2014/09/13 (S) Overnight Guest

Linda’s sister, Sister Marilyn, called a couple of days ago to let us know she would be in the Detroit area on business this weekend.  She wanted to know if we could fetch her this afternoon and if she could spend the night at our house?  The answer was “of course,” of course.  Her flight out wasn’t until Sunday evening, so Linda put the gears in motion and arranged a brunch with the local family for 10 AM tomorrow.

Being Saturday, we went to our ham radio club breakfast in South Lyon.  Before leaving our neighborhood we drove to the other end of the street (dead end with turn-around) to see where the gas hookup crew left off yesterday.  We knew they were working down there today because we saw the trucks leave sometime between 5:30 and 6:00 PM last night.  There’s a chance they will be back today and we wanted to see how close they were to connecting our house to the main line.  It looked like they had quite a few houses to do ahead of ours, so we went to breakfast.

We got home around 10:30 AM to find a crew working in our yard trenching in the branch line to our house.  I was told yesterday they were going to bore it in, so something obviously did not get communicated.  Not only that, they were running a 5/8″ line, which was way too small for the 425 meter we are supposed to get.  I stopped the crew and the guy in charge pulled out his paperwork.  It had “425” written on it big letters, but the drawing showed a 5/8″ line.  He agreed that the 5/8″ line was way too small for that meter and that we should have 1.25″ line.  They pulled the little bit of line they had already run out of the ground, raked out some of the dirt they had already trenched, and moved their machine across the street to trench our neighbors yard.

We were lucky we got home when we did.  They had already cut through some tree roots that did not need to be disturbed and would have torn up a lot more of our yard unnecessarily if I had not interrupted their work.  They were nice about it, but I still found it troublesome that I had spoken to two different supervisors face-to-face about this, one as recently as yesterday, but this crew showed up and did something different than what I had been told, and agreed, would be done.

I was finally going to try to remove the fogged window from the bus today, but we had a lot of rain overnight and woke to overcast skies, temperatures in the upper 40’s, and a forecast high of 57 degrees F with a strong chance of rain through mid-afternoon.  That was not the sort of weather for removing a window from a vehicle parked outside.  Besides, with Marilyn arriving mid-late afternoon I did not want to work on anything messy and then have to get cleaned up.

Linda looked up the kitchen ranges we had been considering.  The GE 30″ 5-burner double-oven convention model (JGB870DEFWW) was on sale again at Lowe’s for $180 off MSRP and we would get another 5% off the sale price by using our Lowe’s credit card.  If we ordered it today delivery would be September 27, longer than I would like, but it is what it is.  We have to order this range because Linda wants a white one to match all of the other appliances in the kitchen and the appliance stores do not tend to stock white ranges with the features we want.  I called our local Lowe’s store and confirmed the free delivery and take away of our current range.  Installation is $20 plus a new flex gas line for $30.

I called TOMTEK HVAC and got hold of Tom.  He seemed put off by the fact that I have someone else doing HVAC work at the house and will have the natural gas already tied in when he comes to convert the main house furnace from propane to natural gas, but he said he would check with Weil-McLain on Monday about what parts he needs to do the conversion.  While on the phone with Tom he suggested that we try D. R. Electric Appliance Sales and Service in Howell for our new gas range.  We looked them up on the web and got their (incorrect) phone number and hours.  I got the correct number from 411 before I realized that it was also on their website.  They closed at 2 PM on Saturdays, so we didn’t make it there today, but I called and got an answering machine, left my name, number, and the reason for the call.  Curt called me back a short time later.  I gave him the model number and he said he would call G.E. on Monday.  He said he had been holding off ordering G.E. appliances waiting for Columbus Day sale pricing.  He figured he would have the range three days from ordering and could probably install it at the end of the week or early next.  They charge $25 for installation and haul away, and $25 for the new flex gas line if we need one, so it’s the same $50 as Lowe’s.  (Lowe’s assured me that they were REQUIRED to install a new flexible gas line.)  That all sounded good depending on the price of the range.  Getting it sooner has some dollar value to us, we’re just not sure how much.

