2015/06/15 (M) Cover Up

Linda was originally scheduled to go into the bakery today but it got rescheduled to tomorrow so we did not have to be up by any certain time other than to be ready for the delivery of our new roof shingles.  Apex Roofing is scheduled to put a new roof on our house this week, weather permitting, and assuming they can finish up jobs they had scheduled for last week when it rained so much.

The truck from Wimsatt Materials in Waterford showed up at 8 AM with our shingles but they were unable to deliver them.  They brought them on a boom truck that was too tall to fit under the phone lines across our driveway and there was nowhere else they could position the truck that would allow them to operate the boon.  They were on the phone with their dispatcher and I called Pat Davidson at Apex roofing to let him know what was going on.  The decision was that they would be back this afternoon with a conveyor truck which would fit under the wires and be able to get the bundles up to the roof.  Pat called back to let me know they would be starting in the morning around 7:30 AM.

Later in the day someone showed up in an Apex van with a large enclosed trailer.  We moved our cars and he backed it up in front of our single garage door.  Wimsatt did not return with shingles so they will presumably deliver them first thing tomorrow morning.  They will need to back into the driveway and position the truck in front of our double garage door but that is also where Apex plans to put their debris trailer.  The guy in the van also made it sound like there would be at least six cars/trucks here needing someplace to park.  It should be an interesting morning, especially given the overnight weather forecast which includes drenching rains and possible severe weather and flooding.  The forecast for the daylight hours, however, looks OK.

After the Wimsatt truck left we finished the last batch of granola for breakfast and then got busy with our chores and projects.  Linda spent part of the day at her desk working on the financials for our local ham radio club (SLAARC).  She also tried to contact PayPal to opt out of their upcoming RoboCall campaign but was not able to get through to a real person.

I settled into my office for the morning, dealing with e-mail but focusing on editing blog posts for the last seven days.  Kate got in touch with me to see if we wanted to see The Bikinis musical production at the Meadow Brooke Theatre this week.  Wednesday through Sunday is the final run.  She also forwarded an invitation to a former colleague’s retirement gathering in a couple of weeks.

We have an RV Critter Guard that seals around our 50 A electrical cord and water hose to keep “critters” from entering the coach via that access hole.  We lost our original foam insert when I forgot to remove it from the cable entrance hole in the floor of the bus utility bay and it fell (blew) out while we were driving.  I checked the RV Critter Guard website and my exact products were not listed.  I measured our existing tongue and groove plate and then contacted the company via their contact form and explained what I needed.  I got an e-mail back indicating that my product was custom made and asking me for one additional dimension from the plastic plate.  I got that measurement and e-mailed it to them and indicated that I wanted another plastic plate and two spilt foam inserts.  I expect to receive an e-mail tomorrow with the price.  Once I have that I will call them to place the order.

I have tried several times in the last two years to order products from EZ Connector but they have always had another question for me that required me to go check something and I have never managed to close the loop with them.  I’ve been on a roll the last couple of weeks and decided that today was the day to get this done.  The company is in California, so I called them during the afternoon (my time).  The woman I spoke to on the phone gave me some good information but suggested I e-mail Joe with my requirements.  Joe e-mailed me back and answered several questions but had another one for me.  I responded to that question and went on to something else while I await the prices.  Once I have the pricing I will have to call them and finalize the order.

I exchanged e-mails with Josh from Coach Supply Direct and got a series of revised quotes from him for our new RV furniture and window shades.  What I really need are the drawings that show the exact dimensions of each piece including the size of the base and the location of the pivot (swivel) point.  Apparently he is having difficulty getting these from Flexsteel.  I would also like to have these for the Lambright Comfort Chairs but we took our own measurements at Bradd and Hall.  The whole process of getting furniture is getting very frustrating.  I need to contact Mike at Suburban Seating regarding the ISRI 6860 and pick a day to drive to ISRI USA in Galesburg to look at fabrics.  While I am at it I should probably get a price from Prevost.

I finally got back to work in the bus this afternoon.  I shut off the auxiliary air compressor, closed the valve on the air manifold that supplies air to the toilet and other house accessories, and drained the water separator.  I then investigated what will be required to remove the toilet.

