Tag Archives: Stanadyne diesel fuel additive

2015/11/28 (S) Berea to Cartersville

I did not take any Ibuprofen before I went to bed last night as I felt OK.  I was also very tired and fell asleep without difficulty around 9:30 PM.  Under the best of circumstances I was going to be awake between 4:30 and 5:30 AM and that was the case this morning.  During that hour the cats prowled around the bed, got some attention from me, and looked out the windows.  What they really wanted, however, was food.

The pickup truck / 5th wheel combination that pulled in on our passenger side last night well after sunset was making departure preparations this morning at 5:30.  The strained muscle(s) in my lower right back were nagging at me and, unable to find a comfortable position, I finally got up at 6 AM as the neighbors were pulling out.  I sat on the sofa with the heater pad on my back and worked on my iPad.

The cats still had food and water but wanted fresh kibble, as they do every morning and evening.  It was in the bathroom closet, where it always is, but took me a while to find as it was hiding in plain sight behind the lower rack of hanging clothes.  Linda finally got up at 6:30 AM.  She rarely sleeps 10 or more hours but she was very tired when she went to bed at 8 PM last night and immediately fell asleep.  She also appears to be coming down with yet another cold.  For someone who rarely gets sick she has suffered with colds this fall.

We only had 300 miles to travel today, all on I-75, between Berea, Kentucky and Cartersville, Georgia.  With a fuel stop somewhere along the way it should only be a six hour day.  We got online and checked the weather.  Rain was forecast to start in Berea around 10 AM so we targeted 8:30 to 9 AM as our departure window and decided to have coffee and breakfast.  The cold front was sitting to our west running from southwest to northeast.  It was moving slowly southeast but the precipitation (mostly rain but with some ice and snow) was along the front and sliding northeast.  Based on how it was moving we figured we would probably have rain between Berea and Knoxville and then dry conditions from there to Cartersville where the chance of rain for today was 0%.

I had the engine running at 8:30 AM.  The battery balance light came on and stayed on for quite a while but eventually turned off and did not come back on.  That may just mean the Vanner equalizer was just doing its job.  However, with the upper and lower banks of the chassis batteries on maintenance chargers since we got here yesterday that just begs the question why they were out of balance.  We may be replacing the batteries and/or the Vanner equalizer this winter.

We pulled out of our site at 8:3 AM.  I-75 through southern Kentucky and northern Tennessee was very hilly but the highway was in excellent condition and it was a scenic and pleasurable drive.  Traffic started to get heavy as we approached Knoxville, Tennessee where there was apparently a college football game being played today.  Traffic remained heavy from there to our destination, which made the driving a little more work and a little less fun, but it was still OK.

The bus ran strong all day and I was able to climb the grade at Jellico, Tennessee in 4th gear without dropping below 50 MPH or getting the engine temperature above 200 degrees F (as best I could tell from the gauge) and the exhaust manifold pyrometers not exceeding 800 degrees F.  That was a big improvement over two years ago when I recall climbing up the mountain in the right lane behind slow trucks in a lower gear and worrying about the engine temperature.

Even though I had the cruise control on for most of the drive I did well using downhill speed to go up the other side and getting on the accelerator early to get the RPMs and turbo boost up and keep them there.  I typically saw 15 PSI boost at 2000 RPM but occasionally 16 or 17 PSI.  We really need a 0-20 boost gauge for this engine but I could not find one and doubt that they exist.  Besides, the new 0-30 gauge is working for me and I have other things that need to be fixed/replaced, such as the twin pyrometer gauge.  The left needle used to stick at the bottom of the scale but now the right needle is doing that.  Tapping on the face of the gauge usually frees it up, but not always.  When the needles are both working, however, they are showing the same temperature within 50 degrees F, which is comforting.  I used to think the bus (and me) liked to run at 62 MPH but I have come to the conclusion that it likes to run 65 to 68 MPH, and I am comfortable with that.

We stopped at the rest area about 41 miles north of the Georgia border where I replied to a text from Kristine and then called John Palmer.  He answered this time, said he was glad to have us visit, and gave me the address.  He said he will have customers there but there was plenty of room and we would not have a problem getting our bus in and out.  (Note:  We are also customers, albeit from a few years ago, but this is primarily a social visit and a place to stop for two nights.)  Rather than take time to eat while sitting still we had some pretzel and peanut snacks as we finished our drive to our destination for the day.

