Tag Archives: Phil Jarrell (Precision Grading)

2016/04/21-25 (R–M) Bad Brakes & More

2016/04/21 (R) More Bad Brakes

[NOTE:  There are no photos for these posts.]

We were up before 8 AM, had coffee in the living room by the warmth and glow of the fireplace, and had fruit for breakfast around 8:45 AM.  We left at 9:40 to take my car to Brighton Honda for its 110,000 mile service appointment at 10 AM.  Linda followed me in the Civic to drive me back to the house but as long as we were that close to Brighton we decided to go to the Verizon corporate store.  To our surprise, the store was permanently closed.  We were pretty sure there was still an “authorized retailer” a little farther down on Grand River Avenue (which never made any sense to me) but after the authorized retailer in Arcadia, Florida was unaware of the Mi-Fi device I was interested in (AC791L) I really wanted to talk to someone in a corporate store.

We did not investigate further as to whether the store had been moved and, not having any other business in Brighton, we headed home.  On the way I got a phone call from our State Farm insurance agent’s office about a long-term care premium that was due last month.  Apparently one of our children did not recognize it was a bill when they checked our mail and did not alert us to its presence.  It wasn’t a big deal, and Linda took care of it when we got home.

I started a load of laundry and settled in to work at my desk.  I did not have a reply yet to my support ticket for our WiFiRanger.  I checked-in to RVillage and saw that our member status had been upgraded to GOLD.  I did a search for used tractors and was researching a portable water deionizing system at AutoGeek.com when I got a call from Curtis Coleman of RVillage.  While Curtis and I were talking I got a call from Gary at Brighton Honda.  He left a message and I called him back.  The rear brake rotors and pads on my Element needed to be replaced.  It seems we have not been able catch a brake break in the last six weeks.

Linda made a haircut appointment with Renee for tomorrow at 10 AM but got a call back from Renee that she was not working tomorrow.  Renee had an opening at 1:15 PM today so Linda took that instead.  It was already noon so Linda heated a can of Amy’s Chili and we split that for lunch along with some fresh black grapes.  We left at 12:40 PM for the drive to Twelve Oaks Mall.  I went along because I wanted to stop at the corporate Verizon store in Novi.

I don’t usually go along with Linda to her haircut appointments since she now cuts my hair at home, but it was good to see Renee again.  She did a nice job with Linda’s hair and we were out of there in under 30 minutes.  For many years the Verizon store was located on the Twelve Oaks Mall property near Twelve Mile Road but it recently moved, so we put the address in the GPS unit.  The new location was nearby on Novi Road just the other side of I-96 from Twelve Oaks and West Oaks Malls.

We were assisted by Christina, who was both knowledgeable and helpful.  We went in thinking we might upgrade both of our phones and our Mi-Fi device and increase our data plan.  I was interested in the AC791L Mi-Fi device.  They did not have one in stock but she knew what it was and said we could have one delivered to our house on Monday via FedEx.  We then looked at phones and Christina steered us towards the latest offerings from Motorola.  We selected one for pricing purposes and she worked up the costs, including a higher data plan.

The new phones would have each cost $26 a month for 24 months, and the extended warranties would have been another $11 each per month for as long as we cared to pay it.  The phones had some nice features—specifically a shatterproof screen, wireless charging, and a screen-facing flash (for those all-important selfies)—but $74/month ($37 x 2) for two years seemed like a lot of money to us, especially given that our Samsung Galaxy S3 phones still work just fine.  Another negative for us is that the new phones are also bigger and we like the size of our S3’s.  Besides, I have a belt clip flip-top soft case for mine that fits nicely and works well.

Offsetting the increased phone costs was the fact that the line charges for our phones would drop from $40 per month per line to $20 per month per line.  Also, the $80 we currently pay for 10 GB of shared data per billing cycle would now buy us 12 GB of data for the same time period.  Finally, upgrading the phones would get us an additional 2 GB of data per phone per billing cycle for “life”, so our 12 GB plan would actually be 16 GB.  We would lose the bonus data, however, if we ever reduced the monthly gigabytes on our plan.

In looking at the cost worksheet I noticed that for $100 per billing cycle we could get 18 GB of shared data and bump that up or down at will without losing anything.  In the end we bought the AC791L Mi-Fi device for $90 ($100 with a $50 rebate and a $40 activation fee), changed the data plan to 18 GB for $100 (per billing cycle), and decided to keep our current phones.  Ignoring the one-time charges connected with the new Mi-Fi device we increased our monthly data from 10 GB to 18 GB, got a new/better Mi-Fi device, dropped our monthly cost from $180 to $160 (before taxes), and were not locked in to anything.  Christina also said to keep our eyes open for special deals on phones, especially around Mother’s Day and Father’s Day.  Roger that, and will do.

By the time we got back to I-96 and Grand River Avenue (GRA) in Brighton it was 3 PM so we stopped at Brighton Honda to check on my car.  While waiting for parts the technician got shifted to another job so my car was not ready yet.  Making a left out of the dealership onto GRA is always difficult and can be impossible in heavy traffic.  Our solution is often to turn right and go to Panera on GRA just south side of I-96, which is exactly what we did.  They did not have any decaf brewed but were happy to make some for us.  It had been cool and overcast all day so we sat by the gas fireplace and enjoyed several cups of coffee.

While we were sitting there I took a minute to call Philip Jarrell and let him know we were back in town.  We discussed the French drain he installed at the west end of property last fall, which seemed to be working well, and the trenching on the other side of the road, where the culvert empties, which had become a small pond.  I mentioned that the new driveway and RV pad looked nice, and that I really wanted to get the ham radio tower erected this year.  That project would require his services for a morning.  By 4:15 PM I had not heard anything further from Gary at Brighton Honda so we drove home.

Gary called at 5 PM to let me know the car was done and the technician was test driving it to make sure everything was correct.  The dealership was open until 8 PM, and we did not want to fight rush hour traffic, so Linda fixed dinner.  We had a salad of arugula and Italian kale with slivered almonds and dried cranberries, microwaved sweet potatoes, and vegan Italian sausage.  Everything was very tasty and I particularly liked the spices in the mock sausage.  Linda tries to make our diet primarily plant-based whole foods, but not having been vegans for most of our lives we find a certain satisfaction (comfort) in the occasional veggie burger, soy hotdog, seitan stroganoff, or other “mock” dish.

After dinner I hung up some laundry and started another load in the washer.  I checked e-mail and had one from my niece Amanda.  She and Ryan were looking at Wednesday, September 27, 2017 as a wedding date and wanted to know if all of us could make it to Hermann, Missouri for the event.  I replied that it would not be a problem for Linda and me and cc:d Brendan and Meghan.  I then texted both of them to alert them to the e-mail.  I also had an e-mail from Kate de Fuccio wanting to know when we expected to be back in Michigan.  I let her know we were back and had gotten preoccupied with opening the house and unloading the bus, but I felt bad that I forgot to text her as soon as we were home.

I also had a reply to my WiFiRanger support ticket requesting that I send screen shots of three of the tabs in the control panel.  I replied that I would try but did not mention that I really wasn’t sure how to do that.  Linda (the Google Queen) suggested that I “Google that” so I did.  It turns out that “alt+prtsc” captures the current window as an image and copies it to the clipboard.  From there you can do what you want with it.  Easy breezy.  (I subsequently ended up with something called “Easy Capture Manager” on my computer that just requires me to push the “prt sc” key and then lets me select what I what to capture.)

By 6:545 PM we were headed back to Brighton Honda to retrieve my car.  Linda dropped me off and returned home.  I paid the bill and returned home a few minutes later.  Thursday night is CBS comedy night and by 8 PM we were ready to just sit and laugh.  But first I had to transfer some of the laundry from the washing machine to the dryer.  I worked on blog posts while being entertained and hung up the dry laundry before going to bed.

2016/04/22 (F) Networking

I was up a little later than usual last night and would have slept in this morning but the cats had other ideas; they always do.  We were up by 8 AM and I made a pot of the Costa Rican Terrazu half-caff coffee that we bought yesterday at Teeko’s Coffee and Teas.  We were both still a little tired, and the thick fog further subdued our moods.  We countered that by treating ourselves to an easy start to our day enjoying our coffee in the living room to the warm glow of the fireplace.

We eventually got dressed, had breakfast, and got on with our day.  Linda got a call from Bill, who handles computer and networking technology for the bakery, and he walked her through the VPN setup for the bakery’s upgraded server.  She then made a grocery list and went shopping.  When she returned I discovered two boxes on the front porch.  UPS had obviously been here without my being aware of it.  The large box was the Instant Pot Linda ordered the other day and the small box was my prescriptions, which I was not expecting to see for another week.

My main focus for the afternoon was dealing with networking issues.  I uncoiled a long Cat 7 Ethernet cable that I found in the ham shack yesterday.  I unplugged the network cable for Linda’s computer from our AT&T gateway/router and plugged in one end of the Cat 7 cable in its place.  I took the other end of the cable into the bus, plugged it in to the HP Color LaserJet 3600 printer, and turned the printer on.  I brought my laptop computer upstairs, connected it wirelessly to the gateway, and tried printing a simple Word document without success.  I checked the printer settings and the TCP/IP addressing mode was configured for a manual address that did not match the address range of our home network.  I reconfigured it for DHCP and it acquired a new IP address in the correct range.  I tried printing again but it still did not work.  I reconfigured the address in the printer device properties on my computer and was finally able to print.  That was a relief as we would really like to leave this printer on the bus and have it networked rather than operating from a USB cable.

I then turned my attention to the WiFiRanger Mobile Ti (WFR-MTi).  I took my computer to the bus so I could use it to control the WFR and capture screen shots.  I was able to connect it to the WFR without difficulty but the WFR could not “see” (detect) any external Wi-Fi signals even though it is on the roof outside the bus and my computer could see them from inside the bus.  Back in the house I plugged in the Amped|Wireless SR20000G Range Extender / Router and configured it to repeat the AT&T gateway which does not broadcast a very strong signal.  Back in the bus my computer could see the strong signals from the Range Extender but the WFR still could not detect any external Wi-Fi signals.  I captured the screen shots for the MAIN, WIFI, and SETUP tabs, as requested by technical support at WiFiRanger, and pasted them into Word documents for uploading to their support system.

I took my computer back to my basement office and cabled it in to the network switch.  I wrote a reply to the WiFiRanger tech support thread, attached the screen shots, and posted it.  Clearly the WFR is not working and I am certain I will end up requesting an RMA and returning it for service, probably sooner than later, but I wanted to start with the online tech support system in case they had any good ideas that had not occurred to me.

Linda spent the afternoon getting acquainted with the Instant Pot and running it through its test procedure.  It checked out as fully functional so she used it to prepare seitan stroganoff for dinner.  I laid down at 5 PM and napped for an hour, finally getting up at 6 PM when Linda put our dinner salads on the table.  She served the stroganoff over brown rice with a side of steamed broccoli and the whole meal was wonderful.

We sat in the living room until 8 PM and then decided to watch Sleepless in Seattle on PBS.  I had forgotten what a good movie it is and enjoyed seeing it again.  Linda fell asleep right after the movie ended and I watched Episode 6 of Ken Burn’s JAZZ before calling it a night.  Like all of Ken Burn’s documentaries, JAZZ is a masterpiece of historical storytelling.  At some point I would like to watch all 10 episodes back-to-back.

2016/04/23 (S) Ham & Eggs

Today was our first Saturday back home, and that meant it was also our first opportunity to have breakfast with our fellow amateur radio operators (hams) from the South Lyon Area Amateur Radio Club (SLAARC).  Before going to sleep last night I set wake-up alarms for 7 AM this morning, but I was awake before then and had time to grab a quick shower before getting dressed.  I also took a few minutes to reattach the ham radio antenna to the magnetic mount on my car and reinstall the ICOM IC-2820 radio control head and microphone.  Even so, we were still on our way by 7:30 AM and arrived at George’s Senate Coney Island on the north edge of South Lyon around 7:50 AM.  During the drive I was part of a group chat with Steve (N8AR), Mike (W8XH), and Bill (W8NN), who was on an HT while riding with Larry (K8UT).  The Yaesu Fusion repeater sounded good and it was good to be on the air again with friends.

Besides our coffee, dry toast, and dry English muffin, Linda and I split a fresh fruit plate.  It was OK at best, but we don’t go for the food.  It was good to see and talk to folks in person and to be back into this part of our “at home” routine.  Today was testing day so a few people left to run the testing session, but most of the group, which numbered 19 people, stayed until 10 AM.

There was an accident this morning on westbound I-96 just east of the US-23 interchange.  It was still being cleared when we drove home so we got stuck in a traffic backup that could easily have been avoided.  Fortunately we did not have to be any particular place by any particular time and worked our way slowly through the congestion.

Back at the house I worked at my desk while Linda started cooking black beans in her new Instant Pot as she wanted to use some on a salad for our lunch.  Normally she would have to soak dry beans overnight and then cook them for quite a while, but the Instant Pot, which can function as a pressure cooker, took them from bag-to-plate in 45 minutes, during which time Linda went for a walk.  Pressure cookers can be very useful.

Once we got back to our house my initial task was to proofread and markup corrections to my article in the latest draft of the June 2016 issue of Bus Conversion Magazine.  Once that was done I uploaded the PDF to a folder in my Dropbox and e-mailed Gary and Jorge that it was there.  Next I checked my WiFiRanger support ticket and discovered that my reply yesterday, with screen shots attached, did not post correctly.  I replied again and this time it posted correctly, or at least appeared to.  With that task taken care of I copied a few images from the Sony a99v camera to my computer.  I then started transferring files from my computer to the NAS that we had with us in the bus.  I was about to start copying files for from that NAS to the older one we left at home when Linda called me up to lunch.

She made a large salad for each of us with tomatoes, blueberries, sliced strawberries, black beans, slivered almonds, and dried cranberries with a balsamic vinaigrette dressing.  She also made some hot tea after lunch which we took to the living room.  Both of us were tired and by 2 PM laid down and took naps.  It was 68 degrees F in the house but it felt very cool.  I think winters in Florida and Arizona have reset my comfort zone from 70 degrees F, plus or minus, to 78 degrees to 80 degrees F.  Jasper found a sunny spot on the floor by one of the living room windows and Juniper curled up with me.  I got up at 3:15 PM and took my iPad out on the deck to work in the crisp air and warm sun.  Linda came out around 3:45 PM but decided it was too cool and went back inside; I did the same around 4 PM.

Linda arranged for us to meet John and Diane Rauch at Camelia’s Mexican Restaurant at 6 PM.  Camelia’s is walking distance from our old house, but we never walked there because the route was not pedestrian friendly.  It’s a half hour drive from where we live now.  I reinstalled the cellular booster in my car and we left at 5:20 PM to leave a little extra time in case we encountered traffic problems.  And sure enough, we did.  The right lane of eastbound I-96 was closed where it ties in to southbound I-275 as the right lane continued to be closed for a construction project.

Our children’s grade school vocal music teacher, Jennifer Davidson, (who moved here from Tennessee) once remarked that Michigan only has two seasons “winter and road construction.”  Truer words were never said.  We stayed to the left, because that’s what we had to do to get onto eastbound I-696.  Although traffic was slow it was moving, unlike the right hand lanes trying to stay on I-96/I-275.  Vehicle speeds returned to “normal” once we got past the split, which around here is 5-to-10 MPH over the maximum posted limit, and a few minutes later we exited the freeway at Orchard Lake Road.  This is the same exit we used for 35 years to get to our house, and I have undoubtedly used this exit more than any other Interstate highway exit in country.  It was familiar, yet strange, as we rarely get back here anymore except to visit with John and Diane, meet someone at Camelia’s (or one of the other many restaurants that can be accessed from the Orchard Lake Road exit), or go to our optometrist or veterinarian, both of whom are two to three miles south of this exit.

We had our fill of chips and salsa and split an order of vegetarian fajitas.  They were OK, and much better than the ones we had a week ago at Mi Camino Real in Logansport, Indiana.  After dinner we went to John and Diane’s house, which is very close to the restaurant, and continued a nice conversation in a quieter setting.  By 9:30 PM we were all tired and started wrapping up our visit.  We left a little before 10 PM, got home at 10:30 PM, and went right to bed on stomachs that were still very full.  WTVS (Detroit PBS) was fundraising around an early Rolling Stones performance that did not grab my interest so I watched Lidia’s Kitchen and the beginning of Martha Stewart’s Cooking school.  She was filleting fish so I turned the TV off and went to sleep.

2016/04/24 (N) Family

We went to bed on full stomachs last night and I did not sleep well, suffering from indigestion for much of the night.  I should have used a second pillow and tried sleeping on my back with my head elevated, but that is not a natural sleeping position for me and I doubt that would have slept any better.  To compensate for the poor sleep I stayed in bed and kept falling back to sleep.  Linda was up way before me, having apparently slept better than I did, and I finally got up to stay at 9 AM.  That was unusually late for me, but at least I felt somewhat rested.

As soon as I got up Linda sliced oranges for our breakfast and prepared to toast bagels while I prepared our morning coffee.  We were not quite done with our preparations when I got a phone call.  It was from Chuck Spera so I answered it.

Chuck and I talk frequently but not usually at 9:30 AM on a Sunday morning.  He and Barbara were on the road and had just crossed into Kentucky on I-75 having left Sevierville, Tennessee early this morning.  Before pulling out this morning Chuck had noticed a little oil by the driver side tag axle during his walkaround, specifically in the holes of the Alcoa aluminum wheels.  He had removed the decorative hub cap and found an oil film there as well, but did not see any pooling.  He assumed that an axle seal was leaking a little but was not sure how to check the oil level in the hub or add oil if needed.  Because of both past and recent experiences, Chuck figured I would know the answers to both questions.  While that was probably unjustified optimism, in this case I did, and gladly shared what I knew about the sight glass and rubber plug in the wheel hub for the oil reservoir.

We had just finished our bagels and orange slices when Brendan texted Linda to see about plans for today.  We had all planned on getting together at Meghan and Chris’ house this afternoon to visit and have dinner but Madeline had come down with Hand, Foot, & Mouth disease (a virus) earlier in the week and Brendan thought he might be getting it too.  Given that Linda had not yet fully recovered her hearing we agreed that it would be best to avoid contact until we knew that no one was contagious.

Madeline was understandably disappointed that she would not see us today and, in lieu of that, requested a FaceTime session.  We were equally disappointed that we would not get to see her (and her parents) but an hour of FaceTime made up for it a bit.  After our FaceTime session we lingered in the living room by the fireplace enjoying our coffee and doodling on our iPads.  We finally got dressed at noon and left for Meghan and Chris’ house at 12:30 PM.

We arrived around 1:15 PM and were greeted by our daughter with a paper grocery bag full of some of our mail.  We had a long, relaxed afternoon to visit and catch up.  Meghan made vegan burgers from scratch and a salad with beans, corn, red bell pepper, and avocado with a lime-based dressing.  We brought a bottle of Barefoot Red Moscato and I found it very much to my taste (sweet).

We departed just after 7 PM and stopped at the new Gas 2 Go station at the northwest corner of I-96 and Latson Road.  The station was still under construction when we left in November.  I was pleased to see that it is a Shell Oil Company station with a Tim Horton’s.  I have had a preference for Shell gasoline for most of my adult life and Tim Horton’s has coffee on a par with Dunkin Donuts, although I do not like the lids they use.  There is also a traffic signal on Latson at the side road for the station, no doubt because this is also the access road for the Livingston County Road Commission complex.  (Leave it to them to take care of themselves while the rest of rest life and limb to get out of the Lowe’s/Walmart center just south of there.)  Whatever the reason, it will slow down traffic exiting I-96 and heading south on Latson Road, making it easier to get out of the Lowe’s/Walmart parking lots.

We were home a little after 8 PM and turned on the TV to watch Grantchester on PBS and Elementary on CBS.  Around 8:40 PM I realized I had missed the SLAARC Information Net which started at 8 PM.  I need to reestablish the habit of tuning in on Sunday evenings, but that time slot competes with some of our favorite programming on PBS.

2016/04/25 (M) Pick Up Sticks

We had a typical start to our day.  After catching the weather on channel 10.2 we were up by 8 AM, had coffee and granola with blueberries and bananas, and used our iPads in the living room with the fireplace turned on.  Our Kitchen Aid mixer broke last year and today Linda was finally ready to replace it.  She decided to get the slightly larger and more powerful model with the crank up mixing bowl as she wants enough power to mix bread dough.  She also wanted it in white to match most of the other kitchen appliances.  To our surprise the white color was more expensive than red or blue but less expensive than some other colors including copper bronze.  She was trying to convince herself that red or blue would be OK but I convinced her to order white.  All of our appliances (and cabinet knobs) are white.  With Amazon Prime it will be here on Wednesday.

The weather forecast was calling for a cold front to move through our area triggering rain, and possibly thunderstorms, starting late in the afternoon and extending through the evening and into the overnight hours.  The grass in most of the yard is not very tall yet, except right in front of the house by the concrete driveway.  The yard is also moist, but not soggy, and we do not expect Keith to be here to cut the grass for the first time this season until sometime next week at the earliest.  The temperature mid-morning was in the low 60’s and was forecast to reach a high of 72.  All-in-all it was an excellent day to pick up sticks around the yard in advance of Keith’s first visit and get the Honda self-propelled lawn mower out and cut the grass in front of the house.

I started my yard cleanup with area around the front berms, raking small branches out of the grass and stacking larger ones on existing brush piles.  While I was working out front a UPS truck showed up with our Max Burton Induction Cooktop and our new Verizon Mi-Fi unit.  I signed for the Mi-Fi and took the packages inside.  Linda used the induction cooker to make some nectar for our hummingbird feeder and also prepared a batch of homemade granola.  She eventually came outside and helped me pick up some of the downed tree limbs in the back yard.  We got the easternmost two acres (2/5ths of our yard) picked fairly well.  We will work on the westernmost three acres another day.

I got the Honda lawnmower out and topped up the tank with fresh fuel.  Small engine Honda equipment is known for starting on the first pull, but my experience is that this is only true when they are new.  No doubt our lawnmower needs to be cleaned up and tuned up, and would start more easily if it was, but I eventually got it started and once it warmed up it ran fine.  I mowed the little bit of the lawn near the house/driveway that looked like it was overdue for a cut.  This is also one of the only parts of the yard anyone really sees if they pull into the driveway.

I had just shut the lawnmower off and was putting it in the garage when the U. S. Mail truck pulled into the driveway.  It was our mail carrier, Michelle, and she had a very large box for us, along with our typical bundle of Monday junk mail.  The box was not very heavy and Linda informed me that it was the 48 rolls of toilet paper she recently ordered.  Well, alrighty then.

It was approaching 1 PM so Linda made salads for our lunch with the leftover bean-corn-tomato salad (that Meghan made yesterday) on top of a bed of mixed greens.  After lunch Linda took her Amateur Extra flash cards outside to study and I focused on getting the new Verizon Jetpack Mi-Fi (Netgear AC791L) assembled and activated.  Assembly consisted of installing the Lithium Ion battery and back cover.  I decided to charge it for a bit while I read the user guide and activation procedure.

When I was fairly certain I had all of the information I needed at my fingertips I called the 877 activation number and keyed in the requested information.  It took a couple of tries to get it right but I finally did.  With the activation completed I turned the device on, looked up the SSID and Password, and connected my iPad to it.  I then entered the relevant information in a new entry in Passwords Plus.

I got a phone call from Gaye Young and chatted with her at some length about RVillage and its relevance to FMCA.  (Gaye is the FMCA National Secretary and chairperson of the National Education Committee.).   She and husband Jerry are at the Rally in the Pasture at FMCA National President Charlie Adcock’s place in Arkansas (or maybe it’s Alabama?) and I knew from talking to Curtis Coleman last week that he was on his way there too.  A year and a half ago the NEC researched and recommended that FMCA partner with RVillage and a year ago the FMCA executive board accepted and endorsed that proposal but then nothing happened.  The FMCA Executive Director was recently let go and Charlie is now trying to get the RVillage train back on the tracks, along with lots of other things as FMCA continues to loose members at an alarming rate.

I suspect that the loss of members is a combination of several factors.  For one, the median age of FMCA members has been in the upper 60’s for quite some time.  That means a certain number of members are “aging out” almost daily.  For another, the downturn in the economy in 2007 was particular hard on the RV industry.  Not only was the industry slow to recover, when it did it was building mostly towables, not motorhomes.  In the past many RV dealers basically “included” an FMCA membership with the purchase of a motorhome, or at least provided information about the Association and an application form.  Another possible factor is that RVers under 50, including Gen-Xers and Millennials, don’t tend to join things.  FMCA is not the only organization suffering membership decline and having difficulty attracting new members, especially younger ones.

Chuck and Barbara got home yesterday and were settled enough for Chuck to call me at 5 PM and update me on their hub oil leak.  Linda made salads for dinner and reheated the brown rice and seitan stroganoff.  After dinner I replied to an e-mail from Gaye and then settled in to watch TV with Linda.  And so it goes.

 

2015/11/11 (W) Two for One

We had late morning dentist/hygiene appointments today so Linda did not get up early to go to the bakery and we slept in and got up at 8:30 AM.  We showered and dressed and finally had granola for breakfast at 9:15.  She made this batch of granola yesterday and it was very yummy.

Since the mice have recently been defeating our simple live traps I cleaned our more complicated one yesterday and set it up last night with a broken open peanut butter pretzel for bait.  When I checked the trap this morning it had two brown field mice inside.  They were anxious to get out and I was glad to oblige.  I set them free in the southwest part of our property on the other side of the road.  The last I saw of them they were headed south into dense cover and away from the house.

Our appointments were at 11 AM in Dearborn.  Linda left at 9:45 and I followed about five minutes later.  We took separate cars since she had to go to the bakery following her appointment.  Before I left I checked on the state of charge of the house batteries in the bus.  There were at 95% SOC.  I turned the charger off last night to let the battery bank drain down a little.  I turned off the Broan cube heater and the three toe-kick heaters and then shutoff the AC power coming into the coach.  I checked that the inverter was working, which it was, and left for my appointment.

We both had good checkups but Linda will need a crown in the spring.  A tooth with an old filling had weakened and needs to be capped.  The dental assistants/hygienists have started taking blood pressure readings as part of modern dentistry’s role in monitoring and promoting overall health.  I don’t know how accurate the wrist cuff machines are but my blood pressure was 121/59 and Linda’s was 128/67, which are excellent readings if they are even close to being correct.

On the way home I stopped at the new Menard’s on Wixom Road just north of I-96.  I was looking for 1/2×2″ fine thread carriage bolts but all they had were coarse thread in longer lengths.  As long as I was there I picked up a 6-pack of work socks and two more of the good live traps like the one we already have.

Back at the house I called Terry at A-1 Upholstery to confirm that our spacer cushion for the bus sofa was ready and that she would be there Friday morning.  Her response was affirmative on both counts.  I then called Josh to verify that he would be at his shop on Friday morning and he said he would.  I need to stop there on the way to A-1 Upholstery and return two swivel seat ring bearings.

The new gravel driveway extension and RV parking pad.  Phil, on the left side of the driveway by the nearer utility pole, rakes out the topsoil he placed along both sides of the driveway.

The new gravel driveway extension and RV parking pad. Phil, on the left side of the driveway by the nearer utility pole, rakes out the topsoil he placed along both sides of the driveway.

Philip Jarrell from Precision Grading was here working on the driveway extension when I got home.  After my phone calls I changed into my work clothes and went out to chat with him for a few minutes.  Phil had brought another load of screened topsoil and was using his track loader to place it along the sides of the driveway extension and at the west end of the property where the French drain begins.  He rough graded it with the track loader and then raked it out by hand and spread grass seed.  He will bring straw bales with him on a subsequent trip to cover the soil/seed but he wanted to get the seed down before he left as we have rain and wind forecast starting late this evening and through tomorrow into Friday.

I finally got to work in the bus at 2 PM.  My objective was to get the SurePly underlayment installed on the passenger seat platform floor.  I lightly sanded the floor patch compound I spread around last night and vacuumed up the particles.  I then mounted the head of each of the new carriage bolts to a thick plastic washer using 3M Heavy Duty (double-sided) Mounting Tape.  I slid the heads into the two mounting channels with the washers under them so the washers held the bolts up off of the bottom of the channel and forced the square collars up in the open slot of the channel where they could not turn when a nut was tightened on them.  This was a critical step because once the underlayment and tile are down I will not be able to get to the heads of these bolts.

With the bolts in position I got the piece of SurePly from the garage.  I was starting to slip it into position when I remembered that I installed an angle bracket yesterday but had not cut out a small piece of the underlayment to fit around it.  So I took the piece back to the garage, cut out the necessary space, and took it back to the coach.  I am starting to wonder how many hours I would have saved by having a proper shop set up right outside the front door of the bus.

[ Photo 2 of 2 – HR – The SurePly underlayment on the co-pilot/navigator platform floor showing how it fits under the outside wall panel and over the four mounting bolts for the seat. ]

The SurePly underlayment on the co-pilot/navigator platform floor showing how it fits under the outside wall panel and over the four mounting bolts for the seat.

The SurePly underlayment on the co-pilot/navigator platform floor showing how it fits under the outside wall panel and over the four mounting bolts for the seat.

The underlayment slipped under the switch panel by the outside wall and dropped over the four mounting bolts just like I planned it, so taking most of yesterday to carefully cut and drill the piece paid off in the end.  That felt good, especially in comparison to how yesterday felt.

The weather today was lovely, reaching a high of 58 degrees F with sunny skies and I am sure that added to by general sense of well-being.  Our part of Michigan is under a high wind warning starting this evening, however, with maximum gusts of 55 to 60 MPH possible.  It’s a good thing we have a whole house generator because those kinds of winds cause power outages.

I decided to screw the underlayment to the bus floor rather than use staples.  Again, I did not want to get the big air-compressor and staple gun out, but I also wanted to use the screws to pull the underlayment down tight to the bus sub-floor.  I was about 50% done when I saw that Phil was putting his track loader back on the trailer.  I thought he was packing up to leave so I went out to talk to him briefly.  I went back to the bus and got another 25% of the piece screwed down before I ran out of screws.  I was using primarily 1″ #6-SR self-drilling screws with some 1-1/4″ of the same kind.  Once again my work was halted short of completion by the lack of some small part.

Phil was finished and on his way at 4:15 PM and by 4:30 I was headed to Lowe’s.  Linda texted me that she was leaving the bakery and I had a nice QSO with Tom (K8TAF) while running my errand.  Lowe’s only had one pack of the 1″ screws, quantity 100, but I thought that might be enough to get me through tomorrow.  I also bought a pack of 100 1-1/4″ screws.

For dinner Linda cooked a couple of yams, heated up a couple of vegan sausages with sautéed onions and red peppers, and steamed some fresh green beans. Yum, yum, yum.  After dinner we sat in the living room for a while using our iPads.  At 8 PM we watched a few nature and science programs on PBS.  Jarel called to confirm when I was coming down to Logansport, Indiana and said that Friday would work.  Linda is headed back to the bakery in the morning so she went right to sleep after we were done watching TV.

 

2015/11/09 (M) Clever Mouse

Madeline coughed quite a bit last night and we were up several times to check on her, so we did not have the best possible night’s sleep.  We got up to stay at 7:30 AM and Madeline got up about 15 minutes later.  I made our morning coffee while Madeline helped her grandma wash blueberries and make vegan blueberry pancakes.  We had a lovely breakfast with orange juice, pancakes with real maple syrup, and blueberries, raspberries, and bananas on the side.

