Tag Archives: Marjorie (Howell Farmers Market)

2015/09/06 (N) Grouting

We got up quietly at 7:30 AM as Madeline was still sound asleep.  Linda did not want to let her sleep too long and get off schedule so I got the “all clear” to grind the coffee beans just before 8 AM.  I made the Costa Rican half-caff because I am trying to use it up so we can replace it with something we like better.  Madeline emerged with Grandma Linda a few minutes later.  After stretching they decided to sit quietly on the living room sofa and read stories while everyone woke up and the adults enjoyed our coffee.

Sometime between 9:30 and 10 AM we left for the Howell Farmers Market.  We walked from one end to the other, with Madeline in her stroller, scoping out this week’s bounty. We then walked back through and Linda bought a few things including hard stem garlic which we had never seen before.  We stopped and chatted with our favorite vendor, Marjorie.

When we got home and put the produce away Linda prepared a snack lunch for herself and Madeline.  The two of them then went on an outing to the farm at Kensington Metropark (KMP) while I stayed behind to work on bus projects.  I decided to start by finishing the assembly of the pieces for the built-in sofa.  I attached the center support for the return air shelf as follows:

  • I determined the center of the long edges of the shelf and drew a line between them.
  • I carried these center marks to the other side and then measured 3/8″ to either side.
  • I connected corresponding marks to create a pair of parallel lines 3/4″ apart and centered on the underside of the shelf.
  • I placed the support in position, determined its fore-aft position, and marked the ends.
  • I then marked a piece of scrap wood, cut it into four pieces, and used them to hold the support in place; two long pieces the same length as the support, and two short pieces across the ends.
  • This allowed me to turn the shelf right side up with the center support held in the correct place and then mark and drill countersunk pilot holes for the screws.
  • I removed the support piece, sanded off any rough spots, put Titebond II wood glue on the edge, and replaced it between the temporary blocking.
  • I stood on the shelf to force the pieces together and ran all the screws down tight.
  • I then removed the temporary blocking.

After sleeping on it last night I decided I would attach the plenum/support boxes to the vertical front panel and the wood wire chase on top of the HVAC chase rather than to the adjacent cabinets or to the floor.  That meant I could go ahead and assemble them as complete, single units.  Easier said than done.

Even though I used right angle corner clamps the two halves I built for each box did not want to go together perfectly.  I managed to get one of them assembled but could not complete the other one by myself.  The problem was that I needed both hands to pull the pieces into alignment and two more hands to operate the drill and screw gun.

By now it was 1 PM, which is Madeline’s normal nap time, but they were not back from the Metropark yet so I gathered up all of the tools and materials I needed to grout the floor tiles in the bus.  That included the special Armstrong S-288 Glacier White sanded vinyl grout, a flat blade screwdriver, the 4″x8″ hard edge float, the smaller margin trowel, the 2″ putty knife (wall scraper), the ScotchBrite sponges, the Revel scrubber, two large buckets for rinse water, paper towels, a large cloth towel, and paper bags.

Madeline pets one of the sheep at the Kensington Metropark animal farm.

Madeline pets one of the sheep at the Kensington Metropark animal farm.

Since Linda and Madeline had still not returned I had a few pretzels with hummus.  They finally got home around 1:30 PM and I heard all about the farm and the animals Ms. M got to see and touch.  The 2-day old piglets were apparently a big hit but so was the playroom.  It was a good outing and I wish I could have gone but I got stuff done that needed to be done.

Madeline finally laid down for her nap at 2 PM but Linda could not help me with the tile grouting as she needed to be within earshot of Madeline’s bedroom.  I decided that we could not afford any further delay for this aspect of the interior remodeling project and resolved to do it by myself.  Without Linda to walk me through the steps, have materials ready, and clean the tools, I needed to be very clear about the steps and their timing.  I must have read the directions on the container of grout a dozen times in an attempt to internalize them but they just would not stick with me.  I needed a spray bottle for water so Linda found one for me.

The afternoon was very warm so I turned off the air-conditioning in our home library, closed up the coach, and turned on two of the three air-conditioners, making sure they were on opposite legs of the electrical service.  I staged all of the stuff in the bedroom storage box as I planned to start on the back side of the bed in the driver side corner by the head of the bed and work my way out.

I finally got started at 2:30 PM.  The grouting involved a specific set of steps that got repeated many times as the directions said to only do 6 – 10 sq. ft. at a time.  That range had to do with the time required to apply and strike the grout, setup time (3 – 8 minutes), misting with water, waiting 20-30 seconds, scrubbing, and finally wiping with a square edged cellulose sponge.  I had to divide the U-shaped bedroom floor into six sections and it took me until 5:30 PM to do that much so my average time was 30 minutes per section, each of which was smaller than 6 square feet.

