Tag Archives: sliced pears (WFPB)

2015/09/24 (R) Blood Work

Linda got confirmation yesterday that our lab orders had been put in by our doctor.  The blood work requires a 12 hour fast (minimum) so we finished dinner last night before 8 PM and did not have breakfast this morning.  We headed out around 8:30 AM for the Henry Ford Health System Columbus Center in Novi, the nearest HFHS lab to our house.  We would not normally get on I-96 at that time of day due to rush hour traffic but we wanted to get this taken care of early and then get something to eat and drink.  We got to the lab at 9:15 and it only took a few minutes to get our blood drawn.  We then headed to the Panera on Novi Road at Grand River Avenue for bagels and coffee and some down time to sit, relax, read, research, and write.

Linda spent some time last evening researching wallpaper installation but found conflicting information.  I got online and looked at some of the same websites.  Wallpaper is a little out of style at the moment and some of the website information was over 10 years old but still seemed relevant.  The interior walls of our motorcoach are finish grade plywood that is firmly attached to the structure of the bus with spray foam insulation underneath.  The issue is how to prep the plywood before we hang the wallpaper.  Some sources indicate that we need to size it, some say to prime it, and others say to use a liner material and then prime, all before hanging the paper.  Other sites, however, say to just hang the paper directly on the plywood and be done with it.

We left Panera and were headed west on Grand River Avenue.  We noticed that Chuck’s truck was at his shop so Linda made a U-turn and we stopped to see if he was there.  He was, so we visited for a while and got to see their new refrigerator and discuss the installation, which Chuck somehow managed to do all by himself.  Even with the use of his forklift, that was quite an accomplishment.

We got back to the house at 12:45 PM, changed into our work clothes, took care of a few chores, and had a light lunch of fresh apples, pears, and hummus with onion on rye bread.  I then called Josh Leach at Coach Supply Direct and left a message asking him to follow up with Ferman Miller at Countertops Plus.  If Ferman does not have any more of the Sandstone Corian I want to make sure Josh gets the 30″x48″ piece from the other supplier before it disappears.

The entrance landing with the floor removed revealing the pneumatic linear actuator that operates the slide out stepwell cover.

The entrance landing with the floor removed revealing the pneumatic linear actuator that operates the slide out stepwell cover.

When we finally got to work on the bus around 2 PM Linda focused on stripping the old wallpaper and I started preparing the entrance for tiling.  She taped off all of the wood trim where she is working, spread painter’s plastic to protect the floor, and wrapped the two living room captain’s chairs.  I removed the existing vinyl tile from the entry platform, removed the plywood cover, and uninstalled the step well cover.  I then removed the tile and treads from the stairs.  I also moved the passenger seat forward and determined that I can probably get to the swivel shaft retaining nut from the back.  Removing the seat by removing this one nut will make it much easier to tile that part of the cockpit.  Ditto for the driver’s seat.

Although we got a late start on the bus today, and worked on it for less than four hours, we were satisfied with what we accomplished.  The old tile came up more easily than I thought it would which bodes well for getting the entry/cockpit tiled with the new Armstrong Alterna Luxury Vinyl tile.

I called Phil Jarrell to verify that he had called Miss Dig and told them to mark the gas main and not just the utilities running to the house.  He said he did and expected that they will be here on Friday.  I will keep an eye open for them and intercede if possible.  Phil expects to start our job on Tuesday.  If he does he will probably be finished by the end of the week or over the weekend.

The entry stairs into the bus with the bottom riser cover plate removed to reveal one of the two air-conditioner compressors installed in the spare tire compartment.  This is how the ports are accessed for service and recharging. The other compressor is accessed through the bay under the driver’s seat.

The entry stairs into the bus with the bottom riser cover plate removed to reveal one of the two air-conditioner compressors installed in the spare tire compartment. This is how the ports are accessed for service and recharging. The other compressor is accessed through the bay under the driver’s seat.

