Tag Archives: Lynch Carpet (Howell MI)

2015/06/23 (T) Grounded

As I wrote in yesterday’s post we did not turn off the lights last night until almost 1 AM because we were keeping a close eye on the weather moving across the lower portion of Michigan’s Lower Peninsula.  Although strong to severe storms were still forecast from 1 AM to 5 AM they either did materialize at our exact location or we slept through them.  We had the house closed up and the air-conditioning on, so that cut down the sound level of outside noises.

A cold front had pushed through by sun up and we woke to a cool morning with blue skies and noticeably lower humidity.  We did not have any trees, or even big limbs, come down and there was no damage to our brand new roof.  The forecast yesterday was threatening enough, however, that in the morning we took the potted plants, and as much of our outside lawn furniture as we could find room for, inside including our sun umbrella and trash cans.  I planned to be gone most of the day, and Linda was leaving mid-afternoon to go to dinner and a movie with Diane Rauch, so our first chore was to put all the lawn furniture, plants, and other outdoor stuff back outdoors.

This week is mostly being devoted to ham radio with the ARRL Field Day as the crowning event this weekend.  My specific focus for most of the week, however, has been the “communications tower” adjacent to the east wall of our house.  As described in previous posts we installed a cable entry box (CEB), mounted the cellular booster in the basement, mounted the inside cellular antenna, and ran coax cables.  The antennas will (hopefully) be mounted on the existing 40 foot tower tomorrow, cabled into the CEB, and cables run from there to devices inside the house.  With any luck by the end of the day tomorrow we will have decent cellular service inside the whole house, the ability to watch OTA TV programs on two different TV sets, and finally be able to connect one of our radios in the ham shack to an antenna.  Today, however, was planned to mostly address other things.

I had an appointment with our dentist at 10:20 this morning and left at 9 AM.  I planned to stop at Chuck’s bus garage and check that the key he lent me worked, but I needed gas for my car.  I did not have time for both and did not really have a choice; I would have to check the key some other time.  I ordered two cables yesterday from Scott (AC8IL) at Adams Electronics.  Later in the evening I was unsure if I had specified the connectors correctly so I called and left a message.  I called again this morning to make sure the message got through.  It did, and my original connector specifications were correct.

I arrived at the dentist’s office about 10 minutes before my appointment time.  I called Rick Short at Isringhausen USA to make sure he was going to be in before I drove two hours to Galesburg, Michigan after my dentist appointment.  I got his voice mail a left a message.  “ISRI” makes very high tech air suspension driver’s seats that are used as original equipment in motorcoaches, semi-tractors, heavy equipment, and locomotives.  I would really like one for our bus, but it is not proving easy to get.

Dr. Steve and his assistant, Leslie, made molds of my upper and lower teeth and a bite impression.  The molds will be used to make a mouth guard that I can wear while I sleep.  Dr. Steve has a strong suspicion that I am clenching my teeth and the mouth guard will reduce or eliminate the irritation it causes.  I will have to ask if I can wear it during the day too as I am occasionally aware of clenching my teeth while I awake.

I had not heard back from Rick by the end of my appointment so I called the main number at ISRI and talked to the receptionist.  It turned out that Rick was not in today and she transferred me to Jeff Woodworth.  Jeff was willing to meet with me but thought it would be a better use of my time to wait until Rick was available.  My next opportunity to drive to Galesburg will be Thursday and I will likely go as the ISRI seat is holding up our ordering of Flexsteel seats through Coach Supply Direct.

I stopped for coffee and then re-routed for Chuck’s bus garage in Novi.  The key to the garage worked perfectly.  I called Linda to let her know about the change in plans and headed for home.  There is too much to do at the moment to waste much time so I installed the #4 AWG bare copper ground wire I bought yesterday at Lowe’s.  I mounted an offset copper wire lug using the center support stud for the copper back plane in the CEB.  I replaced one of the plastic hole plugs with a rubber plug with a small hole in the center.  The hole I chose in the bottom of the CEB allowed the ground wire to come straight up into the lug.

Another view of the cable entry box on the east end of the house by the 40-foot tower.

Another view of the cable entry box on the east end of the house by the 40-foot tower showing the bare copper ground wire that runs to the ground rod and then to one of the tower legs.

