Tag Archives: non-GMO

2014/09/05 (F) WordPress 4.0

We awoke to temperatures in the low 70’s this morning and by noon it was forecast to be 85 degrees F with rapidly rising humidity.  We turned our A-C on yesterday and left in on overnight and through the day today.

WordPress 4.0 was released yesterday and just before midnight I updated the four websites I manage, including this one.  I was looking forward to working with the new version today, but first things first.  Darryll called at 8:15 AM to make sure it was OK to come over.  We finished breakfast and then opened the garage and moved a few things that might be in his way. Although we would have liked to continue working in the garage during the morning, before it got really hot and humid, we were glad to have Darryll here working on the HVAC installation.

Instead of working on organizing the garage Linda worked at her desk and baked a loaf of bread while I assisted Darryll.  He wired up the library thermostat and showed me how the wires were connected.  He installed the return air grill, which required some minor drywall trimming, and installed a 6″ combustion air duct in the ceiling of the utility closet.  The duct had a screen on one end with a hood, like a dryer vent, and was open on the other end.  He installed it from the attic side with the hood in the attic and the open end sticking down through the ceiling into the closet.  I may decide to caulk or apply drywall compound to fill that gap between the duct and the hole Darryll made in the ceiling.

Darryll’s main focus, however, was hooking up the four pieces of duct, two rigid and two flexible, that will carry conditioned air into the library and installing the two ceiling registers.  That involved working in the attic which was very hot.  The flexible duct for the two ceiling registers was the same kind of product that was used in the main house; a pre-insulated flexible accordion tubing with an 8″ inside diameter that comes in 25′ lengths compressed to about 3′ for shipping.  To feed the two registers on the lower part of the west wall of the library he cut lengths of 8″ diameter (circular cross section) metal duct and assembled them.  He attached them to the supply air duct (plenum) with flange connectors.  He then slide insulation blankets (tubes) around them and connected the bottom ends of the duct into the back of the register ducts using several elbows to bring the duct around and close to the wall.  Finally, he slid the insulation down and secured it.

While Darryll was doing all of that I finished connecting the AC power to the condenser/compressor. That involved the following:

  • removing the terminal cover panel from the inside of the fused disconnect box
  • knocking out access holes on the right side and bottom
  • mounting the fused disconnect box to the side if the house
  • cutting a piece of 3/4″ plastic conduit for the cable from the soffit to the box
  • running the NM cable through the conduit
  • installing a watertight 90 degree elbow into the conduit
  • attaching the elbow to the side of the box
  • cutting, stripping, and connecting the line wires
  • cutting the plastic armor on the hookup cable to the right length
  • installing a straight screw-in watertight connector on the box end of the armor
  • installing a screw-in 90 degree elbow watertight connector on the condenser end
  • cutting, stripping, and connecting the load wires in the box
  • cutting, stripping, and connecting the load wires in the compressor.

I had Darryll check my work and then installed the fuses in the pull-out disconnect but was not able to get it to plug all the way in.  Darryll bent the blades slightly and got it to seat fully.  (I need to get two different fuses.  All he had were 30A fuses but 20A would be sufficient.  Also, the fuses he had in his truck were notched on one end.  I think fuses with full barrels on both ends would be better as they would have more contact surface than the notched ones.)  I reinstalled the terminal cover panel and closed the box.  I then re-installed the cover panel on the A-C compressor that Darryll had removed earlier.

With the power connected and most of the ducts run, we turned on the 120VAC/15A circuit breaker (for the unit in the utility closet) and the 240VAC/20A circuit breaker (for the compressor/condenser).  Darryll turned the thermostat mode switch to “cool” and the fan switch to auto and the A-C came to life.  Hooray!  I love it when that happens.

While Darryll finished installing the ducts and the registers I connected and mounted the thermostat for the garage furnace and then connected the wires on the other end of the cable to the terminals on the back of the unit according to Darryll’s instructions.  I removed the end panel from the Reznor ceiling-mounted garage furnace, removed the documentation packet from the inside, checked that the gas valve was in the “on” position, and put the end panel back on.  I also removed the protective plastic film from the bottom of the unit.

