Tag Archives: mice (house)

2015/11/14 (S) Tiling the Cockpit, #1

I was up at 6:30 AM and got a shower.  Linda got up closer to 7 and we were on our way to our ham radio club breakfast by 7:20; but not before I released two more mice.  Either we have a significant colony living nearby or the same few animals are finding their way back into the house.  We find it hard to believe, however, that if they are returning they would re-enter the trap.

We had a good showing for breakfast, minus a few regulars due to the ham fest in Ft. Wayne, Indiana today and tomorrow.  We were the second two people to arrive so we got to sit across from the other Bruce and Linda.  They are leaving for their new place in Florida before the next breakfast so the next time we see them will be in the Sunshine State.  We had a lot of work to do on the bus this weekend so we did not linger over breakfast and were on our way home by 9:15 AM.

The seat cushions and spacer cushion for the built-in sofa in the bus.

The seat cushions and spacer cushion for the built-in sofa in the bus.

By 10 AM we were working on the floor tile for the front of our motorcoach, which I often refer to here as the “cockpit” as a convenient shorthand.  In a sense the cockpit consists of several sub-areas.  I think of the “entry” as consisting of the stairs and the first landing.  At the same level as the landing is the “driver’s area.”  I sometimes refer to this as the pilot’s seat as most of the controls for operating the bus when it is in motion are located here.  The dashboard, however, extends into the landing area and contains controls for some of the house systems.

One step up from the landing level is the “front passenger seat platform” which I often refer to as  “the platform” as a convenient shorthand.  The portion of the platform closest to the entry door side of the bus is where the front passenger seat is located, which I sometimes refer to as the co-pilot and/or navigator seat.  It’s really not a co-pilot seat as you cannot operate the bus from there, so navigator is really the more appropriate term.  In the center of the platform, and extending towards the driver’s side of the bus, is a step which gets you up to the main floor level.

Because the pilot and navigator seats are on different levels from the main floor those seats are not usable as part of the living room, making the front portion of the interior a distinct and dedicated space with its own character, much like a cockpit in an airplane or ship.  Nonetheless, we used the same fabric on the these two seats as we did on all of the other living room furniture and we are using the same tile on the floors and walls as we used on the main floor.

Bruce uses the heat gun to soften a piece of the floor tile so he can cut it.  (Photo by Linda. )

Bruce uses the heat gun to soften a piece of the floor tile so he can cut it. (Photo by Linda. )

We worked from 10 AM until almost 4 PM measuring, cutting, and dry fitting the tiles for the landing and driver’s area.  The driver’s area in particular took a lot of time as every tile had to have something special done to it.  Intricate curves had to be cut to fit around the steering column, brake pedal, and the perimeter of the area and holes had to be drilled for the seat base bolts.  All of this intricate trimming was done by heating the back side of the tiles with a heat gun (much hotter than a hair dryer) and cutting the softened tile with a razor knife.

We quit working for the day at 3:45 PM and changed clothes.  By 4:15 we were on our way to meet John and Diane Rauch at the Livonia 20 Cineplex on Seven Mile Road just west of I-275 for a 5 PM movie.  Ever since Daniel Craig started playing the role of James Bond in the 007 movies we have gone to see them with John and Diane not long after opening day.  After the movie we went to the Macaroni Grill, which is walking distance from the theater on the northeast corner of the intersection of Seven Mile Road and Haggerty Road.

We had to wait awhile for a table but we had plenty to talk about and the time passed quickly enough.  We were seated by 8:20 PM and finally left our table at 10:20.  We started with bread, olive oil, and wine.  We split a two liter bottle of the Chianti house red wine.  It was priced the same as five glasses, but we each had more than two glasses, so it was a good deal.  All four of us had a “make your own pasta” dish with a salad, and each one of us chose a different pasta and add-ins.  I had linguine with a garlic olive oil sauce, mushrooms, tomatoes, and fresh spinach.  Linda had farfalle (bow tie) pasta with arrabiata (spicy tomato) sauce, garlic, mushrooms, and spinach.  Both dishes were well prepared and tasty, and they were vegan!

