Tag Archives: Senate Coney Island (S Lyon MI)

2015/08/29 (S) Up and Down

When we arrived at the South Lyon Senate Coney Island just before 8 AM there were only five other SLAARC members there but we had 16 by the time the last two people showed up.  Linda (K8LMF) got to sit next to Linda (NF8C) for the first time in quite a while and they had a long chat.  All but one person stayed until 9:45 when we got up to leave and everyone else followed suit.

We were back home by 10:15 AM, changed into our work clothes, and got back to work on the bus remodeling project.  It was a very overcast and cloudy day with a high probability of rain that was forecast to be an all-day event.  That altered our plans a little in that we did not want the pieces of underlayment to get wet and our air-compressor could not be out in the rain as it has an electric motor.

Yesterday we marked and cut the underlayment panels in the driveway, laying them across 2x4s to create space for the circular saw blade.  In order to keep the project moving forward we decided to use the temporary “workbench” in the garage for this work.  Since the workbench was covered with drawer fronts that had to be moved we decided to take a little time to put the new handles on them and reattach them to the drawer boxes.  Sometimes it’s true that “there’s no time like the present” to get something done.

Linda has worked hard on cleaning and waxing the walnut drawer fronts and fixed cabinetry in our motorcoach.  The results so far are amazing and we are feeling like all of our work will be worthwhile as the interior of the coach is going to look very nice when we are done with this project.

We had cut the piece of underlayment for part of the hallway last night but needed to trim it to get it to fit correctly.  I think we took it out of, and back into, the bus at least four times, each trip requiring us to go up and down the seven steps in the entryway/cockpit plus the stool outside the door.  I do not know how many times we went up and down those steps today but it was a quite a few.  To add to our enjoyment and bus conversion physical fitness program we were usually carrying something and it was often heavy and/or large.

The next pieces of underlayment to be cut would fill out most of the living room.  I had planned to cut them a certain way but changed my mind after talking it through with Linda.  We took measurements and I made drawings that were close to scale.  We ended up using the full 48″ width of a 4’x8′ sheet and about 86″ of its length for the piece that fills the alcove where the built-in sofa and storage base will go.  It had two large corner cutouts, one to make it fit with two other installed pieces and the other to go around the base of the media cabinet that doubles as an end table for the forward end of the sofa.  After test fitting it we had to trim a couple inches off of a back corner because of a wire bundle and create a notch for several wires that ran through the floor just in front of the driver’s side HVAC chase.  We waited for a lull in the rain and took it back into the coach.

It fit just right but unfortunately there were defects in the subfloor, such as small gouges and depressed screw heads, that needed to be repaired.  Since we could not use the air-stapler today I did not have a good excuse for not patching the floor correctly so I worked on that while Linda resumed working on the woodwork.  The quart of “ready to use” floor patch was not as ready to use as I would have liked.  The directions said to stir thoroughly and when I opened the container there was a half inch of milky white liquid on top of somewhat drier and stiffer material with the consistency of fine wet sand.  The directions also said the open (working) time was about 15 minutes.

I set the timer on the microwave for 20 minutes, spent five of those trying to stir and mix the floor patch ingredients, and then tried to patch everything that really needed it in the allotted time.  I did not care for this material and wish I had used the Universal Patch and Skimcoat that I used everywhere else.  It was gritty and did not feather out or finish as smoothly as I wanted, but there was nothing to do now but wait for it to dry which would take three hours.

Linda decided to work in the house and eventually fix dinner while I worked in the bedroom (of the bus) trying to remove very old masking tape from the subfloor using a 1.25″ putty knife.  After an hour I had about half of it off but called it quits as my hands were sore.

For dinner Linda cooked a couple of ears of corn-on-the-cob, heated some vegetarian (vegan) baked beans, and cooked two vegan “burgers” topped with vegan cheese.  Mustard, ketchup, pickle relish, and four large leaves of romaine lettuce made for a tasty sandwich.  We each had a glass of the Cupcake Black Forest Decadent Red wine with the meal.  Dessert was fresh sliced strawberries with non-dairy (vegan) peach mango “yogurt.”  It was a tasty summertime meal.