I check the mouse traps in the pantry every morning.  A couple of days ago I found one of them broken with the food gone and some mouse poop left in its place.  The pantry doors had been left open overnight so I figured one of the cats had discovered the trap (we use live traps) and tossed it around until the door fell open and the mouse escaped.  I threw it away since it was broken.  This morning I discovered that the food in the other trap had been replaced by mouse poop but the trap was upright with the door closed and was not broken.  The pantry had been closed all night so I knew the cats had nothing to do with it.  Apparently we have a mouse that has figured out how to defeat the traps.  We are not going to set kill traps so we will have to see what else we can find.

We lingered in the living room for a while enjoying our coffee by the fireplace, listening to Madeline play (with) the organ, and watching her play with some of her toys.  She made her futon into a car and took her two “bunnies” for a ride.  By 9:30 AM I had finished my coffee and changed into my work clothes.  It was just below freezing when we got up this morning, but it was a bright, sunny day with no wind, so it would be a comfortable enough day for working on the bus once I turned up the thermostats and warmed up the interior a bit.

My focus today was to get the SurePly underlayment installed on the floor of the passenger seat platform and maybe the two walls.  I also wanted to get the outside wall panel trimmed off so it will fit around the tile and needed to build a new step with an open front, but I did not expect to get to those tasks today.  First up, however, was getting the small patch I worked on yesterday to fit better and be secure.

I trimmed both ends of the underside of the main patch and recut the side/support panel.  I trimmed the side panel several times before I was satisfied with the fit.  I used heavy-duty double-sided tape to hold the top patch and side panel to the metal structure underneath.  I used a 1-1/2″ stainless steel self-drilling wood screw to secure the top to the vertical piece of 3/4″ plywood that forms the face of the passenger seat platform, and a shorter screw to secure the side panel to the same piece of plywood.  I then attached a temporary plate of SurePly over the side panel to the edge of the top plate to hold the side in alignment with the top.

The metal under this patch is rounded leaving a small space between the top and side pieces where they meet.  The vertical plywood front face is also beveled leaving a void.  I used Door and Window Trim Spray Foam Insulation to fill these areas.  This foam has a lower expansion than most spray foam insulation.  I did not overfill the voids but put enough in that it expanded out past the edge.  I will trim it off flush tomorrow when it is cured.  The foam adheres to anything it touches and is rigid enough to be somewhat structural so it should stabilize and secure the patch.  Once I trim it and cover it with underlayment it should be good as new.

Madeline’s Aunt Meghan, who is also her buddy, came to visit and play with her today.  She arrived at noon and I took a break to visit and have lunch.  After lunch Madeline, Meghan, and Linda went to the Brighton Mill Pond Playscape and I resumed working on the bus.  They were gone for several hours.

Floor patching compound being applied to the co-pilot/navigator platform.

Floor patching compound being applied to the co-pilot/navigator platform.

Before I could put a layer of underlayment on the passenger seat platform I needed to use floor patching compound to fill in some low spots and create a smooth taper from the plywood to some metal edging.  But first I removed all of the screws that secure this edging and counter-bored the holes so the screw heads would be flush.  As often seems to happen when I am working on something like this some of the screws were rusted and I did not have appropriate replacements.  I then have to make a trip to Lowe’s, which is what I did, and bought a small quantity of three different size flathead wood screws.  I stopped at O’Reilly’s Auto Parts to see if they had the large metal or nylon washers that are used with the swivel base for the front chairs.  They didn’t, but once again suggested that I try Howell Hardware in downtown Howell.  I have received that suggestion from people at several different stores so guess I need to check the place out.

When I got back home I finished installing the new screws.  The floor patch compound takes a minimum of three to four hours to dry, sometimes much longer, but after two hours it was dry enough for me to use a sanding sponge to smooth out some ridges and feather some edges that needed it.  It was clear, however, that I wasn’t going to be able to accomplish what I set out to do today.  And so it goes; I need to do the work correctly which means doing all the things that need to be done in the order that they need to occur.  Everything takes time and things that have to dry, set, or cure do so on their own schedule, not mine.

Phil had shown up around 3 PM so I went out to chat briefly with him and then went inside to change clothes.  He had a partial load of topsoil left from a job earlier today and dumped it on the other side of the street by the 3rd driveway culvert.  He used his front loader to place it along the south side of the new pull-through driveway extension and moved the small pile from the west end of the property to the north side of the driveway.

I still had plenty of daylight and wanted to make some good use of my time so I started thinking ahead to the layout of the tile in the cockpit.  I measured various parts of the cockpit and although the number of square feet is small compared to the main floor the layout will be more difficult.  As with all tile layouts it needs to be “balanced” while avoiding small pieces.  Linda and I agreed that the pattern in the cockpit does not need to match the main floor, which is laid out diagonally, so that opens up options for how to lay out the tile.

The main landing is less than two tiles wide (front-to-back) so the best layout for that area is with a grout line dividing it in half, but that might not work well in the driver’s area.  The driver’s area presents the additional problem of a steering column, brake pedal/valve, an accelerator pedal with its electrical cable that goes through the floor.  The “holes” in the tile to accommodate these things have to be created using two notched pieces so they can be installed around the protrusions.  I also need holes for the seat base mounting bolts and power cable for the 6-way power base.  Those can be actual holes but I do not want grout lines to fall at the edges of the base.  I also have to be cognizant of the walls, which are getting tiled.  The distance along the face of the passenger seat platform is close to 65″.  The tiles are 16″ squares so four tiles with three 1/8th” grout spaces is only 64-3/8″.  See, it’s complicated.

The other thing I pondered and measured was the new step between the passenger seat platform and the main floor.  Again there are several parameters:  (1) We want the finished (tiled) height to split the distance from the tiled platform to the tiled main floor exactly in half; (2) we want the finished depth to be half the finished depth of the platform, and; (3) we want an open front so we can store shoes under the step.  The total rise will be just under 14″ so the step rise will be a little less than 7″.  Subtracting about an inch for wood and tile will leave a 6″ high space for shoes.  The platform is 29″ deep so splitting that in half results in two treads of 14-1/2″, plenty deep for shoe storage.  I considered having the step angle across the platform, being deeper by the driver seat and shallower by the passenger seat.  While it would add an element of aesthetic interest it would greatly complicate the construction without adding any practical utility, so I rejected that idea.

As I considered the construction of the new step I was also thinking about the fact that there is a hole in the front end of the passenger side HVAC duct.  The hole opens into the space behind the switch panel on the wall next to the passenger seat and just aft of the entry door but there is nowhere for the air to go from there.  The hole is easy to see but not easy to reach so I estimated it to be three inches in diameter which is approximately seven square inches in area.

One possibility is to install a 4″ diameter circular louvered duct in the switch panel.  It would be large enough in area, could be rotated to direct the flow in any desired direction, and has internal shutters that could be closed down to reduce or cut off the air flow.  The main downside is lack of space behind the panel but I could cut off the tube behind the locking tabs.  Another downside is that the cats sleep under the passenger chair while the bus is moving and the direct airflow might be uncomfortable and/or annoying for them.

Another possibility is to create a narrow duct along the back wall of the platform the same height as the new step and tie it in to the inside of the step, allowing the conditioned air to come out the open front.  That will involve a bit more woodworking and complicate the tile installation, but could be added later, so I will probably opt for the round louvered register for now, if I do anything.

When I was done pondering the HVAC possibilities I put the seat pedestals back on the landing, locked up the bus, and went inside to change clothes.  Meghan left while I was changing clothes so I did not get to say goodbye.  Apparently Linda thought I was taking a shower and would be a while.  Since we needed to get Madeline back to her house well before her bedtime we decided to head to Ann Arbor and have dinner there.  I deflated and rolled up her portable toddler bed while Linda and Madeline gathered up her clothes, books, toys, and other things.  I loaded the car while Linda got her dressed to travel.  I checked in with Phil to get a status update and let him know we were leaving.  We were on our way at 4:45 PM.

The drive down was OK as the really heavy traffic was headed north out of Ann Arbor.  We tried to keep Madeline awake by reviewing all the fun things she had done since she got to our house late Friday afternoon but we were not successful.  As I exited M-14 eastbound onto US-23 southbound I could see that traffic was stopped not far after the Plymouth Road exit so I left the highway and headed west on Plymouth Road to Huron Parkway.  From there I headed south, paralleling US-23 to the west.  At Washtenaw Avenue I turned east, and after a short distance turned left into the small shopping plaza where Elevation Burger was located.

I order a grilled cheese sandwich and Mandarin oranges for Madeline.  Linda and I had vegan burgers and fries and Linda shared her fries with Ms. M.  Madeline was slow to wake up but perked up when her food arrived.  That girl likes to eat!  🙂  After dinner we made the short trip to Madeline’s house and arrived at 6:30 PM.  Linda got Madeline into her pajamas while I brought all of the stuff in from the car and turned up the thermostat.

Madeline was wide awake and full of energy so she played with her kitchen toys and tools and had Grandma Linda read her four stories.  I dozed off for a little while and then spent some quality time with Gus the cat.  Gus loves people but tends to keep his distance from Madeline who is just a bit too energetic and enthusiastic for him.

Brendan and Shawna’s flight was due in to Metro Airport at 6:50 PM and he texted Linda at 6:51 that they had landed.  They were home before 8 PM and got to spend time with their very awake, excited, and active daughter.  We left at 8:30 and stopped at Biggby Coffee on Washtenaw Avenue.  Rain was moving into our area from the south but had not yet arrived and the drive home was uneventful.  We were home by 9:15 PM and headed straight to bed where we watched Scorpion and NCIS-LA.  Linda came down with a cold while Madeline was here and went to sleep as soon as NCIS was over.  I watched Travelscope on the Create channel and left the TV on while I worked on this post.  It was another long, busy day during which I made forward progress on the bus.

 

2015/11/05 (R) POR-15

Linda was back at the bakery today, so she was up early and gone before I even thought about getting out of bed.  Having her homemade granola as our standard breakfast means I can feed myself under such circumstances with very little time spent on preparation and cleanup.  I made a cup of Stash China Black tea instead of coffee; it’s quicker and cleaner.  I like tea, and only started drinking coffee at age 50, but this morning the choice was motivated by ease and quickness of preparation and minimal cleanup as I was anxious to get busy working on the bus.

My focus today was getting the areas in the cockpit where I cut out the old water-damaged plywood ready for the installation of new wood.  That meant getting POR-15 applied to the areas of rusted metal in the cockpit and spray painting over it with black rubberized undercoating paint.  I also wanted to start cutting and fitting the wood pieces that I will use to patch the floor.  I finished building a pair of sawhorses and set them up in the driveway just outside the large garage door so I could measure, mark, and cut wood at waist height.  I was working on one of the pieces when the whole house generator came on at noon, ran its exercise cycle, and shut down 20 minutes later.  Shortly thereafter I heard the rumble of a big truck coming down the road and a few seconds after that Phil’s truck and trailer drove past.

Phil drove to the west end of the property, turned around, and parked down there.  He brought his Takeuchi front loader and used it to spread the large pile of topsoil around the part of our yard where the French drain starts.  He filled in low spots and graded everything off to blend in nicely.  He then worked his way up the drain line towards the culvert that goes under the road.  When Phil was done moving dirt around he spread grass seed and loosely distributed three bales of straw.  That gave him a good idea of how much more straw he would need.

I eventually took a break and walked down to chat with him in the middle of all that work.  He finished moving some dirt and also took a break for lunch.  He will have a load of screened topsoil delivered as soon as he can to use on both sides of the new gravel driveway.  He also clarified that the 40 foot parking pad portion of the driveway is probably not flat/level as it is not finished yet.  When he places and grades the topsoil his equipment will tear up the driveway a bit.  He will then use his bulldozer to finish the driveway, making sure the pad is flat and level.  That was a relief as I thought he was done and I was fairly certain the pad was not flat or level.

By 2:30 PM I finally had the areas of rusted metal prepared and masked off with painter’s plastic.  I applied the POR-15 with a foam brush.  In spite of being careful I got some on my hands and in retrospect should have worn disposable gloves.  The only way to get this product off of things, including skin, is with the POR-15 solvent, which I had failed to purchase.  Once dry it is permanent, so my right hand is going to look like I just changed the oil on the bus until the old skin gets replaced with new.  The drying time for the POR-15 is 2 to 6 hours.  The afternoon high temperature was 72 degrees F so I figured I would check at 4:30 PM.  The directions said I could paint it while it was still tacky as long as it set enough not to transfer.

Linda got home around 3:30 PM and changed into her work clothes.  Phil was still here working but we left him alone.  The weather forecast for overnight and into tomorrow was for rain, possibly heavy, so we did not want to cause any delay in Phil’s work.  I had cut and fit four pieces of wood earlier.  We put painter’s plastic over the sawhorses and laid them out bottom sides up.  Linda put 2×4 blocks under them to get the edges off of the plastic and I coated them with Thompson’s Water Seal.  I am doing what I can to protect this new wood from water damage.

I needed to finish masking off the cockpit with painter’s plastic before spraying the black rubberized undercoating paint so Linda helped me with that.  The plastic is very thin and much easier to handle with two people.  While we were doing that Phil drove past.  We took a break and walked down to west end of the property to see what Phil had accomplished today.  Back in the bus we had the area masked off to my satisfaction by 4:45 PM.

The base of my thumbs were bothering me (arthritis) so Linda shook the paint can for the required three minutes.  Although the light was fading due to the hour of the day and the cloud cover, I was still able to see well enough to spray the paint where needed.  That was the end of our work for the day, except for cleaning up, and I was satisfied with what we had accomplished.  We put some painter’s tape over three areas where we thought water might be getting in and then started putting everything away.

The wood pieces we treated with Thompson’s Water Seal were still wet so I picked them up from underneath and carried them into the back of the garage.  Linda brought the blocks in and set them on the floor and I put the pieces back on top of the blocks.  The directions said to allow at least 48 hours for drying but I plan to flip them over and coat the other side tomorrow if possible.  We are running out of time and I cannot wait two days to seal the other side and then another two days for it to dry.  We put the various tools away, removed the plastic from the sawhorses, and moved the 2×4 stringers and the sawhorses into the small garage bay.  It was 5:45 PM when we closed up the garage and it was getting dark, a clear reminder that summer was behind us and winter was approaching.

We relaxed for a while before dinner.  Linda made a nice salad and reheated the whole wheat linguini she made the other night.  We opened the bottle of Frey Natural White wine to try it.  I liked it even less than their Natural Red, if that’s possible.  It was very dry and since I do not care for dry wines I was not able to judge its other qualities.  Linda did not care for it either, and she tends to be OK with dry wines, so I suspect it is just not a very good wine.  I suggested she find a recipe that calls for white wine and use the rest of it in the dish.

One of our favorite TV shows is The Big Bang Theory.  It has moved to Thursday evenings this season, so we went downstairs to watch it.  The problem is that once we are in front of the TV set we tend to stay there.  I use the time to multi-task and work on my blog post for the day, so it’s not a complete waste of time.  Besides, we do not consider being entertained a waste of our time.  I am enjoying working on the bus, and although some aspects of the work appear humorous in retrospect, I am rarely laughing while in the middle of it.  I like things that make me laugh, and The Big Bang Theory is a very cleverly written show that is well acted and very funny.

 

2015/11/03 (T) The Penultimate Cut

I heard noises in the kitchen at 7 AM and thought the cats might be up to something.  I got up and discovered that Linda was just leaving the house.  She is normally out the door between 6:15 and 6:30 AM but did not set her iPad alarm last night.  I stuck my head out the door and said “good morning” as she was getting in the car.

I had my usual breakfast of granola with fresh blueberries and brewed a half pot of Sumatra Mandheling half-caffe coffee.  I was enjoying my cup-a-joe by the fireplace when Linda called to let me know there was a story coming up on Michigan Radio (WUOM) at 8:30 AM about an underground landfill fire in Bridgeton, Missouri.  Bridgeton is where my sister, niece, future nephew, and grand-niece live and I had just heard about this fire for the first time on Sunday evening while talking with my sister.

I got the leaf blower out at 10 AM and spent a couple of hours blowing as many leaves out from under bushes and away from the house into the yard as I could.  Keith arrived at 10:30 AM and followed his usual mowing pattern starting with the west half of the property.  The lawn in the immediate vicinity of the house is the last area he cuts which gave me enough time to get the leaves out into the yard where Keith could mulch them.

Most of our trees have dropped most of their leaves by now and Keith’s mower did a pretty good job of mulching most of them.  Before he left we discussed having him come back one more time.  The grass has quit growing so my preference is to wait two weeks but that will depend on the weather.  Keith will check with us next Monday and we will decide what to do at that time.

Mike (W8XH) is planning to come over tomorrow after breakfast and help me work on the tower and our Hi-Q 6-80 antenna.  I have been collecting materials that I need and took a little time to see if they would work with the tower.  I also took the Diamond X-300N antenna down as I planned to put it on the tower in place of the X-50N that is currently up there.  My materials were not working quite the way I had hoped they would so I headed to Lowe’s to see what else I could find.  I also planned to drop off the used oil and filters from the bus at O’Reilly’s Auto Parts store.

At Lowe’s I found clamp sets designed for mounting antenna masts and bought a pair.  O’Reilly’s parking lot was still closed off.  It looked like it had been re-blacktopped and they were painting the stripes for the parking spaces.  This was my second attempt to get rid of the waste from yesterday’s bus maintenance.  I will try again tomorrow; with any luck the third time will be the charm.damage

The area beneath the co-pilot/navigator seat.  Not a pretty sight, especially when racing against the clock to get the coach finished for the upcoming winter season.

The area beneath the co-pilot/navigator seat. Not a pretty sight, especially when racing against the clock to get the coach finished for the upcoming winter season.

I finally got back to work on the bus at 2:30 PM and removed the front passenger chair pedestal base.  The entire area under the base, between the side-to-side seat mounting channels, was rotten so I cut out the water-damaged wood.  Just below the wood I found rusted metal which appeared to be delaminating.  Metal does not do that so I presume there was a layer of sheet metal on top of a metal housing.  The main structure of the bus is welded stainless steel but mild steel was obviously used to create compartments.  Ugh.

After cutting out the damaged wood the remaining piece towards the outside was loose but would not come out.  I removed a couple of screws from the 1/4″ walnut veneer side panel and pried the top out with a small screwdriver.  This panel has a lot of switches mounted in it and a lot of wires behind it so I could only pull it out about four inches.  That was enough to see a 3/4″x3/4″ piece of blocking screwed to the floor to catch/secure the bottom edge of the panel.  It also enough to see a very large nest made of tiny bits of shredded paper.

The cavity behind the panel to the right of the co-pilot/navigator seat was apparently a great place for a mouse to build a nest.

The cavity behind the panel to the right of the co-pilot/navigator seat was apparently a great place for a mouse to build a nest.

I left the nest alone for the moment and removed two screws from the block that went into the piece of wood I need to remove.  It appeared that a drain line for the front air-conditioner went through the floor near the outside edge and possibly some wires.  I left the nest for Linda to see and will resume working on this tomorrow.

Linda made vegan grilled cheese sandwiches for dinner and served them with some of the leftover broccoli soup and sliced fruit.  We each had a small glass of the Frey Natural Red organic/vegan wine.

After dinner I called Phil to see what his plans were for this week vis-a-vis our driveway and French drain projects.  I got his voice mail and left him a message.  When we left on Saturday afternoon he was just finishing up placing and compacting the gravel in the driveway but said the west end of the yard needed to dry out (again) before he could finish working down there.  Hopefully the new drain will help speed that process along.

The floor area under the driver’s seat in the bus with all of the rotten wood cut out.

The floor area under the driver’s seat in the bus with all of the rotten wood cut out.

Phil uses a self-leveling laser level system to measure elevations.  Not only has he assured me that the new 40 foot parking area is level, he has demonstrated it with his system.  Still, it does not look level, especially from certain points of view, and it does not feel level when driving in it, although that may also be an optical illusion.  We have a transit level and I plan to use it to check the pad, but it requires two people, one to hold the measuring stick and one to look through the telescope and record the readings.  That means I need Linda’s assistance, which means this will have to wait until the weekend.  Perhaps by then I will have the cockpit in the bus repaired.  It’s also possible that Phil will have returned and completed the job, I which case I may have him help me use the transit as a check on his laser system.

We watched our usual lineup of Tuesday evening TV shows while Linda checked in on her online word games and I worked on this post.

 

2015/10/30 (F) 21AA

Linda was up and out the door at 6:15 AM.  I got up an hour later, got dressed to work, and had the last banana-nut muffin and a glass of orange juice to wash down my vitamins.  I turned on the fireplace and settled in to do a search for Chevron Delo 100 conventional SAE 40 motor oil.  O’Reilly’s Auto Parts had it listed online and available in some of their stores locally but not the ones closest to me.  I called the store in Howell and Ron checked the warehouse.  The inventory showed 32 ‘units’ but he said they were packaged with three one-gallon bottles to a box.  I needed 8 gallons to change the oil in the bus’s DD8V92TA engine so I ordered 3 boxes.

I thought I had heard a heavy truck earlier as I was getting dressed but did not investigate.  Around 8:30 AM I heard another one and eventually the gravel hauler pulled into sight.  That meant Phil was already here so I put on my coat and hat (it was chilly outside) and grabbed my camera.  Phil had already spread out some of the construction fabric and the gravel hauler was backing in to the third driveway entrance to dump a load of 21AA road gravel.  He pulled out, unhooked the rear trailer, backed in with the front trailer, and dumped a second load.  The sun was up but low in the sky.  It was brilliant, lighting up the fall colors against darker gray skies to the west but blue skies and white clouds overhead, so I snapped a few photos.

Construction fabric in place on the upper and lower portions of the driveway extension.

Construction fabric in place on the upper and lower portions of the driveway extension.

The gravel hauler reconnected his rear trailer, drove down the street, and turned around by backing his double trailer into the road that leads to the court.  Phil had told me the driver was incredibly skilled but I was impressed watching me maneuver his tractor-trailer train.  After he was gone I helped Phil (a little bit) position some of the construction fabric.  The gravel train was due back in an hour with another load so Phil started up his Takeuchi front loader and started moving the large pile of gravel into place.  I took a couple more photographs and then went inside to have granola for breakfast.  I did not feel like making coffee so I had some Stash China Black tea with soy creamer.  While the water was heating I turned up the thermostats in the bus and the garage.

While I was chatting with Phil he mentioned that he gets all of the things he needs to maintain his Peterbuilt truck and other equipment from Southwest Brake on Haas Lake Road off of Grand River Avenue.  That is certainly closer than driving to W. W. Williams in Dearborn so I checked it out.  I talked to Jack but he could not tell me if they had the filters I needed without part numbers to cross reference.  While I was at it I Googled W. W. Williams and checked the distance to their Dearborn and Saginaw locations, which were 53 and 63 miles respectively.  I also checked the website for A & L Systems in Redford, which is where I get the replacement elements for the Racor fuel filter / water separators.  Before I went to any of these places, however, I checked my existing supply of filters as I try to keep these on hand.

The gravel train returned at 10:05 AM and unloaded two more trailer loads of material.  I checked my stock of filters and appeared to have an oil filter, a spin on fuel filter, and two filter elements for the Racor fuel filter / water separator, but I wasn’t sure.  I spent the rest of the morning checking websites and making phone calls to track down the ones that I needed.

W. W. Williams in Dearborn had the oil filter and secondary fuel filter based on our engine serial number.  That’s pretty cool, and I have confidence that these relatively inexpensive, but critical, parts are the right ones for our engine and the best quality available. They could not identify the spin on coolant filter or the air filter, however.  The air cleaner assembly is apparently determined by the vehicle manufacturer and the two coolant filters on our bus are threaded on to a manifold that is not part of the engine.  I let Chuck know that I might be going to W. W. Williams this afternoon and he asked me to pick up 8 gallons of Detroit Diesel PowerGuard 40 weight oil for him, which I agreed to do.

I had a box in the tub where the filters were stored for a NAPA 4070 Coolant Filter / Conditioner.  I found it on NAPA’s online store but it turns out that Brighton Ford is also a NAPA store so I ordered it from them for pickup tomorrow morning.  They did not have the 6623 (546623) air filter and could not get one for pickup tomorrow.  Their price was higher than I recalled paying for the last one, and I did not need it right away, so I did not order it.

My last call was to A & L Systems, a small company that carries specialty products for heavy trucks and construction equipment.  I got our T. F. Hudgins Spinner II centrifugal oil cleaner from them but they are also a Racor dealer so I get the Racor fuel filter / water separator products from them as well.  John helped me figure out what I already had, which included two replacement elements for the large water separator on the main engine that also serves as the primary fuel filter.  The NAPA 2276 turned out to be the air filter for the generator.  I did not ask about the filter / separator for the Aqua-Hot as I am not going to have Joe change it (I can do it myself when I have time).

At 12:30 PM I chatted briefly with Phil to let him know I was leaving.  He figured he would be done placing and compacting the stone before I got back.  I think he was also going to level out some of the sand he placed at the west end of the yard but I wasn’t sure about that.  He still needs to bring in topsoil to fill in and grade both sides of the driveway and the low areas at the west end of the yard, but he needs the west end to dry out first.

I drove to W. W. Williams in southeast Dearborn.  I bought two secondary fuel filters and two oil filters for me, and eight gallons of Detroit Diesel PowerGuard SAE 40 oil for Chuck.  I then drove home.  It was just under an hour each way plus my time there, so it was a big chunk out of my day, but I did not have a choice as I needed to have the filters on hand by the time Joe got here.

Phil was, in fact, gone when I got back around 3 PM.  It appeared that he had finished spreading the gravel out, leveled the parking area, and driven over it with his track loader to compact it.  The track loader leaves ruts from the tracks so I drove up and down the driveway many times with my car to compact them and even out the surface.  It was mostly for cosmetic purposes, but it looked better and that made me feel better.  I took the filters into the garage and then used one of our metal toothed rakes to even out a few remaining ridges in the gravel.  When I was done I texted Chuck that I had his oil.

Linda called a little before 4 PM while I was working with the rake to let me know she had left the bakery and was stopping at Meijer’s to pick up something for dinner.  I suggested we go out to dinner instead and she quickly agreed.  I figured she would be at least an hour getting home with Friday rush hour traffic so I took a shower and put on my going-out clothes.  Traffic was heavy, as I expected, and she was tired, so it was long, hard drive home for her, as I expected.  We spent over half an hour considering our limited restaurant options without coming to a decision when Linda got a text message from Diane about walking tomorrow morning.  Linda texted back to see if they wanted to have dinner at Camelia’s, the little Mexican place near their house.  It took a phone call to confirm and finalize the arrangements but we agreed to meet them there at 7:30 PM.

Camelia’s is a nice little Mexican restaurant and we had a good meal over good conversation with old (long-time) friends.  Linda and Diane had Margaritas while John and I had draft beers (Dos Equis, of course).  Linda and I split an order of vegetarian fajitas.  They were smoking hot, literally, when they came to the table and very tasty.  We lingered at the restaurant until 9:30 PM.  John and Diane invited us to their house, which is near the restaurant, for tea but we deferred as we were tired, had a half hour drive to get home, and had to be up at 7 AM to drive to South Lyon for breakfast with our fellow amateur radio operators.

We got home a little after 10 PM and went straight to bed.  We caught a few minutes of weather and then went to sleep.

 

2015/10/28 (W) Inside Flash

Linda’s iPad alarm went off at 5:45 AM but she did not get up until after 6.  I got up at the same time she did but she was dressed and out the door by 6:15 while I was still stumbling around.  I put on my warm robe, fed the cats, made coffee, and had a banana nut muffin.  After enjoying my coffee by the fireplace I had my orange juice and granola with blueberries.

It started raining overnight and was still raining this morning as the remnants of hurricane Patricia pulled up from the lower Mississippi River and moved north between the river and the western side of the Appalachian Mountains towards the Great Lakes.  The forecast was for the rain to continue through the day and then off and on into tomorrow.  It was a good day to work in the house so that is mostly what I did.  But first I gathered up the trash from the house and rolled the large container to the street for pickup.

The first thing on my self-imposed to-do list was finalizing an order with DX Engineering.  I had already placed multi-packs of two different sized snap-on ferrite beads in my cart but needed to spend slightly more money to get free shipping.  I am not, however, one of those people who is drawn into buying something I do not need just because it is a BOGO item.

I have been planning for quite some time to install a multi-outlet fused DC distribution panel in the front of the bus to provide Anderson PowerPole connections for the various 12V DC accessories such as the GPS.  I had just never made it a priority, which is to say, never taken the time to figure out exactly which product to buy.  I had to go out to the bus to assess the size and feasibility of available areas for mounting.  After looking at all of the options I selected an 8-port unit from West Mountain Radio.  I really wanted a unit with USB charging ports but the only such model they make only has four PowerPole connections, which is not enough.

My next task was to order a couple of items from the Rockler Woodworking and Hardware website.  I have been considering their black, powder-coated shelf brackets for a while.  I made another trip to the bus to determine how much space I had on the wall where the table will go.  It looked like I will have 14 inches of wall space for mounting brackets so I selected the middle of three sizes, which is 12″ high by 18″ deep.  The brackets will support 1,000 pounds each so a pair of them will certainly support the weight of the Corian-topped dining table.  The table is 38″ long and fully supported by 3/4″ plywood underneath, but it remains to be seen if the wall is strong enough to support the table in a cantilevered installation.  If not, we will have to add a leg or an angled support.

The other thing I needed was hardwood veneer to build the three panels that will replace the strip mirrors that were on the lower portion of the outside hallway wall.  I decided to go with the Allwood 2-ply maple and put a 24″ wide by 96″ long roll in the cart.  The three panels will have a finished size of about 22-1/2″ by 28″ so the 8′ long piece should work out just right.  I placed the order and moved on the next thing which was entering account information into our password program.

Our password app is wonderful but frustrating at times as it tries to synchronize via the cloud every time you open it, edit an entry, or create a new one.  By design it keeps our passwords up-to-date on multiple devices, which is why we have it, but it is slow to sync and sometimes appears to hang up.  When it is trying to sync it won’t let me do anything else, so I sit and wait (or make another cup of tea).

Phil called around 12:15 PM, returning my phone message from yesterday, and we chatted for 20 minutes or so.  With any luck he will have stone delivered here on Friday or Saturday and get the driveway put in before Joe gets here next week with his trailer.  Phil, however, is at the mercy of Wayne County inspectors on another job and was not able to work anywhere today due to the rain.  Most of his work is weather and bureaucrat dependent.

I had the leftover squash and quinoa/lentil pilaf for lunch at 12:45 PM.  While I was eating a lone buck wandered through the back yard with what appeared to be a 6-point rack.  It is the first buck (with antlers) that I have seen this year.

I worked on this post for a while and then went to my office.  As much as I needed to work on getting posts uploaded to my blog there were other unfinished tasks weighing more heavily on my mind.  At the top of the list was an article for Bus Conversion Magazine on a 1985 Model 15 Eagle bus conversion that I saw and photographed at the Eagles International converted coach rally in Quartzsite, Arizona back in January of this year.  I met the owners at that time and subsequently interacted with them a bit but then got really busy with my own projects and had to set the article on the back burner.

I was pleasantly surprised to find that the article was farther along than I remembered.  I also had a short narrative and eight photos from the owners that I had not yet incorporated into the article so that gave me additional material to work with.  With only a few short breaks to interrupt my work I pulled together a first complete draft by 6 PM and e-mailed it to the owners and the publisher of the magazine.  Gary (at BCM) wants to run this article as the feature/cover story in the January 2016 issue so the editor needs it before the end of November.  Personally, I need to be done with it at least a week before Thanksgiving.

