had also used an oversized cover plate on the new outlet and it interfered with the Corian cabinet top.  I finally got around to replacing the cracked outlet this morning.  I also switched the cover plates.  The regular size one still interfered slightly with the Corian top so I cut 1/8″ off of the top edge and added strips of felt on the three edges of the cabinet to raise the Corian top slightly and cushion it.  Everything fit nicely.  I turned the circuit breaker on and checked for power.  The outlets were good to go and I checked this mini-project off my (mental) project list.

I took a break and called the Escapees RV Club to register Linda and me as staff for the July 2016 Escapade.  I then called Josh at Coach Supply Direct regarding extra brackets for our MCD shades/brackets, the wiring of the passenger seat switch, and the correct orientation of the swivel bearings.  I learned that the flange, which wraps around the other piece on the inside of the ring, goes down.  (I had puzzled out that it should go the other way so I am glad I asked.)  When I was done with my phone calls I had a quick lunch of Sabra Roasted Red Pepper Hummus and Snyder sourdough pretzel nibblers.

My next task was unbolting the driver seat pedestal base from the floor.  The pedestal is secured by four large carriage bolts that go through holes at the four corners of the base plate and thread into nuts that I presume are welded into the floor structure.  The base had to be removed in order to remove the old vinyl floor tile which was installed under the base.  To get the old tile out I also had to remove a plastic cover around the steering linkage and a floor mounted bracket that retained the bottom if it.  Last, but not least, I had to unscrew the accelerator bracket from the floor by removing three small lag screws.  The accelerator is electrical, with a cable that runs through the floor, but other than limited access it was easy to detach.

Removing the old vinyl tile from the driver’s area of the cockpit was relatively straightforward.  It’s somewhat flexible and wasn’t glued down that tightly.  When Creative Mobile Interiors installed the tile they laid it out in a way that allowed the pieces to be trimmed in reasonable ways to fit around the steering column and brake pedal.  The brake pedal is mechanically linked to a complex multi-port air valve in the compartment under the floor and any finished floor has to be installed around it.

The plywood under the driver’s seat area was depressed directly under the base.  It seemed unlikely that this was the result of the base being bolted down.  It may indicate that this area also got wet like the area under the passenger side seat base.  I plan to install SurePly underlayment on the floor under the passenger seat but not the under the driver’s seat so I will either have to replace this piece or use floor leveling compound to fill the depressed area.  Replacing the plywood is probably the correct, but more involved, solution.

I started thinking about installing the new tile so I laid out all of the old tiles on the floor in the garage, kind of like putting a simple jigsaw puzzle back together.  I plan to use them as a pattern to cut the new tiles.  With a clear view of the whole driver’s area I became intrigued by the lower sidewall counsel next to the driver’s seat.  The more I looked at it the clearer it became that Royale Coach had cut the top off of a bumped out area, removed the upper three inches of the wall of the bump out, replaced the top piece, and tried to fill in the three inch gap in the side wall.  They had also cut out an access plate and then screwed it back in.  It eventually became obvious to me that they had done this to create horizontal space for the wide Villa driver’s seat that was in the coach when we bought it.  Had Royale Coach left the ISRI seat in place these modifications would not have been needed.  They were originally hidden under carpet but once the carpet was removed the really poor quality of the workmanship in this area was all too apparent.

I probably should have applied adhesive remover to the stairs and walls around the cockpit but it has to sit for 1 to 3 hours and the timing wasn’t right.  The weather was still decent and I needed to finish working on the trees at the west end of our property.  The adhesive remover can be left on for up the 24 hours so applying it at 5 PM with the intent of removing it the next morning might be ideal.  The weather forecast for overnight, through tomorrow, and into Thursday, however, is for rain and colder temperatures, so they will not be good mornings for working with the door of the bus open.

Around 3:30 PM I had a banana nut muffin and then called Phil at Precision Grading.  I got his voice mail and left him a message.  I was getting ready to use the chainsaw to cut down a small dead tree at the west end of the property when Linda texted that she was leaving the bakery.  A few minutes later Chuck called.  He had some carpet remnants for us and was nearby so he came over.  He could not stay long but took the time to look at what I was working on in the bus before he left.  It would still be awhile before Linda got home so I took the chainsaw to the west end of the yard, cut down the tree, de-limbed it, and cut it up into manageable size pieces.  I then cut up another tree of similar size that has been on the ground for a while and cut up some of the larger branches that I trimmed off the trees yesterday.

Linda got home while I was finishing the tree work and started fixing squash and a lentil/quinoa pilaf for dinner, both of which would take some time.  After cleaning the saw and putting it away I took one of the carriage boots from the bus driver’s seat and went to Lowe’s to see if I could find slightly longer replacements.  The old ones were somewhat rusted and some of the threads were in less than ideal condition.  The new Armstrong vinyl tiles are also a bit thicker than the old ones and I wanted to make sure I had bolts that were long enough to completely thread into the retained nuts.  It turned out that the bolts are metric, specifically M12-1.75×80.  Lowe’s had Grade 8 M12-1.75×90 bolts (10 mm longer than the 80s) so I bought four.  I also bought some thick M12 fender washers that were larger than the old ones.  While I was there I picked up a role of red electrical tape.

Dinner was excellent.  The squash was baked without butter (vegan) or brown sugar but was very tasty.  The pilaf had onions, garlic, and mixed greens and was very good.  We finished the Witch’s Brew wine from Leelanau Cellars that Linda used to poach the pears on Saturday.  The squash did not look that big, but neither of us was able to finish our half so we saved it for tomorrow’s lunch.

I checked e-mail after dinner and then we settled in to watch our Tuesday night TV programs.  We caught the weather report at 11 PM and then turned off the television and lights.  I turned down the brightness on my iPad display and worked for another 30 minutes before going to sleep.  I did not hear back from Phil this evening but I already knew he would not be here on Wednesday if the rain came as forecast as he had another job to work on that was better suited to working in rainy conditions than ours.

 

2015/10/26 (M) More Tree Trimming

Linda was up early and off to the bakery.  I got up at 7:15, put on my robe, fed the cats, heated water for a cup of tea, and had a couple of vegan banana nut muffins.  I turned on the fireplace and worked on my iPad with Juniper curled up in my lap.  With Linda going to the bakery most days for the next few weeks this is how our days will start.

I have a lot of things to do, some of which require good weather.  Today looked to be just such a day so I wanted to take full advantage of it.  Keith called yesterday afternoon and we agreed that he would skip this week and mow the grass again on Monday, November 2nd.  That may be the final  cutting for this year and our hope is that most of the leaves will have fallen by then as Keith’s mower does a pretty good job of mulching them.

I left around 10 AM and went to the Tractor Supply Company store in Howell.  They sell Cub Cadet lawn tractors and someone recently suggested to me that they might carry parts specifically for CC machines.  They had a good selection of mower blades and drive belts but their fuel filters were generic and they did not sell starters, fuel pumps, or ignition coils.  I think the “Tractor Supply” name is a misnomer.  I bought a fuel filter but it turned out to be too big to fit in the clip that holds it on the side of the engine.

I got out one of our battery chargers, connected it to the battery on the lawn tractor, and let it sit for a while.  It has a 60A start boost setting and I tried using that to start the tractor.  It did not turn over fast enough but eventually gets a little fuel, putts, putts, putts for a few seconds, and stops.  There could be any number of things wrong such as any/all of: a gummed up carburetor, a bad fuel pump, or a bad starter motor.

My main focus today was trimming trees at the west end of the property.  Most (all) of them have branches that hang down low enough to bump your head when walking or knock you off a riding lawn mower if you are not paying attention.  Some of the branches were in Phil’s way the last time he was here and I said I would trim them before he returned as he will be placing and grading topsoil all through this area.  This will also make it possible for Keith to mow under these trees right up to the trunks, something he has not been able to do up to this point in time.

Except for a short break at 1 PM to have a quick lunch I worked until Linda texted me at 3:30 that she was leaving the bakery.  I was basically done at that point, finished picking up some small branches, and carried my tools back to the garage.  Linda got home at 4:30.  After catching up on our days she made a batch of granola.

I worked for a few minutes in the bus starting to loosen the last few pieces of old vinyl floor tile in the cockpit while Linda pulled dinner together.  We had the leftover dandelion greens risotto.  She used the rest of the greens in a sauté with onions, garlic hot pepper flakes, and a little EVOO.  We had an Asian Apple Pear for dessert; the first one of these either of us has ever had.  It was definitely a pear but a bit crisp, like an apple, and with some apple taste.  Monday night is TV night and we watched our usual shows before going to bed.

 

2015/10/19 (M) Flashless

Linda was up at 5:45 AM and out the door by 6:15.  I woke up but went back to sleep and finally got up at 7:30 and got dressed.  I turned on the furnace in the garage and turned up the thermostats in the bus and then had breakfast.  Rather than grind up a small quantity of coffee beans and get the coffee maker dirty I had a cup of tea.  I retrieved Butch’s e-mail and called Clyde in Canton to arrange pickup of the antique Sun distributor tester that Butch bought from him last night on Ebay.  I will drive down Friday to pick it up.

Phil showed up around 8:30 AM, unloaded his front loader, and got to work on the French drain.  I went out around 10 AM and talked to him briefly.  I then walked through the southwest corner of our property looking for a corner marker.  I did not find one but I did discover some REALLY big trees with REALLY BIG vines woven through them.  The base of the vines was as big as one of the trees, about 30″ in diameter.  I had never seen a vine root that size.

Back at the house I called John Palmer, of Palmer Energy Systems in Florida, to update him on my recent call to Magnum Energy technical support.  He said he would talk to Tom in the next couple of days and try to get me the connector (terminal block) I need.  We agreed I will call him back on Friday.

Next I called A-1 Upholstery in Elkhart, Indiana and talked to Terry.  I ordered a bolster cushion to fill in the space behind the sofa seat cushions and below the sofa back cushions.  It will be 6″ high x 4-3/4″ deep x 78″ long and will be one density of firm foam rather than a firm center layer with softer outer layers on top and bottom (like the seat cushions).  She will use a plain beige fabric as it will not be visible and so it does not have to match the other sofa cushions.  She said it would be ready in early November, which is plenty of time for us to drive down and get it.  The price was $125, which sounded like a fair price to me.

I got out my old Sunpak DX-8R ring flash and connected it to one of my Quantum high voltage battery packs but the battery pack appeared to be dead.  The two battery packs I have are almost unused but have apparently self-discharged and are now dead.  This also happened to my original battery packs.  The only flash equipment I have is set up to run off these packs but I am not inclined to replace them again as I do not use them enough to keep them charged which makes it hard to justify the cost as they are expensive.  Unfortunately that leaves me, for the moment, without any flash capability for the new Sony SLT-A99V DSLT camera.  Buggers.

I sent a TXT message to Joe to let him know that I did not see any indication of axle/hub seal leaks on the inside of the bus wheels.  I then called Bill in Mexico, Indiana and left him a message regarding the antique Sun distributor tester.  I will drive it at least as far as Elkhart, Indiana when I pick up the bolster from A-1 Upholstery and transfer it to Bill if he can meet me there.  There is also the possibility that I will drive it all the way to Bill’s place in Mexico, Indiana and stop by Jarel Beatty’s cabinetry shop in Logansport to have him cut down the connector on the passenger side HVAC duct cover.  If I do I will also pick up the drawings for the desk, sofa, and pull-out pantry as long as I am there.

Phil checks the grade of the new driveway extension.  The laser level is set up by the utility pole.

Phil checks the grade of the new driveway extension. The laser level is set up by the utility pole.

I went back outside and walked through the layout of the driveway extension with Phil.  He then set up his laser level, took elevation measurements at various points, and made an annotated sketch.  He needed to think about the data and figure out what we could actually do given the change in grade from the existing concrete driveway to the road at the third culvert and the need to flatten out before reaching the culvert to tie in with where the barn will (might) eventually go.

Keith, from Kish Lawn Care, showed up around 11 AM to mow the grass.  I got out our leaf blower and let Phil know that I would be occupied for a little while with yard work.  I blew the leaves off of the rear decks, out from under/around various bushes, and off of the two boulder retaining walls into the yard where Keith could mulch them with his riding lawn mower.

