2015/06/23 (T) Grounded

As I wrote in yesterday’s post we did not turn off the lights last night until almost 1 AM because we were keeping a close eye on the weather moving across the lower portion of Michigan’s Lower Peninsula.  Although strong to severe storms were still forecast from 1 AM to 5 AM they either did materialize at our exact location or we slept through them.  We had the house closed up and the air-conditioning on, so that cut down the sound level of outside noises.

A cold front had pushed through by sun up and we woke to a cool morning with blue skies and noticeably lower humidity.  We did not have any trees, or even big limbs, come down and there was no damage to our brand new roof.  The forecast yesterday was threatening enough, however, that in the morning we took the potted plants, and as much of our outside lawn furniture as we could find room for, inside including our sun umbrella and trash cans.  I planned to be gone most of the day, and Linda was leaving mid-afternoon to go to dinner and a movie with Diane Rauch, so our first chore was to put all the lawn furniture, plants, and other outdoor stuff back outdoors.

This week is mostly being devoted to ham radio with the ARRL Field Day as the crowning event this weekend.  My specific focus for most of the week, however, has been the “communications tower” adjacent to the east wall of our house.  As described in previous posts we installed a cable entry box (CEB), mounted the cellular booster in the basement, mounted the inside cellular antenna, and ran coax cables.  The antennas will (hopefully) be mounted on the existing 40 foot tower tomorrow, cabled into the CEB, and cables run from there to devices inside the house.  With any luck by the end of the day tomorrow we will have decent cellular service inside the whole house, the ability to watch OTA TV programs on two different TV sets, and finally be able to connect one of our radios in the ham shack to an antenna.  Today, however, was planned to mostly address other things.

I had an appointment with our dentist at 10:20 this morning and left at 9 AM.  I planned to stop at Chuck’s bus garage and check that the key he lent me worked, but I needed gas for my car.  I did not have time for both and did not really have a choice; I would have to check the key some other time.  I ordered two cables yesterday from Scott (AC8IL) at Adams Electronics.  Later in the evening I was unsure if I had specified the connectors correctly so I called and left a message.  I called again this morning to make sure the message got through.  It did, and my original connector specifications were correct.

I arrived at the dentist’s office about 10 minutes before my appointment time.  I called Rick Short at Isringhausen USA to make sure he was going to be in before I drove two hours to Galesburg, Michigan after my dentist appointment.  I got his voice mail a left a message.  “ISRI” makes very high tech air suspension driver’s seats that are used as original equipment in motorcoaches, semi-tractors, heavy equipment, and locomotives.  I would really like one for our bus, but it is not proving easy to get.

Dr. Steve and his assistant, Leslie, made molds of my upper and lower teeth and a bite impression.  The molds will be used to make a mouth guard that I can wear while I sleep.  Dr. Steve has a strong suspicion that I am clenching my teeth and the mouth guard will reduce or eliminate the irritation it causes.  I will have to ask if I can wear it during the day too as I am occasionally aware of clenching my teeth while I awake.

I had not heard back from Rick by the end of my appointment so I called the main number at ISRI and talked to the receptionist.  It turned out that Rick was not in today and she transferred me to Jeff Woodworth.  Jeff was willing to meet with me but thought it would be a better use of my time to wait until Rick was available.  My next opportunity to drive to Galesburg will be Thursday and I will likely go as the ISRI seat is holding up our ordering of Flexsteel seats through Coach Supply Direct.

I stopped for coffee and then re-routed for Chuck’s bus garage in Novi.  The key to the garage worked perfectly.  I called Linda to let her know about the change in plans and headed for home.  There is too much to do at the moment to waste much time so I installed the #4 AWG bare copper ground wire I bought yesterday at Lowe’s.  I mounted an offset copper wire lug using the center support stud for the copper back plane in the CEB.  I replaced one of the plastic hole plugs with a rubber plug with a small hole in the center.  The hole I chose in the bottom of the CEB allowed the ground wire to come straight up into the lug.

Another view of the cable entry box on the east end of the house by the 40-foot tower.

Another view of the cable entry box on the east end of the house by the 40-foot tower showing the bare copper ground wire that runs to the ground rod and then to one of the tower legs.

Outside the CEB I routed the ground wire around to the existing ground rod and secured it using the new clamp I bought yesterday.  There was an old ground wire connected from a clamp on the tower to the ground rod.  I removed that wire along with some coax and control wires that I had clipped when we removed the old satellite dish.  I then attached the new ground wire to the clamp on the tower.  While we were at it Linda trimmed back a small bush that was growing between the tower legs and I pulled leaves, grass and other stuff out from around the Day Lilies that we transplanted last year around the tower base.