I stopped at our local Shell station to fill the fuel tank in Linda’s car and it was a little after 11 PM when we got home.  We had another mouse in the trap so I took the trap to woods on the southwest part of our property and released it.  Back inside I went straight to bed.  It had been a long but productive and enjoyable day that ended with too much food and too much wine too late in the evening but we were glad to have had a wonderful conversation with our longest standing Michigan friends.

 

2015/11/13 (F) Road Trip

I set my alarm for 5:30 AM and got up when it went off.  I got dressed quietly, fed the cats, refilled their water fountain, and took my allergy pill and B-12 vitamin.  I used a plastic bag to pack a change of underwear and socks, a basic oral hygiene kit, my iPad, my checkbook, and my phone charger cable.  I loaded my travel bag and walnut pieces into the car and then checked the mousetraps in the pantry.  One of them had two mice in it.  It was still pitch dark outside so I drove to the end of the new driveway, parked with my headlights pointing across the road, took the trap to other side of the road, and released them.  They went scurrying off into the thick undergrowth of the woods and I drove back to the house.  I left the trap on the front porch and went inside to wash my hands.

I finally left on my road trip to Indiana at 6:20 AM.  I needed fuel so I headed south on Hacker Road and stopped at the Shell Station on Grand River Avenue at I-96.  There is a Dunkin Donuts co-located with the station so I got an extra-large coffee and was on my way.  I decided to head east a couple of miles on I-96 and then south on US-23 to Ann Arbor where I picked up I-94 west.  I took I-94 as far as I-69 and then headed south.  Somewhere along this segment I realized I had forgotten the box with the two swivel ring bearings.  That meant I would not be stopping at Coach Supply Direct in Edwardsburg, Michigan to return them, which would save me time but necessitate getting them back to Josh another time and/or another way.

The change in plans would loosen up my schedule a bit but I still had four stops to make and was anxious to make time.  I stayed on I-69 south into Indiana and then took the Indiana Toll Road (I-80/90) west.  Traveling west there is one travel plaza between I-69 and the SR-19 exit.  I stopped there to use the restroom and get another cup of coffee.  Back in my car I called Josh to let him know I would not be stopping by his shop today in Edwardsburg.  I then called Linda to update her on my whereabouts and change in plans.  She said she would take care of getting the box with the swivel ring bearings ready to mail.

The weather was overcast, drizzly, cool, and windy when I left this morning.  The winds were out of the west so I had a crosswind or a headwind for the entire trip down.  By the time I reached Indiana I had driven out from under the cloud cover.  The temperature remained very cool but the sunshine was refreshing.

My first stop was A-1 Upholstery in Elkhart, Indiana.  Much to my surprise Terry had used the exact same fabric for the filler cushion that we had her use for all of the other ones, so it was a perfect match!  I got a call from Josh while I was there and called him back as soon as I left, but got his voice mail.

My next stop was at Pat and Vickie Lintners’ house, about three miles from A-1 Upholstery, to pick up a critical accessory piece for the built-in Nutone multi-function kitchen appliance.  We have a functional power base built in to our kitchen counter in the bus but only had the blender attachment.  Vickie gave us a number of other attachments at a rally back in September but many of them required a right angle tower adapter.  She had found the adapter a few weeks after the rally.

From Pat and Vickie’s I backtracked to the main north-south road, went south back over the St. Joseph River, and headed west on Old US-33 (Lincolnway).  I got a call back from Josh and he said to stay on my current road all the way to the Mishawaka bypass and then head south to US-20.  From there I was on familiar road as I headed west to US-31 south.  Michele Henry from Phoenix Paint had called while I was at Pat and Vickie’s and I let it go to voice mail.  I called her back when I was done talking to Josh.  They had both called me with some recent scuttlebutt about a service facility in Elkhart where friends of ours had some major remodeling work done on their vintage bus, but it was also a chance to catch up on things in general and helped pass the time as I drove.

