Linda was back on schedule this morning; up at 5:45 AM and off to the bakery at 6:15.  I got up around 7:30 AM, ground beans for a small pot of coffee and made breakfast.  Breakfast was oatmeal that I made myself from quick cook oats with raisins, dried cranberries, and pecans.  I forgot to add cinnamon and brown sugar but I did add a small amount of vegan butter, sugar, and non-dairy coffee creamer.  I like to cook my oatmeal until it is very thick and then loosen it up slightly with these additions.

After breakfast I checked the thermometers in the bus refrigerator and recorded the temperatures.  They seem to be all over the place and I am really starting to question the accuracy, and thus the usefulness, of these relatively inexpensive “consumer” devices.

Around 10 AM I was getting ready to drive to Canton when I got a call from Chuck.  The pair of motorized MCD duo shades had arrived the other day and he was having difficulty installing them.  I offered to stop by his shop after my errand and he said he would be there.

I called Clyde to make sure he would be home and then headed to Canton to pick up the antique Sun automotive distributor tester.  Clyde’s house was easy to find; an old residential area tucked away behind what is now a heavily developed commercial strip along Ford Road either side of I-275.  He helped me load the tester into my car and then we chatted for a while.  He had a very rare and beautifully restored (customized) 1948 two-door Pontiac boat tail sport coup; all black with two chrome strips, one down each side.  I am not a “car guy” but I appreciate a work of art when I see one.

I drove to Chuck’s shop in Novi to see how the windshield shade installation was progressing.  The pocket between the upper windshields and the cabinets was too narrow on the outside ends to allow the shades to tilt enough to engage the clip in that end and then swing up and latch on the other side.  After struggling with it for a while we went to lunch at the Panera nearby.

Back at his shop we pondered the installation problem until I finally had an insight.  The upper windshields slope away from the overhead cabinets, creating more horizontal space at lower heights.  I suggested that using a 2″x2″ board as a spacer might lower the mounting bracket just enough to allow it to tilt into place and have enough space to lock it in and release it if needed.  Chuck had a scrap piece of 2×2 that we used to see if my idea might work.  Chuck thought it would work so he locked up the shop and I headed for home while headed to The Home Depot.

Back home I checked the thermometers in the bus fridge.  The readings just did not make sense so I brought the LaCrosse base unit and remote into the house to get them away from the TempMinder components.  I researched methods and equipment for measuring temperature in freezers and refrigerators looking for something that would be more accurate and precise than our current technology but I did not find much.

The more accurate temperature measurement instruments that are available for under $100 all use wired probes rather than wireless remote sensors.  The best ones have the probes sealed in small glass bottles filled with a liquid such as alcohol, oil, or glycerin.  These remain liquid at normal freezer and refrigerator temperatures and surround the temperature probe with enough thermal mass to prevent it from responding too quickly to changes in air temperature such as occurs when the door is opened or the fridge compressor and fans are running.  In effect the probes more accurately reflect the temperature of things stored in the refrigerator rather than the instantaneous temperature of the air near the sensor.  The wires for the probes are typically relatively fine and do not prevent the door seals from closing completely, at least in the short term.  A permanent installation, however, seems ill-advised.

I was researching flash units and other accessories for our new Sony alpha 99 camera when Phil showed up mid-afternoon.  I set my research aside and went out to chat with him and watch what he was doing.  He had a full truck load of sand from another job that he dumped at the west end of the property and then moved it into some of the low spots, of which there are many.  He used his front loader to finish removing topsoil from the new driveway area by the third culvert and load it into his truck.  He filled the truck and dumped it at the west end of the property.  He then used his bulldozer to grade out the area of the driveway where he had just removed all of the topsoil.  Finally, he used the front loader to compact the sand driveway base.

Phil was going to come back on Saturday but he is at the point where he needs stone (21AA road gravel) that he will not be able to get it until Monday.  He is also finishing up other jobs that involve inspections and won’t be back here until at least Tuesday.  I need to trim the lower branches on some of the trees to get them out of his way, and out of Keith’s way when he mows the grass, so I will probably do that on Monday, leaving Saturday and Sunday to work on the bus while Linda is available to help.

Phil was still working when Linda got home so I left Phil to finish up and went inside.  I was tired and took a short nap while Linda fixed dinner.  She made a nice salad and risotto with celery and dandelion greens; a first for us, and very tasty.  We also did a taste test of the California Olive Ranch EVOO versus the Philippe Berio EVOO that Linda normally uses.  We used Italian bread that she brought home from the bakery.  I was able to detect a very subtle difference in the taste but had to not use the crust of the bread as the poppy seeds provided their own distinct taste.  The COR product was the top choice of a tasting panel at Cook’s Illustrated magazine and reasonably priced at just under $10 a bottle but I did not find the taste superior to the PB product.