Outside the CEB I routed the ground wire around to the existing ground rod and secured it using the new clamp I bought yesterday.  There was an old ground wire connected from a clamp on the tower to the ground rod.  I removed that wire along with some coax and control wires that I had clipped when we removed the old satellite dish.  I then attached the new ground wire to the clamp on the tower.  While we were at it Linda trimmed back a small bush that was growing between the tower legs and I pulled leaves, grass and other stuff out from around the Day Lilies that we transplanted last year around the tower base.

With the CEB grounded we looked at how we might get a video cable up to the TV/monitor in our bedroom.  The wall where the TV is mounted has a hot water baseboard radiator that comes almost to the trim on the door wall.  That end of the radiator has a copper pipe that goes through the floor into the basement and it was easy to locate the pipe in the basement.  I determined that there was enough space behind the pipe to safely drill a hole but I had to drill it from the top side at an angle.  A 5/8″ wood boring drill bit created a hole just big enough for the molded F-connector on the end of the cable to pass through.

We fed the video coax cable above the suspended ceiling in the ham shack area to the location of the hole.  I then fed the cable up from the basement as Linda pulled it up into the bedroom.  We adjusted the amount of cable in the bedroom to allow the wall mounted TV set to move through its entire range of motion.  The other end of the cable was then routed into the sump pump room.

By the time we finished pulling this cable it was 3:30 PM and time for Linda to leave to pick up Diane.  They were headed to Royal Oak for dinner and a movie as the movie they wanted to see was only showing at the Royal Oak Main Theater.

While I was out during the morning Lynch Carpet had called to let us know our Armstrong vinyl tile was available for pickup so after Linda left I closed up the house and went to get it.  The 12 boxes of tiles, container of vinyl adhesive, and container of vinyl grout were all neatly arranged on a small pallet and tightly wrapped in shipping plastic.  Rather than break this down and load each thing individually they used a fork lift to set the pallet in the back of my Honda Element.  The rear suspension settled at least two inches when they transferred the full weight of the pallet to the floor of my car.

When I got back to the house I backed the car up to the garage.  I cut the shipping plastic loose and unloaded the tubs and boxes of tiles.  I put the pallet on the garage floor and then neatly stacked the boxes of tiles on it to keep them off the floor.  Each box contained 14 tiles measuring 16″ by 16″ for a total area of 24.89 square feet.  The Armstrong Alterna tiles are a “luxury vinyl” product, and are about 1/8″ thick.  Even so, the boxes were heavier than I expected so I decided to weigh one.  It tipped the scale at just under 42 pounds.  That meant the entire pallet weighed close to 500 pounds, and, ignoring the weight of the cardboard box, that is about 3 pounds per tile.

When I drew out the design I determined that I would need 158 tiles, some of which would be partial.  Figuring conservatively at 150 full tiles equivalent, and ignoring the weight of the underlayment, adhesive, and grout, the floor tiles will weigh about 450 pounds.  I have no idea what the carpet and ceramic tile that I have removed weighed but the tiles were heavy.  I also have no idea what the furniture weighed that we have removed but also have no idea what the new furniture will weigh.  The intent was that the new floor and furniture would weigh less than old stuff but we will see.

I traded phone calls with my dad and we finally got to talk for a half hour starting at 4:30 PM.  He turned 90 this past Sunday.  Mike Fearer from Bid-Rite Concrete called at 6 PM and arrived about 10 minutes later to discuss the foundation for our 70 foot ham radio tower.  I had printed off a page from the Universal Tower website showing their tower base.  I also downloaded and printed their base and tower installation instructions.  I had a set of these to give to Mike so he would have some idea of what the project is about.  We looked at the proposed location for the tower and access for his dump cart.  We also talked about the base, a rebar cage, a form around the top of the hole to allow the concrete to be slightly above ground, and a jig to make sure the base is level and the tower is plumb.

He said he was interested in the job and would work with me and Phil Jarrell (the excavator) to get it done.  Rather than bid the job he would just do it for time and materials.  He also said the current price of concrete was about $100 per cubic yard.  We will need about six (6) cubic yards to fill the required 5′ x 5′ x 6′ (deep) hole.  He thought he might be available the middle of next week but I don’t think I could have everything pulled together that quickly.