I stayed home while Linda went to Meijer’s for groceries.  Finding the crew in our yard this morning doing work they were no supposed to be doing spooked me enough to not want to leave the house unattended the rest of the day.  As long as I was stuck at home, I called Bratcher Electric to give them a heads up that the gas connection to the house was imminent.  Being Saturday I got their answering machine and left a message.  I also called Darryll at DCM Heating & Cooling and left a message regarding the gas connection.  Once the meter is hung and connected everything else depends on Darryll getting his piece done first.

We checked the website for Country Squire Fireplace and Lighting in Howell and saw a 10% off coupon, so I printed that.  I wanted to go there today and buy a set of high-efficiency vent-free natural gas fire logs but it will probably be tomorrow afternoon instead.  These logs are more efficient than a typical kitchen range and are designed to be used with the fireplace flue closed, throwing most of the heat they produce into the room instead of up the chimney.  Darryll said he would hook it up for us and add a shutoff valve when he came back to tie in to the gas meter, so we need to have it here before he comes back next week.

Marilyn called and said their flights were running a little behind schedule and that Linda should pick her up around 3 PM rather than 2:30 PM as originally planned.  She called back again and said 3:15 PM would be better.  Linda got back from the grocery store and we had a quick lunch of leftover Sloppy Joe’s.

With overnight lows in the 40’s, highs only in the mid-50’s, and the connection of our natural gas somewhat imminent, we decided we could afford to use propane to heat the house.  We have been conscious of our propane use because we did not want to get in a position where we needed to have either of the tanks filled.  I turned the furnace on and set all the thermostats a few degrees above ambient to take the chill off.

While Linda drove over to Lake Orion, Michigan to fetch Marilyn I decided to work at my desk selecting photos for gallery posts on the garage/HVAC project and natural gas work, and worked a little bit on the websites for the FMCA Great Lakes Converted Coaches and Freethinkers chapters.  I really need to have the GLCC site usable in the next three weeks and the FTH site within a month of that. That sounds ambitious even as I write it down and I suspect it won’t happen.

Linda and Marilyn got to the house around 4:30 PM and after we got Marilyn settled in her bedroom we just sat and relaxed and talked for a while.  We thought she might appreciate a good home-cooked meal but we ended up taking her to LaMarsa for dinner.  She had the Koshary, which we had last night, and we split an order of garlic almond vegetable Ghallaba with green salad and crushed lentil soup.  We all ate way too much pita bread with garlic spread and were uncomfortably full by the time we finished our meal, but it was delicious and we did not have to prepare it or clean up afterwards.

These days twilight now comes around 7 PM and it was dark by the time we got home at 8 PM.  I made a pot of decaf coffee and we settled in the living room for a long chat.  I set the thermostats back before we turned in for the evening as all three of us prefer to sleep in a cool room.

 

2104/07/12 (S) Natural Gas

You might think that this would be a reference to the natural by-product of having breakfast with our ham radio friends in South Lyon this morning at the Senate Coney Island, but that is not the case.  We had a 10:30 AM appointment at the house this morning with Darryll Mech of DCM Heating and Cooling to finalize the work that needs to be done to get the house ready for conversion to natural gas.  The natural gas contractor for Consumer’s Energy (Roese Construction) started installing the main lines in our area a couple of weeks ago and they expect to have the project completed by September 26 (of this year).  That means we will have natural gas to the house sometime between now and then and we need to have everything as ready as we can before they hang the meter so the final conversion will be minimal and quick once the natural gas is turned on.

