Tag Archives: Seattle Blend 1/2 caff (Teeko’s)

2014/09/12 (F) Posted

Linda was up very early to try and beat the morning rush inbound to Detroit from the northwest.  I took an Ibuprofen and went back to bed, finally getting up at 7 AM.  1-800-PACK-RAT was scheduled to pick up the 16 foot long storage container we have had in our driveway for the last two months and I wanted to be up and dressed when they arrived.  I did not have any problems with my teeth overnight.  They felt OK this morning but the upper right was still a bit sensitive to biting pressure.  I had a nice soft banana for breakfast and decided to keep taking the Ibuprofen and Tylenol.

I put a load of laundry in the washer and then ran out to take care of errands.  I stopped at Dunkin Donuts for coffee, Lowe’s for solar salt for the water softener, and then Teeko’s for coffee beans.  Jeff still did not have the Sweet Dreams decaf blend even though he orders it every week.  I got a pound of the Seattle Blend 50/50 regular/decaffeinated, and a pound of regular Brazilian Serra Negra to blend with the decaffeinated beans we already had at home.

Heather, from Root Canal Specialty Associates, called around 9 AM to check on me.  I mentioned the sensitivity and she said that was normal and to keep taking the Ibuprofen/Tylenol through the weekend to counteract any inflammation and/or discomfort.  She wanted to know if I thought the temporary filing was high and making contact before the other teeth.  I wasn’t sure, but she said if it was to call them Monday morning and they would get me in to adjust my bite.

Since I was on the phone anyway I called Bratcher Electric to see about the quote/estimate for the generator service / fuel changeover and the service entrance feed from the transfer switch to the sub-panel to change it into a main panel.  They have been very busy with repairing damage caused by the storms of the last few weeks.  We did not suffer any damage beyond some dead branches breaking off from trees, but south of us folks were hit much harder.  That kind of work always takes priority.

The day was overcast and dreary with morning temps in the mid-40’s and a high of 54, but that was OK; it was a perfect day for sitting at a desk and working on a computer, undistracted by either bad or gorgeous weather.  I did, however, bring my computer upstairs and work at Linda’s desk.  My office is very nice but it is in the basement and it is a bit of a cave.  Sometimes I like that, and sometimes I don’t.  I worked on our blog until early-midafternoon and finally uploaded posts from Aug 2 through Aug 20.

My only interruption was a visit from one of Roese Construction’s field supervisors who was checking on where the runs will go to connect the houses in our neighborhood to the natural gas main.  After looking at our situation he agreed with me and Mel who had looked at this a few weeks ago, that staying to the east of the east entrance to our pull-through driveway made the most sense even through it required them to bore at an angle relative to the main line.  That conversation confirmed that they will be horizontal boring the branch line rather than trenching it in.  He did not give me a firm date, but it sounded like it could be as early as tomorrow (Saturday) and likely by Tuesday next week.

My computer battery was down to under 1 hour of charge remaining, so I took it downstairs and plugged it back in to its power supply.  While I was down there I put another load of laundry in the washing machine.  Back upstairs I made a PB&J sandwich for lunch, along with some green tea.  I got back on the RVillage Mobile development site, played with a few more features, and provided some additional feedback to the development team.  I then worked on this post using my new Logitech Bluetooth keyboard.  The Wacom Bamboo stylus is nice, but the keyboard is the way to go when creating extended text.

Juniper, our female cat, was getting into something in the library so I went to investigate.  She had cornered a yellow jacket and was trying to figure out what to do with it.  I solved the problem for her by capturing it and putting it outside.  I don’t think she was pleased with my solution, but not 20 minutes later she was at it again, and it was another yellow jacket.  We have a nest in the soffit near the library that we need to get rid of, but we have not had a problem with them getting into the house until very recently.  Hopefully that has not changed but I will have to investigate the situation.  It may be that with the onset of cooler temperatures they are finding their way into the library through the recessed ceiling downlight cans.  If so, there’s really no good way to seal those.  Fortunately we can close of the house from the library with a kitchen door and a living room doorwall that includes a screen door.