With the CEB grounded we looked at how we might get a video cable up to the TV/monitor in our bedroom.  The wall where the TV is mounted has a hot water baseboard radiator that comes almost to the trim on the door wall.  That end of the radiator has a copper pipe that goes through the floor into the basement and it was easy to locate the pipe in the basement.  I determined that there was enough space behind the pipe to safely drill a hole but I had to drill it from the top side at an angle.  A 5/8″ wood boring drill bit created a hole just big enough for the molded F-connector on the end of the cable to pass through.

We fed the video coax cable above the suspended ceiling in the ham shack area to the location of the hole.  I then fed the cable up from the basement as Linda pulled it up into the bedroom.  We adjusted the amount of cable in the bedroom to allow the wall mounted TV set to move through its entire range of motion.  The other end of the cable was then routed into the sump pump room.

By the time we finished pulling this cable it was 3:30 PM and time for Linda to leave to pick up Diane.  They were headed to Royal Oak for dinner and a movie as the movie they wanted to see was only showing at the Royal Oak Main Theater.

While I was out during the morning Lynch Carpet had called to let us know our Armstrong vinyl tile was available for pickup so after Linda left I closed up the house and went to get it.  The 12 boxes of tiles, container of vinyl adhesive, and container of vinyl grout were all neatly arranged on a small pallet and tightly wrapped in shipping plastic.  Rather than break this down and load each thing individually they used a fork lift to set the pallet in the back of my Honda Element.  The rear suspension settled at least two inches when they transferred the full weight of the pallet to the floor of my car.

When I got back to the house I backed the car up to the garage.  I cut the shipping plastic loose and unloaded the tubs and boxes of tiles.  I put the pallet on the garage floor and then neatly stacked the boxes of tiles on it to keep them off the floor.  Each box contained 14 tiles measuring 16″ by 16″ for a total area of 24.89 square feet.  The Armstrong Alterna tiles are a “luxury vinyl” product, and are about 1/8″ thick.  Even so, the boxes were heavier than I expected so I decided to weigh one.  It tipped the scale at just under 42 pounds.  That meant the entire pallet weighed close to 500 pounds, and, ignoring the weight of the cardboard box, that is about 3 pounds per tile.

When I drew out the design I determined that I would need 158 tiles, some of which would be partial.  Figuring conservatively at 150 full tiles equivalent, and ignoring the weight of the underlayment, adhesive, and grout, the floor tiles will weigh about 450 pounds.  I have no idea what the carpet and ceramic tile that I have removed weighed but the tiles were heavy.  I also have no idea what the furniture weighed that we have removed but also have no idea what the new furniture will weigh.  The intent was that the new floor and furniture would weigh less than old stuff but we will see.

I traded phone calls with my dad and we finally got to talk for a half hour starting at 4:30 PM.  He turned 90 this past Sunday.  Mike Fearer from Bid-Rite Concrete called at 6 PM and arrived about 10 minutes later to discuss the foundation for our 70 foot ham radio tower.  I had printed off a page from the Universal Tower website showing their tower base.  I also downloaded and printed their base and tower installation instructions.  I had a set of these to give to Mike so he would have some idea of what the project is about.  We looked at the proposed location for the tower and access for his dump cart.  We also talked about the base, a rebar cage, a form around the top of the hole to allow the concrete to be slightly above ground, and a jig to make sure the base is level and the tower is plumb.

He said he was interested in the job and would work with me and Phil Jarrell (the excavator) to get it done.  Rather than bid the job he would just do it for time and materials.  He also said the current price of concrete was about $100 per cubic yard.  We will need about six (6) cubic yards to fill the required 5′ x 5′ x 6′ (deep) hole.  He thought he might be available the middle of next week but I don’t think I could have everything pulled together that quickly.

After Mike left I went to Lowe’s and picked up five 40 pound bags of topsoil, a 1-in/2-out signal splitter (rated for 5 MHz to 2.4 GHz), and a plastic snap cover channel for hiding the video cable we ran up into the bedroom from the basement for the TV set.  I then went to the Meijer’s supermarket just across Grand River Avenue for soy creamer but they did not have what I was looking for.  As long as I was there I had a salad for dinner at the in-store Subway.

While I was sitting there I called Mike Sharpe (W8XH) to confirm that he was available tomorrow to help with the antenna installations on our 40 foot tower.  I mentioned that the only thing I lacked was a standoff with a pulley at the end of it for hoisting stuff up to me.  He suggested that something like that was essential and I agreed, so I headed back to Lowe’s to see what I could figure out.  What I ended up with was a three foot long 7/16-14 threaded rod, a pulley that had a closed eyelet on top (and was big enough for the 3/8ths rope I bought), some 7/16ths washers, and some 7/16-14 nuts.