While working on the article I had quite a few e-mails back and forth with Gary, one of which inquired about my article on The Desert Bar / Nellie E. Saloon outside of Parker, Arizona.  A draft of that article also exists but it is not even a full page of text and I have not yet selected and processed any photos.  I wrote a little bit on The Desert Bar in a March 2016 overview article about our time in Quartzsite.  For a standalone article I will need to say something more/different than I said there.  If the weather continues to be crummy tomorrow I may use that as an excuse to sequester myself in my office, hunker down at my computer, and crank this article out.

One of my afternoon breaks was in response to the doorbell.  It was UPS delivering my order from B&H Photo.  I did not open it right away as I wanted to stay on my BCM article task.  Linda texted me at 3:30 PM to let me know she was leaving the bakery and arrived home about an hour later.  Even though she left the house at 6:15 AM this morning it took her 90 minutes to get to the bakery in Hamtramck.  Wet roads with poor lane markings in marginal early morning light will do that.  Michigan does not do a good job of maintaining its roads.

For dinner Linda made a simple salad of power greens with Ken’s Sweet Vidalia Onion dressing, roasted the white asparagus we bought the other day, and reheated the leftover risotto.  The risotto held up well to being served as leftovers but the white asparagus, which was fresh, was disappointing.  It was tough and we ended up microwaving it.  Linda thought it was bitter, and did not like it, but I think that is a characteristic of asparagus.  We both agreed, however, that it did not taste like much of anything.

While we were relaxing in the living room after dinner I did a search on white asparagus.  Asparagus is a spring vegetable so the stuff we bought probably came from a long way south of the border.  It is grown “underground” by keeping dirt around the stalks; a process known as etiolation, or light deprivation.  It is supposed to be milder than regular (green) asparagus but with a tough, bitter outer skin than needs to be removed before cooking.  The classic German method of preparation is immersion in simmering water with salt and butter until tender.  Now we know.  Eating things out of season may be one of the “benefits” of being globally interconnected but there is a lot to be said for eating local in-season whenever possible.

The power flickered once during dinner and several more times during the evening.  Winds were forecast at 15 – 25 MPH out of the SW gusting to 40 and strengthening into the morning hours as the wind shifted out of the W in advance of a second cold front.  I shut off the color laser printer, the two NAS units, and the Linux box as a precaution but left my laptop on since it runs on its own internal battery.

 

2015/10/27 (T) The Pilot’s Seat

My morning started at 8 AM in its usual fashion.  I fed the cats, made coffee, started a load of laundry, made/ate breakfast (orange/grapefruit juice and granola with fresh blueberries), drank my coffee in the living room with the fireplace on and Jasper at my side, day-dreamed about high quality used Sony alpha lenses, and finally got to work on the bus a little after 10 AM.  Rain is coming tonight and forecast to stick around into Thursday so today would be a good day to do some more trimming, felling, and cutting up of dead trees.  The temperature this morning was still in the 40’s, however, and there is still much to be done in the bus.

A few days ago I installed a new AC outlet on the forward side of the cabinet behind the driver’s seat.  I wired it into the outlet on the aft side of the cabinet and then discovered that the original outlet was cracked.  I had also used an oversized cover plate on the new outlet and it interfered with the Corian cabinet top.  I finally got around to replacing the cracked outlet this morning.  I also switched the cover plates.  The regular size one still interfered slightly with the Corian top so I cut 1/8″ off of the top edge and added strips of felt on the three edges of the cabinet to raise the Corian top slightly and cushion it.  Everything fit nicely.  I turned the circuit breaker on and checked for power.  The outlets were good to go and I checked this mini-project off my (mental) project list.

I took a break and called the Escapees RV Club to register Linda and me as staff for the July 2016 Escapade.  I then called Josh at Coach Supply Direct regarding extra brackets for our MCD shades/brackets, the wiring of the passenger seat switch, and the correct orientation of the swivel bearings.  I learned that the flange, which wraps around the other piece on the inside of the ring, goes down.  (I had puzzled out that it should go the other way so I am glad I asked.)  When I was done with my phone calls I had a quick lunch of Sabra Roasted Red Pepper Hummus and Snyder sourdough pretzel nibblers.

My next task was unbolting the driver seat pedestal base from the floor.  The pedestal is secured by four large carriage bolts that go through holes at the four corners of the base plate and thread into nuts that I presume are welded into the floor structure.  The base had to be removed in order to remove the old vinyl floor tile which was installed under the base.  To get the old tile out I also had to remove a plastic cover around the steering linkage and a floor mounted bracket that retained the bottom if it.  Last, but not least, I had to unscrew the accelerator bracket from the floor by removing three small lag screws.  The accelerator is electrical, with a cable that runs through the floor, but other than limited access it was easy to detach.

Removing the old vinyl tile from the driver’s area of the cockpit was relatively straightforward.  It’s somewhat flexible and wasn’t glued down that tightly.  When Creative Mobile Interiors installed the tile they laid it out in a way that allowed the pieces to be trimmed in reasonable ways to fit around the steering column and brake pedal.  The brake pedal is mechanically linked to a complex multi-port air valve in the compartment under the floor and any finished floor has to be installed around it.

The plywood under the driver’s seat area was depressed directly under the base.  It seemed unlikely that this was the result of the base being bolted down.  It may indicate that this area also got wet like the area under the passenger side seat base.  I plan to install SurePly underlayment on the floor under the passenger seat but not the under the driver’s seat so I will either have to replace this piece or use floor leveling compound to fill the depressed area.  Replacing the plywood is probably the correct, but more involved, solution.

I started thinking about installing the new tile so I laid out all of the old tiles on the floor in the garage, kind of like putting a simple jigsaw puzzle back together.  I plan to use them as a pattern to cut the new tiles.  With a clear view of the whole driver’s area I became intrigued by the lower sidewall counsel next to the driver’s seat.  The more I looked at it the clearer it became that Royale Coach had cut the top off of a bumped out area, removed the upper three inches of the wall of the bump out, replaced the top piece, and tried to fill in the three inch gap in the side wall.  They had also cut out an access plate and then screwed it back in.  It eventually became obvious to me that they had done this to create horizontal space for the wide Villa driver’s seat that was in the coach when we bought it.  Had Royale Coach left the ISRI seat in place these modifications would not have been needed.  They were originally hidden under carpet but once the carpet was removed the really poor quality of the workmanship in this area was all too apparent.

I probably should have applied adhesive remover to the stairs and walls around the cockpit but it has to sit for 1 to 3 hours and the timing wasn’t right.  The weather was still decent and I needed to finish working on the trees at the west end of our property.  The adhesive remover can be left on for up the 24 hours so applying it at 5 PM with the intent of removing it the next morning might be ideal.  The weather forecast for overnight, through tomorrow, and into Thursday, however, is for rain and colder temperatures, so they will not be good mornings for working with the door of the bus open.

Around 3:30 PM I had a banana nut muffin and then called Phil at Precision Grading.  I got his voice mail and left him a message.  I was getting ready to use the chainsaw to cut down a small dead tree at the west end of the property when Linda texted that she was leaving the bakery.  A few minutes later Chuck called.  He had some carpet remnants for us and was nearby so he came over.  He could not stay long but took the time to look at what I was working on in the bus before he left.  It would still be awhile before Linda got home so I took the chainsaw to the west end of the yard, cut down the tree, de-limbed it, and cut it up into manageable size pieces.  I then cut up another tree of similar size that has been on the ground for a while and cut up some of the larger branches that I trimmed off the trees yesterday.

Linda got home while I was finishing the tree work and started fixing squash and a lentil/quinoa pilaf for dinner, both of which would take some time.  After cleaning the saw and putting it away I took one of the carriage boots from the bus driver’s seat and went to Lowe’s to see if I could find slightly longer replacements.  The old ones were somewhat rusted and some of the threads were in less than ideal condition.  The new Armstrong vinyl tiles are also a bit thicker than the old ones and I wanted to make sure I had bolts that were long enough to completely thread into the retained nuts.  It turned out that the bolts are metric, specifically M12-1.75×80.  Lowe’s had Grade 8 M12-1.75×90 bolts (10 mm longer than the 80s) so I bought four.  I also bought some thick M12 fender washers that were larger than the old ones.  While I was there I picked up a role of red electrical tape.

Dinner was excellent.  The squash was baked without butter (vegan) or brown sugar but was very tasty.  The pilaf had onions, garlic, and mixed greens and was very good.  We finished the Witch’s Brew wine from Leelanau Cellars that Linda used to poach the pears on Saturday.  The squash did not look that big, but neither of us was able to finish our half so we saved it for tomorrow’s lunch.

I checked e-mail after dinner and then we settled in to watch our Tuesday night TV programs.  We caught the weather report at 11 PM and then turned off the television and lights.  I turned down the brightness on my iPad display and worked for another 30 minutes before going to sleep.  I did not hear back from Phil this evening but I already knew he would not be here on Wednesday if the rain came as forecast as he had another job to work on that was better suited to working in rainy conditions than ours.

 

2015/10/23 (F) Fetching Antique

Linda was back on schedule this morning; up at 5:45 AM and off to the bakery at 6:15.  I got up around 7:30 AM, ground beans for a small pot of coffee and made breakfast.  Breakfast was oatmeal that I made myself from quick cook oats with raisins, dried cranberries, and pecans.  I forgot to add cinnamon and brown sugar but I did add a small amount of vegan butter, sugar, and non-dairy coffee creamer.  I like to cook my oatmeal until it is very thick and then loosen it up slightly with these additions.

After breakfast I checked the thermometers in the bus refrigerator and recorded the temperatures.  They seem to be all over the place and I am really starting to question the accuracy, and thus the usefulness, of these relatively inexpensive “consumer” devices.

Around 10 AM I was getting ready to drive to Canton when I got a call from Chuck.  The pair of motorized MCD duo shades had arrived the other day and he was having difficulty installing them.  I offered to stop by his shop after my errand and he said he would be there.

I called Clyde to make sure he would be home and then headed to Canton to pick up the antique Sun automotive distributor tester.  Clyde’s house was easy to find; an old residential area tucked away behind what is now a heavily developed commercial strip along Ford Road either side of I-275.  He helped me load the tester into my car and then we chatted for a while.  He had a very rare and beautifully restored (customized) 1948 two-door Pontiac boat tail sport coup; all black with two chrome strips, one down each side.  I am not a “car guy” but I appreciate a work of art when I see one.

I drove to Chuck’s shop in Novi to see how the windshield shade installation was progressing.  The pocket between the upper windshields and the cabinets was too narrow on the outside ends to allow the shades to tilt enough to engage the clip in that end and then swing up and latch on the other side.  After struggling with it for a while we went to lunch at the Panera nearby.

Back at his shop we pondered the installation problem until I finally had an insight.  The upper windshields slope away from the overhead cabinets, creating more horizontal space at lower heights.  I suggested that using a 2″x2″ board as a spacer might lower the mounting bracket just enough to allow it to tilt into place and have enough space to lock it in and release it if needed.  Chuck had a scrap piece of 2×2 that we used to see if my idea might work.  Chuck thought it would work so he locked up the shop and I headed for home while headed to The Home Depot.

Back home I checked the thermometers in the bus fridge.  The readings just did not make sense so I brought the LaCrosse base unit and remote into the house to get them away from the TempMinder components.  I researched methods and equipment for measuring temperature in freezers and refrigerators looking for something that would be more accurate and precise than our current technology but I did not find much.

The more accurate temperature measurement instruments that are available for under $100 all use wired probes rather than wireless remote sensors.  The best ones have the probes sealed in small glass bottles filled with a liquid such as alcohol, oil, or glycerin.  These remain liquid at normal freezer and refrigerator temperatures and surround the temperature probe with enough thermal mass to prevent it from responding too quickly to changes in air temperature such as occurs when the door is opened or the fridge compressor and fans are running.  In effect the probes more accurately reflect the temperature of things stored in the refrigerator rather than the instantaneous temperature of the air near the sensor.  The wires for the probes are typically relatively fine and do not prevent the door seals from closing completely, at least in the short term.  A permanent installation, however, seems ill-advised.

I was researching flash units and other accessories for our new Sony alpha 99 camera when Phil showed up mid-afternoon.  I set my research aside and went out to chat with him and watch what he was doing.  He had a full truck load of sand from another job that he dumped at the west end of the property and then moved it into some of the low spots, of which there are many.  He used his front loader to finish removing topsoil from the new driveway area by the third culvert and load it into his truck.  He filled the truck and dumped it at the west end of the property.  He then used his bulldozer to grade out the area of the driveway where he had just removed all of the topsoil.  Finally, he used the front loader to compact the sand driveway base.

Phil was going to come back on Saturday but he is at the point where he needs stone (21AA road gravel) that he will not be able to get it until Monday.  He is also finishing up other jobs that involve inspections and won’t be back here until at least Tuesday.  I need to trim the lower branches on some of the trees to get them out of his way, and out of Keith’s way when he mows the grass, so I will probably do that on Monday, leaving Saturday and Sunday to work on the bus while Linda is available to help.

Phil was still working when Linda got home so I left Phil to finish up and went inside.  I was tired and took a short nap while Linda fixed dinner.  She made a nice salad and risotto with celery and dandelion greens; a first for us, and very tasty.  We also did a taste test of the California Olive Ranch EVOO versus the Philippe Berio EVOO that Linda normally uses.  We used Italian bread that she brought home from the bakery.  I was able to detect a very subtle difference in the taste but had to not use the crust of the bread as the poppy seeds provided their own distinct taste.  The COR product was the top choice of a tasting panel at Cook’s Illustrated magazine and reasonably priced at just under $10 a bottle but I did not find the taste superior to the PB product.

After dinner I went to my office and checked e-mail.  I took care of some things related to the November 2015 issue of BCM.  We had confirmation e-mails from Molly Pinner for our 56th Escapade Volunteer assignments.  I also had one from Kate with links to camera harnesses at B&H Photo and a second with links to a recent interview on AM1700 with the organizer of the Pop-X art exhibit in Liberty Plaza and photos she has taken of guests at the station and musical groups at SxSW and other venues.

I talked briefly with Mike (W8XH) via the South Lyon 2m repeater using the Yaesu FTM-400 radio.  Our ham shack was working just fine so apparently there was no Info Net this past Sunday.  I called Butch to let him know I had the distributor tester and chatted with him about the refrigerator temperature monitoring problems I am having.  It was then off to bed, as we have to be up by 7 AM to get to our weekly ham radio breakfast in South Lyon.

 

2015/10/21 (W) Electrifying

In spite of being out later than usual last night Linda was up early and off to the bakery at 6:15 AM.  I got up at the same time and made coffee so Linda could take some with her.  Neither of us slept well as we had larger meals, with richer food, and later at night than usual.  I wasn’t hungry but I like to start my day with coffee and it seems to help keep me regular.  TMI, perhaps, but there it is.  I had to get up anyway to prepare the garage so the electricians from Bratcher Electric could get to the areas they needed to work on.  But first I put a load of laundry in the washing machine.

We had a light but steady rain last night starting around midnight.  Phil was hoping for rain over the next few days as the sand base for the driveway will compact much better if the sand is moist.  We have a 70% chance of more rain during the day today and into the evening but by tomorrow a cold front is supposed to push through with much cooler and drier conditions behind it.  I hope the sand gets wet enough to stay moist until Saturday when Phil returns.

Jeremy and Pete from Bratcher Electric showed up at 9 AM.  I walked them through the job and then left them alone to work except for the occasional photograph and questions.  The questions were for my own understanding of the work.

I needed to mix the “GoLightly” prescription for Linda and get it in the refrigerator to chill.  The instructions said to use lukewarm drinking water.  I drew a large pot of our RO water, heated it on the stove, let it cool to what I judged to be lukewarm, added it to the jug, shook it well to mix, and put it in the fridge.  It should be plenty cold by the time she gets home this afternoon.

I was not going to get involved in my own construction projects while Jeremy and Pete were here.  At some point towards the end of their work they were going to have to turn off the whole house generator and disconnect the main service coming in from the utility pole so they could safely tie in the new disconnect that feeds the panel in the garage.  I went ahead and turned off the HP Color LaserJet printer, the two NAS units, and all of the computers except one that was installing updates, and I shut it down when it was done.

While the electricians worked I did some more photo product research.  Based on what I found on the Quantum Instruments, Inc. website they do not make anything that works with the Sony alpha camera bodies, including the SLT-a99v.  Thus it appears that there is no point in repairing (replacing) one or both of my Quantum Turbo battery packs.  I tested my Sunpak DX-8R ring flash the other day so I know I can trigger it but I do not know if I can control it.  My Metz 45CT-4 can operate off of AA batteries but I have not had time to test it with the a99.  Like the ring flash I expect that the a99 will be able to trigger it but I doubt it can control it through the lens (TTL).  If it can then I would have a reason to repair/replace at least one of my Quantum Turbo battery packs.

What all of this means in the short term is that I am going to have to buy a Sony “on-camera flash” designed specifically to work in an integrated way with the a99 body.  Further research revealed that there are only three choices: the HVL-60AM, the HVL-43M, and the HVL-20 (?)  I downloaded the manuals for the 60 and the 43 models and glanced at them, but they are as long as the manual for the camera body.  The 60 has an optional battery pack, but it just holds six AA batteries in addition to the four in the flash unit.  I looked at reviews on the B&H website and they were mixed for both the 60 and the 43.  The 60 is more powerful but is very large.  The 43 is smaller but less powerful and lacks the connector for an auxiliary battery pack.  The biggest knock on both were the mechanical attachment to the camera and an over temp feature that seems to erroneously shut the unit down after just a few quick flashes.

The small box upper left is the new 100 A main disconnect for the electrical panel in the garage.  The large box upper right is the automatic transfer switch and the large box below it is the 200 A service entrance disconnect.

The small box upper left is the new 100 A main disconnect for the electrical panel in the garage. The large box upper right is the automatic transfer switch and the large box below it is the 200 A service entrance disconnect.

After the electricians were gone I heated up a can of Amy’s Red Lentil soup and had some hummus and pretzel nibblers.  I put another load of laundry in the washer and then went in search of an RV outlet box.

Lowe’s had an Eaton box with either a 30 A or 50 Amp single plug and no disconnect or circuit breaker.  The 50 A version is what I installed three years ago for the pull-through drive in front of the house.  What I had forgotten, apparently, was that the largest opening on the bottom of this box was smaller than 2″ but I could not determine if it was 1-1/4″ or 1-1/2″.  Lowe’s did not have the adapters I needed so I went to The Home Depot.  They did not seem to have what I needed either so I went to City Electric Supply.  CES had a better selection of adapters and also had RV panels with circuit breakers.  The panels were much more expensive so I did not buy one but I had them set up the pieces to adapt from 2″ conduit to 1-1/2″ pipe thread.  I then went back to Lowe’s and bought the 50 A outlet box.

Back at the house I spent some more time in the bus fiddling with the remote temperature sensors in the refrigerator but otherwise did not accomplish much.  Linda got home late in the afternoon but was not able to eat anything because of her colonoscopy tomorrow morning.  I was on my own for dinner but do not recall what I had as I am finishing this post a couple of days later.  Linda had to consume half of the GoLightly (1/2 gallon!) between 6 and 8 PM.  I worked in the garage for a while removing the knockouts from the bottom of the RV box.  That was when I confirmed that the hole was sized for 1-1/4″ conduit, not 1-1/2″.  I worked in my office at my computer for the rest of the evening.  We both went to bed before 10 PM as Linda had to get up at 3 AM and drink the other half gallon of GoLightly between then and 5 AM and I had to be up at 5:45 AM so I could get her to HFHS Columbus Center in Novi by 7:15 AM.  Sometimes the scheduling of medical procedures just leaves me shaking my head.

 

2015/10/20 (T) Pop-X Pickle

It’s a good thing there are still five weeks until we depart for Florida; there are a lot of unfinished items that need to be taken care of on the bus and around the house/property before we go.

When Phil is here my attention tends to be on what he is doing.  He really knows his stuff, and is an excellent contractor to work with, but since he is not working from drawn plans there are inevitably questions and discussions about just exactly what it is I want and whether that is the best idea or even doable.

Phil had ordered a load of sandy soil for delivery first thing this morning and the “train” (double trailer) showed up not long after he did.  The sandy soil he wanted was not available so he got clean sand instead.  The train driver of the backed it over our third culvert and into the part of our yard were Phil wanted the material dumped.  That took a lot of skill and was impressive to watch.  I took a few photographs but video was really required to capture what was happening.  The Sony SLT-a99v does video in several different modes but I am just beginning to learn how to use it as a still camera and did not want to mess around with shooting video.  Besides, I am not a videographer; it’s a completely different way of thinking than being a still photographer.

Phil digs the trench for the electrical conduit from the SW corner of the garage to the far side of the driveway extension where he also dug a hole for the post that will support the RV outlet box.

Phil digs the trench for the electrical conduit from the SW corner of the garage to the far side of the driveway extension where he also dug a hole for the post that will support the RV outlet box.

With the material on site Phil was at the point where he needed to dig the trench for the RV electrical feed.  That meant I had to quickly make some final decisions.  I had an 8 foot 4″x4″ treated post and the PVC conduit pieces I needed to go from the post under the driveway to the other side but not enough to go all the way to the garage.  If I only put conduit under the driveway I could cap it, let Phil bury it, and then dig it up later and finish trenching from there to the garage.  I would not do that by hand, however, so it would mean having Phil come back next year just to dig this little trench.  Although I could have him dig the foundation hole for the ham radio tower at the same time that still did not make any sense to me.  Among other considerations I would have to fill the trench in by hand after I ran the cable.

Another option was to still use conduit just under the driveway but go ahead and run direct burial cable like we did two years ago for the pull-through driveway in front of the house.  I would need three (120VAC) or four (240/120VAC) large wires (or equivalent service entrance cable, each at least 80 feet long to get from the outlet box location in the post to the riser pipe on the garage and through the wall into a circuit breaker box.  Not only would I have to get the wire, which would be expensive, I did not have the outdoor outlet box or other parts I needed, so it would take me quite a while to go buy everything.  I also did not know exactly where/how I would feed the circuit.  (I had some ideas about that but they depended on just what the electricians do tomorrow.)

The most expeditious, and least expensive, option was to get more conduit and additional fittings and run the conduit all the way from the post to the southwest corner of the garage.  I left at 9:30 AM for Lowe’s as Phil started digging the trench and the hole for the post.

At Lowe’s I picked up five more 10′ pieces of 2″ PVC conduit, a 45 degree elbow, another 90 degree elbow, a right angle entry box, and a bag of 2″ conduit clamps.  By the time I got back to the house Phil had the post set in place and most of the trench dug.  I got all of the conduit pieces laid out on the ground and got the PVC cement, a hack saw, and the rope and weight.

Since Phil could not do anything else on the driveway until the conduit was installed he helped me install it (or vice-versa).  We joined 10′ sections to both ends of one of the 90 degree elbows and then dropped the weighted rope through it.  We then set the elbow and one of the straight sections in the trench with the elbow at the base of the post and the other straight section going straight up the post where I secured it with two clamps.  We proceeded to drop the weighted rope through additional straight sections of conduit, applied PVC cement to the ends, and put them together.  The conduit had to be inserted about 3″ into the mating piece and twisted as it went in.  I was glad Phil was there to help with this as I did not have the grip strength to do it by myself.  (I don’t have a lot of physical limitations but the arthritis in the base of my thumbs makes itself known in specific situations.)

When we got near the southwest corner of the garage we measured and cut a section of straight pipe to get us to a turn in the trench.  Because of a decorative grass plant the trench could not go directly to the desired location on the west side of the garage and had to go between the grass plant and a nearby small evergreen bush and then turned towards the garage.  We installed a 45 degree elbow to get around the corner and it ended up in the center of the trench.  When I said Phil knew what he was doing I meant it.  We again measured carefully and cut a short section of straight pipe to get us to a 90 degree elbow that would turn up and bring the conduit out of the trench and up the side of the garage.  I measured and cut the vertical riser section and we cemented it into the elbow.  We now had a complete run with conduit coming out of the trench vertically on both ends.

Phil back fills the trench for the electrical conduit from the corner of the garage to the RV electrical post.

Phil back fills the trench for the electrical conduit from the corner of the garage to the RV electrical post.

While Phil used his excavator to scoop and push dirt back into the trench and tamp it down I closed off both ends of the conduit.  At the garage end I removed the gasketed cover from the entry box, cut a short piece of 2″ conduit, and put it in the fitting hole on the back side.  Next I brought the weighted rope up through the bottom fitting hole of the box and used Gorilla tape to secure it inside the short back pipe.  I put a cap on the other end of the short back pipe and then put the entry box on top of the riser sideway.   I coiled up the extra rope, taped it inside the box, and put the gasketed cover back on.   I did not cement any of these connections.  When permanently installed the gasketed cover will point away from the wall and the hole in the back will have a longer piece of paper 2″ conduit cemented in and going through a hole into the wall of the garage.

At the post I used a Rigid brand pipe cutter, designed specifically for cutting large plastic pipe and conduit, to cut off the vertical riser at a convenient height above the top of the post.  I threaded the rope through a 3/8″ hole in the center of a 4″ disc of 3/4″ plywood and tied a big knot in it.  I modified the 2″ cap by drilling three adjacent holes lengthwise from the bottom up and cutting out material with a hacksaw to make a slot.  With the rope hanging over the edge of the conduit I lined up the slot in the cap with the rope and put the cap over the end of the conduit.

Since I decided to not have Phil build the area leading up to the planned barn location I wanted to pull all of the unneeded yellow plastic stakes out of the yard and put them away.  Re-staking the layout, however, is a time-consuming task so I put 10″ metal (iron) spikes at the locations of the front corners of the barn and the center point for the curved transition into the driveway.  I drove them flush with the soil so Keith would not hit them with his mower but we can find them later with a metal detector.

With the conduit installed and the trench filled and tamped, Phil filled started building the “curbs” for the driveway.  He had excavated parts of the driveway path and filled in other areas to create a base for the construction fabric and road gravel that was eight inches below the finish grade.  The construction fabric is 12’6″ wide and Phil likes to wrap it up on the sides about 8″ so when he staked out the driveway to be 11′ 2″ wide.  Phil used the sand to build up the areas along both sides of the driveway so that it looked like he had cut the driveway out, but that is not, in fact, what he had done.

My main bus project today was cleaning up the kitchen and living room, which mostly involved moving tools back to the garage.  It is a confined workspace and tends to get cluttered over time as we fetch tools for this and that.  I also wanted to be able to see the desk and its Corian countertop.

Two of the three sets of cushions in place on the new built-in custom walnut sofa/storage base.

Two of the three sets of cushions in place on the new built-in custom walnut sofa/storage base.

I called Butch in Quartzsite, AZ regarding the distributor tester.  He suggested that I send him an e-mail requesting Bill’s e-mail address and he would send it in his reply.  We then discussed the refrigerator and he suggested that I set the freezer to a colder setting, leave the fresh compartment setting as is, and monitor it for a while to see if it changes.  I did that and reset the min/max memory for both compartments.

Phil is not done with the French drain yet and spent part of the afternoon working on that instead of the driveway.  He made lots of trips back and forth with the front loader to take the topsoil he had removed to create the driveway, spread it out along on top of the pea gravel that fills the drain trench, and grade it off to blend with the undisturbed yard along either side of the drain.  Before he is all done with these two separate, but inter-related projects, he will have to bring in several truckloads of topsoil.  It will be used to fill low spots, especially at the west end of the property, and to cover everything that has been disturbed.  All of the topsoil will be finish graded to blend into the existing contours of the property and then seeded with grass seed.

The view from the living room looking towards the hallway.  The new built-in custom walnut desk has its Corian countertop in place and the new refrigerator is in place next to the built-in custom pull-out pantry.

The view from the living room looking towards the hallway. The new built-in custom walnut desk has its Corian countertop in place and the new refrigerator is in place next to the built-in custom pull-out pantry.

I did not want to get involved in any complex or time-consuming projects so I hung out on the west half of our yard where Phil was working and took lots of pictures with the new camera.  Actually, I had been doing that all day trying to document the work as it progressed.  When I wasn’t taking photos I gathered up broken branches and larger deadfall and carried or dragged it to the brush pile on the west side of the line of large fir trees that separate the east and west halves of our five acres.

Linda called around 3:30 and asked me to see if her wallet was on her desk.  She thought she had it with her but could not find it.  She finally located it in her car where it had been since falling out of her case this morning.  She was on her way home by 3:50 PM.

I had a final chat with Phil, who won’t be back until Saturday, and then closed up the bus and the garage.  We were headed to Ann Arbor this evening and I needed to get cleaned up and put on nicer, more appropriate clothes for our evening out.  I used to wear Oxford shirts and nicer pants every day for work, and sometimes a sport coat and tie or even a suit.  These days it’s mostly polo shirts and blue jeans or sometimes REI ripstop nylon convertible cargo pants.  And this summer it has mostly been my work jeans and work shirts.

We left around 5:15 PM and were parked in Ann Arbor before 6 PM.  We agreed to meet Kate at the Lab Cafe which was just around the corner from the Thompson Street parking garage.  (This garage is behind the former Border’s book store #1 which also housed the company’s corporate headquarters.  Our daughter started with Border’s as a cashier at this store and within four years was a regional manager for their PaperChase product line before the company imploded and went bankrupt.)

Kate was sending Linda text message updates on her travel status and ETA so we ordered a couple of decaf coffees to go.  At $3.75 each they were pricier than we are used to paying for coffee but they were “hand-crafted” and the coffee was very good.  It took the barista at least 10 minutes to make our cups, grinding the beans just before brewing and then slowly pouring hot water through individual filter holders after pre-wetting the filters.  In the time it took to make our coffee I would have been on my second cup at Panera.

Linda (front) and Kate (behind) take in the interior of one of the Pop-X art exhibit sheds.

Linda (front) and Kate (behind) take in the interior of one of the Pop-X art exhibit sheds.

The music was too loud and really awful, a bad combination in our opinion, so we sat outside in spite of the occasional attempt to rain.  When Kate showed up we walked the short distance to Liberty Park to see the Pop-X Art Exhibit.  Organized by the Ann Arbor Art Center, all of the art was displayed in “sheds” designed by an architect, one artist per shed.  The sheds were approximately 10 feet square with steep pitched roofs.  The roofs, and the two sides they pitched down to, were covered in clear wavy plastic panels to let in a lot of natural light.  The back end was solid and the front had a pair of sliding “barn style” doors hung from tracks.  There was a solid floor that was elevated relative to ground level and provision for electrical power.  They were designed to be sold as potting sheds after the exhibit was removed at the end of the week.  Although the light was fading I was still able to get some decent shots with the new Sony a99v DSLT camera.  It has much greater light sensitivity than the Sony alpha 100 it is replacing as my primary camera and this was my first opportunity to take advantage of that since getting it.

Our main reason for coming to Ann Arbor was to have dinner with Kate but Pop-X was a nice bonus.  Ann Arbor has a LOT of dining options; hundreds I would guess just in the very walkable downtown area.  We decided to try the Grizzly Peak Brewing Company after Linda confirmed that they had some things on the menu we could eat.  It was a bit of a walk but the rain held off and it was an otherwise pleasant evening.