It started raining very lightly around 4 PM, but never developed into anything.  Linda got home from the bakery at 5:30 PM.  The storage container had not been picked up yet so we called the 1-800 number and left a message with our callback number.  I got a call around 6 PM from the local (Plymouth, MI) office verifying the pickup and address.  The driver arrived around 7:20 PM and had the unit loaded by 7:30 PM.  After he left we headed to dinner at LaMarsa where we had crushed lentil soup and split an order of Koshary and salad.  Even splitting the dish we both ate too much, aided by the fresh-baked pocket bread and garlic spread.   The food and service were both excellent, as always, and the garlic spread was “…the gift that keeps on giving.”

We got back from dinner a little before 9 PM, too late to start any in-depth computer work, but early enough for me to finish this post and for Linda to do some recipe research for Sunday’s brunch.  It seems like only yesterday it was still light at 10 PM at night, but we are approaching the autumnal equinox, and there are noticeably fewer hours of daylight now.

 

2014/08/20 (W) Like A Well-Oiled Clock

Darryll and Alec (DCM Heating & Cooling) were back today to continue working on the garage and library HVAC project.  I was talking to them as they unloaded tools and materials when I got a call back from Paul Keech.

Paul has changed the name of his company from Paul’s Tree Service to Detroit Tree Recycling and is also running American Mulch.  As I was told yesterday he is trying to focus on tree removal, especially wood lots with multiple trees, rather than tree trimming.  Among other reasons, the trees he removes provides the raw material for his mulch business.  Also, the guy who did most of his climbing the last ten years has moved on to another job and it’s hard for Paul to run a business when he’s up in a tree, even with a cell phone.  I tried to describe the trimming and removal work we need done but in the end we agreed that I would take some photos, put them in a Dropbox folder, and e-mail him the link.  He also encouraged me to get a couple of quotes from some companies more local to our new location.

While I was talking to Paul, Darryll found a small leak in the reducer at the T-fitting behind the garage and tightened it.  The pipe out of this reducer will bring gas into the garage and was the last piece of pipe they worked on the last time they were here.  Alec reset the pressure to 12 PSI and it appears to be holding better than it has up to this point.

In the course of the day, they…

  • …finished setting the Library furnace/air-conditioner and connected the parts together.
  • …cut the hole for the return air register and installed the return air duct.
  • …ran the supply air ducting from the top of the unit along top of the ceiling, over the top of the utility closet door, and then angled it to run along east wall at the ceiling.  All of the duct outside the closet is insulated.  Two flexible ducts will come off the top and run through the attic to supply air through ceiling registers on the east end of the library.
  • …marked the location for the two registers that will be at the bottom of two rigid ducts running down the east garage wall to supply air to the library just above the baseboard heat radiators.
  • …removed the old library window A-C unit and covered the hole with cardboard.  We will have to patch the opening on both sides with drywall and paint it.
  • …shut off the propane to the old library wall-hung space heater, removed the unit, capped the line (iron pipe), turned the gas back on and checked for leaks.
  • …connected the double-walled flue pipe for the library furnace.
  • …connected the double-walled flue pipe for the garage furnace.
  • …ran the 1/2″ iron pipe for the gas supply to the garage furnace.

They will take care of the air-conditioner condenser/compressor installation on a subsequent visit.  In the meantime I need to install electrical junction boxes for the two furnaces, which must have switches located within three feet of each unit.  I also need to run new 12 AWG 2+g NM cable for old A-C condenser/compressor and repurpose the existing A-C condenser/compressor wiring as an outside 120 VAC / 15 Amp outlet.

We still needed to repair drywall in the library and upper east garage wall and install new drywall on the lower east wall of the garage and on the new utility closet walls.  The lower half of the east garage wall is the next thing I have to do as I need to have it done before he comes back to finish the duct work.

I got a call from Chuck Spera just before noon letting me know that he was headed to his shop to pick up his old VDO bus tachometer and take it to Bob’s Speedometer Service on Bergin Road.  Bergin is an east-west road about one mile north of our house.  Bob’s was over at Old US-23, less than five minutes away.  I met Chuck there at 12:30 PM and we met with Matt who handles their VDO instrument repairs.  He tested Chuck’s tach and pronounced it broken but probably repairable, so Chuck decided to leave it there.