About the time I was done blowing leaves Phil had a plan to discuss.  The elevation drops 7-1/2 feet from the concrete driveway (that goes from the street to the garage) to the street at the third culvert some 200 feet away.  Phil thought that our best bet was to slope down from the driveway over a distance of 40 feet, level out for 40 feet, and then gently slope down for 70 feet to the area in front of the future barn location.  That would leave another 50 feet with a slight drop to get to the street.  Some of the area down there will be close to level, however, so another RV could park down there.

We also discussed running power and agreed that I would buy about 40 feet of plastic conduit to get under the level area and headed towards the southwest corner of the garage.  We would need the conduit first thing tomorrow morning so I decided I would go to Lowe’s this evening.

I finally got to work in the bus around 1:30 PM.  I positioned the sofa seat, secured the piano hinge to the stationary backboard with four screws and then drilled all of the other screw holes using my smallest VIX bit.  I installed all of the little screws, dialed back the thermostats, and closed up the bus.  My time-on-task was short but it was a big item to check off of my “list.”

The Sunpak DX-8R ring flash can operate on four AA batteries so I put a set in and connected it to the hot shoe on top of the camera.  The camera was able to trigger the flash (more than once) but the shots were seriously overexposed.  I did not take the time to try and figure out if the flash can be controlled by the camera based on light coming through the lens.  If not it won’t be usable in most situations.

It was a mild day with blue skies and white puffy clouds so I took the new camera outside to capture some images of the work Phil is doing.  I shot a few frames of the more colorful trees in our yard while I was at it.

Linda texted me at 3:40 PM to let me know she was leaving the bakery and stopping at the store on the way home.  Phil continued to find rock, concrete, and brick debris as he dug out the driveway extension.  He used the 30″ toothed bucket on his excavator to sift out the larger pieces and pull them into a pile and then used his front loader to put all of it into his dump truck.  I got a metal tine rake and raked out some of the smaller stuff, not because it needed to be removed but because I needed to do something physical and wanted to smooth it out to get a better idea of how it will look when finished.

Phil started securing his equipment at 5 PM and we were wrapping up our last discussion of the project for the day when Linda got home at 5:30.  After unloading a few groceries she started fixing dinner.  Phil took off and I continued raking for another half hour until dinner was ready.  Linda served the rest of the polenta with puttanesca sauce and steamed sliced parsnips.  I thought we finished the Cupcake Black Forest wine last night but I was pleasantly surprised to find out that we still had enough for our meal this evening.

After dinner I went to The Home Depot looking for a fuel filter for our Cub Cadet lawn tractor.  THD sells Cub Cadet equipment but only had generic fuel filters so I did not buy one.  I went to Lowe’s, where we get a 5% discount on everything we buy! and bought the following:  four 10-foot pieces of 2″ PVC non-conductive conduit, a 90 degree elbow, a coupler, two end caps, 1″ and 1-1/4″ self-drilling screws, an 8′ long pressure treated 4×4′, and a clamp on saw guide.  The saw guide was an impulse purchase but I had a $10 Off card for a total purchase of $50 of more.  We have struggled with makeshift saw guides all summer and fall and I still have more careful cutting to do.  I already have a saw guide but could not find it and should have bought a new one at the beginning of the bus remodeling project.

Phil called the house while I was out so I called him back.  He had figured out that extending the driveway to within 10 feet of the front of the proposed bus barn would add 25% to the cost of the project.  That was more than I was prepared to spend at this time so we will defer that work until we build the barn, probably in summer 2017.  We watched Scorpion and NCIS Los Angeles and then went to bed.

 

2015-10-18 (N) Homage to FLLW  

We got up at 8 AM.  I made Ethiopian Yirgacheffe half-caffe coffee while Linda prepared vegan pancakes.  We had talked yesterday about going to the Howell Farmers Market this morning but did not feel like going out in the early morning chill.  When we finished our coffee I turned the fireplace off and we got dressed to work.

Our focus in the bus today continued to be the built-in sofa.  We decided yesterday to move the plywood seat out from the wall 4-3/4″ from its original position.  The original stationary board on the back side of the piano hinge, which was only 2-3/4″ wide, was designed to place the front edge of the plywood seat (which has a 3/4″ walnut hardwood edge) 3/4″ beyond the cabinetry on both ends of the sofa with an overhang of just a few inches beyond the vertical front support board.  It was a nice design which tied in well with the cabinetry and kept the sofa from intruding into the living room aisle.  It resulted, however, in a seating depth of 16″ which turned out to be too short.  It was my homage to Frank Lloyd Wright: integrated, attractive, cantilevered, and uncomfortable.

As much as I like and admire FLLW’s work, I also like the Bauhaus maxim “form follows function.”  We needed a 3/4″ thick (11/16″ actually) board 7-1/2″ wide by 77-7/8″ long to locate the plywood seat in its new position.  The only wood we had on hand that we could cut this from in one piece was a 24″ X 96″ piece of walnut veneered plywood.  Since the board will not be visible I did not want to waste the walnut veneered plywood for this piece.

We also had a half sheet (4′ X 4′) of good plywood and after thinking about it for a while I decided to make the stationary board in two pieces.  The key was that I would use a third piece, cut from that same 4′ X 4′ sheet, as a splicing plate to join the other two pieces together.  But I was trying to accomplish more than that.  With the original design the pivot line of the piano hinge was over the top of the wiring chase, about 1-3/4″ back from the front edge.  That meant the back edge of the moveable seat board, when closed, was resting on the wiring chase for its entire length.  With the new stationary board the pivot line of the piano hinge is unsupported except for 5-3/4″ on each end.  The third piece of plywood would be at least a partial solution to that problem.

We worked in the garage with the overhead doors closed and the furnace on.  I cut two 7-1/2″ wide pieces off of the 4′ X 4′ sheet of plywood and then cut them to lengths of 38-7/8″ each so they would be just shy of 77-7/8″ when butted together end-to-end.  We took the two pieces to the bus and set them in place on top of the writing chase which sits atop the HVAC duct.  They just fit, which was nice.  I marked the underside along the edge of the wiring chase with a pencil.   We then took the pieces back to the shop.

I found a relatively flat portion of the garage floor and laid the two pieces end-to-end face down.  I set the third piece on top of the first two so that it was of equal length in both directions from the center and was at least 1/4″ forward from the line I had marked.  This third board extended beyond the front edge of the other two boards by at least two inches along its entire length of four feet.  With Linda holding it in place I inserted four self-drilling wood screws, two for each of the main boards, to hold the three pieces in position.

We placed the old 2-3/4″ wide board along the edge of the new boards and marked the locations of all of screw holes for the piano hinge.  I then center punched and drilled countersunk holes for lots of screws being careful to keep them in between the hinge holes.  I ran all of the screws in until the points just protruded from the other side.  I then applied Titebond II wood glue to the two main boards, positioned the third board using the screw tips as alignment guides, and ran all of the screws down pulling the pieces tightly together.  Linda got a paper shop towel wet and I used it to clean off the excess glue that oozed out from between the boards.

We took the new stationary backboard to the bus and set it in place upside down.  I marked the underside along the edge of wiring chase and then we flipped it end-for-end and set it in place right side up.  We pulled it forward so I could mark the locations of the existing screws securing the top of the wiring chase to the two long sides and then slid it back against the wall.  The line served as my guide for where to screw the backboard to the wiring chase.  (The chase has two long “1×2″ sides on edge with a 3/8″ thick plywood top that is about 4-1/2″ wide.  For maximum strength I needed to screw through the backboard into the 1x2s.  I also needed to avoid the space between the 1x2s as that is where all of the AC wiring is run.)

I center tapped a lot of locations and drilled them with a #6 countersink bit even though I was using #8 self-drilling outdoor screws.  The reason for the drilling step was to make sure I did not split any wood.  I screwed the backboard to the wiring chase with lots of 1-1/4″ #8 screws in two rows corresponding to the front and back side boards of the wiring chase.

The backboard pieces had oozed a small amount of additional glue so I used a piece of scrap aluminum sheet metal to scrap it out of the joint.  When the plywood seat is closed the back couple of inches will rest on the third piece of plywood so there cannot be any interference along there.  We set the moveable seat board in place and marked all of the hinge holes on the stationary backboard and then pulled it out gain.  We did not, however, attach the piano hinge to the stationary backboard as I wanted to let the glue cure for at least 24 hours.

By this point it was 1 PM so we stopped to have lunch which consisted of vegan hotdogs with mustard, onions, and relish and both red and green grapes.  We got these grapes at Meijer’s and their produce is usually good, but the green grapes had almost no taste.  Oh well; there will be days (and foods) like that.

After lunch we shifted our attention to the driveway extension project.  I gathered up a box of plastic and wood stakes, a mallet, a 100 foot tape measure, and the site plan for the bus barn and driveway.  It took us about three hours to stake out the location of the pull-through driveway, locate the front corners of the bus barn, and stake out the approach/apron for the barn.  Phil will be back early tomorrow morning and the first thing on the agenda is going over the layout and figuring out elevations for the two planned level pad areas.

At this point Linda went inside to work on dinner while I cleared the margin of the woods along the south side of the driveway extension.  I added bar/chain oil and a 40:1 fuel:oil mixture to the chain saw and got out the compound loppers, pruning saw, pole saw, and safety glasses.  I initially used the loppers to cut down small saplings, cut off small branches, and trim back bushes and vines.  I used the chain saw to cut down slightly larger trees, up to 3” in diameter at the base, and finish cutting out three bushes and some entwined vines.  I then used the pole saw to trim low overhanging branches.  I dragged all of the cuttings to a spot on the west side of the fir trees and used the chain saw to cut the larger trees into smaller pieces.

It was 6:30 PM by the time I was done and had the tools put away.  Dinner was almost ready when I got a call from Butch.  He was following up on how our refrigerator was performing and also needed my assistance with a possible Ebay purchase.  The item he was interested in was in Canton, Michigan about 45 minutes from our house, and the seller was not willing to ship it.  He wanted to know if it would fit in our Honda Element and if so, would I be willing to pick it up if he decided to buy it.  Of course I was willing to help as long as my car was able to handle the item.  While he was on the phone I measured the clearance for the rear hatch and gave him the dimensions.  As soon as we got off the phone he e-mailed me the link to the auction, which still had 85 minutes remaining.

For dinner Linda started with a really nice salad that had slivered almonds and pumpkin seeds and dressed it with Ken’s Sweet Vidalia Onion dressing.  The main course was an amazing soup.  She roasted a golden acorn squash, sweet potatoes, carrots, garlic, and shallots.  She then put these in a pot, added vegetable broth, and heated the mixture.  To finish the dish she used an immersion blender to purée everything into a smooth, thick, hearty, and delicious soup.  After working outside all afternoon on a chilly day it really hit the spot.  We finished the bottle of Cupcake Black Forest red wine we opened yesterday.

After dinner I retrieved Butch’s e-mail, checked out the item, and e-mailed him back.  I then spent a little time reading and replying to posts in various RVillage groups.  I called Butch back just before 8 PM and then turned on the Yaesu FTM-400 to join the SLAARC Info Net at 8 PM.  Unfortunately all I heard was noise.  I have not used the radio for the last few weeks so I don’t know if the net did not take place (unlikely but possible) or if a problem has developed with our system.  If the later, it is most likely the Morgan I.C.E. lightning arrestor (again).  Whatever the reason, I was not going to figure it out this evening.  I went to bed at 9 PM and wrote this post.  It took some time to write but if I do not record the details the same day they slip away quickly.

 

2015/10/16 (F) Desk Installation

We were up at 8 AM, fed the cats, made coffee, and had breakfast.  Phil showed up around 8:30 AM, unloaded his front loader, dropped his flatbed trailer, and left in his dump truck.  I turned on the fireplace and we enjoyed our coffee while iPading until 10:15 AM.

Our first task today was to cut up several large limbs that I pulled out of the woods last evening to get them out of Phil’s way.  I cut them up with the chain saw and then we stacked them on the disposal pile for Phil to haul away.

Phil returned at 10:30 and moved his Caterpillar 305C excavator into the woods across the street by the culvert.  I went down to chat with him briefly to make sure I understood what he was going to work on.  There were a lot of small trees (3″ diameter), saplings, and bushes scattered around the site.  Some of them had been dead for years and some had just been knocked over by Phil.  I decided to work in that area with my chain saw cutting everything up into five foot lengths so Phil could use his front loader to get them into his dump truck.  I worked at this until 11:30 AM and then turned my attention to the bus.  Linda worked on her needlepoint while I cut wood.