There is a shut off valve on the water line behind the toilet so I closed that.  The water line is attached to the toilet mechanism with a plastic connector with two wings and looked like I could undo it by hand.  The air line looked equally easy to disconnect but the drain looked a bit trickier.  It goes out the back of the toilet rather than through the floor.  There is a metal sleeve with band clamps at each end that connects the discharge pipe to the drain line.  Fortunately the band clamp screws are accessible.

The toilet is screwed to the floor with four Philips head screws.  The centers of the screw heads are threaded and there are plastic caps with posts that screw down into the mounting screws to conceal them.  With the water, air, and waste lines disconnected once I unscrew the base the toilet should slide forward and then we may have to lift it to get clear of the water line.  The trick to getting it back in will be to get the four mounting screws back in the exact same holes.

The humidity outside was near 100% and I did not feel like running the bus air conditioners so I did not remove the toilet today.  I need to get it out, however, to remove the last few pieces of ceramic tile from the bathroom floor.  Once it is out it will have to stay out until the new floor is installed.

I tried pulling on one of the window latch knobs on the fixed window across from the kitchen counter and was surprised by easily it moved the latch.  I did not pull it far enough to unlatch it but it appears that getting the window unlatched will be relatively easy.  Getting the frame open without damaging the frame seal, and getting it closed again so it is weather tight, may be slightly more challenging.

I used a chisel to try removing the thinset and mastic that was adhered to the plywood subfloor.  It came off better than I thought it would but it was a slow process.  In addition to being humid in the coach it was very warm as I have had to leave the roof vents closed with the fans off due to the rainy weather.  I removed enough thinset, however, to convince me that it is worth renting the power floor scraper from the Home Depot in Howell for a day and see how it works.

Late afternoon Linda worked in the kitchen making another batch of her fabulous granola and a black beans and rice dish for dinner.  She soaked two Hatch chilies, two Ancho chilies, and four Pequin chilies and used them in the bean dish.  I had a call from Pat Lintner before dinner to let me know that they took their Prevost to McMillers in Nappanee and were very pleased with work and the price.

I thought about driving to the Lowe’s in Howell after dinner to order the new Frigidaire refrigerator for the bus but it got too late to go.  We have decided to have it delivered to Chuck Spera’s shop in Novi.  We can pull it inside and he has a forklift, so hopefully that works out OK.

We were both tired and headed off to bed at 10 PM.  The weather radar showed a band of more intense rain setting up to our southwest and taking aim at us.  Linda fell asleep quickly but I was still up writing when the rains started around 11:15 PM.  We had the house closed up with the air conditioner running and a small fan for air movement so the sounds of the weather are not as noticeable as when we have the windows and doorwalls open.  I checked the radar again on Wundermap and it looked like we might be in for a long stretch of persistent rain unless the line drifted south just enough to miss us.  The strongest weather in the region stretched from Ft. Wayne, Indiana WSW to just south of Logansport, Indiana but there were lots of pockets of yellow with some orange on the screen over all of the southern half of Michigan’s lower peninsula and the northern half of Indiana.  It looked like it might be another restless night.

 

2015/05/12 (T) Dealing with the County

I finally paid a visit this morning to the Oceola Township offices and talked to the assessor and zoning administrator.  I had a satellite image of our property on which I had drawn the proposed barn and driveway.  All they need in order to issue a land use permit is for me to show the size of the building and the setbacks on the image.  I also visited the Livingston County Building Department.  I talked to one of the counter clerks who had me talk to Rick, who is one of the inspectors.  He had just built a large pole barn and used 6×6 posts set in 26″ diameter holes back filled with concrete.  The bottom of the posts need to be at least 48″ below grade to get below the frost line so I will figure on posts four feet longer than my exterior wall height.

Based on my preliminary online research and visits the land use, building and electrical permits are the only other ones I will need in order to put up a bus barn.  The clerk gave me a check sheet of the documentation I will need to provide.  I would have to file some additional paperwork with the County Health Department, but would not need permits from them or from the Drain or Road Commissions.

I drove to the Township offices on Latson Road by way of Hacker and M-59.  Hacker was so bad the last few days due, in part, to heavy rains that it was more pothole than road and many of them were larger and deeper than normal.  The road grader was repairing the road and it was digging deep.  The grader was still working when I returned home but the road was already much better.  The road needs to be rebuilt with a substantial amount of road gravel and with proper drainage ditches along both sides.  Or paved.  Paved would be good.  Linda read something last fall that indicated Oceola and Hartland Townships had agreed to pave Hacker Road from M-59 south to Golf Club.  We checked when we got home this spring but could not find any reference to such a project.