After dinner I tried sanding the floor patches even though the directions said not to sand the dried material.  I used a very old piece of 120 grit sandpaper in my orbital sander and went over the entire area.  I vacuumed the whole area but I could still feel a residual grit on the floor.  I got Linda’s vacuum from the house and tried that.  I then got the Revel wet/dry mop and tried wet moping the area, but it was still gritty.  I was preparing to go over the entire area with the new 80 grit sandpaper but Linda managed to get it clean using the brush attachment on the house vacuum cleaner.

With the area cleaned up we put the piece of underlayment for the sofa nook in place and it fit very nicely but we did not staple it.  We redid our measurements for the passenger side front piece and made some minor adjustments to the dimensions on the drawing.  What I have tried to do wherever possible is to keep at least two factory edges with a common vertex (corner) and use that point and those sides as the basis for my measurements.

It looked like heavy rain was going to hit us from the west but must have tracked north of us.  We continued to get rain, off and on, but nothing heavy every materialized.  Working in the garage we measured and cut the last piece for today.  We made extensive use of the circular saw running it along a saw guide.  By the time we had the sheet cut there was a lull in the rain so we took it to the bus to test fit it.  The fit was close but needed minor trimming in the front outside corner.  By now it was 8:30 PM and we did not want to haul the sheet back out of the bus and into the garage to work on it.  That will be our first task tomorrow followed by stapling the three pieces that we cut today, weather permitting.

We turned in at 10 PM.  There wasn’t anything on TV that interested us, so Linda read for few minutes before falling asleep and I wrote until 11:30.

 

2015/08/22 (S) Clean and Level

We arrived at the SLAARC breakfast just before 8 AM.  We took the last two seats at the end of the long row of tables, but had to add another one as six more people came in after us.  We had a lively chat that lasted until almost 9:30.  After breakfast we stopped at the Tractor Supply Company store in New Hudson to get a couple more deer blocks and then headed for home.

We took a few minutes to put away tools and straighten up the garage enough that we could set up a work surface for Linda to use for cleaning the walnut drawer fronts for all of the bus drawers.  We set up the two sawhorses we got at Lowe’s yesterday, set two 8-foot 2x4s in the provided grooves, and set a 4’x8′ piece of 2″ rigid foam insulation across them to use as the work surface.  I found an old package of 4/0 steel wool and Linda found some old terry cloth towels.

Foam insulation work surface in garage with walnut drawer fronts laid out for cleaning with Touch of Oranges.

Foam insulation work surface in garage with walnut drawer fronts laid out for cleaning with Touch of Oranges.

Linda removed the drawer fronts from seven of the drawer boxes and tagged them so they could be reunited later as each front is uniquely paired with its box.  She then removed the handles from the drawer fronts and set them aside as they will be replaced with new ones once the cleaning is done.  She started with the back sides of the drawer fronts.  Following the directions she sprayed them liberally with Touch of Oranges wood cleaner, let them sit for 10 minutes, sprayed them again lightly, and rubbed them with the 4/0 steel wool.  She then wiped them off with a terry cloth towel and applied Touch of Beeswax using 4/0 steel wool, always working with the grain, of course.  The wax will have at least 24 hours to soak in before being wiped off.  Once that is done she will flip them over and repeat the process on the front side.

While Linda was doing all of that I hauled the 15 gallon DeWalt portable air compressor out by the bus, plugged it in, and connected the air hose.  I used the 4″ circular pneumatic sander on a few remaining high spots and decided I was done with it.  I had found some old packs of 80 grit half sheets and tried using them on my orbital sander but the grit disappeared very quickly and the sheets snagged and tore on splinters in the plywood.  I spent more time changing sheets than I did sanding with them so I abandoned this approach after the fifth sheet.  I did, however, find a half dozen splintered areas and prepared those by making stop cuts with a utility knife and then peeling the splinter free with a putty knife, creating voids that will be filled with leveling compound.

I was tired of sanding and was clearly not going to get the floor back down to bare wood.  I decided that the floor was as sanded and smooth as it was going to get and it was time to move to the next process; patching and leveling.  Before I could do that, however, I needed to clean the coach.  I vacuumed the floor three times and vacuumed all of the woodwork and wallpaper.  As I worked from the bedroom forward Linda followed behind with a microfiber cloth wiping down all of the woodwork.

