Tag Archives: La Plata Creme Fresh (Armstrong Alterna)

2015/11/15 (N) Tiling the Cockpit, #2

Having had a larger than normal meal later than usual last night, and gotten to bed later than usual, we did not get up this morning until a little after 8 AM.  I made coffee but we were not hungry.  By the time we finished our coffee it was approaching 10 AM but once we got to work in the bus we were on task until 7:30 PM with only a short lunch break at 1:15 PM.

Bruce dry fits floor tiles on the navigator seat platform.  (Photo by Linda.)

Bruce dry fits floor tiles on the navigator seat platform. (Photo by Linda.)

We cut and dry fit the tiles for the platform floor and walls.  We had to take time out to use the oscillating saw to undercut the bottom edge of the face board on the passenger side front vertical wiring chase.  With all the tile cut and fitted we determined the order in which we would install them.  We started with the platform floor and the first six tiles of the landing.  I also had to fashion some shims to make sure the tile in the driver-side rear corner of the platform would be installed in exactly the right location.  This would be the first tile installed and if it was even slightly misaligned it would throw all of the other tiles off.

Bruce spreads Armstrong vinyl adhesive on the navigator platform.  (Photo by Linda.)

Bruce spreads Armstrong vinyl adhesive on the navigator platform. (Photo by Linda.)

I marked the edges of all the tiles on the underlayment and then we pulled them up in the reverse order of installation.  Linda prepared some soapy water to use for cleanup of the tools and tiles.  I spread the Armstrong vinyl adhesive and Linda cleaned the trowels when I was done.  We waited for it to cure to the point where we could set the tiles.  Even with two heaters going in the front of the bus the adhesive took about 50 minutes to cure to where it would not transfer when touched.  Once it reached that point we had roughly an hour to set the tiles but it only took about 20 minutes to install them.  I used a large rubber mallet to help set them, pulled the spacers, wiped the edges with a wet paper towel, and then walked on them in lieu of using a 100 pound floor roller which would have been awkward at best to use on such a small area and not worth the time and expense to rent from The Home Depot in Howell.

Bruce installs intricately cut floor tiles in the cramped front of the driver’s area.  (Photo by Linda.)

Bruce installs intricately cut floor tiles in the cramped front of the driver’s area. (Photo by Linda.)

As soon as the first group of tiles was installed we pulled up the remainder of the floor tiles from the landing and driver area.  Linda got some paper grocery bags and painter’s tape and masked off the platform floor along the back and side wall.  I spread adhesive on all of those areas and then Linda once again cleaned the tools.  Approximately 50 minutes from when I started spreading adhesive l started setting the tiles and about 20 minutes after that they were all installed.  Once again I used a large rubber mallet to help set them, pulled the spacers, and wiped the edges with a wet paper towel.  I walked on the floor tiles but had no way to further set the wall tiles.

We were done by 7:30 PM.  Linda cleaned up the tools and water bucket while I closed up the bus.  She started fixing diner and I got out of my work clothes and put on my robe.  Dinner was a nice salad and an Amy’s Roasted Vegetable Pizza; vegan, of course.  We finished the Organic Natural White wine from Frey, but we did not necessarily enjoy it.

Following dinner we relaxed in the living room for a while and I responded to a series of text messages from Kristine Gullen.  I missed the SLAARC information net at 8 PM because it just slipped my mind.  We were in bed by 10 PM and I watched Part 1 of the 2-part PBS American Experience program on Walt Disney while I finished this post.

 

2015/09/04 (F) 100 Pounds

We set our alarm for 6 AM, got up, had granola for breakfast, and then went to The Home Depot to rent a 100 pound floor roller.  The roller consists of three steel rollers, each about 4″ wide and 6″ in diameter, on a common axle.  A three foot long handle attaches to the axle between the middle and outside rollers.  A pair of small wheels attach to the crossbar at the base of the handle for transport and can be swung up out of the way or removed.  We rolled the roller out to our car and loaded it into the back.  We then went back inside and purchased up a hard edge grout float, a small offset float, sponges, a bucket, and a bottle of Armstrong Once and Done floor cleaning concentrate.

Bruce rolls the floor tiles in the kitchen with the 100 lb. roller.

Bruce rolls the floor tiles in the kitchen with the 100 lb. roller.