We arrived at exit 296 in Georgia around 1:45 PM and pulled into the Pilot Travel Center just southeast of the exit with the fuel gauge sitting at 1/4.  We picked this place to refuel because it is just on the other side of I-75 from our campground for tonight and I wanted to use as much of the fuel in the tank as I could without risking sucking dirt off the bottom or running out.

I figured we would take on 150 gallons of diesel fuel so I added 2 ounces of Racor Biocide, three 16 ounce bottles of Stanadyne Performance Formula diesel fuel treatment, and three 16 ounce bottles of Stanadyne Lubricity Formula.  The PF additive treats 60 gallons of fuel per bottle and I add it to the tank before each fill up in proportion to the amount of fuel I think I will add.  The directions for the LF additive say to “use it 4 to 6 times per year” but that is presumably based on an engine operating in a tractor-trailer or other commercial / industrial use.  Still, I only added one bottle last time when I should have added three, so I added three this time.  We ended up only adding 142 gallons but the extra additive won’t hurt anything.

I reset the trip odometer before we pulled out, which I forgot to do when I filled up at home.  We used to record our mileage and fuel purchases to get an idea of our fuel efficiency in miles per gallon but have never really had an accurate figure for a couple of reasons.  One was that the speedometer/odometer was not working correctly, or at all, and only got replaced in fall 2014.  The other is that the Aqua-Hot and auxiliary power plant both burn fuel from the same tank as the main engine.  Consequently, we can get an approximate idea of fuel consumption if we fill up at the beginning of a long day’s drive and then fill up again at the end before parking for the night, or if we know for sure that we are not going to use the Aqua-Hot or Genset prior to refueling.  Since we will be boondocking from tomorrow afternoon until Tuesday morning we will definitely be running the Genset and probably using the Aqua-Hot.

Our next fill up will probably be on the drive from Williston to Arcadia in late December and the only reason for topping up then is to make sure we pull into Big Tree RV Resort in Arcadia with a nearly full tank to minimize condensation while the bus sits there until early March.  This is one of the reasons I wanted to get all of the additives in the tank today.  We will have full hookups at Big Tree and do not expect to have to run the Aqua-Hot for space heating.  Even though we will have metered electric, we will use the electric heating element in the Aqua-Hot for domestic hot water except possibly for showering.  If the resort has a bath/shower house we might use it if convenient.

From the Pilot station I drove to the KOA about 3/10ths of a mile on the other side of I-75 and pulled up to the office at 2:10 PM.  The KOA is near Cartersville, Georgia.  It is a nice enough place with easy access but the facilities are not as extensive (read that as kid/family magnet) as some KOAs.  Linda got us registered and the woman in the office used a golf cart to lead us to our site.  We got a very convenient 50A FHU pull through site so getting in was easy and getting out tomorrow morning should be equally easy.

We leveled the coach and went through our arrival routine, minus the water and sewer connections.  It was 71 degrees F outside with low afternoon sun was just warm enough in the coach that Linda opened several windows and I put the screen in the door window.  We then went for a walk around the campground.  The place was almost full and seemed to have a lot of rigs that appeared to be set up for long-term stays.  The woman in the office confirmed later that they were fully booked for this evening and that 2/3rds of the campground was in use by extended stay visitors, many of whom were doing work in the area for Georgia Power.  That was certainly not the case when we were here two years ago on December 22nd, so that may have just been a matter of timing.

Back at the coach it was warm enough that we opened two of the ceiling vents and turned the fans on to exhaust air from the coach.  I went to put on a pair of shorts and discovered that we had failed to pack any.  I did bring my two pairs of convertible hiking slacks so I unzipped the lower portion of the legs on one pair and made them into shorts.  Much more comfortable.  I will be doing some shopping once we get settled.

I sent a slightly more detailed text message to Kristine and a daily update text message to Chuck which drew a reply and another text from me.  Linda got our WiFiRanger connected to the KOA Wi-Fi and then logged-in to RVillage.  She changed our location for last night to the Oh Kentucky Campground in Berea, KY and then changed it again for today to the Cartersville KOA.  We were apparently the only RVillage members at either campground.

We were a little hungry so Linda walked to the office to see if they had any hotdog buns, as we left ours behind along with a loaf of raisin bread.  They did not have hotdog buns so she cooked a couple of vegan hotdogs and served them on bread.  We also forgot to unplug the Insta-Hot in the kitchen so she texted the kids and asked them to unplug it and remove the bread products when they were next at the house.

