Tag Archives: mac-n-cheese (vegan)

2015/11/16 (M) Tiling the Cockpit, #3

Linda planned to go to the bakery today but decided yesterday to stay home and help me instead.  Based on the 10-day forecast this looks like our last decent weather day to work on the bus and we wanted/needed to make the most of it.

We had breakfast at 8 AM (granola with blueberries and a banana) and had a cup of Stash China Black tea.  I had a text message from Kristine Gullen regarding getting together with her and Jim on Saturday and replied in the affirmative.  We finished our tea by 8:30 and got to work.

I really wanted to finish tiling the cockpit of the bus, or at least as much of it as we could.  That meant cutting and fitting tiles for the stair treads and risers and the two side walls of the entry steps, gluing them in place, and then grouting all of them.  We needed to mount the table if possible and I also needed to build a new step for the platform.  That was a lot to get done in one day and even before we started I doubted that we would get it all done.

When we opened the bus we were surprised to find that the tiles on the walls of the platform had slipped all the way down to the floor tiles.  Obviously I should not have removed the spacers right after installing the tiles and should have to left them in place for any horizontal grout spaces on vertical surfaces.  Oh well, not much to do about it now.

Keith called to see if he should come and mulch the leaves one last time.  The weather the last few days had been very nice, unseasonably warm and dry.  Today was also a beautiful day but the forecast going forward was for much cooler and wetter conditions, so this was an ideal day for our last lawn mowing of the 2015 season.

We measured and cut the tiles for the face of the platform and out to the door.  At that point I evaluated what I needed to do to complete the job.  Basically, I needed to cut all of the tiles for the entry steps and walls and then install them from the bottom up.  Every piece of tile was going to be smaller than a full 16″x 16″ tile and custom cut so even though the square footage was not that much there would be more pieces than usual and it was obviously going to take quite a bit of time to get all of the pieces ready to install.  I thought we could be ready for adhesive in two hours but Linda figured it would be at least three.  It also meant working with the door open which would make it difficult to keep the interior as warm as we needed.

Phil showed up with his excavator and a dozen bales of straw.  I knew the excavator was for a different job as he did not have anything left to do at our place that required it.  He was here to finish covering the topsoil and grass seed with the straw.  We took a break to go talk to him and confirmed that he was done with the driveway and French drain projects except for the straw.  He staged the bales where he needed them but said he had to leave to dig a perk test hole at 1:30 PM and would be back mid-afternoon to finish spreading the straw around.

Linda suggested that we go ahead a grout all of the tile we had already installed.  I was more emotionally invested in completing the tile work than Linda but had to agree that this was the prudent thing to do.  Until the tile was grouted we could not reinstall the accelerator, the steering column shroud, the seat bases, and the seats, so grouting the tile was clearly a critical path item and that is what we did.  It was after noon by the time we finished so we took a break for lunch.  Phil had taken off by this time to go dig the test pit.

Lunch was grilled vegan Italian sausage on a bun with mustard and relish and black grapes on the side.  Keith finished up mowing the yard while we were enjoying a cup of Rooibos tea.  We paid him and chatted about next year.  I gave him our approximate timeframe for returning home from Florida and asked him to go ahead and start mowing next spring whether or not we were here.  We have had Keith take care of our lawn since we bought our house in the country and he has been very good about doing that when we are away and allowing us to catch up with him when we get back.

By the time we got back to work on the bus it was after 1 PM and I had to concede that we were done working on the tile until next spring except for cleaning them, which had to wait until tomorrow as the grout has to cure for 24 hours before final cleaning.  With that decision made we considered what else needed to be done and in what order.

The first order of business was painting the two front seat bases black.  We spread out painter’s plastic on the driveway and taped it down.  We set the bases there and then masked off the top portion with the swivel bearings and mounting bolt.  We wire brushed the bases to remove rust and then went over them with a sanding sponge.  I used a cleaner/degreaser and water to clean them and then gave them a coat of black rubberized undercoating paint.

The next order of business was getting all of the tools and materials that we no longer needed out of the bus to give us room to work on other things.  On Saturday I re-installed the bump out on the walnut cover for the passenger side HVAC duct.  The duct needed to have two 4″ holes drilled in it to match the holes in the metal duct, so that was the next task.  I measured very carefully and transferred the measurements to the face of the cover with equal care.  Even so, I was off slightly and had to use the sheet metal nibbler to enlarge the bottom of each hole.  At least I had a relatively straightforward way to fix this problem; I am not always so lucky.