After dinner I went to my office and checked e-mail.  I took care of some things related to the November 2015 issue of BCM.  We had confirmation e-mails from Molly Pinner for our 56th Escapade Volunteer assignments.  I also had one from Kate with links to camera harnesses at B&H Photo and a second with links to a recent interview on AM1700 with the organizer of the Pop-X art exhibit in Liberty Plaza and photos she has taken of guests at the station and musical groups at SxSW and other venues.

I talked briefly with Mike (W8XH) via the South Lyon 2m repeater using the Yaesu FTM-400 radio.  Our ham shack was working just fine so apparently there was no Info Net this past Sunday.  I called Butch to let him know I had the distributor tester and chatted with him about the refrigerator temperature monitoring problems I am having.  It was then off to bed, as we have to be up by 7 AM to get to our weekly ham radio breakfast in South Lyon.

 

2015/10/17 (S) First Snow

Last night we removed the dining table from the back of my car and put it on the bed in the bus.  We then removed the two rear seats and put them in the garage.  We wanted the back of the Honda Element empty when we got up this morning as we do not usually have time to spare in the morning before driving to South Lyon for breakfast with the South Lyon Area Amateur Radio Club.

It’s always good to see our fellow hams and today was no exception.  We arrived just before 8 AM and stayed for over an hour.  We left around 9:15 and drove to Chuck’s shop in Novi to get the box with the two remaining lower windshields for our bus.  Chuck was already there and helped us load the box into the car.  The box was sized to hold five windshields but only had two in it so it was light enough for us to move by hand.  I knew it would fit in my car as we had measured it on a previous visit and I had checked the dimensions against the car.  We set one end on the tailgate, lifted the other end, and slid it in.  We chatted for a while, and looked at a project Chuck is working in for new front window shades, before heading home.

Phil was not at our house when we got home but he had obviously been there.  All of the concrete, and many of the rocks and boulders, were gone from the driveway extension area so I presumed he had loaded them in his truck and hauled them away.

The Converted Coach Owners (CCO) Halloween Rally was going on this weekend and today was the main day for activities.  We had intended/hoped to go to the rally but the progress on our bus remodeling has slowed over the last couple of weeks for various reasons, all legitimate, and it was not in a condition to travel or be used.  It’s not that things are not getting done; they are, just not as fast as we would like or need them to.  Among other things I have not yet secured the refrigerator and pantry.  We thought about driving over in the car but it was over two hours one way and we needed to spend what time we had available working on the bus and could not justify being gone.  Thanksgiving does not look/feel that far away anymore.  It also seemed ill-advised to be gone while Phil is here digging up the yard.

My main bus focus for today was completing the installation of the built-in sofa.  We had already set the plywood seat board on a blanket on the bus kitchen floor so I had access to the inside of the base/storage box.  I did not need Linda’s assistance for a while so she worked on her counted cross-stitch project.  Before starting on the sofa, however, I took care of a few other minor things.

First I replaced the alkaline batteries in the TempMinder thermometers with Lithium ones.  I then reset the minimum and maximum temperatures for the two remote sensors.  Sensor #1 monitors the freezer and sensor #2 monitors the fresh food compartment of the bus refrigerator.  The directions for the TempMinder suggest using Lithium batteries if the remote sensors will be in cold environments.

Next I got a piece of scrap SurePly underlayment to see how it would fit in the rabbited wood trim on the lower outside wall of the hallway.  I inserted it fully into a corner and marked the edges with a pencil.  It is approximately 3/16″ thick and fit nicely without being too tight.  With a layer of veneer it should be just right.  When I removed it the depth of the rabbits appeared to be 5/16″ to 3/8″.  I think the underlayment will make a nice base for hardwood veneer.  I will cut the panels 1/2″ wider (22-1/2″) and 1/2″ longer (28″) than the 22″ X 27-1/2″ dimensions of the framed opening and allow them to “float” just like a frame and panel door.

My last mini-task was locating the 1/4″ walnut veneered plywood we removed from the old refrigerator and measuring it to see if we had pieces big enough to panel the damaged area on the wall by the co-pilot seat.  I was pleased to find that the remaining pieces are large enough for this application.

By now it was 12:30 PM and my phone reminded me that we had an RVillage Ambassadors webinar/meeting at 1 PM.  Linda heated up some Amy’s Vegetable Bean Soup and made hot lentil loaf sandwiches with ketchup.  Yum.  We got our first snow flurries of the 2015-16 winter season during lunch and they continued off and on through the afternoon.  We moved to Michigan in May 1976.  It snowed on October 15th that year and we had snow on the ground every day until early April 1977.  While that has not held up over the years as a “typical” southeast Michigan winter it was very different from what we grew up with in Missouri and formed our first and most lasting impression of our adopted state.

I retrieved the link for the Go To Meeting from the RVillage website and put it in my web browser.  1 PM came and went with no meeting.  The meeting notice said “Saturday, October 17 at 10 AM PST” but they had clarified that was actually 10 AM PDT, which is 1 PM EDT.  We decided that perhaps they really meant PST, which would be 2 PM our time.  We tried again an hour later, but no meeting ever commenced.