We will be boondocking Sunday and Monday nights so Linda availed herself of the showers at the campground.  I worked for a while on this post and then went over to get a shower.  Linda warned me that it took a while to get hot water so I let the hot water run for at least five minutes but it never got warm enough to shower comfortably.  The men’s bath/shower room was also quite chilly so I took a really quick shower, dried off, and got dressed.  The office had free coffee available so I had some to warm up and mentioned the lack of usable hot water to the woman at the desk.  She seemed surprised but then asked if I let it run a long time, so they know there is an issue.  She said she would mention it to the manager.

Around 6 PM Linda heated up a couple of Amy’s brand Vegetable Korma meals.  As with all Amy’s products they were vegan and tasty, as well as quick and easy, so the quality to efficiency ratio was fairly high.

The antennapoint.com website indicated that we should be able to pick up a few OTA TV stations.  We managed to tune in the ION and PBS affiliates whose towers were NNE of our location and watched a few shows.  Linda read for a while and I checked e-mail and played games on my iPad, which is what I do to relax and/or fill time when

I don’t feel like doing anything else.  Linda was going to make an Apple crisp but did not have enough cinnamon so she added that to her grocery list and cut up an apple to eat.  Around 8 PM she popped the last of the popcorn and added that to her grocery list too.

Around 9:30 PM I closed the ceiling vents in the bedroom and bathroom and took the screen out of the entry door window and closed it.  Linda has had a cough for a few days and has been a bit congested so she went to bed at 10 PM.  I called Butch at 10:15 PM (8:15 MST) but he did not answer.  He does not have a voice mailbox and does not respond to text messages on his phone, so I went to bed.

 

2015/11/18 (W) Fuel Run

Linda was up at 5:45 AM and off to the bakery at 6:15.  I was up at 7:45 AM and skipped breakfast and coffee.  I put on Weather Nation and took stock of the forecast while I folded the clean laundry.  I took a shower, got dressed, made a cup of tea, and had a small glass of orange juice to wash down my pills.

My main objective for today was to get the bus fueled which would also serve as a test run.  The forecast had the chance of rain increasing through the morning and heading towards certainty by early afternoon, albeit intermittent and not very intense.  I wanted to take care of the fueling before the rain settled in but wanted to wait long enough for the temperature to rise so I set 11 AM as my target departure time.  Before I moved the bus, however, several things had to be done.

First on the list was turning on the electric block heater for the main engine.  It wasn’t cold enough for this to be necessary but having the oil warmed up a bit never hurts, especially with the straight 40 weight oil.  It helps the engine crank over and get oil to the bearings more quickly.

The living room and kitchen in the bus looking aft from the cockpit. New flooring, new seating, new desk, new refrigerator, new slide-out pantry, and new window shades (rolled up).

The living room and kitchen in the bus looking aft from the cockpit. New flooring, new seating, new desk, new refrigerator, new slide-out pantry, and new window shades (rolled up).

Next was simply cleaning up the interior so the coach could be safely moved and nothing would get broken.  I gathered up all of the tools and materials that I no longer needed and moved them into the house and garage.  I then installed the solid brass door stop on the bottom of the pull-out pantry.  Finally I mounted the two aluminum angles to the inside of the refrigerator alcove, one by the freezer door and the other by the fresh food door.

The angles were 1/2″x3/4″ with holes drilled in the 3/4″ flange for #6 SR self-drilling wood screws.  I had carefully countersunk (chamfered) each hole so the screw head would be close to flush with the surface of the flange.  The aluminum was only 1/16″ thick so I had to be careful not to overdo it.  With the freezer door open I set the 1/2″ flange against the face of the refrigerator case (on the side opposite the hinges) and held the 3/4″ flange square to the side of the alcove.  I used a #5-6 self-centering VIX drill bit to drill three holes about 3/8″ deep and installed the 5/8″ #6 screws with a manual screwdriver so as not to over torque them.  I repeated the procedure for the second angle which was longer and had five mounting holes.

The new floor in the cockpit of the bus.

The new floor in the cockpit of the bus.

I had a little spare time so I drove my car up and down the new driveway to compact the gravel.  I won’t drive the bus on this new driveway until next year but it already supports the cars very nicely and the weight of the Honda Element was sufficient to knock down some of ridges and compact the surface.