The work at our house breaks down into three pieces.  The first piece is running black pipe on the outside of the house from the southeast corner down the east side, across the back, under the upper and lower decks, along the back of the garage, and up the west side of the garage.  The gas meter will be installed at the southeast corner of the house where the propane currently enters the house.  The existing house piping will be used to supply natural gas to the house furnace, kitchen range, and outside grill connector.  The whole house generator is by the southwest corner of the garage and is currently on its own propane tank.  After the natural gas is hooked up everything needs to be on a single natural gas service/meter.

As the gas pipe runs along the back side of the garage there will be a T to supply gas into the garage.  That has to do with the second piece of the work.  We are having a ceiling mounted garage heater installed and a small furnace/air-conditioner for the library.  The HVAC unit will allow us to heat the library in the winter without cycling the main hot-water baseboard heating system, which is at the end of a long run through unheated attic space and is not particularly efficient or effective.  More importantly, it will allow us to control the humidity on humid summer days (it’s a library, after all, so it contains a lot of books and other humidity sensitive paper materials).  As part of that work we need to remove a propane space heater that is mounted in the wall abutting the garage and cap the line.  We also need to remove a window mount air-conditioner in that same wall.  Yes, that’s right, the current A-C for that room exhausts into the garage.

The third piece of the puzzle will be disconnecting the propane and converting the appliances that currently run on propane; the kitchen range, the main furnace, and the generator.  We will have Darryll take care of disconnecting the propane from the house and connecting the natural gas to the existing house piping and start up the two new furnaces once the gas is available.  We will then have TOMTEK convert the main furnace since they already service it for us.  Depending on timing we may be without our main furnace and domestic hot water until TOMTEK can complete their work.  I may convert the range, have Darryll do it, or have TOMTEK do it.  Regardless of who does the conversion I will need to get the conversion kit.  Bratcher Electric will connect the gas line and convert the whole house generator and do the annual service at the same time.

While Bratcher Electric is here we are going to have them run a 100 Amp, 4-wire cable from the outlet of the transfer switch in the southwest corner of the garage to the panel in the northeast corner of the garage.  The existing setup has the 200 A main panel in the basement of the house with a 60 A / 240 V breaker supplying the cable that feeds the sub-panel in the garage.  That means the power to the sub-panel goes from the garage all the way to the house and then all the back to the garage.  That’s a lot of unnecessary forth and back.  In part because of that, and in part because of the electrical needs of the new garage furnace and library HVAC unit, I am going to replace the sub-panel in the garage with a 100 Amp main breaker panel in advance of all of this work.

The current sub-panel is a General Electric but the main house panel is a Square D Homeline.  Lowe’s and Home Depot carry both the Homeline and QO product lines from Square D, and Home Depot also carries GE and Siemens.  If I installed a GE main panel in the garage I could potentially reuse the existing breakers and save a little money.  On the other hand, they have been in an unconditioned space for who knows how long, and they are not physically compatible with the Homeline breakers.  Indeed, the four different products are not generally interchangeable.  But the main consideration is selection and availability, and the Square D products win on those criteria.

Once the new furnaces are installed we will still have some work to do.  We will have to repair the walls in the library, insulate the hot air duct in the garage (although Darryll may take care of that), and enclose the library HVAC unit.  Because the library HVAC unit will be installed in the northeast corner of the garage it has to be in its own little sealed room to prevent automotive engine exhaust or other noxious fumes in the garage from being drawn in to the conditioned air or explosive fumes, such as gasoline vapor, from being drawn into the combustion chamber.  The furnace will have its own air intake and exhaust tubes.  The garage heater uses a sealed combustion chamber with a special concentric intake and exhaust tube, so it does not have to be enclosed.

Darryll indicated he could start the last week of July and would need about a week to do all of his initial work.  We have company coming the 20th through the 23rd, so we have the upcoming week to prep (clean out) the garage and library for Darryll.  This is the kind of situation that could give us gas if we weren’t used to it and enjoy it.  There’s nothing like a construction project to get you up and moving first thing in the morning and keep you up late at night.

