2014/08/31(N) By Any Other Name

My first task after breakfast was to sand drywall compound and apply the next coat where needed.  I’m down to touch up work in most spots and so I am trying to apply very thin layers with feathered edges that will dry quickly and require minimal sanding.  The old A-C opening in the library, however, is taking many, many overlapping layers.  Fortunately I can finish that at my leisure as Darryll is not working in that location.  Since he just this week installed the two pieces of duct in the lower part of the wall between the garage and the library I am still building up drywall compound to fill the irregular and, in places, large gaps on the garage side.  Unfortunately, the thicker compound takes longer to dry and watching drywall compound dry is worse than watching paint dry as it’s even slower.  The trick is to have something else to do while I wait.  Fortunately, I have lots to do.

I had some e-mail correspondence on Friday with the publisher of Bus Conversion Magazine, Gary Hall, whose name turns out to actually be Gary Hatt.  He had his reasons for not using his real name when he first took over BCM, which he explained and which made good sense.  BCM is running my article on Suncoast Designers in the August 2014 issue and he sent me a Dropbox link to the draft.  It looks like another really good issue, but is again coming out a month late.  Ever since the editor had a minor heart attack in early May they have been a month behind.  It appears that they will be doing an article on spin-on oil filters in the October issue and will also use my article on the Spinner II centrifugal oil cleaner that Joe and I installed a year and half ago.  I only have one other article ready for them to use, so I guess I need to get busy and write some new ones.

When I am not working on the house, the yard, or the bus, there’s always computer work to be done.  I have multiple projects to work on, but I also like to relax on a pleasant day and catch up on reading the blogs and RV magazines that I follow.  It was very pleasant today so we turned off the air-conditioning, opened up the house, and sat on the back deck reading and watching wildlife.  I addition to our resident American Red Squirrel we were treated to a visit by three Sandhill Cranes.  The squirrel has been busy for most of the month harvesting and stockpiling pine cones in what we presume is a midden under a cluster of very large fir trees northwest of the house.  The cranes spent a long time wandering around the back yard foraging.  We sat quietly and watched them and they came closer to the house than usual so we got a very good look at them.  They are large and magnificent.

I finally decided to continue editing the rough drafts of my blog posts for this month and get them ready to upload.  I still need to select photographs to go with some of the posts, or to put in separate gallery posts, but I finally uploaded the tree photos I took on the 21st to our Dropbox and e-mailed the link to Paul at Detroit Tree Recycling.

I spent some time online searching for sources of supply for an ignition coil for our Aqua-Hot diesel-fired hydronic heating system.  I can get one from Darin, but he quoted me MSRP and it is an expensive part.  I wasn’t having much luck so I called Butch mid-evening to discuss the situation.  He suggested that I hold off on getting a new ignition coil until I got the coach to his place and we were able to look at it more carefully.  He said I should have had white smoke and a definite smell from the atomized but unburned diesel fuel.  I didn’t which made him wonder if the problem might be fuel delivery rather than ignition spark.  Good advice, as always.  I don’t know enough about the control circuitry on the Aqua-Hot (it’s actually a Webasto inside) to know how the operation of the spark and fuel solenoid might be intertwined.  I have the manuals, but I have not had time to dig into them.  Besides, I have enough other things to work on right now that I am willing to let this one go for a few more weeks.

 

2014/08/18 (M) Tasks Menagerie

I woke up early, before 5 AM, so I got up, showered, shaved (not a daily occurrence), got dressed, and sat in the living room to read.  I started making coffee around 7 AM, which provided Linda the clue (incentive?) to get up and get dressed.  Ahhh, breakfast (homemade granola).

No more limbs hanging over the bus.

No more limbs hanging over the bus.

Linda was on tap to babysit in Ann Arbor today and left around 8:15 AM.  I got the Little Giant ladder out of the front bay of the bus and set it up as 14′ extension ladder.  This is the only ladder we own that will get me onto the roof of the bus.  I took a brush to clean off the roof of bus and a pole saw/pruner to trim tree branches encroaching on the bus.  When I was done on the roof I collapsed the ladder and put it back in the front bay as this ladder goes wherever the bus goes.  I trimmed lots of other trees from the ground and then gathered up the limbs into a pile to get them out of Keith’s way so he could cut the grass.  (Monday is grass cutting day this year.)