When I got back to the house I unloaded the topsoil near the part of the east yard that needs to be filled in, took the other stuff inside, and then assembled the threaded rod pulley system.  I secured the pulley on one end of the rod using two of the nuts, one on either side of the eyelet.  I threaded a nut onto the other end, put on two washers, two nuts, two more washers, and another nut.  I ran the first two nuts, with two washers between them, part way down the rod.  I left the second pair of nuts, with washers between them, near the end of the rod.

I took the assembly out to the tower and adjusted the position and spacing of the two pairs of nuts and washers so they would bracket two of the horizontal tower members.  In use I will secure the rod to the tower at each pair of nuts/washers using plastic cable ties.  This arrangement will put the pulley at least 18″ from the tower which should be far enough out that we can hoist the DB8e OTA TV antenna to the top of the tower without it banging into the tower or hanging up on something.  This antenna is the largest thing we need to hoist up. The old TV antenna is considerably larger and heavier, but it is coming down via gravity.

There was a message on our answering machine from Linda’s sister, Sr. Marilyn, who lives in St. Louis.  She was listening to the news earlier today about the storms that went through our part of Michigan and wanted to make sure we were all OK.  By the time we finished talking it was dark and I was done working for the day.  Linda called shortly thereafter to let me know she was on her way home and I mentioned the call with Marilyn.

I finally opened the box with the vertical omnidirectional outside antenna for the cellular booster system and discovered that I should have opened it sooner.  The mounting bracket was designed to be mounted to a vertical surface, such as the side of a house, not a tube, such as a tower leg.  I did not want to postpone tomorrow’s tower work so I will have to get up early and figure out a way to adapt the existing bracket so I can mount the antenna to the top of the tower.

My initial thought was that an aluminum U-channel of the correct size might solve the problem very nicely.  I could drill two holes in the bottom of the “U” to match the two holes in the bracket.  I could then drill three pairs of holes through the sides of the channel.  The antenna would be bolted to the bottom of the channel.  With the open part of the channel held against a vertical tube I could secure it with three long plastic cable (zip) ties.  Conceptually it should work and be easy to fabricate, but will take time which I won’t have a lot of in the morning.  We have to get the two coax cables from Scotty (AC8IL), drop off my car at Brighton Honda for its 100,000 mile service, and be back in time to have the mount fabricated and all of the antennas and tools ready to go by 10:30 AM when Mike shows up.

Linda got home at 9:45 PM, earlier than she thought she would when she left.  She and Diane ate at Luigi’s and had a very nice meal.  They also enjoyed the movie.  We had a big day on tap for tomorrow and we asleep by 10:30 PM.

 

2015/06/22 (M) Cable Me This

We turned the air-conditioning off last night and enjoyed the fresh air, pleasant temperature, and lower humidity.  The overnight low was 58 which made for good sleeping.  We awoke to blue skies and what we thought would be a picture perfect Michigan summer day until Linda checked the morning news (iPad).  There was a story about a storm that moved through the upper plains yesterday and had a bead on Michigan for later today and this evening.  What had been a 10% chance of rain for today had been replaced by a forecast for strong-to-severe thunderstorms with the possibility of strong winds, large hail, and tornadoes.  Ahhhh, summer in Michigan.

Not ones to sit around and wait for the apocalypse we did what any sensible couple would do, I made coffee while Linda reheated the last of the Baked French Toast from yesterday’s brunch.  We had breakfast and then sat on the deck enjoying our coffee and contemplating the end of the world, or at least the possible destruction of our brand new roof.  But it’s insured, so “no worries, maan” as they say in Jamaica.  More coffee please.

We have a whole house generator that runs on natural gas so as long as a storm doesn’t damage it we can survive for a very long time without electric utility power.  Losing our AT&T Internet connection, however, would be a genuine hardship as that would require us to use our Verizon Mi-Fi (without the benefit of the new Fusion5s cellular booster which I plan to install on Wednesday) or go to Panera, McDonalds, or one of the libraries to get online.

Keith showed up around 10 AM to cut the grass.  We were hoping he would make it as we have not had too much rain this past week and the last few days in particular have been dry.  I think this is the first time this season he has been able to cut our grass without it being wet.  It looked nice when he was done.

I got a call from Phil Jarrell.  He had been successful in reaching Mike Fearer of Bid Rite Concrete on Mike’s cell phone.  Based on Phil’s description Mike was interested in looking at our tower foundation project and was expecting me to call so I did, using my cell phone, and this time I was able to reach him.  It turned out that the information about his business on the Internet is out of date.  He is no longer in Whitmore Lake but now operates from near M-59 and Latson Road, not far from us.  We agreed that he would stop by tomorrow at the end of the work day to look at our project.

I did not want to do a lot of heavy work today, as I was still a bit tired and sore, but I needed to mount two lightning arrestors in the cable entry box and mount the cellular booster in the sump pump room so I could figure out what coax cable lengths I needed and go get them from Scott Adams (AC8IL) at Adams Electronics in Wixom.  But first I called Mike (W8XH) to let him know I was planning on Wednesday for the tower work, assuming he was still available and the tower was still standing.