Linda had a dark Porter with definite chocolate tones and I had a hard cider with distinct cinnamon/vanilla tones.  It was also supposed to have roasted pecan notes but I did not detect that.  Kate had a red beer that was not hoppy and thought I might have liked it.  I had a sip of Linda’s Porter and it was very agreeable.  We both had small couscous and greens dinner salads, which were very nice, and both had wild mushroom burgers, which were excellent.  Linda said her chips were also very good and my French fries were tasty and generously portioned.  Kate had a burger and all of our meals came with pickles.  Kate does not care for pickles, which I knew, and does not care for vinegar in general, which I did not know, so Linda and I split her pickle rather than have it go to waste.  The waiter was very attentive and a good sport when I asked for a gallon of ketchup for my fries.  He brought two very full bottles for the table and a bottle of Frank’s hot sauce.  We tipped him accordingly.

At 9:30 PM we started a slow stroll back to the parking garage and chatted a while longer by our cars, which coincidentally were parked very close together.  It was 10:40 PM by the time we got home.  I fed the cats and we went straight to bed.  I was up later than I wanted to be trying to outline this post but I had not had much opportunity to work on it throughout the day.

 

2015/10/19 (M) Flashless

Linda was up at 5:45 AM and out the door by 6:15.  I woke up but went back to sleep and finally got up at 7:30 and got dressed.  I turned on the furnace in the garage and turned up the thermostats in the bus and then had breakfast.  Rather than grind up a small quantity of coffee beans and get the coffee maker dirty I had a cup of tea.  I retrieved Butch’s e-mail and called Clyde in Canton to arrange pickup of the antique Sun distributor tester that Butch bought from him last night on Ebay.  I will drive down Friday to pick it up.

Phil showed up around 8:30 AM, unloaded his front loader, and got to work on the French drain.  I went out around 10 AM and talked to him briefly.  I then walked through the southwest corner of our property looking for a corner marker.  I did not find one but I did discover some REALLY big trees with REALLY BIG vines woven through them.  The base of the vines was as big as one of the trees, about 30″ in diameter.  I had never seen a vine root that size.

Back at the house I called John Palmer, of Palmer Energy Systems in Florida, to update him on my recent call to Magnum Energy technical support.  He said he would talk to Tom in the next couple of days and try to get me the connector (terminal block) I need.  We agreed I will call him back on Friday.

Next I called A-1 Upholstery in Elkhart, Indiana and talked to Terry.  I ordered a bolster cushion to fill in the space behind the sofa seat cushions and below the sofa back cushions.  It will be 6″ high x 4-3/4″ deep x 78″ long and will be one density of firm foam rather than a firm center layer with softer outer layers on top and bottom (like the seat cushions).  She will use a plain beige fabric as it will not be visible and so it does not have to match the other sofa cushions.  She said it would be ready in early November, which is plenty of time for us to drive down and get it.  The price was $125, which sounded like a fair price to me.

I got out my old Sunpak DX-8R ring flash and connected it to one of my Quantum high voltage battery packs but the battery pack appeared to be dead.  The two battery packs I have are almost unused but have apparently self-discharged and are now dead.  This also happened to my original battery packs.  The only flash equipment I have is set up to run off these packs but I am not inclined to replace them again as I do not use them enough to keep them charged which makes it hard to justify the cost as they are expensive.  Unfortunately that leaves me, for the moment, without any flash capability for the new Sony SLT-A99V DSLT camera.  Buggers.

I sent a TXT message to Joe to let him know that I did not see any indication of axle/hub seal leaks on the inside of the bus wheels.  I then called Bill in Mexico, Indiana and left him a message regarding the antique Sun distributor tester.  I will drive it at least as far as Elkhart, Indiana when I pick up the bolster from A-1 Upholstery and transfer it to Bill if he can meet me there.  There is also the possibility that I will drive it all the way to Bill’s place in Mexico, Indiana and stop by Jarel Beatty’s cabinetry shop in Logansport to have him cut down the connector on the passenger side HVAC duct cover.  If I do I will also pick up the drawings for the desk, sofa, and pull-out pantry as long as I am there.

Phil checks the grade of the new driveway extension.  The laser level is set up by the utility pole.

Phil checks the grade of the new driveway extension. The laser level is set up by the utility pole.

I went back outside and walked through the layout of the driveway extension with Phil.  He then set up his laser level, took elevation measurements at various points, and made an annotated sketch.  He needed to think about the data and figure out what we could actually do given the change in grade from the existing concrete driveway to the road at the third culvert and the need to flatten out before reaching the culvert to tie in with where the barn will (might) eventually go.

Keith, from Kish Lawn Care, showed up around 11 AM to mow the grass.  I got out our leaf blower and let Phil know that I would be occupied for a little while with yard work.  I blew the leaves off of the rear decks, out from under/around various bushes, and off of the two boulder retaining walls into the yard where Keith could mulch them with his riding lawn mower.

About the time I was done blowing leaves Phil had a plan to discuss.  The elevation drops 7-1/2 feet from the concrete driveway (that goes from the street to the garage) to the street at the third culvert some 200 feet away.  Phil thought that our best bet was to slope down from the driveway over a distance of 40 feet, level out for 40 feet, and then gently slope down for 70 feet to the area in front of the future barn location.  That would leave another 50 feet with a slight drop to get to the street.  Some of the area down there will be close to level, however, so another RV could park down there.

We also discussed running power and agreed that I would buy about 40 feet of plastic conduit to get under the level area and headed towards the southwest corner of the garage.  We would need the conduit first thing tomorrow morning so I decided I would go to Lowe’s this evening.

I finally got to work in the bus around 1:30 PM.  I positioned the sofa seat, secured the piano hinge to the stationary backboard with four screws and then drilled all of the other screw holes using my smallest VIX bit.  I installed all of the little screws, dialed back the thermostats, and closed up the bus.  My time-on-task was short but it was a big item to check off of my “list.”

The Sunpak DX-8R ring flash can operate on four AA batteries so I put a set in and connected it to the hot shoe on top of the camera.  The camera was able to trigger the flash (more than once) but the shots were seriously overexposed.  I did not take the time to try and figure out if the flash can be controlled by the camera based on light coming through the lens.  If not it won’t be usable in most situations.

It was a mild day with blue skies and white puffy clouds so I took the new camera outside to capture some images of the work Phil is doing.  I shot a few frames of the more colorful trees in our yard while I was at it.

Linda texted me at 3:40 PM to let me know she was leaving the bakery and stopping at the store on the way home.  Phil continued to find rock, concrete, and brick debris as he dug out the driveway extension.  He used the 30″ toothed bucket on his excavator to sift out the larger pieces and pull them into a pile and then used his front loader to put all of it into his dump truck.  I got a metal tine rake and raked out some of the smaller stuff, not because it needed to be removed but because I needed to do something physical and wanted to smooth it out to get a better idea of how it will look when finished.

Phil started securing his equipment at 5 PM and we were wrapping up our last discussion of the project for the day when Linda got home at 5:30.  After unloading a few groceries she started fixing dinner.  Phil took off and I continued raking for another half hour until dinner was ready.  Linda served the rest of the polenta with puttanesca sauce and steamed sliced parsnips.  I thought we finished the Cupcake Black Forest wine last night but I was pleasantly surprised to find out that we still had enough for our meal this evening.

After dinner I went to The Home Depot looking for a fuel filter for our Cub Cadet lawn tractor.  THD sells Cub Cadet equipment but only had generic fuel filters so I did not buy one.  I went to Lowe’s, where we get a 5% discount on everything we buy! and bought the following:  four 10-foot pieces of 2″ PVC non-conductive conduit, a 90 degree elbow, a coupler, two end caps, 1″ and 1-1/4″ self-drilling screws, an 8′ long pressure treated 4×4′, and a clamp on saw guide.  The saw guide was an impulse purchase but I had a $10 Off card for a total purchase of $50 of more.  We have struggled with makeshift saw guides all summer and fall and I still have more careful cutting to do.  I already have a saw guide but could not find it and should have bought a new one at the beginning of the bus remodeling project.

Phil called the house while I was out so I called him back.  He had figured out that extending the driveway to within 10 feet of the front of the proposed bus barn would add 25% to the cost of the project.  That was more than I was prepared to spend at this time so we will defer that work until we build the barn, probably in summer 2017.  We watched Scorpion and NCIS Los Angeles and then went to bed.

 

2015-10-18 (N) Homage to FLLW  

We got up at 8 AM.  I made Ethiopian Yirgacheffe half-caffe coffee while Linda prepared vegan pancakes.  We had talked yesterday about going to the Howell Farmers Market this morning but did not feel like going out in the early morning chill.  When we finished our coffee I turned the fireplace off and we got dressed to work.

Our focus in the bus today continued to be the built-in sofa.  We decided yesterday to move the plywood seat out from the wall 4-3/4″ from its original position.  The original stationary board on the back side of the piano hinge, which was only 2-3/4″ wide, was designed to place the front edge of the plywood seat (which has a 3/4″ walnut hardwood edge) 3/4″ beyond the cabinetry on both ends of the sofa with an overhang of just a few inches beyond the vertical front support board.  It was a nice design which tied in well with the cabinetry and kept the sofa from intruding into the living room aisle.  It resulted, however, in a seating depth of 16″ which turned out to be too short.  It was my homage to Frank Lloyd Wright: integrated, attractive, cantilevered, and uncomfortable.

As much as I like and admire FLLW’s work, I also like the Bauhaus maxim “form follows function.”  We needed a 3/4″ thick (11/16″ actually) board 7-1/2″ wide by 77-7/8″ long to locate the plywood seat in its new position.  The only wood we had on hand that we could cut this from in one piece was a 24″ X 96″ piece of walnut veneered plywood.  Since the board will not be visible I did not want to waste the walnut veneered plywood for this piece.

We also had a half sheet (4′ X 4′) of good plywood and after thinking about it for a while I decided to make the stationary board in two pieces.  The key was that I would use a third piece, cut from that same 4′ X 4′ sheet, as a splicing plate to join the other two pieces together.  But I was trying to accomplish more than that.  With the original design the pivot line of the piano hinge was over the top of the wiring chase, about 1-3/4″ back from the front edge.  That meant the back edge of the moveable seat board, when closed, was resting on the wiring chase for its entire length.  With the new stationary board the pivot line of the piano hinge is unsupported except for 5-3/4″ on each end.  The third piece of plywood would be at least a partial solution to that problem.

We worked in the garage with the overhead doors closed and the furnace on.  I cut two 7-1/2″ wide pieces off of the 4′ X 4′ sheet of plywood and then cut them to lengths of 38-7/8″ each so they would be just shy of 77-7/8″ when butted together end-to-end.  We took the two pieces to the bus and set them in place on top of the writing chase which sits atop the HVAC duct.  They just fit, which was nice.  I marked the underside along the edge of the wiring chase with a pencil.   We then took the pieces back to the shop.

I found a relatively flat portion of the garage floor and laid the two pieces end-to-end face down.  I set the third piece on top of the first two so that it was of equal length in both directions from the center and was at least 1/4″ forward from the line I had marked.  This third board extended beyond the front edge of the other two boards by at least two inches along its entire length of four feet.  With Linda holding it in place I inserted four self-drilling wood screws, two for each of the main boards, to hold the three pieces in position.

We placed the old 2-3/4″ wide board along the edge of the new boards and marked the locations of all of screw holes for the piano hinge.  I then center punched and drilled countersunk holes for lots of screws being careful to keep them in between the hinge holes.  I ran all of the screws in until the points just protruded from the other side.  I then applied Titebond II wood glue to the two main boards, positioned the third board using the screw tips as alignment guides, and ran all of the screws down pulling the pieces tightly together.  Linda got a paper shop towel wet and I used it to clean off the excess glue that oozed out from between the boards.

We took the new stationary backboard to the bus and set it in place upside down.  I marked the underside along the edge of wiring chase and then we flipped it end-for-end and set it in place right side up.  We pulled it forward so I could mark the locations of the existing screws securing the top of the wiring chase to the two long sides and then slid it back against the wall.  The line served as my guide for where to screw the backboard to the wiring chase.  (The chase has two long “1×2″ sides on edge with a 3/8″ thick plywood top that is about 4-1/2″ wide.  For maximum strength I needed to screw through the backboard into the 1x2s.  I also needed to avoid the space between the 1x2s as that is where all of the AC wiring is run.)

I center tapped a lot of locations and drilled them with a #6 countersink bit even though I was using #8 self-drilling outdoor screws.  The reason for the drilling step was to make sure I did not split any wood.  I screwed the backboard to the wiring chase with lots of 1-1/4″ #8 screws in two rows corresponding to the front and back side boards of the wiring chase.

The backboard pieces had oozed a small amount of additional glue so I used a piece of scrap aluminum sheet metal to scrap it out of the joint.  When the plywood seat is closed the back couple of inches will rest on the third piece of plywood so there cannot be any interference along there.  We set the moveable seat board in place and marked all of the hinge holes on the stationary backboard and then pulled it out gain.  We did not, however, attach the piano hinge to the stationary backboard as I wanted to let the glue cure for at least 24 hours.

By this point it was 1 PM so we stopped to have lunch which consisted of vegan hotdogs with mustard, onions, and relish and both red and green grapes.  We got these grapes at Meijer’s and their produce is usually good, but the green grapes had almost no taste.  Oh well; there will be days (and foods) like that.

After lunch we shifted our attention to the driveway extension project.  I gathered up a box of plastic and wood stakes, a mallet, a 100 foot tape measure, and the site plan for the bus barn and driveway.  It took us about three hours to stake out the location of the pull-through driveway, locate the front corners of the bus barn, and stake out the approach/apron for the barn.  Phil will be back early tomorrow morning and the first thing on the agenda is going over the layout and figuring out elevations for the two planned level pad areas.

At this point Linda went inside to work on dinner while I cleared the margin of the woods along the south side of the driveway extension.  I added bar/chain oil and a 40:1 fuel:oil mixture to the chain saw and got out the compound loppers, pruning saw, pole saw, and safety glasses.  I initially used the loppers to cut down small saplings, cut off small branches, and trim back bushes and vines.  I used the chain saw to cut down slightly larger trees, up to 3” in diameter at the base, and finish cutting out three bushes and some entwined vines.  I then used the pole saw to trim low overhanging branches.  I dragged all of the cuttings to a spot on the west side of the fir trees and used the chain saw to cut the larger trees into smaller pieces.

It was 6:30 PM by the time I was done and had the tools put away.  Dinner was almost ready when I got a call from Butch.  He was following up on how our refrigerator was performing and also needed my assistance with a possible Ebay purchase.  The item he was interested in was in Canton, Michigan about 45 minutes from our house, and the seller was not willing to ship it.  He wanted to know if it would fit in our Honda Element and if so, would I be willing to pick it up if he decided to buy it.  Of course I was willing to help as long as my car was able to handle the item.  While he was on the phone I measured the clearance for the rear hatch and gave him the dimensions.  As soon as we got off the phone he e-mailed me the link to the auction, which still had 85 minutes remaining.

For dinner Linda started with a really nice salad that had slivered almonds and pumpkin seeds and dressed it with Ken’s Sweet Vidalia Onion dressing.  The main course was an amazing soup.  She roasted a golden acorn squash, sweet potatoes, carrots, garlic, and shallots.  She then put these in a pot, added vegetable broth, and heated the mixture.  To finish the dish she used an immersion blender to purée everything into a smooth, thick, hearty, and delicious soup.  After working outside all afternoon on a chilly day it really hit the spot.  We finished the bottle of Cupcake Black Forest red wine we opened yesterday.

After dinner I retrieved Butch’s e-mail, checked out the item, and e-mailed him back.  I then spent a little time reading and replying to posts in various RVillage groups.  I called Butch back just before 8 PM and then turned on the Yaesu FTM-400 to join the SLAARC Info Net at 8 PM.  Unfortunately all I heard was noise.  I have not used the radio for the last few weeks so I don’t know if the net did not take place (unlikely but possible) or if a problem has developed with our system.  If the later, it is most likely the Morgan I.C.E. lightning arrestor (again).  Whatever the reason, I was not going to figure it out this evening.  I went to bed at 9 PM and wrote this post.  It took some time to write but if I do not record the details the same day they slip away quickly.

 

2015/10/17 (S) First Snow

Last night we removed the dining table from the back of my car and put it on the bed in the bus.  We then removed the two rear seats and put them in the garage.  We wanted the back of the Honda Element empty when we got up this morning as we do not usually have time to spare in the morning before driving to South Lyon for breakfast with the South Lyon Area Amateur Radio Club.

It’s always good to see our fellow hams and today was no exception.  We arrived just before 8 AM and stayed for over an hour.  We left around 9:15 and drove to Chuck’s shop in Novi to get the box with the two remaining lower windshields for our bus.  Chuck was already there and helped us load the box into the car.  The box was sized to hold five windshields but only had two in it so it was light enough for us to move by hand.  I knew it would fit in my car as we had measured it on a previous visit and I had checked the dimensions against the car.  We set one end on the tailgate, lifted the other end, and slid it in.  We chatted for a while, and looked at a project Chuck is working in for new front window shades, before heading home.

Phil was not at our house when we got home but he had obviously been there.  All of the concrete, and many of the rocks and boulders, were gone from the driveway extension area so I presumed he had loaded them in his truck and hauled them away.

The Converted Coach Owners (CCO) Halloween Rally was going on this weekend and today was the main day for activities.  We had intended/hoped to go to the rally but the progress on our bus remodeling has slowed over the last couple of weeks for various reasons, all legitimate, and it was not in a condition to travel or be used.  It’s not that things are not getting done; they are, just not as fast as we would like or need them to.  Among other things I have not yet secured the refrigerator and pantry.  We thought about driving over in the car but it was over two hours one way and we needed to spend what time we had available working on the bus and could not justify being gone.  Thanksgiving does not look/feel that far away anymore.  It also seemed ill-advised to be gone while Phil is here digging up the yard.

My main bus focus for today was completing the installation of the built-in sofa.  We had already set the plywood seat board on a blanket on the bus kitchen floor so I had access to the inside of the base/storage box.  I did not need Linda’s assistance for a while so she worked on her counted cross-stitch project.  Before starting on the sofa, however, I took care of a few other minor things.

First I replaced the alkaline batteries in the TempMinder thermometers with Lithium ones.  I then reset the minimum and maximum temperatures for the two remote sensors.  Sensor #1 monitors the freezer and sensor #2 monitors the fresh food compartment of the bus refrigerator.  The directions for the TempMinder suggest using Lithium batteries if the remote sensors will be in cold environments.

Next I got a piece of scrap SurePly underlayment to see how it would fit in the rabbited wood trim on the lower outside wall of the hallway.  I inserted it fully into a corner and marked the edges with a pencil.  It is approximately 3/16″ thick and fit nicely without being too tight.  With a layer of veneer it should be just right.  When I removed it the depth of the rabbits appeared to be 5/16″ to 3/8″.  I think the underlayment will make a nice base for hardwood veneer.  I will cut the panels 1/2″ wider (22-1/2″) and 1/2″ longer (28″) than the 22″ X 27-1/2″ dimensions of the framed opening and allow them to “float” just like a frame and panel door.

My last mini-task was locating the 1/4″ walnut veneered plywood we removed from the old refrigerator and measuring it to see if we had pieces big enough to panel the damaged area on the wall by the co-pilot seat.  I was pleased to find that the remaining pieces are large enough for this application.

By now it was 12:30 PM and my phone reminded me that we had an RVillage Ambassadors webinar/meeting at 1 PM.  Linda heated up some Amy’s Vegetable Bean Soup and made hot lentil loaf sandwiches with ketchup.  Yum.  We got our first snow flurries of the 2015-16 winter season during lunch and they continued off and on through the afternoon.  We moved to Michigan in May 1976.  It snowed on October 15th that year and we had snow on the ground every day until early April 1977.  While that has not held up over the years as a “typical” southeast Michigan winter it was very different from what we grew up with in Missouri and formed our first and most lasting impression of our adopted state.

I retrieved the link for the Go To Meeting from the RVillage website and put it in my web browser.  1 PM came and went with no meeting.  The meeting notice said “Saturday, October 17 at 10 AM PST” but they had clarified that was actually 10 AM PDT, which is 1 PM EDT.  We decided that perhaps they really meant PST, which would be 2 PM our time.  We tried again an hour later, but no meeting ever commenced.

When I finally got to work in the bus on the sofa I removed six screws, three each from two angle brackets, and pulled the entire base assembly out from the wall, giving me complete access to the HVAC duct and wiring chase.  Much of the final installation of the sofa involved this duct.

Powered and manual sheet metal nibblers with the opening Bruce just cut in the OTR HVAC duct and the piece of sheet metal that was removed.

Powered and manual sheet metal nibblers with the opening Bruce just cut in the OTR HVAC duct and the piece of sheet metal that was removed.

The ends of the plywood seat rest on two boxes with open ends that also serve as plenums for air from the OTR HVAC system ducts.  I needed to cut out rectangular openings in the vertical face of the duct to allow air into the back end of these boxes.  I used a 1/2″ drill to create starter holes at the corners of the openings and then used a manual sheet metal nibbler and a drill-powered reciprocating nibbler, both of which I borrowed from Chuck a few weeks ago, to cut out the sheet metal.  The two tools work differently but they both worked well and I was glad I had both of them for this task.  The powered nibbler created a lot of small metal debris so I vacuumed the whole work area very thoroughly when I was done nibbling.

The right (forward) end of the duct also had an extra hole in it where I did not need or want one.  I removed an old sheet metal patch plate and cut a new one to cover the area I needed to close off.  I ended up having to pre-drill holes as I spun the heads off two of my cheap sheet metal screws.  I had a heck of a time getting the shafts out, but I got it done.  This was just one more example of why seemingly simple projects always take longer than they should.

Phil returned while I was working on the sofa and continued trenching in the French drain.  I stopped to chat with him briefly and Linda came out to let me know she was headed to the grocery store.  I then got back to my own tasks and let Phil get back to his.

The left support/plenum box with the circular register hole cut in the face plate.

The left support/plenum box with the circular register hole cut in the face plate.

The open fronts of the two plenum boxes are attached to the inside of the vertical front support, which is 3/4″ walnut veneered plywood.  To get the air out of the boxes and into the coach my design called for brown plastic 4″ round louvered diffusers.  They are considered “four inch” because the two inch long cylindrical pipe on the back will just fit through a 4″ diameter circular hole.  (A 4″ flexible duct, like dryer duct, will also just fit over the pipe.)  The visible part of the diffuser is actually 5-1/2″ in diameter.

The inside width of the plenum boxes is 4-1/4″ by design.  I needed to center a 4″ hole within that space so I had to locate the center point for my 4″ hole saw very accurately side-to-side.  I also wanted the hole centered vertically.  Using my small square I marked the vertical midpoint on the edge of the front plywood at each end.  I then measured in 2-13/16″ from the midpoint mark and used my spring-loaded center punch to mark the center of the hole.   [The 2-13/16″ dimension came from half the inside width, or 2-1/8″, plus the thickness of the plywood used to make the plenums, or 11/16″.]

A close up view of the nylon mesh screen material used to cover the opening in the HVAC duct to keep critters that might get into the duct from getting into the support/plenum box.

A close up view of the nylon mesh screen material used to cover the opening in the HVAC duct to keep critters that might get into the duct from getting into the support/plenum box.

I stood the boxes on their back ends so the front board was horizontal.  I straddled the front board with my legs to hold it and drilled starter holes with a #6 countersink bit.  I then drilled the 4″ holes with a 4″ hole saw using my 1/2″ Craftsman corded drill, being careful to have the pilot bit in the starter holes and drill perpendicular to the face of the plywood.  I have had this drill for 37 years.  It is very powerful and has several ways it can be gripped quite securely.  It is large, heavy, and lacks the convenience of a cordless drill but when I need to use a bit with a 1/2″ shaft and/or need the torque, this is still the drill for the job.  The hole saw created some sawdust so I vacuumed the whole area thoroughly when I was done drilling.

I was just finishing this work when Linda got back from the grocery store.  She put the groceries away and came out to see if I needed any assistance.  I already had the roll of plastic screen in the bus and she got the Gorilla Tape from the garage.  I cut pieces of the screen large enough to cover the two rectangular openings in the HVAC duct and used lengths of Gorilla Tape to secure them.  We then slid the base/storage assembly back into position, pushed it tight to the HVAC duct, and reattached it to the wood wire chase on top of the duct.  The two support boxes and the return air box have foam weather stripping on the back edges to seal against the duct.

We picked the plywood seat up off of the kitchen floor and set it back in place but did not secure it.  We left it out several inches from its original position and got a seat and back cushion from the bedroom.  We experimented with different spacings and finally agreed that we need to have the seat out 4-3/4″ farther than originally designed.  The current hinge board is 11/16″ plywood, 2-3/4″ wide by just under 78″ long.  This board is screwed to the top of the wiring chase and to one side of the 72″ piano hinge.  I will replace it with a piece that is 7-1/2″ wide by the same length.  I will also have to provide some additional support for the seat side of the piano hinge as in the original design had both sides of the hinge resting on top of the wiring chase on top of the HVAC duct.

The Tulip Tree behind our house in its full fall glory.  This is the first photo to be posted in this blog taken with the new Sony a99v DSLT camera.

The Tulip Tree behind our house in its full fall glory. This is the first photo to be posted in this blog taken with the new Sony a99v DSLT camera.

That was the end of the interior bus work for today.  By the time we were done Phil had driven his front-loader onto his flat-bed trailer and secured it so it appeared he was wrapping up for the day.  I chatted with him about the project for 30 minutes before he left.  Earlier in the afternoon I had found my site plan drawings for the bus barn and agreed to stake out the driveway tomorrow so we could review it first thing Monday morning.

Linda had invited Meghan and Chris for brunch tomorrow but it was not a good weekend for them as the Michigan vs Michigan State football game was taking place in Ann Arbor.  Chris manages the Pizza House restaurant, and being away on football Saturday is not an option.  They will come next Sunday (31st) instead.

For dinner Linda made a nice salad of mixed greens with dried cranberries, sliced almonds, and diced onions dressed with raspberry vinaigrette.  The main course was pan-fried polenta with vegan puttanesca sauce.  It held its heat to the last bite and was very satisfying on a cold evening.  I opened a bottle of Cupcake Black Forest red wine.  We have had it before and, although drier than I prefer, it went well with the meal.

After dinner I got my flashlight and checked the bus for axle/hub seal leaks by looking under the bus from the opposite side to see the inside of the wheels.  I did not see anything to suggest a problem on any of the six positions and will text that information to Joe tomorrow for planning purposes as he would require a second day to work on the seals if that was needed.

We spent the last couple of hours of the day in the living room, with the fireplace turned on, reading, writing, and playing games while enjoying some red grapes for dessert.  Linda got a text from her sister-in-law, Mary, with a photo of her and Ron “standing on ‘the’ corner in Winslow, Arizona.”  Ron has been retired for many years but Mary only recently retired and they are on their first extended camping trip in their A-liner trailer and their first trip to the southwest U.S.

We went to bed around 10 PM.  Linda fell asleep quickly while I divided my attention between cooking shows on the Detroit PBS Create channel, a concert by Eric Clapton on PBS, and working on this post.

 

2015/10/16 (F) Desk Installation

We were up at 8 AM, fed the cats, made coffee, and had breakfast.  Phil showed up around 8:30 AM, unloaded his front loader, dropped his flatbed trailer, and left in his dump truck.  I turned on the fireplace and we enjoyed our coffee while iPading until 10:15 AM.

Our first task today was to cut up several large limbs that I pulled out of the woods last evening to get them out of Phil’s way.  I cut them up with the chain saw and then we stacked them on the disposal pile for Phil to haul away.

Phil returned at 10:30 and moved his Caterpillar 305C excavator into the woods across the street by the culvert.  I went down to chat with him briefly to make sure I understood what he was going to work on.  There were a lot of small trees (3″ diameter), saplings, and bushes scattered around the site.  Some of them had been dead for years and some had just been knocked over by Phil.  I decided to work in that area with my chain saw cutting everything up into five foot lengths so Phil could use his front loader to get them into his dump truck.  I worked at this until 11:30 AM and then turned my attention to the bus.  Linda worked on her needlepoint while I cut wood.

Before getting started on construction tasks I took two pieces of filter material and set them on the wire shelf in the freezer compartment of the new refrigerator, one on top of the other.  I then set the two remote thermometer sensors on the filter material.  Butch had suggested the other night that I set the sensor on a sponge to get it off of the floor of the freezer compartment as it was likely responding to the automatic defroster heat strips when they come on.  I figured the filter material would work just as well and that placing the sensors on the shelf would definitely get them away from the floor.

Linda brought out a bag of ice from the house fridge and put it in the bus freezer.  She also filled several 1/2 gallon juice and milk cartons with water, put the caps on, and put them in the fresh food compartment.  The purpose of all of this was to add thermal mass to the compartments to cause the refrigerator to run less often and reduce large swings in temperature.

Inside the bus our first sub-project was installing the desk, which included putting the front passenger side HVAC duct cover in place even though it is not finished.  It took us quite a while to get everything positioned just right.  With Linda holding things in position I screwed the right pedestal to the wall, adjusted the position of the base and screwed the pedestal to the base.  We then repeated that process for the left pedestal and base.

Linda removes the backing from the double-sided tape on the back side of the air grate in the center connector/cover for the desk.

Linda removes the backing from the double-sided tape on the back side of the air grate in the center connector/cover for the desk.

At this point we had several things to do with, and under, the center connector/cover so I removed it and took it into the garage/shop.  We cut a piece of the decorative brass colored metal grate and secured it to the back of the air opening with small screws every few inches.  Next we cut a piece of black plastic mesh to fit over the grate.  We then cut pieces of 3M Extreme Mounting Tape (double-sided) and attached them to the back side of the grate in between the screws.  Linda peeled off the protective layer and we carefully placed the plastic mesh.  Using one of the scrap pieces of the protective layer I rolled the plastic into the take with our wallpaper seam roller.  Finally, we had a piece of filter material already cut to cover this air intake opening so we set that on top of the mesh, pressed it down to take advantage of the tape, and then secured it with Gorilla Tape on all four edges, rolling it with the seam roller to get good bonding.

A detailed view of one of the homebrewed tongue and groove alignment assemblies made from flat mending plates.

A detailed view of one of the homebrewed tongue and groove alignment assemblies made from flat mending plates.

Back in the coach I had to tie in the outlet strip to the 120VAC power feed.  I shut off the breaker for this circuit and checked with my tester to make sure it was not live.  The hot and neutral wires were accessible but the ground wires were back under the left pedestal where they were not easy to reach and manipulate.  It took a while, certainly longer than it should have, but I got the three ground wires tied together with a grounding clamp.  I connected the hot and neutral wires (three each) relatively easily using wire nuts.  I turned the circuit breaker back on and checked that the outlet strip had power between the correct terminals and did have power between any other terminal pairs.

I went to the garage to get a four foot long piece of 1″X1″ aluminum angle that I bought weeks ago to use as a support bracket for the upper rear edge of the center connector/cover.  I was going to cut off a 26″ long piece and then drill countersunk holes but I noticed a piece of 1/2″X1/2″ light gage angle that was about 26″ long and already had holes in it.  It was long enough to span the space between the pedestals and go under each one about an inch.  That was sufficient to position it correctly so Linda held it there while I secured it to the wall with four round (pan) head screws.  I then put the center connector/cover back in place.

Phil has cleared all of the organic debris from the area where the driveway extension and RV pad will be located.

Phil has cleared all of the organic debris from the area where the driveway extension and RV pad will be located.