Once we got home we got right to work on the bus.  We had a few pieces of vinyl tile that still needed to be cut and installed at the front of the bus and that took us over an hour.  Once that was done it was time to glue the tiles down.  I got the Armstrong S-288 adhesive and the trowel.  We read the directions on the adhesive bucket and finally figured out that I should probably not spread more adhesive than could apply in about 20 minutes as the product is time sensitive.  The adhesive would then have to set until it was tacky but did not transfer to my finger when touched, which would be 10 to 30 minutes, but we would need to have the tiles set within an hour of when I started spreading the adhesive.  The tiles then needed to be rolled with the 100 pound roller.

We started in the center of the coach and installed the tiles as follows:  1) Remove selected tiles; 2) Spread adhesive; 3) Clean up tools while adhesive cured; 4) Lay tiles carefully back in place; and 5) Roll the freshly set tiles.  It sounds easy and straightforward enough, but each step had its own issues.

For Step 1) we had to agree on how to remove and stack the tiles so they were in the correct order for installation and to remove them so as not to disturb the surrounding tiles.  At Step 2) I had to be careful not get adhesive on anything except the area of the floor I was working on.  I also had to make sure the working area was completely covered but also completely troweled off correctly.  In Step 3) the tools needed to be cleaned before the adhesive set so we could use warm soapy water to clean them.  Once set, the adhesive would have to be cleaned off with mineral spirits.  Step 4) was the most critical.  The tiles get installed once the adhesive has set to the touch, i.e. still pliable but no transfer when touched.  The adhesive effectively acts like a contact cement–it is not possible to slide a tile once it is down–so getting each tile correctly positioned on the first try was critical.  Step 5) was the easiest, once we got the 100 pound floor roller out of the car and into the bus.  The tiles needed to be rolled as soon as they were installed, which was easy except for the limited confines of the bus interior.

We ended up doing this six times in the following order:

  1. Kitchen;
  2. Built-in sofa portion of the living room;
  3. Front passenger side of living room’
  4. Hallway;
  5. Foot and front side of bed;
  6. Rear side of bed; and
  7. Bathroom.

This corresponded roughly to the order in which we had done the dry fit and it was critical that the central tiles get installed in exactly the right locations.  We used plastic spacers at all tile intersections and between tile edges where needed.  (The spacers were 2-sided.  One side was an X for use where four tile corners meet.  The other side had three tabs in line for use between the edges of two adjacent tiles.)  These spacers were removed when we pulled the tiles out and replaced when we installed them.  We also divided the job up to keep the number of tiles being set to a small enough number that we could meet the time requirements of the adhesive and to make sure we did not get trapped in the back of the coach.  We finally installed the last piece (for now) at 9 PM.  We had short breaks for lunch and dinner but each cycle of this process took about 90 minutes.

Bruce spreads Armstrong vinyl floor adhesive in the hallway.

Bruce spreads Armstrong vinyl floor adhesive in the hallway.

My knees were sore by the time we quit.  They have never done well with kneeling due to the boney lumps that resulted from Osgood-Slaughter’s disease in my late pre-teens.  Occasionally kneeling down on one of the spacers, which had pointy centers on one side, did not help.  I probably got down and up at least 100 times throughout the day, maybe more, which was hard enough all by itself.  Although I am in better health and physical shape than I was in my 30’s and 40’s at 63 I am certainly not in the prime of my youth.  At one time Linda and I had a hundred pounds or more to lose between us.  Time, use, and the abuse of being overweight have inevitably taken their toll on our joints.  At the end of the day I was left thinking that flooring work is a young person’s game.  Whether hardwood, carpet, tile, or even continuous sheet vinyl, much of the work is done on your hands and knees, or bent over, and it is tough work.

I took a long, hot shower and then Linda took her shower while I checked e-mail.  We had some Coconut Bliss ice cream with fresh strawberries and then turned in.  We watched an episode of Joseph Rosendo’s Travelscope, set the alarm for 7 AM, and went to sleep.

 

2015/09/03 (R) Floored

I turned the lights out at 11:30 PM last night so I was starting to wake up at 6:30 AM this morning and finally got up at 7 AM.  We have had light to moderate fog the last few mornings which always coincides with very still air.  It is a calm, quiet time to gaze out over our own personal “misty moors” and appreciate where we are and the lifetime of work that got us here.

