Tag Archives: monitor wall-mount system

2015/07/25 (S) Monitoring

We started our day with our weekly ham radio breakfast in South Lyon.  As we were leaving breakfast I called Chuck to see if he was at his shop.  He wasn’t but said he could be there between 11 and 11:30 AM.  We drove home, loaded up my car with the accumulated recyclables, headed over to Recycle Livingston, and then headed to Chuck’s shop in Novi.  We arrived before he did and let ourselves in.  I got his Dremel tool kit and pistol style soldering gun and we chatted for a while.  He had a noon appointment with someone at a commercial building he owns in Livonia, and we had a long list of project tasks to take care of, so it was a shorter chat than usual.  We stopped at the Lowe’s in New Hudson and bought a can of garage door spray lube and then headed home, stopping for fuel at the Brighton Shell station on Grand River Avenue at I-96.

At our ham radio breakfast Linda had rye toast and I had an English muffin for breakfast (our usual meals) so we were hungry by the time we got home.  We had roll up sandwiches of hummus, Vidalia onions, and greens with a drizzle of olive in a whole wheat pita.  Very tasty.  We then got to work installing the wall-mounted track for the ZioTek monitor mounting system I bought from CyberGuys.

The north wall of the ham shack.  Critical points for the mounting of the ZioTek track system are marked with green tape.

The north wall of the ham shack. Critical points for the mounting of the ZioTek track system are marked with green tape.

Conceptually the installation was simple but it took all afternoon.  There is a kind of alcove at the north end of my office that serves as our amateur radio (ham) shack.  The purpose of the ZioTek system is to support up to four monitors on the north wall above the two desks located there so that they are not attached to the desks or using up any of the desktop real estate.  The walls in the office are 7/16ths inch thick T-111 exterior plywood with 1/2″ grooves on 4″ centers running the length of the plywood sheets.  The sheets are installed vertically so the groves run vertically giving the appearance of vertically installed 4″ wide rough sawn boards.  We finished the photo studio/office at the old house with this material so we knew we liked the way it looks.  Being plywood it has once major advantage and one major disadvantage compared to drywall; you can screw relatively heavy things to it, but holes are essentially impossible to repair.  What that meant for us was that we only had one chance to get the track in the correct location.

In this case “correct” meant:  at the right height and horizontal location to be able to position the monitors exactly where we wanted them while making sure the track was level.  To accomplish this I bought a 1″x6″-8′ poplar board to use as a mounting plate for the two track sections.  (All of the trim in the ham shack/office is poplar.)  We used pieces of tape to mark the locations of the corners of the three monitors on the wall and marked the centers of the VESA 100×100 mounting plates.  When we knew where the horizontal centerline of the tracks needed to be we determined the horizontal location of the tracks relative to the right end of the poplar board, which would be installed flush to the vertical trim in the northeast corner of the alcove.

The ZioTek tracks will mount to the horizontal poplar board which will be mounted to the wall at the studs.

The ZioTek tracks will mount to the horizontal poplar board which will be mounted to the wall at the studs.

We set the poplar board in the utility hallway and positioned the two tracks on it.  I butted the tracks together and slid one of the mounting plates so it saddled both tracks and kept them aligned.  The tracks are 4.5″ wide and the board was 5.5″ wide so I very carefully positioned the tracks for a 1/2″ reveal along both edges.  I then marked the eight mounting holes (four in each track) and removed the tracks.  Using a brad point wood bit that was slightly smaller than the central shaft of a #14 wood screw I drilled holes that were as carefully centered as I could make them.

We held the board in position against the wall and used a 1.5″ #6 finishing nail through the right mounting hole to hold that end of the board.  We then used a 4-foot level on the top edge of the board and secured the left end with a second nail through one of the mounting holes.  We positioned the chair where it will be when in use and made sure we liked the height of the board.  It looked and felt right so we proceeded to secure it to the wall.

The ZioTek tracks mounted to the poplar board mounted to the wall.  Linda is vacuuming up sawdust from drilling.

The ZioTek tracks mounted to the poplar board mounted to the wall. Linda is vacuuming up sawdust from drilling.

Using a small carpenter’s square I marked locations for mounting screws one inch in from each edge of the board in vertical alignment with the small heads of the nails that secure the T-111 to the studs.  The 8-foot long board spanned six studs so I had 12 holes to drill.  I used a standard drill bit that was slightly smaller than the shaft of a #14 wood screw and drilled through the poplar board, through the T-111, and into the studs.   I used a countersink bit to create recessed pockets for the flathead wood screws.  We then secured the board using 3″ long #14 flathead wood screws.  We applied a little soap to the screw threads to help them go in.

