2014/07/26 (S) Climbing Ladders

We did not go to our usual ham radio breakfast in South Lyon today so I could get an earlier start on the construction work in the garage.  Before I even got started I got sidetracked by a small rain gutter project which led to further gutter projects.

I bought a downspout elbow yesterday and wanted to get it installed before the next rains, which are forecast for tomorrow at 20% in the early morning riding steadily to 90% by 6 PM.  The elbow is a replacement for a short straight downspout section that feeds water from the end of one gutter into a slightly lower gutter that is perpendicular to the first.  The second gutter has the main downspout at one end.  Rather than dumping water straight down into the lower gutter, the elbow will direct it towards the lower gutter drain hole and away from the house.  A picture would make this much clearer, but I did not take one.

While I was installing the elbow I noticed that both gutters had a lot of “stuff” in them and the wire mesh drain hole grates were mostly clogged.  I cleaned all of the gutters last year, although I do not remember exactly when.  I expect a certain amount of organic material to accumulate in the gutters—the house is surrounded by trees after all—but I was surprised by the amount of granular material that had washed off of the shingles.  There was a lot of granular material last year, which I assumed had taken many seasons to accumulate, and I had flushed all of it out of the gutters with a hose.

The guy who inspected the house when we bought it said the roof was “serviceable” without being much more specific.  I suspect it is approaching the end of its useful life, but is not a project we can take on this year.  We have a ranch house with a low pitched roof, probably not more than 4-in-12.  It would take me several weeks to roof it myself, but it’s something I am (still) capable of doing.  Perhaps next summer, after we build the barn.

Given the condition of these two gutters I decided to check/clean all of them.  In the process I found that the gutter on the front of the house had three mounting screws loose at the west end.  I tightened them up, completing my unplanned roof tasks for the day.

There are several interesting things about “small construction projects.”  One is that they seem small because you can conceptualize the outcome and visualize all of the major steps quickly and easily.  Another is that you assume they aren’t going to cost very much; they are, after all, small projects.  Having been educated and worked as an engineer at one point in my life I tend to design things rather than jump right into the building phase.  The design phase is where I usually get my first reality check as I start to consider all of the details of the project that I was not able to quickly and easily visualize.  The next reality check comes when I am finally ready to build, which means cutting and fastening wood, only to realize that I have many days of other tasks I must complete first.  The tricky part of construction is that stuff has to be done in a certain (correct) order.  If not, you end up having to deconstruct something and then reconstruct it, or engineer an entirely different solution which takes even longer and costs even more than what you planned to do in the first place.

So even though I worked all day I did not build the platform.  Here’s what I did instead:  removed some drywall to expose a wire that was a little too short to get the sheathing into the new sub-panel; installed an outlet box and duplex outlet using the old wire and ran a new wire to the panel; filled out the panel with circuit breakers I will eventually need for new or rewired circuits; patched holes in drywall; cut and installed two studs in the north wall to provide 16″ on center spacing for new drywall; bored holes through the new studs for an old wire; installed a switch near the rear garage door fed from the old wire; ran a new wire for a new outside light; went to Lowe’s and purchased a 36″ exterior grade door (steel), a fold-down ladder for the garage attic, an exterior LED light fixture, and a light fixture for the new utility closet; enlarged the garage attic access opening from 22.5″ x 45″ to 22.5″ x 54″; read and pondered the installation instructions for the fold-down ladder; and decided to call it a night.

Somewhere in all of that we had orange/grapefruit juice, Teeko’s Sweet Seattle Dreams coffee (a blend that Jeff does just for us) and Linda’s homemade granola for breakfast; tofu hot dogs for lunch with sweet cherries, and; vegan Pad Thai for dinner that Linda made from scratch.  The Pad Thai was a complicated dish but Linda’s efforts really paid off; it was outstanding.

By the time I showered, worked on this post, and caught up on some blogs I follow it was time for bed.  I was tired but, having exerted myself physically and mentally and accomplished tangible things, it was a good kind of tired.  I no longer climb corporate ladders.  Today I was up and down real ones.

