Tag Archives: Rockefeller drawer pull (THD)

2015/08/29 (S) Up and Down

When we arrived at the South Lyon Senate Coney Island just before 8 AM there were only five other SLAARC members there but we had 16 by the time the last two people showed up.  Linda (K8LMF) got to sit next to Linda (NF8C) for the first time in quite a while and they had a long chat.  All but one person stayed until 9:45 when we got up to leave and everyone else followed suit.

We were back home by 10:15 AM, changed into our work clothes, and got back to work on the bus remodeling project.  It was a very overcast and cloudy day with a high probability of rain that was forecast to be an all-day event.  That altered our plans a little in that we did not want the pieces of underlayment to get wet and our air-compressor could not be out in the rain as it has an electric motor.

Yesterday we marked and cut the underlayment panels in the driveway, laying them across 2x4s to create space for the circular saw blade.  In order to keep the project moving forward we decided to use the temporary “workbench” in the garage for this work.  Since the workbench was covered with drawer fronts that had to be moved we decided to take a little time to put the new handles on them and reattach them to the drawer boxes.  Sometimes it’s true that “there’s no time like the present” to get something done.

Linda has worked hard on cleaning and waxing the walnut drawer fronts and fixed cabinetry in our motorcoach.  The results so far are amazing and we are feeling like all of our work will be worthwhile as the interior of the coach is going to look very nice when we are done with this project.

We had cut the piece of underlayment for part of the hallway last night but needed to trim it to get it to fit correctly.  I think we took it out of, and back into, the bus at least four times, each trip requiring us to go up and down the seven steps in the entryway/cockpit plus the stool outside the door.  I do not know how many times we went up and down those steps today but it was a quite a few.  To add to our enjoyment and bus conversion physical fitness program we were usually carrying something and it was often heavy and/or large.

The next pieces of underlayment to be cut would fill out most of the living room.  I had planned to cut them a certain way but changed my mind after talking it through with Linda.  We took measurements and I made drawings that were close to scale.  We ended up using the full 48″ width of a 4’x8′ sheet and about 86″ of its length for the piece that fills the alcove where the built-in sofa and storage base will go.  It had two large corner cutouts, one to make it fit with two other installed pieces and the other to go around the base of the media cabinet that doubles as an end table for the forward end of the sofa.  After test fitting it we had to trim a couple inches off of a back corner because of a wire bundle and create a notch for several wires that ran through the floor just in front of the driver’s side HVAC chase.  We waited for a lull in the rain and took it back into the coach.

It fit just right but unfortunately there were defects in the subfloor, such as small gouges and depressed screw heads, that needed to be repaired.  Since we could not use the air-stapler today I did not have a good excuse for not patching the floor correctly so I worked on that while Linda resumed working on the woodwork.  The quart of “ready to use” floor patch was not as ready to use as I would have liked.  The directions said to stir thoroughly and when I opened the container there was a half inch of milky white liquid on top of somewhat drier and stiffer material with the consistency of fine wet sand.  The directions also said the open (working) time was about 15 minutes.

I set the timer on the microwave for 20 minutes, spent five of those trying to stir and mix the floor patch ingredients, and then tried to patch everything that really needed it in the allotted time.  I did not care for this material and wish I had used the Universal Patch and Skimcoat that I used everywhere else.  It was gritty and did not feather out or finish as smoothly as I wanted, but there was nothing to do now but wait for it to dry which would take three hours.

Linda decided to work in the house and eventually fix dinner while I worked in the bedroom (of the bus) trying to remove very old masking tape from the subfloor using a 1.25″ putty knife.  After an hour I had about half of it off but called it quits as my hands were sore.

For dinner Linda cooked a couple of ears of corn-on-the-cob, heated some vegetarian (vegan) baked beans, and cooked two vegan “burgers” topped with vegan cheese.  Mustard, ketchup, pickle relish, and four large leaves of romaine lettuce made for a tasty sandwich.  We each had a glass of the Cupcake Black Forest Decadent Red wine with the meal.  Dessert was fresh sliced strawberries with non-dairy (vegan) peach mango “yogurt.”  It was a tasty summertime meal.