Matt did confirm for us that both the tachometer and the speedometer take a square wave input signal in the 3 – 5 volt range with deflection of the needle proportional to the frequency of the waveform.  Presumably this same signal regulates the speed of a motor that drives the gears of the odometer.  I had discussed this very situation with Mike (W8XH) just last night and he is willing to bring his 100MHz 2-channel storage oscilloscope and help us look for and trace these signals if needed.  Once we have known good gauges installed knowing what waveform to look for will help greatly with troubleshooting should they still fail to indicate the appropriate information.

After we were done at Bob’s I headed over to the Meijer’s northeast of M-59 and US-23 to get a few things for Linda.  By the time I got home, Glen Williams of Tenor Clocks LLC had arrived to service our grandfather clock.  I “broke” it about a month ago by trying to wind it at just the wrong time and it has not chimed since then.  It has also never been oiled in the 11 years since we bought it and Glen told us on Saturday that it should be cleaned and oiled every 5 – 7 years.  (We saw Glen at the GLCC/CCO rally in Clio, Michigan this past Saturday when we were there.)  Glen took the mechanism out and examined it and said that nothing was broken.  Apparently it finally bound up the last time I wound it from lack of proper oiling.  He cleaned it, oiled it, and checked it for wear but did not see any.  He reassembled it, checked the operation and timing, and said it was running smoothly and keeping very accurate time “…like a well-oiled clock.”

Although my time on the computer today was limited, I managed to post my blog entry for August 1st and started selecting photos for other posts.  I updated the Technical page on the SLAARC website with a document on low band antennas for Field Day use, and added a link to an online Smith Chart Tutorial.  I then updated the online roster.  I am at the point where I need to generate WordPress user accounts for the club members so I looked more carefully at the WP-Members plug-in documentation to see if there was a way to have the website e-mail each member as I create their account.  It appears that there is, but it will take a little more work on my part to get that set up and working correctly.  As I was working on this our AT&T DSL line started dropping out; again.

Linda spent part of the day preparing food ahead in advance of having company tomorrow.  She held back some of the crushed red lentil soup for our dinner and served it alongside sandwiches.  While we were eating we noticed that the phone said “Line In Use.”  We knew we were not using it, but I picked up one of the handsets, pushed “Talk”, and got a very loud, very noisy busy signal.  We checked all of the phones to make sure there wasn’t a problem with one of them.  There wasn’t.  When I checked again the message said “Check Tel Line.”  That usually means we won’t have a dial tone when we push “Talk” and that was, indeed, the case.

Ken is the service technician that has been out twice to try to resolve the problem and he left his AT&T cell phone number in case we had recurring problems.  He also left his manager’s name and phone number.  I called and left a message for Ken and then called and left a message for his manager, making it very clear that Ken has been working hard to resolve our problem and we are happy with the service he is providing.  I also tried to convey that the service disruptions are interfering with our ability to do things online, like edit websites.  It’s bad enough that the data rate is so slow, but we depend on our “always on” DSL service to always be on.

We went to Lowe’s after dinner to buy a couple sheets of drywall.  We looked for special cover plates with a switch opening in one half and a round hole in the other, but did not find anything like that.  We stopped at Teeko’s on the way back and had Jeff roast two more pounds of half-caff blends for us; one Ethiopian Yirgacheffe and the other Seattle Blend.  He was still out of the Sweet Dreams decaf blend, which we have him mix 50-50 with the regular Seattle Blend to make Sweet Seattle Dreams, but he is supposed to be getting some in his shipment tomorrow.

Back home we unloaded the drywall, had some fresh strawberries for dessert, and read quietly for a while.  I’ve been reading the PDF version of the 2nd edition of The Mobile Internet Handbook and am done except for the glossary and the appendices.  It is over twice as many pages as the 1st edition and is the definitive resource on connectivity for RVers in particular.

