Tag Archives: Pat Davidson (Apex Roofing)

2015/06/10 (W) Ron and Mary

Same routine as yesterday; up at 7 AM, open up the house, feed the cats, clean the litter tray, start a load of laundry, make the coffee, and drink the coffee while using our iPads.

Our daughter’s 34th birthday is tomorrow but she is flying to Las Vegas today to meet up with her husband who is there on a company outing.  We will celebrate her birthday when they get back, perhaps in conjunction with Father’s Day and Linda’s birthday, which is at the end of the month.

Linda left at 9 AM for Brighton Honda to have the 12 V battery in her car checked.  The battery light came on the other day so we thought it might need to be replaced.  Around 9:20 AM I heard thunder and a short time later we had a brief, heavy downpour.  Linda called at the same time and said the battery tested OK.  The problem could be the alternator, of course, but presumably the dealer service people know that and checked for that.  If not, we will likely be back there sooner rather than later.

Linda headed on to Meijer’s to do the grocery shopping.  Today was trash pickup day so I took the trash can to the street.  After meeting with Brad from Chuck It Junk Removal the other day we decided we would rent their trailer for 5 days.  For the same price as having them physically handle 1/3 of a truck of junk (5 cu. yd.) we can get rid of a full truck of junk (15 cu. yd.) by loading it ourselves.  Deal.

I got a call from Phil Jarrell regarding my request for pricing to dig a foundation hole for a ham radio tower foundation.  It was a useful conversation in that I had not previously realized that I will need a concrete contractor in addition to the concrete supplier.  The only thing the concrete supplier will do is show up with a cement mixer truck and dump the concrete where they are instructed to.  The concrete contractor will actually place rebar, build forms, provide carts or a pumper, and get the concrete from the truck to the hole.  Phil recommended Mike Fearer of Bid-Rite Concrete as a good guy who would work with me to get this done.

I talked with Chuck about getting a key to his shop so we could have the new refrigerator delivered there and have the old one picked up without having to trouble him to be there.  He agreed and suggested that we contact the guy down the street about removing the old windshield and installing the new one as part of the refrigerator swap.

Rather than dig into our bus interior remodeling project I have used the last couple of days to finalize decisions about various products and order them.  One of the things I have wanted/needed for a while is a cable entrance box that will allow me to route transmission lines and control cables into the basement from outside.  I talked to Chris Perri, KF7P, at the Dayton Hamvention last month and decided that I liked his custom fabricated cable entry boxes.  I got his business card at the Hamvention and exchanged a couple of e-mails with him this week.  I decided this morning how I want the box initially configured and e-mailed my specs to Chris.  I would like to run the cabling for the cell phone booster through this box so I needed to get it on order.  Speaking of which, the cell phone booster system arrived today via UPS so I am feeling more comfortable that all of the stuff I am ordering will actually get delivered to our house.

Wednesday’s and Fridays are when Recycle Livingston is open and the Wednesday hours are 11 AM to 5:30 PM.  We had my car loaded up with recyclables and Linda drove over after lunch to drop them off.  When she got back she made a batch of her yummy granola and I got a couple more loads of laundry done while continuing to work at my computer.

After doing my alternate tile layout for the bus floor yesterday I decided that I liked the way it looked better than the original ad that it would not involve any more cutting than the row/column layout.  I also felt confident that I had an accurate enough tile count to go ahead and order the tiles.  I drove to the Shell station to fill my tank and then drove to Lynch Carpet in Howell.  I ordered 12 boxes of the 16″ x 16″ Armstrong Alterna Luxury Vinyl Tile in the La Plata Creme Fresh pattern, and a gallon each of the vinyl adhesive and Glacier vinyl grout.  There are 14 tiles per box (24.89 sq. ft.) for a total of 168 tiles (just under 300 sq. ft.).  The inside floor area of the bus is around 300 sq. ft. before subtracting out walls and cabinets but we will be using some of the tiles on vertical surfaces in the entry stairwell and cockpit and around the box that supports the bed platform.  My estimate is that I will have 10 extra tiles.  The guy at Lynch Carpet suggested that I use a scrap piece of tile as a spacer when installing the tiles but I may use the little plastic “X” pieces designed for this purpose.