 

2013_09_28-30 (S,N,M) Gone Fish’in

No, I have not given up my WFPB way of eating, but one of the things I did on Sunday was to run a new network cable from our main Internet gateway (in the kitchen) to my office (in the basement).  I had to pull the cable above a suspended ceiling and then “fish” it up through the floor boards into a wall cavity.  There is a special tool called a “fish tape” that is made for this purpose.  It’s a thin but stiff piece of metal that is coiled up inside a housing with a small hook on the free end.  Because it is relatively stiff, you can push through holes and into wall cavities and other such places until it emerges somewhere, hopefully where you need it to emerge.  I have a fish tape (of course) but I can’t find it (naturally) because the garage/workshop will be the last part of our move to get organized.  So I improvised, and after several false starts ended using a scrap piece of 3-conductor sheathed electrical cable that was long enough, small enough, and stiff enough to get the job done.  But I have gotten way ahead of myself.

As usual, Linda and I went to our South Lyon Area Amateur Radio Club (SLAARC) breakfast on Saturday morning.  Well, almost as usual; we took two cars this time as Linda was headed to Ann Arbor to babysit munchkin Madeline after breakfast, and I was headed in the opposite direction to do ham radio stuff.

Madeline’s domestic servants (our son and his wife) wanted to attend a wedding on Sunday in Madison, Wisconsin and thought the three days required to drive there, celebrate, and drive back might work out better for all involved if their daughter did not make the trip.  They also figured that Madeline would do better in their absence if she was in her own home.  Madeline approved of these plans and gave them the requested 3-day pass.  Although Madeline’s aunt (our daughter) provides child care one day a week, a 3-day stint, over the weekend, in a house without television would mean no college or professional football, and would have been heroic beyond necessity.  This was clearly a job for GRANDMA, who doesn’t have functioning television in her new house anyway, so she wouldn’t miss it.  Besides, when sitting the baby, there’s no time to watch TV (or do much of anything else).

Mike (W8XH) and I had plans to work on the new SLAARC website, but first he had to help Bruce (W8RA) set up his new LP-PAN and integrate it into his ham radio station.  Working on Bruce’s ham shack is no small undertaking.  I’ve never been in the Space Shuttle simulator, but I’ve seen pictures, and sitting at Bruce’s ham station is a pretty good facsimile.  It took Mike a couple of hours, but he got it all working.  We then headed to his QTH to do the website stuff.

Mike and I are building the new SLAARC website using WordPress with the help of fellow SLAARC member Larry (K8UT), who is a bonafide expert in such matters.  A couple of weeks ago we decided to create the new website as a subdomain of the existing website, which is hosted by GoDaddy, and that was an experience in itself.  This would make it very easy, however, to later change some DNS entries and have the original domain name point to the new website.  Larry did the WordPress installation manually rather than using the automatic WordPress installer that most web-hosting companies have available (including GoDaddy).  As a result it has taken longer to get the new site functional, but Mike and I now have a much better understanding of subdomains and an appreciation for some of the complexity that is “under the hood” when using WordPress.  One more call to Larry resulted in some magic on his end, and we were finally up and running.  We then spent several hours installing, activating, and exploring themes.  We haven’t made any final decisions, but we are starting to figure out what questions to ask.  While Mike and I are anxious to move this along, we are not under any external pressure to have it ready by a certain date and want to take our time on the front end.  While it is relatively easy to change WordPress themes even after a website is populated with content, there is a point beyond which that is still going to involve a lot of work.  I like projects, but I don’t like doing projects over (and over, and over …).

I was still in WordPress mode when I got home, so I did some work on our personal website.  I created a tab (main menu item) for “Ham Radio” and created a sub-menu item for “SLAARC”.  These are just placeholders for now, but will eventually have content.  I have also fleshed out the WFPB tab as I start to build out the main menu structure.