With the holes enlarged we put the cover in place.  The 4″ round plastic registers fit through the wood into the duct but not all the way due to two tabs.  I trimmed the tabs off using the Porter-Cable oscillating saw and trimmed a little bit off of one of the outer mounting flanges to make it fit flush.  I drilled holes through the two mounting holes on each register using the #5-6 self-centering drill bit and secured them with #6-5/8″ SR screws.  We then removed the two temporary black plastic registers from the front of the built in sofa.  I trimmed the tabs off of two new brown ones and installed them using the same procedure as the first two.

In the grand scheme of things getting the cover in place and the four registers installed was a small task but it needed to be done and stood in the way of other things.  The cover has been stored on top of the two front seats, which have been lying on their backs on the kitchen floor of the bus for weeks.  We plan to re-install the seats late tomorrow afternoon.

Two more small, but critical, tasks were securing the pull-out pantry and the refrigerator.  I have assumed for quite a while that we would secure the pantry for travel with some form of sliding latch but had not thought about it in any detail.  We also needed to secure the refrigerator but I had not thought about this in any detail either.  As we pondered the pantry latch it slowly became obvious that we did not have enough wood for a strike plate to receive a pin and we did not have two unobstructed surfaces that were in the same plane, which would be required for the kind of latch I had been thinking about.

As for the refrigerator, one of our bus nut friends secured their unit by running mounting bolts (machine screws) through the floor of the cabinet above the fridge and threading them into the unused tapped holes provided for the upper door hinge (if it was reversed) .  After looking at it for a while we realized that we could attach a section of small angle to the inside of the right alcove wall with the other side just against the face of the fridge case but not over so far as to interfere with the door gasket.  My measurements indicated that a 1/2″x3/4″ angle would be just right.  It looked to me like two 12″ pieces, one by the freezer door and one by the bottom of the fresh food compartment door, would be more than adequate to keep the refrigerator from rolling out as it cannot shift sideways or twist due to the aluminum angle on the left/hinge side at the floor.

About this time Phil returned in a red pickup truck.  He finished distributing the straw and loaded three unused bales into the back of his truck.  He pulled up in the main drive and we invited him into the bus to see what we had been working on all summer.    It is always a pleasure working with Phil.  If/when we build a barn we will have him do all of the site prep and finish grading.  He will figure out the final cost for the driveway extension and French drain and send us an invoice.

Linda prepared an easy but tasty dinner consisting of a nice green salad, mixed frozen vegetables (corn, peas, and carrots) suitably reheated, and mac-n-cheese that was both dairy-free and gluten-free.  After dinner we went to Lowe’s and The Home Depot.  At Lowe’s we bought a 1/16″ thick 1/2″x 3/4″ aluminum angle and three 8 foot lengths of brass colored nose edging but did not find a latch that we liked.  At The Home Depot we bought some screws for securing the handle on the front of the pull-out pantry and a solid brass door stop to keep the pantry in place.  The door stop folds up when not in use and should work to keep the pantry closed while traveling.

Although the new Panera on the southwest corner of Grand River Avenue and Latson Road was finally open for business we stopped at Teeko’s Coffee and Tea on the northeast corner of that intersection.  Jeff was there and took our order for eight pounds of coffee beans.  We got two pounds each of Ethiopian Yirgacheffe, regular and decaffeinated, the Seattle Blend (regular), and the Sweet Dreams blend (decaffeinated).  They will roast the beans and then let them outgas for a few days before vacuum sealing them in half-pound portions.  This allows us to take them with us in the bus and keep them very fresh until we are ready to use them and to change what we are drinking more often.

We got home just after 8 PM and took our iPads downstairs to use while we watched our Monday evening CBS TV programs.  We caught the weather forecast and then headed to bed.  It looks like we will have two more days with unseasonably high temperatures near 60 degrees F but with intermittent rain and then a serious cooling trend with highs this weekend barely above freezing.  Our time for working on the bus and being in Michigan is definitely running out.

 

2015/11/08 (N) SLAARC Elections

Madeline was in bed last night at 8 PM and fell asleep quickly.  We were in bed before 10 PM.  Linda fell asleep right away and I put my iPad away and turned off the light at 10:30 PM.  Good thing, too, as Madeline started coughing at 5:30 AM.  Linda got up at 6 AM and brought her into our bed.  I don’t know if she ever fell back asleep but we all stayed there quietly enjoying the warmth of the covers until 7:30 AM, by which time the house was warming up.  Hurrah for programmable thermostats!