When I finally got to work in the bus on the sofa I removed six screws, three each from two angle brackets, and pulled the entire base assembly out from the wall, giving me complete access to the HVAC duct and wiring chase.  Much of the final installation of the sofa involved this duct.

Powered and manual sheet metal nibblers with the opening Bruce just cut in the OTR HVAC duct and the piece of sheet metal that was removed.

Powered and manual sheet metal nibblers with the opening Bruce just cut in the OTR HVAC duct and the piece of sheet metal that was removed.

The ends of the plywood seat rest on two boxes with open ends that also serve as plenums for air from the OTR HVAC system ducts.  I needed to cut out rectangular openings in the vertical face of the duct to allow air into the back end of these boxes.  I used a 1/2″ drill to create starter holes at the corners of the openings and then used a manual sheet metal nibbler and a drill-powered reciprocating nibbler, both of which I borrowed from Chuck a few weeks ago, to cut out the sheet metal.  The two tools work differently but they both worked well and I was glad I had both of them for this task.  The powered nibbler created a lot of small metal debris so I vacuumed the whole work area very thoroughly when I was done nibbling.

The right (forward) end of the duct also had an extra hole in it where I did not need or want one.  I removed an old sheet metal patch plate and cut a new one to cover the area I needed to close off.  I ended up having to pre-drill holes as I spun the heads off two of my cheap sheet metal screws.  I had a heck of a time getting the shafts out, but I got it done.  This was just one more example of why seemingly simple projects always take longer than they should.

Phil returned while I was working on the sofa and continued trenching in the French drain.  I stopped to chat with him briefly and Linda came out to let me know she was headed to the grocery store.  I then got back to my own tasks and let Phil get back to his.

The left support/plenum box with the circular register hole cut in the face plate.

The left support/plenum box with the circular register hole cut in the face plate.

The open fronts of the two plenum boxes are attached to the inside of the vertical front support, which is 3/4″ walnut veneered plywood.  To get the air out of the boxes and into the coach my design called for brown plastic 4″ round louvered diffusers.  They are considered “four inch” because the two inch long cylindrical pipe on the back will just fit through a 4″ diameter circular hole.  (A 4″ flexible duct, like dryer duct, will also just fit over the pipe.)  The visible part of the diffuser is actually 5-1/2″ in diameter.

The inside width of the plenum boxes is 4-1/4″ by design.  I needed to center a 4″ hole within that space so I had to locate the center point for my 4″ hole saw very accurately side-to-side.  I also wanted the hole centered vertically.  Using my small square I marked the vertical midpoint on the edge of the front plywood at each end.  I then measured in 2-13/16″ from the midpoint mark and used my spring-loaded center punch to mark the center of the hole.   [The 2-13/16″ dimension came from half the inside width, or 2-1/8″, plus the thickness of the plywood used to make the plenums, or 11/16″.]

A close up view of the nylon mesh screen material used to cover the opening in the HVAC duct to keep critters that might get into the duct from getting into the support/plenum box.

A close up view of the nylon mesh screen material used to cover the opening in the HVAC duct to keep critters that might get into the duct from getting into the support/plenum box.

I stood the boxes on their back ends so the front board was horizontal.  I straddled the front board with my legs to hold it and drilled starter holes with a #6 countersink bit.  I then drilled the 4″ holes with a 4″ hole saw using my 1/2″ Craftsman corded drill, being careful to have the pilot bit in the starter holes and drill perpendicular to the face of the plywood.  I have had this drill for 37 years.  It is very powerful and has several ways it can be gripped quite securely.  It is large, heavy, and lacks the convenience of a cordless drill but when I need to use a bit with a 1/2″ shaft and/or need the torque, this is still the drill for the job.  The hole saw created some sawdust so I vacuumed the whole area thoroughly when I was done drilling.

I was just finishing this work when Linda got back from the grocery store.  She put the groceries away and came out to see if I needed any assistance.  I already had the roll of plastic screen in the bus and she got the Gorilla Tape from the garage.  I cut pieces of the screen large enough to cover the two rectangular openings in the HVAC duct and used lengths of Gorilla Tape to secure them.  We then slid the base/storage assembly back into position, pushed it tight to the HVAC duct, and reattached it to the wood wire chase on top of the duct.  The two support boxes and the return air box have foam weather stripping on the back edges to seal against the duct.

We picked the plywood seat up off of the kitchen floor and set it back in place but did not secure it.  We left it out several inches from its original position and got a seat and back cushion from the bedroom.  We experimented with different spacings and finally agreed that we need to have the seat out 4-3/4″ farther than originally designed.  The current hinge board is 11/16″ plywood, 2-3/4″ wide by just under 78″ long.  This board is screwed to the top of the wiring chase and to one side of the 72″ piano hinge.  I will replace it with a piece that is 7-1/2″ wide by the same length.  I will also have to provide some additional support for the seat side of the piano hinge as in the original design had both sides of the hinge resting on top of the wiring chase on top of the HVAC duct.

