Tag Archives: Pad Thai (vegan)

2015/08/01 (S) Refrigerator Swapping (NOT)

We had a good crowd for our weekly SLAARC breakfast.  We sat across from Mike (W8XH) and had a chance to discuss what to do about the ‘extra’ user accounts on our computers.  We also discussed the release of Windows 10 that occurred on the 29th of July and all came to the conclusion that we would not be upgrading anytime soon.

When we got home I talked to Chuck on the phone.  He said the sun room company was still moving out of the building in front of his shop and that there was still too much stuff in the way to be able to move our buses around.  Given the circumstances we agreed that we would not do the refrigerator swap today and probably not tomorrow.

At breakfast Mike suggested that we look in the Users folder on our computers to see what files were associated with each of these previously unknown users and then delete the User accounts.  It turned out that these users did not exist, or at least had no folders or files associated with them that we could find.  Linda’s computer did, however, have a couple more folders in the Users folder that did not have User accounts associated with them.  When we deleted each of the phantom accounts we were given the option of saving any associated files in a folder on the desktop.  We selected that option each time but no such folders ever got created, confirming (I suppose) that there were no files associated with that account.

Bill, who takes care of the computers and software for the bakery, installed software on our machines when we first got them and Linda speculated as to whether these phantom accounts might have been inadvertently created at that time.  At this point we will probably never know.  We have strong security systems in place and are reasonably careful in how we interact with the online world, but it was a bit unnerving to find these accounts on our machines.

We were on tap for another warm, humid day and I elected not to do any work on the bus or in the garage.  With the phantom User accounts taken care of I transferred the photos that I received of the custom walnut desk from Jarel from my SG3 phone to my laptop computer and edited them for use on our blog.  I copied recent photos from my DSLR camera to my computer and then settled in to copy blog post drafts from e-mails into Word and edit them.

In the course of the day I did a couple of loads of laundry, worked on the sofa design/drawings, chatted on the ham radio, and took time out to have lunch and dinner, which was the left over Pad Thai.  Having sat for a day or two the dish had absorbed the liquid and, although Linda thought the broccoli was now too soft, I liked it better than when it was freshly made.  I also got to add a generous amount of peanuts, which is how I remember Pad Thai being served in restaurants.  After dinner I started reading “Number Theory and Its History” by Oystein Ore.

 

2015/07/30 (R) Number Theory

We awoke to a decidedly different air mass than we have been experiencing the last week or so; cool with noticeably lower humidity.  Linda turned off the air-conditioning and we opened up the house for the first time in a week.  We had a light breakfast of grapefruit and cinnamon raisin toast and then spent an hour enjoying our coffee.  I finished the little treatise on cryptology yesterday at Panera and started reading Oystein Ore’s “Invitation to Number Theory.”

Linda needed to make a quick grocery run for miso so I worked for a while on the sofa design, laying out the pieces that will be cut from a 48″ x 96″ sheet of 3/4″ plywood.  When she returned from her errand she went for her daily walk while it was still cool.  After her walk she made a cold black bean salad and then made roll up sandwiches using multigrain pita bread.  It was delicious and healthy; the bread alone had nine grams of protein.  After lunch Linda attended to some nutritional calculations related to the dinner she planned to fix and I gathered up the tools I thought we would need to take care of some things in the bus.  That included some small zip lock bags for small parts.

My first task was to remove the screws that secure the shorter head end of the bed platform to the foundation.  The platform is in two pieces joined by a piano (continuous) hinge.  After doing this I lifted the other end and was reminded that I had already disconnected the two gas springs that normally hold it open.  I also realized that the wires which supply 12VDC power to the two compartment lights on the underside of the platform were routed under a fixed cross member and cable-clamped to the other piece of the platform.  I already knew, or assumed, that they were hard-wired and had spade lug crimp connectors ready to go.