Linda let me know that our lab results were available so we each logged in to our HFHS MyChart accounts to look at them.  Linda’s lipid profile showed a higher total cholesterol than she expected and she was not happy about it.  Dr. Vangel had seen the results and commented that they were OK, but Linda was perturbed about it none-the-less.  My total cholesterol was also higher than I would like but not as high as Linda’s.  Her LDL and HDL numbers and ratio looked good and her HDL, in particular, was much better than mine.  This was no doubt a consequence of her almost daily exercise walking.  We apparently do not fully understand the lipid profile numbers or what we still need to change about how we eat to bring them in line with the guidelines put forward by people like Drs. Neal Barnhard and Caldwell Esselstyne.

Linda made a nice salad to start our dinner, served with a small glass of Moscato.  The entrée was a mock chicken scaloppini that she picked up at Whole Foods.  For a side dish she steamed kale with mushrooms, onions, and garlic.  After dinner we sat on the back deck and enjoyed a second small glass of Moscato.

I went to my office and edited the blog posts for July 23 through 31 and hope to upload those posts tomorrow.  I had an e-mail from Molly Pinner with Linda’s invitation to work as an office staff volunteer at the 2016 Escapade in Essex Junction, Vermont.  I replied to that and cc:d Linda.  I then e-mailed Lou and Val Petkus to let them know.  I was wrapping up for the evening when I got an e-mail from Ed Roelle with the September CCO Newsletter.  He develops the newsletter in MS Word and I convert it into PDF for him.  I took care of that and sent it to him and then went upstairs to watch a PBS program on scenic train rides of North America.

The program was interesting but PBS was fundraising again, and the fundraising segments were longer than the programming segments.  It seems like this has been going on all summer and we are, quite frankly, tired of it.  After clicking around the other channels I turned the TV off and went to sleep.

 

2015/09/06 (N) Grouting

We got up quietly at 7:30 AM as Madeline was still sound asleep.  Linda did not want to let her sleep too long and get off schedule so I got the “all clear” to grind the coffee beans just before 8 AM.  I made the Costa Rican half-caff because I am trying to use it up so we can replace it with something we like better.  Madeline emerged with Grandma Linda a few minutes later.  After stretching they decided to sit quietly on the living room sofa and read stories while everyone woke up and the adults enjoyed our coffee.

Sometime between 9:30 and 10 AM we left for the Howell Farmers Market.  We walked from one end to the other, with Madeline in her stroller, scoping out this week’s bounty. We then walked back through and Linda bought a few things including hard stem garlic which we had never seen before.  We stopped and chatted with our favorite vendor, Marjorie.

When we got home and put the produce away Linda prepared a snack lunch for herself and Madeline.  The two of them then went on an outing to the farm at Kensington Metropark (KMP) while I stayed behind to work on bus projects.  I decided to start by finishing the assembly of the pieces for the built-in sofa.  I attached the center support for the return air shelf as follows:

  • I determined the center of the long edges of the shelf and drew a line between them.
  • I carried these center marks to the other side and then measured 3/8″ to either side.
  • I connected corresponding marks to create a pair of parallel lines 3/4″ apart and centered on the underside of the shelf.
  • I placed the support in position, determined its fore-aft position, and marked the ends.
  • I then marked a piece of scrap wood, cut it into four pieces, and used them to hold the support in place; two long pieces the same length as the support, and two short pieces across the ends.
  • This allowed me to turn the shelf right side up with the center support held in the correct place and then mark and drill countersunk pilot holes for the screws.
  • I removed the support piece, sanded off any rough spots, put Titebond II wood glue on the edge, and replaced it between the temporary blocking.
  • I stood on the shelf to force the pieces together and ran all the screws down tight.
  • I then removed the temporary blocking.

After sleeping on it last night I decided I would attach the plenum/support boxes to the vertical front panel and the wood wire chase on top of the HVAC chase rather than to the adjacent cabinets or to the floor.  That meant I could go ahead and assemble them as complete, single units.  Easier said than done.

Even though I used right angle corner clamps the two halves I built for each box did not want to go together perfectly.  I managed to get one of them assembled but could not complete the other one by myself.  The problem was that I needed both hands to pull the pieces into alignment and two more hands to operate the drill and screw gun.