I stopped in Argos for fuel and called Bill Tharpe with an ETA of 12:30 PM.  I then called Jarel to let him know I would be there by 1:30 PM.  Butch had driven me past Bill’s place once some time ago so I had a fairly good understanding of where it was and what it looked like; not that I needed it.  Given the address my Garmin 465T GPS unit took me right to Bill’s place on Mexico Road south of Mexico and north of Peru.  Sounds like I was in Central America.

Bill was outside waiting for me and we unloaded the antique SUN Electric Distributor Tester from my car and into Butch’s truck, which Bill had for the winter.  He was headed to his building in Wabash, where he has a paint booth, to repaint the truck so we did not chat for very long.  Besides, I still had one more stop and it would take at least a couple of hours.

A couple of miles on down Mexico Road I headed west on US-24 towards Logansport and arrived at Jarel Beatty’s cabinet shop at 1 PM.  Jarel was not expecting me until 1:30 so he was in the middle of cutting dados in side panels for a tall cabinet.  When he finished that task he switched to a regular blade in his table saw to work on my pieces.

We selected the most suitable pieces of walnut from among the ones I brought.  He ripped two pieces, one 2″ wide and the other 2-1/16″ wide, and crosscut them to 19-11/16″ long.  He then ran them through his shaper to round off the edges.  He changed the blade on his table saw, reset the depth of cut, and set the fence to cut off the amount of material I had marked with blue painter’s tape on the bump out for the passenger side HVAC duct cover.  With the sawing done he sanded the two new pieces and then sprayed them with a Sherwin-Williams pre-catalyzed lacquer.  He let the first coat dry for 15 minutes and then lightly sanded it with 220 grit paper to knock down tiny bubbles and splatters.  He then applied a second coat.  It was remarkable to see how it changed the appearance of the wood.  Jarel described it as being like “putting water on a rock” and I thought that was an apt description.

After another 15 minutes the pieces were dry enough to be transported without damaging them.  I wrapped things up with Jarel, including finally remembering to get all of my drawings back, and was ready to leave at 3 PM.  The GPS said I would be home by 7 PM, quite a bit earlier than I expected when I left this morning.

I had smooth sailing until I encountered a major traffic jam on I-96 eastbound just east of US-127 on the southeast corner of Lansing, Michigan.  It took 45 minutes to go three miles and I was sitting at about 1/8 tank of fuel.  Ugh.  There turned out to be multi-car accidents in two separate locations about a mile apart plus a car stopped in the right lane that appeared to have run out of fuel.  What a mess.

Once I was clear of the accident area it was clear sailing once again.  I stopped at the Marathon station at the Fowlerville exit (#127) for fuel and checked out the truck pumps.  Although there were lots of semi’s parked there for the night I was disappointed to find that the back lot was in as bad a shape as the Mobil Truck Stop at exit 117.  Still, the round trip from our house would be 20 minutes shorter and it was an alternative place to get fuel.  The closest place to our house where we can fuel the bus is actually the Marathon station on Grand River Avenue at I-96 in Brighton, which has truck pumps around back, but we have some low branches in the southbound lane of Hacker Road just before we get to Grand River Avenue, so we tend to avoid that route and that stretch of Grand River Avenue is often very busy and not someplace I want to be with the bus unless it is later at night.

I checked the mousetrap in the pantry when I got home and we had caught yet another mouse.  I unloaded the car and then took the mouse trap to the end of the new driveway and released it across the road as I had done with the previous four.  As I walked down the driveway it was obvious that Phil had been here with his bulldozer, which Linda confirmed over dinner.

The “parking pad” area is now presumably level but it was definitely not flat as it had deep marks from the bulldozer treads and ridges where the gravel had not been completely smoothed out.  The top inch or so also seemed very loose.  I don’t think Phil is done working on the project as he still needs to spread straw over all of the topsoil that he placed, graded, and seeded the other day.  I suspect that he still needs to compact the gravel one last time with his track loader but I won’t know for sure until I can talk to him.

Dinner was chili and crackers; simple but delicious.  It had been a long day but I had taken care of four things in one trip, three of which were directly related to the bus and two of those of a somewhat critical nature.  We were both off to bed not long after dinner.  Tomorrow was our weekly ham radio breakfast so we would have to be up early to get there on time.