Darryll gathered up his tools, extra parts, and unused materials and loaded them in his truck. He then pressurized his portable air compressor and used it to pressurize the black iron gas pipe.  It has not been holding pressure, so he pumped it up to 15 PSI and we went in search of leaks with a spray bottle of soapy water.  We used my inspection mirror to see behind and under connections and found three leaks.  One was in a 2″ pipe fitting behind the garage, one was in a 2″ pipe fitting near the end of the run by the generator, and one was at an elbow in the 1/2″ pipe where it exits the utility closet on its way to the garage furnace.

Darryll was checking air temperature readings at the registers and in the main plenum of the library HVAC unit.  The library was 89 degrees F when he first turned the A-C on, and the attic was a lot hotter than that.  He connected his gauges to the compressor/condenser and said the readings were close enough to correct that he did not want to add or remove any refrigerant until the room had cooled down and stabilized at the requested temperature.

I was hoping he would get the job finished today but he needed some equipment, which he did not have with him, to work on the iron pipe and he was obviously tired from a long day working in the high heat and humidity.  He may be back tomorrow; if not, Monday or Tuesday. Whenever he returns, I have complete confidence that he will get it done before the gas meter is hung and that it will all work correctly for many years with very little attention other than changing a filter once or twice a year.

We deferred lunch until Darryll left.  We had chickpea salad on a slice of the bread Linda had baked earlier, corn-on-the-cob, and the last of some fresh pineapple.  Nothing says “summer” like organic, non-GMO corn-on-the-cob.

After lunch I called Bratcher Electric to check on the status of the estimate/quote that Mike was putting together to service our generator, convert it to natural gas, and run a 100A Service Entrance Cable from the transfer switch to the garage panel, converting it from a sub-panel to a main panel.  Karen said they have been really busy but he would work on it over the weekend.

I also called 1-800-Pack-Rat to arrange pickup of the storage container on Friday September 12th.  Steven was not able to schedule the pick-up during the call and said he would contact the local office and get back to me.  I made it clear that we did not want to roll over into another billing cycle and I was calling one week ahead of time as we had been instructed.  He assured me that it would not be a problem.  About an hour later we got a return call and follow up e-mail confirming pickup for Friday, September 12.

Late afternoon I checked on the library A-C to make sure it was not freezing up.  Everything looked OK.  The thermostat was set to 76 degrees F and the temperature was down to 77, so I bumped the setting up to 78 to let it cycle off and on.  Although Darryll did all of the heavy lifting on this project (literally) I spent my fair share of time in the attic on warm days installing the pull-down folding ladder and working on electrical wiring and attic lights.  It was very gratifying to see that all of this work—his, mine, and Linda’s—finally result in something that operated correctly.

We were relaxing and reading when severe weather watches and warnings for our area started arriving on our iPads.  Naturally we went outside to see what was going on.  We were both born and raised in the Midwest, the St. Louis, Missouri area, to be exact, and as kids in the 1950’s, threatening weather was a form of summertime entertainment.  Not that we were stupid; we learned from the adults around us when the show was over and it was time to head to the basement.  When I was about 5 years old we lost a plum tree in our backyard to a close encounter with a tornado.

The gathering storm.  The clouds were very dramatic in all directions.

The gathering storm. The clouds were very dramatic in all directions.

The clouds were very dramatic but eventually gave way to a formless mass of gray with swirling winds and a few raindrops.  We checked the Weather Channel app and the Weather Underground Wundermap app on our iPads.  The radar returns showed that we were likely in for some rain, and we got some, but as often happens the worst of it passed north and south of us.  The rain we did get was very welcomed.  We had heavy rain on Monday (Labor Day), Keith mowed the grass on Tuesday, I spread grass seed around on Tuesday and Wednesday, and a flock of six wild turkeys feasted on the grass seed on Wednesday and Thursday. We needed a nice light rain to help the seeds germinate and take root rather than be eaten or washed away in a thunderstorm.

