2015/05/12 (T) Dealing with the County

I finally paid a visit this morning to the Oceola Township offices and talked to the assessor and zoning administrator.  I had a satellite image of our property on which I had drawn the proposed barn and driveway.  All they need in order to issue a land use permit is for me to show the size of the building and the setbacks on the image.  I also visited the Livingston County Building Department.  I talked to one of the counter clerks who had me talk to Rick, who is one of the inspectors.  He had just built a large pole barn and used 6×6 posts set in 26″ diameter holes back filled with concrete.  The bottom of the posts need to be at least 48″ below grade to get below the frost line so I will figure on posts four feet longer than my exterior wall height.

Based on my preliminary online research and visits the land use, building and electrical permits are the only other ones I will need in order to put up a bus barn.  The clerk gave me a check sheet of the documentation I will need to provide.  I would have to file some additional paperwork with the County Health Department, but would not need permits from them or from the Drain or Road Commissions.

I drove to the Township offices on Latson Road by way of Hacker and M-59.  Hacker was so bad the last few days due, in part, to heavy rains that it was more pothole than road and many of them were larger and deeper than normal.  The road grader was repairing the road and it was digging deep.  The grader was still working when I returned home but the road was already much better.  The road needs to be rebuilt with a substantial amount of road gravel and with proper drainage ditches along both sides.  Or paved.  Paved would be good.  Linda read something last fall that indicated Oceola and Hartland Townships had agreed to pave Hacker Road from M-59 south to Golf Club.  We checked when we got home this spring but could not find any reference to such a project.

Back at the house I settled in to create a scale drawing of the floor plan of our bus and then draw in the 16″x16″ floor tiles.  I added up the various areas yesterday and added 25% for waste, but that turned out to be a low estimate.  By drawing the tiles I was able to count how many I would actually need.  I called Lynch Carpet in Howell and talked to Clint to get a rough price estimate for the materials.  The 16×16 Armstrong Alterna Luxury Vinyl Tiles are packed 14 to a box and can only be ordered by the box.  We need 190 tiles for the project so we will have to buy 14 boxes (196 tiles).  That turned out to be 50 square feet more than my original estimate, but would leave us with only six full tiles as spares, assuming I do not ruin any during the installation.  Fortunately, the vinyl adhesive and vinyl grout were less expensive than I expected, so even with a freight charge the bottom line was similar to my first estimate.  Using these tiles it will be approximately a $2,000 project.

My layout has the tiles in a standard pattern with the grout lines lined up in two directions, one running parallel to the long axis of the bus and the other perpendicular to that.  I presumed that this would take less tile and require less cutting but after seeing the layout I am not so sure.  I will probably make a second drawing with the tiles turned 45 degrees and see if it makes more efficient use of the tiles.  We plan to use a grout that is very similar in color to the base color of the tiles so the grout lines will tend to blend in rather than standout as a design feature, and perhaps make the orientation of the tiles less important visually.

Later in the afternoon I called Pat at Apex Roofing to let him know our shingle selection.  I left the information in a voice message and Pat called back later to confirm.  We are going to use the Certainteed Max Def Resawn Shake shingle.  We are still thinking about the skylight tubes.  We talked about putting one or two in the living room and possibly one between the kitchen/dining rooms and one in the hallway.  I realized that the air-conditioner would probably be in the way of the one for the kitchen/dining area, so we will not do that one.

Linda made granola today and made baked/stuffed acorn squash for dinner along with an asparagus, carrot, green bean sauté and fresh sweet Bing cherries.  I took care of some e-mail and then we had slices of the Mother’s Day vegan cake.  I called my sister to check on how our grand-niece was doing.  She called me back later and we had a long chat.  Linda and I then watched season 2, Episode 2 of Sherlock.

After Linda fell asleep I was still up (writing) when a noise started and did not stop.  I suspected it was the water sanitizer recharging, as the water softener had recently recharged, but I got up to make sure that’s what it was and not something else like a sump pump that was stuck in the on position.  It was the sanitizer, so I closed the laundry room door to reduce the noise and went back to bed.  I really need to soundproof the laundry room and reprogram the softener and sanitizer to come on at better times.

 

2014/07/24 (R) Back To Work

We were up earlier than normal.  Linda went into the bakery today and likes to be on the road ahead of the worst of the morning traffic rush.  Since she was working I figured it was a good day for me to also do some paid work (plus a couple of loads of laundry).  Earlier in the summer I agreed to write assessment items for some of the modules in the Michigan Assessment Consortium professional development series on Common Assessment Development.  The items are needed for use with the Lectora platform, which Bill Heldmyer at Wayne RESA is using to re-package the modules.  These are modules that other team members developed, so I have to spend some time with the content before I can write the items.

I did some work on this in June and then got busy with contractors and out-of-town trips.  I am still tied up with construction, contractors, and other projects but a timely completion for this work would be early August so I spent much of today working on it.  I already had one module done and hoped to finish the other six but only managed to complete three of them.  I am anxious to get back to work on the HVAC prep in the garage but I plan to continue working on the assessment items tomorrow as I would like to e-mail them to the team for feedback before the end of the day.

I have a lot going on at the moment.  I like being busy, but this is starting to feel like “work.”  I have a growing list of “must do” bus projects that I have yet to start:  1) fogged window replacement; 2) auxiliary air filter / water separator replacement; 3) Aqua-Hot expansion reservoir replacement; 4) Aqua-Hot exhaust leak repair; 5) motorized windshield shade repair; 6) finishing the installation of the ZENA power generator (for charging the house battery bank while driving), and; 7) redoing the water bay (that’s a big one).  I have an optional project to replace the rear view camera system.