\With Linda’s help I was able to detach the wire loom at several points to create some slack.  The +12VDC wire was connected to a microswitch with a spade lug so it was easy to unplug.  I clipped the neutral wire, stripped both free ends, and attached an insulated male spade connector to one and an insulated female spade connector to the other.  With that the entire platform could now be removed from the bus to get it out of the way while we install the new floor tiles.

In the kitchen area of the bus we unscrewed and removed the walnut trim around the fixed window on the passenger side.  I reinstalled all of the screws so we would not misplace them while Linda took the trim to the garage to store it.  I removed the screws that held each of the three reading lights to underside of the upper cabinet in front of the fixed window.  They were wired with very clever little insulated terminal strips which made them easy to disconnect and will make them equally easy to reconnect.  Linda bagged each fixture and its parts separately in one gallon zip lock bags.

The AC light fixture was trickier to remove.  First I turned off the circuit breaker on the inverter sub-panel and verified that the light no longer came on.  By lifting the false bottom of the cabinet I could see that the fixture was installed onto a ceiling junction box.  That meant there was probably a post threaded into a cross bracket with the post protruding down through the center/mounting hole in the fixture and held in place by the decorative nut.

I was not able to turn the decorative nut by hand so I got the faucet wrench.    I have had this unique and specialized tool for a very long time.  It is designed to reach up behind a sink and grab the retaining nut on the underside of a faucet 12 inches away.  The head is spring loaded and flips over to allow the wrench to be used to tighten or loosen the nut.  Occasionally, like today, it finds an alternate use.  I like it when that happens.

\With the fixture loose I was able to color code the neutral wires with white tape, untwist the wire nuts, and then put the wire nuts back on the two supply wires.  Linda took the fixture to the garage and figured out way to store it safely using an unused waste basket.  We talked about the built-in sofa and some HVAC details for the passenger side of the cockpit before wrapping up our bus work for today.

While I put the tools away Linda started working on dinner.  Tonight’s special creation was vegan Pad Thai.  Regular Pad Thai was a favorite of ours for many years even after we switched to a vegetarian diet as we were still eating eggs.  The dish has a lot of ingredients, so it is a lot of work, and a good vegan version is a real challenge, but Linda executed the dish quite well.  We finished up the watermelon for dessert, which was sweet but light and refreshing.

I try to write every day while the sequence and details of the day’s events are still clear and my thoughts and feelings about them are somewhat “in the moment.”  But I don’t usually finish a post and upload it the same day.  I often finish it the next morning which means I have a chance to sleep on in it.  We have been so busy with the bus remodeling project that I have barely had time to write the drafts of my posts and I have not had the time to transfer them, edit them, select photos and post-process them, and upload everything to the blog.  I don’t like getting so far behind, but there are only so many hours in a day and I do need at least seven hours sleep a night.

After dinner I e-mailed Josh to see when we might get the extra fabric we ordered to make seat and back cushions for the sofa I am designing for the bus.  I then settled in to read about number theory before drifting off to sleep.

 

2014/08/24 (N) The Critical Path

The current “critical path” on the garage/HVAC project is the east wall of the garage which has to be finished before Darryll returns.  Although not as pressing as the drywall work, our first task after breakfast was to (finally) connect the separate ground wire from the garage sub-panel to the house main electrical panel and remove the bonding screw that tied the grounds and neutrals together in the sub-panel.  That took about an hour, but that was because it was work that had to be done carefully as the main panel was energized while I was working on it.

With the ground wire taken care of we sanded drywall compound on the east garage wall.  We wiped the dust off with a slightly damp sponge and I applied the next coat of drywall compound.

We then worked on wiring.  I finally decided on the locations for the two furnace switches, each of which had to be within three feet of their respective units.  I decided to locate the switch for the library HVAC unit on the new wall opposite (20″) and above (16″) the cable entry hole in the side of the furnace.  The switch will be in an outdoor rated surface mount junction box with the supply cable entering from the rear.  I had already run the cable into the middle wall cavity and had to drill a hole through one of the studs to get the cable where I needed it to be.