I checked all of the tire pressures and they were OK so I did not have to get out an air compressor and adjust them.  I will have to do this next week before we leave, however, as the temperatures will have cooled off significantly by then.

Around 11 AM I turned on the coach batteries and opened the auxiliary air supply valve for the engine accessories.  I turned off all of the electric heating elements and made sure the inverter was turned on and then started the main engine.  I let it run for one minute and then switched it go high idle.  While the engine was warming up and the air pressure was building I shut off the shorepower, disconnected the power cord, and stowed it.

I pulled out at 11:15 AM and headed for the Mobile Truck Stop at exit 122 on I-96, approximately 22 miles from the house.  While there are a couple of closer places I could get fuel this truck stop has very good egress and is fairly busy, which means the fuel is being turned over frequently and is thus relatively fresh.  The drive is a mix of Interstate and Michigan Highways with a few stoplights and a couple of miles of dirt road, so the bus has to run up and down through its gears.  It is also a long enough round trip to get the engine up to normal operating temperature under load.

I estimated that the tank would take on about 120 gallons of diesel fuel so I added two bottles of Stanadyne Performance Formula and one bottle of Stanadyne Lubricity Formula.  The tank started whistling at 112 gallons, which meant it was getting full.  I added the last few gallons by controlling the flow manually and stopped at 119.990 gallons, so my 120 gallon estimate was pretty good.  I paid for the fuel and got a free beverage to go with it.

I had some occasional light rain on the drive out and on the drive back but the trip was otherwise uneventful.  I was back at 12:45 PM, parked the coach, and started the auxiliary generator, which I had not done for several months.  To load the generator I turned on all three electric toe-kick heaters, the engine block heater, the Aqua-Hot electric heating element, and front bay electric heater.  I let it run for 90 minutes with an average current draw of 25 Amperes on each leg, which is about 35% of its full load capability.

I got the shorepower cord out and connected it but did not turn it on.  As long as I had water and air pressure I flushed the toilet and then ran a little water through the various faucets in the coach.  I set a rubber door mat under the drain for the fresh water tank to keep the water from drilling a hole in the driveway and then let the tank drain slowly.  While it was draining I got the long fresh water hose out and connected it to the spigot on the front of the house and the water port for the coach.  With the fresh water tank empty I checked that the outside water spigot was configured to provide filtered/softened water.  I closed the drain valve, opened the fill valve, and opened the valve at the house.  I then went in the house, set a timer, and had a bite of lunch.

I had a phone call while I was driving back from the truck stop but did not answer it.  The caller left a message so I listened to it and then called him back.  Kevin Stufflebeam, from the southwest part of Michigan, had a 1995 Marathon Prevost conversion with a non-functioning Webasto system.  It turned out that he had the system worked on by a company in that area and the guy from the company had called me during the summer.  They got my name and contact information from Josh Leach at Coach Supply Direct, with my permission.

The fresh water tank has an overflow tube so that is how I knew it was full.  I closed the fill valve on the bus, closed the spigot valve at the house, and then opened the fill valve to relieve the pressure in the hose.  Sure, it was a lot of back-n-forth, but it eliminated the spray that occurs when unscrewing a fitting on a pressurized hose.  It also makes the fitting easier to unscrew.  I removed the hose from the coach and then from the house.  The spigot is about four feet higher than the driveway so I pulled the hose up towards the spigot, allowing it to drain as I coiled it up.  Once it was coiled I connected the two ends together, put it back in its storage tub, and put the tub back in the front bay.

Linda called at 4:30 PM to say she was on her way home.  It had been raining, off and on, all afternoon so I took about 45 minutes to drive on the new driveway with my Honda Element and compact it even more.  But first I got the metal toothed rake and evened out the few remaining ridges and valleys.  Besides going up and down the driveway I drove across it at various angles at both ends.  Most of the driveway has fresh topsoil along both edges, which is soft and has grass seed and straw on top of it, so I stayed off of those areas as they definitely should not be compacted.  The end of the new driveway by the house ties into our concrete driveway and some solid, undisturbed lawn with a flare.  The far end, which ties into the street at our third culvert, is much wider (to allow the bus to make the turn), relatively flat, and ties in to solid, undisturbed lawn.  The concrete, road, and undisturbed lawn allowed me to drive beyond the edges of the driveway in these areas and go across them at various angles.