Being Sunday morning, and having Madeline here, we were in no hurry to get up, get dressed, or get busy.  Not that we had nothing to do, we just were not in a hurry to do anything.  Linda prepared baked French toast last night, with a little help from Madeline, and let it sit overnight in the refrigerator.  She got up at 6:45 to pre-heat the oven and again at 7 to put the dish in to bake.

I got up at 7:30 and made coffee.  The downlight over the end of the counter where I make the coffee burned out last night so I replaced the bulb.  Linda set the table and took the French toast out of the oven at 8.  When she cut into it and served out pieces for each of us it was obvious that something was very wrong.  Instead of baked French toast we had inedible goo.  Linda has had very few recipe failures since we switched to a whole-food plant-based (WFPB) vegan diet but this one took first place.  She mentioned that it was a different recipe than she has used in the past and that she used an egg replacer she has not used before which did not seem to dissolve correctly last night.

Linda was willing to make vegan pancakes but I did not see any reason for her to go to that trouble.  We still had plenty of granola, part of a loaf of cinnamon raisin bread, and fresh berries, all of which made for an easy but tasty breakfast.]

Madeline plays (at) the organ.  It is one of her favorite “toys” at our house.

Madeline plays (at) the organ. It is one of her favorite “toys” at our house.

After breakfast I cleared the table and then read a book to Madeline while Linda cleaned off the dishes.  I turned on the fireplace and we drank our coffee in the living room while Madeline found various things to play with, ultimately ending up at the organ.

By 9:30 AM we were feeling like getting dressed.  I put in my work clothes and finally got to work in the bus at 10 after turning up the thermostats in the library, garage, and bus.  The first thing I needed to do was screw down the last/top layer of SurePly underlayment in the landing and driver area.  I used #6 SR (square recessed) self-drilling wood screws in three different lengths based on what was underneath the underlayment.  I chose to use screws rather than staples for several reasons.  The main one was that I needed the ability of the screws to pull things together.  The other reason was that I did not want to get the air compressor and stapler out for this relatively small number of fasteners.  (The SurePly underlayment for the main floor of the bus was stapled with approximately 350 staples per full 4’x8’ sheet.)

I pulled up the larger piece of SurePly one last time, measured the location of the boundary between the original bus floor and the new patch, marked the boundary on the top of the large piece, and put it back in place.  I carefully aligned the smaller piece to the stair edge and along the front and made sure the larger piece also fit correctly.  The smaller piece sits entirely on the new landing, which is 3/4″ plywood, so I secured it with 1″ screws, spacing them 2-to-3 inches apart along every edge and about 4 inches apart in the field.

The 1/2″ piece of plywood just forward of the driver’s seat was partially unscrewed and needed to be screwed back down.  Since it was installed over the original 1″ thick plywood bus floor I replaced the existing screws with 1-1/4″ screws and added more, especially along the edges.

To secure the larger piece I used 1-1/2″ screws over the patch, which was already about 1-1/4″ thick.  Over the original 1″ thick plywood bus floor I used the 1-1/4″ screws and over the 3/4″ thick landing I used 1″ screws.  I ran out of the 1″ length before I got the larger piece secured.  As much as I did not want to spend time driving around today I could not finish this task without the proper screws so around 11:15 AM I headed off to Lowe’s.  As long as I had to make the trip I looked for washers to space up the mounting bolts for the passenger seat pedestal base and nylon washers to go under the nut on the main mounting stud for the two swivel bases.  I found something that might work for the former but not the latter.

Linda and Madeline were getting ready to leave as I returned home just before noon.  Madeline was upset because Linda made her wear a sweater under her coat and she did not want to.  She is generally a cheerful and pleasant little girl but we never know when or why she is going to draw a line in the sand.  She doesn’t always or even usually get her way but she is persistent.  The tears, of course, are not the result of genuine injury and are usually quickly enough wiped away by focusing her attention on something else.  They finally pulled out of the driveway at 12:15 PM for an outing at Kensington Metropark.

I finished securing the larger piece of SurePly over the landing and then started on the next task.  I had decided to patch in an area at the end of the passenger platform where it drops down into the back of the driver area.  The area to be patched was only 12-3/4″ long and less than 4″ wide but the underlying metal was rounded over in this area and there wasn’t much I could use to attach new wood.  The area was also deep and not level.  I ended up making a sandwich with two layers of SurePly, two wood shins on top of those, and a piece of 3/4″ plywood on top.  I got all of the pieces cut and fitted and then marked them with pencil lines down the exposed edges to act as alignment marks.