Back at the house I settled in to create a scale drawing of the floor plan of our bus and then draw in the 16″x16″ floor tiles.  I added up the various areas yesterday and added 25% for waste, but that turned out to be a low estimate.  By drawing the tiles I was able to count how many I would actually need.  I called Lynch Carpet in Howell and talked to Clint to get a rough price estimate for the materials.  The 16×16 Armstrong Alterna Luxury Vinyl Tiles are packed 14 to a box and can only be ordered by the box.  We need 190 tiles for the project so we will have to buy 14 boxes (196 tiles).  That turned out to be 50 square feet more than my original estimate, but would leave us with only six full tiles as spares, assuming I do not ruin any during the installation.  Fortunately, the vinyl adhesive and vinyl grout were less expensive than I expected, so even with a freight charge the bottom line was similar to my first estimate.  Using these tiles it will be approximately a $2,000 project.

My layout has the tiles in a standard pattern with the grout lines lined up in two directions, one running parallel to the long axis of the bus and the other perpendicular to that.  I presumed that this would take less tile and require less cutting but after seeing the layout I am not so sure.  I will probably make a second drawing with the tiles turned 45 degrees and see if it makes more efficient use of the tiles.  We plan to use a grout that is very similar in color to the base color of the tiles so the grout lines will tend to blend in rather than standout as a design feature, and perhaps make the orientation of the tiles less important visually.

Later in the afternoon I called Pat at Apex Roofing to let him know our shingle selection.  I left the information in a voice message and Pat called back later to confirm.  We are going to use the Certainteed Max Def Resawn Shake shingle.  We are still thinking about the skylight tubes.  We talked about putting one or two in the living room and possibly one between the kitchen/dining rooms and one in the hallway.  I realized that the air-conditioner would probably be in the way of the one for the kitchen/dining area, so we will not do that one.

Linda made granola today and made baked/stuffed acorn squash for dinner along with an asparagus, carrot, green bean sauté and fresh sweet Bing cherries.  I took care of some e-mail and then we had slices of the Mother’s Day vegan cake.  I called my sister to check on how our grand-niece was doing.  She called me back later and we had a long chat.  Linda and I then watched season 2, Episode 2 of Sherlock.

After Linda fell asleep I was still up (writing) when a noise started and did not stop.  I suspected it was the water sanitizer recharging, as the water softener had recently recharged, but I got up to make sure that’s what it was and not something else like a sump pump that was stuck in the on position.  It was the sanitizer, so I closed the laundry room door to reduce the noise and went back to bed.  I really need to soundproof the laundry room and reprogram the softener and sanitizer to come on at better times.

 

2015/05/08 (F) Bus Barn Trojans

Today was a hodgepodge of activity.

Chuck called mid-morning and we had a long chat about bus barns.  I think our needs would be met nicely by a SteelMaster S-model steel arch building 32 feet wide by 56 feet long with a 19 foot inside center height.  We have been quoted a price of $20,400 for two of these ($10,200 each) delivered to two separate but nearby addresses.  The price does not include end walls, roof vent adapters, or skylight panels.  The site prep is going to be about $10,000.  A 16 ft. wide by 14 ft. high overhead door will be $5,000.  If I can get the concrete work for $10,000 and frame in the end walls, pull the permits, and run the electrical service for another $5,000 we can get this building erected for $40,000 and not spend all summer building it.  That’s a lot of ifs and it’s a lot of money, but we have looked at this a lot of different ways and that appears to be the bottom end in terms of cost.

Chuck likes the idea of 40 ft. wide by 60 ft. long building with that same 19 ft. interior ceiling height.  His logic is that he could put two buses in there, or a bus and a really big trailer, and still have room for workbenches, cabinets, and tools along the outside walls.  True enough, but we do not plan to own two buses simultaneously nor do we plan to rent space in our barn.  Chuck and are also not discussing going in together on a building as we both want to store our buses at our homes where they are convenient to load, unload, and work on.  Besides, I have been quoted $25,000 for that size building.  Although I think it included steel end walls with framed openings for an overhead door and an entrance door on one end, this project is never going to happen at that price unless we win a lottery, and that is unlikely as we rarely buy tickets.