Any kind of weather always slows commuter traffic and Linda did not get home until 6 PM.  It had been a long day for both of us and she just wanted to relax for a while.  She opened a bottle of Barefoot Moscato and poured each of us a glass.  For dinner we had mock oriental orange chicken with reheated frozen broccoli and white rice with soy sauce.  It was an easy but very tasty meal.

After dinner I finally settled in at my desk to finish updating the FMCA Freethinkers Chapter roster, financial statements, and minutes from the 2014 annual meeting.  Linda reviewed the financial statements and helped me reconcile them to the bank statements.  Once we were satisfied they were accurate I saved everything as PDFs, uploaded them to our Dropbox, and sent the folder link to the members via e-mail.  We then headed to bed and watched the last episode of The Brain on Detroit PBS.  Linda went to sleep and I wrote for a while, finally turning the light out at 11:30 PM.

 

2015/08/08 (S) A New Bus Fridge (Finally)

We overslept and did not get up until 7:15 AM.  The weather has been very pleasant all this past week but we awoke to light rain.  We left for our SLAARC breakfast at 7:25 AM and took a different route than usual to see how it would be for the bus.  I headed north on Hacker to M-59, east to US-23, and south to I-96 east.  The ramp from US-23 south to I-96 east is a left exit, left entrance, with a very short merge lane in the middle of a major construction project.  I decided that was not our best option for the bus.

We arrived at breakfast at 8 AM to find a dozen people already there but at least 10 more showed up after us.  We enjoyed the conversation, as we usually do, but did not linger and were on our way back home by 9:15 AM.  As soon as we arrived we changed into our work clothes and got busy with the final preparations to move the bus to Chuck’s bus garage in Novi.

I pulled the bus out at 10:30 AM and Linda followed in the Element, which had all of the pieces we had removed from the old refrigerator along with tools, blankets, and some 2x4s.  The bus roof was brushed by a few small, low branches getting from our house to N. Hacker Road, reminding me that I need to covertly trim trees and bushes along our street.  I say covertly because they are not on our property.  The last time I took the bus out we went south on Hacker to Grand River Avenue.  This would have been our preferred route today except that the trees are not trimmed up in a few places and one of them, just before Bendix Drive, clunked the stuff on our roof pretty hard last time.  I did not care to repeat that so I went north as we had this morning in the car.

At M-59 I headed west to Latson Road, a trip of some four to five miles in the wrong direction.  The reason is that Latson Road going south has a relatively new, and easy to navigate, intersection with I-96.  From there we had an easy run to the Beck Road exit, a short jog south to Grand River Avenue, an easy left turn, and the final mile to Chuck’s shop where we arrived at 11 AM.

Chuck had already pulled his bus out of the building and parked it out of the way but there were several trucks and a dumpster trailer blocking access to his door.  They belonged to a motley crew that the owner of the building in front of Chuck’s shop had hired to clean up some of the mess left behind by the sunroom company that just moved out of the building.  He had me pull up to the right and position myself to back up and then negotiated with the workers to move their vehicles.  I pulled up the tag axles and waited.  The workers were not happy about it but they did it.

To get our bus into Chuck’s shop nose first he had me back parallel to the building and then bring it around to the passenger side into a space adjacent to the front building until I was perpendicular to his door.  I was then able to pull straight in but I did not pull in all the way.  Chuck had me stop with the fixed window frame opposite his forklift which he had already positioned for use.  The on again, off again light rain was not a factor as the window frame we needed to open was well inside his shop.

Linda and I unloaded all of the stuff from the car and brought it inside the shop.  We realized that we forgot to bring the camera so Linda tried to capture the progress of the work with her cell phone camera.  I have put those images in a separate gallery post for this date.

Randy, the owner of the Printology business in the suite adjacent to Chuck’s, came over to see what we were up to and stuck around to help.  With me working from an 8 foot step ladder outside the bus, while Chuck and Linda worked inside, we opened the window frame about 24 inches and propped it with a piece of 2×4.  I then carefully lifted the window higher while Linda sighted along the bottom of the upper cabinet.  When I had the frame high enough to be clear of the cabinet Chuck measured the length of 2×4 we would need to prop it open.