After dinner I tried sanding the floor patches even though the directions said not to sand the dried material.  I used a very old piece of 120 grit sandpaper in my orbital sander and went over the entire area.  I vacuumed the whole area but I could still feel a residual grit on the floor.  I got Linda’s vacuum from the house and tried that.  I then got the Revel wet/dry mop and tried wet moping the area, but it was still gritty.  I was preparing to go over the entire area with the new 80 grit sandpaper but Linda managed to get it clean using the brush attachment on the house vacuum cleaner.

With the area cleaned up we put the piece of underlayment for the sofa nook in place and it fit very nicely but we did not staple it.  We redid our measurements for the passenger side front piece and made some minor adjustments to the dimensions on the drawing.  What I have tried to do wherever possible is to keep at least two factory edges with a common vertex (corner) and use that point and those sides as the basis for my measurements.

It looked like heavy rain was going to hit us from the west but must have tracked north of us.  We continued to get rain, off and on, but nothing heavy every materialized.  Working in the garage we measured and cut the last piece for today.  We made extensive use of the circular saw running it along a saw guide.  By the time we had the sheet cut there was a lull in the rain so we took it to the bus to test fit it.  The fit was close but needed minor trimming in the front outside corner.  By now it was 8:30 PM and we did not want to haul the sheet back out of the bus and into the garage to work on it.  That will be our first task tomorrow followed by stapling the three pieces that we cut today, weather permitting.

We turned in at 10 PM.  There wasn’t anything on TV that interested us, so Linda read for few minutes before falling asleep and I wrote until 11:30.

 

2015/08/09 (N) Sounds of Silence

Sunday usually means a trip to the Howell Farmers Market if the weather is nice.  The weather was OK but Linda did some major grocery shopping last night and did not need anything from the market so we did not go.  We were both tired from yesterday’s refrigerator swap, physically and emotionally, and wanted to take it easy today.  I brewed a pot of Ethiopian Yirgacheffe half-caff coffee and we enjoyed that while reading in the living room.  We eventually ate breakfast and then got ready for the rest of our day.  For me that meant doing three loads of laundry.

I put the first load of laundry in the washer and then drove to The Home Depot to get two more drawer pulls.  We also wanted to look at wall paper but they do not stock any.  Lowe’s had a very limited selection of wallpapers, but we thought a couple of them might work if we could not find anything else.  One, in particular, was scrubable and another was paintable.  We also found one that we liked in a book of Allen-Roth samples.  This was not something we needed to decide on the spot but it is something we need to get settled sooner rather than later.

When we got home we pulled the new refrigerator out of its alcove and plugged it in.  I set the freezer and fresh food compartment controls to the “normal” mark.  Linda filled containers with water and placed them in both compartments.  I found the remote thermometer for the unit that is still mounted on the wall next to the alcove and set it in the fresh food compartment.  The two thermometers are off by a couple of degrees in opposite directions, but close enough for what I needed to do as it will allow me to monitor the temperature without opening the door.  The new refrigerator was much quieter than the old one, which was one of the improvements we were looking for in a new unit.

New fridge in alcove.  Kitchen drawers removed.  Floor being prepped.

New fridge in alcove. Kitchen drawers removed. Floor being prepped.

When we got home we had a phone message from Jim, N8KUE, regarding motorhomes.  Jim plans to retire from the Ford Research Labs in March.  He and Pam are seriously considering getting a motorhome and are starting to research the market.  We’ve said for a while that we would be glad to meet for coffee and talk motorhomes, bus conversions, and the RV lifestyle.  I called Jim back, suggested that we meet them at the Biggby’s Coffee in South Lyon at 4:30 PM, and they agreed.