From Lynch Carpet I drove to Lowe’s in Howell to see if they had a different portable air compressor that might be more appropriate than the 6 gallon Porter Cable we just bought.  The Porter-Cable air compressor has a maximum regulated pressure of 150 PSI but that is also the maximum tank pressure.  I will have to test it on one of the front bus tires to determine if it will get the job done and if not I will return it.

The guy at Lynch Carpet also suggested that I rent a handheld grinder from Abe’s or A-1 Rental, both in Howell.  Abe’s did not have any grinders of any kind and A-1 was closed on Wednesdays.  The gal at Abe’s suggested the tool rental service at the Howell Home Depot, so I stopped there.  They also did not have a handheld grinder but they did have a floor model concrete grinder.  It was so heavy that I doubt if we could have gotten it into the bus and it was too big to maneuver in the tight spaces where I need to work.  They did have a lighter/smaller floor stripper and I may give that a try before I resort to grinding off the thinset with an angle grinder and diamond impregnated wheel and/or a belt sander with a very aggressive belt.

Pat Davidson called from Apex Roofing while I was out so I called him back.  They will be able to start on our roof next week Monday or Tuesday and will deliver the shingles on Friday this week.  I confirmed that we wanted two of the 14″ light tunnels for the living room.  I also indicated that I had scrapped the idea of building a dormer or installing a roof hatch as I simply did not get this taken care of in time.

Linda had closed up the house and turned on the air-conditioning while I was out.  It was pulling moisture out of the air but would not bring the air temperature lower than 78 degrees.  Not good.  This will be our third summer in this house and we have not used the air-conditioning very much.  The first summer we were gone for most of June, all of July, and a few days in August.  We had the unit serviced last year and thought it was working OK but perhaps did not really use it after that.  We did install filters in the return air grills so perhaps they are restricting the airflow too much.  It is also possible that it needs refrigerant.  I will have to check our records from last year and then call TOMTEK to arrange to have it serviced again.

Linda’s brother, Ron, and his wife, Mary, arrived early this evening.  They are on their way to northwest Illinois for a week-long organized bicycle ride.  They have to be there on Saturday and will be spending the next three nights at our house.  Visits from them are usually not more than once a year but we really enjoy their company when they are here.

For dinner Linda made a nice green salad and then made whole wheat angel hair pasta with onions, garlic, and mushrooms lightly sautéed in olive oil.  Ron does not imbibe but Linda, Mary, and I had a glass (or two) of Moscato.  We moved to the deck after dinner and had fresh strawberries for dessert.  It cooled off as darkness set in and we eventually moved back inside.  The other three were in the kitchen and I was sitting on the sofa when Juniper suddenly caught a mouse in the middle of the living room, or at least that is where I noticed that she had it.  She took it downstairs and I got her to drop it in the bathroom sink but I was unable to get it into a container to take it outside and it escaped into my office.  I closed the doors but I have no doubt it can go wherever it wants in the house from there.  When I returned upstairs we chatted until 11 PM and then all turned in for the evening.

 

2015/05/26 (T) Reflections

I decided to put off doing the laundry until later in the week.  Linda made a grocery shopping list while we had our morning coffee.  I called Pat Davidson at Apex Roofing to discuss the installation of a roof access hatch.  We did some online research for pest control companies in the Brighton-Hartland-Howell area and decided to call Best Pest Control LLC.  I talked to the owner, Ryan, about his perimeter defense package, and decided to give his company a try.  They will spray outside the house for ants, spiders, hornets, wasps, and yellow jackets.  I called Phil Jarrell from Precision Grading and left him a voice message regarding some additional driveway work, a French drain for the west end if the property, and a hole for a ham radio tower foundation.