After Mike left I went to Lowe’s and picked up five 40 pound bags of topsoil, a 1-in/2-out signal splitter (rated for 5 MHz to 2.4 GHz), and a plastic snap cover channel for hiding the video cable we ran up into the bedroom from the basement for the TV set.  I then went to the Meijer’s supermarket just across Grand River Avenue for soy creamer but they did not have what I was looking for.  As long as I was there I had a salad for dinner at the in-store Subway.

While I was sitting there I called Mike Sharpe (W8XH) to confirm that he was available tomorrow to help with the antenna installations on our 40 foot tower.  I mentioned that the only thing I lacked was a standoff with a pulley at the end of it for hoisting stuff up to me.  He suggested that something like that was essential and I agreed, so I headed back to Lowe’s to see what I could figure out.  What I ended up with was a three foot long 7/16-14 threaded rod, a pulley that had a closed eyelet on top (and was big enough for the 3/8ths rope I bought), some 7/16ths washers, and some 7/16-14 nuts.

When I got back to the house I unloaded the topsoil near the part of the east yard that needs to be filled in, took the other stuff inside, and then assembled the threaded rod pulley system.  I secured the pulley on one end of the rod using two of the nuts, one on either side of the eyelet.  I threaded a nut onto the other end, put on two washers, two nuts, two more washers, and another nut.  I ran the first two nuts, with two washers between them, part way down the rod.  I left the second pair of nuts, with washers between them, near the end of the rod.

I took the assembly out to the tower and adjusted the position and spacing of the two pairs of nuts and washers so they would bracket two of the horizontal tower members.  In use I will secure the rod to the tower at each pair of nuts/washers using plastic cable ties.  This arrangement will put the pulley at least 18″ from the tower which should be far enough out that we can hoist the DB8e OTA TV antenna to the top of the tower without it banging into the tower or hanging up on something.  This antenna is the largest thing we need to hoist up. The old TV antenna is considerably larger and heavier, but it is coming down via gravity.

There was a message on our answering machine from Linda’s sister, Sr. Marilyn, who lives in St. Louis.  She was listening to the news earlier today about the storms that went through our part of Michigan and wanted to make sure we were all OK.  By the time we finished talking it was dark and I was done working for the day.  Linda called shortly thereafter to let me know she was on her way home and I mentioned the call with Marilyn.

I finally opened the box with the vertical omnidirectional outside antenna for the cellular booster system and discovered that I should have opened it sooner.  The mounting bracket was designed to be mounted to a vertical surface, such as the side of a house, not a tube, such as a tower leg.  I did not want to postpone tomorrow’s tower work so I will have to get up early and figure out a way to adapt the existing bracket so I can mount the antenna to the top of the tower.

My initial thought was that an aluminum U-channel of the correct size might solve the problem very nicely.  I could drill two holes in the bottom of the “U” to match the two holes in the bracket.  I could then drill three pairs of holes through the sides of the channel.  The antenna would be bolted to the bottom of the channel.  With the open part of the channel held against a vertical tube I could secure it with three long plastic cable (zip) ties.  Conceptually it should work and be easy to fabricate, but will take time which I won’t have a lot of in the morning.  We have to get the two coax cables from Scotty (AC8IL), drop off my car at Brighton Honda for its 100,000 mile service, and be back in time to have the mount fabricated and all of the antennas and tools ready to go by 10:30 AM when Mike shows up.

Linda got home at 9:45 PM, earlier than she thought she would when she left.  She and Diane ate at Luigi’s and had a very nice meal.  They also enjoyed the movie.  We had a big day on tap for tomorrow and we asleep by 10:30 PM.

 

2015/06/10 (W) Ron and Mary

Same routine as yesterday; up at 7 AM, open up the house, feed the cats, clean the litter tray, start a load of laundry, make the coffee, and drink the coffee while using our iPads.

Our daughter’s 34th birthday is tomorrow but she is flying to Las Vegas today to meet up with her husband who is there on a company outing.  We will celebrate her birthday when they get back, perhaps in conjunction with Father’s Day and Linda’s birthday, which is at the end of the month.