Before getting started on construction tasks I took two pieces of filter material and set them on the wire shelf in the freezer compartment of the new refrigerator, one on top of the other.  I then set the two remote thermometer sensors on the filter material.  Butch had suggested the other night that I set the sensor on a sponge to get it off of the floor of the freezer compartment as it was likely responding to the automatic defroster heat strips when they come on.  I figured the filter material would work just as well and that placing the sensors on the shelf would definitely get them away from the floor.

Linda brought out a bag of ice from the house fridge and put it in the bus freezer.  She also filled several 1/2 gallon juice and milk cartons with water, put the caps on, and put them in the fresh food compartment.  The purpose of all of this was to add thermal mass to the compartments to cause the refrigerator to run less often and reduce large swings in temperature.

Inside the bus our first sub-project was installing the desk, which included putting the front passenger side HVAC duct cover in place even though it is not finished.  It took us quite a while to get everything positioned just right.  With Linda holding things in position I screwed the right pedestal to the wall, adjusted the position of the base and screwed the pedestal to the base.  We then repeated that process for the left pedestal and base.

Linda removes the backing from the double-sided tape on the back side of the air grate in the center connector/cover for the desk.

Linda removes the backing from the double-sided tape on the back side of the air grate in the center connector/cover for the desk.

At this point we had several things to do with, and under, the center connector/cover so I removed it and took it into the garage/shop.  We cut a piece of the decorative brass colored metal grate and secured it to the back of the air opening with small screws every few inches.  Next we cut a piece of black plastic mesh to fit over the grate.  We then cut pieces of 3M Extreme Mounting Tape (double-sided) and attached them to the back side of the grate in between the screws.  Linda peeled off the protective layer and we carefully placed the plastic mesh.  Using one of the scrap pieces of the protective layer I rolled the plastic into the take with our wallpaper seam roller.  Finally, we had a piece of filter material already cut to cover this air intake opening so we set that on top of the mesh, pressed it down to take advantage of the tape, and then secured it with Gorilla Tape on all four edges, rolling it with the seam roller to get good bonding.

A detailed view of one of the homebrewed tongue and groove alignment assemblies made from flat mending plates.

A detailed view of one of the homebrewed tongue and groove alignment assemblies made from flat mending plates.

Back in the coach I had to tie in the outlet strip to the 120VAC power feed.  I shut off the breaker for this circuit and checked with my tester to make sure it was not live.  The hot and neutral wires were accessible but the ground wires were back under the left pedestal where they were not easy to reach and manipulate.  It took a while, certainly longer than it should have, but I got the three ground wires tied together with a grounding clamp.  I connected the hot and neutral wires (three each) relatively easily using wire nuts.  I turned the circuit breaker back on and checked that the outlet strip had power between the correct terminals and did have power between any other terminal pairs.

I went to the garage to get a four foot long piece of 1″X1″ aluminum angle that I bought weeks ago to use as a support bracket for the upper rear edge of the center connector/cover.  I was going to cut off a 26″ long piece and then drill countersunk holes but I noticed a piece of 1/2″X1/2″ light gage angle that was about 26″ long and already had holes in it.  It was long enough to span the space between the pedestals and go under each one about an inch.  That was sufficient to position it correctly so Linda held it there while I secured it to the wall with four round (pan) head screws.  I then put the center connector/cover back in place.

Phil has cleared all of the organic debris from the area where the driveway extension and RV pad will be located.

Phil has cleared all of the organic debris from the area where the driveway extension and RV pad will be located.

Phil starts trenching and placing the plastic drain tile tubing for the French drain.

Phil starts trenching and placing the plastic drain tile tubing for the French drain.

 

 

 

 

 

 

 

 

 

 

 

Phil had long since left in his truck to dump all of the wood debris.  We had a light lunch of Amy’s Lentil Vegetable soup and fresh organic grapes.  While we were eating a group of three deer came to our back yard and eventually ended up eating apples that had fallen from our tree onto the ground.  These same deer, along with two others, were here yesterday at twilight and were very frisky.  We saw them later in our neighbor’s yard across the street.

Another view of Phil’s smaller excavator with the 12” bucket being used to trench the French drain in the southwest portion of our property.

Another view of Phil’s smaller excavator with the 12” bucket being used to trench the French drain in the southwest portion of our property.

Phil returned around 3 PM and started working on the French drain.  He replaced the 30″ wide toothed bucket with the 12″ one and started at the high end if the culvert on this side of the road.

The grand finale was the installation of the Corian desktop, which has been sitting on a blanket in the middle of the living area floor since Tuesday.  I drilled countersunk holes through the four corner plates in each desk pedestal from underneath.  I then inserted 1-1/4″ #8 self-drilling outdoor wood screws into each hole, again from underneath, until they just protruded above the corner blocks and then backed them off until the tips were just below the surface.  We set the desktop across the pedestals and pushed it as tight to the back and right end wall as we could.  Linda put her weight on it and I ran the screws home, pulling the top tight to the pedestals.  We reinstalled the four drawers in the right pedestal, finally getting them off the floor in the hallway where they have been since Tuesday.  We stepped back to admire the desk and agreed it was a thing of beauty and a joy to behold.  Linda also marveled, once again, at how much space she now has to work in the kitchen.

A wider shot showing the excavator and drain tile.  The laser level is at the left edge of the frame.  The main arm of the excavator (with the bucket attached) has a laser sensor on it that tells Phil exactly where the lower edge of the bucket is relative to the laser level.

A wider shot showing the excavator and drain tile. The laser level is at the left edge of the frame. The main arm of the excavator (with the bucket attached) has a laser sensor on it that tells Phil exactly where the lower edge of the bucket is relative to the laser level.

The “denouement” was mounting the outlet strip and adding felt pads to the two fake drawer fronts on the left pedestal and then adjusting the magnetic catches.  I originally had the outlet strip (temporarily) mounted to the wall between the two pedestals with two screws a few inches below the cord notch in the center of the back edge of the desktop.  Rather than put it back there I decided to mount it on the underside of the desktop just in front of the cord notch.

The underside location will work just as well as the wall mount location for regular 2- and 3-prong plugs but probably not as well for small AC adapters.  The added pluses of this location, however, are: 1) it will not interfere with cords coming through the notch, 2) it will be up out of the way of the UPS (uninterruptible power supply) that will sit on the shelf at the top of the center connector/cover, and 3) if liquids are accidentally spilled and run over through the notch they will not run into the outlet strip.  Besides, devices with an AC adapter will probably be plugged into the UPS so this was a better overall approach.

Our next task was to adjust the sofa seat until it was deep enough to be comfortable.  We slide the plywood seat out a couple of inches and then got the seat and back cushions (three each) from the house where they have been stored since September 21st.  We put the cushions in place and sat down.  We pulled the cushions out and pulled the seat board out until it was five inches farther out than originally designed and put the cushions back in.

The front edge of the seat cushions were out farther than I liked but we both agreed the sofa was now comfortable to sit on.  The distance from the bottom front edge of the back cushions to the front edge of the seat cushions was originally only 16 inches and that turned out to just be too short.  With the seat board moved out it will now be 21 inches.

In order for the sofa to work correctly, both as a sofa and as a bed, we will need a cushion that is 5″ wide by 6″ high, by ~76″ long to fill in the space behind the seat cushions and below the back cushions.  The height and foam makeup will be such that it is level with the tops of the seat cushions and have the same firmness and feel.  Would that I had designed the sofa for this depth to begin with and had the seat cushions made accordingly, but we were trying to open up the living room by not having the sofa protrude into the aisle any more than absolutely necessary.

Next up was reinstalling the wood trim in hallway.  We have an interesting plan for the lower half of the hallway but in case we do not get it finished before we leave for the winter we wanted the trim off the bed and back on the wall.

The lower outside hallway wall.  There were originally three framed panels of vertical strip mirrors here.  We will replace them with wood panels, probably in a lighter color to contrast with the walnut trim.

The lower outside hallway wall. There were originally three framed panels of vertical strip mirrors here. We will replace them with wood panels, probably in a lighter color to contrast with the walnut trim.

This trim originally framed three panels of vertical strip mirrors.  We were able to remove the mirrors as they were glued to wallpaper.  In the process we discovered that the left and right panels were the same width but the center panel was wider.  The trim consisted of six pieces of wood; a long upper and lower horizontal piece and four vertical pieces.  The six pieces were screwed to the lower half of the outer wall but not attached to each other.  The left and right vertical pieces were tight to adjacent woodwork, but the two intermediate pieces were free to be repositioned.

We reattached the upper horizontal piece first making sure the mounting screws went back in the same holes.  Next we pushed the lower horizontal piece into place but did not screw it to the wall.  We then attached the left and right verticals.  The horizontal distance between the inside edges of the left and right verticals was 75 inches.  The two intermediate verticals were each 4-1/2″ wide so the distance between verticals needed to be 22″ (75 minus 9 = 66 divided by 3 = 22).  We carefully positioned and secured the two intermediate verticals to achieve this spacing.

The trim boards all have rabbited edges on the back side.  I need to measure them carefully, but they are ~3/16″ deep by 3/8″ wide.  Our current plan is to use 3/16″ underlayment or other 3/16″ high quality plywood to make three panels that will fit within these rabbits with a little room to spare.  The panels will either have a hardwood face or we will cover them with a hardwood veneer of a wood that contrasts with the walnut trim.  We can get the veneer from Rockler once we decide what we want.

Linda spread out several towels on the new desktop and we moved tools and supplies from the A-V cabinet, behind the driver’s seat, to the new desk.  I then removed the Corian top of the A-V cabinet and put in on the bed.  We still have a small amount of wallpaper to install in the front of the living room and into the cockpit on the driver side, but it will not be easy to do.

These areas, such as the one behind the A-V cabinet, are small with limited access so most of my sanders cannot be used.  The only one that might work is the Porter-Cable oscillating tool but I did not get it out today.  I got some sanding sponges instead and tried those on the wall under the passenger side window trim next to the co-pilot seat.  When I sanded a dark area about 6″ long by 3″ wide the wood in the center crumbled and I ended up with a hole 3″ long by an inch and a half wide.  I could see one of the stainless steel structural members through the hole.  Given what was obviously water damage I was glad we bought a bus with welded stainless steel as the main structural material.

Based on what I could see, the walls in the bus appear to be 1/2″ plywood although I did not measure the thickness.  This area had obviously gotten very wet over a long period of time and some of the wood has rotted.  It is the only spot we have discovered that is this damaged and we immediately realized that we will not be able to wallpaper this area.  We will probably panel over it, similar to what we plan to do with the veneered panels in the hallway, but today was not the day to figure that out.

It was going on 5 PM and we decided we were done for the day.  I turned off all of the electric heaters, turned on the Aqua-Hot, turned on all three thermostats, and set the temperature to 20 degrees C.  The refrigerator was also indicating much colder freezer temperatures than it had been before I moved/isolated the remote sensors so I reset the freezer and fresh food controls to their “normal” center positions.  Tomorrow we will replace the alkaline batteries with the Lithium batteries we bought specifically for the TempMinder thermometer system, reset the min/max data, and monitor it for a few days.

I walked down to see what Phil was doing.  He was making good progress with the French drain but did not have enough of the plastic drain tile to finish it today.  He plans to work tomorrow and will have the additional tile he needs to finish the drain.  I left him to his work and took photos of the fall colors in our yard as I worked my way back to the house.

I spent an hour at my computer dealing with e-mail and transferring photos from the Sony a100 to my laptop.  Linda called me to dinner at 7 PM.  It was a simple meal of vegan Coney dogs with mustard, onion, and beans served open-faced on a whole wheat hotdog bun.  As a side dish Linda steamed Opo squash.  It was the first time either of us had this particular squash.  It was very mild with a hint of cucumber.  It is available all over the world and widely consumed as it is relatively inexpensive.  It was OK, but I thought it might work better as an ingredient rather than a stand-alone side dish.