Mike lent me an AmpedWireless dual-band WiFi repeater that he wasn’t using and I spent some time Saturday evening and Sunday morning playing with it.  It is a very cool device.  In WiFi repeater mode it will pick up a 2.4GHz and/or a 5.0GHz WiFi network and rebroadcast it.  What’s really cool, however, is that it will pick up a 2.4GHz WiFi network and rebroadcast it as 5.0GHz WiFi network.  I have been looking for a device that will do this for quite some time.  Our iPads and smartphones are all 5.0GHz capable, so using them with a 5.0GHz WiFi signal offloads that traffic from the 2.4GHz network, leaving it for 2.4GHz only devices.  The 5.0GHz band also has a lot more bandwidth than the 2.4GHz band with very few devices using it, so there is less interference and more reliable network connections.  Unfortunately, the device did not work well at our house as it appeared to be in conflict with our WiFi thermostat.

Wireless repeaters, access points, bridges, etc. are all designed so that they can be setup and configured wirelessly through a web-browser.  In order to accomplish this they map a specific URL to a specific IP address in the 192.168.xxx.yyy range.  In this case, 192.168.1.240.  Unfortunately, I think the WiFi thermostat also uses that IP address.  There may be a way to work around this, but I did not have time to pursue that today.  The AmpedWireless device is actually configurable in five different modes.  WiFi repeater is the default, but it can be a Wireless Access Point or a Wireless Bridge, or two other things.

As a result of playing with this device, I think I finally understand the difference between various networking technologies.  A Network Switch (NS) is a device that allows multiple devices to be connected together using network cables, with one cable going back to the router (where the IP addresses are controlled through DHCP).  A Wireless Repeater (WR) is just that; it picks up a WiFi signal and rebroadcasts it (repeats it), usually on the same frequency and channel, but with a different SSID; no cables required.  (The Amped Wireless WiFi Repeater can rebroadcast it on a different frequency and/or channel, very nice.)  A Wireless Access Point (WAP) generates a WiFi network and is connected to the main router through a network cable.  We have a Linksys WAP running now.  A Wireless Bridge (WB) is the mirror image of a WAP.  It allows multiple devices to be connected to it using cables (sounds like it’s a NS) and then communicates using WiFi with a wireless router or WAP.  This allows lots of equipment to be located remotely from the main Internet gateway/router without running a cable between the two locations.

While Linda continued her marathon munchkin duty on Sunday, I worked around the house trying to check things off my “to-do” list faster than they got added.  I didn’t succeed, but I did get a lot done.  My main focus was my office, which had become the place where stuff was getting piled so we could feel like we had put other parts of the house in reasonably good order.  I either needed to get it organized or close it off for the open house.  Some of our fellow hams are coming to the open house and will want to see the ham shack (which is also my office), so closing it off from public view wasn’t really an option.

Monday was odds-n-ends day.  I continued to try to clean up and organize my office and the basement, installed two new door closers on the front screen/storm door, and installed new hardware (tracks) for the pair of bi-fold doors on the kitchen pantry.  It doesn’t sound like much, but it takes all day.  I snagged some replacement toilet flappers from Lowe’s, a nice shelving unit for the bedroom from Staples, and a large quantity of ICE Sparkling Water from Walmart.  (It’s not my favorite place to shop, but Meijer’s doesn’t carry this product.)

Mid-afternoon there was a knock at the door.  It was a representative from a company that is subcontracting with Consumer’s Energy to possibly run a natural gas main down our street.  I walked our property with the guy and explained the rather complicated situation that has led to us having two propane tanks and what they implications of that were for us switching to natural gas.  I went ahead and signed up after making sure we could back out if we decided this really wasn’t what we wanted to do.  As of now, however, we are definitely interested in switching to natural gas.  Consumer’s Energy estimates the equivalent cost for a gallon of propane, which is currently $2.00 + or – $0.40, at $0.77.  At that ratio, our infrastructure payback would be about 3 years.  There is also the added benefit of having a constant supply of fuel without a truck having to come and fill a tank.  Value?  Priceless.