Linda was still sound asleep so I closed the bedroom door to shield her from the noise of the coffee grinder.  That was probably unnecessary as she was sleeping with her good ear down, but I did want to wake her prematurely.  I ground up 8 scoops of the Cafe Europe (reg) / Columbian (decaf) blend which yielded nine scoops of grounds.  I have figured out over time that to make 9 cups of coffee takes about 10 cups of water as that quantity of grounds absorbs and holds almost a cup.  (These are 6 ounce coffee “cups,” of course, not real 8 ounce cups.)  More importantly the strength of the coffee seems to come out right.

Once the coffee was brewing I washed out the grinder reservoir and wiped out the grinder.  It seems to hold coffee grounds as if they were magnetic and being relatively fine particles they get into all of the small nooks and crannies.  Why a coffee grinder has small nooks and crannies is one of those product design questions that suggest the designer(s) never actually used their product for its intended purpose.

My main reason for getting up early was that it was no longer comfortable to stay in bed.  My lower right back has been sore for over a week now and is worse when lying down than when working, much of which has been on my hands and knees.  My secondary reason for arising early was that I wanted to get an earlier start working on the bus today.  We need to finish the dry layout of the vinyl tile floor today so I can apply the adhesive tomorrow, with Linda’s help, before we have Madeline for the weekend starting Saturday sometime.

I assumed my usual position on one of the living room sofas with our male cat, Jasper, at my right side, and quietly enjoyed my coffee while doing some online research and starting this blog post.  Speaking of which, I am now (once again) over six weeks behind in uploading posts to our blog.  By the time we are done working in the evening and have had dinner I need what little time and energy I have left to write the draft post for that day.  Uploading them is a whole different process that also takes time and thought.  I am determined, however, to be caught up before we leave for the winter and to post daily while we are away.  Being behind is not fun for me, and posts that are 4 – 8 weeks old are probably not interesting to anyone who might read the blog.

I need a very specific trowel, an Armstrong S-891, to apply the Armstrong S-288 vinyl tile adhesive.  As I mentioned in yesterday’s post, The Home Depot and Lowe’s do not sell this trowel or one even remotely similar.  Lowe’s did, however, have a plastic spreader that has the correct notch size and spacing.  Someone in the floor department at one of the stores suggested we try Blakely’s Supply in Wixom so I plan to call them this morning.  Don at Lynch Carpet in Howell, where we got the tile and adhesive, mentioned another place so I may have to call them back and get the name of the business.

We’ve had the tile since early July so we could have taken care of this a long time ago but didn’t.  As much as I tried to “work ahead” with respect to the design of the project, procurement of materials, and contracting with the cabinet maker we did not attend to everything in a timely manner.  Exhibit #1 is the wallpaper, which had a 2-week lead time, and exhibit #2 is this trowel.  Overall we have done well keeping things moving along and in retrospect this will look like a well-planned and smoothly executed project, but right now I need something that I don’t have.  🙁

I called Blakely’s at 8:30 AM.  They do not carry Armstrong products but they did have a trowel that matched the specifications of the S-891.  They had one in stock so I asked them to hold for me.  With the Labor Day weekend almost upon us we decided to drive to Wixom and buy the trowel before busying ourselves in the bus.

The round trip would have taken an hour but we went to The Home Depot in Howell before returning to the house and bus.  This particular Home Depot has a tool rental operation and we wanted to see if they had a 100 pound floor roller.  They did.  In fact, they had two of them; $22/day (24 hours).  If I call before they close tonight they will hold one for me to pick up in the morning between 6 – 8 AM.

By the time we got home we were finally a little bit hungry and had our usual breakfast of homemade granola with fresh blueberries and banana.  Thunderstorms were forecast for today so we brought the saber saw into the bus so we would not have to walk outside to the garage to use it.

We resumed working in the bathroom and got all of the tiles for that space measured, cut, and fitted into place.  We then continued from the hallway into the bedroom and up the front side of the bed towards the driver’s side of the coach.  It seems that our pace has slowed yesterday and today but that’s not really the case.  What has happened is that all of the pieces have to be cut, some of them along four or five lines that cannot all be scored and snapped, and we are working in a much more confined space that makes it difficult to make accurate measurements.

By 3:30 PM we were part way down the foot of the bed and decided to take a lunch break.  Linda made sandwiches on toasted rye bread with vegan deli slices, onion, tomato, and lots of power greens.  She chatted briefly with our son about arrangements for this weekend and then we got back to work at 4:30 PM.