I exchanged a couple of text messages with Chuck and confirmed that we would be at his shop tomorrow after breakfast to retrieve our two bus windshields.  The rest of the evening was spent in the living room by the fireplace reading and writing on our iPads before turning in and watching episodes of Rick Steeves’ Europe and Joseph Rezendo’s Travelscope on Detroit PBS (WTVS).

 

2015/10/11 (N) Now Heat This

I guess we were tired after having Madeline at our house for 23 hours.  We slept in until after 8 AM and it was going on 9 by the time the coffee was brewed and we sat down to breakfast.  I really needed to attend to some paperwork for our FMCA Freethinkers chapter but was also eager to get deeper into the manual for the new Sony a99v camera.  I installed the PDF manual onto my laptop yesterday from the CD-ROM that came with the camera and then e-mailed it go my iPad2 so I could read it conveniently.

HL – Jasper, our mackerel tabby male cat, allows himself to be photographed on the living room floor.  You wouldn’t know it from this photo, but he is actually a very sweet animal ad a real joy to have in our household.

Jasper, our mackerel tabby male cat, allows himself to be photographed on the living room floor. You wouldn’t know it from this photo, but he is actually a very sweet animal ad a real joy to have in our household.

Other than the time, date, and date format I have not adjusted any of the default settings or experimented with the camera’s many functions.  I have taken a few photos just to make sure it works but I do not want to start generating a lot of image files until I have made decisions about basic things like folder naming conventions and “normal” shooting modes and settings.  I did, however, enable a “rule of thirds” grid on the viewfinder screen.

Linda worked on our personal accounting and then prepared the treasurer’s report for our amateur radio club meeting this evening.  I took a break from reading the camera manual to research the availability of some accessories on the B&H Photo website.

The electric cable release for my old Minolta 9000 SLR film cameras works with the a100 so it may work with the a99v too.  If not, newer remotes are available, including wireless ones that are not too expensive.  I found the angle finder but it is discontinued.  With the adjustable LCD screen in the back of the camera the angle finder isn’t really necessary but would have been a nice accessory just the same.  I am also looking for a case and/or a photographer’s vest and/or a chest harness/holder.  The a99v with the vertical grip and a telephoto lens is a substantial piece of equipment, both in size and weight, and the chest harness/holder would support that weight more comfortably and securely than a neck strap.  I found several interesting things but not exactly what I had in mind.

By the time Linda finished her accounting tasks I was dressed to work.  First up was the hydronic heating system in our bus.  I got four pieces of 2×4, each about four feet long, and two pieces of 2×12 about 16″ long.  I put a pair of 2x4s under each desk base and inserted one of the 2x12s between the 2x4s and the base.  That raised each base three inches which was enough to ensure that the heater hoses attached to the lower fitting on each heat exchanger sloped slightly downward back towards the main unit.

The hose that connects the two heat exchangers together in series is attached to the top fitting on each one.  Half way between the exchangers is a T with the bull branch pointing up.  A ball valve with a waste port is attached to the branch.  While Linda held the valve higher than anything else in the system I opened the valve and used a small funnel to slowly pour in antifreeze.  When the lines and exchangers appeared to be full I closed the valve, turned on the thermostat for that loop, and turned it up to cause the circulating pump to come on.  I let the pump run for a few minutes and then turned it off.  Again with Linda elevating the valve I opened it and added a little more antifreeze.  I ran the pump again for a few minutes and shut it off.  This time the coolant was still right at the valve so I shut it and Linda set it down.

It was now time for “the big test.”  In order to be able to see if there were any leaks, and catch any coolant if there were, we put heavy duty paper shop towels under all six of the clamped connections where the heater hose went over 3/4″ copper as well as under the soldered joints of the T and valve.  I opened the water bay on the passenger side, where the Aqua-Hot is installed, checked the coolant level in the expansion tank, and made sure the paper cup was positioned under the overflow tube.  The level of coolant in the expansion tank was just above Minimum Cold.  With everything in order I turned on the Aqua-Hot burner and then turned the front zone thermostat back on.  I also turned on the thermostats for the bathroom and bedroom zones to cause coolant to circulate through those loops.

There are quite a few gallons of antifreeze in the hydronic heating system and even on a mild day such as today (temperature just above 70 degrees F) it takes a while to heat it up to the 170 degrees required to shut off the diesel burner.  I kept checking the hoses by the fill valve and the expansion tank.  When the hoses were warm and the level of the coolant had risen 1/2″ in the expansion tank I cracked open the waste port on the fill valve.  I got a tiny, short hiss and then coolant came out so I quickly closed it.  It appeared that our method for filling the system and bleeding the air out had worked as intended, and there was no evidence of any leaks.

I left the Aqua-Hot on until it shut off on its own.  The expansion tank was near full at this point and I topped it up.  As the system cools down the coolant will contract in volume and some of the coolant in the expansion tank will be drawn back into the main chamber.  It’s important that there is more coolant in the expansion tank than the amount that will be drawn in or air will get drawn in instead.  I buttoned up the coach and turned to my next task.

I removed the chain from the new Poulan Pro 18” chain saw since I completely dulled it trying to cut through a tree root.  As long as the cover, chain, and bar were off I cleaned up the motor unit as best I could.  Oil impregnated sawdust is tenacious stuff.  I put the new chain on the bar and attached them to the motor, making sure the chain was oriented correctly.  I topped up the bar and chain oil reservoir and topped off the fuel tank.

It took several trips to get the 7′ step ladder, pole saw, compound lopping shears, hand tree saw, and chain saw back to the apple tree.  I noticed yesterday that one of the main branches coming off the trunk about 3′ above the ground was dead.  The bark was missing and the smaller limbs were brittle.  The bark looked like it might have been chewed away by deer but I wasn’t sure.  All I knew is that it was dead.

I started with the pole saw and worked from the ladder to cut off the limbs that extended far up into the tree.  Once I had those detached and pulled out of the tree I started the chainsaw and used it to cut off the larger branches as I worked my way down towards the main trunk.  I gathered all of the smaller material into a pile and then gathered the larger pieces together.  I used the largest piece as a sawbuck to support the other pieces as I de-limbed them and cut them into four foot lengths.  I then cut up a large pine tree limb that has been sitting on the ground under the apple tree for quite a while.  I used the pole saw and loppers to trim off a few other small branches and the carried all of the tools back to the garage.  It was 3 PM by the time I got everything put away.  I was done with physical work for the day so I got a much needed shower and got dressed appropriately for our meeting later.

The apple tree is still in need of serious pruning if it us to survive and bear useful fruit.  It particular it needs to be “topped.”  It is too tall overall, especially in the center, and much of the fruit is growing up there where the sunlight is good but it cannot be reached either by us or by the deer.  We have been putting deadwood in the firepit all summer and, more recently, on the disposal pile, where it goes mostly depending on what part of the yard the tree was in when it fell or got cut down.  In the case of the apple tree it occurred to me that Applewood is prized for the smoke it produces when grilling so I may stack it up, let it continue to dry, and perhaps rent a chipper next year to turn it into something useful.

We had breakfast later than usual, and skipped lunch, so we ate dinner at 4:30 PM, which was earlier than usual.  Dinner was lentil loaf, baked potato, and steamed broccoli, a simple but healthy and tasty meal.

On Friday I exchanged a few text messages with Josh at Coach Supply Direct regarding our desktop and table.  The net result was that his schedule had changed and he was not going to be able to get our desktop and table from Countertops Plus in Shipshewana, Indiana and deliver them to us for over a week, at the earliest.  He had also planned to bring some extra clips for our MCD shades and look at the wiring on the front passenger seat 6-way power base.  Those last two items were not critical but we are ready to install the desk once we have the desktop and cannot afford to wait another week and a half to get it.  I called and left a message for Ferman Miller to let him know I would be driving down tomorrow morning to pick them up.  I then worked on this post until 5:30 PM when I stopped to reinstall the antenna, radio, and GPS in my car.

We left at 5:45 PM for our monthly SLAARC meeting and shortly thereafter heard Mike (W8XH) on the South Lyon 2m repeater.  I replied to his call and we had a QSO that lasted almost all the way to our meeting site, where we arrived within a minute of one another.

We socialized with fellow club members from 6:30 PM until Harvey (AC8NO) called the business meeting to order just after 7 PM.  The club secretary was absent so I took the minutes.  The business meeting lasted less than 10 minutes and was followed by a presentation on APRS by Eric (K8ERS).  I gave Mike (W8XH) a check for the Icom IC-2820H dual band radio that has been in my car since early summer.

As I said at the beginning, I really needed to update the FMCA Freethinkers roster and financial reports and make them available this evening.  Well, sometimes things don’t happen just because they need too.  Today was just too perfect a day to waste it sitting inside at a computer and by the time we got home from our meeting I did not feel like starting this task.  I will try to make this a priority tomorrow evening, but each day is an adventure and I have to be agile in dealing with the myriad tasks that lay before me, including ones that appear unexpectedly.

 

2015/10/07 (W) The Root Cause

We had Linda’s homemade granola for breakfast with fresh blueberries.  Berry season is just about over for the year and they will become more expensive as they have to be transported from farther away.  I made a pot of Sweet Seattle Dreams, the half-caff blend that Jeff makes just for us, and we drank it in the living room.  Linda checked in on the world and pulled up the latest video from NutritionFacts.org while I researched hardwood veneers on Rockler.com.

After breakfast and coffee I called Metro Environmental Services to arrange to have the culvert under the road cleaned out.  They were able to schedule us for this afternoon so I accepted that appointment.  I then called Brighton Honda to check on my car and left a message for Rob, the service advisor who wrote up the repair for the driver side door lock.  I had no sooner left that message than I got a call from Karen at Bratcher Electric.

Mike had worked up the quote to install the 100 Amp disconnect, tie it into the output of the transfer switch, and run a 100 Amp 4-wire service entrance cable to the current sub-panel, making it into a main panel.  They would also disconnect and cap the current sub-panel feed from the basement as part of the work.  At just north of $1,300 it was a good $300 higher than I expected.  My expectation, however, was not based on anything specific other than my own sense of the cost of materials and the amount of labor that might be involved, plus a desire for it to not cost more than $1,000.  🙁

With the phone calls taken care of we worked in the bus for the rest of the morning.  Linda worked on stripping the remnants of wallpaper that remained after we removed the mirrors from the lower outside hallway wall yesterday.  I worked on re-routing the heater hoses for the fan-coil heat exchangers.  She got her job done before I got mine done.  That’s usually the way it is.

To start, I removed one of the old 4″ round plastic grates and used my inspection mirror and a flashlight to examine the inside of the HVAC duct.  What I discovered was that the two heater hoses were secured periodically with plastic cable clamps to the outer wall of the HVAC duct.  I also discovered that the metal part of the duct is just the inner wall and top.  The bottom is the plywood subfloor of the bus and the outer wall is the plywood wall.  As originally built the metal portion of the duct could be removed but when Royale Coach did the conversion they built cabinets around the ducts and put wood wiring chases on top of them in such a way that they can no longer be removed without partially disassembling the coach.

The location of the hoses and wires in the duct was such that I could safely use my 4″ bi-metal hole saw to cut access holes for the hoses.  I determined where the cable clamps were located by measuring inside the duct.  I then marked where the access slots in the bottom back of the bases would be located and determined where I needed the two hoses to emerge from the duct.

The manual sheet metal nibbler used to cut a line between the bottoms of the two holes in the HVAC duct.

The manual sheet metal nibbler used to cut a line between the bottoms of the two holes in the HVAC duct.

There was already a 4″ hole at one of my needed locations so I drilled a second one next to it with an inch in-between.  I used Chuck’s hand powered sheet metal nibbler to connect the holes together to make an opening that looked like the track around a football field.  We vacuumed up the metal chips and I then installed door edge molding all the way around the edge of the opening.  I was able to reach the screws holding the first pair of cable clamps with a #2SR screwdriver and remove them.  This large slot will be behind the left end of the center connecting cover of the desk and the hose for the heat exchanger that goes in the left base will come out of it.

 

Plastic U-channel door edge molding installed around the new heater hose opening.

Plastic U-channel door edge molding installed around the new heater hose opening.