 

2015/11/09 (M) Clever Mouse

Madeline coughed quite a bit last night and we were up several times to check on her, so we did not have the best possible night’s sleep.  We got up to stay at 7:30 AM and Madeline got up about 15 minutes later.  I made our morning coffee while Madeline helped her grandma wash blueberries and make vegan blueberry pancakes.  We had a lovely breakfast with orange juice, pancakes with real maple syrup, and blueberries, raspberries, and bananas on the side.

I check the mouse traps in the pantry every morning.  A couple of days ago I found one of them broken with the food gone and some mouse poop left in its place.  The pantry doors had been left open overnight so I figured one of the cats had discovered the trap (we use live traps) and tossed it around until the door fell open and the mouse escaped.  I threw it away since it was broken.  This morning I discovered that the food in the other trap had been replaced by mouse poop but the trap was upright with the door closed and was not broken.  The pantry had been closed all night so I knew the cats had nothing to do with it.  Apparently we have a mouse that has figured out how to defeat the traps.  We are not going to set kill traps so we will have to see what else we can find.

We lingered in the living room for a while enjoying our coffee by the fireplace, listening to Madeline play (with) the organ, and watching her play with some of her toys.  She made her futon into a car and took her two “bunnies” for a ride.  By 9:30 AM I had finished my coffee and changed into my work clothes.  It was just below freezing when we got up this morning, but it was a bright, sunny day with no wind, so it would be a comfortable enough day for working on the bus once I turned up the thermostats and warmed up the interior a bit.

My focus today was to get the SurePly underlayment installed on the floor of the passenger seat platform and maybe the two walls.  I also wanted to get the outside wall panel trimmed off so it will fit around the tile and needed to build a new step with an open front, but I did not expect to get to those tasks today.  First up, however, was getting the small patch I worked on yesterday to fit better and be secure.

I trimmed both ends of the underside of the main patch and recut the side/support panel.  I trimmed the side panel several times before I was satisfied with the fit.  I used heavy-duty double-sided tape to hold the top patch and side panel to the metal structure underneath.  I used a 1-1/2″ stainless steel self-drilling wood screw to secure the top to the vertical piece of 3/4″ plywood that forms the face of the passenger seat platform, and a shorter screw to secure the side panel to the same piece of plywood.  I then attached a temporary plate of SurePly over the side panel to the edge of the top plate to hold the side in alignment with the top.

The metal under this patch is rounded leaving a small space between the top and side pieces where they meet.  The vertical plywood front face is also beveled leaving a void.  I used Door and Window Trim Spray Foam Insulation to fill these areas.  This foam has a lower expansion than most spray foam insulation.  I did not overfill the voids but put enough in that it expanded out past the edge.  I will trim it off flush tomorrow when it is cured.  The foam adheres to anything it touches and is rigid enough to be somewhat structural so it should stabilize and secure the patch.  Once I trim it and cover it with underlayment it should be good as new.

Madeline’s Aunt Meghan, who is also her buddy, came to visit and play with her today.  She arrived at noon and I took a break to visit and have lunch.  After lunch Madeline, Meghan, and Linda went to the Brighton Mill Pond Playscape and I resumed working on the bus.  They were gone for several hours.

Floor patching compound being applied to the co-pilot/navigator platform.

Floor patching compound being applied to the co-pilot/navigator platform.

Before I could put a layer of underlayment on the passenger seat platform I needed to use floor patching compound to fill in some low spots and create a smooth taper from the plywood to some metal edging.  But first I removed all of the screws that secure this edging and counter-bored the holes so the screw heads would be flush.  As often seems to happen when I am working on something like this some of the screws were rusted and I did not have appropriate replacements.  I then have to make a trip to Lowe’s, which is what I did, and bought a small quantity of three different size flathead wood screws.  I stopped at O’Reilly’s Auto Parts to see if they had the large metal or nylon washers that are used with the swivel base for the front chairs.  They didn’t, but once again suggested that I try Howell Hardware in downtown Howell.  I have received that suggestion from people at several different stores so guess I need to check the place out.