 

2014/07/19 (S) A Busy Day

At 7:30 AM we were about to leave for our usual Ham radio club breakfast in South Lyon when we realized some of the landscaping crew was already in the back yard.  I talked briefly with Steve to see if he had any questions for us and to let him know we would be gone for the morning.  We arrived at the Senate Coney Island a little later than usual to find a big group, some of whom were not regular attendees.  We would normally have lingered and enjoyed conversation over coffee, but we needed to get to Ann Arbor for a quick visit and to pick up my socket wrench toolbox from our son.

When we arrived at Brendan and Shawna’s house Madeline was outside pushing her push toy around the front yard.  As soon as she saw us she took off down the sidewalk towards the park.  Shawna retrieved her and got her stroller ready while Brendan and I transferred things out of and in to my car.  We then walked to Burn’s Park where Madeline played for about 45 minutes before we headed back to their house.  We had hugs all around and left.  We stopped at the Whole Foods Market in our way back to US-23 and then headed for home.

Back at the house, four landscapers were working, including Steve, and lots was getting done.  Hurray!  I got busy working on the electrical sub-panel in the garage while Linda made a run to the recycling center.  When she got back she did a load of laundry, which is normally my job, while she cleaned the lower level of the house.

I had to make a trip to Lowe’s for electrical parts and Linda had to make one in the evening to buy some 15 Amp single-pole circuit breakers, but I managed to get the old sub-panel removed, the wires labeled, the new panel hung, and all but one wire reconnected.  That wire needs to be replaced and I will do that first thing in the morning.  We turned the breaker on in the basement that feeds power to the sub-panel in the garage, turned on the main breaker in the sub-panel, and then turned each branch circuit breaker and checked to see that it was working correctly.

The reason Linda had to go get 15 Amp circuit breakers is that I discovered the old sub-panel had 14 gauge (AWG) wires “protected” by 20 Amp circuit breakers.  14 AWG wires are only rated to carry 15 Amps.  If allowed to carry more than that for any length of time they will overheat which could melt the wire insulation and lead to a short or worse, arcing, which can start a fire.  I will be placing those circuits on 15 Amp breakers in the morning.

 

2014/07/18 (F) Tracing Circuits

When I talked to Steve from Village Landscape Development (VLD) yesterday he explained that they had not been out to work on our project because one of his employees had not shown up on Monday or Tuesday and late Tuesday informed him that he was done for the season for personal reasons.  Unfortunately for us, that employee was the crew chief for our project.  Steve said he spent Wednesday rearranging his crew assignments and assured me there would be people and materials at the house today.  When I left at 10 AM there was no sign of either, and no phone call letting us know when we might expect to see them.

I stopped at AAA Appliance to pick up the HVAC filters I ordered yesterday and then went to Lowe’s and bought the Square D Homeline electrical panel value pack.  It’s a 100 Amp main breaker panel with 20 slots and came with five 20 Amp single pole breakers.  I bought two ground bar kits, as well as a 20 Amp and 30 Amp 2-pole breaker (for 240 VAC devices).

As I was getting in the car to come home Linda called to see if I remembered to buy the weatherproof outlet covers for the outside outlets by the deck.  I had not, so I went back in to get them.  Apparently I forgot to buy some other electrical things I needed because I ended up with a non-contact voltage sensor, an outlet tester that works with GFCI outlets, and a system for determining which breaker supplies an outlet with having to turn breakers off and on until you find the right one.

When I finally got back to the house we installed one of the new filters behind the large return air grill in the living room.  We had to trim pieces of foam weather seal and pack it in to the small gap around the filter to force air to flow through the filter rather than around it.  We turned on the A-C to check the airflow and decided to check all of the registers.  There turned out to be return air ducts in all three bedrooms, which actually makes more sense than a single return in the living room.

The return air duct in the master bedroom had fiberglass insulation stuffed in it, presumably to cut down on winter heat loss, but there was no filter material.  Of the two supply ducts only the one farthest from the air-handler seemed to have airflow.  We removed the return air grill and cut a piece of the old living room filter material to fit and screwed the grill back on with the filter material behind it.