I showed Linda the pullout pantry slide hardware I found last night on the Rockler website, a German made top-bottom pair specifically designed for this application and able to support up to 450 pounds.  It’s pricey, but it looks like the right stuff for the job.  We also found some assembled pullout pantries online, including some that were 5″ wide, but they were not deep enough and getting just the right height looked tricky.  We really want to maximize the use of our available cubic inches.

Keith showed up around 10 AM with his new Scag riding lawn mower.  He is still going to have the Hustler repaired as a backup, but the Scag is a nicer/better machine.  It is fuel injected, which should be more reliable, and it is faster, which makes more efficient use of Keith’s time.  It also has a seat that can be adjusted from soft to firm, making for a more comfortable operator experience over the course of a long day.

As much as I need to work at my computer and drafting table I need to work even more in the bus right now.  I started by reassembling the inside of the cabinet above the refrigerator, except for the liner carpet, and reinstalled the fluorescent light fixture on the ceiling.  I am keeping the carpet pieces for now, but mostly to use as templates for new material.  I would have preferred white Formica interior surfaces, as they are brighter and easier to keep clean, but the bus has a lot of curves and carpet is a very conformable and forgiving material.

The interior of the bus deconstructed in preparation for a new floor, seating, and custom desk.

The interior of the bus deconstructed in preparation for a new floor, seating, and custom desk.

My next task was cleaning out and securing the area under the bed platform.  I removed the half box covers, the flexible ducts, and the floor-mounted cleats.  I threw the ducts away and stored the other pieces in the garage.  I then reattached the strip light on the top edge of the forward side of the base, reinstalled the two circular HVAC registers (so the cats could not try to get under the bed through the holes), put the cover plates back on the two duplex AC outlets and reinstalled the outlet expanders which also have dual USB charging ports.  I need to put some sort of temporary netting over the port holes in the section of the HVAC chase under the bed, but I need to find a suitable material for that.  The long term plan is to seal those holes and install registers in the sections of chase outside the bed base.  I thought about disconnecting the lift struts for the bed platform so I could raise it higher and reinstall a drawer onto its glides, but decided to leave that for another day.

While I was working in the bus Ryan from Best Pest Control called me back and said he had a crew that could fit us in within the hour so I said “sure.”  I closed up the house as they would be spraying around all of the windows, doors, and doorwalls.  Two guys showed up a little while later and I walked them through the job, wrote a check, signed the work order, and they got busy.  They found two hornet nests by the east end of our deck and destroyed them.  I hate to kill even a hornet but they have been buzzing around our windows and doors, poking at voids in the mortar on the face brick, and occasionally getting into the house and we need to put a stop to their use of our residence as a place to build their homes.

The pest control guys were already gone and Keith was driving away as Linda returned from the supermarket.  I helped get the groceries into the kitchen.  After they were put away we had a light lunch around 1 PM of fresh baby carrots, mini bell peppers, sourdough pretzel nibblers, hummus, and red grapes.

The dinette seat used to fit in this corner The strip mirrors have been removed from the outside wall next to the window.

The dinette seat used to fit in this corner The strip mirrors have been removed from the outside wall next to the window.

I have been taking a lot of short breaks while working on the bus.  It was warm and humid again today and warmer still in the coach even with windows open and the roof vent fans exhausting air.  But the breaks are not just to rest, they are also to ponder the details of how the interior will get rebuilt and what additional deconstruction still needs to take place.

In the front of the coach there was a 120 VAC electrical cable coming out of an access hole in the passenger side HVAC chase, passing through a 4″ flexible duct adapter, and disappearing through a hole in the floor.  I originally thought the cable came from the duplex outlet on the wall just above the access hole but I discovered that it did not.  It was routed through the chase from somewhere farther back in the bus.  I determined that that the hole in the floor appeared to go into the OTR HVAC bay and sure enough, when I opened the bay there was the cable coming through the ceiling.  It turned towards the center of the bus and then went through the wall into the bay to the front.  It was then easy to determine that it was the power feed for the electric heater mounted on the rear wall of the front bay.