After lunch I finally emptied out the back of my car and re-installed one of the back seats that was out all winter.  I was going to vacuum the interior but my Shop-Vac had very little suction.  An inspection of the filter revealed that it was completely clogged with drywall dust.  I closed up the car and put the Shop-Vac back in the garage where Linda wrote down the model number.

I got out the 8 foot stepladder and carried the three roofing samples up onto the roof.  I laid them out side-by-side so we could compare them in the same light.  Linda also viewed them from the west end of the house and from the rear of the house.  We agreed that the Certainteed Landmark Pro Max Def ReSawn Shake was the one we liked.  Linda made note of that in the quote packet while I loaded the sample boards into my car.

I drove to ABC Supply Co. in New Hudson and returned the roofing samples.  I stopped at the nearby Lowe’s to buy a replacement filter for the Shop-Vac.  I think the sales associate who helped had somewhere else to be and something else to do as it did not seem really interested in helping me find the right filter.  I usually shop at the Lowe’s in Howell and the service there is generally very friendly.  The model number of our Shop-Vac did not come up in either the Lowe’s system or the Shop-Vac website even though we bought it a Lowe’s just two years ago.  Apparently it is no longer made or sold.  After looking at the current Shop-Vacs and the replacement filters I selected an LG wet/dry filter as my best bet.

I-96 west bound was fine until Kensington Road at which point it was stop and go, but mostly stop , so I excited at there and headed north, eventually heading west on Hyne, across Old US-23 and over to Hacker Road.  I don’t know if it was faster, but at least I was moving most of the time at a good speed.  I really dislike sitting in traffic.

Mike Sharpe was scheduled to come over after breakfast tomorrow to see if we could identify the source/cause of the Trojan notifications I have been getting for a while now from my es|et Smart Security 8 program.  It appears that the notifications are being triggered by the copying of a .tmp file associated with the automatic backup of files from one or more of the four WordPress websites I run.  I was doing online research on the infection and was looking for information on the es|et website when I noticed that they had a live chat technical support feature.  I decide to see if they could help me and ended up spending an hour with Eric.  With his helped I think we found and eliminated the at least one instance of the offending file.

Linda made a nice salad for dinner.  Having had something to eat I pursued the Trojan problem back to the next level; the website from which the infected file was being backed up.  The Small Business WordPress theme (in the “smallbiz” folder) was the source of the problem.  I did not recall installing this theme, however, so I am not sure how it got installed into the website.  I checked the other three websites and discovered that this theme was also installed on our personal website/blog.  That probably explains why I was getting two notifications for what appeared to be the same thing.  It took me a while to find an explanation on WordPress.org of how to delete themes.  It was very easy once I saw it, but like many others I could not find the button on my own.  I eliminated the theme from both websites along with others from all four websites that I did not plan to use.  Only time will tell if that has eliminated the problem.

I then dealt with e-mails that I had neglected for the last several days and took another look at the SLAARC GoDaddy account.  It was almost midnight by the time I got to bed.

 

2015/05/07 (R) Meshuggah Nuns

We spent part of last night researching a new refrigerator for the bus.  Possibilities included models from 13.5 cubic feet to 17 cubic feet from various manufacturers.  We found one that was a close match to the dimensions of our current unit, but we are thinking about downsizing to create space for a slide out pantry.

One huge disappointment is that all of the SunFrost models, including their 16 cubic foot unit, are 34.5″ wide.  Our refrigerator cubby is only 33-3/4″ wide and there is no easy/practical way to modify it to make it wider.  Although very expensive, the SunFrost units are super insulated and use 1/5th the energy of comparable capacity energy efficient refrigerators.  They are also available with 12 VDC or 24 VDC compressors, thus avoiding the inefficiencies associated with using the inverter when boondocking.

I spent some time measuring the floor and wall surfaces in the bus that are currently tiled or carpeted but did not calculate the area.  I need to do a drawing and put together an Excel spreadsheet as the bus has a lot of odd shaped spaces.

We drove to ABC Supply Co. in New Hudson to pick up samples of Certainteed Landmark Pro shingles.  We had narrowed down the possibilities to three choices but needed to see them next to our brick, siding, and trim.

On the way home we stopped at Lynch Carpet in Howell to return the Armstrong tile samples and determine delivery time, which was 2-3 weeks worst case.  We did not get a quote since I did not have the square footage figured out yet, but Clint made a note of the tile and vinyl grout we like.

