Tag Archives: The Bauhaus

2015-10-18 (N) Homage to FLLW  

We got up at 8 AM.  I made Ethiopian Yirgacheffe half-caffe coffee while Linda prepared vegan pancakes.  We had talked yesterday about going to the Howell Farmers Market this morning but did not feel like going out in the early morning chill.  When we finished our coffee I turned the fireplace off and we got dressed to work.

Our focus in the bus today continued to be the built-in sofa.  We decided yesterday to move the plywood seat out from the wall 4-3/4″ from its original position.  The original stationary board on the back side of the piano hinge, which was only 2-3/4″ wide, was designed to place the front edge of the plywood seat (which has a 3/4″ walnut hardwood edge) 3/4″ beyond the cabinetry on both ends of the sofa with an overhang of just a few inches beyond the vertical front support board.  It was a nice design which tied in well with the cabinetry and kept the sofa from intruding into the living room aisle.  It resulted, however, in a seating depth of 16″ which turned out to be too short.  It was my homage to Frank Lloyd Wright: integrated, attractive, cantilevered, and uncomfortable.

As much as I like and admire FLLW’s work, I also like the Bauhaus maxim “form follows function.”  We needed a 3/4″ thick (11/16″ actually) board 7-1/2″ wide by 77-7/8″ long to locate the plywood seat in its new position.  The only wood we had on hand that we could cut this from in one piece was a 24″ X 96″ piece of walnut veneered plywood.  Since the board will not be visible I did not want to waste the walnut veneered plywood for this piece.

We also had a half sheet (4′ X 4′) of good plywood and after thinking about it for a while I decided to make the stationary board in two pieces.  The key was that I would use a third piece, cut from that same 4′ X 4′ sheet, as a splicing plate to join the other two pieces together.  But I was trying to accomplish more than that.  With the original design the pivot line of the piano hinge was over the top of the wiring chase, about 1-3/4″ back from the front edge.  That meant the back edge of the moveable seat board, when closed, was resting on the wiring chase for its entire length.  With the new stationary board the pivot line of the piano hinge is unsupported except for 5-3/4″ on each end.  The third piece of plywood would be at least a partial solution to that problem.

We worked in the garage with the overhead doors closed and the furnace on.  I cut two 7-1/2″ wide pieces off of the 4′ X 4′ sheet of plywood and then cut them to lengths of 38-7/8″ each so they would be just shy of 77-7/8″ when butted together end-to-end.  We took the two pieces to the bus and set them in place on top of the writing chase which sits atop the HVAC duct.  They just fit, which was nice.  I marked the underside along the edge of the wiring chase with a pencil.   We then took the pieces back to the shop.

I found a relatively flat portion of the garage floor and laid the two pieces end-to-end face down.  I set the third piece on top of the first two so that it was of equal length in both directions from the center and was at least 1/4″ forward from the line I had marked.  This third board extended beyond the front edge of the other two boards by at least two inches along its entire length of four feet.  With Linda holding it in place I inserted four self-drilling wood screws, two for each of the main boards, to hold the three pieces in position.

We placed the old 2-3/4″ wide board along the edge of the new boards and marked the locations of all of screw holes for the piano hinge.  I then center punched and drilled countersunk holes for lots of screws being careful to keep them in between the hinge holes.  I ran all of the screws in until the points just protruded from the other side.  I then applied Titebond II wood glue to the two main boards, positioned the third board using the screw tips as alignment guides, and ran all of the screws down pulling the pieces tightly together.  Linda got a paper shop towel wet and I used it to clean off the excess glue that oozed out from between the boards.

We took the new stationary backboard to the bus and set it in place upside down.  I marked the underside along the edge of wiring chase and then we flipped it end-for-end and set it in place right side up.  We pulled it forward so I could mark the locations of the existing screws securing the top of the wiring chase to the two long sides and then slid it back against the wall.  The line served as my guide for where to screw the backboard to the wiring chase.  (The chase has two long “1×2″ sides on edge with a 3/8″ thick plywood top that is about 4-1/2″ wide.  For maximum strength I needed to screw through the backboard into the 1x2s.  I also needed to avoid the space between the 1x2s as that is where all of the AC wiring is run.)

I center tapped a lot of locations and drilled them with a #6 countersink bit even though I was using #8 self-drilling outdoor screws.  The reason for the drilling step was to make sure I did not split any wood.  I screwed the backboard to the wiring chase with lots of 1-1/4″ #8 screws in two rows corresponding to the front and back side boards of the wiring chase.

The backboard pieces had oozed a small amount of additional glue so I used a piece of scrap aluminum sheet metal to scrap it out of the joint.  When the plywood seat is closed the back couple of inches will rest on the third piece of plywood so there cannot be any interference along there.  We set the moveable seat board in place and marked all of the hinge holes on the stationary backboard and then pulled it out gain.  We did not, however, attach the piano hinge to the stationary backboard as I wanted to let the glue cure for at least 24 hours.