The storage area under the end platform with the 4" flexible ducts and cover boxes removed.

The storage area under the end platform with the 4″ flexible ducts and cover boxes removed.

At that point I knew which circuit breaker to turn off and was able to cut the cable in the living room without risking an electrical shock.  I slipped the 4″ duct adapter off and set it aside.  We don’t generally use the electric heater in the front bay, and certainly do not need it this time of year, so I wire-nutted the ends of the hot and neutral wires, coiled them up, and stowed them in the HVAC chase for the time being.  I coiled the end of the wire coming out of the floor around one of the Aqua-Hot coolant hoses so it would not drop into the bay below.

The area of the bus that was the outside rear corner of the dinette kept drawing my attention.  That corner was decorated with vertical strip mirrors with beveled edges.  There are also strip mirrors used as wainscoting on the lower portion of the outside wall of the hallway and at the end of the hallway opposite the bathroom door.  The strip mirrors are the one thing in this bus we have never liked but they did not bother us enough to not buy the coach.  Now that we are involved in a major interior remodeling, however, we are looking for ways to remove them or cover them up.  We really do not like them.

In the case of the former dinette mirrors, I had previously determined that the ones against the wall of the coach were mounted (glued) onto a sheet of plywood that appeared to be mounted to a pair of cleats along the two vertical edges.  I tried prying under the bottom of the first strip but it cracked and chipped.  It quickly became apparent that removing these strip mirrors from whatever they are glued to was probably not a viable option.

The beveled strip mirrors in the hallway of our bus.  We really do not like these things.

The beveled strip mirrors in the hallway of our bus. We really do not like these things.

[p4 R]  After removing a 1-1/4″ wide piece of thin trim wood I was able to loosen the left (forward) edge at the bottom.  The walnut trim around the fixed window just forward of the mirrors, however, prevented me from pulling it out any farther.  I had a reasonably good idea how the window trim was attached but first I had to remove another piece of 1-1/4″ thin trim that covered the gap between the window trim I needed to remove and the trim for the next window forward.  With Linda’s help I removed eight screws and the 3-sided window trim came right off.  We set it carefully aside and returned to the mirrors.

With the window trim removed we were able to pull the left (forward) edge of the plywood mirror backing out enough to see behind it.  Our lucky “break” (no pun intended but, whoops, there it is) was that the screws holding the plywood to the left cleat pulled out of the cleat.  I say lucky because the screw heads were under the glass mirror strips and none of the mirror strips broke.  We kept working it out until the upper edge bumped into the return air grill trim on the underside of the upper cabinet.  We removed the grill and set it aside.  We were then finally able to pull the left edge out far enough that I could remove a couple of screws that were holding the right cleat to the panel that forms one of the back walks of the pantry.  Something was still holding it and when I changed position I saw that there was another screw near the top.  I removed that screw and the whole panel came out with the right cleat still attached.  Three more screws and the left cleat was also out.  We reattached the return air grill to the underside of the upper cabinet and then reattached the window trim.

The wallpaper behind this panel was in very good shape except for the screw holes where the cleats were attached.  We plan to put shelves in this corner to utilize the space and they may get used for some ham radio equipment.  Regardless of what ends up there having the mirrors out gives us more room for the shelves and will just plain look better.

A view from the kitchen of the dinette corner and hallway.  A custom desk will go where the dinette seating used to be and double as work surface for the kitchen.

A view from the kitchen of the dinette corner and hallway. A custom desk will go where the dinette seating used to be and double as work surface for the kitchen.

The mirrors on the other wall of this corner are glued directly to the walnut panel that forms one of the backs of the pantry.  I tried loosening the bottom edge of the one in the corner and it cracked.  That area will be concealed by the desk, but we will cover all of the mirror strips with some sort of thin panel.  We have the same problem with the mirror strips across from the bathroom door and may just have to live with those as I have not come up with an attractive way to cover them.  I need to investigate the strip mirrors in the hallway.  There is a good chance that they are glued to plywood panels that are screwed to the wall at locations covered buy wood trim.  If we are lucky removing the trim will allow us to unscrew and remove the mirror panels.  If not, we will just put the trim back on.