The Tulip Tree behind our house in its full fall glory.  This is the first photo to be posted in this blog taken with the new Sony a99v DSLT camera.

The Tulip Tree behind our house in its full fall glory. This is the first photo to be posted in this blog taken with the new Sony a99v DSLT camera.

That was the end of the interior bus work for today.  By the time we were done Phil had driven his front-loader onto his flat-bed trailer and secured it so it appeared he was wrapping up for the day.  I chatted with him about the project for 30 minutes before he left.  Earlier in the afternoon I had found my site plan drawings for the bus barn and agreed to stake out the driveway tomorrow so we could review it first thing Monday morning.

Linda had invited Meghan and Chris for brunch tomorrow but it was not a good weekend for them as the Michigan vs Michigan State football game was taking place in Ann Arbor.  Chris manages the Pizza House restaurant, and being away on football Saturday is not an option.  They will come next Sunday (31st) instead.

For dinner Linda made a nice salad of mixed greens with dried cranberries, sliced almonds, and diced onions dressed with raspberry vinaigrette.  The main course was pan-fried polenta with vegan puttanesca sauce.  It held its heat to the last bite and was very satisfying on a cold evening.  I opened a bottle of Cupcake Black Forest red wine.  We have had it before and, although drier than I prefer, it went well with the meal.

After dinner I got my flashlight and checked the bus for axle/hub seal leaks by looking under the bus from the opposite side to see the inside of the wheels.  I did not see anything to suggest a problem on any of the six positions and will text that information to Joe tomorrow for planning purposes as he would require a second day to work on the seals if that was needed.

We spent the last couple of hours of the day in the living room, with the fireplace turned on, reading, writing, and playing games while enjoying some red grapes for dessert.  Linda got a text from her sister-in-law, Mary, with a photo of her and Ron “standing on ‘the’ corner in Winslow, Arizona.”  Ron has been retired for many years but Mary only recently retired and they are on their first extended camping trip in their A-liner trailer and their first trip to the southwest U.S.

We went to bed around 10 PM.  Linda fell asleep quickly while I divided my attention between cooking shows on the Detroit PBS Create channel, a concert by Eric Clapton on PBS, and working on this post.

 

2015/10/16 (F) Desk Installation

We were up at 8 AM, fed the cats, made coffee, and had breakfast.  Phil showed up around 8:30 AM, unloaded his front loader, dropped his flatbed trailer, and left in his dump truck.  I turned on the fireplace and we enjoyed our coffee while iPading until 10:15 AM.

Our first task today was to cut up several large limbs that I pulled out of the woods last evening to get them out of Phil’s way.  I cut them up with the chain saw and then we stacked them on the disposal pile for Phil to haul away.

Phil returned at 10:30 and moved his Caterpillar 305C excavator into the woods across the street by the culvert.  I went down to chat with him briefly to make sure I understood what he was going to work on.  There were a lot of small trees (3″ diameter), saplings, and bushes scattered around the site.  Some of them had been dead for years and some had just been knocked over by Phil.  I decided to work in that area with my chain saw cutting everything up into five foot lengths so Phil could use his front loader to get them into his dump truck.  I worked at this until 11:30 AM and then turned my attention to the bus.  Linda worked on her needlepoint while I cut wood.

Before getting started on construction tasks I took two pieces of filter material and set them on the wire shelf in the freezer compartment of the new refrigerator, one on top of the other.  I then set the two remote thermometer sensors on the filter material.  Butch had suggested the other night that I set the sensor on a sponge to get it off of the floor of the freezer compartment as it was likely responding to the automatic defroster heat strips when they come on.  I figured the filter material would work just as well and that placing the sensors on the shelf would definitely get them away from the floor.

Linda brought out a bag of ice from the house fridge and put it in the bus freezer.  She also filled several 1/2 gallon juice and milk cartons with water, put the caps on, and put them in the fresh food compartment.  The purpose of all of this was to add thermal mass to the compartments to cause the refrigerator to run less often and reduce large swings in temperature.

Inside the bus our first sub-project was installing the desk, which included putting the front passenger side HVAC duct cover in place even though it is not finished.  It took us quite a while to get everything positioned just right.  With Linda holding things in position I screwed the right pedestal to the wall, adjusted the position of the base and screwed the pedestal to the base.  We then repeated that process for the left pedestal and base.

Linda removes the backing from the double-sided tape on the back side of the air grate in the center connector/cover for the desk.

Linda removes the backing from the double-sided tape on the back side of the air grate in the center connector/cover for the desk.