By now it was 1 PM, which is Madeline’s normal nap time, but they were not back from the Metropark yet so I gathered up all of the tools and materials I needed to grout the floor tiles in the bus.  That included the special Armstrong S-288 Glacier White sanded vinyl grout, a flat blade screwdriver, the 4″x8″ hard edge float, the smaller margin trowel, the 2″ putty knife (wall scraper), the ScotchBrite sponges, the Revel scrubber, two large buckets for rinse water, paper towels, a large cloth towel, and paper bags.

Madeline pets one of the sheep at the Kensington Metropark animal farm.

Madeline pets one of the sheep at the Kensington Metropark animal farm.

Since Linda and Madeline had still not returned I had a few pretzels with hummus.  They finally got home around 1:30 PM and I heard all about the farm and the animals Ms. M got to see and touch.  The 2-day old piglets were apparently a big hit but so was the playroom.  It was a good outing and I wish I could have gone but I got stuff done that needed to be done.

Madeline finally laid down for her nap at 2 PM but Linda could not help me with the tile grouting as she needed to be within earshot of Madeline’s bedroom.  I decided that we could not afford any further delay for this aspect of the interior remodeling project and resolved to do it by myself.  Without Linda to walk me through the steps, have materials ready, and clean the tools, I needed to be very clear about the steps and their timing.  I must have read the directions on the container of grout a dozen times in an attempt to internalize them but they just would not stick with me.  I needed a spray bottle for water so Linda found one for me.

The afternoon was very warm so I turned off the air-conditioning in our home library, closed up the coach, and turned on two of the three air-conditioners, making sure they were on opposite legs of the electrical service.  I staged all of the stuff in the bedroom storage box as I planned to start on the back side of the bed in the driver side corner by the head of the bed and work my way out.

I finally got started at 2:30 PM.  The grouting involved a specific set of steps that got repeated many times as the directions said to only do 6 – 10 sq. ft. at a time.  That range had to do with the time required to apply and strike the grout, setup time (3 – 8 minutes), misting with water, waiting 20-30 seconds, scrubbing, and finally wiping with a square edged cellulose sponge.  I had to divide the U-shaped bedroom floor into six sections and it took me until 5:30 PM to do that much so my average time was 30 minutes per section, each of which was smaller than 6 square feet.

I took a short break, had something to drink, and checked with Linda on the timing of dinner.  We settled on 6:30 PM and I returned to my grouting.  I had to do the bathroom floor in two sections, which got me into the hallway and joined up with the work from the bedroom.  I went in to clean up for dinner and was greeted by the smell of something baking.  Madeline wanted to make cupcakes so Linda assembled the ingredients and walked her through the steps, letting her do as much of the work as possible.  For not even being three years old yet she is very interested in cooking, but only if it is something she will get to eat! 🙂

Dinner was vegan cheeseburgers, corn-on-the-cob (from the Farmers Market), left over black beans and edamame, and sliced pears.  I worked in the bus from 7 to 8 PM and finished the hallway as far as the bend that transitions into the kitchen.  I cleaned all of the tools and sealed the grout container using Cling-Wrap pressed down onto the surface of the grout to keep air away from it, and locked up the bus.

I washed up and turned on the Yaesu FTM-400 2m/70cm radio in the ham shack while Linda helped Madeline take a bath.  Steve, N8AR, was serving as net control for the weekly SLAARC information net and had already started the net but not yet called for check-ins so I got to participate in the entire net.  We had a small group this evening, most likely due to it being a holiday weekend, but it was still a good net.

I came upstairs to have dessert with Linda and Madeline; chocolate cupcakes (vegan) with sprinkles.  Yum.  I then returned to my office to re-read an article I wrote about replacing the speedometer in the bus and editing it to indicate where the pictures should be placed.  I dealt with several BCM related e-mails and then came upstairs.

Madeline was in her pajamas and sitting in her portable bed while Linda read a story.  She decided that she wanted me to read a couple stories too, so I did.  We got her tucked in with her stuffed animals arranged at the four corners of her bed, turned on the night light, and left her to fall asleep.

I opened the bottle of Apricot wine that Brendan and Shawna picked up from Leelenau Cellars and we each had a small glass.  I worked on this post while Linda cleaned up the kitchen.  It had been a long and very tiring day for both of us but a very satisfying and productive day as well.  We don’t mind that kind of tired.