I wanted to run the Aqua-Hot but discovered we had left the electric heating element on so the coolant was hot enough the diesel burner would not come on.  We have been told by Aqua-Hot service technicians in seminars that the unit should be run at least once a month to keep it in peak operating condition.  I turned the electric heating element off and checked to see what else might be on that wasn’t needed.

I looked at replacing the overflow reservoir with the larger Oasis one I got from Butch, but it would require stand-offs or brackets to clear existing water lines (at least until I rebuild the water bay) and I did not feel like getting involved in that today.  Besides, the overflow reservoir was just below the full/hot mark from having left the electric heating element turned on, so I needed to let the system cool down before I could do anything anyway.

No limbs hanging out into the pull-through driveway.

No limbs hanging out into the pull-through driveway.

I chatted with Keith for a little while after he finished cutting the grass and then had lunch, after which I settled in to work at my desk on the SLAARC WordPress website.  I took a break mid-afternoon and made several phone calls.  My first call was to Heights Tower Systems in Pensacola, Florida to start finding out what I need to get our used Heights tower erected, how to order it, and what it’s going to cost.  My chat with Katie made it sound like they might not be all that helpful.  They need measurements, photos, and the name of the previous (original) owner as a starting point and I said I would send her that information as soon as I could.

I called Paul’s Tree service next to see if Paul Keech might come out and trim our trees.  The gal who answered the phone said Paul was trying to get out of the tree-trimming business but wanted to know if we needed trees trimmed or felled?  We need both, but I was primarily looking for trimming.  I guess that was the wrong answer.  I left my name and phone numbers and asked that he at least give me a call.  I suspect we will have to find someone else to trim several trees in places I cannot reach.

My last call was to EZ-Connector in Tulare, California.  I talked to Joe and was ready to order until he suggested I double check a couple of things first, specifically the number of circuits (wires) I need and the length of connecting cable.  I need to get these parts ordered, but I’m not sure when I will find time to verify these things.

Linda stopped at the Whole Foods Market in Ann Arbor but still got home ahead of the afternoon traffic.  She bought an Amy’s roasted vegetable pizza for dinner which we enjoyed with red grapes and sweet Bing cherries.  I worked some more on the SLAARC website creating pages for business meeting documents and uploading them.  I also uploaded my blog posts for the last five days of July to our personal blog.  I added more projects to my bus project list, got discouraged at its growing length, and went to bed.

 

2014/08/15 (F) On The Level

I got dressed this morning for physical work, but ended up doing very little.  I worked at my desk most of the morning, including working through the first chapter of the Intro to Linux course on edX.  I came up from the basement to have lunch at 12:30 PM after which I moved my car out of the pull-through driveway.  I then started the bus and, with Linda’s assistance, backed it out of the pull-through driveway, drove it the short distance to our straight driveway (which ties into the other end of the pull-through driveway), pulled it up onto the concrete driveway as far as it could go, and parked it.  The concrete driveway runs uphill from the road to the garage and, not knowing how long it might be there, I lowered the front end and raised the back end; not enough to level it but enough to make it better.  Linda chocked the drive tires while I hooked up the electrical shore-power.  The front bay had gotten water in it from the recent rains so we opened all of the bays to let them air out while Linda soaked up as much water as she could with a couple of old towels.

Spreading 21AA road gravel to fix the driveway.

Spreading 21AA road gravel to fix the driveway.

I got out our 8′ step ladder and pole saw/lopper to prune some large (1 – 2 inch) dead branches that were hanging over the pull-through driveway where the rear end of the bus normally sits.  I no sooner started this work when Phil from Precision Grading showed up right on time with his dump truck, tracked front-loader, and rolling compactor attachment to repair the damage done to the pull-through driveway by the recent landscaping work.

Phil off-loaded the front-loader from the trailer and then disconnected the trailer from the dump truck.  He had a small load of 21AA road gravel (with lots of fines) that he dumped in two different spots in the pull-through driveway.  He then put the truck back in the street and set up his laser level to see just what he needed to do.  He used the front loader to move the gravel around and distribute it evenly and finished by back blading it with the bucket to level it.

Rolling and compacting the driveway.