Storm clouds looking east.

Storm clouds looking east.

Around 7:30 PM our power flickered several times and we received e-mail messages from our generator letting us know that utility power had been lost and then quickly regained.  We decided to check the Kohler OnCue software to see what the generator was doing.  We thought sure we had installed the software on Linda’s computer, so we could monitor it from her desk in the kitchen/dining area, but it wasn’t there.  After much searching and head scratching we checked my old laptop and there it was!  When we thought about it we realized that the generator had been installed about a week before Linda started configuring her new Samsung laptop, so there was no way we had put the software on her machine.  We’ve been very, very busy the last 20 months, so it was not surprising to us that we had forgotten the exact sequence of events.

20140905-08295

Approaching from the southwest the clouds got more ominous.

The severe warnings expired at 8 PM and the severe watches at 9 PM, but that did not mean the rain was done.  A big fetch of moisture was located south of Chicago, Illinois and moving through southwest Michigan in our general direction.  The rain was forecast to continue into the early hours of tomorrow but be done before sunrise.  When the rains finally came it rained hard for a while.  Tomorrow is forecast to be a perfect Michigan day and I plan to buy another bag of grass seed to spot seed the areas that got washed away, again.

 

2014/09/03 (W) Pine Cone Midden

After breakfast Linda downloaded the Hanks Writer to her iPad2 while I downloaded three app updates to mine.  After checking in on the blogs that I follow, I spread some grass seed around the bare and thin spots in the back and west side of the yard by the house.  I wanted to take care of that while it was cool and the ground was still damp with dew from the overnight lows in the upper 50’s.

Darryll did not call last night, so I did not expect him to be here today.  Our son might be interested in the old window air-conditioner so we moved it to the southeast corner of the garage and plugged it in to make sure it worked.  It did, so I sent him a text message to that effect.

We cleared off the table we have been using to cut drywall and got the 1/4″ birch plywood panel that will be the front of the box that encloses the electrical sub-panel and cables.  We measured carefully, twice, laid out the cut lines, and checked the measurements again.  We got the center cutout very close to correct on the first try and only had to trim it a little bit in one corner to get it to fit around the panel box.  We did not secure it place as we still need to feed the thermostat cable through the wall and put some insulation in the wall cavity to the left of the panel as this is an outside wall.

With the carpentry work done we started cleaning and reorganizing the garage, making sure that Darryll will still have access to things he needs to work on.  We plan to have the storage pod picked up on the 12th or 13th, so even though Darryll is not quite finished, we were anxious to start working on the rest of the garage.

We moved the tools and supplies we’ve been using to the three new shelving units on the east wall of the garage.  We then unloaded two shorter units and two tall units on the west wall and spread everything out on the floor.  We moved the units to the northeast wall, the shorter ones fitting nicely under the low end of the flue where it exits the utility closet wall.  We went through the stuff on the floor and put some of it in the trash, set some of it aside to recycle, designated a few things to go to the Salvation Army, collected RV parts in boxes to take to the GLCC Surplus and Salvage rally next month, and put the rest back on the shelves.

We took a break for lunch and then finished up in the garage for the day.  Linda worked at her desk and I changed out of my construction clothes into something more suitable for working at my desk.  She made marinated baked tofu cubes for dinner, with sautéed green beans and corn-on-the-cob (organic and non-GMO, of course).  We sat on the deck and watched our resident American Red Squirrel gather pine cones and move them under the cluster of three big fir trees where we presume it has a nest and pine cone midden.  These trees have never been trimmed and the lower branches are sizable and long and the ends rest on the ground.  I peeked in there the other day but did not see pine cones piled around any of the trunks like I expected, so I’m not sure where the midden is located.

I was up later than I should have been but I finished reading Big Lake Scandal.  The fifth book in Nick Russell’s Big Lake murder mystery series, it was a good read.  Nick has created an interesting place with interesting characters and reveals a little more about them with each volume.  He is particularly good at capturing the way people might actually talk to one another on a daily basis in a small western town.  He should know; he has spent a lot of time in such places over the years.