In the late afternoon I had a nice chat with Joe from EZ*Connector.  EZ*Connector is a small company in California that has designed, and manufactures, a keyed, magnetically retained, sealed electrical connector.  It comes in 7 and 14 pin configurations for non-military use and is an ideal solution to the problem of connecting a tow vehicle (bus) to a towed vehicle (car).  Our current setup requires two separate electrical cables with mechanical or friction latches.  The EZ*Connector will provide a much easier and yet superior connection.  They are just now bringing a new 14 conductor cable to market and suggested I wait until early November to order.

Linda called to say she would be home around 7 PM.  I put water on to boil to make angel hair pasta with red sauce, and she picked up a salad on the way home.  She made the sauce last week, and it was fabulous.  (I am not normally a fan of marinara sauce, but this sauce has me rethinking that position.)  A glass of 2009 Egri Merlot to wash it down, and fresh plums for dessert made a fine conclusion to a long day.

 

2013_09_06 (Fri) House Systems

I have often commented here about the “house” systems in our converted coach; the water (fresh and sewage) and electrical (lights, appliances) systems and their components that make a large motorized vehicle behave like a stationary house.  Those components include things that are found in any stationary dwelling (water and sewage pipes, plumbing fixtures, electrical wires, circuit breakers, switches, light fixtures, appliances, etc.), things that are found in some stationary dwellings (sewage tanks, macerator pumps, well pumps, fresh water pressure tanks, reverse osmosis systems, power generators and transfer switches), and things that are not commonly found in stationary homes (yet) (various gauges, batteries, inverters & chargers, power protection devices, solar panels, and even wind turbines.)  RVs do not have geothermal or low-head hydro systems.

Today, however, was about actual house systems, that is to say, systems for our actual (stationary) house.  We have had a “rotten egg” smell in our domestic fresh water system since we bought the house and finally called Adams Well Drilling and Water Treatment, a local Howell-based company, to come out and take a look at our current equipment.  Brian arrived as scheduled at 9 AM and we walked him through the complete fresh water system.  He took some water samples directly from the well (before any filtering, softening, or other treatment).  The good news was that our dissolved iron was at 1.2 ppm (mg/L), which is a treatable level, but above the 0.3 ppm at which iron starts to become a problem in the water.  The less good news came from two directions: 1) that our Water Boss water softener wasn’t doing a very good job and 2) we appeared to have iron bacteria, which a regular water softener doesn’t treat very well (or at all) even with the special “iron out” salt.

We discussed a range of options but Brian’s recommendation, which we accepted, was a new water softener and a “carbon unit”.  The carbon unit is self cleaning using special chlorine crystals, and is very effective in dealing with iron bacteria.  We will also have new sediment and taste filter housing installed as part of the installation.  There may be other issues with the water system in this house, which was built in 1977, but the water treatment equipment was probably due to be replaced regardless of what else we do.  The following website from the Illinois Department of Public Health gives a nice synopsis of iron in drinking water:   http://www.idph.state.il.us/envhealth/factsheets/ironFS.htm .

The other fresh water issue we have, based on the testing that was done as part of the purchase inspection, is Arsenic.  The level that came back from the lab was 34 ppb (ug/L).  The old “safe” level was 50 ppb, but the current “safe” level is 10 ppb.  Zero ppb would be ideal, of course, but is not achievable at a reasonable cost. To further complicate matters, there are two kinds of Arsenic found in well water: Arsenic 5 and Arsenic 3.  The prior water testing did not test for these separately, but the sample Brian took today is going to a private lab that can/will test for each separately.  We were told previously that Arsenic 5 is the more typical and is mostly removed by Reverse Osmosis (RO) but that Arsenic 3 is not removed by RO.  The house has a Culligan RO system installed that supplies water to the refrigerator and a special faucet in the kitchen sink.  It was in the house when we bought it and we decided to continue renting it until we could determine our true needs and consider our options.  Not knowing if we had Arsenic 3 in our water, we purchased a special Arsenic 3 filter from Culligan which installs in the manifold after the RO membrane.  We made a call to Culligan to check on our contract and got a call back from our rep (Jeff) who has been a good guy to work with.  Long term it makes no sense to rent the unit, so we are exploring purchasing it or removing it and having Adams install a similar system.