Rolling and compacting the driveway.

Once he had the gravel the way he wanted it, he removed the bucket and attached the vibrating roller/compactor.  He went over the driveway several times, always making his final pass going backwards while pulling the roller to smooth out the tracks created by the machine’s drive treads.  The roller/compactor worked the fines down into the base and by the time he was done the driveway looked and felt tight; even better than last year when Phil did not yet have this attachment.  The machine also shook the entire house, especially the rear deck which is mostly supported by tall 6×6 and 4×4 posts.  He indicated that we did not need to wait for rain, or anything else, before putting the bus back in its spot, so after he left that is what we did.

But before Phil left, he used his laser level to check the grade in the back.  Although it does not appear to the naked eye to drop very much in the first 70 feet, the laser level indicated that there was a steady down slope over that distance with a total drop of over 1 foot.  He checked all the way to the edge of the cattails marsh, at which point the ground was down 4-5 feet from the deck.  The surface of the neighbor’s pond looks to be at least two feet lower from there.

The compacting roller really makes a difference.

The compacting roller really makes a difference.

There are several implications to this.  For one, it means the surface of the pond is well below our basement slab (6 – 7 feet) and at least 2 feet below the bottom of the footings for our house, so it is probably not the source of the water that runs into our sump.  It also means there is adequate grade to allow surface water to run off once the grass grows in (although it would be better if there was more grade than there currently is in the first 50 feet).  Equally important, the grade is more than adequate for a very effective French drain should we decide to have Phil pull up the existing drain lines and replace them.  Finally, having a hole dug at least 8 feet deep for the ham radio tower base should not pose a problem as the starting elevation is at least 6 feet above the basement slab.

With regards to the tower base, Phil suggested that I have the rebar cage, mounting bolts, and alignment structure built ahead of time and ready to go.  He could dig the hole first thing in the morning with his mini-excavator (up to 8’ deep) and figured it would only take an hour at most.  The assembled rebar could be positioned, plumbed, and secured in an hour or so, and the concrete could be delivered and poured in the late morning.  He indicated that spreading the work out over more time than that, especially letting the hole sit overnight, was not a good idea

Close up of the compacting roller attachment.  This thing shook the whole house!

Close up of the compacting roller attachment. This thing shook the whole house!

We discussed how to get the concrete into the hole given its location about 40 feet northeast of the northeast corner of the house.  Our two options appear to be the little dump carts or a pumper.  The carts would have to drive up the east side of the house between the house and the septic tanks, but Phil thought that would be OK as long as they put down plywood to drive on.  He said a pumper truck would be very expensive but that a separate pump is available that can be towed to the job site.  With that equipment the concrete mixer truck would simply unload the concrete into the pumper, which would then pump it to the hole.  Both the truck and the pumper would be in the east end of our pull-through driveway.  Phil suggested that I call Carl Russell in Byron, Michigan as he is a good concrete guy and probably has a concrete pump.

After Phil left we reversed our earlier steps and moved the bus back into the pull-through driveway.  It rolled right up onto the level pad area and did not leave any noticeable tire tracks.  Nice.  We hooked up the “50 Amp” shorepower cable, turned off the chassis batteries, checked that all of the battery chargers were working, and shut/locked everything.

While Phil was working, Linda went to the Howell Library to return children’s books and came back with a card for the Howell Melon Festival.  The Festival started today and runs through Sunday.  She wanted to go walk around so we skipped dinner and headed out around 5 PM.  At the first turn in our road we encountered two workers from Roese Construction.  They were working on installing the natural gas main line down the street and said another crew would be coming along behind them in 1 – 2 weeks doing the branch runs up to the meters on the houses.

The Howell Melon Festival was just getting started when we got there but parking was already at a premium.  We parked a few blocks away in an empty church parking lot.  Some of the smaller side streets were already blocked off but Grand River Avenue and Michigan Avenue were both still open to traffic.  They will be closed tomorrow and Sunday and filled with vendor booths.