The location of the next pair of cable clamps corresponded, roughly, to where I needed the hose for the right heat exchanger to emerge.  I drilled two 4″ holes, side-by-side, at that location and nibbled out the little bit of metal in-between them to make a second slot.  Again, I installed the door edge molding around the entire edge.  The molding was a tight fit, and I had to use a screwdriver to get it to go on the inner curves, but I got it on.  The U-channel is locked in mechanically and has adhesive in it so it should stay put once it has had a few days in place.  Once the hoses are re-routed I will put screen material, and perhaps some solid plates, over the openings to prevent critters from gaining access to the living area by way of the HVAC PCTS (Prevost Critter Tunnel System).

 

The access holes in the OTR HVAC duct in the area behind where the desk will be installed.

The access holes in the OTR HVAC duct in the area behind where the desk will be installed.

Linda had two medical appointments this afternoon, both routine diagnostic procedures, so she got cleaned up, changed her clothes, and left around 12:30 PM as I was finishing up the second slot.  I went inside and was thinking about making something for lunch when the doorbell rang.  It was our mail carrier, Michelle, with a package that was too big for the mailbox.  A few minutes later the doorbell rang again.  I figured it was Michelle again, but it was one of the guys from Metro Environmental Services.  They were supposed to call first but just showed up.

I put my shoes on and walked them down to the clogged culvert that goes under the road.  I was really hoping they could clean it out from the south side but when we went into the woods we could not see the end of the culvert.  They got a metal detector and located the end of the pipe.  It was almost completely buried and had a massive root running right in front of it from a very large nearby tree.  They got a shovel and dug out around the root, exposing much of it and the end of the pipe.

The tree was probably 30″ in diameter at the base and the root was at least 10″ in diameter.  I got my (new) 18″ chain saw but had trouble getting it started.  It turned out it was out of gasoline.  Once I got it started I tried to cut through the root on either side of the culvert.  I thought I was all the way through on one end (closest to the tree) and most of the way through on the other end, but the root would not budge.  I dulled the teeth on the chain to the point where the saw would no longer cut and did not want to take the time to put a new chain on just to ruin it quickly.  The guys finally agreed to hydrojet the culvert from the north side of the road.

The actual cleaning out of the culvert did not take that long.  The pump produces 2,000 PSI and they used about 300 gallons of water from the onboard tank on their truck.  The head on the end of the hose has one forward facing nozzle and many rear/side facing nozzles.  The forward facing nozzle loosens and cleans out the area directly in front of the head while the other nozzles force the head forward and blast whatever is in the pipe back out towards the entrance.

They started with a small head and ran it in until there was water coming out the other end of the culvert.  They then pulled the hose back and switched to a much larger head and ran that all the way through and back.  When they were done muddy water filled the culvert and the depressions on either end.  On the inlet end the water was only about 3″ deep in the bottom of the culvert but on the outlet end it was near the top.  They billed me for the minimum first hour amount even though I think they were here longer than that.

I called Phil to let him know what we had run into.  He was surprised, to say the least, as he thought he had checked the other end of the culvert.  Obviously not, but that’s water under the road, so to speak.  Besides the problems with the root and the discharge end of the culvert being below the surface, it looked to me like the discharge area was something of a low spot and it was not obvious to me where water would flow from there.  I have learned, however, that I am not very good at judging such things visually.

Cory, our neighbor across the street, had come over to see what was going on.  He offered that the discharge area does, in fact, drain to the south through his property and eventually to Golf Club Road.  Cory has been here for 30 years so I have no reason to doubt the truth of that.  The elevation where Golf Club ends at Hacker and where our street ends at Hacker appears to be about the same.  Our street is fairly level while Golf Club has a little bit of up and down, but it is subtle.  I suggested to Phil that we might have to clear a path into the woods for his small digger and do some trenching to give the water a way out.

While Cory and I were chatting I noticed that the trees along this part of the road were hanging out over the road on both sides and were rather lower than they should be.  This is the very thing I complain about with regards to the way most of our neighbor’s fail to maintain their properties along the road.  I decided I should do something about it so I got our pole saw and spent a couple of hours trimming the low overhanging branches.

Linda went to the Whole Foods Market in West Bloomfield following her medical appointments and got home just as I was finishing up the pruning.  She went for a walk while I called John Palmer of Palmer Energy Systems in Florida.  I bought our Magnum inverter/charger for the bus from John along with various accessories and batteries.  I needed a 4-wire terminal block for our Magnum Battery Monitor Kit (BMK) because I had messed up the one that came with it when I originally installed it.  John confirmed that Magnum Energy had recently been acquired by Sensata, and was in the process of relocating the plant to Minnesota, but that several of the old-timers were still on board.  John needed to talk to Tom anyway and asked me to call him back in a week to see if he was able to get the connector.

I checked with the service department at Brighton Honda again and Rob said he expected to get the new door lock mechanism back from the locksmith tomorrow morning and to have the car ready for me to pick up by the end of the day.  It will be nice to finally have it back.

The cloudy weather finally broke today and we saw some blue sky with brighter light levels than we have had recently.  The day was lovely but a little on the cool side by late afternoon so we both had a cup of hot tea.  Linda took advantage of the light to work on her counted cross-stitch project, a holiday stocking for grand-daughter Madeline, and I went back to the bus to sand off the last traces of the old wallpaper from the outside wall in the hallway.

I used our Porter-Cable 1/4 sheet palm sander with 80, 120, and finally 220 grit sandpaper.  The sander has an integral dust collection bag but it does not capture all of the dust.  I used the vacuum cleaner to pick up as much of the residual dust as I could and then used a tack cloth to wipe down the wall.

For dinner Linda made pan-grilled tofu with caramelized onions in sweet barbecue sauce.  She served it open-faced on rye bread, because that is what we had, and steamed some fresh green beans as a side dish.  Yum.

After dinner I drove to Lowe’s.  I needed something I could use to plug the two heater hoses to keep them from leaking as I pull them back through the HVAC duct and out through the new slots I made for them today.  I ended up buying two 3/4″ barbed plastic plugs.  While I was there I looked to see if they had any bleeder valves but they did not.  They do not sell parts designed specifically for hydronic heating systems and I will have to go to Northwest Plumbing and Supply for such items.

While I was in the plumbing isle I looked to see if I could figure out some combination of parts to make a fill valve for the system but did not see anything that inspired me.  I would love to have one or more high point expansion tanks on this system but I do not have any easily accessible places for them from which I could also run overflow drain lines.  There is a good sized volume of unused space behind the drawers on the passenger side of the bedroom but it would be a very difficult place to install anything.  Perhaps Northwest Plumbing and Supply will have something.

On the way home I stopped at the BP station and topped up the fuel tank in Linda’s car.  I drove home with greater consideration for fuel economy than usual and managed to get the average MPG up to 56.7 before it dropped back to 55.4 as I pulled in the driveway.  It will drop into the upper 40s as soon as Linda starts the engine tomorrow morning but it was fun to get it into the driveway with numbers above 55 MPG.

 

2015/10/06 (T) Trimming & Stripping

We did not get an early start to our day today.  I got up a little after 8 AM and Linda got up 15 minutes later.  Even so, she still had our granola and berries ready before I had the coffee made, but in my defense I had the extra step of transferring the three pounds of coffee we bought yesterday from their paper bags to our metal containers with the air-tight lids.  We were wondering about whether grapes are berries so Linda Googled the topic.  Botanically, grapes are berries but strawberries and raspberries are not.  Also included among the “true” berries are bananas, tomatoes, cucumbers, and eggplants.  That’s right, tomatoes, cucumbers, and eggplants are fruits.

Linda left at 9:30 AM to meet Diane at Kensington Metropark for a 10 AM walk.  Mike from Bratcher Electric showed up at 10:30 to revisit the wiring project I needed his company to do.  They are going to install a 100 Amp disconnect switch next to the transfer switch in the southwest corner of the garage, run power to the disconnect switch from the transfer switch, and then run a 4-wire service entrance cable (SEC) from the disconnect switch through the garage attic to the electrical distribution panel in the closet with the HVAC system for the library.  The electrical panel is currently a 60 A sub-panel of the main distribution panel in the basement and this project will convert it to a 100 A main panel while still allowing it to be powered by the generator if the utility power goes out.

When Mike left I gathered up the two metal cutting tools I borrowed from Chuck, our corded 1/2″ Craftsman drill (which I needed to power one of the nibblers), the small Rigid drill kit, and my telescoping inspection mirror.  My plan was to cut one or two openings in the passenger side HVAC duct for the heater hoses but I decided to do some yard work instead.

We still had some bushes growing out over the drainage ditch by the mailbox and I wanted to get them trimmed up and add the waste material to the timber pile before Phil hauled it away tomorrow (hopefully).  I was still working on this little distraction when Linda got back from her walk so she got a pair of gloves and helped.  The bushes and trees in this area have an extensive system of vines running through them.  I got a lot of the smaller vines cut and pulled free and I managed to trim one bush back enough to create an “entrance” to the inner part of this stand of trees.

Once I was “inside” the grove I found one of the main sources of the vine, a massive thing that looked like something out of a Harry Potter movie.  It was easily 10″ in diameter where it came out of the ground and had 4″ to 6″ pieces branching off in different directions.  I have no idea what kind of vine this but I suspect it is a wild grape vine.  Given its size I surmised that it has been there for a very long time gradually chocking off the trees.  I will have to eventually cut it out, but I would like to find out first just exactly what it is.

Linda helped drag all of the clippings over to the disposal pile where we cut some of them into smaller pieces before adding them to the pile.  We noticed a small tree hanging out into the space above the driveway that Phil is about to build.  We thought the tree was dead and decided to cut it down.  It was 5″ in diameter 6″ above the ground–big enough to require the chain saw–and also had a lot of branches that were large enough to be more expeditiously dispatched with said same machine.

After felling the tree and de-limbing it I was not so sure that it was dead.  We had a half dozen other trees along the northern edge of this stand woods that looked to be similarly dead but I decided not to cut them down.  One in particular had a lot of obviously new, small branches.  We will wait until spring and see which, if any, of these trees develop leaves.  If they are alive I will trim them instead of cutting them down.

We put away the yard tools and took a break to have a light, late lunch of vegan cold cuts sandwiches and black grapes with a glass of beet juice.  I like beets on salads and as a side vegetable.  Beet juice is OK but a bit more of an acquired taste.  We have added it into our daily food plans because of its ability to control blood pressure.  Linda is adding ground flax seed to her granola for the same reason.

Measuring and cutting wallpaper on the dining room table in the house.

Measuring and cutting wallpaper on the dining room table in the house.

At 2 PM we decided to hang the wallpaper in the hallway of the bus so we gathered all of our tools and took them to the coach.  I measured the wall and determined the lengths (30″) and widths of the four pieces; two full width (26.5″) and two partial width (15.5″), one for the left end and one for the right end.  We cut the four pieces on the dining room table in the house where we could unroll over six feet of wallpaper, measure more accurately, and cut more easily.  We cut the two full pieces out of the end of the first double roll and cut the two partial pieces out of the beginning of a new double roll.

Linda took the pieces to the bus and laid them out on the bed.  I was getting ready to pour some GH-95 paste into the tray and roll it onto the wall when I decided to remove the trim board that separates the upper wall from the vertical mirror strips on the lower wall.  My intent was to avoid having to trim the bottom edge of the wallpaper by tucking it behind this board.  What I discovered was that the strip mirrors on the lower portion of the wall were glued to the wallpaper and some of them were loose.

The fact that the mirrors were glued to wallpaper and not to the plywood wall surface meant that they could be removed.  I unscrewed the four vertical pieces of wood trim that framed the mirrors in three panels and then removed the bottom trim piece.  I carefully removed each mirror by prying the underlying wallpaper loose from the wall using a large screwdriver and working from the top down.  When the entire strip was loose I cut the wallpaper to release it.  I handed them to Linda and she stored them carefully inside the built-in sofa.  I managed to get all of them off except one which fractured in several places.  We taped it up and vacuumed up the few glass fragments that were created when it broke.

At this point we were clearly not going to hang the four pieces of wallpaper we just cut as we needed to finish stripping the base layer of the old wallpaper first.  We also had to take a little time to decide how to finish the lower wall.  One option would be to wallpaper the entire wall and not put the wood trim back.  We probably have enough wallpaper to do that, even after cutting the four smaller pieces for the upper wall, but we did not think the wall would look right if we did that.