I pulled the two small nails out of the track mounting holes.  Using the same drill bit I finished drilling out the mounting holes all the way through the T-111.  We positioned and partially installed one track using 2″ long #14 flathead wood screws in the two end mounting holes.  We then did the same thing with the other track.  I slid one of the mounts so that half of it was in each track and partially installed the remaining four screws.  I gently snugged up all eight screws, checking the track alignment as I went, and then torqued them down.  The heads stick up above the inside surface of the track but the shuttle mounts are raised on the underside so they slide right over the screw heads without interference.

The first of three monitors to get mounted.  This one is on the left end of the tracks.

The first of three monitors to get mounted. This one is on the left end of the tracks.

With the track mounted to the wall we turned our attention to installing the monitor mounting arms and monitors.  We used one of the long arms on the left, the short arm in the center, and the medium arm on the right.  The other long arm will eventually end up on the far right or get swapped for the medium arm, but for now I only wanted to mount three monitors.  We installed the nice Dell monitor that goes with my older Dell Precision laptop in the center and installed the two ASUS monitors to either side of it.

By the time we got the third monitor mounted the office was in more disarray than usual and we did not have time to clean up tools and put things back in order.  Linda did manage, however, to run the vacuum cleaner and get most of the sawdust and wood chips sucked up.  Our son had called during the afternoon with a last minute request for babysitting services from Linda and I decided to go too.

A view of the mounts for the left and center monitors.  This is a substantial system.

A view of the mounts for the left and center monitors. This is a substantial system.

We left at 6 PM for Ann Arbor and stopped at the Whole Foods Market to pick up a few things for dinner.  We got two different vegan sushi rolls, a cold couscous salad, and some organic black grapes.  When we arrived at Brendan and Shawna’s house a little before 7 PM Madeline was surprised and excited to see us.  Brendan and Shawna left around 7:15 PM for an engagement party and Madeline was fine with the whole thing.  She was still eating her blueberries and strawberries and then wanted Linda to read several books to her.  We went upstairs to see how her crib had been converted to a toddler bed, allowing her to get up during the night to use the bathroom.  Such a big girl.  But not too big for pajamas that featured fairies.

After another couple of stories Madeline went to bed without a fuss.  We then had dinner.  The California rolls were OK but the couscous salad was outstanding and the grapes were very good.  We sat on the couch using our iPads but I could not stay awake so I laid down and drifted off to sleep.  I was awakened about 90 minutes later by the return of Madeline’s parents.  Linda gathered up our leftover food and the roses the kids had gotten her as a “thank you” for babysitting on such short notice which gave me time to fully wake up.  We were on our way by 10:30 PM and back home shortly after 11.

 

2015/07/10 (F) Eye of the Beholder

I was up at 7 AM and made coffee.  This usually wakes Linda up, but not this morning.  After waiting a reasonable amount of time I went ahead and started drinking.  If someone tells you that 7:30 is too early in the morning to be drinking don’t believe it, and if someone tells you that you should never drink alone don’t believe that either.

Linda eventually got up but looked really tired.  Unbeknownst to me she had awoken in the middle of the night and not been able to get back to sleep.  Neither of us were hungry after the large meals we had last night for dinner so we just had a little juice to wash down our little pills (vitamins and an allergy pill for me).

I’ve been looking for a system to wall-mount multiple flat-panel LCD monitors above/behind the desks in the ham radio shack portion of the downstairs office.  Linda was helping search for products and found AFC Industries in New York.  Their website had a large variety of very serious looking products.  The ones that caught my eye were a 72″ wall mount track with four articulated monitor mounts and a 48″ track with three mounts.  They had an 800 number and the website said to call for pricing.  That’s usually a bad sign but they appeared to have exactly what I needed so I decided to call them later.

I had planned to work on the custom desk design all day but Linda had other ideas.  She had become frustrated with the clutter in the library and the inability to really clean that room and decided that today was the day to do something about it.  Point acknowledged.  Some of the clutter (but not all) is artwork and she thought the place for us to start was to get some of it hung on the walls.  Again, point well taken and agreed.  Doing this correctly is a slow process, however, so I knew my plans for the whole day had just changed.  Sometimes you have go along to get along.