By this point it was 1 PM so we stopped to have lunch which consisted of vegan hotdogs with mustard, onions, and relish and both red and green grapes.  We got these grapes at Meijer’s and their produce is usually good, but the green grapes had almost no taste.  Oh well; there will be days (and foods) like that.

After lunch we shifted our attention to the driveway extension project.  I gathered up a box of plastic and wood stakes, a mallet, a 100 foot tape measure, and the site plan for the bus barn and driveway.  It took us about three hours to stake out the location of the pull-through driveway, locate the front corners of the bus barn, and stake out the approach/apron for the barn.  Phil will be back early tomorrow morning and the first thing on the agenda is going over the layout and figuring out elevations for the two planned level pad areas.

At this point Linda went inside to work on dinner while I cleared the margin of the woods along the south side of the driveway extension.  I added bar/chain oil and a 40:1 fuel:oil mixture to the chain saw and got out the compound loppers, pruning saw, pole saw, and safety glasses.  I initially used the loppers to cut down small saplings, cut off small branches, and trim back bushes and vines.  I used the chain saw to cut down slightly larger trees, up to 3” in diameter at the base, and finish cutting out three bushes and some entwined vines.  I then used the pole saw to trim low overhanging branches.  I dragged all of the cuttings to a spot on the west side of the fir trees and used the chain saw to cut the larger trees into smaller pieces.

It was 6:30 PM by the time I was done and had the tools put away.  Dinner was almost ready when I got a call from Butch.  He was following up on how our refrigerator was performing and also needed my assistance with a possible Ebay purchase.  The item he was interested in was in Canton, Michigan about 45 minutes from our house, and the seller was not willing to ship it.  He wanted to know if it would fit in our Honda Element and if so, would I be willing to pick it up if he decided to buy it.  Of course I was willing to help as long as my car was able to handle the item.  While he was on the phone I measured the clearance for the rear hatch and gave him the dimensions.  As soon as we got off the phone he e-mailed me the link to the auction, which still had 85 minutes remaining.

For dinner Linda started with a really nice salad that had slivered almonds and pumpkin seeds and dressed it with Ken’s Sweet Vidalia Onion dressing.  The main course was an amazing soup.  She roasted a golden acorn squash, sweet potatoes, carrots, garlic, and shallots.  She then put these in a pot, added vegetable broth, and heated the mixture.  To finish the dish she used an immersion blender to purée everything into a smooth, thick, hearty, and delicious soup.  After working outside all afternoon on a chilly day it really hit the spot.  We finished the bottle of Cupcake Black Forest red wine we opened yesterday.

After dinner I retrieved Butch’s e-mail, checked out the item, and e-mailed him back.  I then spent a little time reading and replying to posts in various RVillage groups.  I called Butch back just before 8 PM and then turned on the Yaesu FTM-400 to join the SLAARC Info Net at 8 PM.  Unfortunately all I heard was noise.  I have not used the radio for the last few weeks so I don’t know if the net did not take place (unlikely but possible) or if a problem has developed with our system.  If the later, it is most likely the Morgan I.C.E. lightning arrestor (again).  Whatever the reason, I was not going to figure it out this evening.  I went to bed at 9 PM and wrote this post.  It took some time to write but if I do not record the details the same day they slip away quickly.

 

2015/07/16 (R) RV Work

We were up at 6 AM and by 6:25 Mara had started the engine of her motorhome to pull in the slides.  She disconnected the electrical cord and we helped her back out of the driveway at 6:40.  She was pointed west so she had to drive to the end of our street and use the circle to turn around.  Her destination was Cummins Bridgeway in New Hudson.  When she made the appointment they said the closer to 7 AM she could arrive the better.  They estimated she would be there 3 to 4 hours.

Mara's Fleetwood Bounder parked in our pull-thru driveway.

Mara’s Fleetwood Bounder parked in our pull-thru driveway.  Linda in green jacket, Mara in red.

Linda did not sleep well last night, a common side effect of eating too much too late in the evening, and went back to bed once Mara was safely on her way.  I decided to stay up and clean the coffee maker before making coffee.

I wiped out the upper housing and cleaned the nooks and crannies with Q-tips.  The upper housing is undoubtedly designed the way it is to make it structurally adequate with a minimum of plastic but it was equally obviously not designed with any consideration for being able to clean it.  Like many things, it leaves me wondering if the designers ever use the products they design or what sort of functional specifications they work from and who develops those.  I think the Bauhaus had it right when they declared “form follows function.”  My guess is that commercial equipment, while less “stylish” than consumer goods, has cleanability and serviceability as primary design considerations.