We left the house around 4:15 PM and drove across M-59 to Rochester.  The Rochester Mills Beer Company restaurant was in downtown, about five miles east of the Oakland University campus and the theatre.  It was after 5:30 PM when we got to the parking lot.  We did not expect Kate before 6:30 PM so we ordered a hummus appetizer plate and two beers.  The hummus platter featured three different flavored hummus that were very good.  Linda had a chocolate coffee tasting dark brew and I had a Framboise.  Framboise is a raspberry beer that originated in Holland and tastes more like raspberries than beer.  Perfect!

Kate left work at 5 PM.  The drive from that part of town to this part of town is one of the worst in the Detroit area, and that is a terrible time of day to do it, but that is what she did because she did not have a choice.  She stopped for flowers and a card but made it to the Rochester Mills Beer Company in time to enjoy a pizza and some beer.  We had a no cheese veggie pizza with a whole wheat crust that was pretty good.  Linda had a different but still dark beer for her second serving while Kate and I both had the Wit’s Belgian style beer with orange and coriander.  Although much more beer-like than the Framboise, it was agreeable.  Except for some “guest beers” everything at the Rochester Mills Beer Company is brewed by them.  It is very local, very fresh, and very good as far as beer goes.  They also feature Michigan wines, which we always appreciate seeing in a Michigan restaurant, but we were not having wine this evening.

We made it to the theatre with only a few minutes to spare.  Kate got the tickets from will call as they were under her cousin’s name.  We had great seats in row D just left of center.  Meadow Book is not a large theatre and sitting this close to the stage made for a very intimate experience.  The playbill was the musical “Meshuggah Nuns.”  We were not familiar with this musical but it was delightful.  The 5-member cast were all professionals, including Cindy Williams (Shirley from the Laverne and Shirley TV show) and Eddie Mekka (Carmine Ragusa from the same TV program).  They all gave excellent performances but Jeanne Tinker, who played Sister Amnesia, was our favorite.  When dressed in a habit one really has to act with their face and hers was very expressive.  She also had the “comic” part in the cast and was very funny.

The show ended at 10 PM after which we visited briefly with Kate’s cousin, Mikeala, who is part of the theatre crew working with costuming.  We chatted with Kate a while longer in the parking lot and did not get home until close to midnight.

 

2015/05/05 (T) BAF & MEF3 Visit

Today was a family visit day.  We were up a bit earlier than usual and enjoyed a light breakfast and a quiet first half of the morning.  One of the things I’ve had on my to-do list is ordering Touch of Oranges Wood Cleaner and Touch of Beeswax Wood Preservative.  I finally got those ordered today directly from the company with free ground shipping.  I checked Amazon but the prices were no better and the products were not eligible for Amazon Prime.  I also found what I think is an exact replacement for my iPad2 flip cover and put it in our Amazon shopping cart.

Our son (Brendan) and grand-daughter (Madeline) arrived around 10 AM.  Madeline knows her way around the main floor of our house at this point and headed directly for the pantry to see what snacks we might have.  We tend to have dried fruit on hand, especially raisins and cranberries, as a tasty but healthy choice.  She is very fond of dried cranberries.  We spent the morning playing and talking and having a drawn out snacky lunch.  Somewhere in there Brendan setup the Pack-n-Play.

Pat Davidson from Apex Roofing showed up around noon to look at our roof and give us a quote.  Apex has done two roofs for us on the previous house and did excellent work at a fair price both times.  The quote was about what I expected and I gave Pat the verbal go ahead to put us in the schedule.  They are scheduling out about six weeks, so mid -June looks like the timeframe.  That potentially runs into the SKP Tri-Chapter Rally or the ARRL Field Day, as well as bus and bus barn projects, so we will have to see exactly where things fall.  We like to be around while this sort of work is going on.  This time, however, I also need to build a dormer on the back side of the roof to provide better access to the attic, generally, and the air-conditioner evaporator/air-handler, specifically.

The quote is for a new roof, with new underpayment and ice shield, so it is a “tear off” where they first remove all of the old roofing and repair any damaged/missing roof decking or boards.  They always look for at least a three day window with a dry weather forecast.  Pat said they would work with me relative to the dormer.  Specifically, they would start the tear off in the area where I want to build the former and then move to a different part of the roof so I can do the carpentry.  Linda and I need to visit ABC Supply Co. in new Hudson to pick out the specific shingle we want, and we plan to do that sooner rather than later.