Linda left at 9 AM for Brighton Honda to have the 12 V battery in her car checked.  The battery light came on the other day so we thought it might need to be replaced.  Around 9:20 AM I heard thunder and a short time later we had a brief, heavy downpour.  Linda called at the same time and said the battery tested OK.  The problem could be the alternator, of course, but presumably the dealer service people know that and checked for that.  If not, we will likely be back there sooner rather than later.

Linda headed on to Meijer’s to do the grocery shopping.  Today was trash pickup day so I took the trash can to the street.  After meeting with Brad from Chuck It Junk Removal the other day we decided we would rent their trailer for 5 days.  For the same price as having them physically handle 1/3 of a truck of junk (5 cu. yd.) we can get rid of a full truck of junk (15 cu. yd.) by loading it ourselves.  Deal.

I got a call from Phil Jarrell regarding my request for pricing to dig a foundation hole for a ham radio tower foundation.  It was a useful conversation in that I had not previously realized that I will need a concrete contractor in addition to the concrete supplier.  The only thing the concrete supplier will do is show up with a cement mixer truck and dump the concrete where they are instructed to.  The concrete contractor will actually place rebar, build forms, provide carts or a pumper, and get the concrete from the truck to the hole.  Phil recommended Mike Fearer of Bid-Rite Concrete as a good guy who would work with me to get this done.

I talked with Chuck about getting a key to his shop so we could have the new refrigerator delivered there and have the old one picked up without having to trouble him to be there.  He agreed and suggested that we contact the guy down the street about removing the old windshield and installing the new one as part of the refrigerator swap.

Rather than dig into our bus interior remodeling project I have used the last couple of days to finalize decisions about various products and order them.  One of the things I have wanted/needed for a while is a cable entrance box that will allow me to route transmission lines and control cables into the basement from outside.  I talked to Chris Perri, KF7P, at the Dayton Hamvention last month and decided that I liked his custom fabricated cable entry boxes.  I got his business card at the Hamvention and exchanged a couple of e-mails with him this week.  I decided this morning how I want the box initially configured and e-mailed my specs to Chris.  I would like to run the cabling for the cell phone booster through this box so I needed to get it on order.  Speaking of which, the cell phone booster system arrived today via UPS so I am feeling more comfortable that all of the stuff I am ordering will actually get delivered to our house.

Wednesday’s and Fridays are when Recycle Livingston is open and the Wednesday hours are 11 AM to 5:30 PM.  We had my car loaded up with recyclables and Linda drove over after lunch to drop them off.  When she got back she made a batch of her yummy granola and I got a couple more loads of laundry done while continuing to work at my computer.

After doing my alternate tile layout for the bus floor yesterday I decided that I liked the way it looked better than the original ad that it would not involve any more cutting than the row/column layout.  I also felt confident that I had an accurate enough tile count to go ahead and order the tiles.  I drove to the Shell station to fill my tank and then drove to Lynch Carpet in Howell.  I ordered 12 boxes of the 16″ x 16″ Armstrong Alterna Luxury Vinyl Tile in the La Plata Creme Fresh pattern, and a gallon each of the vinyl adhesive and Glacier vinyl grout.  There are 14 tiles per box (24.89 sq. ft.) for a total of 168 tiles (just under 300 sq. ft.).  The inside floor area of the bus is around 300 sq. ft. before subtracting out walls and cabinets but we will be using some of the tiles on vertical surfaces in the entry stairwell and cockpit and around the box that supports the bed platform.  My estimate is that I will have 10 extra tiles.  The guy at Lynch Carpet suggested that I use a scrap piece of tile as a spacer when installing the tiles but I may use the little plastic “X” pieces designed for this purpose.

From Lynch Carpet I drove to Lowe’s in Howell to see if they had a different portable air compressor that might be more appropriate than the 6 gallon Porter Cable we just bought.  The Porter-Cable air compressor has a maximum regulated pressure of 150 PSI but that is also the maximum tank pressure.  I will have to test it on one of the front bus tires to determine if it will get the job done and if not I will return it.

The guy at Lynch Carpet also suggested that I rent a handheld grinder from Abe’s or A-1 Rental, both in Howell.  Abe’s did not have any grinders of any kind and A-1 was closed on Wednesdays.  The gal at Abe’s suggested the tool rental service at the Howell Home Depot, so I stopped there.  They also did not have a handheld grinder but they did have a floor model concrete grinder.  It was so heavy that I doubt if we could have gotten it into the bus and it was too big to maneuver in the tight spaces where I need to work.  They did have a lighter/smaller floor stripper and I may give that a try before I resort to grinding off the thinset with an angle grinder and diamond impregnated wheel and/or a belt sander with a very aggressive belt.