Another option would be to install wood panels to replace the mirror strips.  In this case we would use a light wood with a natural finish to provide an intentional contrast with all of the walnut trim.  The mirror strips are slightly beveled on their long edges and measure 3/16″ thick at those edges.  That means a 3/16″ hardwood veneered plywood should be a perfect fit, allowing all of the wood trim to go back in place.  Maple or Birch with a natural finish are the most likely choices.

The wood panels is the option we will almost certainly pursue and we do not have to resolve exactly what panels to use in order to finish wallpapering the upper part of the wall.  All told this will push our finish date back a couple of days, but we don’t really have a finish date anyway, and we will like the final result a lot better.  We really do not like the strip mirrors and wish we could remove or cover all of them.

It was only 4:30 PM when we quit working in the bus for the day but we had both had a relatively physical day and were ready to quit.  The lighting in the hallway was also a little dim due to the continuing heavy cloud cover which was having the added effect of lowering our energy level and enthusiasm a bit.

My last couple of e-mails to Lou Petkus of the SKP Photographers BoF had gone unanswered so I called Lou to make sure everything was OK.  It was; he and Val have just been very busy.  We know about busy.  We had a nice chat about cameras and RVing plans for the upcoming winter.

Linda always puts nice dinner meals on the table and tonight was no different.  She halved and cored a white acorn squash and baked it in the oven with a little vegan butter and brown sugar.  She had a few Brussels sprouts left over and some baby carrots so she added onions and sautéed them to make a very good vegetable medley.  Finally, she heated a package of mock chicken in orange sauce.  The trio of dishes was not only tasty but lifted my spirits; not that either of us are down, but the weather has been heavily overcast for several days and had a slightly depressing effect on our moods.

I got a call from Phil after dinner updating me on his availability to work on our driveway and French drain project.  The 2-day job he started yesterday morning is probably going to take him the entire week to finish so there is very little chance we will see him back at work on our project before next Monday.  He did, however, find time to call a company that can hydrojet the culvert under our road and find out their pricing.  He gave me the name and phone number and I will call them tomorrow and try to set something up.  The other upside is that we have more time to pull dead trees out of the woods in front of our house, cut them up, and add them to the disposal pile, if we so choose.

Linda’s favorite TV shows are concentrated on Sunday, Monday, and Tuesday evenings so we watched NCIS and NCISNOLA followed by an episode of LIMITLESS, just to see what it was like.  I watched Two and a Half Men, which I happen to find very amusing, and then went to sleep.

 

2015/20/04 (N) Family Trees

I was awake at 7 AM and got up at 7:20, showered, shaved, and dressed for the upcoming visit by our son, daughter-in-law, and younger grand-daughter.  We did not have breakfast, as they were bringing bagels with them, but I did make a small pot of coffee to get the day started.  While it was brewing I gathered up a load of laundry and put it in the washing machine.

We finally turned the furnace on a couple of days ago so the house was cool but comfortable.  Even so we turned on the fireplace and enjoyed our coffee while we awaited our visitors.  Brendan sent a text message indicating a 9:30 AM arrival and it was only a few minutes later than that when they showed up.  Today’s visit was the result of specific request by Madeline yesterday to see her Grandma Linda and Grandpa Bruce.  She will be coming back on Friday after pre-school/day-care and spending the night.  She is then going to go see her Grandma B and Cliff in Denver while her mom attends a conference.

Brendan and Shawna brought five bagels, one for each of us, with cream cheese and lox for them and hummus for us.  They also brought sliced tomatoes, cucumbers, and onions.  We provided our Melt non-dairy butter substitute, a large pot of Kenya AA (single origin) coffee, orange juice, a bowl of mixed fruit, and a bowl of honeydew melon.  It was a wonderful mid-morning breakfast.

After breakfast the adults took turns playing with Madeline.  At one point Brendan reminded her to ask me something and what followed was a request to take a tour of the bus.  So we did!  Madeline is not yet 3 years old, and the bus does not really mean anything to her yet, but Brendan and Shawna wanted to see the work we had done.  We are looking forward to taking Madeline with us for short trips when she is a little older.

Madeline normally takes a nap at 1 PM and Shawna was a bit tired too so they packed up and left around 12:30 PM and drove back to Ann Arbor.  There was a “block party” taking place later this afternoon for their block and they wanted to rest before it started.

We needed to get some yard work done yet today so we changed into our work clothes.  I moved the laundry to the dryer and then got busy figuring out how to start and operate the new Poulan Pro 18″ chain saw.  The quick start guide had 10 steps, numbered and clearly illustrated.  I followed the steps carefully and it started right up.  We gathered up our rake, hand saw, wheelbarrow, and compound pruning shears along with a face shield, safety glasses, hearing protector, and heavy canvas work gloves and headed down to where the dead tree fell across the road a few days ago.

The tree fell across the road and had been moved out of the road by a neighbor shortly after it fell.  I had gone out a little while after that and cleaned up the limbs on the other side of the road and the small debris that was still in the road.  The tree, however, was still in the ditch along the side of the road and need to be cut up and moved.  Phil said he would take it and dispose of it if we cut it into pieces not longer than five feet and piled it by all the other timber and yard debris.

This turned out to be just the first of five trees that we cut up this afternoon.  Once the first tree was done we cut down a second one that was still standing but very dead and leaning out towards the road.  Better to take it down now than have it fall during the winter.  This tree was only 20 feet from the first one and not quite as tall, the top having broken off some time long ago.  These were both ash trees, killed by the Emerald Ash Borer beetle.  It saddened me that all of this wonderful ash timber was going to a landfill instead of a sawmill, but we had no practical way to turn it into usable lumber.

While Linda acted as spotter for cars I made a “V” cut about three feet above the ground on the side where it was going to fall and then made a relief cut on the back side until it toppled under its own weight.  Once it was down I quickly cut it into shorter pieces and Linda got them off the road.

As long as we were working along the edge of the road I decided to prune or remove a few other saplings, bushes, vines, and deadfall so that Keith could mow the grass in the drainage ditch.  That turned out to be quite a bit of extra work but it needed to be done.  We encountered two different bushes with serious thorns and had to work carefully.  Without gloves, eye protection, and heavy weight long sleeve clothing and blue jeans it would have been dangerous and painful.

There is a complex of vines that runs all through this stand of trees.  We cut a lot of smaller runners and pulled them free form the other growth but I cut several at ground level that were at least 3″ in diameter.  A thorough cleaning and restoration of this particular stand of trees will take more time than we have to spend right now, but perhaps we can get some of this kind of work done next spring and early summer along with finishing the interior of the bus and redoing the water bay.

We have had a large tree down at the west end of our property for quite a while, and Keith has just been mowing around it, so we moved all of our equipment down there and worked on that area of the yard.  There were a lot of other small limbs scattered about and dead/broken branches hanging in several trees.  We gathered up the smaller stuff and cut it into manageable lengths and wheelbarrowed it to the disposal pile.  I then used the chain saw to remove the larger limbs and cut the tree up into four foot lengths.  It was 10 inches in diameter at the base and 30 feet long before we cut it up.  There is also a lot of pruning that needs to be done to the trees in this part of the yard, and some of it will require the pole saw and/or a ladder, and/or some careful climbing; but not today.

With that area cleaned up we moved our gear to the firepit (burn pile).  We have had a conifer tree on the ground next to the firepit for the entire summer and, once again, Keith has had to mow around it.  This tree was about 6 inches in diameter at the base and 20 feet long.  Linda found a second, smaller, tree and dragged it over.  I pruned all of the smaller limbs with the compound shears and then used the chain saw to cut off the larger branches and cut the trunk up into four foot lengths.  Rather than transport all of this material to the disposal pile we added it to the burn pile.  The pile is now about eight feet in diameter and four feet high so it should make quite a fire when we finally light it up.  I think we will wait for a chilly fall day to do that, if we get to it at all this year.  The longer the pile sits here the more of a problem it will be, however, as small animals will undoubtedly use it for shelter and to build nests.

It was 4 PM when we quit and we had only worked for three hours but it was very physical work and we were tired, or at least tired enough that we were not going to start working in the bus at that point.  By the time I cleaned off the chainsaw and we put all of the tools away it was 4:30 PM.  We changed out of our work clothes and I added them to my second load of laundry for the day.  We sat in the living room reading and writing for an hour or so until Linda pulled together our dinner.  In the interest of time she microwaved a couple of sweet potatoes (yams), steamed some Brussels sprouts, heated the last two mock chicken scaloppini, and poured a couple of glasses of Franzia Moscato.

After dinner I tended to the laundry and then settled in to work at my desk for a while.  I logged in to RVillage and saw that Curtis had posted in the Stakeholders group that he was holding Go To Meeting sessions today at 9 AM and 5 PM PDT.  That was noon and 8 PM EDT.  We had obviously missed the noon meeting, and would have anyway with company here but as it was only 7 PM we could still participate in the evening meeting.  We had an hour to wait so I decided to start uploading blog posts starting with August 1st.

I uploaded the posts for the 1st, 2nd, and 3rd, including a few photos, but something did not seem right as the photos did not corresponded to the posts.  I checked more carefully and observed that I had renamed photos from early September with early August dates.  I quickly edited the two posts that included photos and deleted the images from the posts.  I am two months behind again uploading posts and having to go back and select/process photos for my August posts will only delay the uploading further.  Ugh.

I launched Go To Meeting at 7:55 PM EDT and let Linda know it was time for the meeting.  Curtis was already online and we eventually had eight stakeholders checked in, some of which were individuals and some of which were couples.  Curtis, the founder and CEO of RVillage, gave us an update on recent development work, new features to be released next week, monetization of the site, and the progress of the current round of investor financing.  The meeting lasted about 45 minutes.

I was glad I caught the error with the photos for my blog but I was not in the humor to spend hours working on fixing it this evening.  Linda cut a couple of pieces of the vegan frozen chocolate torte that she made last weekend and that was reason enough to quit working at my computer for the evening.  We spent an hour relaxing in the living room eating our torte while reading and writing.  Yesterday Phil said he would call this evening and let us know whether he would be here tomorrow or at another 2-day job, but he did not call.

When we finally turned in a little before 10 PM we watched TV for a while before turning out the lights.  We caught the last half of a program on the glass blowing school at Pilchuck and “A Woman in Battle” about a Cuban born woman who disguised herself as a man to fight in the Civil War on the Confederate side but ultimately became a Union spy.  Tomorrow we hang wallpaper in the bus and we will need to be well rested so it was lights out by 11 PM.

 

2015/10/01 (R) New Month, Same Project

For various reasons we have not worked on the bus the last two days.  For one, Linda is still recovering from a cold and/or seasonal allergies that may have been triggered by some weeding she did over the weekend.  August and September are the time of year for ragweed in Michigan.  For another, I was tied up most of Tuesday with the bus windshield replacement and yesterday we both had our annual physical exams, mine in the morning and Linda’s in the afternoon.  Throw in an unexpected problem with the driver door lock on my car and a lawn tractor that wouldn’t start and that took care of most of the day.  Since I wasn’t working on the bus I used some of my time to edit drafts of blog posts and started selecting and processing a few photos to go with them.

I got a call from Philip Jarrell around 8 PM last night letting me know that a last minute project came up that required his attention today.  If all goes well he plans to start on our French drain and driveway extension project tomorrow.  Our project is a relatively small job for Phil and I accept that he has to fit it in around larger projects for long-term customers who give him a lot of repeat business.  Still, I think he likes working with us and does his best to fit us in.

I had hoped to get back to work on the bus today, specifically working on priming the walls and hanging the new wallpaper, but Linda had another annual medical appointment this afternoon.  Neither of us likes to get into our work clothes and get involved in physical tasks for just a small portion of the day so after breakfast, and a leisurely morning in the living room enjoying coffee to the glow and warmth of our fireplace, she settled in to work at her desk for a while before going on a walk.

Our whole house generator threw a code 34 on Tuesday afternoon indicating that it required maintenance but would still operate if needed.  I called Bratcher Electric to see what was needed and spoke with Karen.  I think she and Mike own the business, but it’s possible she is Mike’s daughter.  Whichever, I’m certain that she is family.  Our generator was last serviced one year ago on the same date (29th) and the 34 was the total number of hours it has run since being installed in May 2013.  I set up the service appointment for Friday October 9th.