Cable entry box showing copper ground plane with Morgan lightning arrestors (lower left), control line arrestor (center top), and cellular and OTA TV arrestors (center).

Cable entry box showing copper ground plane with Morgan lightning arrestors (lower left), control line arrestor (center top), and cellular and OTA TV arrestors (center).

I determined that I needed two coaxial cables and ordered them from Scott by phone rather than take the time today to drive to his place of business.  They will both be LMR-400 with N-connectors on both ends.  One will be 50 feet long, for our 2m/70cm Diamond X50-N VHF/UHF base station antenna, and the other will be 15 feet long, to get from the cellular booster lightning arrestor in the cable entry box to the repeater (amplifier) in the sump pump room.  I will pick them up early Wednesday morning and install them.

One of the lightning arrestors was for the SureCall Fusion5s cellular booster system.  It has N-connectors on both ends, one of which is intended for bulkhead mounting.  It came with an angle bracket that fit over the bulkhead end and I used that to mount it.  I used the 2′ length of LMR-400 that came with the booster installation kit to position the lightning arrestor so the cable from the repeater could exit one of the 2″ conduits and bend around and connect to it.  LMR-400 is a low loss, 50 ohm impedance, coaxial cable that can handle high RF transmit power.  The cellular booster only has a 1 Watt transmitter but is operating at frequencies where energy losses in coax cables become significant.  To do what it does LMR-400 is just under 1/2″ in diameter.  It is fairly stiff and does not make sharp bends so cable runs and connections have to be carefully planned.

The other lightning arrestor was for the Antennas Direct DB8e OTA TV antenna and serves a dual purpose as the power insertion device for the tower mounted amplifier.  The coax cable for OTA TV signals is typically 75 ohm impedance RG-6 with F-connectors.  It is half the diameter of LMR-400 and much more flexible.  It is also typically used to receive low power signals and convey them in one direction; from the antenna to the TV.  Because we are 25 miles from the nearest TV tower and some of the towers are 50+ miles away, I ordered a signal amplifier to go with the antenna.

Ideally you want to amplify an OTA TV signal as soon as it comes out of the antenna and this amplifier does just that.  It will mount on the same tower leg as the antenna about two feet below the antenna feed point.  However, being an active electronic device it needs electrical power to operate.  There are two basic ways that could be done.

One way would be to have power wires, such as +5 VDC and DC Ground that are separate from the coaxial cable that carries the radio frequency (RF) energy.  The two OTA TV antennas on our bus are set up this way with three wires to supply power and control the enclosed rotor.

The other way is to provide DC power through the coaxial cable itself, which is how this amplifier is set up.  The nice thing about this arrangement is that the amplifier only has two connections and they are both coax connectors that can be weather sealed.  To get the DC power into the coax cable, however, requires a special device called a power inserter.  The power inserter, in turn, requires the coax to be split into two segments so there end up being four connections instead of two.  The power inserter for this amplifier very conveniently acts as a lightning arrestor as well, which is why I mounted it to the copper back plane in the cable entrance box.

By boosting what I presume will be weak signals from distant towers the amplified signal should be strong enough to survive the trip through the coax cable to the power inserter, from there to a 1-in/2-out signal splitter, and then through additional lengths of coax to the two TV sets.

After getting the two lightning arrestors mounted in the cable entry box I took a break for lunch and then went to Lowe’s for some supplies.  When I got back home I turned my attention to mounting the SureCall Fusion5s cellular booster (repeater amplifier) in the sump pump room.  The sump pump is in the northeast corner of the basement, which is also the northeast corner of our ham shack and office.  (The ham shack occupies the north wall and my desks occupy the east wall.  Most of the rest of the room is storage.)

I gutted and rebuilt this space, with the help of long-time friend John Rauch, before we moved in and created the large closet (small room) around the sump with insulated walls to contain sounds.  I installed an electrical sub-panel in this room to provide power to the office and ham shack desks and to an RV outlet by the pull-through driveway.  I fed the power for the RV outlet through the bond on the east wall just above the concrete block foundation and ran it underground to the far side of the driveway.  It was my intention from the beginning to mount a cable entrance box next to the power feed and have all of the coax cables and control wires for outside devices enter the sump pump room in the same manner as the power.

The ham shack/office walls are finished with T-111 exterior plywood with 4″ groove spacing and I finished the interior of the closet the same way as I knew I would eventually want to mount things to the walls.  I mounted the SureCall Fusion5s booster on the west wall of the closet about a foot inside the door and just below my eye level so I could see all of the connectors, switches, and indicator lights on the top and front of the unit.  It had four mounting tabs, two top and two bottom, that attached easily to the wall with short wood screws.