 

2014/08/13 (W) Bad Times

Linda had a rough night last night.  The tooth on which she just got a new crown two weeks ago started throbbing and even Tylenol did not do much to dull the pain.  She finally got some sleep early this morning and slept in while I had toast with jam and coffee for breakfast.  She called the dentist when she finally got up and they said they could see her at 10:30 AM.  She tried drinking some coffee but the hot liquid immediately aggregated her bad tooth.

Linda has been following a story in the news about Ferguson, the town in Missouri where we grew up.  There was an incident there over the weekend in which a cop ended up shooting an 18-year-old African-American male.  There were limited witnesses, so the truth about what happened is obscure at best.  The town, a northern suburb of St. Louis, is now experiencing “riots” and looting.

It is difficult for me to picture what is happening.  Although Linda’s oldest brother still lives in Ferguson we have not been back there in years.  This is the kind of situation that “happens to other people in other places” not in the Ferguson of my memory from the 1950’s and 60’s.

Darryll and Alec (DCM Heating &Cooling) showed up just after 9 AM and Linda left for the dentist at 9:15 AM.  The stormy weather of the last two days cleared out overnight replaced by cool northwest breezes, abundant sunshine, and blue skies.  When the weather in Michigan is nice it is really nice.  I took a few minutes to get the trash to the curb, made sure Darryll was all set, and then retreated to my desk to work on the membership and financial records for our FMCA Freethinkers associate chapter, of which I am the current vice-president and secretary.

I got a call from Linda around 11:15 AM letting me know she had a 2:15 PM appointment with an endodontist down the street from our dentist.  She was going to go to Fairlane Mall to kill some time but since she did not get much sleep last night I suggested she go to the endodontist’s office and sleep in their waiting room.  Given her discomfort and sensitivity to hot liquids she will likely come home today with a new root canal procedure having been done.

Darryll and Alec finished the 2″ iron pipe installation, connected an air pressure gauge, and pressurized the pipe to 12 psi to check for leaks.  The natural gas pressure in the line will only be ~4 in-WC (inches of water column).  1 PSI = ~27.67 in-WC, so 4 in-WC us is approximately 1/7 PSI, a relatively low pressure.  Still, there cannot be any leaks in the piping connections.

With the pipe done for now they turned their attention to hanging the Reznor garage heater.  To support the unit Darryll installed two U-channels in the attic spanning the top side of the bottom cord of three trusses.  He determined the location of the threaded support rods from the garage ceiling side using a cardboard template and drilled the holes up into the attic.  He and Alec then assembled everything with Darryll doing the attic work.  The Reznor is not that heavy, but he prefers to hang the unit when possible rather than screw it into something.

To position the unit they set it on top of one of our 6′ tall plastic shelving units and blocked it up another six inches with scrap wood.  (We used the same technique to install the pull-down attic ladder a couple of weeks ago as described in a previous post.)  The unit is 12″ high and they set it 6″ below the ceiling near the center of the rear (north) wall.  That location will optimize getting heat to all parts of the garage and put the unit right where Darryll needed it to connect the exhaust flue pipe using the existing flue that was originally used for the wood-burning stove.

Linda usually fixes our meals, but I used to do a lot of the cooking during “tax season” when she was working ridiculously long hours as a C.P.A.  Lucky for me we had chickpea salad in the refrigerator and I remembered how to make a sandwich.  A few almonds and some of this morning’s coffee (Teeko’s Seattle Blend half-caff) made for a tasty, quick, and easy lunch.  I checked the pressure on Darryll’s gauge and it had dropped quite a bit, so there was a leak (or leaks) somewhere that he will have to find and tighten.  That’s unfortunate given the size of this pipe and the number of connections, but “it’s all part of the job” as the saying goes.

I was hopeful that Phil from Precision Grading might come fix our pull-through driveway today, but as of 1 PM I had not seen or heard from him.  There’s still a chance we could see him later today, but it was a long shot at best based on the premise that with all the rain on Monday and Tuesday he might not be able to work anywhere else today.