Phil starts trenching and placing the plastic drain tile tubing for the French drain.

Phil starts trenching and placing the plastic drain tile tubing for the French drain.

 

 

 

 

 

 

 

 

 

 

 

Phil had long since left in his truck to dump all of the wood debris.  We had a light lunch of Amy’s Lentil Vegetable soup and fresh organic grapes.  While we were eating a group of three deer came to our back yard and eventually ended up eating apples that had fallen from our tree onto the ground.  These same deer, along with two others, were here yesterday at twilight and were very frisky.  We saw them later in our neighbor’s yard across the street.

Another view of Phil’s smaller excavator with the 12” bucket being used to trench the French drain in the southwest portion of our property.

Another view of Phil’s smaller excavator with the 12” bucket being used to trench the French drain in the southwest portion of our property.

Phil returned around 3 PM and started working on the French drain.  He replaced the 30″ wide toothed bucket with the 12″ one and started at the high end if the culvert on this side of the road.

The grand finale was the installation of the Corian desktop, which has been sitting on a blanket in the middle of the living area floor since Tuesday.  I drilled countersunk holes through the four corner plates in each desk pedestal from underneath.  I then inserted 1-1/4″ #8 self-drilling outdoor wood screws into each hole, again from underneath, until they just protruded above the corner blocks and then backed them off until the tips were just below the surface.  We set the desktop across the pedestals and pushed it as tight to the back and right end wall as we could.  Linda put her weight on it and I ran the screws home, pulling the top tight to the pedestals.  We reinstalled the four drawers in the right pedestal, finally getting them off the floor in the hallway where they have been since Tuesday.  We stepped back to admire the desk and agreed it was a thing of beauty and a joy to behold.  Linda also marveled, once again, at how much space she now has to work in the kitchen.

A wider shot showing the excavator and drain tile.  The laser level is at the left edge of the frame.  The main arm of the excavator (with the bucket attached) has a laser sensor on it that tells Phil exactly where the lower edge of the bucket is relative to the laser level.

A wider shot showing the excavator and drain tile. The laser level is at the left edge of the frame. The main arm of the excavator (with the bucket attached) has a laser sensor on it that tells Phil exactly where the lower edge of the bucket is relative to the laser level.

The “denouement” was mounting the outlet strip and adding felt pads to the two fake drawer fronts on the left pedestal and then adjusting the magnetic catches.  I originally had the outlet strip (temporarily) mounted to the wall between the two pedestals with two screws a few inches below the cord notch in the center of the back edge of the desktop.  Rather than put it back there I decided to mount it on the underside of the desktop just in front of the cord notch.

The underside location will work just as well as the wall mount location for regular 2- and 3-prong plugs but probably not as well for small AC adapters.  The added pluses of this location, however, are: 1) it will not interfere with cords coming through the notch, 2) it will be up out of the way of the UPS (uninterruptible power supply) that will sit on the shelf at the top of the center connector/cover, and 3) if liquids are accidentally spilled and run over through the notch they will not run into the outlet strip.  Besides, devices with an AC adapter will probably be plugged into the UPS so this was a better overall approach.

Our next task was to adjust the sofa seat until it was deep enough to be comfortable.  We slide the plywood seat out a couple of inches and then got the seat and back cushions (three each) from the house where they have been stored since September 21st.  We put the cushions in place and sat down.  We pulled the cushions out and pulled the seat board out until it was five inches farther out than originally designed and put the cushions back in.

The front edge of the seat cushions were out farther than I liked but we both agreed the sofa was now comfortable to sit on.  The distance from the bottom front edge of the back cushions to the front edge of the seat cushions was originally only 16 inches and that turned out to just be too short.  With the seat board moved out it will now be 21 inches.

In order for the sofa to work correctly, both as a sofa and as a bed, we will need a cushion that is 5″ wide by 6″ high, by ~76″ long to fill in the space behind the seat cushions and below the back cushions.  The height and foam makeup will be such that it is level with the tops of the seat cushions and have the same firmness and feel.  Would that I had designed the sofa for this depth to begin with and had the seat cushions made accordingly, but we were trying to open up the living room by not having the sofa protrude into the aisle any more than absolutely necessary.

Next up was reinstalling the wood trim in hallway.  We have an interesting plan for the lower half of the hallway but in case we do not get it finished before we leave for the winter we wanted the trim off the bed and back on the wall.

The lower outside hallway wall.  There were originally three framed panels of vertical strip mirrors here.  We will replace them with wood panels, probably in a lighter color to contrast with the walnut trim.

The lower outside hallway wall. There were originally three framed panels of vertical strip mirrors here. We will replace them with wood panels, probably in a lighter color to contrast with the walnut trim.

This trim originally framed three panels of vertical strip mirrors.  We were able to remove the mirrors as they were glued to wallpaper.  In the process we discovered that the left and right panels were the same width but the center panel was wider.  The trim consisted of six pieces of wood; a long upper and lower horizontal piece and four vertical pieces.  The six pieces were screwed to the lower half of the outer wall but not attached to each other.  The left and right vertical pieces were tight to adjacent woodwork, but the two intermediate pieces were free to be repositioned.

We reattached the upper horizontal piece first making sure the mounting screws went back in the same holes.  Next we pushed the lower horizontal piece into place but did not screw it to the wall.  We then attached the left and right verticals.  The horizontal distance between the inside edges of the left and right verticals was 75 inches.  The two intermediate verticals were each 4-1/2″ wide so the distance between verticals needed to be 22″ (75 minus 9 = 66 divided by 3 = 22).  We carefully positioned and secured the two intermediate verticals to achieve this spacing.

The trim boards all have rabbited edges on the back side.  I need to measure them carefully, but they are ~3/16″ deep by 3/8″ wide.  Our current plan is to use 3/16″ underlayment or other 3/16″ high quality plywood to make three panels that will fit within these rabbits with a little room to spare.  The panels will either have a hardwood face or we will cover them with a hardwood veneer of a wood that contrasts with the walnut trim.  We can get the veneer from Rockler once we decide what we want.

Linda spread out several towels on the new desktop and we moved tools and supplies from the A-V cabinet, behind the driver’s seat, to the new desk.  I then removed the Corian top of the A-V cabinet and put in on the bed.  We still have a small amount of wallpaper to install in the front of the living room and into the cockpit on the driver side, but it will not be easy to do.

These areas, such as the one behind the A-V cabinet, are small with limited access so most of my sanders cannot be used.  The only one that might work is the Porter-Cable oscillating tool but I did not get it out today.  I got some sanding sponges instead and tried those on the wall under the passenger side window trim next to the co-pilot seat.  When I sanded a dark area about 6″ long by 3″ wide the wood in the center crumbled and I ended up with a hole 3″ long by an inch and a half wide.  I could see one of the stainless steel structural members through the hole.  Given what was obviously water damage I was glad we bought a bus with welded stainless steel as the main structural material.

Based on what I could see, the walls in the bus appear to be 1/2″ plywood although I did not measure the thickness.  This area had obviously gotten very wet over a long period of time and some of the wood has rotted.  It is the only spot we have discovered that is this damaged and we immediately realized that we will not be able to wallpaper this area.  We will probably panel over it, similar to what we plan to do with the veneered panels in the hallway, but today was not the day to figure that out.

It was going on 5 PM and we decided we were done for the day.  I turned off all of the electric heaters, turned on the Aqua-Hot, turned on all three thermostats, and set the temperature to 20 degrees C.  The refrigerator was also indicating much colder freezer temperatures than it had been before I moved/isolated the remote sensors so I reset the freezer and fresh food controls to their “normal” center positions.  Tomorrow we will replace the alkaline batteries with the Lithium batteries we bought specifically for the TempMinder thermometer system, reset the min/max data, and monitor it for a few days.

I walked down to see what Phil was doing.  He was making good progress with the French drain but did not have enough of the plastic drain tile to finish it today.  He plans to work tomorrow and will have the additional tile he needs to finish the drain.  I left him to his work and took photos of the fall colors in our yard as I worked my way back to the house.

I spent an hour at my computer dealing with e-mail and transferring photos from the Sony a100 to my laptop.  Linda called me to dinner at 7 PM.  It was a simple meal of vegan Coney dogs with mustard, onion, and beans served open-faced on a whole wheat hotdog bun.  As a side dish Linda steamed Opo squash.  It was the first time either of us had this particular squash.  It was very mild with a hint of cucumber.  It is available all over the world and widely consumed as it is relatively inexpensive.  It was OK, but I thought it might work better as an ingredient rather than a stand-alone side dish.

I exchanged a couple of text messages with Chuck and confirmed that we would be at his shop tomorrow after breakfast to retrieve our two bus windshields.  The rest of the evening was spent in the living room by the fireplace reading and writing on our iPads before turning in and watching episodes of Rick Steeves’ Europe and Joseph Rezendo’s Travelscope on Detroit PBS (WTVS).

 

2015/10/15 (R) Camera Software Updates

We had breakfast and coffee as usual but Linda had to leave at 9 AM for a 10 o’clock meeting at the bakery.  I had the fireplace on and hot coffee in my cup so I just stayed put in the living room in my warm winter robe.  I was finishing yesterday’s post when I got a call from Joe Cannarozzi looking for Chuck Spera’s phone number.  My N/A/P book is in my phone so after we were done talking I looked it up and texted it back to him.

After wrapping up yesterday’s blog post and starting today’s I spent a little time with the manual for the new Sony a99v DSLT camera and added a BC-VM10 battery charger to my B&H Photo cart.  Around 10:15 AM I made a follow up phone call to John Palmer at Palmer Energy Systems regarding the terminal block for the Magnum Energy Battery Monitor Kit (BMK).  John had not had a chance to talk to anyone from Magnum and indicated that his main contacts were away at a trade show.  He will still try to follow up with them but thought I might do just as well calling them directly.  They are in Washington State but are relocating to Minnesota as a result of being purchased by Sensata Technologies so I deferred the call until later today.  John said their phone and e-mail contact information had not changed yet, but he thought it might eventually as a result of the sale to Sensata and relocation to Minnesota.

There wasn’t much I could do with the desk in the bus without Linda’s help so I gathered up the laundry and started a load.  I then worked in my office for a while.  I was going to off-load photos from both the Sony a100 and Sony a99v but the Play Memories Home software indicated that updates were available and certain features (social media website interaction) required the newest version.  While I do not plan to interact with social media very much, photographically, I might want to at some point.  Besides, I like to have my software as up-to-date as possible.

The version that came on the CD-ROM was 1.03.something and the latest version from Sony’s website was 5.03.something, so my camera body was probably sitting at B&H Photo for quite a while.  The installer was a 15.6 MB download and program was a lot bigger than that.  It took over an hour to download, install, and then re-scan all of the images in the PICTURE folder, even though it just did this on Tuesday.  While I was waiting I got a solicitation from the Michigan VFW and agreed to send them a small donation of $10.

Rather than sit and stare at my computer screen I got the mail and then called Magnum Energy and asked for technical support.  I was caller number six in line to talk to someone so I selected the return call option from their menu and left my name.  Their system had already captured my phone number but had me confirm it.

One of the things I need to do with the new Sony a99v camera is figure out whether my old flash equipment can be used with it.  I found my Sunpak ring flash, my Metz CT-45, and my two Quantum Turbo gel cell battery packs.  The battery packs had their chargers connected so I set them up in the ham shack and plugged them in.

Linda called at 3 PM to let me know she was just leaving the bakery and planned to stop at Meijer’s.  That meant we would not be finishing the desk installation until tomorrow.  At that point I had not yet heard back from Magnum Energy; so much for being number six in line for a call back.

Debris piled where the new driveway extension will go.  Phil’s truck and large excavator in the distance on the road at the discharge end of the culvert.

Debris piled where the new driveway extension will go. Phil’s truck and large excavator in the distance on the road at the discharge end of the culvert.

I was just about to return to my office when Phil Jarrell showed up at 3:10 PM.  I put on my outdoor work shoes and sweatshirt and went out to join him.  We looked at the discharge end of the culvert and agreed on a game plan.  He unloaded his excavator with the 30″ toothed bucket attached, drove it back into the woods well beyond the end of the metal culvert, turned it around, and brought it back towards the culvert.  Phil’s Caterpillar excavator is a powerful machine and he was able to dig the large root loose that was blocking the outlet of the culvert.  He then dug a trench back from there for about 20 feet, clearing out lots of other stuff as he went, and then stopped.

Linda got home at 4 PM after deciding not to stop at Meijer’s after all.  I walked back to the house and suggested she come see what Phil was doing.  She did and then went back inside to do some bakery-related work at her computer.

A closer view of Phil’s truck and excavator.  He can move a lot of dirt, rock, and anything else he wants with this thing.

A closer view of Phil’s truck and excavator. He can move a lot of dirt, rock, and anything else he wants with this thing.

Phil used a shovel to clean out the end of the culvert, which was already filled with mud, so he could determine the elevation of the top and bottom of the discharge end of the culvert.  He then set up his laser level and started taking readings.  The 12″ diameter culvert drops 9 inches from the high end to the low end.  Phil said a 2″ drop would have been sufficient and the 9″ drop is actually a problem.  If it only dropped two inches most of the discharge end would be above grade.  But that is not the situation so we started working our way into the woods checking the elevation as we went.

The excavator positioned in the woods digging the large root out from in front of the discharge end of the culvert under the road.

The excavator positioned in the woods digging the large root out from in front of the discharge end of the culvert under the road.

By sighting down the center of the road in front of our house I determined roughly where the property line was.  Phil determined that if we continued trenching straight out from the culvert to the property line we would be out a total distance of about 50 feet and would be seven inches below the bottom of the inlet side of the culvert.  He also pointed out the soil he had already dug was very sandy and should drain well.  The fact that this whole wooded area had grass growing in it provided further evidence that it drained well.  A high clay soil would have held water and created an inhospitable environment for grass.

It was well past 5 PM and with the cloudy skies the light was fading so Phil did not want to go any farther today.  He also needed to get fuel in his front loader so it was ready to go first thing tomorrow.  He parked the excavator where it was out of the way and locked it before taking off.

 

 

The discharge end of the culvert with tree roots, dirt, and other debris cleared out of the way.

The discharge end of the culvert (dark hole center right) with tree roots, dirt, and other debris cleared out of the way.  The light gray horizonal stripe at the top of the screen is the road.

Linda made a wonderful pasta dish for dinner.  She used a whole wheat linguini and added it to a sauté of EVOO, garlic, onions, mushrooms, sun-dried tomatoes, greens, and Brussels sprouts.  Yup, Brussels sprouts in pasta.  It was a first for me and it was very good.  Earlier in the week she had picked up a couple of bottles of Barefoot Moscato at the store, one white and the other red, so I opened the red.  It was sweet, of course, but we both liked it and thought it went well with the pasta which was all savory ingredients.

After dinner I returned to my office and finally connected the new Sony SLT-A99V camera to my computer and transferred images to my laptop as I had set out to do this morning.  After completing the transfer I formatted both cards, changed the file system to create daily date folders, and set the USB transfer mode to Mass Storage.  I registered the body, vertical grip, batteries, battery charger, and SD memory cards along with the old Sony alpha 100 body and lens (DSLR-A100K) and then created entries in our password program with all of the relevant details.

The packaging for the SD cards indicated that there were two free software programs available to support the cards so I went to the referenced website.  One program was Memory Card Data Recovery and the other was X-Pict Story.  The purpose of the data recovery program is self-evident.  X-Pict Story is used to create slide shows.

Both programs required proof that I had qualifying media in the form of model and serial numbers in order to even download them.  I got the packaging for one of the SDXC UHS-1 memory cards and looked it over very carefully but could find either piece of information.  I took the cards out of the camera but could not see any identifying information on them.  I got my magnifying lens hood and with that extreme magnification I was able to just make out a model number (SF-64UY) on one side and 8-digit serial number on the other.

As long as I was in front of my computer I checked into RVillage and went through a dozen and a half notifications and “liked” or commented on a few.  There was an Ambassadors virtual meeting today 2 PM PDT (5 PM EDT but we were busy.  There is another one on Saturday at 10 AM PDT (1 PM EDT) and we will try to arrange our day so we can participate.

I spent some more time researching harness systems for holding cameras in front of me.  I think the 2-camera harness from Cotton Carriers may be just what I am looking for.  I was having trouble navigating their website using my iPad2 so I will look at their products more closely on the computer tomorrow.  I will also investigate whether I can order their products through Amazon or be better off ordering directly from the company.

Linda stayed up reading past 11:30 PM which is unusual for her.  I finished this post just after midnight but will look it over again in the morning before e-mailing it to myself.  Lights out; big day tomorrow with lots to try and get done.

 

2015/10/07 (W) The Root Cause

We had Linda’s homemade granola for breakfast with fresh blueberries.  Berry season is just about over for the year and they will become more expensive as they have to be transported from farther away.  I made a pot of Sweet Seattle Dreams, the half-caff blend that Jeff makes just for us, and we drank it in the living room.  Linda checked in on the world and pulled up the latest video from NutritionFacts.org while I researched hardwood veneers on Rockler.com.

After breakfast and coffee I called Metro Environmental Services to arrange to have the culvert under the road cleaned out.  They were able to schedule us for this afternoon so I accepted that appointment.  I then called Brighton Honda to check on my car and left a message for Rob, the service advisor who wrote up the repair for the driver side door lock.  I had no sooner left that message than I got a call from Karen at Bratcher Electric.

Mike had worked up the quote to install the 100 Amp disconnect, tie it into the output of the transfer switch, and run a 100 Amp 4-wire service entrance cable to the current sub-panel, making it into a main panel.  They would also disconnect and cap the current sub-panel feed from the basement as part of the work.  At just north of $1,300 it was a good $300 higher than I expected.  My expectation, however, was not based on anything specific other than my own sense of the cost of materials and the amount of labor that might be involved, plus a desire for it to not cost more than $1,000.  🙁

With the phone calls taken care of we worked in the bus for the rest of the morning.  Linda worked on stripping the remnants of wallpaper that remained after we removed the mirrors from the lower outside hallway wall yesterday.  I worked on re-routing the heater hoses for the fan-coil heat exchangers.  She got her job done before I got mine done.  That’s usually the way it is.

To start, I removed one of the old 4″ round plastic grates and used my inspection mirror and a flashlight to examine the inside of the HVAC duct.  What I discovered was that the two heater hoses were secured periodically with plastic cable clamps to the outer wall of the HVAC duct.  I also discovered that the metal part of the duct is just the inner wall and top.  The bottom is the plywood subfloor of the bus and the outer wall is the plywood wall.  As originally built the metal portion of the duct could be removed but when Royale Coach did the conversion they built cabinets around the ducts and put wood wiring chases on top of them in such a way that they can no longer be removed without partially disassembling the coach.

The location of the hoses and wires in the duct was such that I could safely use my 4″ bi-metal hole saw to cut access holes for the hoses.  I determined where the cable clamps were located by measuring inside the duct.  I then marked where the access slots in the bottom back of the bases would be located and determined where I needed the two hoses to emerge from the duct.

The manual sheet metal nibbler used to cut a line between the bottoms of the two holes in the HVAC duct.

The manual sheet metal nibbler used to cut a line between the bottoms of the two holes in the HVAC duct.

There was already a 4″ hole at one of my needed locations so I drilled a second one next to it with an inch in-between.  I used Chuck’s hand powered sheet metal nibbler to connect the holes together to make an opening that looked like the track around a football field.  We vacuumed up the metal chips and I then installed door edge molding all the way around the edge of the opening.  I was able to reach the screws holding the first pair of cable clamps with a #2SR screwdriver and remove them.  This large slot will be behind the left end of the center connecting cover of the desk and the hose for the heat exchanger that goes in the left base will come out of it.

 

Plastic U-channel door edge molding installed around the new heater hose opening.

Plastic U-channel door edge molding installed around the new heater hose opening.

The location of the next pair of cable clamps corresponded, roughly, to where I needed the hose for the right heat exchanger to emerge.  I drilled two 4″ holes, side-by-side, at that location and nibbled out the little bit of metal in-between them to make a second slot.  Again, I installed the door edge molding around the entire edge.  The molding was a tight fit, and I had to use a screwdriver to get it to go on the inner curves, but I got it on.  The U-channel is locked in mechanically and has adhesive in it so it should stay put once it has had a few days in place.  Once the hoses are re-routed I will put screen material, and perhaps some solid plates, over the openings to prevent critters from gaining access to the living area by way of the HVAC PCTS (Prevost Critter Tunnel System).

 

The access holes in the OTR HVAC duct in the area behind where the desk will be installed.

The access holes in the OTR HVAC duct in the area behind where the desk will be installed.

Linda had two medical appointments this afternoon, both routine diagnostic procedures, so she got cleaned up, changed her clothes, and left around 12:30 PM as I was finishing up the second slot.  I went inside and was thinking about making something for lunch when the doorbell rang.  It was our mail carrier, Michelle, with a package that was too big for the mailbox.  A few minutes later the doorbell rang again.  I figured it was Michelle again, but it was one of the guys from Metro Environmental Services.  They were supposed to call first but just showed up.

I put my shoes on and walked them down to the clogged culvert that goes under the road.  I was really hoping they could clean it out from the south side but when we went into the woods we could not see the end of the culvert.  They got a metal detector and located the end of the pipe.  It was almost completely buried and had a massive root running right in front of it from a very large nearby tree.  They got a shovel and dug out around the root, exposing much of it and the end of the pipe.

The tree was probably 30″ in diameter at the base and the root was at least 10″ in diameter.  I got my (new) 18″ chain saw but had trouble getting it started.  It turned out it was out of gasoline.  Once I got it started I tried to cut through the root on either side of the culvert.  I thought I was all the way through on one end (closest to the tree) and most of the way through on the other end, but the root would not budge.  I dulled the teeth on the chain to the point where the saw would no longer cut and did not want to take the time to put a new chain on just to ruin it quickly.  The guys finally agreed to hydrojet the culvert from the north side of the road.

The actual cleaning out of the culvert did not take that long.  The pump produces 2,000 PSI and they used about 300 gallons of water from the onboard tank on their truck.  The head on the end of the hose has one forward facing nozzle and many rear/side facing nozzles.  The forward facing nozzle loosens and cleans out the area directly in front of the head while the other nozzles force the head forward and blast whatever is in the pipe back out towards the entrance.

They started with a small head and ran it in until there was water coming out the other end of the culvert.  They then pulled the hose back and switched to a much larger head and ran that all the way through and back.  When they were done muddy water filled the culvert and the depressions on either end.  On the inlet end the water was only about 3″ deep in the bottom of the culvert but on the outlet end it was near the top.  They billed me for the minimum first hour amount even though I think they were here longer than that.

I called Phil to let him know what we had run into.  He was surprised, to say the least, as he thought he had checked the other end of the culvert.  Obviously not, but that’s water under the road, so to speak.  Besides the problems with the root and the discharge end of the culvert being below the surface, it looked to me like the discharge area was something of a low spot and it was not obvious to me where water would flow from there.  I have learned, however, that I am not very good at judging such things visually.

Cory, our neighbor across the street, had come over to see what was going on.  He offered that the discharge area does, in fact, drain to the south through his property and eventually to Golf Club Road.  Cory has been here for 30 years so I have no reason to doubt the truth of that.  The elevation where Golf Club ends at Hacker and where our street ends at Hacker appears to be about the same.  Our street is fairly level while Golf Club has a little bit of up and down, but it is subtle.  I suggested to Phil that we might have to clear a path into the woods for his small digger and do some trenching to give the water a way out.

While Cory and I were chatting I noticed that the trees along this part of the road were hanging out over the road on both sides and were rather lower than they should be.  This is the very thing I complain about with regards to the way most of our neighbor’s fail to maintain their properties along the road.  I decided I should do something about it so I got our pole saw and spent a couple of hours trimming the low overhanging branches.

Linda went to the Whole Foods Market in West Bloomfield following her medical appointments and got home just as I was finishing up the pruning.  She went for a walk while I called John Palmer of Palmer Energy Systems in Florida.  I bought our Magnum inverter/charger for the bus from John along with various accessories and batteries.  I needed a 4-wire terminal block for our Magnum Battery Monitor Kit (BMK) because I had messed up the one that came with it when I originally installed it.  John confirmed that Magnum Energy had recently been acquired by Sensata, and was in the process of relocating the plant to Minnesota, but that several of the old-timers were still on board.  John needed to talk to Tom anyway and asked me to call him back in a week to see if he was able to get the connector.

I checked with the service department at Brighton Honda again and Rob said he expected to get the new door lock mechanism back from the locksmith tomorrow morning and to have the car ready for me to pick up by the end of the day.  It will be nice to finally have it back.

The cloudy weather finally broke today and we saw some blue sky with brighter light levels than we have had recently.  The day was lovely but a little on the cool side by late afternoon so we both had a cup of hot tea.  Linda took advantage of the light to work on her counted cross-stitch project, a holiday stocking for grand-daughter Madeline, and I went back to the bus to sand off the last traces of the old wallpaper from the outside wall in the hallway.

I used our Porter-Cable 1/4 sheet palm sander with 80, 120, and finally 220 grit sandpaper.  The sander has an integral dust collection bag but it does not capture all of the dust.  I used the vacuum cleaner to pick up as much of the residual dust as I could and then used a tack cloth to wipe down the wall.

For dinner Linda made pan-grilled tofu with caramelized onions in sweet barbecue sauce.  She served it open-faced on rye bread, because that is what we had, and steamed some fresh green beans as a side dish.  Yum.

After dinner I drove to Lowe’s.  I needed something I could use to plug the two heater hoses to keep them from leaking as I pull them back through the HVAC duct and out through the new slots I made for them today.  I ended up buying two 3/4″ barbed plastic plugs.  While I was there I looked to see if they had any bleeder valves but they did not.  They do not sell parts designed specifically for hydronic heating systems and I will have to go to Northwest Plumbing and Supply for such items.

While I was in the plumbing isle I looked to see if I could figure out some combination of parts to make a fill valve for the system but did not see anything that inspired me.  I would love to have one or more high point expansion tanks on this system but I do not have any easily accessible places for them from which I could also run overflow drain lines.  There is a good sized volume of unused space behind the drawers on the passenger side of the bedroom but it would be a very difficult place to install anything.  Perhaps Northwest Plumbing and Supply will have something.

On the way home I stopped at the BP station and topped up the fuel tank in Linda’s car.  I drove home with greater consideration for fuel economy than usual and managed to get the average MPG up to 56.7 before it dropped back to 55.4 as I pulled in the driveway.  It will drop into the upper 40s as soon as Linda starts the engine tomorrow morning but it was fun to get it into the driveway with numbers above 55 MPG.

 

2015/10/06 (T) Trimming & Stripping

We did not get an early start to our day today.  I got up a little after 8 AM and Linda got up 15 minutes later.  Even so, she still had our granola and berries ready before I had the coffee made, but in my defense I had the extra step of transferring the three pounds of coffee we bought yesterday from their paper bags to our metal containers with the air-tight lids.  We were wondering about whether grapes are berries so Linda Googled the topic.  Botanically, grapes are berries but strawberries and raspberries are not.  Also included among the “true” berries are bananas, tomatoes, cucumbers, and eggplants.  That’s right, tomatoes, cucumbers, and eggplants are fruits.

Linda left at 9:30 AM to meet Diane at Kensington Metropark for a 10 AM walk.  Mike from Bratcher Electric showed up at 10:30 to revisit the wiring project I needed his company to do.  They are going to install a 100 Amp disconnect switch next to the transfer switch in the southwest corner of the garage, run power to the disconnect switch from the transfer switch, and then run a 4-wire service entrance cable (SEC) from the disconnect switch through the garage attic to the electrical distribution panel in the closet with the HVAC system for the library.  The electrical panel is currently a 60 A sub-panel of the main distribution panel in the basement and this project will convert it to a 100 A main panel while still allowing it to be powered by the generator if the utility power goes out.

When Mike left I gathered up the two metal cutting tools I borrowed from Chuck, our corded 1/2″ Craftsman drill (which I needed to power one of the nibblers), the small Rigid drill kit, and my telescoping inspection mirror.  My plan was to cut one or two openings in the passenger side HVAC duct for the heater hoses but I decided to do some yard work instead.

We still had some bushes growing out over the drainage ditch by the mailbox and I wanted to get them trimmed up and add the waste material to the timber pile before Phil hauled it away tomorrow (hopefully).  I was still working on this little distraction when Linda got back from her walk so she got a pair of gloves and helped.  The bushes and trees in this area have an extensive system of vines running through them.  I got a lot of the smaller vines cut and pulled free and I managed to trim one bush back enough to create an “entrance” to the inner part of this stand of trees.

Once I was “inside” the grove I found one of the main sources of the vine, a massive thing that looked like something out of a Harry Potter movie.  It was easily 10″ in diameter where it came out of the ground and had 4″ to 6″ pieces branching off in different directions.  I have no idea what kind of vine this but I suspect it is a wild grape vine.  Given its size I surmised that it has been there for a very long time gradually chocking off the trees.  I will have to eventually cut it out, but I would like to find out first just exactly what it is.

Linda helped drag all of the clippings over to the disposal pile where we cut some of them into smaller pieces before adding them to the pile.  We noticed a small tree hanging out into the space above the driveway that Phil is about to build.  We thought the tree was dead and decided to cut it down.  It was 5″ in diameter 6″ above the ground–big enough to require the chain saw–and also had a lot of branches that were large enough to be more expeditiously dispatched with said same machine.

After felling the tree and de-limbing it I was not so sure that it was dead.  We had a half dozen other trees along the northern edge of this stand woods that looked to be similarly dead but I decided not to cut them down.  One in particular had a lot of obviously new, small branches.  We will wait until spring and see which, if any, of these trees develop leaves.  If they are alive I will trim them instead of cutting them down.

We put away the yard tools and took a break to have a light, late lunch of vegan cold cuts sandwiches and black grapes with a glass of beet juice.  I like beets on salads and as a side vegetable.  Beet juice is OK but a bit more of an acquired taste.  We have added it into our daily food plans because of its ability to control blood pressure.  Linda is adding ground flax seed to her granola for the same reason.

Measuring and cutting wallpaper on the dining room table in the house.

Measuring and cutting wallpaper on the dining room table in the house.

At 2 PM we decided to hang the wallpaper in the hallway of the bus so we gathered all of our tools and took them to the coach.  I measured the wall and determined the lengths (30″) and widths of the four pieces; two full width (26.5″) and two partial width (15.5″), one for the left end and one for the right end.  We cut the four pieces on the dining room table in the house where we could unroll over six feet of wallpaper, measure more accurately, and cut more easily.  We cut the two full pieces out of the end of the first double roll and cut the two partial pieces out of the beginning of a new double roll.

Linda took the pieces to the bus and laid them out on the bed.  I was getting ready to pour some GH-95 paste into the tray and roll it onto the wall when I decided to remove the trim board that separates the upper wall from the vertical mirror strips on the lower wall.  My intent was to avoid having to trim the bottom edge of the wallpaper by tucking it behind this board.  What I discovered was that the strip mirrors on the lower portion of the wall were glued to the wallpaper and some of them were loose.

The fact that the mirrors were glued to wallpaper and not to the plywood wall surface meant that they could be removed.  I unscrewed the four vertical pieces of wood trim that framed the mirrors in three panels and then removed the bottom trim piece.  I carefully removed each mirror by prying the underlying wallpaper loose from the wall using a large screwdriver and working from the top down.  When the entire strip was loose I cut the wallpaper to release it.  I handed them to Linda and she stored them carefully inside the built-in sofa.  I managed to get all of them off except one which fractured in several places.  We taped it up and vacuumed up the few glass fragments that were created when it broke.