The return duct from the small bedroom had a thin piece of filter material behind the grill and adequate airflow from the supply duct.  We removed the return air grill, cleaned the filter material and re-attached the grill with the filter material behind it.  The middle bedroom had good air flow from the supply register but nothing to filter the air going into the return air duct.  We cut another piece of the old living room return air filter and installed it behind the return air grill.

I think we now have filter material on all of the cold air returns.  It strikes me as very odd that all of these air return ducts do not come together and then feed through a single filter.  We turned the A-C on and let it run while we had a quick lunch.  Except for the poor airflow to the one of the two supply registers in our bedroom, everything seemed to be working so we turned our collective attention to our next task.

The Coleman compressor/condenser unit was noticeably out of level.  Linda weeded around the base and trimmed back the rhododendron as the leaves of the closet ones were being sucked up against the heat transfer panels (radiator fins).  Once we had a little space around the base of the compressor we lifted the low side with a 3′ crowbar and slide a couple of bricks under that edge to hold it.  We had an old, unopened, bag of paver base so we used that to fill the large gap under the compressor base.  I scooped and placed it with a garden trowel and packed it with the end of a 1 x 2. We raised the unit a little and pulled the bricks out.  A minor tweak and we had it level.

We used the circuit tester to finish checking all of the outlets in the garage and the library and map what each circuit breaker supplied.  We discovered that the switch to the left of the sub-panel controlled an outside outlet mounted very high on the wall just under the soffit.  We have no idea why that outlet is installed where it is; perhaps it powered deicer cables or some other roof/gutter-related system at one time.  I was getting some very strange voltage measurements at the switch and at the outlet so I replaced both of them, but that did not change the readings.  I put a weatherproof cover plate on the outlet while I was at it.

Steve showed up mid-late afternoon with the excavator, his nephew Spencer, and a large role of plastic drain tile.  He used the excavator to move a couple of large boulders around back and then dig trenches for the drain tile.  He assured me there would be a crew here all day tomorrow, and he would be here to supervise them.

I needed to trim a stud in order to install the new electrical panel in my desired location but was unable to cut it with any of my existing tools.  What I needed was an oscillating cutter, so I headed back to Lowe’s and got one.  I was about to use it to trim out a section of a stud when I double checked a measurement and realized it was supporting the drywall that formed the northwest corner of the library.  Removing it was definitely not a good idea and that forced me to rethink the installation of the new panel box.  I do my best thinking when I’m asleep, so that was the end of my work for the day.

2014/05/07 (W) Plumbing

After breakfast Linda headed to Ann Arbor to babysit our younger grand-daughter.  I had a long list of things to do at my computer today, and planned to spend the day inside at home doing them.  I did not manage to do most of them as I ended up doing other things instead; so much for plans.

Wednesday is trash day (sorry, Prince Spaghetti), so I got the trash to the curb.  (I know, I know, how have I managed to arrange such an interesting life?)  A box of Bus Conversion Magazines arrived yesterday, so I opened it to check the contents and then e-mailed the publisher that all was well.

We do not have curbside recycling at the house the way we did in the previous one, so we have to take our recyclables to a drop-off center run by Recycle Livingston.  The center is open Wednesdays and Saturdays.  On her way out the door Linda reminded me that I had to take the recyclables to the center.  We keep a set of cardboard boxes on the floor in the pantry and sort our recyclables as they become available.  I loaded them in the car for later.

At some point in the past the shower diverter in the bathtub quit working, so that had been on my “to do” list for a while.  Coincidentally, while we were in Florida I had seen an episode of “Ask This Old House” that dealt with this exact repair!  I had to use a large pipe wrench to unscrew the old bathtub spout/diverter as the threads were corroded.  With the old diverter off I now had a fairly good idea of what I needed in the way of a replacement part.