There is a duplex AC electrical outlet on that wall and one on the opposite (east) wall.  The power supplies for the cellular booster and OTA TV antennas will plug in to these along with the sump pump and the charger/controller for the battery powered backup sump pump.  One of the things I bought at Lowe’s were two outlet expanders which I installed in these two duplex outlets.  I also bought a switch with a pilot light to replace a single pole Decora switch that will eventually control the light in the closet.  I installed the switch but did not complete the wiring as I have to tie it in to the light fixture which requires me to cut the power to that circuit.   I would also like to replace the bare bulb fixture while I am at it but have not yet purchased a replacement.

Although it was late afternoon I decided to install the inside antenna for the cellular booster system and run the coaxial cable that connects it to the booster.  The antenna is designed to mount to a flat ceiling and provide a hemispherical coverage area below the plane of the ceiling.  I had previously figured out that if I mounted this antenna in the main floor hallway near the midpoint of the house I could connect it to the cellular amplifier using a 50 foot length of coax cable that came with the system.

The desired mounting location was opposite the door to the hall closet and the access to the attic is through the ceiling of that closet, so that was very convenient.  We emptied the closet, removed the clothes rod, and setup our six foot step ladder.  I removed the piece of foam insulation we currently use to seal the attic access opening and climbed up, flashlight in hand to check out what was on the other side of the ceiling.

Our desired location for the antenna was free of problems on the back side so I drilled a 3/4″ hole for the mounting stud and used a piece of rebar to poke a hole through the insulation for the coax cable that came out of the stud.  Linda fed the coax and stud through the hole and I put the retaining nut on the stud from the attic side of the ceiling.  The antenna is shaped like a coffee filter, is about six inches in diameter at the ceiling, and tapers down to about four inches in diameter about four inches from the ceiling.  The housing is white plastic and blends in well with the ceiling paint.

About four feet from where we installed the antenna is a chase that runs from the attic to the furnace room in the basement.  It appears that once upon a time something having to do with the furnace ran through this chase, such as the combustion air intake.  The combustion air is now drawn through the back wall under the deck and the exhaust goes out through the east wall of the basement via a double wall stainless steel flue pipe.  The chase is no longer used for furnace or other utilities although there are electrical cables to switches mounted in the bathroom walls and it still contained a piece of 4″ plastic pipe.

I positioned myself near the chase and guided one end of a 50 foot length of LMR-400 coax down through the pipe and through the hole into the furnace room while Linda held the roll of coax near the top of the ladder and unrolled it.  At one point the coax bunched up and Linda had to go to the furnace room and untangle it.  At another point the 4″ plastic pipe slipped through the bottom hole into the furnace room which caught me by surprise.  Once the cable was mostly fed through I routed it to the location of the antenna, connected it to the pigtail coax from the antenna, wrapped the connection in weather seal tape to keep moisture out, and secured it with a cable tie.

With the antenna installed Linda started preparing dinner while I dealt with the 37 feet of coax in the furnace room.  The furnace room does not have a finished ceiling so I had access to the areas above the suspended ceilings in all of the adjacent rooms.  In particular I was able to feed the free end of the coax above the ceiling in the office and into the sump pump room.  I secured the cable with plastic cable ties at two points in the furnace room to keep it away from the flue and various hot water pipes.  I had about 8 extra feet of cable so I made a large coil with two loops such that the free end came off the loop straight down into the connector on top of the booster.  I hung the coil on the wall above and to the right of the booster making for a very neat installation.

I took a shower to try and get rid of some of the fiberglass itch while Linda finished the dish she was making for dinner.  It was a complex Indian style dish with Basmati rice, garbanzo beans, Swiss chard, onions, and shallots, seasoned with salt, black pepper, cayenne pepper, cumin seeds, garam masala, fresh lemon (zest and juice), and fresh dill that Linda grew herself.  The house was filled with the aromas of all these ingredients for a couple of hours as they were prepared and combined into the final dish.  It tasted as good as it smelled with many flavor layers.

Our beautiful blue sky gave way to high, thin clouds through the morning and then to lower, thicker clouds during the early afternoon.  By 2 PM the clouds to the west were dark as I drove to Lowe’s in Howell and the first, heavy rains came as I got to the parking lot.  I waited a few minutes and they stopped so I got into the store without getting wet.  I had the same good fortune on my way back to the car.  The sustained rains came later in the evening along with a tornado watch.  We went to bed before 10 AM but did not go to sleep.  It took me a long time to write this post and we kept a watchful eye on the weather radar.  Although thunderstorms were forecast as a certainty from 1 to 5 AM with the possibility that they might be severe, we finally turned the lights out around 12:45 AM and tried to get some sleep.