Pat Davidson called from Apex Roofing while I was out so I called him back.  They will be able to start on our roof next week Monday or Tuesday and will deliver the shingles on Friday this week.  I confirmed that we wanted two of the 14″ light tunnels for the living room.  I also indicated that I had scrapped the idea of building a dormer or installing a roof hatch as I simply did not get this taken care of in time.

Linda had closed up the house and turned on the air-conditioning while I was out.  It was pulling moisture out of the air but would not bring the air temperature lower than 78 degrees.  Not good.  This will be our third summer in this house and we have not used the air-conditioning very much.  The first summer we were gone for most of June, all of July, and a few days in August.  We had the unit serviced last year and thought it was working OK but perhaps did not really use it after that.  We did install filters in the return air grills so perhaps they are restricting the airflow too much.  It is also possible that it needs refrigerant.  I will have to check our records from last year and then call TOMTEK to arrange to have it serviced again.

Linda’s brother, Ron, and his wife, Mary, arrived early this evening.  They are on their way to northwest Illinois for a week-long organized bicycle ride.  They have to be there on Saturday and will be spending the next three nights at our house.  Visits from them are usually not more than once a year but we really enjoy their company when they are here.

For dinner Linda made a nice green salad and then made whole wheat angel hair pasta with onions, garlic, and mushrooms lightly sautéed in olive oil.  Ron does not imbibe but Linda, Mary, and I had a glass (or two) of Moscato.  We moved to the deck after dinner and had fresh strawberries for dessert.  It cooled off as darkness set in and we eventually moved back inside.  The other three were in the kitchen and I was sitting on the sofa when Juniper suddenly caught a mouse in the middle of the living room, or at least that is where I noticed that she had it.  She took it downstairs and I got her to drop it in the bathroom sink but I was unable to get it into a container to take it outside and it escaped into my office.  I closed the doors but I have no doubt it can go wherever it wants in the house from there.  When I returned upstairs we chatted until 11 PM and then all turned in for the evening.

 

2015/05/07 (R) Meshuggah Nuns

We spent part of last night researching a new refrigerator for the bus.  Possibilities included models from 13.5 cubic feet to 17 cubic feet from various manufacturers.  We found one that was a close match to the dimensions of our current unit, but we are thinking about downsizing to create space for a slide out pantry.

One huge disappointment is that all of the SunFrost models, including their 16 cubic foot unit, are 34.5″ wide.  Our refrigerator cubby is only 33-3/4″ wide and there is no easy/practical way to modify it to make it wider.  Although very expensive, the SunFrost units are super insulated and use 1/5th the energy of comparable capacity energy efficient refrigerators.  They are also available with 12 VDC or 24 VDC compressors, thus avoiding the inefficiencies associated with using the inverter when boondocking.

I spent some time measuring the floor and wall surfaces in the bus that are currently tiled or carpeted but did not calculate the area.  I need to do a drawing and put together an Excel spreadsheet as the bus has a lot of odd shaped spaces.

We drove to ABC Supply Co. in New Hudson to pick up samples of Certainteed Landmark Pro shingles.  We had narrowed down the possibilities to three choices but needed to see them next to our brick, siding, and trim.

On the way home we stopped at Lynch Carpet in Howell to return the Armstrong tile samples and determine delivery time, which was 2-3 weeks worst case.  We did not get a quote since I did not have the square footage figured out yet, but Clint made a note of the tile and vinyl grout we like.

We left the house around 4:15 PM and drove across M-59 to Rochester.  The Rochester Mills Beer Company restaurant was in downtown, about five miles east of the Oakland University campus and the theatre.  It was after 5:30 PM when we got to the parking lot.  We did not expect Kate before 6:30 PM so we ordered a hummus appetizer plate and two beers.  The hummus platter featured three different flavored hummus that were very good.  Linda had a chocolate coffee tasting dark brew and I had a Framboise.  Framboise is a raspberry beer that originated in Holland and tastes more like raspberries than beer.  Perfect!