I carefully assembled the sandwich upside down in the shop and screwed it together from the bottom.  I then put it in place in the bus and measured for a vertical piece with an angled rear edge to catch the outside edge of the patch and hold it up.  I secured the patch with one 1-1/2″ screw near the front and secured the vertical piece with one screw into the same piece of wood.

Building and installing this patch took a while and I was just finishing it when Linda and Madeline got home around 3:30 PM from their trip to Kensington Metropark.  By this time it was too late to start working on the underlayment for the passenger seat platform as I needed to stop working at 4 PM and get cleaned up for our amateur radio club meeting this evening.  With the little time remaining I unscrewed the top of the step and removed the two screws that held it to the rear and side walls of the co-pilot/navigator platform.  I then removed a half dozen flat head wood screws that held a piece of metal trim to the front edge of the platform.

The screws were rusted but came out.  The issue for my work was that the heads were not countersunk and stuck above the metal in a way that would interfere with installing the sheet of underlayment.  I used a 7/16″ drill bit to create tapered holes and may go back tomorrow and use my countersink bit.  I looked, but did have any appropriate screws to replace the ones I took out.  That meant another trip to Lowe’s which I could do after dinner on my way to the ham radio club meeting.

I put the two swivel pedestal/bases back in the landing and locked the bus.  I made sure everything was in the garage that needed to be and closed the overhead door.  I showered and shaved and put on clean clothes.  I then sat on the living room sofa with Madeline while Linda fixed dinner.  I worked on this post while Ms. M played games on Linda’s iPad.  It’s amazing to watch a 3-year old manipulate an iPad.  Their use of the touch screen is intuitive, which is cool, and it holds their attention in a way that other activities do not, almost to the point of obsession or addiction, which can border on troubling.  In spite of how much Madeline likes to eat, Grandma Linda had to gently take the iPad away and get her to come to the table for dinner.

As part of her food planning for this weekend Linda had picked up some mock turkey patties with gravy.  She also picked up some vegan heat-n-serve mac-n-cheese.  Those were the main course this evening along with a nice green salad and the rest of the fresh pineapple.  Dessert was going to be cake but I had to leave before it was served.

I left at 5:30 PM and drove to Lowe’s in New Hudson.  I monitored a QSO between Mike (W8XH) and Steve (N8AR) until Steve reached the meeting location in South Lyon.  I then called for Mike and we chatted until I reached Lowe’s.  I bought a box of 1-1/4′ long # 12 flathead wood screws and picked up three 40 W appliance light bulbs for the microwave in the house as the installed ones had burned out.

I got to the Witch’s Hat Depot at 6:35 PM so I had a chance to visit with my fellow hams before the meeting started at 7 PM.  Steve (N8AR) had a display set up with several different DC power meters he ordered off of EBay.  The business meeting was longer than usual because we had to elect officers for 2016.  The process was very smooth, surprisingly so actually, but still took 10 minutes.  The meeting was done by 7:20 after which the club president, Harvey (AC8NO), did a presentation on his Icom IC-7200 portable base station transceiver.

I was back home by 8:40 PM.  Madeline had already gone to bed so Linda and I had some quiet adult time to enjoy a cup of hibiscus tea.  We were both tired after long days of work and play but we did a lot today and felt good about the things we accomplished.

 

2015/09/05 (S) Building the Built-in

We set the alarm for 7 AM as we had to return the 100 pound floor roller to The Home Depot by 8:08 AM.  We got the roller out of the bus, reattached the transport wheels, and loaded it into the back of my car.  We positioned it so that Linda could hold on to the handle while I drove.  One-hundred pounds that is designed to roll is not something you want loose in your car.  We got to the store at 7:40 AM but the associate was busy renting a ditch digging machine to someone.  We had to wait 15 minutes but that was OK.  After returning the roller we drove back to the house so Linda could get her car and our iPads and then drove separately to Panera in Brighton.

Linda had her usual Everything bagel and I had my usual Cinnamon Swirl & Raisin bagel, both sliced and toasted with nothing on them.  Two large coffees rounded out the order.  The coffee was hot and did not have grounds in it (for a change).  For some reason we got an extra Everything bagel that we did not order so which we split it.