I decided to locate the on/off switch for the ceiling mounted garage furnace on the ceiling about a foot to the right of the right rear corner, again using an outdoor rated surface mount junction box.  The dedicated 15A cable was already routed to that general area so we just had to move it to the new location.

We also had to install the wiring for the thermostats.  Darryll brought a large reel of 4-conductor, 18 AWG thermostat cable, so we had the material we needed.  I was studying the installation instructions for the thermostats and it appeared that they needed 24 VAC to operate.  I called Darryll and left a message regarding this.  He called back fairly quickly and told me we did not need transformers as they were already in each of the furnaces.  He also left me know he would be back on Wednesday morning.

With the transformer question answered we were able to proceed with the cable installation.  The thermostat for the garage furnace will mount on the outside of the west wall of the new utility closet, so we had to run thermostat wire from that location through the attic to the ceiling mounted switch box.  The thermostat for the library HVAC unit will mount on the wall to the right of the door into the garage and above the return air register/duct, so we also had to run thermostat wire from there through the garage attic and over to the location of the on/off switch in the utility closet.  I worked in the attic while Linda worked in the garage.

We took a break for lunch and then started installing insulation in the utility closet walls.  We got one staple installed and discovered that we were out of staples.  That meant a trip to Lowe’s.  Lowes’s is about six miles driving distance and we prefer not to go for just one small thing, so we made a list.  The Arrow staple gun takes T50 staples.  The surface mount junction boxes have several threaded holes into which you can screw different clamps depending on how the cable is connected.  I planned to use flexible armored cable, sometimes referred to as “greenfield”, to bring 120VAC power to the furnaces.  Lowe’s had 6′ lengths of armored cable with an extra foot of wire on each end.  I needed a little more than 36″ for the library furnace and a little less than 36″ for the garage furnace, so that worked out nicely.  The guy in the electrical department got me set up with the right clamps for the ends called saddle connectors.

When I got home, I discovered that I had bought brads rather than staples, so Linda headed back to Lowe’s to return the brads and buy the staples.  While she was gone I pulled the wires out of the armored cable and cut the armor into two pieces.  I fed the wires back through the shorter piece and connected it between the garage furnace and the switch box.  Linda got back before I could complete the cable for the other furnace, so I set it aside to finish later.

With a good supply of staples we insulated the west wall of the utility closet and the space above the door on the south wall.  We then installed drywall over those same areas.  We had to notch around the flue pipe and the black iron gas pipe, but we measured carefully (and twice) and the panel fit just right.  We applied fiberglass tape to the one vertical seam, and prepared a length of corner bead for the outside corner at the junction of the two walls.  Linda prepared dinner while I applied joint compound to the seam and screw dimples.  I mudded the corner, pressed the corner bead in place, and then mudded over it lightly.  I then did some touch up sanding on the east garage wall and applied what I hoped would be a final coat of drywall compound.

I finished just in time to clean up and have dinner; vegan Pad Thai made from scratch.  A small glass of the 2009 Egri Merlot and some lemon melon later for dessert put a nice cap on a very productive day.

 

2014/07/27 (N) Attic Access

We had a long day of work today.  We were up just after 7 AM, had a light breakfast of toast, fruit juice, and coffee, read a few blog posts, and got to work.  My first task was to apply a second, light coat of drywall compound to all of the divots in the wall.

Our main morning task was the installation of the fold-down ladder for the garage attic.  It was definitely a two-person job.  Per the instructions, we installed temporary installation boards to support the assembly while we secured it in place.  The installation required one of us to be in the attic and that job fell to me.  We put the assembly on top of a plastic shelving unit to get it close to the ceiling.  Once I was in the attic with all of the tools I would need, including a headlamp, Linda slid the shelving unit so the assembly was directly under the rough opening.  It was still too far from the ceiling for me to reach from above so she placed two footstools under it.  I was then able to reach one end from above and pull it up into the opening while she lifted the other end into position from below.