Kate left work at 5 PM.  The drive from that part of town to this part of town is one of the worst in the Detroit area, and that is a terrible time of day to do it, but that is what she did because she did not have a choice.  She stopped for flowers and a card but made it to the Rochester Mills Beer Company in time to enjoy a pizza and some beer.  We had a no cheese veggie pizza with a whole wheat crust that was pretty good.  Linda had a different but still dark beer for her second serving while Kate and I both had the Wit’s Belgian style beer with orange and coriander.  Although much more beer-like than the Framboise, it was agreeable.  Except for some “guest beers” everything at the Rochester Mills Beer Company is brewed by them.  It is very local, very fresh, and very good as far as beer goes.  They also feature Michigan wines, which we always appreciate seeing in a Michigan restaurant, but we were not having wine this evening.

We made it to the theatre with only a few minutes to spare.  Kate got the tickets from will call as they were under her cousin’s name.  We had great seats in row D just left of center.  Meadow Book is not a large theatre and sitting this close to the stage made for a very intimate experience.  The playbill was the musical “Meshuggah Nuns.”  We were not familiar with this musical but it was delightful.  The 5-member cast were all professionals, including Cindy Williams (Shirley from the Laverne and Shirley TV show) and Eddie Mekka (Carmine Ragusa from the same TV program).  They all gave excellent performances but Jeanne Tinker, who played Sister Amnesia, was our favorite.  When dressed in a habit one really has to act with their face and hers was very expressive.  She also had the “comic” part in the cast and was very funny.

The show ended at 10 PM after which we visited briefly with Kate’s cousin, Mikeala, who is part of the theatre crew working with costuming.  We chatted with Kate a while longer in the parking lot and did not get home until close to midnight.

 

2015/05/05 (T) BAF & MEF3 Visit

Today was a family visit day.  We were up a bit earlier than usual and enjoyed a light breakfast and a quiet first half of the morning.  One of the things I’ve had on my to-do list is ordering Touch of Oranges Wood Cleaner and Touch of Beeswax Wood Preservative.  I finally got those ordered today directly from the company with free ground shipping.  I checked Amazon but the prices were no better and the products were not eligible for Amazon Prime.  I also found what I think is an exact replacement for my iPad2 flip cover and put it in our Amazon shopping cart.

Our son (Brendan) and grand-daughter (Madeline) arrived around 10 AM.  Madeline knows her way around the main floor of our house at this point and headed directly for the pantry to see what snacks we might have.  We tend to have dried fruit on hand, especially raisins and cranberries, as a tasty but healthy choice.  She is very fond of dried cranberries.  We spent the morning playing and talking and having a drawn out snacky lunch.  Somewhere in there Brendan setup the Pack-n-Play.

Pat Davidson from Apex Roofing showed up around noon to look at our roof and give us a quote.  Apex has done two roofs for us on the previous house and did excellent work at a fair price both times.  The quote was about what I expected and I gave Pat the verbal go ahead to put us in the schedule.  They are scheduling out about six weeks, so mid -June looks like the timeframe.  That potentially runs into the SKP Tri-Chapter Rally or the ARRL Field Day, as well as bus and bus barn projects, so we will have to see exactly where things fall.  We like to be around while this sort of work is going on.  This time, however, I also need to build a dormer on the back side of the roof to provide better access to the attic, generally, and the air-conditioner evaporator/air-handler, specifically.

The quote is for a new roof, with new underpayment and ice shield, so it is a “tear off” where they first remove all of the old roofing and repair any damaged/missing roof decking or boards.  They always look for at least a three day window with a dry weather forecast.  Pat said they would work with me relative to the dormer.  Specifically, they would start the tear off in the area where I want to build the former and then move to a different part of the roof so I can do the carpentry.  Linda and I need to visit ABC Supply Co. in new Hudson to pick out the specific shingle we want, and we plan to do that sooner rather than later.