Linda tried to pull up the Arcadia Bus Rally website to get the registration form but the domain name appeared to be for sale.  I e-mailed Brenda Phelan to find out what is going on.  She and her husband, Bill, operate the rally.  I then worked on the drawings for the built-in sofa cushions.

We had an early dinner at 3:30 PM and left for South Lyon at 4 PM and got to Biggby’s Coffee just after 4:30 PM.  Jim, Pam, and their son Adam, were already there.  We talked until after 6:30 PM and then drove the short distance to the Witch’s Hat Depot in the South Lyon Historic Village where our South Lyon Area Amateur Radio Club (SLAARC) holds its monthly business meeting and program.  One of the members, John (NU8M), a materials science engineer who works for Bosch, gave a very interesting presentation on the various processes that affect electronics as they age and can ultimately cause them to fail.  It was a pleasant evening, weather-wise, and some of us lingered in conversation for a while after the meeting before heading home.

We arrived home hungry and had some hummus with sourdough pretzel nibblers and pita chips and a small piece of watermelon.  I checked the bus refrigerator and the fresh food compartment was down to 34.4 degrees F indicated.  The remote thermometer is off by about 2 degrees F but I don’t recall in which direction.  I turned the thermostat to a warmer setting and will check it again tomorrow.  We turned in for the night and Linda read while I wrote for a while before turning off the lights.

 

2015/08/07 (F) Arrangements

We had our usual, but never boring, homemade granola with fresh blueberries for breakfast.  I brewed a pot of the Costa Rican half-caff coffee we bought yesterday without tasting it first.  We found it to be somewhat bitter, which is not our taste in coffee, so we probably will not buy more after this batch is gone.

We spent a good part of the morning researching cabinet pulls on the Cabinet Service Hardware (CSH) website.  We found a pull on the CSH website that appeared to be identical to the one from The Home Depot, which is a Rockefeller Antique Brass from Liberty Hardware.  The one from CSH was a Belwith Keeler HH.P135-AB for $2.47 each.  The one from The Home Depot was $2.48 plus tax but no S&H.  Since we have the one from THD in hand and like how it looks we will probably buy them locally.

Many of the drawers in the bus have the pulls attached to the walnut face and then the face attached to the front of the drawer box.  Thus, the only way to remove the pulls is to first unscrew the box from the face.  I took the face off of one drawer and installed the new pull.  It fit perfectly, confirming that the mounting hole spacing is 3″ center-to-center.   The one from THD comes with 1″ and 1.5″ #8-32 machine screws but it looks like we will need something shorter than 1″ for the framed drawers and shorter than 1.5″ for the solid drawers.  The cabinet doors have 3/4″ thick frames so the 1″ machine screws may work for those.  Thus we should be able to use some of the machine screws that come with the pulls from THD but will have to buy some as well.  The pulls from CSH do not come with screws so we would have to buy those anyway.

Linda left around noon to meet Diane in Livonia to see a movie (Ricki and the Flash) starring Meryl Streep, Kevin Kline, and Rick Springfield.  I went on an errand run while she was away.  At The Home Depot in Howell I found 10 packs of the drawer pull we like so the price came out to under $2 per pull compared to $2.48 when purchased individually.  We need 58 to replace all the ones in the coach plus at least four for the new desk drawers so I bought six 10-packs.  We have not decided if we will replace the single screw round pulls on the two TV cabinet doors with the double screw pulls.  If we do we will need a couple more pulls.  If not, we will need two round pulls in the same style and finish, which THD also carries.  I bought small packs of #8-32×3/4″ and #8-32×1-1/4″ lengths so I can figure out what lengths work best in each location.

Jarel called while at was THD.  The plans for the built-in sofa had arrived in today’s mail and he had a few questions.  We talked through the issues and came to the conclusion that it would be better for us to come down on Wednesday instead of Tuesday to pick up the desk.  That will give him time to cut the sofa pieces and do some minor assembly and finishing.  The plywood seat and side pieces need to be stained to resemble the walnut hardwood and a 3/4″x3/4″ piece of walnut hardwood needs to be attached to the front edge.  He also needs to cut the piece of walnut veneered plywood for the front and then spray everything with the same lacquer he has used on all of the walnut desk pieces.