I assembled the tools I needed to apply the Universal Patch and Skimcoat; a 3″ putty knife, a 5″ putty knife, a combination smooth and toothed rectangular trowel, a mixing bucket, and a 2 foot long wooden stir stick and a mixing paddle designed to go in a drill.  Each bag of UPS weighs 7 pounds and gets mixed with 1.75 quarts of water, which works out to 1 part water to 2 parts UPS.

The directions on the bag indicated that a full bag of UPS, properly mixed, would cover 20 to 25 square feet 1/8″ thick.  That’s only a 5’x5′ area, but I only had a few gouges that were 1/8″ deep, so an entire bag was going to cover a lot more than 25 square feet when applied as a skim coat.  Not having worked with this material before I had no idea how much working time I would have so I decided to mix half a bag.  The recommended mixing method using a paddle in an electric drill turned out to be a bad idea so used the 2-foot long wooden stir stick to mix the compound.

TEC Universal Patch and Skimcoat applied to the floor in that hallway.

TEC Universal Patch and Skimcoat applied to the floor in that hallway.

I started in the bathroom patching small depressions and then working out from the baseboards.  By the time I got out into the hallway I had not even used half the compound and it was starting to set up.  I hurried to use as much of it as I could, and tried adding a little extra water to extend its workability, but was only able to use about 60% of it before it was too stiff to spread and trowel off smoothly.  I could have waited 1 hour and then mixed and applied more compound but I did not want to risk disturbing what I had already done and it has to set for 24 hours before I can sand it, which I will have to do.

Cleanup required warm soapy water for the tools.  I then poured it into the 5 gallon compound bucket, topped it up with water, stirred it to dissolve the compound as much as possible, and let it sit.

For dinner Linda made Farro with mushrooms, onions garlic, glazed snow peas, and grated carrots.  She needed some dry white wine for the Farro dish and opened a bottle of Pinot Grigio, so we had a glass with the meal.  As rule if a wine is used in a dish it is also a good choice to drink with that meal.

After dinner I went to Lowe’s and got some more 4/0 steel wool and some 80 grit sandpaper sheets.  I stopped at O’Reilly’s for a battery disconnect switch for the lawn tractor but they did not have one.  I tried the Howell Tractor Supply Company but they did not have one either.  I drove to the Brighton Shell station, topped off the fuel in the Element, and went home.  We turned in at 9 PM and watched a 007 movie before going to sleep.

 

2015/06/27 (S) ARRL Field Day

At 5 AM I was vaguely aware of the sound of rain.  The cats were chasing each other through the house so I got up to make sure nothing was amiss, such as another mouse.  They were just having a bout of morning friskiness.  I added a little food up to their bowls, which drew their attention, and went back to bed.

My Amateur Radio vanity license plate.  There were a LOT of these in the parking lot at the SLAARC Field Day site.

My Amateur Radio vanity license plate. There were a LOT of these in the parking lot at the SLAARC Field Day site.

I finally woke up and got up about 8:15 AM and got dressed in a suitable manner for today’s American Radio Relay League (ARRL) Field Day event.  The temperature was in the mid-50s, overcast and raining with blustery winds; not exactly the nice summer day we were all hoping for.  Some of the members of the South Lyon Area Amateur Radio Club (SLAARC) were gathering for breakfast at the usual place (Senate Coney Island) at the usual time (8 AM) but we obviously did not join them today.

I went to my office to retrieve my Sony DSLR and decided to turn on our Icom IC-7000 ham radio.  I had it tuned to the SLAARC (K8VJ) repeater in South Lyon when Keith, KD8YYJ, announced his presence.  He was driving from the west side of Howell to Wixom and seeing what repeaters he could hit.  We chatted for 10 to 15 minutes and I invited him to stop by the SLAARC Field Day site at the South Lyon Township James F. Atchison Memorial Park.