I have had the idea for a while that we could make another low pantry or shallow storage area along the hallway wall above the HVAC chase where the strip mirrors are currently located.  Linda does not like the idea as she is concerned it will make the hallway to narrow.  The storage would not be any deeper than the HVAC chase is now, and would not be any higher than the wood trim along the top of the strip mirrors, which serve as a kind of wainscoting.

By this point it was 5:30 PM.  Linda headed inside to fix dinner while I got trash and materials out of the coach and carried them to the garage.  Linda let me know that a severe thunderstorm watch had been issued effective until 10 PM.  It rained lightly off and on until we sat down to eat and then the downpour came but we did not have anything severe, just heavy rain for a while.  She made a dish using garbanzo beans, garlic, kale, salt, pepper, and fresh lemon juice.  It was delicious and the fresh lemon juice really made it sparkle.  She also served the last of the risotto she made for dinner when Steve and Karen were here on Saturday.  We had strawberries with Lotus brand Biscoff cookies for dessert.  I worked on this post on my iPad, took a shower, and went to bed.  I never did make it to my office today.

 

2015/05/12 (T) Dealing with the County

I finally paid a visit this morning to the Oceola Township offices and talked to the assessor and zoning administrator.  I had a satellite image of our property on which I had drawn the proposed barn and driveway.  All they need in order to issue a land use permit is for me to show the size of the building and the setbacks on the image.  I also visited the Livingston County Building Department.  I talked to one of the counter clerks who had me talk to Rick, who is one of the inspectors.  He had just built a large pole barn and used 6×6 posts set in 26″ diameter holes back filled with concrete.  The bottom of the posts need to be at least 48″ below grade to get below the frost line so I will figure on posts four feet longer than my exterior wall height.

Based on my preliminary online research and visits the land use, building and electrical permits are the only other ones I will need in order to put up a bus barn.  The clerk gave me a check sheet of the documentation I will need to provide.  I would have to file some additional paperwork with the County Health Department, but would not need permits from them or from the Drain or Road Commissions.

I drove to the Township offices on Latson Road by way of Hacker and M-59.  Hacker was so bad the last few days due, in part, to heavy rains that it was more pothole than road and many of them were larger and deeper than normal.  The road grader was repairing the road and it was digging deep.  The grader was still working when I returned home but the road was already much better.  The road needs to be rebuilt with a substantial amount of road gravel and with proper drainage ditches along both sides.  Or paved.  Paved would be good.  Linda read something last fall that indicated Oceola and Hartland Townships had agreed to pave Hacker Road from M-59 south to Golf Club.  We checked when we got home this spring but could not find any reference to such a project.

Back at the house I settled in to create a scale drawing of the floor plan of our bus and then draw in the 16″x16″ floor tiles.  I added up the various areas yesterday and added 25% for waste, but that turned out to be a low estimate.  By drawing the tiles I was able to count how many I would actually need.  I called Lynch Carpet in Howell and talked to Clint to get a rough price estimate for the materials.  The 16×16 Armstrong Alterna Luxury Vinyl Tiles are packed 14 to a box and can only be ordered by the box.  We need 190 tiles for the project so we will have to buy 14 boxes (196 tiles).  That turned out to be 50 square feet more than my original estimate, but would leave us with only six full tiles as spares, assuming I do not ruin any during the installation.  Fortunately, the vinyl adhesive and vinyl grout were less expensive than I expected, so even with a freight charge the bottom line was similar to my first estimate.  Using these tiles it will be approximately a $2,000 project.

My layout has the tiles in a standard pattern with the grout lines lined up in two directions, one running parallel to the long axis of the bus and the other perpendicular to that.  I presumed that this would take less tile and require less cutting but after seeing the layout I am not so sure.  I will probably make a second drawing with the tiles turned 45 degrees and see if it makes more efficient use of the tiles.  We plan to use a grout that is very similar in color to the base color of the tiles so the grout lines will tend to blend in rather than standout as a design feature, and perhaps make the orientation of the tiles less important visually.

