Tag Archives: making granola (Linda)

2015/09/14 (M) Final Prep (for now)

We were up at 8 AM and had breakfast but I did not take the time to make coffee.  I gathered up the laundry and started a load.  I then headed to Lowe’s to buy an outlet strip that I could easily hardwire.  I looked at angle iron to support the upper back edge of the interpedestal desk cover at the wall but did not buy any.  The iron has holes and slots manufactured into it that I thought might allow me to adjust its location vertically without having to move the location of the screws.  Alas, the slotted openings were horizontal rather than vertical.

Linda was cooking a batch of granola when I got home and made a pot of coffee.  I decided to tend to some travel preparation items before getting back to work on the remodeling project.  I wanted to check/adjust the tire pressures while it was still cool.  The tires were all down about 1.5 PSI, which was very good given how long it has been sitting.  I used the new 6-gallon air-compressor to bring them up to the pressures I like to run and it worked OK.  I will have to pause a little more often while it re-pressurizes but it is less than half the size of the 15-gallon DeWalt and will travel with much more easily.

My next task was to unload the front bay which I did while Linda continued to work on our food for the week.  We find it much easier to deal with food at rallies if she “cooks ahead” and “reheats to serve.”  I set everything in the driveway in front of the bus and tried to sort it into two groups; things were staying home for this trip and things that were going with us.

I then opened the drain valve on the fresh water tank, which goes through the floor of the water bay, and let the water run onto a container lid so it wouldn’t dig a hole in the gravel driveway.  I was getting ready to deploy the fresh water hose(s) when I noticed that they were in need of some serious cleaning.  Linda agreed to take care of that and cleaned their storage tub too.  Ditto for the waste water (sewage) hoses and their storage tub.  Her taking on this task allowed me to return to working on the installation of the desk.

I had a 12″ long piece of 1/8″ aluminum angle and decided to use it to support the upper back edge of the interpedestal shelf/cover.  I drilled and countersunk five holes in one of the flanges.  Linda finished cleaning the hoses and then got our wireless thermometer from the house.  It has a base thermometer and two wireless remotes so she put one remote in the freezer and the other one in the fresh food compartment.  We wanted to monitor the temperature and dial it in to where we needed it before loading the refrigerator with food.

The stacked mending plates used to create a tongue-&-groove alignment system between the center cover and both the left and right desk pedestals/bases.

The stacked mending plates used to create a tongue-&-groove alignment system between the center cover and both the left and right desk pedestals/bases.

I removed the interpedestal cover and set the left pedestal aside so I could complete the AC wiring connections.  I mounted the outlet strip to the wall centered between the two pedestals and about two inches below the level of the underside of the plywood that will support the Corian top.  The outlet strip had a 15 foot cord.  I determined how much of that length I needed to get through the right pedestal and forward along the wiring chase to where the other wires were located.  I cut off the extra length, routed the power cord into the right pedestal at the left upper rear corner, down the inside left rear corner, and out the left end of the upper base.  From there it ran forward to the other wires where I connected them.  I turned on the circuit breaker and then turned on the outlet strip.  The switch lit up, indicating the presence of 120V AC.  I used my Etcon tester to check the duplex outlet by the passenger seat.  It also had power so the wiring was good.

I set the interpedestal shelf/cover back in place, aligned with the right base, and then aligned the left base to it.  I checked the distance from each end of the base to the HVAC duct and adjusted it to be the same.  We then adjusted the position of the left pedestal until we were satisfied with the alignment with the interpedestal cover.  We checked the alignment of the front top edges of the pedestals with a 6′ metal ruler.  Everything looked OK so I secured the pedestal to the base using two screws that will be hidden by the laser printer in normal use.

I needed to screw the pedestal to the wall in the two upper corners to minimize the visibility of those screws.  It was not flush to the wall at those points so I used a shim in the upper right.  We will have to cover the vertical gap at the left rear with molding.

Bruce finds the center of a drawer front by finding the point where the diagonals of the face intersect.  The handle mounting holes were located horizontally 1-1/2” to either side of this center point.

Bruce finds the center of a drawer front by finding the point where the diagonals of the face intersect. The handle mounting holes were located horizontally 1-1/2” to either side of this center point.