At this point we were clearly not going to hang the four pieces of wallpaper we just cut as we needed to finish stripping the base layer of the old wallpaper first.  We also had to take a little time to decide how to finish the lower wall.  One option would be to wallpaper the entire wall and not put the wood trim back.  We probably have enough wallpaper to do that, even after cutting the four smaller pieces for the upper wall, but we did not think the wall would look right if we did that.

Another option would be to install wood panels to replace the mirror strips.  In this case we would use a light wood with a natural finish to provide an intentional contrast with all of the walnut trim.  The mirror strips are slightly beveled on their long edges and measure 3/16″ thick at those edges.  That means a 3/16″ hardwood veneered plywood should be a perfect fit, allowing all of the wood trim to go back in place.  Maple or Birch with a natural finish are the most likely choices.

The wood panels is the option we will almost certainly pursue and we do not have to resolve exactly what panels to use in order to finish wallpapering the upper part of the wall.  All told this will push our finish date back a couple of days, but we don’t really have a finish date anyway, and we will like the final result a lot better.  We really do not like the strip mirrors and wish we could remove or cover all of them.

It was only 4:30 PM when we quit working in the bus for the day but we had both had a relatively physical day and were ready to quit.  The lighting in the hallway was also a little dim due to the continuing heavy cloud cover which was having the added effect of lowering our energy level and enthusiasm a bit.

My last couple of e-mails to Lou Petkus of the SKP Photographers BoF had gone unanswered so I called Lou to make sure everything was OK.  It was; he and Val have just been very busy.  We know about busy.  We had a nice chat about cameras and RVing plans for the upcoming winter.

Linda always puts nice dinner meals on the table and tonight was no different.  She halved and cored a white acorn squash and baked it in the oven with a little vegan butter and brown sugar.  She had a few Brussels sprouts left over and some baby carrots so she added onions and sautéed them to make a very good vegetable medley.  Finally, she heated a package of mock chicken in orange sauce.  The trio of dishes was not only tasty but lifted my spirits; not that either of us are down, but the weather has been heavily overcast for several days and had a slightly depressing effect on our moods.

I got a call from Phil after dinner updating me on his availability to work on our driveway and French drain project.  The 2-day job he started yesterday morning is probably going to take him the entire week to finish so there is very little chance we will see him back at work on our project before next Monday.  He did, however, find time to call a company that can hydrojet the culvert under our road and find out their pricing.  He gave me the name and phone number and I will call them tomorrow and try to set something up.  The other upside is that we have more time to pull dead trees out of the woods in front of our house, cut them up, and add them to the disposal pile, if we so choose.

Linda’s favorite TV shows are concentrated on Sunday, Monday, and Tuesday evenings so we watched NCIS and NCISNOLA followed by an episode of LIMITLESS, just to see what it was like.  I watched Two and a Half Men, which I happen to find very amusing, and then went to sleep.

 

2015/10/05 (M) Pondering Wallpaper

I woke up to stay at 7:20 AM, got up shortly thereafter, and got dressed to work.  Today was finally wallpapering day.  I fed the cats and refilled the reservoir on their recirculating water dish.  Linda was still sound asleep, and I suspected that she did not sleep well last night, so I closed the bedroom door while I ground the coffee beans so as not to disturb her.  She is still fighting off a cold and/or allergies and so am I.  I used the last of the Ethiopian Yirgacheffe beans plus a couple of scoops of the Kenya AA.  We are a day or two away from being out of coffee and will have to get some more when we go out this morning to buy wallpaper paste and tools.

Linda got up at 7:40.  Phil had not shown up yet nor called to update us on whether he would be here so we were left to guess that he was on his way to the other last minute job that he said he would probably have to take care of today and tomorrow.  The temperature at 8 AM was 55 degrees F with light fog.  It looked very wet outside but I could not tell if it had rained overnight or if it was just heavy dew.  The high was forecast to be 72, and we have the electric heaters on in the bus, so the walls should be warm enough for us to hang wallpaper today.

We left at 9:30 to go buy wallpaper paste and a few tools at Lowe’s in Howell.  We stopped at Teeko’s on the way and ordered three pounds of coffee beans.  We got one pound each of the following, roasted to order:  1) Sweet Seattle Dreams (1/2 Seattle Blend and 1/2 Sweet Dreams decaf blend); 2) Ethiopian Yirgacheffe half-caff; and 3) 1/2 Sumatra Manhelding with 1/2 Sumatra decaf.  At Lowe’s we bought a gallon jug of Roman GH-95 Wallpaper Paste for Kitchen and Bath.  It is supposed to be more suitable for high moisture environments and since we tend to use the bus with the windows open it can get humid inside.  We also got a smoothing tool, a 24″ paint shield to use for as a trimming guide, a 1/4″ nap 9″ long roller cover, and an inexpensive paint brush.  We stopped at Teeko’s on the way home and Roger had our coffee beans ready for pickup.

Back home I gathered up the tools we already had and took everything to the bus.  I got a scrap of underlayment to use as a small work surface for measuring and cutting off lengths of wallpaper.  We did not have room to set up a work surface in the bus that was big enough to roll out the wallpaper and apply paste to the back side so we decided to apply the paste to the walls using a roller and brush.

Before we got started installing the wallpaper Keith showed up around 10:45 AM to cut the grass.  I wasn’t sure he would come today due to the wet conditions, but he did not think it was wet enough to be a problem.  It’s been two weeks since the last grass cutting and it definitely needed to be mowed, at least in some places.  We also cut up and moved a couple of downed trees so he was finally able to mow the grass where they had been.

I had just finished chatting with Keith when Phil showed up around 11 AM to pick up his small excavator.  He had been at another job since 7 AM.  It was supposed to only involve “moving some stone around” so he only took his front loader to the site.  When he got there he was shown a much more extensive landscaping plan and a job site that included removing tree stumps and other digging operations.  Even with that his plan is to be back at our place on Wednesday.

My first task was to sand the primed walls.  I used the Porter-Cable palm sander, first with 120 grit sandpaper and then with 220 grit.  Linda then wiped down the walls with tack cloth while I put the sander away.  There is not a lot of room to work in the bus so we try to remove tools that we are not using.

We finished gathering our tools and materials, including two big buckets of water (one with mild soap) and spent an hour pondering the wallpaper installation.  Part of the pondering involved measuring the three wall areas that were ready for wallpaper and deciding where we would start and how we would proceed from there.  By the time we were ready to cut and paste wallpaper it was 12:30 PM so we took a break and had a sandwich and grapes for lunch.

When we unrolled the first double roll of wallpaper we noticed periodic faint horizontal “lines.”  These turned out to be slight impressions from the outside edge of the end of the roll which was very tightly wrapped in clear plastic.  We decided to cut four shorter pieces to go behind the desk and behind the sofa just in case the impressions did not smooth out and disappear.  We cut two more short pieces to continue forward under the windows on the passenger side.  We then cut longer pieces for the corner behind the desk and the wall at the kitchen end of the sofa.

The last time we hung wallpaper was 30 years ago.  It was all pre-pasted and required reverse rolling the piece to be hung, immersing it in a water tray to activate the glue, and then slowly pulling it out as it unrolled and drained.  We then slid it into position on the wall, smoothing it out and removing the air bubbles as we went, and finally trimming it.  The wallpapers we used were thinner than the stuff we have for the bus and we created seams by overlapping adjacent panels slightly and cutting through both pieces half way between the overlap.  The free edge pieces were both removed and we had perfect seams.

The wallpaper we bought for the coach is a heavier vinyl that is washable and scrubbable.  We got the paper from Delux Drapery & Shade Co. in Ann Arbor but it did not come with installation instructions other than to follow the adhesive manufacturer’s directions.  The associate at Lowe’s, however, was very helpful and told us specifically not to overlap and trim the seams the way we had years ago.  The appropriate technique for the heavier vinyl wallpapers is to butt the edges together and roll them flat.

You always reach a point in every project where there is nothing left to do but to do it.  We poured some of the paste into a paint tray (with a plastic liner for easier cleanup later).  I started on the passenger side of the bus in the corner behind the desk on the back side of the pantry.  I used the brush to cut in the corners where the wall met the adjacent woodwork and used the roller to fill in the field.  We butted the right edge of the panel into the corner along its full length and then smoothed it towards the left and top as best we could.  The wall curves in as it goes up but I got the top edge tucked and trimmed.  I made a relief cut at the bottom of the window surround on the left which allowed us to finish smoothing the bottom portion of the panel under the window and get the upper panel tucked in, where the wall meets the surround, and trim it.  I then trimmed around the window release mechanism and along the bottom of the panel.

Wallpaper tools in sofa (seat removed) and wallpaper on wall behind the sofa.

Wallpaper tools in sofa (seat removed) and wallpaper on wall behind the sofa.

The vinyl wallpaper did not trim easily even with a new, very sharp, break-off style blade.  It also did not want to stick to the wall and we ended up peeling it back in places and spreading more paste.  We had primed the walls with Zinser 1-2-3, a water-based acrylic primer, so they should not have been very absorbent.  We hung a total of eight pieces, five on the passenger side and three on the driver side, and stopped for the day.  The wall in the hallway was prepped for four additional pieces but we decided to defer those until to tomorrow.  We cleaned up all of the tools and then relaxed for a while in the living room.

Linda prepared dinner while I worked on this post.  I could not figure out from the odor what she was making but it sure smelled good.  It turned out to be a tofu scramble, a vegan interpretation of scrambled eggs, and she served it with toasted raisin bread.  Very tasty and very satisfying.  It’s the one breakfast dish that she makes that does equally well as a dinner meal.

I drove to O’Reilly’s Auto Parts to get some door edge trim/guard and stopped at the Meijer’s supermarket for tissues and laundry supplies.  The door edge trim is a plastic U-channel that I will use to cover the edge of a hole (or holes) I will cut in the passenger side HVAC duct for the Aqua-Hot heater hoses to base through into the desk bases without making any sharp turns.

We felt like being entertained and settled in to watch several TV shows.  In-between two of the shows I made popcorn, a rare treat for us but one we really enjoy.

 

2015/10/03 (S) Wallpaper Stumps

Last night we discussed not going to breakfast this morning and that was sufficient to give us permission to sleep in.  We got up at 7:30 AM, too late to make it to South Lyon by 8, so I made coffee while Linda cooked oatmeal with nuts and dried fruits.

There was a hawk on the ground just behind our house.  It took flight but stayed in the area dancing with a crow.  In spite of seeing it repeatedly–on the ground, perched in a tree, and in flight–we could not identify it other than to be fairly certain it was not a red-tailed hawk.  Red-tailed hawks are the most commonly seen raptor around here but they are very distinctive due to their red tails.

I checked the bus and the temperature was 54 degrees F, too cool for wallpapering.  I had left two electric heaters on last night but obviously did not set the thermostats high enough.  The refrigerator freezer compartment was 24 degrees, which is way too high, and has me concerned that something has broken, perhaps as a result of driving on our very bad roads.  I settled in to enjoy my coffee (as best I could) and await the arrival of Philip Jarrell from Precision Grading.

Phil showed up at 8:35 AM.  The fact that he was probably starting work on our French drain and driveway extension project this morning was the main reason we decided not to go to our weekly ham radio club breakfast.  I left Phil alone long enough to get his equipment unloaded and then went out to chat with him briefly.  He had already communicated with me by phone during the week about what he wanted to accomplish today, and where he needed to start the work, but I always like to be on site when a contractor arrives and double check these things.  That is especially true when they have big equipment that can move a lot of earth in a short time.

Phil was using his smaller backhoe to dig up tree stumps and pull debris out of the woods along the area where the pull-through driveway extension will run.  He also pulled out concrete blocks, pipes, and other building debris that has been thrown there over many years.  I did not, however, have him pull out the two piles of bricks as I presume they are the same as the ones on the house and we might want to keep them for future repairs.

I needed to get the air-ride seat base back to Chuck this morning so I put it in the car and drove to his shop in Novi.  He was just pulling his stacker trailer out of the shop with his forklift when I arrived.  After he finished getting it out and positioning it I gave him the air-ride base and he put it in the trailer through the side door.  We chatted briefly about moving the two remaining windshields, during which time Barbara showed up, so I left them to their chores and headed home.

Back at the house we decided not to try hanging wallpaper today.  The temperature was in the low 50’s and it was drizzling lightly and intermittently.  Not wanting to waste the day we decided to straighten up the temporary workshop we have set up in the garage.  We had just started that when we got a call from our son and he put his daughter on the phone.  Madeline wanted to come visit her grandparents which we were all too happy to oblige.  A return call pinned down the day/time as tomorrow morning.  I helped Linda load the recyclables into her car and she took them to Recycle Livingston.  She stopped at the Meijer’s in Howell on the way home to pick up ingredients for a fruit salad for tomorrow’s visit.

Part of the reason for cleaning up the garage/shop was that when I went to pull out the tub with all of our wallpapering tools I could not find it even though we both remembered recently seeing the tools somewhere.  The more we looked the more it seemed that “recently” was either a long time ago or a product of our collective imaginations.  We still have a lot of stuff in boxes from our move 2-1/2 years ago and we have boxes stored behind boxes in the garage making it difficult to get to many of them.

We worked steadily except for a lunch break and a couple of quick chats with Phil.  Lunch was a half sandwich of hummus and onions on rye with leftover potato salad and collard greens Cole slaw.

Phil was working by the culvert that goes under the road and had dug away the earth in front of it.  I got down and looked in; it was completely clogged.  Phil said he knew a company in Walled Lake that could open it and clean it out using a hydro-jet system and agreed to give them a call on Monday.  He was setting up his laser level to shoot the grade and mark the route for the French drain when I went back inside.We did not get the garage completely cleaned and organized but by mid-afternoon it was a lot better than when we started.  I eventually spotted the dark gray tray that we have used in the distant past for wetting pre-pasted wallpaper.  It was on top of some upper cabinets, not down on a shelf where we had been looking.  Inside were all of our wallpapering tools except for a long edge that we used for guiding the razor knife when trimming corners.  The smoothing tool was falling apart and completely useless so we threw it away.  We will need to pick up a few new tools when we buy the wallpaper paste.

Linda made some hot tea and settled in to work on her counted cross-stitch project while I worked on my iPad.  I eventually went back to the garage to see if I could find my small gasoline powered chain saw.  Fortunately, it was where I remembered last seeing it.  We have a dead tree that needs to be cut down before it also falls across the road and several trees that are already down and need to be cut into small enough pieces so that Phil can use his front loader to move them to his dump truck.

As long as Phil is hauling wood debris off of the site we might as well take advantage of his willingness to take whatever will fit in his truck.  The alternative is for us to haul it to the fire pit with our (currently non-functioning) lawn tractor and burn it.  Unfortunately I could not find the small red plastic gasoline container that I use for gasoline mixed 40:1 with 2-cycle oil for use in small, air-cooled 2-stroke engines such as the chain saw.  I also could not find our Ryobi multipurpose trimmer/saw and figured I had lent all of this to one of our children, probably our son.

Our 13″ McCullough chain saw has not seen regular use over the years but has always been willing to run when needed and proven to be very handy.  It’s a nice size for cutting down small trees and de-limbing larger ones.  In order to use it I needed a small gasoline container.  I would normally go to Lowe’s in Howell but much of the drive is on dirt roads.  It had been drizzling all day and the dirt roads were sloppy so I went to The Home Depot in Brighton.  The entire route is paved except the first/last mile from/to our house.

THD had quarts of pre-mixed gasoline and oil in 40:1 and 50:1 ratios.  Although expensive compared to the cost of gasoline at a filling station, I did not have to buy a new container, a bottle of oil, stop at the filling station on the way home, deal with mixing everything in the correct ratio, add Stabil fuel stabilizer to the container, and then remember what was in the container or label it.  Sometimes the price of convenience is a price worth paying.

When I got home I added the fuel to the tank of the chain saw and set all of the controls according to the starting directions.  I figured it would take a few pulls of the handle, perhaps quite a few, to get it to start but I did not expect the engine to be locked up.  On a couple of tries I got the crank to turn slightly but mostly it would not budge.  I have no idea what is wrong with it but I suspect that something is rusted or bent.  Whatever the case I have no intention of taking the time to try to disassemble it to find out.

Dinner was salad and leftover pizza with a small glass of wine.  I went to Lowe’s after dinner and bought a new chain saw.  Lowe’s sells at least five different brands of chain saws but they feature Husqvarna.  I bought a Poulan Pro 18″ model figuring the longer chain bar would be useful for cutting down and/or cutting up slightly larger trees.  I got it for 1/2 to 2/3 of the comparable Husqvarna models.

Poulan is Husqvarna’s less expensive product line and it seemed good enough for the occasional use it will get.  We have too many trees on our property to be without a functioning chain saw, however, and Phil will be done cleaning and hauling timber at the end of his next day here.  I will probably take the little McCullough somewhere to see if it can be repaired but that may not be until next spring.  Even if I took it someplace on Monday I would not have it back in time, assuming it can even be repaired.

Back home I turned on the natural gas fireplace and we relaxed in the living room reading, writing, and playing games on our iPads.  With the new iOS 9 Apple changed the Game Center so the login screen pops up every time you open any game.  It is REALLY annoying and apparently we are not alone in that view.  Linda was checking online to see if there was a way to disable it and saw a lot of chatter on the subject, none of it positive (but no way to disable the “feature”).  She did find something that said it should stop popping up for any game where you have clicked “Cancel” three times in a row but she has canceled the login more times than that yet is still getting the screen.  Interestingly, the login screen has stopped popping up on my iPad.  The only difference between them is that I used mine the other day while waiting at Discount Tire without any connection to the Internet.  Maybe that confused it.

We turned in just before 10 PM hoping to watch a little television but did not find much on that interested us even on PBS.  We searched through the channels and happened on a program titled “If You Build It” (on one of the three PBS affiliates we can pick up) about project-based learning.  It was interesting.

 

2015/10/02 (F) Tire Nibblers

It dropped into the mid-40s last night and the house cooled off proportionally.  It starts getting light at 7 AM these days and cool mornings are just another reason to stay under the covers a little longer.  I finally got up at 7:30 AM, got dressed to work, and made our morning coffee.  After our breakfast of fresh mixed berries and homemade granola I turned on the fireplace and we enjoyed our coffee to its dancing light and warmth.

Chuck called to let me know he had set out one of his sheet metal nibblers for me to pick up at the shop.  I left around 10:30 AM and drove Linda’s Honda Civic to Discount Tire in Howell.  (My Honda Element is tied up at Brighton Honda until the middle of next week to get a broken driver-side door lock replaced.)  I noticed last night while we were out that several tires on the Civic were under-inflated and the sidewalls were badly weather-checked.  They still had plenty of tread but the paperwork indicated they were put on five years and 80,000 miles ago.  Time for a change.

At Discount Tire the sales associate confirmed that the date code was from 2009 and corroborated my observations.  The tread was probably good for another 20,000 miles but I do not mess around with old tires with cracked sidewalls.  Michelin no longer makes the Defender, at least not in the P195/65R15 size, so I bought a set of four Continentals that should perform equally well and last for 90,000 miles.  That means they will age out before the wear out, which is fine with me.  It was going to be a two hour turnaround time so I texted Linda and Chuck and settled in to wait.  Thank goodness for iPad games.

The technician pulled the car in at noon and a few minutes later asked me if I had the key for the wheel locks.  I had looked for it earlier and not found it.  He wasn’t sure he could get them off at all and would certainly ruin them in the attempt.  That sounded like a bad situation getting worse so I had them set the tires aside while I took the car to Brighton Honda and had them remove the special lug nut from each wheel using their master key set.  I bought a new set at the Honda dealership (so any Honda dealer can remove them in the future) and had them put those on and made sure I had the key when I left.

While I was there Rob gave me a quote on four Continental tires.  The installed price, including a rebate in the form of a Visa gift card, was 30% lower than the price I paid at Discount Tire so I showed the quote to the guy at the counter when I got back.  He said the quote was for a different, less expensive, discontinued tire.  I had no way of knowing if that was true or not but he also asked if the guy who wrote me up gave me the rebate form for the tires I bought.  I said ‘no’ so this guy printed out an extra receipt and gave it to me with the rebate form.  That narrowed the price difference to 20% and I was satisfied with that.  I liked the tires I had purchased and did not want to undo and then redo the sale.  I have also had good experiences over the years with Discount Tire, including their nationwide free rotation and balancing policy.

When the tires were finally mounted, balanced, and installed I headed for Chuck’s shop in Novi.  He was there when I arrived and had three different metal cutting tools laid out to show me.  One was manual, one was electric, and one was powered by a drill.  We decided that the manual one and the drill powered one were most likely to work for what I needed to do.  He put them in a cardboard box along with cans of three different chemicals he was getting rid of.  His trash, my treasurers.

On the way back to the house I stopped at the Shell station at Beck and Grand River Avenue to top up the fuel tank.  I texted Linda and then headed for home.  I arrived home at 3 PM to find lunch on the table.  That was a nice surprise.

After lunch we uninstalled the desk in the bus and set the pedestals on part of a large blanket in the center of the kitchen floor.  We draped the blanket over them and then uninstalled the hinged sofa seat and set it across the pedestals.  We folded the blanket back over the seat and set the desk bases on top of it.  We now had clear access to the wall behind the desk and the wall behind the sofa.

I got a 3″ brush from the basement and then got the Zinzer 123 Primer, opened it, and stirred it.  It was still in good shape as it has been in the library since last fall when we repaired and repainted the west wall after Darryl was done installing the new HVAC system.  Rather than pour it into another container I found a lid from a copy paper box to put it under the one gallon can.  Linda finished masking off the woodwork and counters in the bus and then helped me spread painter’s plastic to protect the floor.  We spread out an old bathroom towel, put the box lid on that, and then put the can inside the (upside down) box lid.  I set the can lid aside and worked directly out of the can.

I started in the back of the hallway and primed the upper half of the outside wall as I worked towards the front.  The lower half of this wall has vertical mirror tile wainscoting.  We wanted to remove it but assumed the pieces were glued directly to the plywood wall, as they are elsewhere in the coach, in which case removing them would have done a lot of damage.  We repositioned the plastic, towel, and paint and I continued up the passenger side priming the plywood next to and (mostly) under the windows.  Completing that side up to the cockpit required one more repositioning of all the stuff.  I was working in close proximity to the new living room captain’s chairs so we wrapped those in painter’s plastic as well.

Bruce primes the bare plywood behind the sofa and under the driver side living room window.

Bruce primes the bare plywood behind the sofa and under the driver side living room window.

I moved to the driver’s side and primed the area under the window and up the left side.  Even though Linda had masked off all of the woodwork with painter’s tape I worked carefully and stayed away from the tape.  We are not sure that the priming is even necessary and I did not want to risk getting any on the woodwork.

By the time we finished it was 5:30 PM and we were done working on the bus for the day.  We had only worked for a couple of hours, and only accomplished a small task, but it was a critical path task that stood in the way of getting a whole chain of other important things done.  Tomorrow we will sand the primer with 220 grit paper using the palm sander and try hanging the new wallpaper.

Linda made a pizza for dinner using the gluten-free almond meal recipe she got from Mara.  She topped it with greens, onions, mushrooms, sun-dried tomatoes, and Daiya non-dairy cheese.  There is also cheese in the crust along with garlic and other good things.  We had a nice salad first with walnuts, beets, and sun-dried tomato vinaigrette.  The salad was very good and the pizza was outstanding.

Philip Jarrell called to let us know he would be here at 8 AM tomorrow to start our French drain and driveway project, weather permitting.  Detroit Public Television shows classic movies at 8 PM on Fridays and tonight’s selection was “Bullit” starring Steve McQueen and Jacqueline Bisset.  We watched This Old House and a couple of travel shows after that and then went to sleep.

 

2015/10/01 (R) New Month, Same Project

For various reasons we have not worked on the bus the last two days.  For one, Linda is still recovering from a cold and/or seasonal allergies that may have been triggered by some weeding she did over the weekend.  August and September are the time of year for ragweed in Michigan.  For another, I was tied up most of Tuesday with the bus windshield replacement and yesterday we both had our annual physical exams, mine in the morning and Linda’s in the afternoon.  Throw in an unexpected problem with the driver door lock on my car and a lawn tractor that wouldn’t start and that took care of most of the day.  Since I wasn’t working on the bus I used some of my time to edit drafts of blog posts and started selecting and processing a few photos to go with them.

I got a call from Philip Jarrell around 8 PM last night letting me know that a last minute project came up that required his attention today.  If all goes well he plans to start on our French drain and driveway extension project tomorrow.  Our project is a relatively small job for Phil and I accept that he has to fit it in around larger projects for long-term customers who give him a lot of repeat business.  Still, I think he likes working with us and does his best to fit us in.

I had hoped to get back to work on the bus today, specifically working on priming the walls and hanging the new wallpaper, but Linda had another annual medical appointment this afternoon.  Neither of us likes to get into our work clothes and get involved in physical tasks for just a small portion of the day so after breakfast, and a leisurely morning in the living room enjoying coffee to the glow and warmth of our fireplace, she settled in to work at her desk for a while before going on a walk.

Our whole house generator threw a code 34 on Tuesday afternoon indicating that it required maintenance but would still operate if needed.  I called Bratcher Electric to see what was needed and spoke with Karen.  I think she and Mike own the business, but it’s possible she is Mike’s daughter.  Whichever, I’m certain that she is family.  Our generator was last serviced one year ago on the same date (29th) and the 34 was the total number of hours it has run since being installed in May 2013.  I set up the service appointment for Friday October 9th.

While I had Karen on the phone I asked about the project Mike had come out to look at a year ago.  I need his electricians to run a 4-wire, 100 Amp service entrance cable (SEC) from the transfer switch in the southwest corner of the garage, through the garage attic, and into the secondary distribution panel in the HVAC closet in the northeast corner of the garage, making it a main panel instead of subpanel.  Karen said she would leave a note for Mike to follow up with me.

It was going on noon when I finally got back to work on the bus.  It is a gorgeous fall day, chilly and breezy but with abundant sunshine, and I just could not let it slip away without getting something done on our interior remodeling project.  I was at least 60% done with rebuilding the landing where the stepwell slide cover used to be and that seemed like the logical thing to get finished.  It was 52 degrees F in the bus so I turned on the front electric toe-kick heater and set up the small Broan portable electric heater in the kitchen blowing forward towards the cockpit.  I also noticed that the refrigerator thermometer indicated 43.5 degrees F.  We do not have any food in the fridge but we do have freezer packs and containers of water for mass.  43.5 is warmer than I want so I checked the freezer reading and it was 28 degrees F.  Yikes!  That was way too warm.

Frame and center support for the new landing platform. Air lines crimped and secured.

Frame and center support for the new landing platform. Air lines crimped and secured.

The 31″ X 27.5″ piece of 3/4″ thick plywood for the landing platform flexed slightly when I stepped in the middle.  I’m not sure anyone would notice it when stepping on it but we do not want the tile that will be on there to crack from the deflection.  My solution was to cut an appropriate length of the 2.5″ wide 3/4″ thick poplar and install it on edge running long ways to support the middle of the plywood.  I had to use an angle bracket at the back edge (by the driver’s seat) and place shins under it at several places to get it to fit just right.

About this time Linda came out to let me know lunch was ready.  We each had a half sandwich of hummus and raw onion on rye bread and some black grapes.  She left for her doctor’s appointment and I made a big cup of Constant Comment decaffeinated tea.  I called Chuck to see if he knew where his powered metal shears (nibbler) were and if I could borrow it.  The answers were ‘yes’ and ‘yes.’  I decided to take his suggestion of cutting two new access openings in the passenger side HVAC duct to allow the two existing heater hoses to come out and go directly to the fan-coil heat exchangers with minimal bending.  It will simplify the installation, eliminate soldered copper parts and connections that would restrict flow and be a potential leakage point.  Since my car is in the shop for the next several days I will have meet up with him when Linda’s car is available.

Back in the bus I checked the refrigerator and the fresh food compartment was at 39 degrees F and the freezer was At 6 degrees F.  Those are the sort of temperatures I expect to see.  I had the freezer set to cycle between about 0 and 10 but occasionally saw it go as high as 17.  I figured it had something to do with an automatic defrost cycle, but anything over 20 is troubling.  Linda had suggested earlier that perhaps we need to replace the batteries in the remote sensors and the base unit.  She may well be right and it won’t hurt to do that anyway.

When I got back to work on the landing I folded over the ends of the two air lines and put cable ties on them to close them off.  The air supply for the solenoid valve that controls these two lines has a shut off valve which I intend to keep closed, but if it gets opened accidentally it could drain the auxiliary air tank through one or the other line if they were not crimped closed.  I may eventually disconnect the supply line at the valve and cap it, but for now this will at least prevent an open line leak.

New landing platform structure with sound/thermal insulation.

New landing platform structure with sound/thermal insulation.

After screwing down and cutting off the shims I plugged the hole where the air lines come through the floor with steel wool and secured the lines to the floor with cable clamps.  I then cut fiberglass insulation to fit the two spaces in the floor.  I used the same John’s Manville Sound & Thermal insulation that we used in my office and ham shack as I had some left.  I put the plywood floor piece in place, evened it up along the front edge, and screwed it down but ran out of screws before I had it completely secured.  Projects are like that.

I was walking towards the garage when I saw a car coming very slowly from west of our house headed east.  The drive pulled past our third drive and stopped but I could not see what the driver was doing.  The car eventually continued on, followed closely by a second vehicle and I thought the flashed me a somewhat dirty look, but they did not stop and were too far away to be sue.  Still, I thought that was odd.  I did not give any further thought to it until I went out to get the mail and noticed a lot of debris in the road and a large, dead tree in the ditch.  It had been windy all morning and at one point I thought I heard the crack of a falling tree but it sounded farther away than where this one lay.  The driver had obviously stopped to move it and was probably a little bit annoyed that they had to do that because I had not taken care of it.  Hey, I didn’t know!

I moved it a little more and then got a metal toothed rake and pulled all of the small debris out of the road.  There were limbs on the other side of the road that were 1″ to 2″ in diameter so the tree had obviously fallen all the way across the road.  The property on the other side of the road is part of our yard but I would have cleaned up the branches regardless since the tree clearly fell from our yard.

Linda stopped for groceries on the way back from her doctor appointment and did not get home until almost 4 PM.  We got a pruning saw and cutter and she helped me cut up some of the upper part of the tree and get the pieces farther from the road.  We noticed another dead tree in the same area that looked like it would eventually fall over across the road.  I can cut it down safely but will need the chain saw to do so.  I was not in the humor to get it out and try to get it started at that exact moment but noted to myself that I needed to do this sooner rather than later.

We were not going to start any messy bus work at that hour so I changed into nicer clothes to go out to dinner.  Before we left I texted Josh at Coach Supply Direct to clarify an earlier e-mail and let him know that two of the MCD shades were not staying attached to one of their clips.  We left at 5 PM for the La Marsa in Brighton and stopped at the bank on the way.  For dinner we split an order of Moussaka and got two salads as our sides along with the warm pocket bread and garlic spread.  The food was good and we had a tasty, filling meal for under $14 plus tip.  It is our best/favorite restaurant option within reasonable driving distance of our house.