The weather was perfect and all of the downtown restaurants were very busy with lots of outside seating.  In the 16 months we have lived in the new house we have never really visited most of the downtown Howell merchants.  We went into Country Squire, a business that sells fireplace logs and inserts as well as outdoor cooking grills.  They had a couple of natural gas fireplace logs that were 99%+ efficient and did not require the flue to be open.  We thought they were a bit pricey but they were actually capable of heating a room.  We don’t use our existing propane logs because they are mostly decorative and require the flue damper to be open, which just wastes fuel and money.  The Country Squire also had a couple of natural gas grills that would mount to our deck and attach to our existing quick disconnect.

We walked through the food vendor area but did not see anything that interested us.  After walking past the starting gate for the Howell Melon Run we ended up at Uptown Coffee, on the northeast corner of Grand River and Main, where we had some brew and Sabra hummus with pretzel chips.  We started back towards our car and paused at the Old Courthouse long enough to hear the first number by the band.  They sounded good and not too loud.  We had our folding camp chairs in the car but decided to pass on the concert.

We stopped at Walmart on the way home to buy a microwave popcorn popper bowl and stock up on flavors of ICE brand sparkling flavored water.  Meijer’s sells a few flavors but Walmart has the broadest selection, including my two favorites (pineapple-coconut and blueberry-pomegranate).  Our final stop was at Lowe’s for a 100-pack of bright orange marker flags.  I will use these to mark the powerline that runs under the driveway to feed the RV outlet, the propane line to the house, the drain pipe from the corner of the house into the first septic tank, and the drain pipe that connects the outlet of the second septic tank to the beginning of the drain field.

It was a long day but a good one.  We watched another episode of Doc Martin and then called it a night.

 

20140711 (F) Nice Weather Lately

Steven’s nephew, Spencer, was here a little after 8 AM and spent some time cleaning up the driveway.  He was joined by Tommy, who was only available for the morning.  Tommy got instructions from Steve by phone and they tried working on the retaining walls, but I’m not sure what they accomplished.  One of the large boulders Steve positioned yesterday on the lower west wall had dropped 6 inches and they were unable to re-position it.

It was another pleasant day, so I decided to work outside during the morning.  I cut up some previously trimmed tree limbs and then started pruning our apple tree.  I tried to cut all of the dead limbs and branches I could reach from the ground using our new Fiskar’s ratcheting lopper.  With that material removed I was able to use the pole saw and compound lopper to remove some larger and/or higher limbs.  By noon it was getting warm and I knocked off for the day and had lunch.  Linda made the chickpea (garbanzo bean) salad that we both like so much and served it on a bed of greens with red grapes and sweet Bing cherries on the side.

Tommy had to take off for the afternoon and left Spencer to start moving smaller rocks onto the slope of the east retaining wall.  We would occasionally hear one thud against the foundation and I decided I should check on his progress.  He was doing a fine job of tossing rocks into place, but I did not like the way the earth was pitched as it appeared to slope back towards the house.  I examined the west wall and it appeared to have the same problem.

Since the whole reason for this project was to get water to flow away from the house, I asked Spencer to take a break while I called Steve.  I told him that something just did not look right to me and that I could not see any evidence of a drain tile behind the upper wall on the west side.  He was running the excavator at another job site and wasn’t able to come look at our job so he sent Kyle over to pick up Spencer, who did not have a car.  With a chance of rain in the forecast for Saturday through Monday it is looking more and more like this job will not be done until the end of July.

In the afternoon I continued working on configuring my Windows 8.1 laptop.  My challenge today was getting Outlook 2013 to preview PDF files.  I used the search feature on the Start screen to locate information, some of which indicated I would have to create and/or edit the registry.  In the end the solution only required two steps:  installing Adobe Reader 11 and then setting it as the default program for PDFs.

With that problem solved I edited my blog posts for July 1 through 9 and started uploading them.  I managed to get the posts for the 1st, 2nd, and 3rd uploaded before dinner.  I also got a return call from Darryll at DCM Heating and Cooling and we agreed he would come to the house tomorrow at 10:30 AM to finalize the work we need done and pin down a start date to prep the house for natural gas and install a small HVAC unit for the library and a furnace for the garage.  We also need the main air-conditioner serviced.  Luckily it has been a cool summer so far.  The conversion of appliances will have to wait until the natural gas line is connected to the meter and turned on, which could be as late as early October.