While I had Karen on the phone I asked about the project Mike had come out to look at a year ago.  I need his electricians to run a 4-wire, 100 Amp service entrance cable (SEC) from the transfer switch in the southwest corner of the garage, through the garage attic, and into the secondary distribution panel in the HVAC closet in the northeast corner of the garage, making it a main panel instead of subpanel.  Karen said she would leave a note for Mike to follow up with me.

It was going on noon when I finally got back to work on the bus.  It is a gorgeous fall day, chilly and breezy but with abundant sunshine, and I just could not let it slip away without getting something done on our interior remodeling project.  I was at least 60% done with rebuilding the landing where the stepwell slide cover used to be and that seemed like the logical thing to get finished.  It was 52 degrees F in the bus so I turned on the front electric toe-kick heater and set up the small Broan portable electric heater in the kitchen blowing forward towards the cockpit.  I also noticed that the refrigerator thermometer indicated 43.5 degrees F.  We do not have any food in the fridge but we do have freezer packs and containers of water for mass.  43.5 is warmer than I want so I checked the freezer reading and it was 28 degrees F.  Yikes!  That was way too warm.

Frame and center support for the new landing platform. Air lines crimped and secured.

Frame and center support for the new landing platform. Air lines crimped and secured.

The 31″ X 27.5″ piece of 3/4″ thick plywood for the landing platform flexed slightly when I stepped in the middle.  I’m not sure anyone would notice it when stepping on it but we do not want the tile that will be on there to crack from the deflection.  My solution was to cut an appropriate length of the 2.5″ wide 3/4″ thick poplar and install it on edge running long ways to support the middle of the plywood.  I had to use an angle bracket at the back edge (by the driver’s seat) and place shins under it at several places to get it to fit just right.

About this time Linda came out to let me know lunch was ready.  We each had a half sandwich of hummus and raw onion on rye bread and some black grapes.  She left for her doctor’s appointment and I made a big cup of Constant Comment decaffeinated tea.  I called Chuck to see if he knew where his powered metal shears (nibbler) were and if I could borrow it.  The answers were ‘yes’ and ‘yes.’  I decided to take his suggestion of cutting two new access openings in the passenger side HVAC duct to allow the two existing heater hoses to come out and go directly to the fan-coil heat exchangers with minimal bending.  It will simplify the installation, eliminate soldered copper parts and connections that would restrict flow and be a potential leakage point.  Since my car is in the shop for the next several days I will have meet up with him when Linda’s car is available.

Back in the bus I checked the refrigerator and the fresh food compartment was at 39 degrees F and the freezer was At 6 degrees F.  Those are the sort of temperatures I expect to see.  I had the freezer set to cycle between about 0 and 10 but occasionally saw it go as high as 17.  I figured it had something to do with an automatic defrost cycle, but anything over 20 is troubling.  Linda had suggested earlier that perhaps we need to replace the batteries in the remote sensors and the base unit.  She may well be right and it won’t hurt to do that anyway.

When I got back to work on the landing I folded over the ends of the two air lines and put cable ties on them to close them off.  The air supply for the solenoid valve that controls these two lines has a shut off valve which I intend to keep closed, but if it gets opened accidentally it could drain the auxiliary air tank through one or the other line if they were not crimped closed.  I may eventually disconnect the supply line at the valve and cap it, but for now this will at least prevent an open line leak.

New landing platform structure with sound/thermal insulation.

New landing platform structure with sound/thermal insulation.

After screwing down and cutting off the shims I plugged the hole where the air lines come through the floor with steel wool and secured the lines to the floor with cable clamps.  I then cut fiberglass insulation to fit the two spaces in the floor.  I used the same John’s Manville Sound & Thermal insulation that we used in my office and ham shack as I had some left.  I put the plywood floor piece in place, evened it up along the front edge, and screwed it down but ran out of screws before I had it completely secured.  Projects are like that.

I was walking towards the garage when I saw a car coming very slowly from west of our house headed east.  The drive pulled past our third drive and stopped but I could not see what the driver was doing.  The car eventually continued on, followed closely by a second vehicle and I thought the flashed me a somewhat dirty look, but they did not stop and were too far away to be sue.  Still, I thought that was odd.  I did not give any further thought to it until I went out to get the mail and noticed a lot of debris in the road and a large, dead tree in the ditch.  It had been windy all morning and at one point I thought I heard the crack of a falling tree but it sounded farther away than where this one lay.  The driver had obviously stopped to move it and was probably a little bit annoyed that they had to do that because I had not taken care of it.  Hey, I didn’t know!

I moved it a little more and then got a metal toothed rake and pulled all of the small debris out of the road.  There were limbs on the other side of the road that were 1″ to 2″ in diameter so the tree had obviously fallen all the way across the road.  The property on the other side of the road is part of our yard but I would have cleaned up the branches regardless since the tree clearly fell from our yard.

Linda stopped for groceries on the way back from her doctor appointment and did not get home until almost 4 PM.  We got a pruning saw and cutter and she helped me cut up some of the upper part of the tree and get the pieces farther from the road.  We noticed another dead tree in the same area that looked like it would eventually fall over across the road.  I can cut it down safely but will need the chain saw to do so.  I was not in the humor to get it out and try to get it started at that exact moment but noted to myself that I needed to do this sooner rather than later.

We were not going to start any messy bus work at that hour so I changed into nicer clothes to go out to dinner.  Before we left I texted Josh at Coach Supply Direct to clarify an earlier e-mail and let him know that two of the MCD shades were not staying attached to one of their clips.  We left at 5 PM for the La Marsa in Brighton and stopped at the bank on the way.  For dinner we split an order of Moussaka and got two salads as our sides along with the warm pocket bread and garlic spread.  The food was good and we had a tasty, filling meal for under $14 plus tip.  It is our best/favorite restaurant option within reasonable driving distance of our house.

After dinner we stopped at The Home Depot in Brighton but they did not have the screws I wanted.  When we came back out I noticed that the tires on Linda’s car were under-inflated and on closer inspection that the side walls were badly checked.  We drove to Discount Tire in Howell but they were closed.  We stopped at Lowe’s and bought the screws I needed, some furnace filter material, and Lithium batteries (AA and AAA) for our TempMinder base/remote thermometers as we keep the two remotes in the bus freezer and fresh food compartment and the base station on the bus kitchen counter.

Back at the house I worked in my office for a while selecting/processing photos to go with blog posts but I did not feel like putting in a long, sustained effort on the task.  I got a call from Phil at Precision Grading.  His other job did not get finished today and he will have to return to that job site tomorrow.  He hopes to start our French drain and driveway work on Monday but that may not happen.  I am anxious for him to get started but I have no control over that.  I appreciate, however, that he keeps me informed as it allows me to plan my own time.

We watched The Woodwright’s Shop, Rick Steves’ Europe, and Travel in the Americas on DPTV (WTVS) and then went to sleep.

 

2015/09/15 (T) Coach Supply Direct

We were awake at 6 AM and I planned to be on the road in the bus at 7 AM but it did not work out exactly that way.  For starters, I needed to take a shower.  Next, I really needed a haircut, which Linda does for me.  Along the same lines I needed to shave.  Another factor was that it was still darker at 7 AM than I wanted to drive in.  We also had last minute things to assemble and load such as toiletries, technology, shoes, hats, sunglasses, baskets and bags full of essential incidentals, as well as design drawings for the custom woodworking in the coach.  We were close to being ready for me to pull out at 8 AM but I still needed to check the tree limbs that hang out over the road near our house.  Good thing I did; many of them had grown down and were less than 13’6″.  How did we know?  We set the extension handle on the pole saw so that the length from the bottom of the handle to the tip of the saw blade was 13’6″.  Anything that touched the blade got trimmed.

I finally connected the chassis batteries, turned on the engine air accessories valve, and fired up the bus engine at 8:15 AM.  Linda helped me check the exterior lights, all of which were OK.  I pulled out at 8:25 AM and worked my way slowly down our street and was able to maneuver so as not to scratch the sides.  I had not driven north on Hacker in some time.  The road was in very bad condition and I thought the glass tubes in the new light fixtures would not survive the first, short leg of the trip.  Two of the kitchen cabinet drawers came open, which they do not normally do.  Linda had taped the refrigerator doors closed so they stayed that way.  The new pull-out pantry stayed closed and so did all of the drawers on the new desk.

Once I was on M-59 the trip was much smoother but not without some bumpy road sections along the way.  I-69S between Lansing and I-94 in particular is a surprisingly rough road.  I thought about stopping at the rest area on I-96 westbound just before Lansing but was anxious to make up for the late start.  The bus rolled along easily at 68 MPH without the car attached.  The difference between towing and not towing is subtle but I am aware of it.  The bus alone accelerates a little faster and stops a little easier.  It is also 20 feet shorter than the bus/car combination which makes it easier to pass and merge.

I stopped at the rest area on I-69 southbound just north of I-94, as that would be my last convenient opportunity to do so, and called Josh at Coach Supply Direct to update him on my travels.  I continued south on I-69 intending to exit at Coldwater and head west on US-12.  I was paying attention to the truck in front of me and realized a few seconds too late that I had missed the exit.  I drove three more miles to the Fenn Road exit and headed back north towards Coldwater.

Once I was on US-12 westbound, a road I have driven many times, the trip was uneventful until I got west of Sturgis.  MDOT was rebuilding several miles of the highway between Sturgis and White Pigeon and had the road down to one lane.  I was the first vehicle to arrive at the flagger so I figured I was in for a wait.  I did not check the time but the delay was at least 20 minutes.  I called Josh and updated him on my location and ETA.  Bring first in line made the wait easier as I could see what was, and wasn’t, happening.  Eventually it was our turn to go and I got to lead the parade except for a truck hauling dirt who they let go ahead of me.  That was just as well; he was in a big hurry and quickly disappeared from site, traveling at what I considered to be much too high a speed for the conditions.  All traffic was being routed on the eastbound lane and shoulder and I had to drive straddling the rumble strips to keep from knocking my fillings loose.

I finally made it to Coach Supply Direct in Edwardsburg just after noon.  I had talked to Josh on Sunday about how best to get the bus into his place.  Following his advice I continued past M-62 to Cass Street and turned left.  Cass merged into Elkhart Road and shortly thereafter I turned left into the fenced property where his business is located.  Josh had described where other motorhomes were parked and where he wanted me relative to them so I was able to get the bus situated without assistance, another advantage to not having the car attached to the back of the bus as I could back up as needed.  Josh came out of the building as I was shutting down the engine.

Josh has several guys working with him at the moment; Jim, Tyler, and Tim.  The first task was removing the remaining pleated shades from the side windows and installing the new MCD shades.  Jim is very knowledgeable about MCD shades and was the lead installer.  The shades are very nice and will be more functional than the old ones.  The automatic retract speed was still a little fast on some of them and might need to be adjusted but that is a minor thing.

While the guys worked on the shades Josh and I looked at the new seats and discussed the larger set of tasks that needed to be accomplished.  I was very pleased with our choice of fabric and how the seats turned out.  The only apparent glitch was that the slide rails for the two captain’s chairs for the living room had come without the actuator handles.  Josh made some phone calls and arranged to pick up the needed parts first thing tomorrow morning.  We also measured for the Corian desk top and contacted his supplier regarding that.

I needed something to eat and drink and since the coach was being worked on I walked across the street in search of nutritional sustenance.  I walked past the Taco Bell and had my sights set on the McDonald’s (French fries and a diet Coke) when I spotted the Subway, which was closer and offered better food options for me.  I had a Veggie Delight Chopped Salad, chips, and a diet Coke.  I dined in, refilled my drink, and then walked back.

A view of the cockpit of our bus with the old Villa pilot and co-pilot/navigator seats removed.  This shot is from the living room looking forward.

A view of the cockpit of our bus with the old Villa pilot and co-pilot/navigator seats removed. This shot is from the living room looking forward.

Tyler is an experienced automotive technician and was the main guy responsible for removing the two Villa chairs from the cockpit area.  He unbolted the 6-way power mechanism from the swivel pedestal but left it attached to the seat.  With the seats out of the bus he removed the 6-way power base from each one and installed it on the corresponding new Flexsteel seat.  There was more to this mounting than just tightening a few bolts and he was not quite done by the time he had to quit for the day.  The controls still had to be mounted, the wiring connected, and the seats installed in the bus.