When I got back home I finished installing the new screws.  The floor patch compound takes a minimum of three to four hours to dry, sometimes much longer, but after two hours it was dry enough for me to use a sanding sponge to smooth out some ridges and feather some edges that needed it.  It was clear, however, that I wasn’t going to be able to accomplish what I set out to do today.  And so it goes; I need to do the work correctly which means doing all the things that need to be done in the order that they need to occur.  Everything takes time and things that have to dry, set, or cure do so on their own schedule, not mine.

Phil had shown up around 3 PM so I went out to chat briefly with him and then went inside to change clothes.  He had a partial load of topsoil left from a job earlier today and dumped it on the other side of the street by the 3rd driveway culvert.  He used his front loader to place it along the south side of the new pull-through driveway extension and moved the small pile from the west end of the property to the north side of the driveway.

I still had plenty of daylight and wanted to make some good use of my time so I started thinking ahead to the layout of the tile in the cockpit.  I measured various parts of the cockpit and although the number of square feet is small compared to the main floor the layout will be more difficult.  As with all tile layouts it needs to be “balanced” while avoiding small pieces.  Linda and I agreed that the pattern in the cockpit does not need to match the main floor, which is laid out diagonally, so that opens up options for how to lay out the tile.

The main landing is less than two tiles wide (front-to-back) so the best layout for that area is with a grout line dividing it in half, but that might not work well in the driver’s area.  The driver’s area presents the additional problem of a steering column, brake pedal/valve, an accelerator pedal with its electrical cable that goes through the floor.  The “holes” in the tile to accommodate these things have to be created using two notched pieces so they can be installed around the protrusions.  I also need holes for the seat base mounting bolts and power cable for the 6-way power base.  Those can be actual holes but I do not want grout lines to fall at the edges of the base.  I also have to be cognizant of the walls, which are getting tiled.  The distance along the face of the passenger seat platform is close to 65″.  The tiles are 16″ squares so four tiles with three 1/8th” grout spaces is only 64-3/8″.  See, it’s complicated.

The other thing I pondered and measured was the new step between the passenger seat platform and the main floor.  Again there are several parameters:  (1) We want the finished (tiled) height to split the distance from the tiled platform to the tiled main floor exactly in half; (2) we want the finished depth to be half the finished depth of the platform, and; (3) we want an open front so we can store shoes under the step.  The total rise will be just under 14″ so the step rise will be a little less than 7″.  Subtracting about an inch for wood and tile will leave a 6″ high space for shoes.  The platform is 29″ deep so splitting that in half results in two treads of 14-1/2″, plenty deep for shoe storage.  I considered having the step angle across the platform, being deeper by the driver seat and shallower by the passenger seat.  While it would add an element of aesthetic interest it would greatly complicate the construction without adding any practical utility, so I rejected that idea.

As I considered the construction of the new step I was also thinking about the fact that there is a hole in the front end of the passenger side HVAC duct.  The hole opens into the space behind the switch panel on the wall next to the passenger seat and just aft of the entry door but there is nowhere for the air to go from there.  The hole is easy to see but not easy to reach so I estimated it to be three inches in diameter which is approximately seven square inches in area.

One possibility is to install a 4″ diameter circular louvered duct in the switch panel.  It would be large enough in area, could be rotated to direct the flow in any desired direction, and has internal shutters that could be closed down to reduce or cut off the air flow.  The main downside is lack of space behind the panel but I could cut off the tube behind the locking tabs.  Another downside is that the cats sleep under the passenger chair while the bus is moving and the direct airflow might be uncomfortable and/or annoying for them.

Another possibility is to create a narrow duct along the back wall of the platform the same height as the new step and tie it in to the inside of the step, allowing the conditioned air to come out the open front.  That will involve a bit more woodworking and complicate the tile installation, but could be added later, so I will probably opt for the round louvered register for now, if I do anything.