Later in the afternoon I called Pat at Apex Roofing to let him know our shingle selection.  I left the information in a voice message and Pat called back later to confirm.  We are going to use the Certainteed Max Def Resawn Shake shingle.  We are still thinking about the skylight tubes.  We talked about putting one or two in the living room and possibly one between the kitchen/dining rooms and one in the hallway.  I realized that the air-conditioner would probably be in the way of the one for the kitchen/dining area, so we will not do that one.

Linda made granola today and made baked/stuffed acorn squash for dinner along with an asparagus, carrot, green bean sauté and fresh sweet Bing cherries.  I took care of some e-mail and then we had slices of the Mother’s Day vegan cake.  I called my sister to check on how our grand-niece was doing.  She called me back later and we had a long chat.  Linda and I then watched season 2, Episode 2 of Sherlock.

After Linda fell asleep I was still up (writing) when a noise started and did not stop.  I suspected it was the water sanitizer recharging, as the water softener had recently recharged, but I got up to make sure that’s what it was and not something else like a sump pump that was stuck in the on position.  It was the sanitizer, so I closed the laundry room door to reduce the noise and went back to bed.  I really need to soundproof the laundry room and reprogram the softener and sanitizer to come on at better times.

 

2015/05/05 (T) BAF & MEF3 Visit

Today was a family visit day.  We were up a bit earlier than usual and enjoyed a light breakfast and a quiet first half of the morning.  One of the things I’ve had on my to-do list is ordering Touch of Oranges Wood Cleaner and Touch of Beeswax Wood Preservative.  I finally got those ordered today directly from the company with free ground shipping.  I checked Amazon but the prices were no better and the products were not eligible for Amazon Prime.  I also found what I think is an exact replacement for my iPad2 flip cover and put it in our Amazon shopping cart.

Our son (Brendan) and grand-daughter (Madeline) arrived around 10 AM.  Madeline knows her way around the main floor of our house at this point and headed directly for the pantry to see what snacks we might have.  We tend to have dried fruit on hand, especially raisins and cranberries, as a tasty but healthy choice.  She is very fond of dried cranberries.  We spent the morning playing and talking and having a drawn out snacky lunch.  Somewhere in there Brendan setup the Pack-n-Play.

Pat Davidson from Apex Roofing showed up around noon to look at our roof and give us a quote.  Apex has done two roofs for us on the previous house and did excellent work at a fair price both times.  The quote was about what I expected and I gave Pat the verbal go ahead to put us in the schedule.  They are scheduling out about six weeks, so mid -June looks like the timeframe.  That potentially runs into the SKP Tri-Chapter Rally or the ARRL Field Day, as well as bus and bus barn projects, so we will have to see exactly where things fall.  We like to be around while this sort of work is going on.  This time, however, I also need to build a dormer on the back side of the roof to provide better access to the attic, generally, and the air-conditioner evaporator/air-handler, specifically.

The quote is for a new roof, with new underpayment and ice shield, so it is a “tear off” where they first remove all of the old roofing and repair any damaged/missing roof decking or boards.  They always look for at least a three day window with a dry weather forecast.  Pat said they would work with me relative to the dormer.  Specifically, they would start the tear off in the area where I want to build the former and then move to a different part of the roof so I can do the carpentry.  Linda and I need to visit ABC Supply Co. in new Hudson to pick out the specific shingle we want, and we plan to do that sooner rather than later.