 

2015/06/16 (T) More Stupid

Linda was scheduled to go to the bakery this morning but rescheduled to tomorrow due to last night’s weather forecast and the possibility of flooded highways in Detroit.  The morning rush hour traffic is bad under the best of conditions and flooded roadways can make it near impossible.  She also did not sleep well and woke up tired.

The Apex roofing crew started showing up just before 8 AM and the Wimsatt truck showed up with the shingles a little after 8 AM.  They brought a conveyor truck this time and were able to get the shingles off the truck and onto the roof without difficulty.  The Apex crew did not waste any time getting to work.  It turned out to be a great day for roofing; clear skies, no rain, moderate temperatures, lower humidity, and some breeze.  Even so, it is work that is done without the benefit of shade and roofs are hot places to work even on the nicest of days.

Wimsatt unloads shingles onto the garage roof.

Wimsatt unloads shingles onto the garage roof.

Linda continued working on the financials for our amateur radio club while I checked my e-mail.  I had a reply from RV Critter Guard telling me what to order and how much it would cost.  I placed the order through their website and used PayPal to complete the transaction.  I tried calling the concrete contractor that Phil recommended (Bid Rite Concrete LLC in Whitmore Lake) but the phone would disconnect after the first ring and revert to a dial tone.  Perhaps the recent storms caused a problem but I e-mailed Phil to see if he had a different number for them.  I called the Henry Ford Medical Center in West Bloomfield and made dermatology appointments for myself and Linda.

With all of that taken care of I turned my attention to the bus.  The toilet is a Microphor LF-210.  It uses pressurized air to operate the waste valve and the water valve and to help push the waste through the drain pipe and into the black tank.  To remove the toilet I had to undo three connections—air, water, and waste—and take out the four screws securing it to the floor.  If only it was as easy as that makes it sound.

The plumbing at the back of the Microphor toilet in our bus.

The plumbing at the back of the Microphor toilet in our bus.

Undoing the air line was easy and undoing the water connection only a little less so.  The waste connection was another matter.  The 1.5″ black plastic drain pipe was routed from the water bay through the floor and into the HVAC chase that runs along the driver’s side of the coach.  The converter, Royale Coach, brought it out through a hole in the wood that covers the chase, making it impossible to take the wood cover off.  The pipe then made two right angle bends, the first one towards the floor and the second one towards the back of the toilet.  The waste pipe was connected to the toilet discharge pipe with a length of rubber hose and a compression sleeve.

The toilet has a large hole in the back for all of these lines to pass through to the inside where they get hooked up.  It should have been a simple matter to slide the toilet away from the wall/chase but the last bend in the drain line was below the top edge of the bottom of the hole, preventing it from coming out.  After wiggling the toilet enough to get the rubber hose loose from the drain pipe I was able to lift the drain pipe just enough to slide the toilet out.  I took pictures for a possible BCM article on our interior remodeling project and then Linda helped me move the toilet out of the bathroom to the front of the coach.

The more I disassemble this coach the more stupid I think the design and construction of its systems are.  I don’t know that coaches from Marathon, Liberty, Vantare, Featherlight, Parliament, Millennium, Custom Coach, or any of a dozen other companies that have come and gone, is any better as I have never tried to disassemble one of them.  These are one-of-kind vehicles that are custom built specifically for the original purchaser and the over-riding factor in every case is the interior design.  Stuff, like toilets, go where the customer wants it, and systems, which are generally buried and hidden from view, get built wherever and however they can be made to fit.  The converter does not expect to have to repair or replace anything during the very short 12 month, 12,000 miles, warranty period and if stuff breaks after that, or someone wants to do a remodel or upgrade sometime later, it will all be time and material.  How difficult it is to do, and how many hours it takes, is someone else’s problem at that point.

The Apex crew hard at work on the back side of the main roof.

The Apex crew hard at work on the back side of the main roof.

We had a call from Butch updating us on a possible property purchase.  They are waiting for a clear title search before making an offer.  The property includes a house and a sizable barn.  The barn needs a new roof and the house will have to be gutted and the inside rebuilt, but for the right price it will still be a good deal.  They already have a good estimate to replace the barn roof and since they are now retired they have more time to work on the house than they would have a year ago.  They also have family and friends who can help.  Besides, they still have their home/business building in Twelve Mile, Indiana and their bus, which they lived in all this past winter, so they will not be under any pressure to get the inside rebuilt quickly.

Linda started downloading updates from Adobe Creative Cloud, which take a very long time, and then left at 3:30 PM for Ann Arbor.  She agreed to take care of grand-daughter Madeline while Brendan and Shawna attended a reception at the University of Michigan – Ann Arbor for newly tenured and promoted faculty.  I was on my own for dinner and Linda bought an Amy’s pizza so I would have something easy to prepare.