I got a call from Gary at GM Construction sometime in the last few days.  He finally had all of his supplier quotes for our pole barn / bus garage project and had a price for us.  It was higher than I would have liked, but less than the quote from Morton Buildings, which was for a much smaller barn.  Last night I called Phil from Precision Grading to update him on the status of the project and to see if he would swing by and look at the pull-through driveway which the landscapers have torn up more than I expected.  My best guess is that we will get a barn up somehow, but I’m not sure when or how.

For dinner Linda made pan-grilled sliced tofu with onions and Bar-B-Que sauce served on a toasted sandwich bun with a side of lightly oiled and baked potato wedges and a few fresh strawberries.  Of course, that meant ketchup with Tabasco sauce.  We split a can of cold Yuengling beer which was the perfect beverage for this meal.  Sometime in the last two days Linda made a raspberry sauce from frozen raspberries we picked last year.  Earlier today she made a vegan chocolate cake and this evening the cake and raspberry sauce came together for dessert.

 

2014/07/02 (W) Trees And Rocks

Steve arrived at 6:45 AM and got right to work using the excavator to place additional large boulders for the rear retaining walls.  He was done by 8:30 AM and loaded the excavator back on his trailer to take to another job site.  I noticed that one of his trailer tires was very under-inflated so I got out my large portable air compressor to inflate it.  This tire turned out to have a puncture in the tread and was not going to hold air.  Steve knew the tires were not in good shape but I discovered that they were not an adequate load range for the weight he was carrying even if they were inflated to their maximum cold pressure, which they were not.  I inflated all of them as high as I was comfortable given their age.  If it had been my trailer I would have taken it, unloaded, immediately to a nearby tire store and had them put on four new tires with an appropriate load range.  I am not a tire expert, but we have been to enough seminars on RV tires and weight safety, that I have a better understanding of the subject then most people.

The excavator working on the rear retaining walls.

The excavator working on the rear retaining walls.

Linda made her yummy vegan pancakes for breakfast after which I decided to trim trees in the southeast corner of the yard.  It was cooler than yesterday but still a bit humid, so the working conditions were not ideal.  I worked until mid-afternoon and got one tree pruned of all its deadwood and took some low dead limbs off of several other trees.  I enjoy the pruning; it requires some thought about ladder placement, choice of tools, and where to cut, and I have a nicer/healthier looking tree when I am done.  Taking the small branches off of the larger limbs, cutting the limbs into shorter lengths, and carting everything to the fire pit; not my favorite thing to do.  Linda assures me that cleanup has never been my forte.

Two landscapers showed up around 10 AM and worked on the retaining walls.  There were supposed to be three of them, but one guy could not make it.  The hand work they were doing really needed three guys, so it was hard for them.  They got to a point where they were waiting on a delivery of sleeved plastic drain tile that wasn’t showing up in a timely fashion so I gave them directions to the Lowe’s at Grand River and Latson Roads where they bought a 100 foot roll and tied it to the roof of their car to get it back to our house.  They were then able to place the landscape fabric behind the first course of boulders, across the bottom of the shelf and up the back, lay the drain tile in the trench, and back fill the trench.  This gave them a place to stand as they worked on the next shelf.

Linda spent the morning cooking a batch of her amazing granola and her equally amazing vegan potato salad.  She boiled and then cubed red potatoes and mixed them with vegan mayo, apple cider vinegar, celery, onion, dill pickle, and dill weed.  We have been having tofu hot dogs for lunch with some regularity as it is an easy, tasty summer treat (with mustard, onions, and relish).  The potato salad was the perfect accompaniment, especially as it was still slightly warm.  Sweet cherries provided the finishing note for a tasty summer lunch.

Steve came back around 3 PM to check on the progress of his crew, gave them some specific goals for the rest of the day, and took off.  The crew was here until 6 PM.  Everyone has been working hard but we are at the stage in the project where there has been a lot more destruction than construction.  We have been through enough construction projects over the years that we know what to expect, but it is still stressful to see everything torn up.

Linda made baked stuffed acorn squash for dinner with a side of grilled baby bok choy.  The stuffing was made from carrots, celery, mushrooms, onions, sun dried tomatoes, bread cubes, raisins, walnuts, flax seeds, and sage.  It reminded me of stuffing from a Thanksgiving holiday meal.  We had a small glass of Franzia Sweet Red wine which paired well with the savory main dish.