We read and followed the directions carefully so we already had the pull string and T-handle installed.  That allowed Linda to move the plastic shelves out of the way, carefully open the door from below, and position the step ladder.  I dropped her the cord for the worklight and then had enough light to work comfortably.  We temporarily secured the unit with deck screws.  They were cheap screws and the heads tended to strip easily, but we got them in far enough to hold the unit in place while I installed the lag screws.

The 10 lag screws got installed through pre-drilled holes, six of which went through metal hinge plates.  The instructions said to drill through these holes into the trusses and headers, but the folding ladder hardware made that difficult, and my drill buts were all a bit short to do much.  By cutting the zip ties and partially unfolding the ladder I was able to get all 10 lag screws most of the way in with my drill.  They all had to be shimmed.  The final tightening was done with a socket and ratchet.

We took a break for lunch around 1 PM and had leftover miso soup, tofu hot dogs, and fresh apples.  I made a quick run to Lowe’s to get some additional electrical parts I needed to install lights and a light switch in the garage attic.  While I was there I also bought a baby gate for our basement stairs.  Up until now we have blocked the landing for the basement stairs with a couple of chairs when grand-daughter Madeline has come to visit.  Now that she has successfully spent the night at our house we anticipate many more such visits and wanted a more permanent solution.

The device I bought had a gate with a latch.  It was designed to be installed under tension, but the directions said it had to be anchored to the walls if used at the top of a flight of stairs.  We were not thrilled about mounting it to the walls, but we did.  The installation took about an hour to complete.

Back in the garage I found an old, unopened drywall sanding/finishing sponge.  It had a 1/4″ thick coarse pad on one side for sanding.  The regular sponge side was used to wipe off the drywall and slightly wet the areas to be sanded.  I let the sanded areas dry, wiped everything down, and applied a coat of white exterior semi-gloss to the area of the two existing walls and the ceiling that will be inside the utility closet.

The probability of rain rose steadily though the day and finally resulted in thunderstorms around 4:30 PM.  Steve said yesterday he would be here today and I tried to get him to understand that based on the forecast he needed to be here early.  He wasn’t.  He showed up with the excavator about an hour after the rains, by which point the retaining wall work site had turned to mud.

He took the excavator back there anyway and we watched him work while we had dinner, which consisted of a very nice green salad with strawberries and the rest of the Pad Thai from last night.  (Even left over it was still exceptional.)  He was moving boulders and a lot of dirt trying to get rid of the small mountain range that blocked the flow of water away from our lower deck and was spreading the dirt around in an effort to create some of the final grading.  He brought a helper with him and they had long lengths of drain pipe that I think the intended to install.  But the skies darkened, the rain started, the wind came up, and the warning sirens came on.  He shut off the machine and the two of them made a run for their truck and left.  More rain is forecast for tonight with a chance of thunderstorms, possibly severe.  The probability for rain on Tuesday is currently 60%, and stays at 40% through Wednesday.  At this juncture it appears that they won’t get much work done here this week, and their machine may be stuck here until it dries out.

After dinner Linda and I finally built the base for the platform where the library HVAC unit will be installed.  It’s a 40″ deep x 46″ wide box with center cross bracing.  It’s made of pieces of 2 x 12 on edge.  We set it in the northeast corner of the garage, leveled it with shims, and secured it to the studs in the walls with 3.5″ nails.  I had to make all of the cuts with my Rockwell 8″ circular saw as the chop saw won’t cut something that wide.  I did not cut the plywood platform as I need to install it after the new (west) wall of the utility closet is in place so I can nail through the base into the wall studs.  I will, however, cut the plywood tomorrow before the wall is built as I will be able to set it on the base and trace around it on the underside to get a perfect fit.

My goal for tomorrow is to cut the platform, build the west wall, set it in place and anchor it, and install the platform.  Linda has a 12:30 PM dentist appointment, so I will have to do most of this work by myself.  By that point I will need to get cleaned up, shift gears, and get ready for a 4 PM FMCA Education Committee work session.