We put the removable plates back in the bottom of each pedestal.  I drilled the holes for the pulls in the four desk drawers, installed the pulls, and put the drawers back in the desk.  To find the correct location for the holes Linda suggested that we put a piece of painter’s tape in the center of the face and then draw a small segment of the two diagonals to find their intersection.  For the two small drawers that was all we needed as they got single knob style pulls.  For the two larger drawers we needed to locate the holes 1-1/2″ to either side of the center on a line through the center parallel to the top and bottom edges.  I measured carefully and I think we did a pretty good job.

Sometime during the morning I texted Jarel the dimensions for a 3/4″ thick piece of walnut 1-7/8″ high by 34″ long to use as a face for the edges of the three layers of plywood under the refrigerator.  He texted back and said “no problem” which lead to an exchange of a dozen e-mails clarifying just exactly what I wanted.  I did not mind, better that than assumptions that result in wasted time making parts that don’t fit.  Jarel is an experienced cabinet maker and is meticulous in his work.  He knows all the questions to ask about things I did not specify and does so before cutting any wood.

Our last construction task before departure tomorrow was rehanging the bathroom door.  I measured the distance from the bottom hinge to the bottom edge of the door and compared it to the distance from the hinge in the door frame to the floor.  It looked like it should fit without rubbing so we hung the door.  (The old ceramic tile rubbed as the door was swung to its fully open position, but the thickness of the underlayment and vinyl tile is less than the ceramic and thinset, at least in that area.)

Linda was still trying to prepare our food for the rally as there will be very little of the included food that we can eat.  She made a grocery run while I returned to emptying out the front bay of the bus.  I plan to leave most of the stuff that was stored in that bay at home so Josh has access to the ceiling to see if we can through-bolt mount the two captain’s chairs in the living room.  I might also store all of the GLCC stuff down there as Linda will be coming down on Wednesday in the car with the cats and we want to minimize the amount of other stuff in the car.

I thought about sanitizing the fresh water system by using the 12V DC water pump and the winterizing valves/tubes to draw a dilute chlorine solution from a bucket and pump it through the fresh water pipes.  I decided against it based on available time and higher priority items that needed to be done.  I connected the clean fresh water hoses to the coach and started filling the tank.  I checked that the fuel polishing pump was off and checked the air springs and latch on the generator.  I made a mental note that the aft air springs (front of the Yanmar diesel engine) needed air and made sure the slide tray was latched in place.  I was going to start the generator and let it power the air conditioners but decided to forego for now that as well.

We had unlatched and removed the towbar from the bus receiver earlier in the summer.  I used one of our hand trucks to move it over by the car.  I put the passenger side rear seat down and loaded the towbar in behind it along with the bag that holds all of the other pieces.  That left plenty of room for the two cat carriers, litter tray, and any miscellaneous things she may bring along on Wednesday.

We put the mattress back onboard and Linda made the bed, but forgot the electric heating pad.  Linda did some cleaning and then we loaded clothing and food.  Computers, cameras, and other technology will go on first thing tomorrow morning.  We then got the various GLCC items out of the garage and staged them by the passenger side of the bus.  I loaded our personal items onto the driver’s side half of the slide tray and loaded the GLCC stuff onto passenger side half.

Our goal was to be done by 5 PM but it was 6 PM when I finally had the pressure washer ready to use.  It took me a little over an hour to spray the car and the coach and I wrapped up for the day at 7:30 PM.  We had seitan stroganoff for dinner with the 2013 Egri Merlot and had watermelon for dessert.  It was another long day but we got a lot accomplished and most it did not require me to work on my hands and knees, for which I was grateful.

 

2015/09/05 (S) Building the Built-in

We set the alarm for 7 AM as we had to return the 100 pound floor roller to The Home Depot by 8:08 AM.  We got the roller out of the bus, reattached the transport wheels, and loaded it into the back of my car.  We positioned it so that Linda could hold on to the handle while I drove.  One-hundred pounds that is designed to roll is not something you want loose in your car.  We got to the store at 7:40 AM but the associate was busy renting a ditch digging machine to someone.  We had to wait 15 minutes but that was OK.  After returning the roller we drove back to the house so Linda could get her car and our iPads and then drove separately to Panera in Brighton.

Linda had her usual Everything bagel and I had my usual Cinnamon Swirl & Raisin bagel, both sliced and toasted with nothing on them.  Two large coffees rounded out the order.  The coffee was hot and did not have grounds in it (for a change).  For some reason we got an extra Everything bagel that we did not order so which we split it.