The dormer is simple in concept but a bit trickier in execution.  I would build two tapered walls on the ground that look like right triangles.  The hypotenuse would attach to the roof with the long leg on top and horizontal and the shirt leg facing out and vertical.  Joists would be installed across the two walls, tying the together.  The front wall would be framed for an access door between the two short legs.  Two rafters would be installed at the end wall.  The ridge board would be set in place and cut to tie into the roof.  Two backer boards would be installed on the roof running at an angle from the ends of the side walls up to the ridge board.  The rest of the rafters would then be installed.  The walls and roof would then get plywood sheeting and decking.  The final carpentry would be fascia boards and siding.  Fortunately we have a pile of Hardy Board left over from when the house was sided.  Hopefully there is enough to side the dormer and it is in good enough shape to use.  I would then install the door, which I might have to build.  Apex would then roof the dormer, including continuous ridge venting.  The final steps would be painting the door and door trim and installing fascia and vented soffit material to match what is already on the house if I can find a supplier.  We would like the dormer to blend in and look like it belongs there.

Brendan got Madeline down for her nap at 1 PM and then spent a little time looking at what we plan to do with the floor in the bus before heading back to Ann Arbor.  I gathered up the Armstrong vinyl floor tile samples and drove to Lynch Carpet in Howell to return them and see what else they might have.  Clint let me keep the one we like for a couple more days and gave me a grout color chart.  I then headed to Best Buy in Brighton to pick up a Sony Blue-Ray/DVD player and a couple of flash drives, all of which were on sale.  I stopped for gas and got back to the house just as Madeline was waking up from her nap.

I was able to spend a little time researching a potential new vehicle.  As much as we are enamored with the Jeep Wrangler Unlimited the Consumer Reports data on them is very discouraging, especially the reliability data.  Viable alternatives may be the Nissan Frontier Pickup Truck or the Nissan Xterra SUV, both of which are available in 4×4 configurations.  Even the Ford F-150 might be a possibility as it is available in a 4-door, short-bed, 4×4 version.  They all have much better CR reliability data that the Jeeps.  The problem is, they are not Jeeps.  If we can wait a year, Ford is releasing an F-150 Raptor in fall 2016 that will feature a 10-speed transmission with six selectable driving modes including rock, mud & sand, and Baja (high speed desert racing).  It will probably also feature a ridiculously high price, but then none of these vehicles are inexpensive.

We got a phone call from XPO around 4:20 PM to let us know they would be delivering our box spring mattress foundation around 5 PM.  They showed up right on time and carried it to our bedroom.  Linda signed the delivery slip and they were gone as quick as they arrived.  We will wait until Brendan retrieves Madeline tomorrow to disassemble and reassemble the bed.

I entertained Madeline while Linda prepared dinner, but Madeline was very interested in what her Grandma Linda was doing, so we kept going to the kitchen to check on the work.  Linda served some “mock” chicken tenders, but she also fixed fresh green beans and homemade mashed potatoes, reheated some frozen edamame, and set out fresh black grapes and pineapple chunks.  Madeline is a good eater and we all enjoyed our meal.

Madeline is “potty trained” and very proud of the fact that she is no longer wearing a diaper.  She had a very successful day letting us know she needed to use the toilet.  We have a booster ring for the hall bathroom and put a stool in there for her.  She uses the stool to get up in the toilet seat and then uses it to stand up at the sink and wash her hands.  The hall bathroom sink/counter is lower than normal and turns out to be a great height for Madeline with the use of the stool.

We played after dinner until Madeline was tired.  She has always been comfortable staying with us but at 29 months of age is starting to have some anxiety about being away from her parents.  She wanted her daddy, and was briefly a little bit teary, but it wasn’t anything Grandma Linda couldn’t handle.  Linda followed the usual routine of looking at the rug (wall art) and all of the pictures in the hallway, the small bedroom, and finally the middle bedroom where Madeline’s Pack-n-Play is set up.  She selected the Construction Kitties book (again) for a bedtime story.  It was one of the books we got from the library yesterday and was her favorite choice all day today.  She fell asleep easily as she usually does.  We are active, busy people, but it’s a different kind of busy from having a 2-year old in the house.  We were tired, and turned in about an hour after our grand-daughter, but it was a good kind of tired.

We were so busy today that we failed to notice that it was Cinco de Mayo until it was almost over.

 

2015/05/04 (M) Moving Things Along

I had a list of things I wanted to accomplish today but did not get most of them completed.  I am trying to make purchasing decisions and get products and materials ordered so I can get some projects done and checked off my list.  It wasn’t a wasted day, as I gathered additional information, but it was frustrating to not get orders placed for things that I thought we settled items.