I had been putting off fixing the leaky dishwasher fresh water connection but today was finally the day to tackle that project.  As I was thinking about heading to the recycle center, and then to Lowe’s for plumbing parts, I got a call from Steve at Village Landscape Development (VLD).  He wanted to swing by and go over the front stairs and rear retaining wall projects again and get us on his schedule.  We agreed on 1 PM.  It was 11:30 AM, so I had just enough time to drop off the recyclables and get a new diverter from Lowe’s.

Steve (VLD) came by and we walked through the two projects.  We were on the same page and settled on tentative start and completion dates, so we signed an agreement and I gave him a deposit.  After he left, I called Wayne (KD8H), set up to get the tower tomorrow at 11:00 AM, and then e-mailed Steve (N8AR) to let him know the date/time.  He had permission to use Bruce’s (W8RA) closed trailer to help me with the tower.

Back at the dishwasher I turned the water supply on and the connection didn’t just drip, it spurted.  I redid the connection with pipe thread compound instead of Teflon tape but it did not help at all.  I tried tightening it and it got worse.  It was clearly time to rethink my approach.

I find that a good way to rethink my approach to a problem is to do something else, so I installed the new diverter for the bathtub/shower in the hall bathroom.  It only needed to be threaded on hand tight as it is not a pressurized fitting.  Water either flows out the spout into the tub or gets blocked and forced (diverted) up to the shower head; a pretty simple device, really.  It was not quite the right length and left a 1/2 inch gap between the base and the wall tile.  At least this way I could see if any water was leaking out the back end.  🙂  It wasn’t, so I let it go for now.

I returned to the dishwasher problem and took another look.  It appeared that the rubber seal (O-ring) in the end of the hose may have gotten nicked or mis-shapen, perhaps from over tightening.  There was no indication of a leak between the 90 degree elbow and the dishwasher inlet.

I headed back to Lowe’s for a new 8’ dishwasher connection hose.  I could not purchase just the hose; it only came as a kit with the 90 degree elbow and another adapter, which turned out to be fortuitous.  I noticed that the instructions did not call for Teflon tape or pipe thread compound and I verified that with the associate in plumbing.  I also picked up a decorative filler plate for the diverter.

The flexible water line connects to the lower left front corner of the dishwasher, loops underneath the unit, goes through a hole in the adjacent cabinet at the lower left rear, goes through the other side of that cabinet into the space under the corner sink cabinet bottom, and finally emerges through a hole in the floor of the cabinet along with a water pipe.  The only way to run the new flexible line, without removing the dishwasher and disassembling cabinets, was to attach one end of the new line to the dishwasher end of the old line and use the old line to pull it through.  Zip ties have lots of uses, and this is one of them.

Before making any connections I read the instructions again.  The connections at the end of the hose were to be “finger tight plus 1/4 turn.”  Although “finger tight” is an incredibly imprecise term–some number of inch-pounds would be precise–these directions clearly indicated that over tightening was a bad thing to do.  I connected the line at both ends following the directions as best I could and opened the supply valve a little.  No more spurting but I still had a drip leak and shut off the water supply.  I knew the hose was OK so it had to be the elbow.  I had to pull the dishwasher part way out to get to the 90 degree elbow.  (This why I installed an 8 foot hose.)  After I got it out I examined it and did not see any obvious thread damage or cracks, but there was some pitting and one pit in particular looked like it might be a through pinhole.  No matter, it was trash.

I installed the new elbow using pipe thread compound on the male NPT pipe threads that go into the female NPT fitting on the dishwasher.  These kinds of fittings are always a bit tricky.  They have to be tight enough to not leak, without overdoing it, and they have to be oriented a certain way to allow something else to connect to them; in this case the supply hose.  I reattached the flexible hose, turned on the water supply, and voilà, no leaks!  As long as I was on a roll I unscrewed the bathtub diverter, slipped the decorative spacer over the pipe, and screwed the diverter back on, lining it up carefully with the spacer and getting it snug but properly aligned.  Even though it took most of the afternoon I had successfully completed two plumbing jobs in one day.