As I was finishing up at THD I also got a call from Chuck letting me know that everything was on track for the refrigerator swap tomorrow.  My next stop was at the Howell Lowe’s for a 4′ x 4′ sheet of 3/4″ plywood but I did not like their selection any better than THD.  I ended up buying two quarter sheets (24″ x 48″) of birch plywood.  This plywood has a lot of thin layers, so it is very flat and dimensionally stable, with defect free surfaces that are sanded smooth and very clean edges.  These sheets will go on the bottom of the refrigerator alcove in the bus to elevate the new refrigerator above the new vinyl tile floor.

Back home I texted Josh at Coach Supply Direct, called Terry at A-1 Upholstery, and called Butch regarding the change in our visit date for next week.  Linda got home shortly thereafter and helped me reattach the edge trim to the two doors of the old refrigerator and load them into the back of my car.  We covered everything with blankets and then loaded all of the drawers, shelves, racks, and bins.  Once the old fridge is out of the bus we will clean it, reassemble it, plug it in, and make sure it is cooling.  We will then call DTE Energy to arrange pick up through their recycling program.

Loading pieces of the old refrigerator into the back of the Element to take to Chuck's shop.

Loading pieces of the old refrigerator into the back of the Element to take to Chuck’s shop.

Linda bought an Amy’s Roasted Vegetable Pizza while she was out and cooked it for dinner.  It is our favorite store bought pizza, and much better (for us) than what we can usually get at restaurants and pizzerias (with the exception of Satchel’s in Gainesville, Florida), but not as good as the pizza we had while Mara was here.  That pizza was memorable.

After dinner I got a shower and then worked on the design/drawings for the seat and back cushions for the built-in sofa for the bus.  I started editing blog posts for July but did feel like uploading them.  We went to bed earlier than usual as we had to up at 7 AM tomorrow to go to our weekly ham radio club breakfast.

 

2015/08/06 (R) Three Quarters Framed

As usual, we started the day with breakfast and then enjoyed our coffee while reading and writing.  Best Pest Control showed up mid-morning to apply the second treatment for hornets, wasps, etc. so we closed up all of the windows and doorwalls while they sprayed.

We located a Wayne-Dalton facility in Livonia so I called them.  As I suspected they were the factory distribution center and would not sell to us directly.  They did, however, give me the name of one of their customers, a business in Milford named The Door Doctor that had a retail store front.  I called them and they had a 12 foot length of the required D-channel bottom weather seal for our small (8′) garage door.  It turned out that they were not actually in downtown Milford but were more conveniently located near the Milford Road exit of I-96.  When the pest control guys were done and gone I drove over and bought the seal.

Back home Linda made quesadillas for lunch and set out some yummy black grapes.  We then made an errand run to Howell.  Our first stop was at Teeko’s Coffee and Tea where we ordered a pound each of fresh roasted Ethiopian Yirgacheffe half-caff and Costa Rican half-caff beans.  The Yirgacheffe is one of our favorites.  The Costa Rican is something new for us.

Our next stop was The Home Depot for a half sheet (4′ x 4′) of 3/4″ plywood.  They only had one type in a 4′ x 4′ size and I did not like it so we did not buy it.  They had nicer plywood in full sheets (4′ x 8′) but I did not need that much and did not want to fuss with something that size.  We did, however, find a drawer/cabinet pull that we liked and bought one to try out with our bus cabinets.  It’s a Rockefeller style from Liberty in an antique brass finish for a 3″ center-to-center hole spacing.  They also had a matching single screw knob in case we need it.