When I was done pondering the HVAC possibilities I put the seat pedestals back on the landing, locked up the bus, and went inside to change clothes.  Meghan left while I was changing clothes so I did not get to say goodbye.  Apparently Linda thought I was taking a shower and would be a while.  Since we needed to get Madeline back to her house well before her bedtime we decided to head to Ann Arbor and have dinner there.  I deflated and rolled up her portable toddler bed while Linda and Madeline gathered up her clothes, books, toys, and other things.  I loaded the car while Linda got her dressed to travel.  I checked in with Phil to get a status update and let him know we were leaving.  We were on our way at 4:45 PM.

The drive down was OK as the really heavy traffic was headed north out of Ann Arbor.  We tried to keep Madeline awake by reviewing all the fun things she had done since she got to our house late Friday afternoon but we were not successful.  As I exited M-14 eastbound onto US-23 southbound I could see that traffic was stopped not far after the Plymouth Road exit so I left the highway and headed west on Plymouth Road to Huron Parkway.  From there I headed south, paralleling US-23 to the west.  At Washtenaw Avenue I turned east, and after a short distance turned left into the small shopping plaza where Elevation Burger was located.

I order a grilled cheese sandwich and Mandarin oranges for Madeline.  Linda and I had vegan burgers and fries and Linda shared her fries with Ms. M.  Madeline was slow to wake up but perked up when her food arrived.  That girl likes to eat!  🙂  After dinner we made the short trip to Madeline’s house and arrived at 6:30 PM.  Linda got Madeline into her pajamas while I brought all of the stuff in from the car and turned up the thermostat.

Madeline was wide awake and full of energy so she played with her kitchen toys and tools and had Grandma Linda read her four stories.  I dozed off for a little while and then spent some quality time with Gus the cat.  Gus loves people but tends to keep his distance from Madeline who is just a bit too energetic and enthusiastic for him.

Brendan and Shawna’s flight was due in to Metro Airport at 6:50 PM and he texted Linda at 6:51 that they had landed.  They were home before 8 PM and got to spend time with their very awake, excited, and active daughter.  We left at 8:30 and stopped at Biggby Coffee on Washtenaw Avenue.  Rain was moving into our area from the south but had not yet arrived and the drive home was uneventful.  We were home by 9:15 PM and headed straight to bed where we watched Scorpion and NCIS-LA.  Linda came down with a cold while Madeline was here and went to sleep as soon as NCIS was over.  I watched Travelscope on the Create channel and left the TV on while I worked on this post.  It was another long, busy day during which I made forward progress on the bus.

 

2015/07/28 (T) Mighty Dremel

I got up at 8 AM.  I must have been sleeping soundly as I was unaware until then that had already gotten up.  She had gone for a walk and left me a note.  The high temperature today is forecast to hit 90 degrees F and she wanted to get her walk in early.  I fed the cats and checked the mouse trap in the pantry.  We caught another one overnight so I carried the trap back to the northeast corner of the yard and released it.

I made our morning coffee and had just settled in to work on my iPad while it brewed when Linda returned from her walk at 8:35 AM.  We enjoyed our first cup of coffee and then had breakfast.  She made a batch of her fabulous granola yesterday but we have to finish the previous batch first.

Today was the day to get back to work on the bus.  First I spray lubed the two overhead garage doors, both rollers and section hinges, and ran them up and down and back up.  I needed to open them anyway to get out the ladder and tools and sometimes it’s better to spend an extra minute while you are thinking about something and just take care of it.  Besides, I had no way of knowing if I would accomplish anything else today so at least the doors worked more smoothly.

This is where the "stop block" was located.  The left screw came out but the right one did not.  I had to grind it off.

This is where the “stop block” was located. The left screw came out but the right one did not. I had to grind it off.

In a very real sense our entire bus remodeling project hinges on getting the old refrigerator out and the new refrigerator in.  The refrigerator swap, in turn, hinges on being able to open the fixed window panel on the passenger side of the bus.  That panel is hinged at the top by a pair of rolled channels, one on the top back edge of the window frame and the other on the lower back side of a rail that runs almost the entire length of the bus.  Most of the upper body side panels are hung from these rails and secured at the bottom with latches or other fixed hardware.