I remembered that we had a one gallon jug of distilled white vinegar in the bus so I got that and ran eight cups of it through the coffee maker.  I added four cups of water to the used vinegar and ran it through again.  I then ran 12 cups of RO water through the coffee maker.  By the time I was done it was approaching 8 AM so I ground up some of the Sumatra Mandheling beans (not decaffeinated) and made seven cups of coffee.  I normally make 8 – 9 cups but this was full-strength stuff.  I’ve been making 11 cups while Mara is here but it turns out that she does not drink much coffee so I will be back to my usual 8 – 9 half-caff servings going forward.

I enjoyed my first cup of coffee while finishing yesterday’s blog post and starting this one.  I enjoyed my second cup while researching hardware for mounting a small table to a wall so that it is essentially cantilevered, which is the table arrangement we need for the bus.  I found a 2-piece aluminum extrusion that might be the solution for attaching the table to the wall.  It is 30″ long and can be cut to length but I do not think it will not be strong enough by itself to support the table.  I found an angle bracket on Rockler that might be the additional piece I need.  It is 12″ x 18″ with a notched corner, made of 1/8″ steel, and powder-coated black.  A pair of them will support 1,000 pounds so one in the center would be more than sufficient.  An alternative would be a wood strut angling back to the wall but we are not willing to have a vertical table leg.  I have not decided whether the table should be removable but I am leaning towards a more permanent installation.

Linda eventually got up but neither of us were hungry so we did not have breakfast.  I went to my office and ordered the ZioTek monitor mounting system from CyberGuys.  I then e-mailed Ewa at AFC Industries and thanked her for the second quote but let her know that the price was way out of my budget.  I finally settled in to work on the custom desk design for the bus and eventually finished it (I think).  Linda left around 12:30 PM for her dermatology appointment.

Now that we have base station antennas cabled to the ham shack I tend to have the new Yaesu FTM-400DR/DE dual band (VHF/UHF) radio on whenever I am working in my office.  It provides a pleasant diversion from my other tasks and is actually useful.  Somewhere mixed in with everything else were a couple of QSOs with ham buddies and an attempt to coordinate with Steve (N8AR) and Mike (W8XH) about testing my two Morgan lightning arrestors at Steve’s QTH.

This toad was sitting on a rock by our front porch.

This toad was sitting on a rock by our front porch.

Our bus had settled in the rear and was clearly out of level.  The reason it had settled was that I forgot to switch the suspension system to Level Low and shut off the air to the engine accessories.  It was of no consequence but it bugged me so I started it, let it air up, re-leveled it, shut it down, and switched off the batteries and engine air accessories.

Mara returned from Cummins Bridgeway around 1 PM and I guided her back into her parking spot.  They did the routine service on her motorhome engine and generator but found several things on the genset that needed to be repaired.  She agreed to have the work done so they removed the genset from her rig and will reinstall it next Wednesday.  They also inspected the motorhome and gave her a list of other things that needed to be fixed, some right away and some eventually.  She did not have them do any of that work as she wanted me to look at the list first.  The added service work means Mara will be visiting with us for at least another week, which pleased us greatly.

I went over the list with her and we discussed the relative importance and urgency of each repair.  One of the items involved the caulking on the roof so we both climbed up there to have a look.  I also wanted to scope out how we might install her weBoost Drive 4G-X cellular booster system.  While we were on the roof I was able to rock the rig side-to-side quite a bit just by shifting my weight.  One of the other items on the diagnostic list was shock absorbers and I indicated that I thought that sounded appropriate, especially given that the back ones reportedly had cracked/broken mounts.  They also noted that the transmission fluid was low and that the filter and fluid should be replaced.  I encouraged her to have these taken care before she left as Cummins Bridgeway is a very good service facility.

The other items were things that could wait but the caulking of the roof was something Mara could do herself.  She likes to take care of as much of her rig as possible and she will be here through at least Wednesday, so she has time.

Linda got back from her out-patient surgical appointment with bandages in seven different places.  We visited for a while and then I left the ladies and returned to my office.  I started on the design of the pull-out pantry for the bus and quickly realized that the very expensive Fulterer heavy-duty pull-out pantry slide I ordered from Rockler was too wide for the space we have available.  I came upstairs and groused about it for a while until Linda and Mara urged me to try canceling the order.  I called Rockler and spoke to someone in customer service.  I won’t know until tomorrow at the earliest, and probably not until Monday, if I was successful in intercepting the order before it shipped.  If not I will have to pay to ship it back and may have to pay a restocking fee.  Although I do not have anywhere else I can use it at the moment, between the restocking charge and the cost of shipping I may just keep it and find a use for it.

Linda made a large salad for dinner and we chatted during and after the meal.  It had been an early, long, hard day for all of us.  Mara returned to her rig before it was dark and Linda headed off to bed shortly thereafter with me not far behind.