At this point we had several things to do with, and under, the center connector/cover so I removed it and took it into the garage/shop.  We cut a piece of the decorative brass colored metal grate and secured it to the back of the air opening with small screws every few inches.  Next we cut a piece of black plastic mesh to fit over the grate.  We then cut pieces of 3M Extreme Mounting Tape (double-sided) and attached them to the back side of the grate in between the screws.  Linda peeled off the protective layer and we carefully placed the plastic mesh.  Using one of the scrap pieces of the protective layer I rolled the plastic into the take with our wallpaper seam roller.  Finally, we had a piece of filter material already cut to cover this air intake opening so we set that on top of the mesh, pressed it down to take advantage of the tape, and then secured it with Gorilla Tape on all four edges, rolling it with the seam roller to get good bonding.

A detailed view of one of the homebrewed tongue and groove alignment assemblies made from flat mending plates.

A detailed view of one of the homebrewed tongue and groove alignment assemblies made from flat mending plates.

Back in the coach I had to tie in the outlet strip to the 120VAC power feed.  I shut off the breaker for this circuit and checked with my tester to make sure it was not live.  The hot and neutral wires were accessible but the ground wires were back under the left pedestal where they were not easy to reach and manipulate.  It took a while, certainly longer than it should have, but I got the three ground wires tied together with a grounding clamp.  I connected the hot and neutral wires (three each) relatively easily using wire nuts.  I turned the circuit breaker back on and checked that the outlet strip had power between the correct terminals and did have power between any other terminal pairs.

I went to the garage to get a four foot long piece of 1″X1″ aluminum angle that I bought weeks ago to use as a support bracket for the upper rear edge of the center connector/cover.  I was going to cut off a 26″ long piece and then drill countersunk holes but I noticed a piece of 1/2″X1/2″ light gage angle that was about 26″ long and already had holes in it.  It was long enough to span the space between the pedestals and go under each one about an inch.  That was sufficient to position it correctly so Linda held it there while I secured it to the wall with four round (pan) head screws.  I then put the center connector/cover back in place.

Phil has cleared all of the organic debris from the area where the driveway extension and RV pad will be located.

Phil has cleared all of the organic debris from the area where the driveway extension and RV pad will be located.

Phil starts trenching and placing the plastic drain tile tubing for the French drain.

Phil starts trenching and placing the plastic drain tile tubing for the French drain.

 

 

 

 

 

 

 

 

 

 

 

Phil had long since left in his truck to dump all of the wood debris.  We had a light lunch of Amy’s Lentil Vegetable soup and fresh organic grapes.  While we were eating a group of three deer came to our back yard and eventually ended up eating apples that had fallen from our tree onto the ground.  These same deer, along with two others, were here yesterday at twilight and were very frisky.  We saw them later in our neighbor’s yard across the street.

Another view of Phil’s smaller excavator with the 12” bucket being used to trench the French drain in the southwest portion of our property.

Another view of Phil’s smaller excavator with the 12” bucket being used to trench the French drain in the southwest portion of our property.

Phil returned around 3 PM and started working on the French drain.  He replaced the 30″ wide toothed bucket with the 12″ one and started at the high end if the culvert on this side of the road.

The grand finale was the installation of the Corian desktop, which has been sitting on a blanket in the middle of the living area floor since Tuesday.  I drilled countersunk holes through the four corner plates in each desk pedestal from underneath.  I then inserted 1-1/4″ #8 self-drilling outdoor wood screws into each hole, again from underneath, until they just protruded above the corner blocks and then backed them off until the tips were just below the surface.  We set the desktop across the pedestals and pushed it as tight to the back and right end wall as we could.  Linda put her weight on it and I ran the screws home, pulling the top tight to the pedestals.  We reinstalled the four drawers in the right pedestal, finally getting them off the floor in the hallway where they have been since Tuesday.  We stepped back to admire the desk and agreed it was a thing of beauty and a joy to behold.  Linda also marveled, once again, at how much space she now has to work in the kitchen.

A wider shot showing the excavator and drain tile.  The laser level is at the left edge of the frame.  The main arm of the excavator (with the bucket attached) has a laser sensor on it that tells Phil exactly where the lower edge of the bucket is relative to the laser level.

A wider shot showing the excavator and drain tile. The laser level is at the left edge of the frame. The main arm of the excavator (with the bucket attached) has a laser sensor on it that tells Phil exactly where the lower edge of the bucket is relative to the laser level.

The “denouement” was mounting the outlet strip and adding felt pads to the two fake drawer fronts on the left pedestal and then adjusting the magnetic catches.  I originally had the outlet strip (temporarily) mounted to the wall between the two pedestals with two screws a few inches below the cord notch in the center of the back edge of the desktop.  Rather than put it back there I decided to mount it on the underside of the desktop just in front of the cord notch.

The underside location will work just as well as the wall mount location for regular 2- and 3-prong plugs but probably not as well for small AC adapters.  The added pluses of this location, however, are: 1) it will not interfere with cords coming through the notch, 2) it will be up out of the way of the UPS (uninterruptible power supply) that will sit on the shelf at the top of the center connector/cover, and 3) if liquids are accidentally spilled and run over through the notch they will not run into the outlet strip.  Besides, devices with an AC adapter will probably be plugged into the UPS so this was a better overall approach.