After dinner we stopped at The Home Depot in Brighton but they did not have the screws I wanted.  When we came back out I noticed that the tires on Linda’s car were under-inflated and on closer inspection that the side walls were badly checked.  We drove to Discount Tire in Howell but they were closed.  We stopped at Lowe’s and bought the screws I needed, some furnace filter material, and Lithium batteries (AA and AAA) for our TempMinder base/remote thermometers as we keep the two remotes in the bus freezer and fresh food compartment and the base station on the bus kitchen counter.

Back at the house I worked in my office for a while selecting/processing photos to go with blog posts but I did not feel like putting in a long, sustained effort on the task.  I got a call from Phil at Precision Grading.  His other job did not get finished today and he will have to return to that job site tomorrow.  He hopes to start our French drain and driveway work on Monday but that may not happen.  I am anxious for him to get started but I have no control over that.  I appreciate, however, that he keeps me informed as it allows me to plan my own time.

We watched The Woodwright’s Shop, Rick Steves’ Europe, and Travel in the Americas on DPTV (WTVS) and then went to sleep.

 

2015/09/28 (M) Connected

I was up at 8 AM, got dressed to work, gathered up the laundry, and started a load in the washer.  I was getting ready to grind the beans for our morning coffee when Linda got up.  She did not look at all well, having come down with what appeared to be a bad cold late last night.  But she’s a trooper and washed our breakfast berries, as she does most mornings, and got our granola ready.

Bus work notwithstanding my first task this morning was to figure out what had gone wrong with the thermostat in the main floor hallway of the house.  This is our “main” thermostat; it controls the heat to the living room, entry foyer, hallway, and kitchen/dining room.  It also controls the air-conditioning for the entire main floor of the house.  There is no air supply or return from the basement and the library has its own HVAC system.

I used my VOM to check the voltage at the secondary of the transformer on the furnace, at the input to each of the five motorized valves, and the voltage coming out and going to the five thermostats (four for space heating zones and one for domestic hot water).  Everything looked OK.  I pulled the main thermostat off of the base to check the wiring there.  I also got out the installation manual to make sure I knew what I was checking.

The wiring of the base plate matched the diagram for a 1H/1C-2T system, i.e., one heating system, one cooling system, and TWO transformers.  The manual was also very clear that the common wire had to come from the cooling system transformer.  The voltage from Rc to C was just under 15 volts when I expected it to be ~26V.  All of this pointed towards the air-handler.  I shut off the circuit breaker for the air-handler and reset it but that did not fix anything.  The evidence was confirming my suspicion that something happened while Rebecca was in the attic on Friday.  That meant I was going to have to go in the attic to figure out what it was.

Getting into the attic meant I had to empty the hall coat closet of all of its hanging contents and most of the stuff sitting on the floor and remove the wooden hanging rod, which fortunately lifts up and out easily.  I then had to lean a 6-foot step ladder against the back wall, climb up, and unscrew the 1/2″ piece of foam insulation that we use as a temporary cover until I can fabricate something more permanent (hopefully something that involves a self-storing ladder and hinged, spring-loaded door).

With the cover removed I was able to get my waist to about ceiling height, set my flashlight where I could reach it, and hoist myself up into the attic.  I do not have any permanent/switched lighting in the attic, but I plan to install some at some point.  What I should do is install a hatch in the hallway so I do not have to empty the closet to get into the attic, but that probably won’t happen.  I did this in our previous house and it made working in the attic much more convenient.  Flashlight in hand I crawled the 15+ feet over to the air-handler on plywood set across the roof trusses on a slope.  I was reminded than another attic project will be to rig up a walkway (crawlway) that is level and does not compress the insulation.  The insulation in this attic is a mess and needs to be straightened out, so that is another project for our “to do” list.  But I digress.

When I got to the air-handler I saw a surface mounted switch box on top of the unit partially obscured by one of the flexible ducts.  The switch was in the “Off” position so I flipped it to the “On” position.  I did not see a transformer so I presumed it was inside the enclosure.  I also presumed that Rebecca had either accidental moved the switch while checking/measuring the unit or had turned it off as a safety precaution and forgot to turn it back on.  It did not really matter as the result was the same either way.

I worked my way back to the hatch in the closet ceiling, lowered myself down onto the top of the step ladder, and climbed down.  The thermostat, which is on the wall across from the closet, now had information showing on the display.  The upside to all if this was that I now knew something about our HVAC system and Wi-Fi thermostat that I did not previously know, so at least I learned something in the process.

This thermostat is 7-day programmable model so I set the day and time and then went through the programmed values but could only access the settings for the cooling mode.  I activated the setup menu and walked through all of the settings, changing only one that had nothing to do with the programming.  I finally got out the user manual and saw that I had to select a mode in order to program its schedule.  I manually set temperatures for heating and cooling that would not cause those systems to come on and then programmed the times and temperature set points, four per day for each mode, for all seven days.

Keith showed up late morning while I was working.  We agreed to let the grass go for another week.  It has been dry and a little warm during the day for the last week and the grass has not grown much.  There is, however, a real possibility of rain latter today and into tomorrow.  Also, Phil is supposed to start tomorrow on the French drain and driveway work and with a little luck in the weather department may be done by next Monday.

With the thermostat issue resolved I turned my attention to the bus.  I thought about priming the walls but decided against it.  I would need to move the desk pedestals and bases, unscrew the sofa seat platform and move it on top of the pedestals, and then mask everything with painter’s plastic.  All of that was work that was much more easily and quickly accomplished with two people and Linda was sound asleep taking a nap that she obviously needed.

The other reason for not getting into the priming was that I have to take the bus to Chuck’s shop in Novi tomorrow morning to have the two lower windshields replaced.  That meant the bus had to be ready to move before the end of today and there were two things I had to do in that regard.  One was to reattach the desk pedestals to their bases and to the wall.  The other was to connect the loose ends of the two Aqua-Hot heater hoses together.  It had only just occurred to me that once I start the main engine the Aqua-Hot will heat up and the coolant will expand.  If these hoses are not connected the supply line will have coolant coming out of it and the return line will suck air into the system, neither of which would be good things.

I took care of the desk first.  I reattached each pedestal to its corresponding base using the existing screw holes.  I set the two assemblies in place with the connecting cover and then reattached each pedestal to the wall using the existing screw hole.  I thought about trimming down the temporary plywood top and reinstalling it but decided there was no point in doing that.  I cleaned up the rest of the interior making sure there were no loose items on counters or elsewhere that could fly around while the coach was moving.

The two bleeder valves were still clamped inside an old piece of heater hose that originally connected the two front heat-exchangers together with short stubs of hose on the other ends.  Working in the garage on our temporary workbench I unclamped and removed the hoses.  One of the valves was very badly corroded on one end and was not reusable.  The other one needed to be cleaned up but appeared to otherwise be serviceable.  Some of the inside of the hose was stuck to the metal of one of the pipe ends and was surprisingly difficult to remove.

I washed my hands, which were filthy, checked my e-mail, sent a message to Bill Gerrie, replied to an e-mail from Butch, took the dried laundry upstairs, folded it, and put it away.  Linda woke up while I was finishing the laundry and heated up some Amy’s mock chicken noodle soup for our lunch, which we had with sourdough pretzel nibblers and roasted red pepper hummus.  It was 2:30 PM by the time we finished lunch.  I called Josh Leach at Coach Supply Direct to see if he had followed up with Ferman Miller at Countertops Plus regarding our Corian tabletop.  I got his voice mail and left a message.  It felt like the day was slipping away and I had not done much but I had, in fact, accomplished quite a bit and all of it was stuff that needed doing.

I worked on this post for an hour and then completed the task of connecting the two heater hoses together.  I cut the ends of the old hoses off so I had clean material and square ends.  I slipped two band clamps over each hose and pushed them over the pipe ends of the bleeder valve.  They were very difficult to get on but I got them on far enough to put two clamps on each connection.  I did not turn the Aqua-Hot on as I would rather not refill these hoses with antifreeze at this time but I did start the main engine to air up the chassis and then let it run for 30 minutes to get it up to temperature.  It did not have any noticeable effect on the coolant in the Aqua-Hot in that short amount of time.

While the engine was running I closed the roof vents and made one last check that the interior was secure.  Once I shut the engine off I closed the various air valves, disconnected the batteries, locked up the coach, and was done working on/with the bus for the day.  I changed out of my work clothes and went to my office to edit blog posts from early August and get them ready to upload.

Linda called me up to dinner at 7 PM.  We had vegan cheeseburgers with leftover vegan potato salad and collard greens Cole slaw (inherently vegan).  It was yummy.  I went back to my office to edit more posts but got involved in e-mails from/to Bill Gerrie and Gary Hatt.  Gary sent me the BCM logo he is using for business cards and I spent over an hour trying to use Microsoft Publisher, and then Word, to layout a BCM business card that says “Freelance Author/Photographer.”  I did not care for the result and really want a card with the cover of the February 2013 issue as a full card photo.  The cover of that issue is our bus.

I came upstairs a little after 10 PM and watched the end of NCIS Los Angeles with Linda.  She did some online research and concluded that she did not have a cold but is suffering from an allergic reaction to something.  She went straight to sleep while I played a few games on my iPad before turning out the lights.

 

2015/09/25 (F) Miss Dig

I turned the lights out at 11 PM last night and slept until 8:15 AM this morning.  I was preparing coffee when Linda told me there were wild turkeys in the back yard.  They were gathered at the deer feed block and more showed up while we were watching.  There were 15 in all, and they were big.  We had our usual granola for breakfast with fresh blueberries, strawberries, and bananas.  We finished our morning routine and coffee at 10 AM and got back to work on the bus.

Linda continued working on removing the old wallpaper while I worked on the entry and cockpit.  She used a drywall sanding sponge to try and remove the last little bit of material from the walls she stripped yesterday and it worked rather well but not 100%.  I was able to remove the step well cover assembly yesterday and today I removed the last step before reaching the main floor.  It did not come out easily; the three screws securing it to two adjacent walls were badly rusted and the Philips heads would not hold the screwdriver bit.  I ended up prying them loose, and inelegant (brute force) but effective solution.  I am going to rebuild this step with a slightly deeper run and an open front so we can store shoes under it.  First, however, I have to tile the floor.

I spent some time examining the old tile in the driver’s part of the cockpit.  It clearly goes under the accelerator pedal but around the brake pedal.  That’s reasonable as the accelerator is electrical, with only a cable that goes through a small hole in the floor, while the brake is pneumatic and the major part of it is in the bay below the floor with all of the air lines connected to it.  I came to the conclusion that the tile was also installed under the seat base, which means Creative Mobile Interiors removed the base to install the tile.  I did not come to a final decision regarding removing the tile versus tiling over it, but I am leaning towards removing it.

I was also able to determine that the retaining nut on the swivel bases for the pilot and copilot seats was 15/16″ and accessible from the rear with the seats moved forward.  That means I can remove the seat, 6-way power base, and swivel plate as one assembly by removing one nut.  I will then have excellent access to the pedestal mounting bolts and the driver’s area once everything else is out of the way.

Rebecca from Shutz HVAC called at 10:30 AM and arrived about 15 minutes later.  Shutz is the HVAC installation contractor for the Lowe’s in Howell and she was here to look at our main air-conditioning system and give us a quote on a new Trane system as that is what Lowe’s sells.  Lowe’s had a Pro Show on Wednesday and Rebecca was staffing the Shutz table so we stopped to chat.  She let us know that everything at Lowe’s was on sale through tomorrow at closing for 10% off with our Lowe’s credit card, including installation labor.  The card is automatically good for 5% off on any product purchase so the extra 5% is not enough of an incentive to cause us to make the purchase, but we were curious what a new system might cost.  I will get a quote from Darryl at DCM, however, before making any decisions.  Also, our friend Mike (W8XH) recently had an A-C system installed and was very happy with the company, product, and installation so I will find out who he used and get a quote from them too.

Rebecca was very nice and very knowledgable.  After looking at the condenser/compressor outside I got a step ladder and she went up in the attic to look at the old air-handler/evaporator.  The system is a Coleman and we have no idea how old it is; we just know that it did not do a good job of cooling the house this summer.  The quote was for a “3 ton” system for $7,800.  With 10% off it came to $7,020 but that price was based on flushing, testing, and reusing the existing refrigerant lines, which did not sound like a good idea to me.

Charles from USIC (Miss Dig) showed up around 11:30 AM to mark the utilities.  Phil plans to start digging and grading next week, hopefully Tuesday.  Charles came to the front door and I excused myself from the air-conditioning conversation to walk the property with him.  I explained what we were having done and showed him where the work would take place.  He marked the main gas line along the entire length of our property, a portion of the branch line going to our meter, the tie in for the branch line to the house across the street, and the T at the northwest corner of our property where the main line splits to service the court.  He also marked the phone line, which runs underground from a pole west of our house to the southwest corner of our garage.  The main electrical service runs underground with the phone line but someone else has to come out and mark that.  I chatted with Charles briefly before he left and then called Phil and left him a message.

Last summer Darryl from DCM Heating and Cooling installed a new natural gas furnace with an air conditioner for our library, a natural gas heater in our garage, ran all of the black iron pipe, including 160 feet of 2″ line, hooked us up to the gas meter, and got everything working for just under $11,000.  The Trane system would be bigger than the one for the library, and the air-handler in the attic is a more difficult installation, but $7,800 for just the air-conditioner without new refrigerant lines seemed a bit high.  After Rebecca left I called and left a message for Darryl.

Linda was ready to strip the wallpaper behind the built-in sofa so we moved the two desk pedestals onto a blanket on the kitchen floor in the bus and unscrewed the seat and set it on top of the desk pedestals.  When I finally got back to work on the bus I removed the cover for the front OTR HVAC system and set it aside.  I was trying to get access to the underside of the wood trim that includes a grab handle that needs to be tightened but had a look around first.

I noticed a damper controlled by a flexible cable and figured it was what determined if the air was fresh or recirculated.  I turned the knob on the dashboard and saw the cable move but not the damper.  The damper was stuck so I loosened it by hand but the knob still did not cause it to move.  I then noticed that the sheath of the flexible cable had come loose from its retaining clip.  It was a tight spot in which to work but I was able to loosen the two screws holding the clip using a right angle screwdriver.  I slipped the sheath under the clip, tightened the screws enough to hold it, and turned the knob.  It worked!  On a day when I did not feel like I was accomplishing very much this was a tangible and unexpected success.

I removed the only four visible screws from the wood trim but it would not budge.  I had tried removing it once before without success but was determined to get it loose this time.  The only reasonable explanation was that CMI had glued it on after tightening the grab handle as part of the initial work we had them do right after we bought the coach.  I carefully worked a pry bar under the passenger side end and gradually applied force to it.  It was, indeed, “glued” on but it appeared that I would be able to pry it loose without breaking anything if I took my time.

When I did finally get it off I could see that they had used clear silicon (adhesive) caulk to attach it to a dark gray plastic piece.  Royale Coach had originally attached it to this plastic piece using four screws.  The plastic piece turned out to be the lower windshield defroster duct and I am considering how we might finish this without replacing the wood trim.  Wallpaper is currently at the top of my list but I doubt that it would be a good solution.  Of further interest to us was the wood itself.  We presumed it was maple based on the color but were puzzled why they would have used a different wood in the entryway.  Once we saw the back side, however, it was obviously walnut that lightened where it was exposed to light to the point of looking like maple.  There is other wood in the entry and copilot area that is equally light and we now realized that we had a refinishing task and not just a cleaning task, ahead of us at some point.

My next task was to scrape as much of the caulk off as I could.  I got a lot of it off, but not all.  Silicon caulk is difficult to remove.  I eventually found a single edge razor blade holder and blade and used that to get the last bit off.  I then worked on removing layers of masking tape from the edges of the base where the former step well slide was installed.

I have some carpentry to do to rebuild the steps and prep them for the tile installation and needed some materials and supplies so I went to Lowe’s and got:

  • Adhesive remover;
  • A 4’x8′ sheet of 3/16″ SurePly underlayment;
  • Two 3/4″ x 2.5″ – 6′ poplar boards;
  • A 15/16″ open or closed end ratcheting wrench;
  • A bottle of Piranha Wallpaper remover;
  • A Piranha wallpaper remover sponge;
  • A pack of 2,000 18 gauge 3/4″ long x 1/4″ crown staples;
  • A pack of 25 sheets of 120 grit and a pack of 25 sheets of 220 grit 1/4 sheet sandpaper.

I got 10% off the total bill! which was nice.  I did not get a palm sander as they were out of the Porter Cable model I wanted.  The Lowe’s in New Hudson showed two in their inventory so we will stop there tomorrow after breakfast and get one.  I also needed a half sheet of 3/4″ plywood to make a new platform to replace the step well slide but did not feel like dealing with that.

For dinner Linda heated some butternut squash ravioli she bought at Whole Foods.  She served it with sliced vegan Italian sausage cooked with mushrooms, onions, and garlic, a side dish of steamed fresh green beans, and a glass of Moscato.

After dinner I uploaded my blog posts for July 23 through 31 plus a gallery post of 11 photos I got from Jarel Beatty of the custom walnut desk in the process of being built in his shop.  I got a call back from Darryl and we discussed the new air-conditioning system.  He said he would get me a price but advised us not to let anyone reuse the old refrigerant lines.  If they are not 100% clean the old refrigerant will contaminate the new system.  If Shutz installs the Trane system it comes with a 10 year parts and labor warranty, but it would still be a hassle to deal with getting a contaminated unit repaired or replaced.

After chatting with Darryl for a while we agreed that there wasn’t any urgency to this.  For one, we need to have Darryl check the current system for leaks, and assuming it does not have one, for proper refrigerant charge, cooling capacity, and airflow.  Darryl is busy doing heating systems at the moment, but is willing to do the maintenance work.  Also, the cooling season is done for this year and we will be traveling during the hottest part of next summer.  A final factor is that this has been another expensive summer for us with the new roof on the house, the interior remodeling of our motorcoach, and the work Phil is about to do, so we would prefer to defer this expense.

 

2015/09/24 (R) Blood Work

Linda got confirmation yesterday that our lab orders had been put in by our doctor.  The blood work requires a 12 hour fast (minimum) so we finished dinner last night before 8 PM and did not have breakfast this morning.  We headed out around 8:30 AM for the Henry Ford Health System Columbus Center in Novi, the nearest HFHS lab to our house.  We would not normally get on I-96 at that time of day due to rush hour traffic but we wanted to get this taken care of early and then get something to eat and drink.  We got to the lab at 9:15 and it only took a few minutes to get our blood drawn.  We then headed to the Panera on Novi Road at Grand River Avenue for bagels and coffee and some down time to sit, relax, read, research, and write.

Linda spent some time last evening researching wallpaper installation but found conflicting information.  I got online and looked at some of the same websites.  Wallpaper is a little out of style at the moment and some of the website information was over 10 years old but still seemed relevant.  The interior walls of our motorcoach are finish grade plywood that is firmly attached to the structure of the bus with spray foam insulation underneath.  The issue is how to prep the plywood before we hang the wallpaper.  Some sources indicate that we need to size it, some say to prime it, and others say to use a liner material and then prime, all before hanging the paper.  Other sites, however, say to just hang the paper directly on the plywood and be done with it.

We left Panera and were headed west on Grand River Avenue.  We noticed that Chuck’s truck was at his shop so Linda made a U-turn and we stopped to see if he was there.  He was, so we visited for a while and got to see their new refrigerator and discuss the installation, which Chuck somehow managed to do all by himself.  Even with the use of his forklift, that was quite an accomplishment.

We got back to the house at 12:45 PM, changed into our work clothes, took care of a few chores, and had a light lunch of fresh apples, pears, and hummus with onion on rye bread.  I then called Josh Leach at Coach Supply Direct and left a message asking him to follow up with Ferman Miller at Countertops Plus.  If Ferman does not have any more of the Sandstone Corian I want to make sure Josh gets the 30″x48″ piece from the other supplier before it disappears.

The entrance landing with the floor removed revealing the pneumatic linear actuator that operates the slide out stepwell cover.

The entrance landing with the floor removed revealing the pneumatic linear actuator that operates the slide out stepwell cover.

When we finally got to work on the bus around 2 PM Linda focused on stripping the old wallpaper and I started preparing the entrance for tiling.  She taped off all of the wood trim where she is working, spread painter’s plastic to protect the floor, and wrapped the two living room captain’s chairs.  I removed the existing vinyl tile from the entry platform, removed the plywood cover, and uninstalled the step well cover.  I then removed the tile and treads from the stairs.  I also moved the passenger seat forward and determined that I can probably get to the swivel shaft retaining nut from the back.  Removing the seat by removing this one nut will make it much easier to tile that part of the cockpit.  Ditto for the driver’s seat.

Although we got a late start on the bus today, and worked on it for less than four hours, we were satisfied with what we accomplished.  The old tile came up more easily than I thought it would which bodes well for getting the entry/cockpit tiled with the new Armstrong Alterna Luxury Vinyl tile.

I called Phil Jarrell to verify that he had called Miss Dig and told them to mark the gas main and not just the utilities running to the house.  He said he did and expected that they will be here on Friday.  I will keep an eye open for them and intercede if possible.  Phil expects to start our job on Tuesday.  If he does he will probably be finished by the end of the week or over the weekend.

The entry stairs into the bus with the bottom riser cover plate removed to reveal one of the two air-conditioner compressors installed in the spare tire compartment.  This is how the ports are accessed for service and recharging. The other compressor is accessed through the bay under the driver’s seat.

The entry stairs into the bus with the bottom riser cover plate removed to reveal one of the two air-conditioner compressors installed in the spare tire compartment. This is how the ports are accessed for service and recharging. The other compressor is accessed through the bay under the driver’s seat.

Linda let me know that our lab results were available so we each logged in to our HFHS MyChart accounts to look at them.  Linda’s lipid profile showed a higher total cholesterol than she expected and she was not happy about it.  Dr. Vangel had seen the results and commented that they were OK, but Linda was perturbed about it none-the-less.  My total cholesterol was also higher than I would like but not as high as Linda’s.  Her LDL and HDL numbers and ratio looked good and her HDL, in particular, was much better than mine.  This was no doubt a consequence of her almost daily exercise walking.  We apparently do not fully understand the lipid profile numbers or what we still need to change about how we eat to bring them in line with the guidelines put forward by people like Drs. Neal Barnhard and Caldwell Esselstyne.

Linda made a nice salad to start our dinner, served with a small glass of Moscato.  The entrée was a mock chicken scaloppini that she picked up at Whole Foods.  For a side dish she steamed kale with mushrooms, onions, and garlic.  After dinner we sat on the back deck and enjoyed a second small glass of Moscato.

I went to my office and edited the blog posts for July 23 through 31 and hope to upload those posts tomorrow.  I had an e-mail from Molly Pinner with Linda’s invitation to work as an office staff volunteer at the 2016 Escapade in Essex Junction, Vermont.  I replied to that and cc:d Linda.  I then e-mailed Lou and Val Petkus to let them know.  I was wrapping up for the evening when I got an e-mail from Ed Roelle with the September CCO Newsletter.  He develops the newsletter in MS Word and I convert it into PDF for him.  I took care of that and sent it to him and then went upstairs to watch a PBS program on scenic train rides of North America.

The program was interesting but PBS was fundraising again, and the fundraising segments were longer than the programming segments.  It seems like this has been going on all summer and we are, quite frankly, tired of it.  After clicking around the other channels I turned the TV off and went to sleep.

 

2015/09/23 (W) Autumnal Equinox

We were up at 8 AM, had granola for breakfast, and enjoyed our coffee in the living room by the fireplace.  I like cool mornings.

I spent some time yesterday morning, and again this morning, considering my full-frame DSLR options.  The only 50 MP “35mm” DSLR camera body on the market at this time is the Canon 5Ds/R and there is no indication that Sony plans to introduce a successor to the A99 anytime soon.  The A99 is still available, as is the vertical battery pack/grip and I am at the point where I will probably order one.  It has a 24 MP full-frame CMOS sensor, which is double the resolution of my alpha 100.  More importantly, it will accept all of my old 35mm Minolta A-mount lenses and they will work as designed.

Linda left at 9:40 AM to meet Diane at Kensington Metropark.  I gathered up the laundry, sorted it, and started the first load.  I then settled in at my desk for a while.

I e-mailed Mike (W8XH) to see if he could assist me on Saturday and/or Monday with climbing the tower to do some more antenna work.  I then e-mailed Bill Gerrie to see if he and Karen were in Michigan yet.  I pulled up the initial mockup of the October 2015 issue of Bus Conversion Magazine and proofread my article on replacing the speedometer.  Jorge had done a good job of laying it out.  I e-mailed back four minor corrections, one slightly larger one, and a general comment about the lack of space following periods.  I had an e-mail from Steve Smith (N8AR) with contact information for Yaesu Fusion technical support.

The washing machine beeped so I transferred that load to the dryer and started another one.  I noticed that it was after 11:30 AM so I cleaned the cats’ litter tray, grabbed the garbage from under the kitchen island sink, put it in the trash can, and got it to the street.  Alchin’s normally comes “around noon” but I had a feeling they had already driven by.  They were still in our subdivision, however, and stopped on the way out to empty our can.

I had another cup of coffee and updated this post.  By noon Linda had not called yet let me know she was on her way home so I headed to Lowe’s for a roll of plumber’s sandpaper.  I also picked up the paste we need to hang the new wallpaper.  On the way back to the house I stopped at Teeko’s Coffee and Tea to order some Cafe Europe half-caff blend.  Linda was home when I got back and we had a light lunch.  We have both finally taken off some of the weight we put on this past winter.  Long, hard work days with little or no lunch seem to help.

By the time we got back to work on the bus projects it was 3 PM.  It’s hard to make progress when the workday starts in the afternoon.  Today is the autumnal equinox, so it gets dark much earlier in the evening than it did in late May, June, July and even most of August.  Still, as anxious as I am to get the heat exchangers re-installed we have to deal with the wallpaper in that part of the bus first.  Linda helped me assemble the right desk base, repeating what we did yesterday with the left base.

The left pedestal base with the Aqua-Hot fan-coil heat exchanger mounted inside.

The left pedestal base with the Aqua-Hot fan-coil heat exchanger mounted inside.

We installed the metal grates on the air openings (from the inside) and then used doubled-sided tape to affix the plastic mesh to the metal grate.  We put a 1/2″ plywood spacer in the bottom and marked the locations of the mounting bracket holes and the heat exchanger.  We took the exchanger and spacer out, punched the starter holes, and drilled.  Linda cleaned the heat exchanger and used a pair of tweezers to straighten the bent radiator fins, of which there were quite a few.  We cleaned off the two copper pipe stubs that provide the inlet and outlet for the antifreeze and then attached the self-stick 3/8″ X 1/4″ dense foam weather-stripping around the front of the housing.  We mounted the exchanger to the spacer with approximately 1/8″ of the foam weather-stripping beyond the front edge of the spacer.  We put the spacer/exchanger assembly back in the base and I secured it with screws while Linda pulled it into position, compressing the weather-stripping.

Linda cleans and straightens the fins on one of the fan-coil heat exchangers.

Linda cleans and straightens the fins on one of the fan-coil heat exchangers.

I took a few photographs as we worked and took some more of the finished assemblies.  While we were working we got a call from Philip Jarrell of Precision Paving.  Phil was calling to see if we still wanted the French Drain and driveway work done.  He has been busy all summer and even more so coming into fall when folks decide they need stuff done before winter.  He had given us a quote (estimate) back in the spring but could not do the work then because the soil was way too moist.  The property has dried out nicely over the last seven weeks and he wanted to make sure he did the work yet this year if we were still interested.  I told him “yes” and he said he would call “Miss Dig” right away to get the utilities marked and then get started.

The two desk bases with the fan-coil heat exchangers installed view from above and behind.

The two desk bases with the fan-coil heat exchangers installed view from above and behind.

I think this annoyed Linda as it will be another significant expenditure, but it’s something I think needs to be done and it is not easy to get a slice of Phil’s time.  (Actually, we have done a lot of difficult work together on the bus this summer and I think she was already annoyed from working with me on the right base.)  Not taking advantage of Phil’s availability would likely mean a two-year delay in getting this work done.

This project is actually a combination of two different projects that happened to make more sense to do at the same than at separate times.  The French drain is intended to dry out the far west end of our property which has standing water in the spring and after heavy rains, and stays moist/soft for the first half of the summer.  There are a lot of trees in that area and we have lost some and are losing others.  The driveway work will give us additional parking for people visiting in their RVs and create the main approach to the location for the bus barn that I hope to eventually build.  The topsoil that Phil pulls out from the driveway will be used to fill in low spots on the west end of the property, further improving the drainage in that area.

The right desk base viewed from above/behind showing the fans mounted on the back side of the heat-exchanger.

The right desk base viewed from above/behind showing the fans mounted on the back side of the heat-exchanger.

Linda returned to stripping wallpaper in the bus while I folded the laundry and put it away.  For dinner we had a salad and more of the soup that Linda made yesterday.  After dinner Linda researched wallpaper installation while I worked at my computer and uploaded eight blog posts from the third week of July.  About the time I finished the last one Brendan called so I went upstairs and Linda put the call on speaker.  He is a couple of weeks into his position at Eastern Michigan University teaching Art History and gave us a status report on how it is going, along with news of how Madeline is doing in her new daycare program University of Michigan.

We watched Dr. Michael Greger’s 2015 nutrition research summary on Linda’s iPad.  This is an annual presentation that he does at the vegan Summerfest in Pennsylvania.  His theme this year was the top health concerns of Americans, based on a major survey that was done by one of the national survey organizations, and what nutrition research has to offer with respect to these.  As we already know, many different diseases, one common answer; whole-food, plant-based, nutrition with no animal products.  We really are what we eat, and Americans are now some of the least healthy people on the planet.  We went to sleep reaffirmed in our dietary choices.

 

2015/06/22 (M) Cable Me This

We turned the air-conditioning off last night and enjoyed the fresh air, pleasant temperature, and lower humidity.  The overnight low was 58 which made for good sleeping.  We awoke to blue skies and what we thought would be a picture perfect Michigan summer day until Linda checked the morning news (iPad).  There was a story about a storm that moved through the upper plains yesterday and had a bead on Michigan for later today and this evening.  What had been a 10% chance of rain for today had been replaced by a forecast for strong-to-severe thunderstorms with the possibility of strong winds, large hail, and tornadoes.  Ahhhh, summer in Michigan.

Not ones to sit around and wait for the apocalypse we did what any sensible couple would do, I made coffee while Linda reheated the last of the Baked French Toast from yesterday’s brunch.  We had breakfast and then sat on the deck enjoying our coffee and contemplating the end of the world, or at least the possible destruction of our brand new roof.  But it’s insured, so “no worries, maan” as they say in Jamaica.  More coffee please.

We have a whole house generator that runs on natural gas so as long as a storm doesn’t damage it we can survive for a very long time without electric utility power.  Losing our AT&T Internet connection, however, would be a genuine hardship as that would require us to use our Verizon Mi-Fi (without the benefit of the new Fusion5s cellular booster which I plan to install on Wednesday) or go to Panera, McDonalds, or one of the libraries to get online.

Keith showed up around 10 AM to cut the grass.  We were hoping he would make it as we have not had too much rain this past week and the last few days in particular have been dry.  I think this is the first time this season he has been able to cut our grass without it being wet.  It looked nice when he was done.

I got a call from Phil Jarrell.  He had been successful in reaching Mike Fearer of Bid Rite Concrete on Mike’s cell phone.  Based on Phil’s description Mike was interested in looking at our tower foundation project and was expecting me to call so I did, using my cell phone, and this time I was able to reach him.  It turned out that the information about his business on the Internet is out of date.  He is no longer in Whitmore Lake but now operates from near M-59 and Latson Road, not far from us.  We agreed that he would stop by tomorrow at the end of the work day to look at our project.