We have artwork that is not currently displayed which ranges in size from 8″ x 10″ to 2′ x 5′.  Some of it is framed and ready for hanging and some of it is not.  It is mostly paintings but there is some photography, a few poster prints, and some textile pieces.  We went through every piece looking primarily for oil paintings that we liked and that would fit the spaces we had available to hang them.  Before we were finished with this project for the day we had hung eight paintings.  We also found four paintings that we liked but lacked frames, or ways to hang them, and set them aside for now.  Most of the paintings were done by Ann Metzger, my late great Aunt, but one was done by my late mother.  We had also moved a few items out of the library into the driveway to be donated to the Salvation Army.  I tend to use drywall screws with large fender washers as hangers as they are strong and very secure.  We ran out of stainless steel fender washers so that created a natural stopping point for our task.

For a change of pace I decided to climb the tower to measure the center sleeve inside diameter so I could determine what outside diameter mast to get.  I got out Mike’s climbing harness, set up the step ladder, put on the harness, climbed up onto the roof, connected the waist strap around the tower, and started climbing.  I alternately attached and detached the two safety cables and made good progress until I got to the DB8e OTA TV antenna.  To go higher I would have to move from the west face to the northeast face and then undo the waist strap and reconnect it above the mounting point for the OTA TV antenna.  I did not feel like doing that today.  I was, however, able to reach the bottom of the sleeve by extending my tape measure.  The tip of the tape fit inside the bottom of the sleeve with what appeared to be about a quarter inch to spare.  I then climbed down and got off the roof, got out of the climbing harness, and put it away.

Back in the house the tip of the tape measured approximately 1-1/8″ across thus it appears that the sleeve is sized for a 1-3/8″ outside diameter mast.  I checked Universal Towers website, since they are located in S. E. Michigan, but their selection of aluminum masts did not include this O.D.  OnlineMetals.com has 1-3/8″ O.D. 6061-T6 aluminum tube in five different wall thicknesses and a large variety of lengths so that may be the easiest way to get one.  But first I will check the usual ham radio places.

Next I called AFC Industries and was routed to Ewa who was very curious what I was going to use the multiple monitors for since I was not a company.  I tried to explain why I would need at least three monitors in an amateur (ham) radio shack but she had never heard of ham radio and I don’t think I did a very good job of explaining it.  She was paying attention to what I was describing, however, about where I wanted to position the monitors.  She could not give me pricing on the phone so I gave her my e-mail address to send a quote.  Ewa was prompt in the sending the quote but I did not see it until later as we had the leftover seitan stroganoff for lunch and then left to run errands.

Linda had loaded our donation items in the back of my car while I was on the phone.  I brought seven paintings to the car and we left.  Our first stop was the Salvation Army donation center between Brighton and Howell.  We then went to the Howell Art and Framing Center, a frame shop on the east end of downtown Howell.  The proprietor, Rick, worked with us quite a while as we selected frames for four of the seven pieces and played with his Jack Russell terrier, Rudy.  These four pieces will go in the library when they are done in about three weeks.  Our final stop was Meijer’s where we picked up fender washers, salad greens, and coffee filters.

Back at the house I went to my office to check e-mail and work on the desk design.  The quote was there from Ewa and she had already made a follow up phone call so I opened the e-mail and looked at the quote.  It was almost double what I expected which was already double what I wanted to spend.  I e-mailed her back and asked for a simpler configuration but politely explained that her numbers were way out of my price range.  The interesting thing about such experiences is that the Ziotek products I’ve been looking at on the CyberGuys website suddenly do not seem so expensive.  It’s funny how that works.

While I was working I got a TXT message from Chuck following up on the refrigerator installation.  I texted back that I had not yet checked whether we can open the fixed glass window frame but would do so immediately and call him back.  I moved the 7′ step ladder next to the bus and climbed up to inspect the stop blocks as Linda pushed the window open.  The two stop blocks on that frame were definitely contacting the drip rail immediately above them preventing the frame from opening more than about 8 to 10 inches at the bottom.  The good news was that the Zip Dee patio awning would not interfere with the opening of the window.  The bad news is that I was not able to remove the two Philips head screws that secured each block to the frame.

I called Butch to find out what the tool was that I used at his shop to work on my brakes.  He said it was a manual impact tool.  This nifty little device is a screwdriver that turns through a small angle when you strike the end of it with a hammer.  This has the unique benefit of driving the screwdriver bit into the screw head while turning.  Butch thought that any auto store would have these so I called the local O’Reilly’s but they did not have any in stock in the store.

While I was talking to Butch Linda was researching other places to buy such a tool.  It turned out that Sears would be a good choice but the closest one was at Twelve Oaks Mall over 20 miles away.  I was getting ready to drive there but called Chuck first.  It turned out that he has two of them so I will borrow one tomorrow after our ham radio club breakfast.  I spent the last couple hours of the evening working on the desk design.  I then went to bed and worked on this post.