I took a short break, had something to drink, and checked with Linda on the timing of dinner.  We settled on 6:30 PM and I returned to my grouting.  I had to do the bathroom floor in two sections, which got me into the hallway and joined up with the work from the bedroom.  I went in to clean up for dinner and was greeted by the smell of something baking.  Madeline wanted to make cupcakes so Linda assembled the ingredients and walked her through the steps, letting her do as much of the work as possible.  For not even being three years old yet she is very interested in cooking, but only if it is something she will get to eat! 🙂

Dinner was vegan cheeseburgers, corn-on-the-cob (from the Farmers Market), left over black beans and edamame, and sliced pears.  I worked in the bus from 7 to 8 PM and finished the hallway as far as the bend that transitions into the kitchen.  I cleaned all of the tools and sealed the grout container using Cling-Wrap pressed down onto the surface of the grout to keep air away from it, and locked up the bus.

I washed up and turned on the Yaesu FTM-400 2m/70cm radio in the ham shack while Linda helped Madeline take a bath.  Steve, N8AR, was serving as net control for the weekly SLAARC information net and had already started the net but not yet called for check-ins so I got to participate in the entire net.  We had a small group this evening, most likely due to it being a holiday weekend, but it was still a good net.

I came upstairs to have dessert with Linda and Madeline; chocolate cupcakes (vegan) with sprinkles.  Yum.  I then returned to my office to re-read an article I wrote about replacing the speedometer in the bus and editing it to indicate where the pictures should be placed.  I dealt with several BCM related e-mails and then came upstairs.

Madeline was in her pajamas and sitting in her portable bed while Linda read a story.  She decided that she wanted me to read a couple stories too, so I did.  We got her tucked in with her stuffed animals arranged at the four corners of her bed, turned on the night light, and left her to fall asleep.

I opened the bottle of Apricot wine that Brendan and Shawna picked up from Leelenau Cellars and we each had a small glass.  I worked on this post while Linda cleaned up the kitchen.  It had been a long and very tiring day for both of us but a very satisfying and productive day as well.  We don’t mind that kind of tired.

 

2015/05/24 (N) Nuts to That

We had our usual coffee and breakfast granola but made a more leisurely morning of it than normal.  We finally got dressed around 11 AM and headed to the Howell Farmers Market at 11:20 where we bought another bar of soap from Marjorie.  I got to pick this time and chose the ginger-grapefruit.  We bought the Eucalyptus soap two weeks ago and Marjorie suggested letting them air dry for two weeks before using them.  We will see how long the Eucalyptus bar lasts once we start using it and that will tell us how often we need to purchase from her to stay ahead of our usage, allowing for drying time.

We stopped at Lowe’s to return the “white” toilet seat and buy a “biscuit” colored one.  We looked at pipe wrenches but did not buy one.  I did by a 14 TPI, 6″ long blade for my Sawz-All that said it would cut metal up to 1/2″ thick.  I still hoped to get the nut off of the trailer ball on the lawn tractor without having to cut the threaded stud, but the blade was my backup plan.

We had a brief confab regarding the motorcoach refrigerator alcove and cabinet.  I found my small plumber’s toolbox and it had several pipe wrenches inside.  I took the largest one and checked to see if/how it would fit the trailer ball on the lawn tractor.  It opened more than wide enough and looked like it would snug down tight around the throat of the ball (between the ball and the hex flange base).  Linda kept the pipe wrench from slipping out of position on the ball while I used the torque wrench with the 3/4″ drive, 1-1/8″ socket to remove the nut.  It was still a bit of work but we got the ball off without cutting, cracking, or heating.  I then backed the lawn tractor up to the utility trailer and Linda connected the trailer yoke to the tractor tow plate.

Next we tackled the hall bathroom toilet seat replacement.  Once again we encountered nuts that would not come off.  This time the nuts were a hard plastic but the bolts were rusted and the nuts would not turn.  I eventually cut through the two plastic nuts with a utility knife and pried them apart allowing us to remove the old retaining bolts.  We installed the new seat/lid which came with its own special bolt and elongated plastic nut.  The nuts had special tips designed for 1/2″ sockets and engineered to break off when tightened to just the right point.  We had both nuts torqued down and broken off but the seat was slightly crooked so I had to loosen then, reposition the seat, and re-tighten them by feel.  What should have been a simple, short job ended up being a long and difficult one, in part because there was not a lot of room on the sides of the toilet bowl to get under here and work.  As we were cleaning up Linda noticed that the toilet tank was leaning slightly to the right relative to the base/bowl and thought we should adjust it.

I was already aware of the leaning tank, and the fact that it was not as tight as it should be.  The tank is held to the bowl by two bolts that go through the bottom of the tank and are sealed by gaskets under the heads.  I tried tightening the wing nut on the left bolt.  Even though it was rusty I was able to turn it, but the tank immediately started leaking from the bolt hole in the bottom.  We shut off the water and flushed the toilet to get most of the water out of the tank.  Linda held the left bolt head with a long flat blade screwdriver while I turned the wing nut on the underside of the bowl, first by hand and then with pliers.  I was careful not to over torque it and the tank was still a bit wobbly, but it was straighter and it did not leak when we refilled it.  We will keep an eye on it.  A leaky tank will result in water continuously running onto the floor and causing major damage of not detected quickly and stopped.