Linda left at 9 AM to drive to Ann Arbor to pick up grand-daughter Madeline who will be with us until sometime on Monday.  Her mom and dad are attending a wedding on Sunday in Madison, Wisconsin so they are driving over today and driving back on Monday.  I stayed at Panera getting my money’s worth of coffee while finishing yesterday’s blog post and starting on today’s missive.

I left Panera at 9:45 and stopped for gasoline at the Shell station on the way home.  $2.29/gallon.  I would love to see $2/gallon gasoline again.  Better yet, I would love to see $2/gallon diesel fuel.  Linda planned to stop at the grocery store on the way back but I wanted to start a load of laundry and be home when Linda got back to the house with Madeline.

I got the laundry sorted and the first load started and then spent a little time at my desk.  I had to reset a password for someone on the SLAARC website and I logged in I was reminded that WordPress 4.3 was now available.  There were seven other updates available as well; three plug-ins and four themes.  I don’t use any of those themes and should probably delete them, but for now I just updated WP and then updated everything else.  I then logged in to our personal website, the FMCA-GLCC website, and the FMCA Freethinkers website and did the same updates.

While I was in our personal website I cleared out the 104 spam comments that had accumulated since my last house cleaning.  In the Freethinkers website I activated all of the plug-ins except Wordfence.  I have problems with this website and tech support at iPower says it is the Wordfence plug-in that is at fault.  They ask for permission to deactivate it and I give them permission but ask that they only disable that one plug-in.  Instead they disable ALL of them; every time.  I would really like to move this website to QTH.com and I may just do that as an add-on domain to our account.  Unfortunately our e-mail reflectors are set up on through the iPower account and I doubt that the club will want to pay for two different web hosting services.

It was a nicer day than we have had for most of the week, cooler with clearer skies and a nice breeze, so I opened up the windows in the motorcoach and turned on all three ceiling exhaust fans to air out the interior and get rid of the lingering smell from the floor tile adhesive.  (Yes, that is one, long sentence, but since I have added this one, it is now a proper paragraph rather than a single sentence paragraph.)

Linda and Madeline stopped at the Whole Foods Market in Ann Arbor, which is not far from our son and daughter-in-law’s house, and got to our house at 11 AM.  Madeline and I helped Grandma Linda unload the groceries and put them away.  I moved a few things from the front hallway into the library where Linda put most of the bus drawers last night (three of them are in our bedroom).  Madeline wanted her inflatable porta-bed set up so Linda took care of that.  Once her bedroom was arranged we got out her toy box and started playing with things.  She also had a couple of bags of things she brought with her and got a small soccer ball out of one of them.  We had a great time throwing and rolling it around the living room.  It is always wonderful to see the pure joy of a young child at play doing something as simple as this.

By 12:30 PM Madeline was ready for lunch so Linda made a PB&J sandwich and washed some green grapes.  She washed some black organic grapes for us and I had a few pretzels dipped I Sabra Roasted Red Pepper Hummus.  It’s my favorite hummus from them, or pretty much anyone else.

After Madeline laid down for her afternoon nap at 1 PM Linda and I both got busy with chores.  As much as I would like to have taken today off, at least from hands and knees work, we only had eight days left to get some significant tasks accomplished on the bus.  In terms of a critical path view of the overall project the critical task is grouting the floor tile that we finished installing at 9 PM last night.  Not only will it take some time to do but once it is done it cannot be walked on for 24 hours.  As much as it needed to be done, however, I needed a day of not being on my hands and knees.  If I get it done on Sunday I can resume work inside the coach on Monday.

While Linda made a batch of granola I worked on assembling some of the pieces for the built-in sofa.  My plan was to fully assemble the two plenum boxes that will support the ends of the plywood seat, and I intended to do that by gluing and screwing the four pieces together for each.  In order to do that I needed screws of the appropriate type (#6 SR) and length (1-1/4″) so I went to Lowe’s to get them.  While I was there I looked at continuous hinges and angle brackets but did not buy any.  I need a 72″ hinge but all they had were 48″, 30″, and 12″.  I may be able to use two 30″ and one 12″ but I need to check the actual dimension.  I also needed a #6 drill but with an integral countersink but Lowe’s did not seem to have what I needed so I went to The Home Depot and found something there.

I think this marking scribe belonged to my mother’s father.

I think this marking scribe belonged to my mother’s father and is at least 100 years old.