Linda left at 9 AM to drive to Ann Arbor to pick up grand-daughter Madeline who will be with us until sometime on Monday.  Her mom and dad are attending a wedding on Sunday in Madison, Wisconsin so they are driving over today and driving back on Monday.  I stayed at Panera getting my money’s worth of coffee while finishing yesterday’s blog post and starting on today’s missive.

I left Panera at 9:45 and stopped for gasoline at the Shell station on the way home.  $2.29/gallon.  I would love to see $2/gallon gasoline again.  Better yet, I would love to see $2/gallon diesel fuel.  Linda planned to stop at the grocery store on the way back but I wanted to start a load of laundry and be home when Linda got back to the house with Madeline.

I got the laundry sorted and the first load started and then spent a little time at my desk.  I had to reset a password for someone on the SLAARC website and I logged in I was reminded that WordPress 4.3 was now available.  There were seven other updates available as well; three plug-ins and four themes.  I don’t use any of those themes and should probably delete them, but for now I just updated WP and then updated everything else.  I then logged in to our personal website, the FMCA-GLCC website, and the FMCA Freethinkers website and did the same updates.

While I was in our personal website I cleared out the 104 spam comments that had accumulated since my last house cleaning.  In the Freethinkers website I activated all of the plug-ins except Wordfence.  I have problems with this website and tech support at iPower says it is the Wordfence plug-in that is at fault.  They ask for permission to deactivate it and I give them permission but ask that they only disable that one plug-in.  Instead they disable ALL of them; every time.  I would really like to move this website to QTH.com and I may just do that as an add-on domain to our account.  Unfortunately our e-mail reflectors are set up on through the iPower account and I doubt that the club will want to pay for two different web hosting services.

It was a nicer day than we have had for most of the week, cooler with clearer skies and a nice breeze, so I opened up the windows in the motorcoach and turned on all three ceiling exhaust fans to air out the interior and get rid of the lingering smell from the floor tile adhesive.  (Yes, that is one, long sentence, but since I have added this one, it is now a proper paragraph rather than a single sentence paragraph.)

Linda and Madeline stopped at the Whole Foods Market in Ann Arbor, which is not far from our son and daughter-in-law’s house, and got to our house at 11 AM.  Madeline and I helped Grandma Linda unload the groceries and put them away.  I moved a few things from the front hallway into the library where Linda put most of the bus drawers last night (three of them are in our bedroom).  Madeline wanted her inflatable porta-bed set up so Linda took care of that.  Once her bedroom was arranged we got out her toy box and started playing with things.  She also had a couple of bags of things she brought with her and got a small soccer ball out of one of them.  We had a great time throwing and rolling it around the living room.  It is always wonderful to see the pure joy of a young child at play doing something as simple as this.

By 12:30 PM Madeline was ready for lunch so Linda made a PB&J sandwich and washed some green grapes.  She washed some black organic grapes for us and I had a few pretzels dipped I Sabra Roasted Red Pepper Hummus.  It’s my favorite hummus from them, or pretty much anyone else.

After Madeline laid down for her afternoon nap at 1 PM Linda and I both got busy with chores.  As much as I would like to have taken today off, at least from hands and knees work, we only had eight days left to get some significant tasks accomplished on the bus.  In terms of a critical path view of the overall project the critical task is grouting the floor tile that we finished installing at 9 PM last night.  Not only will it take some time to do but once it is done it cannot be walked on for 24 hours.  As much as it needed to be done, however, I needed a day of not being on my hands and knees.  If I get it done on Sunday I can resume work inside the coach on Monday.

While Linda made a batch of granola I worked on assembling some of the pieces for the built-in sofa.  My plan was to fully assemble the two plenum boxes that will support the ends of the plywood seat, and I intended to do that by gluing and screwing the four pieces together for each.  In order to do that I needed screws of the appropriate type (#6 SR) and length (1-1/4″) so I went to Lowe’s to get them.  While I was there I looked at continuous hinges and angle brackets but did not buy any.  I need a 72″ hinge but all they had were 48″, 30″, and 12″.  I may be able to use two 30″ and one 12″ but I need to check the actual dimension.  I also needed a #6 drill but with an integral countersink but Lowe’s did not seem to have what I needed so I went to The Home Depot and found something there.

I think this marking scribe belonged to my mother’s father.

I think this marking scribe belonged to my mother’s father and is at least 100 years old.

Back home I was getting all of my tools and supplies ready when I realized that I would not be able to attach the plenum/support boxes to the adjacent cabinets if they were fully assembled.  This was an example of incomplete design; either I have forgotten how I planned to anchor these boxes, changed my thinking about this in the time since I did the design work, or never figured out this detail in the first place.