Our next task was to adjust the sofa seat until it was deep enough to be comfortable.  We slide the plywood seat out a couple of inches and then got the seat and back cushions (three each) from the house where they have been stored since September 21st.  We put the cushions in place and sat down.  We pulled the cushions out and pulled the seat board out until it was five inches farther out than originally designed and put the cushions back in.

The front edge of the seat cushions were out farther than I liked but we both agreed the sofa was now comfortable to sit on.  The distance from the bottom front edge of the back cushions to the front edge of the seat cushions was originally only 16 inches and that turned out to just be too short.  With the seat board moved out it will now be 21 inches.

In order for the sofa to work correctly, both as a sofa and as a bed, we will need a cushion that is 5″ wide by 6″ high, by ~76″ long to fill in the space behind the seat cushions and below the back cushions.  The height and foam makeup will be such that it is level with the tops of the seat cushions and have the same firmness and feel.  Would that I had designed the sofa for this depth to begin with and had the seat cushions made accordingly, but we were trying to open up the living room by not having the sofa protrude into the aisle any more than absolutely necessary.

Next up was reinstalling the wood trim in hallway.  We have an interesting plan for the lower half of the hallway but in case we do not get it finished before we leave for the winter we wanted the trim off the bed and back on the wall.

The lower outside hallway wall.  There were originally three framed panels of vertical strip mirrors here.  We will replace them with wood panels, probably in a lighter color to contrast with the walnut trim.

The lower outside hallway wall. There were originally three framed panels of vertical strip mirrors here. We will replace them with wood panels, probably in a lighter color to contrast with the walnut trim.

This trim originally framed three panels of vertical strip mirrors.  We were able to remove the mirrors as they were glued to wallpaper.  In the process we discovered that the left and right panels were the same width but the center panel was wider.  The trim consisted of six pieces of wood; a long upper and lower horizontal piece and four vertical pieces.  The six pieces were screwed to the lower half of the outer wall but not attached to each other.  The left and right vertical pieces were tight to adjacent woodwork, but the two intermediate pieces were free to be repositioned.

We reattached the upper horizontal piece first making sure the mounting screws went back in the same holes.  Next we pushed the lower horizontal piece into place but did not screw it to the wall.  We then attached the left and right verticals.  The horizontal distance between the inside edges of the left and right verticals was 75 inches.  The two intermediate verticals were each 4-1/2″ wide so the distance between verticals needed to be 22″ (75 minus 9 = 66 divided by 3 = 22).  We carefully positioned and secured the two intermediate verticals to achieve this spacing.

The trim boards all have rabbited edges on the back side.  I need to measure them carefully, but they are ~3/16″ deep by 3/8″ wide.  Our current plan is to use 3/16″ underlayment or other 3/16″ high quality plywood to make three panels that will fit within these rabbits with a little room to spare.  The panels will either have a hardwood face or we will cover them with a hardwood veneer of a wood that contrasts with the walnut trim.  We can get the veneer from Rockler once we decide what we want.

Linda spread out several towels on the new desktop and we moved tools and supplies from the A-V cabinet, behind the driver’s seat, to the new desk.  I then removed the Corian top of the A-V cabinet and put in on the bed.  We still have a small amount of wallpaper to install in the front of the living room and into the cockpit on the driver side, but it will not be easy to do.

These areas, such as the one behind the A-V cabinet, are small with limited access so most of my sanders cannot be used.  The only one that might work is the Porter-Cable oscillating tool but I did not get it out today.  I got some sanding sponges instead and tried those on the wall under the passenger side window trim next to the co-pilot seat.  When I sanded a dark area about 6″ long by 3″ wide the wood in the center crumbled and I ended up with a hole 3″ long by an inch and a half wide.  I could see one of the stainless steel structural members through the hole.  Given what was obviously water damage I was glad we bought a bus with welded stainless steel as the main structural material.

Based on what I could see, the walls in the bus appear to be 1/2″ plywood although I did not measure the thickness.  This area had obviously gotten very wet over a long period of time and some of the wood has rotted.  It is the only spot we have discovered that is this damaged and we immediately realized that we will not be able to wallpaper this area.  We will probably panel over it, similar to what we plan to do with the veneered panels in the hallway, but today was not the day to figure that out.

It was going on 5 PM and we decided we were done for the day.  I turned off all of the electric heaters, turned on the Aqua-Hot, turned on all three thermostats, and set the temperature to 20 degrees C.  The refrigerator was also indicating much colder freezer temperatures than it had been before I moved/isolated the remote sensors so I reset the freezer and fresh food controls to their “normal” center positions.  Tomorrow we will replace the alkaline batteries with the Lithium batteries we bought specifically for the TempMinder thermometer system, reset the min/max data, and monitor it for a few days.