Linda called around 1:45 PM to let me know the endodontist was able to see her at 12:15 PM.  They did some tests to confirm it was the nerve in the suspect tooth and then did the root canal procedure.  Apparently sensitivity to heat and a lack of sensitivity to cold is indicative of a nerve gone bad.  They gave her an initial dose of antibiotics and some pain killers (Motrin) and sent her on her way with prescriptions for more of the same.

Darryll and Alec wrapped up for the day around 2:15 PM and walked me through what they had done and what was left to do.  While I was eating, talking, and working they had run the gas pipe through the back wall of the garage and installed the flue pipe for both furnaces.  Darryll needed a few more parts to finish the job and needed to get home to deal with a flooded basement situation from the recent rains.  He indicated they should be done by the end of next week, at least with everything they can do until the gas line gets run to the house and hooked up to meter.  The timing may turn out to be tighter than expected.  When Linda turned onto our street she observed that Roese Construction had started running gas line down our road and appeared to be hooking up houses as they went, but that turned out not be the case.

I was questioning Darryll about the exhaust flue for the Reznor garage furnace and discovered that it is not a sealed combustion unit like the one we had at the other house.  He assured me it was approved for use in garages and that he has installed a lot of them over the years, but would double check to make sure.  He can return this one if needed, but said the sealed unit is more expensive.  It would also require completely different fresh air and exhaust ducting that would have to go through the back wall of the garage.  I suspect we will stick with the one that is already installed.

Darryll sprayed every iron pipe connection with soapy water and the only leak he found was the cap they put on the end of the run this morning.  Apparently they did not tighten it fully when they installed it.  He snugged it down and had Alec re-pressurized the pipe to 12 PSI but did not recheck for leaks.  (Hypothetically, if the leak at the end of the pipe was big enough other leaks might not show up anywhere else until that one was fixed.)  If there are no other leaks then the pressure should stay at 12 PSI indefinitely; certainly until they come back on Monday or Tuesday.

For dinner Linda made a nice green salad and a pepper seitan dish served over white rice; simple but delicious.  I checked the pressure in the black iron pipe after dinner, when it was cooler and the sun had dropped lower in the western sky, and it was down to 11 PSI.  That seemed like a lot of pressure loss to me, but the Ideal Gas Law (PV=nRT) says that for a fixed volume (V) the pressure (P) and temperature (T) are directly proportional (by the factor nR).  We know from experience that the pressure in an RV tire changes a little with changes in the ambient air temperature even when sitting still and quite a bit when the tire heats up from driving.  If all the tire pressures are set to the same value first thing in the morning and one side of the RV is facing south on a sunny day the pressures in the tires on the sunny side will be measurably higher than the shady side at mid-afternoon.  Of course there is a lot of air in our bus tires since they run at 100 PSI, more or less.  Most of the black iron pipe is not exposed to direct sun for most of the day so tomorrow I may re-pressurize the pipe at 10 PSI and record the pressure and temperature every 30 minutes until 2 or 3 PM to see how it varies.  Or not.

Phil (Precision Grading) called back this evening and said he could take care of fixing the driveway on Friday afternoon for a very reasonable price.  Sold.  That means we will not be going to the Clio rally on Friday for the 1 PM roundtable discussion.  So be it.  We will probably drive up on Saturday after our ham radio breakfast.  While Phil is here we are going to shoot the grade in the back with his laser level if he has time and see what we really have.  He and I agree that just eyeballing it things do not look quite right.

It’s obvious to me after the heavy rains on Monday and Tuesday that the two plastic drain pipes running out into the back yard should have had a third drain tile line put in the trench with them (perforated with an oversock) and the trench should have been filled with pea gravel to create a French drain that would remove the water flowing into that low lying area and keep it from saturating the ground.  It would also have made the pipes better able to withstand being driven over by a vehicle.  As it stands, anything heavy that drives over that area while it is moist/soft will most likely crush the pipes (again).  I’m annoyed because I did not know enough to specify this as part of the job and because Steve, for whatever reason, did not recommend it.