Our next stop was the Howell Art and Frame shop in downtown Howell to pick up three of our four pieces of artwork.  The owner, Rick, had ordered the fourth frame the wrong size and had to reorder it.  The three that were finished looked very nice and I would like to think that the artist, Ann Metzger, would have been pleased with our choices.  Ann was married to my mother’s cousin and took up painting as rehabilitation therapy for breast cancer surgery in her early 40’s.  She turned out to be quite good and was active in the St. Louis artist’s guild for many years.  We have collected many of her works over the last 44 years.

We stopped at Lowe’s to look at their drawer pulls but they did not have anything similar to the one we got at The Home Depot.  We stopped back at Teeko’s to pick up our coffee order and then headed home.

Back home we moved the paintings to the library and turned our attention to installing the seal on the 8 foot wide garage door.  With the door all the way up we were able to slide the old seal out towards the larger door.  I thought we could install the new one with the door in the same position without removing the track from the bottom of the door.  That was, indeed, the case but it did not go in easily.  I trimmed the ends and ran the door up and down a few times and made minor adjustments on each end until it worked properly.  We still need to redo the side and top seals for both doors.

I tried programming the garage door remote control in my car the day we installed the new opener on the small garage door but wasn’t able to.  At the suggestion of the woman at The Door Doctor, I Googled the model numbers of our various remotes and found the manuals.  I had forgotten that the four 3-button remotes we bought a couple of years ago had to be configured before they could be paired with the openers.  Once I knew how to do that I was able to program mine and Linda’s to work with both doors.  Each of our children also have one and I will have to re-program those the next time they are here.

I exchanged e-mails with Josh at Coach Supply Direct about picking up the extra fabric we ordered, perhaps next Tuesday.  I also e-mailed and texted with Jarel about picking up the desk pieces next Tuesday and possibly the pieces for the built-in sofa.  He did not, however, receive the mailing tube with the drawings and cut sheet today, so we will see if that works out.  I suggested he defer work on the pull-out pantry in favor of the sofa pieces as that will allow me to keep working while he is on vacation at the end of this month.  He still owes us a price estimate for the pantry but at this point it almost doesn’t matter as he will be the one building it regardless of the number.

I talked to Terry at A-1 Upholstery in Elkhart regarding the sofa cushions.  She and her mom, Lou, run the business.  I last talked to Terry in early June and she remembered the conversation.  I described once again what we were looking for and she gave me a rough estimate of the cost.  She said we could stop by Tuesday morning to drop off the fabric and discuss the job and thought they could have it finished by the end of August.  That would be great timing for us.  We are starting to feel like this whole project will come together nicely once we get the refrigerators swapped and can finely get back to work on the floor of the bus.

I installed the new Morgan M-302N I.C.E. style lightning arrestor and connected the radio and antenna cables.  I had a short QSO with Mike (W8XH) via the South Lyon 2m repeater and had no issues on transmit or receive.  I started working on a gallery post of 45 photos from the ARRL Field Day event at the end of June but only got half of it done before dinner.

Linda made a delicious zoodles dish for dinner.  Zoodles are zucchini noodles that she cuts with her SpiraLife slicer and uses in place of grain or rice pasta.  The dish had the usual garlic, onion, olive oil base but also had shallots, mushrooms, kale, and sun-dried tomatoes.  We had fresh watermelon later for dessert.

After dinner I finished the gallery post while monitoring the Novi and South Lyon repeaters.  I then had a long QSO with Mike (W8XH) and Steve (N8AR) that gave me a chance to test the M-302N lightning arrestor on both VHF and UHF at three different power levels.  We continued to have the minor problem with quick, apparently random, audio dropouts on our Yaesu FTM-400 dual band radios.  The apparent randomness has made it difficult to puzzle out what might be causing this and we all agreed that we need to set aside time to plan and execute a systematic test and record the results for analysis.

Butch called to chat about house (bus) battery cabling and other things.  I mentioned that we would be coming down on Tuesday and would try to arrange our timing so we can stop and visit over dinner.  We then watched The Princess Bride on DVD.  It’s our all-time favorite movie and I long ago lost count of how many times we have seen it.