 

2014/07/26 (S) Climbing Ladders

We did not go to our usual ham radio breakfast in South Lyon today so I could get an earlier start on the construction work in the garage.  Before I even got started I got sidetracked by a small rain gutter project which led to further gutter projects.

I bought a downspout elbow yesterday and wanted to get it installed before the next rains, which are forecast for tomorrow at 20% in the early morning riding steadily to 90% by 6 PM.  The elbow is a replacement for a short straight downspout section that feeds water from the end of one gutter into a slightly lower gutter that is perpendicular to the first.  The second gutter has the main downspout at one end.  Rather than dumping water straight down into the lower gutter, the elbow will direct it towards the lower gutter drain hole and away from the house.  A picture would make this much clearer, but I did not take one.

While I was installing the elbow I noticed that both gutters had a lot of “stuff” in them and the wire mesh drain hole grates were mostly clogged.  I cleaned all of the gutters last year, although I do not remember exactly when.  I expect a certain amount of organic material to accumulate in the gutters—the house is surrounded by trees after all—but I was surprised by the amount of granular material that had washed off of the shingles.  There was a lot of granular material last year, which I assumed had taken many seasons to accumulate, and I had flushed all of it out of the gutters with a hose.

The guy who inspected the house when we bought it said the roof was “serviceable” without being much more specific.  I suspect it is approaching the end of its useful life, but is not a project we can take on this year.  We have a ranch house with a low pitched roof, probably not more than 4-in-12.  It would take me several weeks to roof it myself, but it’s something I am (still) capable of doing.  Perhaps next summer, after we build the barn.

Given the condition of these two gutters I decided to check/clean all of them.  In the process I found that the gutter on the front of the house had three mounting screws loose at the west end.  I tightened them up, completing my unplanned roof tasks for the day.

There are several interesting things about “small construction projects.”  One is that they seem small because you can conceptualize the outcome and visualize all of the major steps quickly and easily.  Another is that you assume they aren’t going to cost very much; they are, after all, small projects.  Having been educated and worked as an engineer at one point in my life I tend to design things rather than jump right into the building phase.  The design phase is where I usually get my first reality check as I start to consider all of the details of the project that I was not able to quickly and easily visualize.  The next reality check comes when I am finally ready to build, which means cutting and fastening wood, only to realize that I have many days of other tasks I must complete first.  The tricky part of construction is that stuff has to be done in a certain (correct) order.  If not, you end up having to deconstruct something and then reconstruct it, or engineer an entirely different solution which takes even longer and costs even more than what you planned to do in the first place.

So even though I worked all day I did not build the platform.  Here’s what I did instead:  removed some drywall to expose a wire that was a little too short to get the sheathing into the new sub-panel; installed an outlet box and duplex outlet using the old wire and ran a new wire to the panel; filled out the panel with circuit breakers I will eventually need for new or rewired circuits; patched holes in drywall; cut and installed two studs in the north wall to provide 16″ on center spacing for new drywall; bored holes through the new studs for an old wire; installed a switch near the rear garage door fed from the old wire; ran a new wire for a new outside light; went to Lowe’s and purchased a 36″ exterior grade door (steel), a fold-down ladder for the garage attic, an exterior LED light fixture, and a light fixture for the new utility closet; enlarged the garage attic access opening from 22.5″ x 45″ to 22.5″ x 54″; read and pondered the installation instructions for the fold-down ladder; and decided to call it a night.

Somewhere in all of that we had orange/grapefruit juice, Teeko’s Sweet Seattle Dreams coffee (a blend that Jeff does just for us) and Linda’s homemade granola for breakfast; tofu hot dogs for lunch with sweet cherries, and; vegan Pad Thai for dinner that Linda made from scratch.  The Pad Thai was a complicated dish but Linda’s efforts really paid off; it was outstanding.

By the time I showered, worked on this post, and caught up on some blogs I follow it was time for bed.  I was tired but, having exerted myself physically and mentally and accomplished tangible things, it was a good kind of tired.  I no longer climb corporate ladders.  Today I was up and down real ones.