While Brian was doing his thing, Darryl showed up from DMC HVAC.  Darryl did the HVAC installation for our office/library/garage addition/renovation at the old house and did a great job.  When it comes to contractors I like to use local people when I can but I also like to stick with people we have worked with before.  Darryl is not local to our new place, but he is a known quantity whose work we respect.  Although we have a loop from the hydronic hot water heating system in the Florida room/library, it has some issues.

The major issue is that the supply and return lines run through the ceiling and into the wall which adjoins the garage.  We think this house originally had a detached garage with a concrete patio between the garage and the end of the house.  Sometime later a roof was added connecting the house and the garage and the two open sides were closed in with 16 feet of doorwall and fixed glass panels.  The only practical way to extend the heating systems was to run the pipes overhead.

The other issue is that this space does not have air-conditioning.  (There is a small window mount unit in the garage wall.  Yup, it exhausts heat into the garage.)  We have space in a corner of the garage by this room to install a small forced-air furnace/air-conditioner and get the air to/from the room easily along the garage ceiling.  We would also like a ceiling mounted forced-air furnace in the garage so we can store paints and other things that we want to be able to keep above freezing, or bump the temperature up a bit and have a comfortable place to work.  Darryl installed one of these at our old house, and it was a very nice feature.

In anticipation of this work, we had a second propane tank installed next to the garage when the whole house backup generator was installed back in May.  I told AmeriGas at the time what we planned to do so they did a temporary installation of the tank and ran a line directly to the generator.  One of the thinks Darryl will need to do is mount a permanent pressure regulator on the side of the garage and then run pipe to get the propane over to the two new furnaces.

As Darryl was finishing up, Tom and Tom showed up from TOMTEK HVAC.  TOMTEK is a Howell-based company that we decided to have service our hydronic heating system.  It’s an old Weil-McLain Gold unit with some corroded parts.  It was also filled with water.  When we looked at the house originally the heating loop to the Florida room was shut off.  It turned out that something had failed while the owners were away during the winter and that loop had frozen and ruptured.  They repaired it prior to closing, but I never did understand why the system didn’t have an appropriate anti-freeze in it instead of water.  As of today, it does.

One of the nice things about hydronic heat is that it is easily zoned.  Our system has four zones, each with its own thermostat.  One of those thermostats also controls the air-conditioning for the main floor of the house.  That may seem odd, but it is a consequence of the A/C unit probably being added sometime after the house was built.  As a result, the air handler is in the attic and all of the air ducting is too.  It’s a single system controlled from a single point, and is completely separate from the hydronic heating system except for this one shared thermostat.  It was the failure of this particular thermostat that prompted us to go ahead and contact TOMTEK and have them out to service the system and install four new thermostats.  The one that controls the living/dining rooms and kitchen, as well as the air-conditioning, is a Wi-Fi enabled device that will allow us to monitor the temperature in the hallway, which is the most central point in the house, and control the main heating loop and the air-conditioner remotely if we so desire.  Pretty cool; literally.  The “boiler” needed some additional service for which TOMTEK had to order parts, so they will be back another day to finish up the maintenance on the unit.

Overlapping contractors made for a somewhat intense day.  Fortunately there were two of us available to interact with them, and they all got the attention they needed from us, when they needed it.  As soon as Brian was done I called Adams Well Drilling and Water Treatment and scheduled him to come back on the 11th to install the new water treatment equipment.