It looked like 52 inches would do the trick.  I had a 56″ piece of 2×4 so I cut it down to 52″ with my 7-1/4″ Rockwell circular saw.  I used the first piece to mark a second piece on an 8 foot 2×4 and cut that.  Linda took both pieces inside the bus where she handled one and Chuck handled the other.  As I lifted the bottom edge of the window from outside the bus the window hinge (at the top) made some unpleasant (and a bit unnerving) sounds but I got it high enough that they could put the two braces in place and the frame did not come unhinged.  We had just finished this task when John Rauch and his son, John, arrived at noon to help move the refrigerators.

The old refrigerator was lying face down in the bus.  The two Johns lifted it as a test and determined that they would not have any difficulty moving it.  Linda fetched one of the blankets and dropped it over the sill of the open window to protect it and the side of the coach.  Chuck had placed the long forks on his forklift about two feet apart and slid a narrow pallet over them.  He raised the forks and brought the forklift forward towards the bus.  We got him to position the top of the pallet even with the top of the sill and about 3″ away from the side of the coach.

John and John are very strong and were able to lift the old refrigerator case and pass it through the window onto the pallet.  With a person on ladders on either side of the pallet we slid the refrigerator all the way out.  Chuck then tilted the forks slightly, slowly backed away, and lowered it down.  John and John got the old refrigerator off the pallet, carried it out of the way, and stood it upright on its base.  They then lifted the new refrigerator onto its back, picked it up, and placed it on the pallet.  They went back inside the bus while Chuck brought the forklift up to the coach and raised the forks until the pallet was at window sill level.  John and John slid it into the bus, stood it up, and rolled it into the alcove.  I then secured it in place with a piece of 1×3 wood screwed to the floor across the front to keep it from rolling out while driving.  There is approximately three inches of space above the fridge but it cannot tilt out very far before the upper back edge catches the ceiling of the alcove.

John, John, and Chuck raised the window frame slightly to remove the 2x4s and close the frame when the top hinge started coming apart.  Linda yelled for me and I scrambled over to get another pair of hands on the frame.  With me and Chuck holding the outside (free) edge and the two Johns holding the hinge edge I was able to see where the hinge was out and direct folks as to what to do.  It took several tries and a few minutes (that seemed like hours) but we got the hinge re-engaged and then closed the window frame.  We took a few minutes to rest and chat and Chuck showed John (the father) his race car.   The heavy lifting was all done so John, John, and Randy took off, but before they did Linda gave John (the son) a gift for their new baby girl, Lucy Violet.

Linda and I put all the shelves and bins in the new refrigerator and then reattached the two doors.  That was a bit of extra work as it came with the hinges on the right side but we needed the door to open on the right side.  With the doors on we took a moment to consider our choice of size and color (black) and felt we had made the right decision.  We started to reassemble the old refrigerator but we were all hungry and decided to go to lunch first.  I started the bus and pulled it all the way into the shop so we could close up.  Chuck then drove us down the street to Panera for lunch.  We took our time and had a nice meal and a nice chat.

Back at the shop we decided to switch the buses around so Chuck would be free to leave.  He wanted a picture of the two buses together so I backed ours out of his shop, swung around to the passenger side, got parallel to his bus, and then backed up so the nose of our bus was about 10 feet behind the nose of his.  He and Linda then both took photos with their cell phones.  When the photo shoot was done I pulled forward to the left and then backed in parallel to the building about four feet from the curb.  That gave Chuck plenty of room to pull up next to me on my passenger side and then back around next to the front building and get lined up to pull straight into his bay just as I had done earlier.

Back in the shop Linda wiped out the inside of the old refrigerator and then we reattached the two doors.  As she cleaned each rack, shelf, and bin I placed it back into the refrigerator.  When it was fully reassembled we plugged it in.  It came on, ran for about 60 seconds and then shut off.  It obviously was not cold yet, and might have been cause for alarm if I had not dealt with this “problem” before.

I knew from prior experience that the defrost timer had probably disconnected the compressor and connected the evaporator defroster.  Chuck pulled out three of his lawn chairs and we sat around waiting for the refrigerator to restart.  The only thing missing was three cold beers.  We knew the unit still had power as the lights were working.  There was an outside chance that the overload protector (fuse?) might have blown, but I did not consider that to be likely.  Our patience was rewarded about 25 minutes later when the compressor came back on.  While we were waiting we gathered up our tools and various materials and loaded everything back into the Honda Element.