The dormer is simple in concept but a bit trickier in execution.  I would build two tapered walls on the ground that look like right triangles.  The hypotenuse would attach to the roof with the long leg on top and horizontal and the shirt leg facing out and vertical.  Joists would be installed across the two walls, tying the together.  The front wall would be framed for an access door between the two short legs.  Two rafters would be installed at the end wall.  The ridge board would be set in place and cut to tie into the roof.  Two backer boards would be installed on the roof running at an angle from the ends of the side walls up to the ridge board.  The rest of the rafters would then be installed.  The walls and roof would then get plywood sheeting and decking.  The final carpentry would be fascia boards and siding.  Fortunately we have a pile of Hardy Board left over from when the house was sided.  Hopefully there is enough to side the dormer and it is in good enough shape to use.  I would then install the door, which I might have to build.  Apex would then roof the dormer, including continuous ridge venting.  The final steps would be painting the door and door trim and installing fascia and vented soffit material to match what is already on the house if I can find a supplier.  We would like the dormer to blend in and look like it belongs there.

Brendan got Madeline down for her nap at 1 PM and then spent a little time looking at what we plan to do with the floor in the bus before heading back to Ann Arbor.  I gathered up the Armstrong vinyl floor tile samples and drove to Lynch Carpet in Howell to return them and see what else they might have.  Clint let me keep the one we like for a couple more days and gave me a grout color chart.  I then headed to Best Buy in Brighton to pick up a Sony Blue-Ray/DVD player and a couple of flash drives, all of which were on sale.  I stopped for gas and got back to the house just as Madeline was waking up from her nap.

I was able to spend a little time researching a potential new vehicle.  As much as we are enamored with the Jeep Wrangler Unlimited the Consumer Reports data on them is very discouraging, especially the reliability data.  Viable alternatives may be the Nissan Frontier Pickup Truck or the Nissan Xterra SUV, both of which are available in 4×4 configurations.  Even the Ford F-150 might be a possibility as it is available in a 4-door, short-bed, 4×4 version.  They all have much better CR reliability data that the Jeeps.  The problem is, they are not Jeeps.  If we can wait a year, Ford is releasing an F-150 Raptor in fall 2016 that will feature a 10-speed transmission with six selectable driving modes including rock, mud & sand, and Baja (high speed desert racing).  It will probably also feature a ridiculously high price, but then none of these vehicles are inexpensive.

We got a phone call from XPO around 4:20 PM to let us know they would be delivering our box spring mattress foundation around 5 PM.  They showed up right on time and carried it to our bedroom.  Linda signed the delivery slip and they were gone as quick as they arrived.  We will wait until Brendan retrieves Madeline tomorrow to disassemble and reassemble the bed.

I entertained Madeline while Linda prepared dinner, but Madeline was very interested in what her Grandma Linda was doing, so we kept going to the kitchen to check on the work.  Linda served some “mock” chicken tenders, but she also fixed fresh green beans and homemade mashed potatoes, reheated some frozen edamame, and set out fresh black grapes and pineapple chunks.  Madeline is a good eater and we all enjoyed our meal.

Madeline is “potty trained” and very proud of the fact that she is no longer wearing a diaper.  She had a very successful day letting us know she needed to use the toilet.  We have a booster ring for the hall bathroom and put a stool in there for her.  She uses the stool to get up in the toilet seat and then uses it to stand up at the sink and wash her hands.  The hall bathroom sink/counter is lower than normal and turns out to be a great height for Madeline with the use of the stool.

We played after dinner until Madeline was tired.  She has always been comfortable staying with us but at 29 months of age is starting to have some anxiety about being away from her parents.  She wanted her daddy, and was briefly a little bit teary, but it wasn’t anything Grandma Linda couldn’t handle.  Linda followed the usual routine of looking at the rug (wall art) and all of the pictures in the hallway, the small bedroom, and finally the middle bedroom where Madeline’s Pack-n-Play is set up.  She selected the Construction Kitties book (again) for a bedtime story.  It was one of the books we got from the library yesterday and was her favorite choice all day today.  She fell asleep easily as she usually does.  We are active, busy people, but it’s a different kind of busy from having a 2-year old in the house.  We were tired, and turned in about an hour after our grand-daughter, but it was a good kind of tired.

We were so busy today that we failed to notice that it was Cinco de Mayo until it was almost over.