Back home I was getting all of my tools and supplies ready when I realized that I would not be able to attach the plenum/support boxes to the adjacent cabinets if they were fully assembled.  This was an example of incomplete design; either I have forgotten how I planned to anchor these boxes, changed my thinking about this in the time since I did the design work, or never figured out this detail in the first place.

Ideally I could anchor them in a way that does not destroy the cabinets or the floor.  One way to accomplish that would be to attach them to the HVAC plenum at the back and the vertical front support board using angle brackets, and to the top of the wiring chase above the HVAC plenum via the two filler strips on either side of the seat.  If I do that I can fully assemble the two plenum/support boxes before installing them.

For now I only assembled half-boxes with one side piece attached to the bottom piece and the other side piece attached to the top piece.  I built one of them for the left end and the other one for the right end. What this leaves open as an option is screwing the side/bottom assembly to its adjacent cabinet and then screwing the other assembly to the first one without using any glue.  The dry assembly would allow everything to be disassembled later if needed.

Madeline was up by this time and helped Grandma Linda put the new seed block in the bird feeder.  They then walked around to the front of the garage to see what Grandpa Bruce was doing.  I showed them my tools and the pieces of wood and explained how everything was going to work and fit together.

Two pieces of one of the plenum boxes held at right angles for gluing and screwing.

Two pieces of one of the plenum boxes held at right angles for gluing and screwing.

I aligned the pieces being joined, which are all 3/4″ cabinet grade 13 ply plywood, using two corner clamps.  I then scribed a line 3/8″ from the edge of the piece that was sitting on the edge of the other piece.  I marked screw locations every two inches with the spacing centered along the line.  I drilled pilot holes with countersinking to ensure the screw heads would be below the surface of the wood.  I disassembled the two pieces, leaving the piece that the screws would go in first in the clamps, and sanded off any rough edges.  I ran screws part way into each hole so the tips protruded just enough to put the two pieces back into alignment when they were rejoined.  I applied Titebond II wood glue to the edge piece spread it out, and wiped off my finger with a wet cloth.  I inserted the edge piece back into the clamps, used the screws to make sure it was aligned, tightened the clamps, and ran the screws most of the way down.  I then loosened the clamps holding the edge piece and drew it up tight by running the screws all the way down.  I used a wet towel to wipe off the excess glue that was squeezed from the joint and set it aside to dry.  I took a lot of pictures too.

The center portion of the storage space under the seat will have an elevated platform with closed ends to create a plenum for the OTR HVAC return air.  I assembled the two end pieces to the ends of the platform using the same method I used for the plenum/support boxes.  There is also a support piece for the middle of the platform but I cannot use the clamps to hold it in position relative to the platform so I will have to do something else.  I was thinking that I did not feel like tackling that task when Linda and Madeline came back to the garage to let me know it was almost time for dinner.  Saved by the food bell, I closed up the garage and went inside to eat.

Linda set out some carrot slivers, diced peaches, and home grown cherry tomatoes.  She cooked some mock chicken patties and heated up some vegan gravy to go with them as a main course.  For sides she heated black beans, edamame, and vegan Mac-n-cheese.  We all enjoyed our meal.

Madeline really enjoys the swings at the Brighton Mill Pond Imagination Station Playscape.

Madeline really enjoys the swings at the Brighton Mill Pond Imagination Station Playscape.

Our son let Linda know that Madeline had not been sleeping through the night recently and had developed a sensitivity to noises.  Linda figured Madeline might sleep better if she engaged in some vigorous play after dinner and suggested that we go to the Brighton Mill Pond Imagination Station Playscape.  Ms. M liked the idea but wanted to make sure I was coming too.  I found a reasonably good parking spot and pushed her over in the stroller because she does not like to walk for the sake of walking.  But once we got to the playscape she was in “go mode.”  As the sun set and the light faded we strollered her over to Jack’s for a scoop of vanilla ice cream with sprinklers.  We then strollered her back to the car and drove home.

Linda had promised Madeline that she could watch a video before she went to bed.  She had selected an episode of Daniel Tiger, an animated children’s program based on the Daniel Striped Tiger character from the old Mr. Rogers TV program.  We had Shawna’s iPad with access to her Netflix account but the program was downloading slower than molasses poured on a cold day.  We had problems with video, then audio, but eventually got it to work after I turned off the Wi-Fi transceiver on my smartphone.  Linda got Madeline ready for bed while fiddled with the technology.

After the video Grandma Linda carried Ms. M around to look at all her favorite artwork, a bedtime ritual that goes back to the first time she ever stayed at our house overnight.