Chuck had a message from his wife, Barbara, with her ETA so we decided to settle back into the lawn chairs and kibbutz until Barb arrived.  She showed up a little while later and Chuck got out a fourth chair and we sat in the shop listening to the sound of the functioning refrigerator and debriefing the events of the day.  As a result of the window frame hinge coming loose I am now of the opinion that I did not need to remove the two stop blocks.  I suspect they are there to “stop” the hinge from coming apart and I should not have removed them.  Chuck is also thinking about replacing the refrigerator in their bus and is going to check with Prevost regarding these blocks.  As much as anything I was annoyed with myself for the amount of time I wasted removing these blocks but what is done is done and I now need to reinstall the one block that came off undamaged and get a replacement for the other one, even though I can only attach it with one machine screw.  Butch thinks he can make one for me, otherwise I will have to get one from Prevost.

Our local electrical utility, DTE Energy, will pick up used appliances.  In the case of a refrigerator it has to be plugged in and running, which I presume means it is functioning and cooling the interior.  If so, they will take it away and send us a check for $50.  From our end that’s a good deal as we don’t have to pay someone to haul it away.  Because of the R-12 Freon there are very few places that will deal with it.  My guess is that DTE has a sub-contractor who will recover, clean, and recycle the R-12, which is no longer being made and has become very expensive.  They may also recycle the copper tubing and electrical wire, and possibly the metal case and other materials.  Even with the labor to do this work the unit must be worth more than $50 to them.

We all needed to get some dinner so we wrapped up our visit and started up our bus.  I pulled out onto westbound Grand River Avenue followed by Linda in the car.  At Beck Road we turned north and then got on I-96 westbound.  The bus was at 3/8ths of a tank of fuel so I decided to stay on I-96 and go to the Mobil truck stop at M-52, a run of about 30 miles that would allow the engine and transmission to come up to normal operating temperature.  Linda exited at Latson Road and stopped at Meijer’s to do some grocery shopping.

The Mobil truck stop is run down with a very poor, pot-holed apron and parking area, but there are usually several tractor-trailers fueling here when we pull in as it is one of only two places that a semi can refuel between Detroit and Lansing.  There weren’t any trucks getting fuel when I pulled in but it was 7:30 PM on a Saturday evening and there were a half dozen tractor-trailers settled in the parking area for the night.  I poured two bottles of Stanadyne diesel fuel additive into the fuel tank followed by two ounces of Racor Biocide.  I then added 125 gallons of diesel fuel to the tank, which took about 11 minutes.  By the time I paid for the fuel and was ready to pull out it was 8 PM.

I called Linda to let her know I was on my way and then reset the trip odometer.  I drove east on I-96 for 10 miles to the M-59 / Burkhardt Road exit and got on M-59, which only goes east from there.  Eleven miles later I made the turn south onto N. Hacker Road and completed the drive to our house.  Linda heard me idling in the street, where I stopped to lift the tag axles before making the tight right turn into our pull-through driveway, and came out to help get me parked.  Once I was positioned correctly I put the tag axle back down, let the engine low idle for a minute to let the turbo spin down and let the heads cool off and the temperature to equalize, switched the Level Low system out of drive mode, and shut off the engine.  I shut off the air supply to the engine accessories, shut off the chassis batteries, connected the shore power cord, locked everything up, and went in for the evening.

It had been a long day and we were glad to have it behind us.  I had been anticipating the refrigerator exchange, with some dread, for well over a month.  The concern was that we would not be able to move the units out/in through the window frame, requiring us to remove and replace the lower passenger-side windshield, or that something would go wrong, like the hinge, and turn out to be an expensive and difficult problem to fix.  With each passing day it was also becoming a bottleneck in our remodeling project, at least psychologically if not physically.  But it was finally done and ended well.  We will plug in the new refrigerator tomorrow to make sure it works.  We tested it in Chuck’s shop when it was delivered so we expect it to work now.  There is a lot of work to do but now we can get on with it and I expect it to go well.

In spite of being tired we stayed up and watched the PBS broadcast of the Simon and Garfunkel reunion concert they did live in New York City’s Central Park 10 years after they split up as a duo.  Their music remains among my most favorite from my youth and it has lost nothing with the passing of many years.

 

2014/06/15 Family Time

We were parked in a fenced compound area next to the regular “campground” at the Elkhart County 4-H Fairgrounds.  The campground has gravel sites with 50A full hookups, and we were allowed/encouraged to use the sewer connections to dump our holding tanks before departing this morning.  We had checked out the campground last night and decided that it would be easier for us to pull around to the dump stations on the outer road than to maneuver into and out of one of the open campground sites, all of which were back-ins.