Ideally I could anchor them in a way that does not destroy the cabinets or the floor.  One way to accomplish that would be to attach them to the HVAC plenum at the back and the vertical front support board using angle brackets, and to the top of the wiring chase above the HVAC plenum via the two filler strips on either side of the seat.  If I do that I can fully assemble the two plenum/support boxes before installing them.

For now I only assembled half-boxes with one side piece attached to the bottom piece and the other side piece attached to the top piece.  I built one of them for the left end and the other one for the right end. What this leaves open as an option is screwing the side/bottom assembly to its adjacent cabinet and then screwing the other assembly to the first one without using any glue.  The dry assembly would allow everything to be disassembled later if needed.

Madeline was up by this time and helped Grandma Linda put the new seed block in the bird feeder.  They then walked around to the front of the garage to see what Grandpa Bruce was doing.  I showed them my tools and the pieces of wood and explained how everything was going to work and fit together.

Two pieces of one of the plenum boxes held at right angles for gluing and screwing.

Two pieces of one of the plenum boxes held at right angles for gluing and screwing.

I aligned the pieces being joined, which are all 3/4″ cabinet grade 13 ply plywood, using two corner clamps.  I then scribed a line 3/8″ from the edge of the piece that was sitting on the edge of the other piece.  I marked screw locations every two inches with the spacing centered along the line.  I drilled pilot holes with countersinking to ensure the screw heads would be below the surface of the wood.  I disassembled the two pieces, leaving the piece that the screws would go in first in the clamps, and sanded off any rough edges.  I ran screws part way into each hole so the tips protruded just enough to put the two pieces back into alignment when they were rejoined.  I applied Titebond II wood glue to the edge piece spread it out, and wiped off my finger with a wet cloth.  I inserted the edge piece back into the clamps, used the screws to make sure it was aligned, tightened the clamps, and ran the screws most of the way down.  I then loosened the clamps holding the edge piece and drew it up tight by running the screws all the way down.  I used a wet towel to wipe off the excess glue that was squeezed from the joint and set it aside to dry.  I took a lot of pictures too.

The center portion of the storage space under the seat will have an elevated platform with closed ends to create a plenum for the OTR HVAC return air.  I assembled the two end pieces to the ends of the platform using the same method I used for the plenum/support boxes.  There is also a support piece for the middle of the platform but I cannot use the clamps to hold it in position relative to the platform so I will have to do something else.  I was thinking that I did not feel like tackling that task when Linda and Madeline came back to the garage to let me know it was almost time for dinner.  Saved by the food bell, I closed up the garage and went inside to eat.

Linda set out some carrot slivers, diced peaches, and home grown cherry tomatoes.  She cooked some mock chicken patties and heated up some vegan gravy to go with them as a main course.  For sides she heated black beans, edamame, and vegan Mac-n-cheese.  We all enjoyed our meal.

Madeline really enjoys the swings at the Brighton Mill Pond Imagination Station Playscape.

Madeline really enjoys the swings at the Brighton Mill Pond Imagination Station Playscape.

Our son let Linda know that Madeline had not been sleeping through the night recently and had developed a sensitivity to noises.  Linda figured Madeline might sleep better if she engaged in some vigorous play after dinner and suggested that we go to the Brighton Mill Pond Imagination Station Playscape.  Ms. M liked the idea but wanted to make sure I was coming too.  I found a reasonably good parking spot and pushed her over in the stroller because she does not like to walk for the sake of walking.  But once we got to the playscape she was in “go mode.”  As the sun set and the light faded we strollered her over to Jack’s for a scoop of vanilla ice cream with sprinklers.  We then strollered her back to the car and drove home.

Linda had promised Madeline that she could watch a video before she went to bed.  She had selected an episode of Daniel Tiger, an animated children’s program based on the Daniel Striped Tiger character from the old Mr. Rogers TV program.  We had Shawna’s iPad with access to her Netflix account but the program was downloading slower than molasses poured on a cold day.  We had problems with video, then audio, but eventually got it to work after I turned off the Wi-Fi transceiver on my smartphone.  Linda got Madeline ready for bed while fiddled with the technology.

After the video Grandma Linda carried Ms. M around to look at all her favorite artwork, a bedtime ritual that goes back to the first time she ever stayed at our house overnight.