The roofers finished up for the day around 5 PM.  By the time they left most of the trash was in their dumpster trailer and the roof was tarped as a precaution against rain even though the forecast for tonight and tomorrow is for dry weather.  Rain returns to the forecast tomorrow night into Thursday but turns dry again on Friday, so we are optimistic that they will get the job finished this week.  It’s a big job but Apex has a big crew working on it and they got a lot of work done today.  We are very pleased with the look of the Certainteed Landmark Pro Max Def Resawn Shake shingle that we chose.  I took pictures of the work throughout the day as I always try to do with major projects.

After the roofers left I worked for a while in the bus.  I took the mattress into the house along with the electric heating pad controls.  I disconnected the two gas struts that support the plywood bed platform so I could open it far enough to reinstall one of the drawers.  I left them disconnected as I plan to remove the platform to provide better access to the sides of the box and floor.  I also plan to reposition them when I reinstall the platform to provide better access to the storage area underneath.  I then took measurements and made a sketch of the file drawer box for the desk.

Installing soffit baffles and replacing roof decking on the front of the main roof.

Installing soffit baffles and replacing roof decking on the front of the main roof.

I cooked the Amy’s Roasted Vegetable Pizza on the outdoor gas grill, both to avoid heating up the house and to see how it responded to that cooking method.  I used the grilling mat and the result was quite acceptable.  A glass of Franzia Moscato was a nice accompaniment.

After dinner I worked at the drafting board in my office turning my sketch and measurements into a scale drawing.  The two boxes for the desk will be trickier than a standard desk box because of the HVAC chase and because I have to put an Aqua-Hot heat exchanger in the bottom of each one.  I worked until about 9 PM and then came back upstairs.

The air-conditioner worked fine yesterday but was once again unable to bring the temperature in the house below 74 degrees F even though the outside air temperature never rose above 80.  There is clearly something wrong and I am wondering if one of the cold air ducts is open into the attic and/or one of the return air ducts us drawing hot air from the attic.  Either of these conditions would reduce the air flow to the house and overtax the evaporator in the air handling unit.  The more likely cause, however, is lack of refrigerant.  Whatever the case I shut the system off and opened up the house.

I was relaxing in the living room when Linda called at 9:30 PM to let me know she had left her babysitting gig and was stopping at the Whole Foods Market before heading home.  The reception started at 5 PM and lasted until 9 PM.  She was home by 10:15 PM and straight away to bed as she has to go into the bakery tomorrow and wants to leave early enough to be ahead of the morning rush hour traffic.

 

2015/06/10 (W) Ron and Mary

Same routine as yesterday; up at 7 AM, open up the house, feed the cats, clean the litter tray, start a load of laundry, make the coffee, and drink the coffee while using our iPads.

Our daughter’s 34th birthday is tomorrow but she is flying to Las Vegas today to meet up with her husband who is there on a company outing.  We will celebrate her birthday when they get back, perhaps in conjunction with Father’s Day and Linda’s birthday, which is at the end of the month.

Linda left at 9 AM for Brighton Honda to have the 12 V battery in her car checked.  The battery light came on the other day so we thought it might need to be replaced.  Around 9:20 AM I heard thunder and a short time later we had a brief, heavy downpour.  Linda called at the same time and said the battery tested OK.  The problem could be the alternator, of course, but presumably the dealer service people know that and checked for that.  If not, we will likely be back there sooner rather than later.

Linda headed on to Meijer’s to do the grocery shopping.  Today was trash pickup day so I took the trash can to the street.  After meeting with Brad from Chuck It Junk Removal the other day we decided we would rent their trailer for 5 days.  For the same price as having them physically handle 1/3 of a truck of junk (5 cu. yd.) we can get rid of a full truck of junk (15 cu. yd.) by loading it ourselves.  Deal.

I got a call from Phil Jarrell regarding my request for pricing to dig a foundation hole for a ham radio tower foundation.  It was a useful conversation in that I had not previously realized that I will need a concrete contractor in addition to the concrete supplier.  The only thing the concrete supplier will do is show up with a cement mixer truck and dump the concrete where they are instructed to.  The concrete contractor will actually place rebar, build forms, provide carts or a pumper, and get the concrete from the truck to the hole.  Phil recommended Mike Fearer of Bid-Rite Concrete as a good guy who would work with me to get this done.

I talked with Chuck about getting a key to his shop so we could have the new refrigerator delivered there and have the old one picked up without having to trouble him to be there.  He agreed and suggested that we contact the guy down the street about removing the old windshield and installing the new one as part of the refrigerator swap.