I have mentioned before what a nice facility this is.  Several of our GLCC members are from north central Indiana and explained to us that the fairground is as nice as it is because it is booked every week for most of the year, winter being the exception.  Elkhart is considered the center of the RV industry in the U.S., but the reality is that RV-related industry is located throughout north central Indiana, and a little bit of southern Michigan, with a few facilities in other parts of Indiana and Ohio.  There is also significant RV industry in California, Oregon, and Florida, and to a lesser extent in Pennsylvania and Alabama.  By “RV Industry” I am referring to manufacturing, not RV parks, resorts and campgrounds, or RV dealers and service facilities, which are obviously located all over the place.

We skipped breakfast and coffee, as we always do on travel days.  Linda prepared the inside for travel and then we visited for a while with our GLCC friends.  Around 9:00 AM I unplugged the electrical power, stowed the cord, turned on the chassis batteries, opened the air valve for the engine accessories, and fired up the engine.  I did not have any trouble getting out of our parking spot or the compound.  I drove over to the dump station, which can accommodate nine RVs at one time, and Linda followed in the car.  While the holding tanks were emptying we hooked up the car for towing.  With everything stowed and secured for travel we checked the toad controls and lights and were on our way, exiting the fairgrounds at 9:25 AM.

We followed the same route home that we used when we left the Escapade rally a month ago: CR-34 (Monroe St.) east to CR-29 north to IN-4 east to IN-13 north to US-20 east to I-69 north to I-96 east to M-59 east and finally a couple of miles of dirt roads to our house.  We stopped at the Travel America (T/A) truck stop on M-60 at I-69 to put biocide and Stanadyne diesel additive in the tank along with 75 gallons of diesel fuel.

We had just over 1/4 tank of fuel indicated on the fuel gauge when we pulled in to the T/A.  If the gauge is anywhere near accurate that was approximately 50 gallons of fuel, enough to travel another 200 miles and still have 15 – 20 gallons in the tank; more than enough to get us to the Mobil truck stop on I-96 about 25 miles before our house.  I wanted to use as much of the fuel in the tank as I could before adding more but did not want to risk running out or sucking sediment off the bottom and clogging the fuel filters.  In the end we decided it was safer to stop and add fuel while we still had the 1/4 tank.  The 75 gallons brought the fuel gauge up to 5/8ths, which is what I expected.  The fuel tank capacity is 235 gallons, but I assume the full mark on the gauge corresponds to 200 gallons.  That makes every 1/8 of a tank on the gauge correspond to 25 gallons.  We also presume that our average fuel economy, based on prior data, is 6 MPG which equates to 150 miles per 1/8 tank.

We did not fill the tank because the bus is going to be sitting for a while and we did not want to have all of that fuel onboard aging in the summer heat.  There is a reason, however, to keep the fuel tank as full as possible.  Most of the fuel that is pumped to the engine is used to cool the injectors and the DDEC engine computer and returned to the tank. The more fuel in the tank, the less frequently any particular molecule passes through the engine giving the fuel in the tank more time to dissipate the heat.

Our trip was easy and un-eventful other than the powered driver-side windshield shade quite working.  Add that to the list.  We got home by 1:30 PM which gave us time to unload food and a few essentials from the bus and take showers.  Since Linda spent Saturday morning preparing food, she only had minimal cooking to do for dinner.  Our son, daughter-in-law, and grand-daughter arrived at 3:30 PM and our daughter and son-in-law arrived at 4:00 PM.  Madeline had a cold, wasn’t feeling well, and had only had a short nap, but she was fine as long as she was busy.  This was a combination birthday and Father’s Day gathering, but mostly an excuse to gather our small, immediate family.  We had a lovely summer meal of potato salad, collard greens cole slaw, baked beans, and cheeseburgers with chocolate cupcakes (from a local bakery) and fresh strawberries for dessert.  All vegan, and all delicious.

Brendan, Shawna, and Madeline left shortly after dinner and Meghan and Chris left around 8:00 PM.  Although our morning departure and drive home had been quite routine and the family gathering had been relaxed and relatively easy, it all added up to a long day.  I started the download of an update to my Adobe Creative Cloud subscription that looked like it was going to take a while, so we skipped watching an Episode of Doc Martin and turned in for the night.