I worked all day yesterday as part of the SLAARC Field Day setup crew.  There was more setup to do starting at 9 AM this morning but the setup mostly involved radios, computers, Wi-Fi networking, and power.  I was not in any humor to rush off into the clammy weather conditions, and Linda was up by this point, so we had breakfast.  She found some Silk brand ‘yogurt’ at Meijer’s last week so we had that.  It was OK.  It is a creamy style yogurt, which is not my preference, but it was tasty enough.  Bananas, cinnamon raisin bread, and juice rounded out the meal.  Linda even made the coffee.  I turned on the natural gas fireplace to ward off the chill in the living room where we lingered and enjoyed our morning brew.

The SLAARC Field Day operating stations use wirelessly networked computers (left) running N1MM Logger+ to record the contacts that are made.  HF transceiver to the right.

The SLAARC Field Day operating stations use wirelessly networked computers (left) running N1MM Logger+ to record the contacts that are made. HF transceiver to the right.

I finally left for the Field Day site around 11 AM.  The operating event started at 2 PM but the first of four meals was lunch today at noon and I wanted to capture photos of the rest of the setup and the lunch event.  It was raining lightly when I arrived and continued to rain until I left at 2:15 PM.  In between arrival and departure I took some photos and helped out a little bit, but there were plenty of people there taking care of what needed to be done.

Mike (W8XH) brought his Icom IC-2820H dual band mobile radio and several lengths of 50 ohm coax and we transferred those to my car.  He then walked me through the various menus and functions his new Yaesu FTM-400DR/DE radio, a dual band (VHF/UHF) 50 Watt rig with digital voice capability and a color touch screen display.  A group of SLAARC members recently purchased a Yaesu DR-1X repeater that works with the new Yaesu digital voice and data modes in addition to the traditional FM mode and are testing it as a replacement for the current, and very old, K8VJ repeater.

Mike’s IC-2820H is available for $350 but the FTM-400DR has a $100 rebate through the end of June, bringing the price down to $500.  As much as I would like to have a VHF/UHF radio in my car I am looking at one of these radios to install in the cockpit of the bus so we can use it going down the road.  The long-term plan is to put the Icom IC-7000 HF/VHF/UHF radio in our towed vehicle and get the Hi-Q 80-6 antenna mounted and operational in addition to the Diamond SG-7900 VHF/UHF antenna that is already on the Honda Element.

For base station use I would like to get an Elecraft K3s or Flex SDR rig.  The K3s has become the rig of choice among the members of the SLAARC who are serious about working HF and contesting.  Either of those are radios that could be fairly easily moved from the house to the bus when we travel.  Antenna options in the bus could include running coax to the Hi-Q on the toad and/or a “flagpole” HF vertical that is mounted using the towbar receiver or a base stand that goes under one of the tires.  An antenna switch would allow the use of the VHF/UHF antenna that was already installed for the cockpit radio.  All of these “base station” options would obviously be for stationary use only.

[Photo 3 – HC]

The ARRL FIeld Day event showcases the ability of amateur radio operators to set up equipment in the field on short notice and keep it on the air for 24 hours, no matter what.  The weather turned bad for the event.  The portable generator is under the tent in the right foreground.

The ARRL FIeld Day event showcases the ability of amateur radio operators to set up equipment in the field on short notice and keep it on the air for 24 hours, no matter what. The weather turned bad for the event. The portable generator is under the tent in the right foreground.

I uncoiled the coax cables that Mike lent me to see how long they were.  There was a 5 foot piece that was too short for what I needed, and a piece that was approximately 40 feet, which was longer than I needed.  The third piece was at least as long as the 40 footer.  I “tagged” his coax with small white cable ties so I could identify them later and return them to him.

I did not want to mess around switching coax cables in the rain so I unboxed Mike’s Icom 2820 and got it set up to use with my existing antenna and transmission lines.  I spent a little time with the manual and then powered it up.  It was already configured from when Mike used it in his ham shack so I did not need to do any setup to use it.  I monitored both the South Lyon 2m and Novi 440 MHz repeaters and was able to “hear” both of them, although the South Lyon signal was much better (stronger, quieter, clearer) than the Novi.  A couple of SLAARC members were on the South Lyon repeater taking care of Field Day business.  I waited a suitable amount of time after they were done and called for Mike (W8XH) and he came back right away.