I did not want to do a lot of heavy work today, as I was still a bit tired and sore, but I needed to mount two lightning arrestors in the cable entry box and mount the cellular booster in the sump pump room so I could figure out what coax cable lengths I needed and go get them from Scott Adams (AC8IL) at Adams Electronics in Wixom.  But first I called Mike (W8XH) to let him know I was planning on Wednesday for the tower work, assuming he was still available and the tower was still standing.

Cable entry box showing copper ground plane with Morgan lightning arrestors (lower left), control line arrestor (center top), and cellular and OTA TV arrestors (center).

Cable entry box showing copper ground plane with Morgan lightning arrestors (lower left), control line arrestor (center top), and cellular and OTA TV arrestors (center).

I determined that I needed two coaxial cables and ordered them from Scott by phone rather than take the time today to drive to his place of business.  They will both be LMR-400 with N-connectors on both ends.  One will be 50 feet long, for our 2m/70cm Diamond X50-N VHF/UHF base station antenna, and the other will be 15 feet long, to get from the cellular booster lightning arrestor in the cable entry box to the repeater (amplifier) in the sump pump room.  I will pick them up early Wednesday morning and install them.

One of the lightning arrestors was for the SureCall Fusion5s cellular booster system.  It has N-connectors on both ends, one of which is intended for bulkhead mounting.  It came with an angle bracket that fit over the bulkhead end and I used that to mount it.  I used the 2′ length of LMR-400 that came with the booster installation kit to position the lightning arrestor so the cable from the repeater could exit one of the 2″ conduits and bend around and connect to it.  LMR-400 is a low loss, 50 ohm impedance, coaxial cable that can handle high RF transmit power.  The cellular booster only has a 1 Watt transmitter but is operating at frequencies where energy losses in coax cables become significant.  To do what it does LMR-400 is just under 1/2″ in diameter.  It is fairly stiff and does not make sharp bends so cable runs and connections have to be carefully planned.

The other lightning arrestor was for the Antennas Direct DB8e OTA TV antenna and serves a dual purpose as the power insertion device for the tower mounted amplifier.  The coax cable for OTA TV signals is typically 75 ohm impedance RG-6 with F-connectors.  It is half the diameter of LMR-400 and much more flexible.  It is also typically used to receive low power signals and convey them in one direction; from the antenna to the TV.  Because we are 25 miles from the nearest TV tower and some of the towers are 50+ miles away, I ordered a signal amplifier to go with the antenna.

Ideally you want to amplify an OTA TV signal as soon as it comes out of the antenna and this amplifier does just that.  It will mount on the same tower leg as the antenna about two feet below the antenna feed point.  However, being an active electronic device it needs electrical power to operate.  There are two basic ways that could be done.

One way would be to have power wires, such as +5 VDC and DC Ground that are separate from the coaxial cable that carries the radio frequency (RF) energy.  The two OTA TV antennas on our bus are set up this way with three wires to supply power and control the enclosed rotor.

The other way is to provide DC power through the coaxial cable itself, which is how this amplifier is set up.  The nice thing about this arrangement is that the amplifier only has two connections and they are both coax connectors that can be weather sealed.  To get the DC power into the coax cable, however, requires a special device called a power inserter.  The power inserter, in turn, requires the coax to be split into two segments so there end up being four connections instead of two.  The power inserter for this amplifier very conveniently acts as a lightning arrestor as well, which is why I mounted it to the copper back plane in the cable entrance box.

By boosting what I presume will be weak signals from distant towers the amplified signal should be strong enough to survive the trip through the coax cable to the power inserter, from there to a 1-in/2-out signal splitter, and then through additional lengths of coax to the two TV sets.

After getting the two lightning arrestors mounted in the cable entry box I took a break for lunch and then went to Lowe’s for some supplies.  When I got back home I turned my attention to mounting the SureCall Fusion5s cellular booster (repeater amplifier) in the sump pump room.  The sump pump is in the northeast corner of the basement, which is also the northeast corner of our ham shack and office.  (The ham shack occupies the north wall and my desks occupy the east wall.  Most of the rest of the room is storage.)

I gutted and rebuilt this space, with the help of long-time friend John Rauch, before we moved in and created the large closet (small room) around the sump with insulated walls to contain sounds.  I installed an electrical sub-panel in this room to provide power to the office and ham shack desks and to an RV outlet by the pull-through driveway.  I fed the power for the RV outlet through the bond on the east wall just above the concrete block foundation and ran it underground to the far side of the driveway.  It was my intention from the beginning to mount a cable entrance box next to the power feed and have all of the coax cables and control wires for outside devices enter the sump pump room in the same manner as the power.

The ham shack/office walls are finished with T-111 exterior plywood with 4″ groove spacing and I finished the interior of the closet the same way as I knew I would eventually want to mount things to the walls.  I mounted the SureCall Fusion5s booster on the west wall of the closet about a foot inside the door and just below my eye level so I could see all of the connectors, switches, and indicator lights on the top and front of the unit.  It had four mounting tabs, two top and two bottom, that attached easily to the wall with short wood screws.

There is a duplex AC electrical outlet on that wall and one on the opposite (east) wall.  The power supplies for the cellular booster and OTA TV antennas will plug in to these along with the sump pump and the charger/controller for the battery powered backup sump pump.  One of the things I bought at Lowe’s were two outlet expanders which I installed in these two duplex outlets.  I also bought a switch with a pilot light to replace a single pole Decora switch that will eventually control the light in the closet.  I installed the switch but did not complete the wiring as I have to tie it in to the light fixture which requires me to cut the power to that circuit.   I would also like to replace the bare bulb fixture while I am at it but have not yet purchased a replacement.

Although it was late afternoon I decided to install the inside antenna for the cellular booster system and run the coaxial cable that connects it to the booster.  The antenna is designed to mount to a flat ceiling and provide a hemispherical coverage area below the plane of the ceiling.  I had previously figured out that if I mounted this antenna in the main floor hallway near the midpoint of the house I could connect it to the cellular amplifier using a 50 foot length of coax cable that came with the system.

The desired mounting location was opposite the door to the hall closet and the access to the attic is through the ceiling of that closet, so that was very convenient.  We emptied the closet, removed the clothes rod, and setup our six foot step ladder.  I removed the piece of foam insulation we currently use to seal the attic access opening and climbed up, flashlight in hand to check out what was on the other side of the ceiling.

Our desired location for the antenna was free of problems on the back side so I drilled a 3/4″ hole for the mounting stud and used a piece of rebar to poke a hole through the insulation for the coax cable that came out of the stud.  Linda fed the coax and stud through the hole and I put the retaining nut on the stud from the attic side of the ceiling.  The antenna is shaped like a coffee filter, is about six inches in diameter at the ceiling, and tapers down to about four inches in diameter about four inches from the ceiling.  The housing is white plastic and blends in well with the ceiling paint.

About four feet from where we installed the antenna is a chase that runs from the attic to the furnace room in the basement.  It appears that once upon a time something having to do with the furnace ran through this chase, such as the combustion air intake.  The combustion air is now drawn through the back wall under the deck and the exhaust goes out through the east wall of the basement via a double wall stainless steel flue pipe.  The chase is no longer used for furnace or other utilities although there are electrical cables to switches mounted in the bathroom walls and it still contained a piece of 4″ plastic pipe.

I positioned myself near the chase and guided one end of a 50 foot length of LMR-400 coax down through the pipe and through the hole into the furnace room while Linda held the roll of coax near the top of the ladder and unrolled it.  At one point the coax bunched up and Linda had to go to the furnace room and untangle it.  At another point the 4″ plastic pipe slipped through the bottom hole into the furnace room which caught me by surprise.  Once the cable was mostly fed through I routed it to the location of the antenna, connected it to the pigtail coax from the antenna, wrapped the connection in weather seal tape to keep moisture out, and secured it with a cable tie.

With the antenna installed Linda started preparing dinner while I dealt with the 37 feet of coax in the furnace room.  The furnace room does not have a finished ceiling so I had access to the areas above the suspended ceilings in all of the adjacent rooms.  In particular I was able to feed the free end of the coax above the ceiling in the office and into the sump pump room.  I secured the cable with plastic cable ties at two points in the furnace room to keep it away from the flue and various hot water pipes.  I had about 8 extra feet of cable so I made a large coil with two loops such that the free end came off the loop straight down into the connector on top of the booster.  I hung the coil on the wall above and to the right of the booster making for a very neat installation.

I took a shower to try and get rid of some of the fiberglass itch while Linda finished the dish she was making for dinner.  It was a complex Indian style dish with Basmati rice, garbanzo beans, Swiss chard, onions, and shallots, seasoned with salt, black pepper, cayenne pepper, cumin seeds, garam masala, fresh lemon (zest and juice), and fresh dill that Linda grew herself.  The house was filled with the aromas of all these ingredients for a couple of hours as they were prepared and combined into the final dish.  It tasted as good as it smelled with many flavor layers.

Our beautiful blue sky gave way to high, thin clouds through the morning and then to lower, thicker clouds during the early afternoon.  By 2 PM the clouds to the west were dark as I drove to Lowe’s in Howell and the first, heavy rains came as I got to the parking lot.  I waited a few minutes and they stopped so I got into the store without getting wet.  I had the same good fortune on my way back to the car.  The sustained rains came later in the evening along with a tornado watch.  We went to bed before 10 AM but did not go to sleep.  It took me a long time to write this post and we kept a watchful eye on the weather radar.  Although thunderstorms were forecast as a certainty from 1 to 5 AM with the possibility that they might be severe, we finally turned the lights out around 12:45 AM and tried to get some sleep.

 

2015/06/16 (T) More Stupid

Linda was scheduled to go to the bakery this morning but rescheduled to tomorrow due to last night’s weather forecast and the possibility of flooded highways in Detroit.  The morning rush hour traffic is bad under the best of conditions and flooded roadways can make it near impossible.  She also did not sleep well and woke up tired.

The Apex roofing crew started showing up just before 8 AM and the Wimsatt truck showed up with the shingles a little after 8 AM.  They brought a conveyor truck this time and were able to get the shingles off the truck and onto the roof without difficulty.  The Apex crew did not waste any time getting to work.  It turned out to be a great day for roofing; clear skies, no rain, moderate temperatures, lower humidity, and some breeze.  Even so, it is work that is done without the benefit of shade and roofs are hot places to work even on the nicest of days.

Wimsatt unloads shingles onto the garage roof.

Wimsatt unloads shingles onto the garage roof.

Linda continued working on the financials for our amateur radio club while I checked my e-mail.  I had a reply from RV Critter Guard telling me what to order and how much it would cost.  I placed the order through their website and used PayPal to complete the transaction.  I tried calling the concrete contractor that Phil recommended (Bid Rite Concrete LLC in Whitmore Lake) but the phone would disconnect after the first ring and revert to a dial tone.  Perhaps the recent storms caused a problem but I e-mailed Phil to see if he had a different number for them.  I called the Henry Ford Medical Center in West Bloomfield and made dermatology appointments for myself and Linda.

With all of that taken care of I turned my attention to the bus.  The toilet is a Microphor LF-210.  It uses pressurized air to operate the waste valve and the water valve and to help push the waste through the drain pipe and into the black tank.  To remove the toilet I had to undo three connections—air, water, and waste—and take out the four screws securing it to the floor.  If only it was as easy as that makes it sound.

The plumbing at the back of the Microphor toilet in our bus.

The plumbing at the back of the Microphor toilet in our bus.

Undoing the air line was easy and undoing the water connection only a little less so.  The waste connection was another matter.  The 1.5″ black plastic drain pipe was routed from the water bay through the floor and into the HVAC chase that runs along the driver’s side of the coach.  The converter, Royale Coach, brought it out through a hole in the wood that covers the chase, making it impossible to take the wood cover off.  The pipe then made two right angle bends, the first one towards the floor and the second one towards the back of the toilet.  The waste pipe was connected to the toilet discharge pipe with a length of rubber hose and a compression sleeve.

The toilet has a large hole in the back for all of these lines to pass through to the inside where they get hooked up.  It should have been a simple matter to slide the toilet away from the wall/chase but the last bend in the drain line was below the top edge of the bottom of the hole, preventing it from coming out.  After wiggling the toilet enough to get the rubber hose loose from the drain pipe I was able to lift the drain pipe just enough to slide the toilet out.  I took pictures for a possible BCM article on our interior remodeling project and then Linda helped me move the toilet out of the bathroom to the front of the coach.

The more I disassemble this coach the more stupid I think the design and construction of its systems are.  I don’t know that coaches from Marathon, Liberty, Vantare, Featherlight, Parliament, Millennium, Custom Coach, or any of a dozen other companies that have come and gone, is any better as I have never tried to disassemble one of them.  These are one-of-kind vehicles that are custom built specifically for the original purchaser and the over-riding factor in every case is the interior design.  Stuff, like toilets, go where the customer wants it, and systems, which are generally buried and hidden from view, get built wherever and however they can be made to fit.  The converter does not expect to have to repair or replace anything during the very short 12 month, 12,000 miles, warranty period and if stuff breaks after that, or someone wants to do a remodel or upgrade sometime later, it will all be time and material.  How difficult it is to do, and how many hours it takes, is someone else’s problem at that point.

The Apex crew hard at work on the back side of the main roof.

The Apex crew hard at work on the back side of the main roof.

We had a call from Butch updating us on a possible property purchase.  They are waiting for a clear title search before making an offer.  The property includes a house and a sizable barn.  The barn needs a new roof and the house will have to be gutted and the inside rebuilt, but for the right price it will still be a good deal.  They already have a good estimate to replace the barn roof and since they are now retired they have more time to work on the house than they would have a year ago.  They also have family and friends who can help.  Besides, they still have their home/business building in Twelve Mile, Indiana and their bus, which they lived in all this past winter, so they will not be under any pressure to get the inside rebuilt quickly.

Linda started downloading updates from Adobe Creative Cloud, which take a very long time, and then left at 3:30 PM for Ann Arbor.  She agreed to take care of grand-daughter Madeline while Brendan and Shawna attended a reception at the University of Michigan – Ann Arbor for newly tenured and promoted faculty.  I was on my own for dinner and Linda bought an Amy’s pizza so I would have something easy to prepare.

The roofers finished up for the day around 5 PM.  By the time they left most of the trash was in their dumpster trailer and the roof was tarped as a precaution against rain even though the forecast for tonight and tomorrow is for dry weather.  Rain returns to the forecast tomorrow night into Thursday but turns dry again on Friday, so we are optimistic that they will get the job finished this week.  It’s a big job but Apex has a big crew working on it and they got a lot of work done today.  We are very pleased with the look of the Certainteed Landmark Pro Max Def Resawn Shake shingle that we chose.  I took pictures of the work throughout the day as I always try to do with major projects.

After the roofers left I worked for a while in the bus.  I took the mattress into the house along with the electric heating pad controls.  I disconnected the two gas struts that support the plywood bed platform so I could open it far enough to reinstall one of the drawers.  I left them disconnected as I plan to remove the platform to provide better access to the sides of the box and floor.  I also plan to reposition them when I reinstall the platform to provide better access to the storage area underneath.  I then took measurements and made a sketch of the file drawer box for the desk.

Installing soffit baffles and replacing roof decking on the front of the main roof.

Installing soffit baffles and replacing roof decking on the front of the main roof.

I cooked the Amy’s Roasted Vegetable Pizza on the outdoor gas grill, both to avoid heating up the house and to see how it responded to that cooking method.  I used the grilling mat and the result was quite acceptable.  A glass of Franzia Moscato was a nice accompaniment.

After dinner I worked at the drafting board in my office turning my sketch and measurements into a scale drawing.  The two boxes for the desk will be trickier than a standard desk box because of the HVAC chase and because I have to put an Aqua-Hot heat exchanger in the bottom of each one.  I worked until about 9 PM and then came back upstairs.

The air-conditioner worked fine yesterday but was once again unable to bring the temperature in the house below 74 degrees F even though the outside air temperature never rose above 80.  There is clearly something wrong and I am wondering if one of the cold air ducts is open into the attic and/or one of the return air ducts us drawing hot air from the attic.  Either of these conditions would reduce the air flow to the house and overtax the evaporator in the air handling unit.  The more likely cause, however, is lack of refrigerant.  Whatever the case I shut the system off and opened up the house.

I was relaxing in the living room when Linda called at 9:30 PM to let me know she had left her babysitting gig and was stopping at the Whole Foods Market before heading home.  The reception started at 5 PM and lasted until 9 PM.  She was home by 10:15 PM and straight away to bed as she has to go into the bakery tomorrow and wants to leave early enough to be ahead of the morning rush hour traffic.

 

2015/06/09 (T) Cyclo 5

I was up at 7 AM, fed the cats, and made coffee, which has become Linda’s wake up alarm.  Phil Jarrell showed up at 8 AM.  He set up his laser level and checked elevations for a gravel driveway that would connect our concrete driveway around to our third culvert.  Some of this driveway may eventually provide access to a barn, but it will also provide a second pad that is level and big enough to support a 45 foot bus conversion.

Phil moved the laser level to a different spot and checked the elevations of various points at the west end of the property relative to the culvert that runs under the road to the little triangle of our yard in the southwest corner.  Although it did not appear so to me, all of the property to the west and north is higher than the bottom of the culvert.  That means Phil should be able to construct a French drain that will help dry this area out and hopefully save the trees that are there.  He will also use the top soil he pulls out of the driveway to fill in the various low spots.

Phil was done and on his way by 9:30 AM.  I forgot to mention the hole for the ham radio tower base so I e-mailed him about that additional work.  While it will almost certainly be less expensive to have him dig the hole while he is already here working on other things it is a project that requires my involvement, parts that I do not yet have, and coordination with a concrete company who can pump or cart the concrete from the truck to the hole.

The old driver's chair in our bus is a Villa captain's chair.

The old driver’s chair in our bus is a Villa captain’s chair.

We had breakfast after which I sorted the laundry.  The warm white load was small so I stripped the bed in the bus and added those sheets to the load.  We cleaned off the twin mattress in the small bedroom with most of the stuff going down to my office.  The stuff on the double bed in the middle bedroom then went to the small bedroom, allowing us to strip the double bed so I could launder the sheets and pillow cases.

Based on the e-mail I got yesterday from Cory at Rupes/Cyclo I figured out that I wanted the Cyclo 5-Pro Mark II Dual Head Orbital Polisher with the ProGuard backing plates.  I also determined which foam pads and chemicals I wanted and placed the order directly with Rupes/Cyclo online.  I also updated our PayPal account and used it for this transaction.

 

I went to my office and spent several hours doing a second floor plan drawing for the bus, this one showing the tiles installed as diamonds rather than squares.  Over the course of the afternoon Linda heated up some Amy’s chili for lunch and I got two more loads of laundry done.

Late afternoon brought a call on our landline that turned out to be a recorded message claiming to be from the IRS and stating that this was their final attempt to reach us before filing a lawsuit.  Yeah, right.  The IRS does not make such calls, of course, nor do they send such e-mails.  They like paper trails and contact people by registered mail or show up unannounced at the door.  And they don’t sue people, they just seize assets.  A Google search quickly revealed that this was an IRS Impersonation Scam that has been around for a while but gets resurrected from time to time.

The swivel/slide 6-way power base under the driver's chair in our bus.  We will reuse this if we get a Flexsteel replacement chair but not if we get an ISRI.

The swivel/slide 6-way power base under the driver’s chair in our bus. We will reuse this if we get a Flexsteel replacement chair but not if we get an ISRI.

We were annoyed enough by this particular scam that I filed a complaint with the U. S. Treasury Department and the Federal Trade Commission.  While I was on the FTC website I opted us out of receiving “Firm Offers” for insurance and pre-approved credit cards.  I also verified that our landline and cell phones (2) are on the Federal Do Not Call list, although it has not eliminated telemarketing calls. The fact that we are on the DNC list, however, allows us to file complaints with the FTC when we get such calls.

For dinner Linda made a nice salad with poppy seed dressing and heated up a couple of teriyaki noodle bowls.  It was yummy and a small glass of Moscato was very agreeable as well.  After dinner I was revisiting the EZ Connector website when a TXT message came through with a picture of his Chuck’s new VDO 0–15 PSI turbo boost gauge.  I was thinking about calling Chuck anyway so I rang him up and we had a long chat.

 

2015/06/08 (M) Home for a While

It rained until well after midnight last night.  The rain was not steady but more in the form of heavy downpours associated with thunderstorms.  The gutter along the rear of our house was not able to handle the volume of water and it was spilling over onto our deck making a sound that we are not used to.  I noted that I should check the gutters for clogs at the downspouts today.  My phone chirped, which meant I had an e-mail, and I presumed it was from our whole house generator.  When I got up this morning the clocks on the microwave and range were flashing “2:06”, so my first thought was that we must have taken a power hit then, but the messages on my phone indicated that utility power had been lost and restored around 3:45 AM; at least that was the date/time stamp on the e-mails.  I got up just before 6 AM and finally figured out that the clocks probably reset to 00:00 when the power blipped (3:45 AM + 2:06 elapsed time = 5:51 AM).

I sat in the living room writing with my iPad and playing games until a little after 7 AM and then made coffee, which got Linda out of bed.  We had planned to empty out more of the bus today but the weather was gloomy and we were tired from the rally so we had a long, leisurely morning before busying ourselves with inside chores.  Linda worked at her desk and I wasn’t in the humor to work downstairs in my office so I set my computer up on the dining room table.  Other than an occasional trip to the bus or the garage I mostly sat in front of my computer and talked on the phone all day.

Linda called Alchin’s, our regular trash collection company, to see if they would pick up the old RV furniture.  They do not have a special truck they can send and could not take the steel furniture even if they could get it into their garbage truck.  Linda suggested we find a company like “Got Junk” and searched online for one in the area.  We decided to call “Chuck It Junk Removal” as they are located relatively close to our house.  Keith, from Kish Lawn Care, showed up around 11 AM to cut the grass and Brad, from Chuck It Junk Removal, showed up around 12:45 PM to look at the furniture and flooring we pulled out of the bus and give us a quote on the cost to haul it away.  As Keith was finishing mowing the grass dark clouds were rolling in from the west and not long after he left we had more rain, although nothing like last night.

My dentist thinks my current intermittent teeth issues are the result of clenching my teeth at night so I made an appointment to get fitted for a mouth guard to wear while sleeping.  I also got hold of Phil Jarrell and he decided that tomorrow morning at 8 AM would be a good time for him to stop by and take some elevation readings for the driveway extension and a French drain for the far west end of the property.  Besides the obvious economy of having him do both jobs while he is on site, we need a place to put the topsoil he will dig out for the driveway and we need topsoil to fill in low spots on the west end of the yard.

I managed to finally get some orders placed today.  The big one was for a SureCall Fusion5s multi-band cell phone booster (transceiver) system from Cellular Solutions in Mt. Pleasant, Michigan.  The other was for a window seal from Prevost.  This is not the seal that holds the glass in the frame but rather a large rubber part that seals the space between the window frame and the structure of the coach.  We may need to unlatch the large fixed window on the passenger side and use it to get the old refrigerator out and the new one in.  This window frame has not been opened since we bought the bus and may not have been opened for many years before that, possibly not ever since the bus was built.  I want the new seal on hand in case the current one gets damaged trying to open the window frame.

Besides these two purchases I talked to someone at A-1 Upholstery and described our home made sofa plans.  She suggested that we would need ~9 yards of 54″ wide material for the sofa seats and back cushions.  I sent an e-mail to Josh at Coach Supply Direct reminding him of some things we had discussed at the rally last week and Rick Short at Isringhausen with questions about their 6800 series bus driver seats.  I also finally got to talk to Mike at Suburban Seating in New Jersey.  As I suspected we cannot buy the seat directly from ISRI, but I may be able to order it through Suburban Seating and pick it up from ISRI USA in Galesburg, Michigan.  That would be much nicer than having it shipped to our house on a truck from New Jersey.

I called Rupes/Cyclo to try to get answers to a few questions about the Cyclo 5-Pro Mark II Dual Head Orbital Polisher and its various pads but could not figure out how to talk to a real person.  I submitted the online Contact Form with my questions and got a speedy reply from Cory as a result of which I now know what to order.  All I have to do is figure out how many of each thing I need.  The Cyclo 5 is available on Amazon Prime, by itself, but it did not appear to be the Mark II model.  Some of the major distributors claim to give you a set of “free” ProGuard Orbital Backing Plates, but the Rupes/Cyclo website clearly states that the polisher is not sold without one of the three head options.  I prefer not to patronize businesses that misrepresent their offerings and will probably order the polisher, pads, and chemicals directly from Cyclo even if I am paying MSRP.

I got a call from Gary Hatt at Bus Conversion Magazine.  I had not looked at or replied to e-mails in over a week and he wanted to make sure everything was OK.  While we were talking we got a call from Curtis Coleman of RVillage so Linda took that initially until my other call was concluded.  I had e-mailed Curtis earlier in the day and he was responding to that communique.

Somewhere in the middle of all that we had chickpea salad on a bed of greens for lunch.  Linda then went for a walk, met Chris (K8VJ) at Lowe’s to pick up some SLAARC mail, and roasted vegetables for our dinner when she got home.  I sent Chuck Spera a short e-mail inquiring about how to open the latches on our emergency escape window and then called it a night.

 

2015/05/27 (W) The Root of all Things

Yesterday I used up the last of the coffee beans that Jeff at Teeko’s shipped to us in Quartzsite in late February so this morning I transferred the beans we had roasted last week into our airtight containers and started using them.  Grinding our own custom roasted coffee beans is how my mornings usually start and is just another small thing I like about being retired.

We rarely made coffee at home in the morning when we were employed outside the house.  It took too much time and made a mess that had to be cleaned up later, including the travel mug that we had to remember to rinse out at work and then bring home.  Besides, Linda got free unlimited coffee and tea at the office and I found it easier to stop at Panera and get a large coffee to go; half hazelnut and half decaf.  It was part of my morning routine that I found comforting and the cup was disposable when I was done.

I had a follow-up appointment and evaluation at the endodontist today, so I did not work in the bus this morning other than to take a few pictures of the old dinette corner, where I removed the mirrors yesterday, and the area under the bed, which I also worked on yesterday.

After morning coffee and breakfast I went to my office to work at my computer.  I off-loaded the pictures I just took, selected a few, processed them, and copied them to the folder for this blog.  I then downloaded and installed Adobe FlashPlayer in order to view the Gilbreath Upholstery Service website.  The download also installed a McAfee virus checker that I did not ask for or want and I don’t recall being given an option to opt-out.  I really dislike it when programs do things like that.  In fact, I think it should be illegal and companies who do it should be subject to heavy fines.  I tried to download the PDF catalog but Adobe Reader said it had an unrecoverable error.  Arrrgh!  I e-mailed them to request one that worked.  We will see if that results in anything.

I was responding to a few e-mails when Butch called.  He was trying to figure out the best way to connect up the eight L-16 6 VDC batteries he bought in Quartzsite to make a 24 VDC battery bank with a 12 VDC center tap.  Working only from verbal descriptions we finally ended up with the same diagram of a series-parallel interconnection scheme with equal electrical path lengths through all of the batteries.  The difference between series-parallel and parallel-series is not important when the batteries are operating correctly but each connection scheme is vulnerable to a different battery failure mode.  I happen to prefer the series-parallel scheme as I think it results in better battery charging, but that’s an often debated subject.  The equal path lengths through the batteries, however, is something that is worth accomplishing if at all possible.

By the time we were done talking I needed to leave for my endodontist appointment.  Dr. McWatters said the root canal they did on my upper right rear (tooth #4) last September looked good.  They tested the upper rear teeth on my left side but did not find any indication of a problem.  That would normally be good news, except that I had an intermittent problem in that area all winter so I know something is wrong and will eventually require attention, most likely when it is least convenient for me (middle of the night on a weekend).  But for now there is nothing more to do.

hen I got home I had a few pretzels and hummus and some red grapes and then got back to work at my desk.  I copied my blog post drafts for the 17th through the 26th from e-mails to Word and started editing them.  I took a break to have some tea and write while Linda cooked dinner.  She grilled two veggie burgers along with the rest of the asparagus we bought on Sunday and served the potato salad she made earlier in the day.  Most of the asparagus was mushy except for the tips which I attributed to the plants not the cook.  These were very large purple stalks, not the usual somewhat thinner green ones so maybe that had something to do with it.

After dinner I returned to my desk and finished editing all of my blog posts for May 10 through 26.  Somewhere in the middle of that work Phil Jarrell returned my phone call from yesterday.  We agreed that I will call him back after the GLAMARAMA Rally and he will bring his laser level and we will shoot some elevations.  With a little luck and a bit of perseverance we may get a gravel driveway connecting the 3rd (westernmost) culvert to our concrete driveway with a level spot for one or two guest RVs to boondock. We will also get a dozen tree stumps removed, get a French drain installed to remove water from the western end of the property, and get a hole dug for a ham radio tower foundation.  That last bit of digging will also require a rebar cage, hinged tower base, and coordination with a supplier that can pump concrete immediately after the hole is dug.

When I was done editing my blog posts I logged into our WordPress site, deleted 181 spam comments, and installed an update for our Fast Secure Contact Form plugin.  I started creating the post for May 10 but half way through the Chrome browser became non-responsive indicating that it might be out of memory.  That seemed unlikely, but I closed all of the program’s I had open, shut down my computer, and restarted it.  When I logged back in nothing was responding so I sat and waited until I was eventually able to do things.  The first thing I did was uninstall the McAfee Security Scan app that got installed along with the Adobe FlashPlayer earlier today.  I then proceeded to download three updates for Windows and MS Office, or tried to.

The three updates were only 27 MB total, but after 35 minutes they were only 53% done.  My guess was that the data rate on our AT&T “High Speed Internet” (DSL) connection had slowed to a barely usable trickle, perhaps because of all the rain we had the last few days, but whatever the cause it was almost midnight so I left it to finish at its own pace and went to bed.  I worked on this post and played a few games by which time it 12:45 AM so I got up, put on my robe, and went back to my office.  The download had finished and two of the three updates had installed.  The third one reported an error but Windows Update needed the computer to be restarted to finish the installation so that’s what I did.

Windows updates normally install during shutdown and finish installing on startup and that is precisely what happened this time as well.  I let the system startup completely (until the hard drive light was not on) and then downloaded, installed, and ran the latest version of CCleaner.  It downloaded much faster so maybe it was the Microsoft update server that was slow, or perhaps the McAfee app was causing the problem.

We had rain yesterday and more rain today, including some thunder.  The lights flickered a few times both days but the generator never came on.  If out Internet performance is still sluggish in the morning I will reset the AT&T gateway and see if that helps.  I also noticed that our home refrigerator was suddenly showing 45 degrees F instead of 40.  Linda had loaded it up with food yesterday, and added the potato salad today, but the temperature should not have changed by that much and should have returned to the 40 degree set point within a few hours.  Even adjusting the thermostat down did not rectify the problem over the course of the day so perhaps something else has changed, such as a blocked vent.  I will have to check for that tomorrow.  Hopefully the power blips did not blip some control circuit.  I think I will pull the fridge away from the wall and cycle the power.  We can vacuum off the back while it is out.  If it still won’t hold the temperature we want Linda might get a new refrigerator for the house sooner than expected, although a call to AAA Appliance Service Network in Howell might a more prudent first response.