Rather than dig into our bus interior remodeling project I have used the last couple of days to finalize decisions about various products and order them.  One of the things I have wanted/needed for a while is a cable entrance box that will allow me to route transmission lines and control cables into the basement from outside.  I talked to Chris Perri, KF7P, at the Dayton Hamvention last month and decided that I liked his custom fabricated cable entry boxes.  I got his business card at the Hamvention and exchanged a couple of e-mails with him this week.  I decided this morning how I want the box initially configured and e-mailed my specs to Chris.  I would like to run the cabling for the cell phone booster through this box so I needed to get it on order.  Speaking of which, the cell phone booster system arrived today via UPS so I am feeling more comfortable that all of the stuff I am ordering will actually get delivered to our house.

Wednesday’s and Fridays are when Recycle Livingston is open and the Wednesday hours are 11 AM to 5:30 PM.  We had my car loaded up with recyclables and Linda drove over after lunch to drop them off.  When she got back she made a batch of her yummy granola and I got a couple more loads of laundry done while continuing to work at my computer.

After doing my alternate tile layout for the bus floor yesterday I decided that I liked the way it looked better than the original ad that it would not involve any more cutting than the row/column layout.  I also felt confident that I had an accurate enough tile count to go ahead and order the tiles.  I drove to the Shell station to fill my tank and then drove to Lynch Carpet in Howell.  I ordered 12 boxes of the 16″ x 16″ Armstrong Alterna Luxury Vinyl Tile in the La Plata Creme Fresh pattern, and a gallon each of the vinyl adhesive and Glacier vinyl grout.  There are 14 tiles per box (24.89 sq. ft.) for a total of 168 tiles (just under 300 sq. ft.).  The inside floor area of the bus is around 300 sq. ft. before subtracting out walls and cabinets but we will be using some of the tiles on vertical surfaces in the entry stairwell and cockpit and around the box that supports the bed platform.  My estimate is that I will have 10 extra tiles.  The guy at Lynch Carpet suggested that I use a scrap piece of tile as a spacer when installing the tiles but I may use the little plastic “X” pieces designed for this purpose.

From Lynch Carpet I drove to Lowe’s in Howell to see if they had a different portable air compressor that might be more appropriate than the 6 gallon Porter Cable we just bought.  The Porter-Cable air compressor has a maximum regulated pressure of 150 PSI but that is also the maximum tank pressure.  I will have to test it on one of the front bus tires to determine if it will get the job done and if not I will return it.

The guy at Lynch Carpet also suggested that I rent a handheld grinder from Abe’s or A-1 Rental, both in Howell.  Abe’s did not have any grinders of any kind and A-1 was closed on Wednesdays.  The gal at Abe’s suggested the tool rental service at the Howell Home Depot, so I stopped there.  They also did not have a handheld grinder but they did have a floor model concrete grinder.  It was so heavy that I doubt if we could have gotten it into the bus and it was too big to maneuver in the tight spaces where I need to work.  They did have a lighter/smaller floor stripper and I may give that a try before I resort to grinding off the thinset with an angle grinder and diamond impregnated wheel and/or a belt sander with a very aggressive belt.

Pat Davidson called from Apex Roofing while I was out so I called him back.  They will be able to start on our roof next week Monday or Tuesday and will deliver the shingles on Friday this week.  I confirmed that we wanted two of the 14″ light tunnels for the living room.  I also indicated that I had scrapped the idea of building a dormer or installing a roof hatch as I simply did not get this taken care of in time.

Linda had closed up the house and turned on the air-conditioning while I was out.  It was pulling moisture out of the air but would not bring the air temperature lower than 78 degrees.  Not good.  This will be our third summer in this house and we have not used the air-conditioning very much.  The first summer we were gone for most of June, all of July, and a few days in August.  We had the unit serviced last year and thought it was working OK but perhaps did not really use it after that.  We did install filters in the return air grills so perhaps they are restricting the airflow too much.  It is also possible that it needs refrigerant.  I will have to check our records from last year and then call TOMTEK to arrange to have it serviced again.

Linda’s brother, Ron, and his wife, Mary, arrived early this evening.  They are on their way to northwest Illinois for a week-long organized bicycle ride.  They have to be there on Saturday and will be spending the next three nights at our house.  Visits from them are usually not more than once a year but we really enjoy their company when they are here.

For dinner Linda made a nice green salad and then made whole wheat angel hair pasta with onions, garlic, and mushrooms lightly sautéed in olive oil.  Ron does not imbibe but Linda, Mary, and I had a glass (or two) of Moscato.  We moved to the deck after dinner and had fresh strawberries for dessert.  It cooled off as darkness set in and we eventually moved back inside.  The other three were in the kitchen and I was sitting on the sofa when Juniper suddenly caught a mouse in the middle of the living room, or at least that is where I noticed that she had it.  She took it downstairs and I got her to drop it in the bathroom sink but I was unable to get it into a container to take it outside and it escaped into my office.  I closed the doors but I have no doubt it can go wherever it wants in the house from there.  When I returned upstairs we chatted until 11 PM and then all turned in for the evening.