I walked down to see what Phil was doing.  He was making good progress with the French drain but did not have enough of the plastic drain tile to finish it today.  He plans to work tomorrow and will have the additional tile he needs to finish the drain.  I left him to his work and took photos of the fall colors in our yard as I worked my way back to the house.

I spent an hour at my computer dealing with e-mail and transferring photos from the Sony a100 to my laptop.  Linda called me to dinner at 7 PM.  It was a simple meal of vegan Coney dogs with mustard, onion, and beans served open-faced on a whole wheat hotdog bun.  As a side dish Linda steamed Opo squash.  It was the first time either of us had this particular squash.  It was very mild with a hint of cucumber.  It is available all over the world and widely consumed as it is relatively inexpensive.  It was OK, but I thought it might work better as an ingredient rather than a stand-alone side dish.

I exchanged a couple of text messages with Chuck and confirmed that we would be at his shop tomorrow after breakfast to retrieve our two bus windshields.  The rest of the evening was spent in the living room by the fireplace reading and writing on our iPads before turning in and watching episodes of Rick Steeves’ Europe and Joseph Rezendo’s Travelscope on Detroit PBS (WTVS).

 

2015/10/01 (R) New Month, Same Project

For various reasons we have not worked on the bus the last two days.  For one, Linda is still recovering from a cold and/or seasonal allergies that may have been triggered by some weeding she did over the weekend.  August and September are the time of year for ragweed in Michigan.  For another, I was tied up most of Tuesday with the bus windshield replacement and yesterday we both had our annual physical exams, mine in the morning and Linda’s in the afternoon.  Throw in an unexpected problem with the driver door lock on my car and a lawn tractor that wouldn’t start and that took care of most of the day.  Since I wasn’t working on the bus I used some of my time to edit drafts of blog posts and started selecting and processing a few photos to go with them.

I got a call from Philip Jarrell around 8 PM last night letting me know that a last minute project came up that required his attention today.  If all goes well he plans to start on our French drain and driveway extension project tomorrow.  Our project is a relatively small job for Phil and I accept that he has to fit it in around larger projects for long-term customers who give him a lot of repeat business.  Still, I think he likes working with us and does his best to fit us in.

I had hoped to get back to work on the bus today, specifically working on priming the walls and hanging the new wallpaper, but Linda had another annual medical appointment this afternoon.  Neither of us likes to get into our work clothes and get involved in physical tasks for just a small portion of the day so after breakfast, and a leisurely morning in the living room enjoying coffee to the glow and warmth of our fireplace, she settled in to work at her desk for a while before going on a walk.

Our whole house generator threw a code 34 on Tuesday afternoon indicating that it required maintenance but would still operate if needed.  I called Bratcher Electric to see what was needed and spoke with Karen.  I think she and Mike own the business, but it’s possible she is Mike’s daughter.  Whichever, I’m certain that she is family.  Our generator was last serviced one year ago on the same date (29th) and the 34 was the total number of hours it has run since being installed in May 2013.  I set up the service appointment for Friday October 9th.

While I had Karen on the phone I asked about the project Mike had come out to look at a year ago.  I need his electricians to run a 4-wire, 100 Amp service entrance cable (SEC) from the transfer switch in the southwest corner of the garage, through the garage attic, and into the secondary distribution panel in the HVAC closet in the northeast corner of the garage, making it a main panel instead of subpanel.  Karen said she would leave a note for Mike to follow up with me.

It was going on noon when I finally got back to work on the bus.  It is a gorgeous fall day, chilly and breezy but with abundant sunshine, and I just could not let it slip away without getting something done on our interior remodeling project.  I was at least 60% done with rebuilding the landing where the stepwell slide cover used to be and that seemed like the logical thing to get finished.  It was 52 degrees F in the bus so I turned on the front electric toe-kick heater and set up the small Broan portable electric heater in the kitchen blowing forward towards the cockpit.  I also noticed that the refrigerator thermometer indicated 43.5 degrees F.  We do not have any food in the fridge but we do have freezer packs and containers of water for mass.  43.5 is warmer than I want so I checked the freezer reading and it was 28 degrees F.  Yikes!  That was way too warm.

Frame and center support for the new landing platform. Air lines crimped and secured.

Frame and center support for the new landing platform. Air lines crimped and secured.

The 31″ X 27.5″ piece of 3/4″ thick plywood for the landing platform flexed slightly when I stepped in the middle.  I’m not sure anyone would notice it when stepping on it but we do not want the tile that will be on there to crack from the deflection.  My solution was to cut an appropriate length of the 2.5″ wide 3/4″ thick poplar and install it on edge running long ways to support the middle of the plywood.  I had to use an angle bracket at the back edge (by the driver’s seat) and place shins under it at several places to get it to fit just right.