The window frame in question has two latches that can be released allowing the frame to swing open and provide an emergency exit, except for the two “stop blocks” in the upper outside corners which are attached to the frame (with two screws) just below the rail.  As the name suggests, these blocks appear to stop the frame from opening more than about 10 inches. That would make emergency escape difficult but it makes it impossible to remove a refrigerator.  We know these frames will open farther as someone posted a photo of an H3 on one of the Prevost bus websites with this same frame open almost 90 degrees (horizontal).

As I have described here before I successfully removed the left block and the left screw from the right block a couple of weeks ago but have been unable to remove the right screw from the right block.  Early in my attempt to remove it I stripped the Philips head and things just got worse from there.  I borrowed an impact screwdriver from Chuck, which successfully extracted the left screw but the right screw would not budge.  I eventually bought and used three different screw extractor sets and broke two drill bits using one of them.

The Dremel with a cutoff wheel installed.  The stop block was unusable by the time I got it of.

The Dremel with a cutoff wheel installed. The stop block was unusable by the time I got it of.

I borrowed a soldering gun and Dremel Kit from Chuck on Saturday and finally got around to using them today.  The idea of the soldering gun was to heat the screw causing it to expand and then contract when it cooled.  This will sometimes cause screw threads to separate from tapped holes.  In this case the block was already turning relative to the shaft of the screw but the screw was not turning so I hoped the heat might free it from the threaded hole in the frame.  To find out, however, I needed to create a slot in the shaft that would accept a flat blade screwdriver, in particular the large bit that is part of Chuck’s impact screwdriver kit.  Enter the Dremel.

In order to create a wide enough slot I put two cutoff wheels on the arbor.  The block is at the top of the window frame so standing at the highest safe step of our 8-foot step ladder I was at a comfortable height for holding the Dremel vertically and cutting a horizontal slot.  The cutoff wheels are about the size of a quarter so the slot extended well beyond the screw head, or what was left of it, into the block.  Using the Dremel was a last resort and I knew that once I made that decision the block was going to get destroyed.

The Dremel cutoff wheels cut through the block, which is aluminum, very easily and did not have any trouble with screw or the broken drill bits.  The drill bits eventually loosened to where I was able to extract them with pliers.  I tried several different screwdrivers in my newly created slot but to no avail.  I sprayed WD-40 around the block and screw using paper towels to catch the overspray and clean up any runs.  I kept cutting the block until I was able to pry it off of what remained of the screw.  With less than a quarter inch of the shaft left I cut a slot in the end and tried to unscrew it but the tangs just broke off.  I tried unscrewing it with pliers but it would not budge.  The protruding stub would interfere with opening the frame 90 degrees so I used the Dremel with a cutoff wheel to grind the shaft down flush with the frame.

All the "stuff" I used to attack 25 cents worth of aluminum because of corrosion.

Some of the “stuff” I used to attack 25 cents worth of aluminum because of corrosion.

Linda came out to help at this point.  I repositioned the ladder and then we unlatched the frame on the inside.  Linda pushed it out while I supported it from outside.  It opened farther than it had before but we did not try to raise it to a horizontal position.  The frame/glass is very heavy and we did not want to risk having it come loose at the hinge. We closed the frame and latched it.  I took a few pictures and then put all of the tools away.  The weather was very warm and humid and that was enough outside work for today.

We had hummus, pita chips, and black grapes for lunch.  After lunch I spent a few minutes in my office checking e-mail and then typed up the minutes from our July SLAARC meeting.  I then started working on the design/drawings for the built-in sofa.

I have a very long list of things to do but the furniture design remains a priority as I need to make sure Jarel has all the information he needs to keep moving forward on the custom cabinetry.  Although I will be assembling the sofa Jarel will be cutting all of the pieces.  I will be using a long rip of a full sheet of plywood and a long piece of 3/4 x 3/4 walnut hardwood as an edge band for the horizontal platform.  In order to give Jarel a cut sheet I needed to design the unit.  I also needed to design it so I knew it would fit when assembled.

I took an occasional break to chat with friends on the two local ham radio repeaters that we tend to use but otherwise stayed on task until late afternoon.  I had pulled a book on cryptology from our personal library and started reading it.  I took a nap before dinner and continued reading afterwards.  Fascinating stuff, cryptology.