To fix this correctly we would need to have Phil locate the existing plastic pipe and dig it up back past the Y-connector for the two downspouts and up into the two slopes far enough that it is out of his way.  That would allow him to re-grade the entire area properly, dig a new trench starting from the edge of the lower deck, install the three drain lines, fill the trench with pea gravel, and then finish grade the slopes and valley correctly, all of which Village Landscape should have done, in my opinion, but did not.  It would also give us the opportunity to replace the corrugated plastic drain line with PVC pipe which would better withstand the weight of a vehicle once encased in pea gravel.  The rear retaining walls and front stairs/sidewalk look nice and appear to have been built correctly so we did get something for our money, most, in fact, of what we paid for, just not everything we needed.

 

2014/08/01 (F) Schmoo Returns

(Note:  I have posted two photo galleries dated August 1, 2014, one for the front sidewalk and stairs project and one for the rear retaining walls and drain lines project.)

We took a break from personal construction projects today to get ready for another 2-night sleepover by our grand-daughter Madeline.  Her folks (our son and daughter-in-law) needed to do some painting on their rental house over the weekend and the most efficient use of their time was for Brendan to bring Madeline to our house late this morning.  That allowed him to return to Ann Arbor to work on their front porch this afternoon and will let them get an early start on Saturday morning and work as late as they want/need to.  It will also give them the option to work on Sunday morning if needed before coming to our house for dinner and to retrieve their daughter.  Brendan and Shawna both have birthdays in early August, and Brendan’s happens to be on Sunday.  Our daughter (Meghan) and her husband (Chris) will join the celebration gathering.

The landscapers were here early for what they hoped would be their last day on this job.  Linda left early to do some grocery shopping and was back well before Brendan and Madeline arrived or I had to leave for my dermatology appointment.  I got back on my computer for the first time since Monday, checked e-mails, off-loaded photographs from our digital SLR, and installed updates on four WordPress websites.

Today was also the first day to log in to edX and start the free Introduction to Linux course, but I did not have time to deal with that.  The course is self-paced and should take 40 – 60 hours to complete.  I would like to spend two hours each day on this and have it completed by September 1st.  The timing has turned out not to be that good, but I am under no obligation to take/finish the course; it’s simply a free opportunity that I would like to take advantage of while it is available.

I left for my doctor’s appointment with time to spare and ended up needing it.  There is a lot of road and utility construction going on in our area and I did not have a good way out.  I still made it on time, but not by much.  I did not have to wait very long to see Elizabeth, the dermatology PA.  I got a thorough looking over and a clean bill of health.

On the return trip from the clinic I stopped at Teeko’s to get some coffee.  Jeff had the Ethiopian Yirgacheffe in both regular and decaffeinated, so I got our usual 50/50 blend.  He was out of Sweet Dreams (a decaf blend) that I have him mix 50/50 with his Seattle Blend to make Sweet Seattle Dreams.  He did, however, have the Seattle Blend in decaf so I got a 50/50 regular/decaf mix.

Madeline was still napping when I got home.  Linda said she fell asleep a little later than normal so she let her sleep until 4:30 PM.  Once awake, she was go go go right through dinner until bedtime.

Steve (Village Landscape Development) worked on the front sidewalk in the morning, laying rectangular brick pavers in a herringbone pattern and then cutting it all the way around for border bricks.  He finished placing boulders on either side of the top steps by the front porch and had one of his crew mix up a small batch of concrete and place it along the two long/free edges.  Another crew member finished grading out the soil on either side of the sidewalk, spread grass seed, and covered it with straw.

Steve, Linda, and I did a walk-around, and the project has come together very nicely except for the leaking drain line(s).  Steve spent much of afternoon digging in very muddy conditions and ultimately unearthed about 30 feet of plastic drain line that was punctured or completely crushed.  He replaced what he believed was all of the damaged line, but until we put water down them we won’t really know.  They were not able to finish the grading because the clay soil was so wet that it was unworkable, so they will be back next Tuesday (or later) weather permitting.  They had to come back anyway as they needed a bit more egg rock to finish a bed that we added at the last minute.  As a result of the walk-around we added another bed of egg rock at the east end of the deck to tie in with rock under the deck, and two more downspout drain lines, all of which they will do the next time they are here.