About this time Linda came out to let me know lunch was ready.  We each had a half sandwich of hummus and raw onion on rye bread and some black grapes.  She left for her doctor’s appointment and I made a big cup of Constant Comment decaffeinated tea.  I called Chuck to see if he knew where his powered metal shears (nibbler) were and if I could borrow it.  The answers were ‘yes’ and ‘yes.’  I decided to take his suggestion of cutting two new access openings in the passenger side HVAC duct to allow the two existing heater hoses to come out and go directly to the fan-coil heat exchangers with minimal bending.  It will simplify the installation, eliminate soldered copper parts and connections that would restrict flow and be a potential leakage point.  Since my car is in the shop for the next several days I will have meet up with him when Linda’s car is available.

Back in the bus I checked the refrigerator and the fresh food compartment was at 39 degrees F and the freezer was At 6 degrees F.  Those are the sort of temperatures I expect to see.  I had the freezer set to cycle between about 0 and 10 but occasionally saw it go as high as 17.  I figured it had something to do with an automatic defrost cycle, but anything over 20 is troubling.  Linda had suggested earlier that perhaps we need to replace the batteries in the remote sensors and the base unit.  She may well be right and it won’t hurt to do that anyway.

When I got back to work on the landing I folded over the ends of the two air lines and put cable ties on them to close them off.  The air supply for the solenoid valve that controls these two lines has a shut off valve which I intend to keep closed, but if it gets opened accidentally it could drain the auxiliary air tank through one or the other line if they were not crimped closed.  I may eventually disconnect the supply line at the valve and cap it, but for now this will at least prevent an open line leak.

New landing platform structure with sound/thermal insulation.

New landing platform structure with sound/thermal insulation.

After screwing down and cutting off the shims I plugged the hole where the air lines come through the floor with steel wool and secured the lines to the floor with cable clamps.  I then cut fiberglass insulation to fit the two spaces in the floor.  I used the same John’s Manville Sound & Thermal insulation that we used in my office and ham shack as I had some left.  I put the plywood floor piece in place, evened it up along the front edge, and screwed it down but ran out of screws before I had it completely secured.  Projects are like that.

I was walking towards the garage when I saw a car coming very slowly from west of our house headed east.  The drive pulled past our third drive and stopped but I could not see what the driver was doing.  The car eventually continued on, followed closely by a second vehicle and I thought the flashed me a somewhat dirty look, but they did not stop and were too far away to be sue.  Still, I thought that was odd.  I did not give any further thought to it until I went out to get the mail and noticed a lot of debris in the road and a large, dead tree in the ditch.  It had been windy all morning and at one point I thought I heard the crack of a falling tree but it sounded farther away than where this one lay.  The driver had obviously stopped to move it and was probably a little bit annoyed that they had to do that because I had not taken care of it.  Hey, I didn’t know!

I moved it a little more and then got a metal toothed rake and pulled all of the small debris out of the road.  There were limbs on the other side of the road that were 1″ to 2″ in diameter so the tree had obviously fallen all the way across the road.  The property on the other side of the road is part of our yard but I would have cleaned up the branches regardless since the tree clearly fell from our yard.

Linda stopped for groceries on the way back from her doctor appointment and did not get home until almost 4 PM.  We got a pruning saw and cutter and she helped me cut up some of the upper part of the tree and get the pieces farther from the road.  We noticed another dead tree in the same area that looked like it would eventually fall over across the road.  I can cut it down safely but will need the chain saw to do so.  I was not in the humor to get it out and try to get it started at that exact moment but noted to myself that I needed to do this sooner rather than later.

We were not going to start any messy bus work at that hour so I changed into nicer clothes to go out to dinner.  Before we left I texted Josh at Coach Supply Direct to clarify an earlier e-mail and let him know that two of the MCD shades were not staying attached to one of their clips.  We left at 5 PM for the La Marsa in Brighton and stopped at the bank on the way.  For dinner we split an order of Moussaka and got two salads as our sides along with the warm pocket bread and garlic spread.  The food was good and we had a tasty, filling meal for under $14 plus tip.  It is our best/favorite restaurant option within reasonable driving distance of our house.

After dinner we stopped at The Home Depot in Brighton but they did not have the screws I wanted.  When we came back out I noticed that the tires on Linda’s car were under-inflated and on closer inspection that the side walls were badly checked.  We drove to Discount Tire in Howell but they were closed.  We stopped at Lowe’s and bought the screws I needed, some furnace filter material, and Lithium batteries (AA and AAA) for our TempMinder base/remote thermometers as we keep the two remotes in the bus freezer and fresh food compartment and the base station on the bus kitchen counter.

Back at the house I worked in my office for a while selecting/processing photos to go with blog posts but I did not feel like putting in a long, sustained effort on the task.  I got a call from Phil at Precision Grading.  His other job did not get finished today and he will have to return to that job site tomorrow.  He hopes to start our French drain and driveway work on Monday but that may not happen.  I am anxious for him to get started but I have no control over that.  I appreciate, however, that he keeps me informed as it allows me to plan my own time.

We watched The Woodwright’s Shop, Rick Steves’ Europe, and Travel in the Americas on DPTV (WTVS) and then went to sleep.