Butch is building new ride height linkages for his bus and wants to build some for me as well, so that makes nine “bus projects” I would like to accomplish before the weather turns too cold to work outside.  Some of these are projects I can do with the bus in front of the house once I can move it back into its normal parking spot.  The rest are things I will work on once I get it down to Butch and Fonda’s place in Twelve Mile, Indiana, probably this September.

The FMCA education committee work is ramping up and I have three websites I am trying to launch, one of which has an August 11 target date, plus our own website/blog to maintain (as of this writing I am over two weeks behind on blog posts).  I am also supposed to be writing a “featured bus” article for Bus Conversion Magazine on Marty and Pat Caverly’s MCI MC-5B conversion “Scooby Doo & Bookworm.”  It’s a great conversion that has taken 20 + years to build and will be the cover/centerfold story when it is published.  I have 1,500 photos from Marty and the only way I will make sense of the project is to sit down with Marty, select images, and make notes.  Once I have a sense of the chronology of the work, and the images to illustrate it, I can weave the words together to tell the story.

Kyle and Spencer were here working on the landscaping for most of the day.  Steve stopped by in the morning to go over the work from yesterday and outline the work for today.  It’s coming along, albeit much more slowly than I think it should.  For a job that requires a lot of manual labor we normally only have two guys on site, sometimes three and sometimes only one.  And, sad to say, they simply do not work as hard and as persistently when Steve is not here.

Linda got home ahead of the afternoon traffic.  We had leftover potato and lentil curry and naan for dinner and both the dish and the bread were still excellent.  A few black grapes and dark, sweet cherries for desert and we were off to bed early.

 

20140711 (F) Nice Weather Lately

Steven’s nephew, Spencer, was here a little after 8 AM and spent some time cleaning up the driveway.  He was joined by Tommy, who was only available for the morning.  Tommy got instructions from Steve by phone and they tried working on the retaining walls, but I’m not sure what they accomplished.  One of the large boulders Steve positioned yesterday on the lower west wall had dropped 6 inches and they were unable to re-position it.

It was another pleasant day, so I decided to work outside during the morning.  I cut up some previously trimmed tree limbs and then started pruning our apple tree.  I tried to cut all of the dead limbs and branches I could reach from the ground using our new Fiskar’s ratcheting lopper.  With that material removed I was able to use the pole saw and compound lopper to remove some larger and/or higher limbs.  By noon it was getting warm and I knocked off for the day and had lunch.  Linda made the chickpea (garbanzo bean) salad that we both like so much and served it on a bed of greens with red grapes and sweet Bing cherries on the side.

Tommy had to take off for the afternoon and left Spencer to start moving smaller rocks onto the slope of the east retaining wall.  We would occasionally hear one thud against the foundation and I decided I should check on his progress.  He was doing a fine job of tossing rocks into place, but I did not like the way the earth was pitched as it appeared to slope back towards the house.  I examined the west wall and it appeared to have the same problem.

Since the whole reason for this project was to get water to flow away from the house, I asked Spencer to take a break while I called Steve.  I told him that something just did not look right to me and that I could not see any evidence of a drain tile behind the upper wall on the west side.  He was running the excavator at another job site and wasn’t able to come look at our job so he sent Kyle over to pick up Spencer, who did not have a car.  With a chance of rain in the forecast for Saturday through Monday it is looking more and more like this job will not be done until the end of July.

In the afternoon I continued working on configuring my Windows 8.1 laptop.  My challenge today was getting Outlook 2013 to preview PDF files.  I used the search feature on the Start screen to locate information, some of which indicated I would have to create and/or edit the registry.  In the end the solution only required two steps:  installing Adobe Reader 11 and then setting it as the default program for PDFs.

With that problem solved I edited my blog posts for July 1 through 9 and started uploading them.  I managed to get the posts for the 1st, 2nd, and 3rd uploaded before dinner.  I also got a return call from Darryll at DCM Heating and Cooling and we agreed he would come to the house tomorrow at 10:30 AM to finalize the work we need done and pin down a start date to prep the house for natural gas and install a small HVAC unit for the library and a furnace for the garage.  We also need the main air-conditioner serviced.  Luckily it has been a cool summer so far.  The conversion of appliances will have to wait until the natural gas line is connected to the meter and turned on, which could be as late as early October.

I got a call from Gary at GM Construction sometime in the last few days.  He finally had all of his supplier quotes for our pole barn / bus garage project and had a price for us.  It was higher than I would have liked, but less than the quote from Morton Buildings, which was for a much smaller barn.  Last night I called Phil from Precision Grading to update him on the status of the project and to see if he would swing by and look at the pull-through driveway which the landscapers have torn up more than I expected.  My best guess is that we will get a barn up somehow, but I’m not sure when or how.

For dinner Linda made pan-grilled sliced tofu with onions and Bar-B-Que sauce served on a toasted sandwich bun with a side of lightly oiled and baked potato wedges and a few fresh strawberries.  Of course, that meant ketchup with Tabasco sauce.  We split a can of cold Yuengling beer which was the perfect beverage for this meal.  Sometime in the last two days Linda made a raspberry sauce from frozen raspberries we picked last year.  Earlier today she made a vegan chocolate cake and this evening the cake and raspberry sauce came together for dessert.