We repeated the testing we had done last night.  The performance with the 2m South Lyon repeater seemed to be much better but the performance on the 70cm Novi repeater was the same or worse with a fading component to the noise.  I think we were on the air 15 to 20 minutes.  Based on the test results from last night and this afternoon I think I have two separate issues that are probably interacting; the IC-7000 needs to be grounded and the 25 feet of coax from the cable entry box (CEB) to the radio (Go Box) needs to be shorter and much higher quality.  I need to install the ground bar on the wall behind the ham radio desks and then purchase a suitable length of ground wire and run it from the CEB to the copper ground bar.  I will also need to get a 15 foot length of 50 ohm LMR-400 coax from Scott (AC8IL) with an N-male connector on one end and a PL-259 connector on the other end.

Linda prepared our dinner at 5 PM.  She made corn-on-the-cob and “cowgirl steaks,” a new (to us) vegetable protein product she found at Meijer’s.  After dinner we drove back to the SLAARC Field Day site to socialize with club members at dinnertime.  The weather at our house was still rainy with light-to-moderate winds and occasional stronger gusts.  We arrived at the Field Day site to find a flurry of activity and strong, steady winds out of the north with continued sporadic rain.

Jim (KC8WMW) stays dry as he works the GOTA (Get On The Air) station in one of the tents.

Jim (KC8WMW) stays dry as he works the GOTA (Get On The Air) station in one of the tents.

The small red tent that was originally supposed to be the VHF tent was nowhere to be seen and at least eight people were engaged in trying to control and fold up the large canopy that the club purchased yesterday at Costco to serve as the combined VHF and GOTA tent.  We quickly learned that the small tent, which was not being used, had collapsed and the large tent, which was unoccupied but full of radios and computers, had come unstaked and blown over in the wind.  Those who were not helping with the equipment canopy were gathered in the food canopy.  I pitched in on the equipment canopy rescue and Linda took the camera and joined the folks in the food tent.

After gathering up all of the pieces of the canopy and getting them back in the trailer some of the team added extra ropes and stakes to the windward end of the food canopy and both the 20m and 40m tents.  Another part of the team, including me, got Marty’s (KB8JIU) satellite tracking equipment out of the screen room, which had been draped with solid plastic tarps to keep the rain out, and then took the room down, disassembled the legs, folded it up, and stuffed it in the trailer.  The red tent was stuffed under a picnic table that was in the screen room so I grabbed that and put it in the trailer.  The support pole for one end of our off-center-fed dipoles was bending over to the south more than we liked.  Steve, N8AR, tied a rope around the existing rope, which was inline with the antenna and being used to keep it taught.  He slid the second rope up the first one as far as he could get it to go and then pulled it out to the northwest (the antenna was oriented east-west with the tension rope running east off of the east end).  He pulled it out until the support pole was reasonably vertical and I staked it down.

The winds really howled out of the north driving the rain before them.  This shelter (from Costco) did not survive along with another tent and a screen room.

The winds really howled out of the north driving the rain before them. This shelter (from Costco) did not survive along with another tent and a screen room.

So the bad news was that some of our Field Day setup had not survived the weather which had not even reached severe conditions.  The good news was that our generator was still producing power, all of our towers and antennas were intact and functional, we had our two key stations on the air, and our food canopy was full of people and hot food.  Not the Field Day everyone had hoped for, but a great opportunity for teamwork and camaraderie and a learning experience to be sure, even if it was not the kind of lesson we wanted to learn.

We left around 7:30 PM and went to the New Hudson Lowe’s, which was very close to our Field Day site, where I bought 18 feet of AWG 6 stranded copper wire with a green sheath.  As soon as the weather improves I plan to run this from the CEB to the ham shack and use it to connect the ground bar in the shack to the copper backplane (ground plane) in the CEB.  I will then connect the ground on our Go Box (Icom IC-7000) to the ground bar and see if it helps with my noise issue.

Back at the house Linda wanted to watch an episode of NCIS Los Angeles, which we can now do thanks to our new OTA TV antenna.  We then watched an episode of Christina Cooks, Christina Perillo’s vegan cooking show from a decade ago.  These are still relevant and useful episodes and we especially enjoy them having seen and met her and her husband Robert on our two Taste of Health Holistic Holiday at Sea vegan cruises.  Linda read and I wrote for a while before lights out and off to sleep.