Linda cleaned up the bathroom while I put the tools away.  We then changed the primary whole house water filter.  The filter we use is the same 10″ length as a standard potable filter element but is about 5″ in diameter and has two micron ratings.  It’s a spun polypropylene media that is 50 microns at the large outer surface and 5 microns at the small inner surface.  In principle it filters better and longer than a single micron rating element by filtering out larger particles first and thus not clogging up the 5 micron material with large particles.  The same thing would be accomplished, of course, with two filters in series, or three, or four, each with progressively smaller micron ratings.

The Post-It note by the filter said we had last changed it on 11 November 2013.  If that was true it was way overdue to be replaced.  The element was completely black from outside to in so it had been in there longer than the fall of 2014 for sure.  We are starting to get some slime in the toilet tanks again and the water seems to have a slight black tinge, but that may have been due to the filter element needing to be changed.  I may need to have Adams Water Treatment come out again to discuss installing an iron filtration system.  Our drinking/cooking water still goes through a reverse osmosis system, so it is very pure.

Having accomplished several rather physical tasks I decide to sit in the living room and work on my blog posts for the last few days.  Linda made hot tea for us to enjoy while iPading, after which she reheated the leftover risotto and asparagus from last night’s dinner and we finished the open bottle of 2013 Egri Merlot.  After dinner I finally settled in to work on computer-based tasks.  I had a long list of things to do but did not get to most them.  I did manage to off-load recent photos of the bus interior from my camera to my computer, select a few to use in blog posts, and processed them.  I edited a few more blog posts but did not get them uploaded to our website.  I then dealt with e-mails and went to bed.

 

2015/05/03 (N) Markets and Meetings

We cleaned up the dishes from last night, started the dishwasher, and then had coffee on the deck but did not have breakfast.  At 10 AM we drove down to the Howell Farmers Market for the opening day of the outdoor season.  We walked the market and then bought a bar of soap from Marjorie and a loaf of bread from Great Harvest.  Marjorie is our favorite vendor at the Howell Farmers Market.  She has liberal bumper stickers all over her van, grows her own herbs, raises honey bees, and makes her own soaps and other wonderful products.  She went missing from the Farmers Market last season and as soon as we saw her this year we knew why; she was wearing a “cancer cap.”  She is now cancer free and back at the Market, and it was really good to see her there.

On the way home we stopped at Home Depot to look at vinyl floor tile.  Their selection was different that Lowe’s but no better.  We spent most of our time looking at various wood flooring products and brought home four samples plus a small vinyl tile sample.  When we got home we had toast for lunch using the bread we had just bought.  I started a load of laundry and then settled in to review my Exterior Makeover article.  I made final corrections, uploaded it to the READY folder in my Dropbox, and e-mailed the editor and publisher of Bus Conversion Magazine to let them know it was ready.

We both took breaks from what we were doing to look at the floor samples in the bus.  We did not like any of the woods.  The vinyl tile sample was OK, but not quite right.  At the store most of the lighter shades of faux stone style vinyl tiles had a lot of grey in them.  I did not think grey would look good in our bus but it turns out that the Corian surfaces have grey flecks, the wallpaper has a lot of grey, and the leather furniture may have more grey in it than I realized.  And yet when I visualize the interior of the coach what I “see” is walnut and brass.  We need to look somewhere other than the big box stores for vinyl tiles.

The DVD of Sherlock, season 1, episode 2, would not play correctly on the DVD player in our bedroom last night so I put it in the DVD player in the basement to see if it would play correctly.  Linda did not stay awake to try and watch it last night, which was just as well, so I suggested that she watch it and see if it played OK.  It took a long time for the player to decide to play the disc but once it did it played all the way through.  That told me that there is a problem with the old Sony VHS/DVD player in the bedroom.

While Linda was watching Sherlock I moved the laundry to the dryer and then started compiling my posts for April 26 through 30, 2015 into a single post.  I got that done, uploaded it to our blog, created the tags, and published it.  I made it back upstairs just as Linda was putting dinner on the table.  Much of life is timing, good or bad.  We had leftovers from last night, including salad, veggie-fruit kabobs, and potatoes.

We left a little after 6 PM for the May meeting of the South Lyon Area Amateur Radio Club.  We normally meet on the second Sunday of the month but always move that up to the first Sunday in May to avoid Mother’s Day.  We arrived right at 6:30 PM and there was already a good crowd there but the club president was not among them.  At 6:40 PM I was getting ready to convene the meeting when someone pointed out that the start time had been changed to 7 PM two meetings ago.  I guess we should read the minutes, especially of meetings that we miss (like December through April).  Our business meetings are usually short followed by a program.  Tonight, however, we had a presentation from our field day committee followed by a discussion and a motion to approve a budget for the activity which was unanimously approved.

After we got home I brought the DVD player up from the basement and we watched episode 3 of season 1 of Sherlock.  The disc and player worked fine, so I will be looking for a replacement for the old Sony player sometime soon.