The dormer is simple in concept but a bit trickier in execution.  I would build two tapered walls on the ground that look like right triangles.  The hypotenuse would attach to the roof with the long leg on top and horizontal and the shirt leg facing out and vertical.  Joists would be installed across the two walls, tying the together.  The front wall would be framed for an access door between the two short legs.  Two rafters would be installed at the end wall.  The ridge board would be set in place and cut to tie into the roof.  Two backer boards would be installed on the roof running at an angle from the ends of the side walls up to the ridge board.  The rest of the rafters would then be installed.  The walls and roof would then get plywood sheeting and decking.  The final carpentry would be fascia boards and siding.  Fortunately we have a pile of Hardy Board left over from when the house was sided.  Hopefully there is enough to side the dormer and it is in good enough shape to use.  I would then install the door, which I might have to build.  Apex would then roof the dormer, including continuous ridge venting.  The final steps would be painting the door and door trim and installing fascia and vented soffit material to match what is already on the house if I can find a supplier.  We would like the dormer to blend in and look like it belongs there.

Brendan got Madeline down for her nap at 1 PM and then spent a little time looking at what we plan to do with the floor in the bus before heading back to Ann Arbor.  I gathered up the Armstrong vinyl floor tile samples and drove to Lynch Carpet in Howell to return them and see what else they might have.  Clint let me keep the one we like for a couple more days and gave me a grout color chart.  I then headed to Best Buy in Brighton to pick up a Sony Blue-Ray/DVD player and a couple of flash drives, all of which were on sale.  I stopped for gas and got back to the house just as Madeline was waking up from her nap.

I was able to spend a little time researching a potential new vehicle.  As much as we are enamored with the Jeep Wrangler Unlimited the Consumer Reports data on them is very discouraging, especially the reliability data.  Viable alternatives may be the Nissan Frontier Pickup Truck or the Nissan Xterra SUV, both of which are available in 4×4 configurations.  Even the Ford F-150 might be a possibility as it is available in a 4-door, short-bed, 4×4 version.  They all have much better CR reliability data that the Jeeps.  The problem is, they are not Jeeps.  If we can wait a year, Ford is releasing an F-150 Raptor in fall 2016 that will feature a 10-speed transmission with six selectable driving modes including rock, mud & sand, and Baja (high speed desert racing).  It will probably also feature a ridiculously high price, but then none of these vehicles are inexpensive.

We got a phone call from XPO around 4:20 PM to let us know they would be delivering our box spring mattress foundation around 5 PM.  They showed up right on time and carried it to our bedroom.  Linda signed the delivery slip and they were gone as quick as they arrived.  We will wait until Brendan retrieves Madeline tomorrow to disassemble and reassemble the bed.

I entertained Madeline while Linda prepared dinner, but Madeline was very interested in what her Grandma Linda was doing, so we kept going to the kitchen to check on the work.  Linda served some “mock” chicken tenders, but she also fixed fresh green beans and homemade mashed potatoes, reheated some frozen edamame, and set out fresh black grapes and pineapple chunks.  Madeline is a good eater and we all enjoyed our meal.

Madeline is “potty trained” and very proud of the fact that she is no longer wearing a diaper.  She had a very successful day letting us know she needed to use the toilet.  We have a booster ring for the hall bathroom and put a stool in there for her.  She uses the stool to get up in the toilet seat and then uses it to stand up at the sink and wash her hands.  The hall bathroom sink/counter is lower than normal and turns out to be a great height for Madeline with the use of the stool.

We played after dinner until Madeline was tired.  She has always been comfortable staying with us but at 29 months of age is starting to have some anxiety about being away from her parents.  She wanted her daddy, and was briefly a little bit teary, but it wasn’t anything Grandma Linda couldn’t handle.  Linda followed the usual routine of looking at the rug (wall art) and all of the pictures in the hallway, the small bedroom, and finally the middle bedroom where Madeline’s Pack-n-Play is set up.  She selected the Construction Kitties book (again) for a bedtime story.  It was one of the books we got from the library yesterday and was her favorite choice all day today.  She fell asleep easily as she usually does.  We are active, busy people, but it’s a different kind of busy from having a 2-year old in the house.  We were tired, and turned in about an hour after our grand-daughter, but it was a good kind of tired.

We were so busy today that we failed to notice that it was Cinco de Mayo until it was almost over.