 

2014/09/01 (M) A Day To Labor

One of the odd things about being “retired” is that holidays, like weekends, do not have the same significance they had when we were employed full time.  We no longer have “3-day weekends.”  We also do not have a tradition in our family of gathering on the summer holidays, so those days tend to blend into the days around them.  If not for our Saturday morning ham radio breakfast and the Sunday morning Howell Farmers Market we probably would not know what day of the week it was.

Knowing that today was Labor Day, Linda prepared vegan cinnamon rolls yesterday and baked them first thing this morning.  This was the first time she has made these and they were a real treat. Vegan, yes; whole plant-based food, not exactly.  These will be a rare treat for us.

As has been my pattern for the last few weeks, I sanded and touched up drywall first thing after breakfast.  Most of the drywall compound was finally smooth enough that I felt it was ready to prime.  I discovered that I was out of primer, so I went to Lowe’s to get some and picked up a few other things while I was there.  It was very humid today, which tends to slow the drying of paint, but primer is thinner than paint and gets absorbed into the paper drywall covering   I was hopeful that I might get a first coat of paint applied this evening.

Mike (W8XH) sent an e-mail Saturday evening to the members of the SLAARC announcing the availability of the new WordPress website and indicating that they would each be receiving a unique username and password from me in the next few days.  I wanted to wait at least 24 hours before I started creating users.  That waiting period had passed, so today I parked myself in front of my computer and registered users.

Part of the registration process required me to create a username.  That was easy for a ham radio club as (almost) everyone has an FCC call sign.  It also required a valid/unique e-mail address.  When I created an account an e-mail, with their username and a randomly generated password, got sent to the e-mail address I entered.  The e-mail also contained instructions on how to get to the website, how to login, and how to change their password.  I finished creating the last user account around 9 PM, but I did not work on this between 5 PM and 8 PM.

The vegan cinnamon rolls made for a filing and somewhat higher calorie breakfast, so we skipped lunch today and had an early dinner.  I had requested a picnic type of meal to celebrate the end of the summer tourist season, and Linda fixed a nice one.  We had vegan potato salad, corn-on-the-cob, and pan-grilled tofu slices with BBQ sauce and caramelized onions served open-faced on some of the Italian bread she made for dinner on Saturday.  Dessert was watermelon balls.  And the wonderful thing is that I am maintaining a good weight.  Eating well and eating healthy are not mutually exclusive.  However, like low-fat and fat-free foods, and then gluten-free foods, the processed food industry has discovered a “market” for foods that are free of animal products.  That, however, does not mean they are free of unpronounceable chemicals or excessive amounts of sugar and salt.  There is a growing amount of vegan junk food available in the marketplace.

We spent a little time after dinner on the back deck watching wildlife as a storm front approached from the west.  As the wind kicked up we lost our AT&T DSL connection and then our phone went out, exhibiting the same behavior we have had throughout most of August.  I shut down my computer and changed back into my work clothes to do some painting.  I put a coat of paint on the east wall of the garage and both the inside and outside of the utility closet.  It started raining really hard so I had to close the garage door, which cut down on my light, but eventually the rain let up and I was able to open the garage doors again.  The inside of the utility closet may need another coat, but I think that most of the outside of the closet, and the east wall of the garage, may be done.  That means I can finally mount the thermostat for the garage furnace and put cover plates back on switches and outlets.

I am still working on the outside of the south wall of the utility closet (with the door).  I am using drywall compound to create a smooth transition at the hinge edge of the door to correct for a carpentry error I made when installing the door much earlier in the project.  The transition will make it possible for me to install trim around the door, but I have to build up the transition in thin, tapered layers, allow it to dry, sand it smooth, and repeat the process over, and over, and over.  Ditto for the west wall of the library, which is the other side of the east wall of the garage, where I am building up a slightly recessed area where the opening was for the old window A-C unit so it will blend in with the surrounding wall surface.