 Josh (R) confers with Tyler (L) as he is working on getting the new Flexsteel pilot and navigator seats ready to install.

Josh (R) confers with Tyler (L) as he is working on getting the new Flexsteel pilot and navigator seats ready to install.

Since all of the seat prep work was being done on a work surface in the building I took advantage of the access I had to the cockpit area.  I borrowed a scraper and scrapped off small fragments of carpet.  I borrowed a spray bottle of Spic-n-Span and cleaned the swivel pedestals.  I discovered a small piece of paper blocking the lower left HVAC nozzle and removed it.  I also discovered that the fresh air damper was not buried deep in the front end of the coach like I thought it was.  The lever by the driver’s left knee, which has been so difficult to operate, actuated a short cable that controls a damper just to the left of the steering column below the dash.  I was able to use two cable ties to secure some wire bundles out of the way of the damper allowing it to open wider and to open/close more easily.  I finished by borrowing a small shop vac and vacuuming up all of the loose material I had created.

The old 6-way power bases being attached to the new Flexsteel pilot and navigator captains seats. The new seats came with new controls that Tyler had to mount and wire.  Both seats also included lumbar support air bladders with their own air pump as part of the seat.

The old 6-way power bases being attached to the new Flexsteel pilot and navigator captains seats. The new seats came with new controls that Tyler had to mount and wire. Both seats also included lumbar support air bladders with their own air pump as part of the seat.

I borrowed a piece of 3/4″ plywood about four feet long and put it across the two pedestals of the desk to make a temporary work surface.  I got the folding chair out from under the bed, along with my computer and iPad, and got the “desk” set up to use my computer.  I tried to get photos with my camera of the different aspects of the project throughout the day.  I also took seven pictures with my smartphone and sent them to Linda’s smartphone so she could see the progress.  Josh’s wife stopped by to check on his schedule and I gave her a tour of the remodeling project.

A view of the bottom of the two new Flexsteel “class C” captain’s chairs for the passenger side of the of the living room with one of the slide/swivel bases and its seatbelt attachment bar.

A view of the bottom of the two new Flexsteel “class C” captain’s chairs for the passenger side of the of the living room with one of the slide/swivel bases and its seatbelt attachment bar.

I got our Verizon Mi-Fi online, connected my iPad to the Wi-Fi Ranger, connected the WFR to the Mi-Fi, and then started my computer and connected it to the WFR.  I checked my e-mail and there was one from RVillage regarding a new group feature, group home page feeds, and asking that group owners post to their group home page feeds and create an announcement for the group that would notify everyone in the group of the new feature.

As long as I was in RVillage I created a new private, non-searchable group called RVIG (for RVillage Investors Group) and invited Curtis, the founder/CEO of RVillage, to join.  He accepted and I private messaged him, which prompted a phone call that resulted in me transferring ownership of the group to him.  He wanted to change “Investors” to “stakeholders,” which I agreed was a better term.  It also turns out that an a priori “friend” connection is needed to invite someone to join a group and Curtis was the only person who would have such a connection with all of the RVillage stakeholders.  I always thought that Curtis should create and manage this group but he has so much on his plate that sometimes it’s easier if someone else initiates something and then hands it off to him.  I was glad to be the catalyst in this case.

It was another long day but I spent a relatively small percentage of it on my hands and knees, or on my back looking under the dashboard, which I have not been physically able to do in until today because of the very confined space in front of the driver’s seat.  I brought one of our folding Zip Dee chairs inside and set it up on the passenger side of the living room so I had someplace comfortable to sit and use my iPad.  I spent several hours finishing yesterday’s post and writing today’s post.  All four of the seats are supposed to be installed tomorrow morning and I should be on my way to Elkhart Campground by noon.  Linda plans to leave between 11AM drive down in the Element with the cats.  She should arrive about 3-1/2 hours after she departs from the house by which time I should have the bus parked and hooked up.

 

2014/06/22 (N) Outside Inside

We split our time today between outside work and inside work.  The temperature was 60 degrees F when we got up so after a light breakfast of homemade granola with fresh fruit and some coffee we resumed our tree trimming work from yesterday.  While Linda gathered up branches from yesterday’s trimming, I worked on our Norway Crimson King Maple.   This is a magnificent tree, one of the nicest on our property, but it is close to our rear deck at one end and has grown out over the deck such that low branches are at or below eye level and block access to part of the deck as well as the stairs that lead down into the northeast yard.

In the same general area as the maple tree are several large White Pine trees.  The lower limbs had grown out and down to reach sunlight, placing their extremities at or below eye level.  We want to be able to walk under these trees without getting poked in the eye and we want Keith, who cuts our grass, to be able to drive his zero-turn riding mower under these trees without getting poked or knocked out of the seat.

While I was trimming the maple and pines for clearance I also removed as many dead branches and limbs as I could reach with the pole saw.  I had noticed yesterday that our pear tree and our apple tree also had quite a bit of deadwood so I turned the pole saw on them next.  Linda continued to gather the smaller branches and pile them in manageable size bundles around the outside of the fire pit.  She also dragged the larger limbs over near the fire pit.  Once I was done pruning I used our bow saw to remove the smaller branches from these larger limbs and then cut the limbs into 3-to-4 foot lengths.

Linda was going to shovel the ash from yesterday’s fire into a plastic bag but discovered that it was still quite hot.  We stirred up the ash cone, made a big pile of small branches on top of it, and then stacked the larger pieces of wood on top of that, teepee style.  It took a while but the amount of smoke steadily increased until we finally had a small flame.  It did not take long from that point for it to develop into a good size fire.  We also recalled that ash from a burn pile is good to add to the soil for some flowering plants and decided we would use it rather than dispose of it in the trash.

We needed to work at our desks today and did not want to exhaust ourselves doing outdoor work so we quit at 1 PM and put our tools away.  We had lunch at 2 PM and then spent the rest of the afternoon and early evening doing various tasks at our desks.  Part of that time I investigated a web-based RV trip planning tool called RV Trip Wizard.  Making recommendations relative to this program is one of the things the FMCA education committee has been asked to do.  The website had a demo available, as well as a tutorial and a user’s guide, so I was able to get a good feel for what it does and its ease of use.  The Geeks On Tour also had a review available which filled in some details and highlighted a few deficiencies.

Overall I found the website well conceived and nicely implemented, having most of the features needed to plan an RV trip without a lot of unnecessary clutter.  Features included routing with: turn-by-turn directions, mileage, overnight stops (17,000 in the database and growing), points of interest, and estimated expenses.  Trips can be exported as Excel spreadsheets and as files that can be imported into a GPS.  The trip preferences section allows you to specify key parameters about our RV, travel “style”, and estimated costs.  Missing from the parameters, however, was weight and propane.  It also allows you to indicate a prioritized order for RV parks and campgrounds when looking for places to stay overnight.  When planning a trip it will alert you if your rig is incompatible with part of your route, but does not automatically route you around it.  That would be unacceptable in a GPS, but is probably OK in this case as you can drag the route around on the map or add waypoints to change it.  Finally, you can save an unlimited number of trips indefinitely, recall one, do a “save as,” and then modify it if you want to repeat a previous trip with modifications.  RV Trip Wizard is a web-based subscription service and you must have an Internet connection to use it.  You cannot save your trips to your local device, and if you do not renew your subscription all of your saved trips are gone forever.

We had fresh fruit at 7 PM (bananas, blueberries, and strawberries) and a glass of wine, after which I worked for a couple of more hours before turning in to watch season 3 episode 2 of Doc Martin.

2014/06/21 (S) Happy Birthday

Today was my dad’s 89th birthday and I called to wish him a happy one.  He was 18 years old on D-Day when he landed at Omaha Beach on the Normandy coast of France; June 6th, 1944.  His unit suffered 90% casualties during the invasion, but he survived to celebrate his 19th birthday in a foxhole in France.  Not long after that he was wounded during the push inland and spent 6 months recovering in a hospital in England before returning to duty.  He was awarded a Purple Heart for is injuries.  Only a few years ago his unit also received medals of commendation, most of them posthumously.

For all of my youth and most of my adulthood he has not discussed the events of June, 1944.  He tried to see Saving Private Ryan but had to leave the theater.  He said the invasion scene was the most realistic he had ever seen in a movie, too close to the truth for him to watch, but that the real thing was far more horrible than any film could capture.  He still doesn’t talk about his combat experiences, but in his later years he has found a great sense of pride in his former military service.

He was recalled to active duty during the Korean Conflict, but did not serve in the Korean theater.  He had finished his bachelor’s degree in civil engineering and was assigned to an Army Corps of Engineers unit where he taught soldiers how to construct various kinds of bridges and other structures in the field.

When I talked to him today he said he had come across some interesting statistics recently regarding World War II.  During the course of the war, which I took to mean from the attack on Pearl Harbor to the global end of hostilities, 16 million American men and women served on active duty.  Of those 16 million, slightly less than one (1) million are still alive today, and the youngest of them, like my dad, are in their late 80’s.  Millions more worked on the civilian side of the war effort, and I suspect the statistics for that group are very similar.

———-

We went to breakfast in South Lyon with our ham radio club friends as we do most Saturday’s.  The group varies in size from week to week; sometimes it’s as small as eight and sometimes, like today, over 20.  Our club was holding a volunteer examiner (VE) testing session at 9 AM, as we do on the 4th Saturday of most months, so a few folks had to leave early to run the session.  After breakfast five of us went to the Field Day site at the Lyon Township Atchison Memorial Park.  We helped Steve (N8AR) unload his riding lawn mower and four of us moved heavy metal picnic tables out of the way so he could mow the field where the South Lyon Area Amateur Radio Club (SLAARC) will set up on Friday for the American Radio Relay League (ARRL) Field Day event.

Field Day is a 24 hour operating event to showcase the capabilities of amateur (ham) radio nationwide.  It starts at 2 PM EDT on the last Saturday in June and ends at 2 PM EDT the next day.  This is the second year in a row that we will miss Field Day, so we wanted to at least help with some of the site preparations

We finally had a day without rain and decided to work in the yard.  We have a lot of trees and bushes on our property that are in need of serious trimming, including the removal of dead limbs and branches.  We also have a lot of organic debris from previous trimmings lying around the yard in various places.

While Linda made a run to the recycling center I started trimming a red honeysuckle bush in front of our living room that was badly overgrown and blocked our view of the driveway from one of the windows.  When she got back from the recycling center we worked on a tree that had grown out into our pull-through driveway and down towards the ground, making it difficult-to-impossible for Keith to mow the lawn under and around the tree.

While we were working on this tree Linda found a Painted Turtle resting in the shade under one of the branches that almost reached the ground.  We wondered if it was the same one we had rescued a month ago as it tried to cross the road in front of our house.  I had relocated that turtle to the northeast corner of our yard near our neighbor’s pond.  We worked around the turtle for a while and enjoyed observing it, but once I was done with the trimming I relocated it to the northeast corner of the yard by the pond.  I then worked on another, smaller tree near the driveway that had a lot of dead branches.  We had several other trees on that same side of the house that had low hanging branches so I trimmed those as well.  I then moved to the area just northwest of the house and did the same for a couple of trees there.

We gathered up all of the trimmings and separated them by green (with leaves) and dead (dry and able to burn).  We hauled the dry trimmings back to our recently constructed fire pit where Linda made a pile of kindling from the smallest/driest material and started the fire.  I kept trimming trees and cutting up larger limbs into smaller pieces for the burn pile while Linda hauled them to the fire pit.  It was almost 5 PM by the time we quit working.  We were tired and a bit sore, but it felt good to have accomplished tasks that needed to be done.  There is a lot more to do, of course; we are learning just how much land five acres really is, especially with as many trees as we have.  It will take more than one summer to fully prune our arbor, but that’s OK, we have time.

If the weather holds we will likely work in the yard again tomorrow.  Keith will probably be here on Monday to mow the grass and we need to make sure all of the larger trimmings have been picked up before he arrives.  I also want to prune our pear tree and apple tree before we get any deeper into summer.  They both produced abundant and usable fruit last fall, but we were unable to reach most of it because the trees are badly shaped with too much tall, vertical growth in the center.  But that is for another day; tonight we finished season 2 of Doc Martin and started season 3.