Based on a recommendation from bus buddy Butch I had decided to order a Cyclo 5 dual head orbital polisher.  I had looked at them before on Amazon but on closer inspection discovered that there is a Cyclo 5-Pro and now a Cyclo 5 Mark II and Cyclo 5-Pro Mark II.  The Mark II models are the current ones but much of what is for sale on Amazon are the previous generation.  Not only that, any one of them comes in three different configurations, two of which appear to duplicate one another.  I finally figured out that the Pro version has a variable speed motor.  The configurations have to do with the style of buffing pads and how they attach to the tool.  It turns out that whatever I get I can order the other parts if needed, so which one to order comes down to which pad attachment method I think best suits my needs.  That means more research before I place an order somewhere.

I have also decided to finally install a cellular booster system at the house and identified the TopSignal 5-band system as the one I probably wanted.  I have always been partial to Wilson Electronics, but the company has changed ownership in the last year and rebranded everything for the consumer market as WeBoost.  The redesigned “consumer” website is less informative than the old one and the company has been slower than other companies to bring products to market.  The model I would want is listed as “available soon.”

I called Cellular Solutions and talked to Paul.  They sell the WeBoost and TopSignal products but he steered me towards the SureCall Fusion5s, which is similarly priced to the TopSignal and more expensive than the WeBoost.  It is also a 5-band/multi-mode (3G/4G/LTE, etc.) transceiver so it will cover almost all cellular carriers including Verizon, without locking us into any specific carrier.  I was also going to call PowerfulSignal, who sells most of the same products, but there was no price difference based on the information I had and Cellular Solutions is a Michigan-based company.

We also need an Over-The-Air TV antenna so I started revisiting the website for AntennasDirect.com.  I spent some time looking at their website while we were in Quartzsite, Arizona but never ordered one.  One of the links on their website is to AntennaPoint.com.  This website shows the direction and distance to OTA TV towers based on your ZIP code.  It turns out that we have broadcast antennas in all directions but most of them are at ~104 degrees (Detroit) and ~270 degrees, plus or minus (East Lansing, Kalamazoo, and Battle Creek).  The ground rises to the west from our house so the Detroit metro stations will still be our primary ones.  Even so, the closest tower in any direction is 27 miles away and the farthest is 58, so we will need a serious antenna to pull these in.  (Antenna point.com only display towers up to 60 miles away but that covers everything we would care about.)

I have been trying to catch up and dispatch these kinds of lingering projects so I can work on plans for the bus barn and get started on our bus projects.  At this point I am no longer confident, however, that we will ever build a barn.  No matter what approach we take it is just going to cost more than we want to spend and it looks like dealing with the permitting process may be a hassle.  Added into this mix are several major projects on the bus, the need for a new roof on the house, and the need (desire) for a new car.  Ugh.

One of the bus projects is the remodeling of the seating in the front half of the coach.  As part of that project we want to remove the old carpet from the front and the bedroom and the black ceramic tile from the kitchen and hall, and probably the bathroom.  We did some online research and liked the look and quality of Armstrong Alterna Luxury Vinyl Tiles.  These tiles come in a 16″x16″ and a 12″x12″ size and a few of them come in 8″x8″.  From the website I determined there was a dealer, Lynch Carpet, close to us with an excellent selection of Alterna samples.

We made an errand run, stopping at the Howell Library to return a DVD, do some car research in Consumer Reports, and check out a few children’s books for Madeline’s visit tomorrow.  We stopped at the Howell branch of First Merit Bank to make a SLAARC deposit, and then drove to Lynch Carpet.  Clint worked with us and we took four samples to look at in the bus.  Once we saw them with our cabinetry the one we liked best was the La Plata Crème Fresh.  It has a faux stone, low luster, textured surface that is mostly off-white but has distinct milk chocolate brown veining.  I was thinking we would install the tile diagonally (as diamonds instead of squares) but that would probably result in more cutting of tiles, so more work, more time, more waste, and more cost.  The more I thought about that the more I liked the idea of a simpler layout, but that decision is far from made.

The rest of the day was filled with the usual things; a load of laundry, working at our desks, fixing/eating dinner, reading, games, and online research, the last three typically done on our iPads while curled up on the living room couches.