The rain that had been forecasted for most of the day finally arrived but did not affect our work as we had everything inside that we needed.  We worked until 7 PM and finished the floor tiles in the bedroom.  That left five or six pieces to be cut at the front where the main floor and cockpit meet.  My sister called and I said I would call her back when we were done.  We figured it would take at least an hour to finish these pieces.  We were tired and hungry and decided to defer this work until first thing tomorrow morning.  We shut off the air-conditioners, turned off the lights, and locked the bus.

While Linda prepared dinner I cleaned the cat’s litter tray, checked my e-mail, and replied to one from BCM.  Dinner was fresh steamed broccoli, whole grain bread, and mock chicken with orange sauce.  Another Gardein product, the “chicken” was very tasty.

I called my sister back after dinner and we had a long chat which wrapped up just before 10 PM.  Linda and I went to bed and settled in.  I was finishing up this post around 11 PM when it started raining.  From the sound it was quite a downpour but it did not last even 15 minutes.

 

2015/09/01 (T) Tiling Kate

We both slept until 8 AM this morning and even then got up slowly and reluctantly.  We probably need a day off to rest, relax, and catch up on some not-so-physical tasks, but now is not the time.  There is too much to do and time is slipping by.  The fact that hot weather, muggy weather is forecast for the rest of the week probably had some effect on our enthusiasm for getting back to work.  We should probably get up at 6 AM and quit working by early afternoon, but I am not on a sleep schedule that accommodates those hours.

We had our usual homemade granola with blueberries, split a banana, and had OJ/GFJ to wash down our vitamins.  I made Ethiopian Yirgacheffe half-caff coffee, but not as much as usual.  We enjoyed our coffee in the living room with our cats and finally got back to work at 10 AM.

Dry fit of Armstrong Alterna floor tiles.  The starting point was where the kitchen was where the kitchen transitions into the hallway.

Dry fit of Armstrong Alterna floor tiles.  The starting point was where the kitchen was where the kitchen transitions into the hallway.

Today was one of the milestone days we have been working towards all summer; we (finally) started laying out (dry fitting) the new floor tiles.  I had done two layouts on 1/4″ grid paper back in early June; one with the sides of the tiles parallel and perpendicular to the centerline of the bus floor, the other with the sides turned 45 degrees.  We both liked the turned layout better so I used it to estimate the number of tiles we needed and placed the order back in mid-June.  They took a few weeks to arrive but they have been sitting flat in their boxes since early July waiting to be installed.

My original drawing has tiles lined up with opposite corners on the centerline of the floor, although it looks good on paper there was no way I could draw it at a scale that allowed me to accurately account for the 1/8″ grout spacing.  The drawing was just a “proof of concept” and a starting point for the actual layout.

We laid tiles out according to the plan from a starting point in front of the refrigerator that would allow one of the grout lines to go down the center of the hallway in front of the pantry.  Unfortunately that did not allow the tiles to reach the front edge of the floor by the cockpit or work out well for the toe kick space under the kitchen base cabinets or hallway running back to the bathroom and bedroom.

A famous problem in mathematics is finding convex polygons that can “tile the plane.” What this means is that the polygon can fit together with itself perfectly so that there are no gaps.  Some of Escher’s artwork was based on the use of such polygons and that is the context in which most people would be familiar with this concept.  Among “regular” polygons, which are equilateral and equiangular, triangles, squares, and pentagons can tile the plane.  So can right triangles and parallelograms, which includes the rhombus.  Beyond that it gets a bit tricky and someone just recently discovered a previously unknown irregular pentagon using a computer program to systematically examine a very large number of possibilities.

What does that have to do with our bus remodeling project?  Not much, really, beyond the obvious fact that the new vinyl floor tiles for our motorcoach are squares with an edge length of 16 inches.  Floor tiles are almost universally square in shape because they are easy to manufacture and can be laid out on a floor in several different ways. Finding a way that fits a particular space in a balanced way is the tricky part, however, and more so in this case because the tiles need to form a continuous pattern of grout lines (if possible) while working their way down the hall and into the bathroom and bedroom.

We shifted the string of tiles running down the centerline towards the kitchen cabinets on the driver’s side of the bus so the corners just reached the recessed base.  We then shifted them towards the rear of the coach to get reasonable size pieces at the front edge by the cockpit.  We filled in some tiles to either side of the main fore-aft string to make sure they would make it to the edges with reasonable size pieces.  When it was clear that this positioning was going to provide a balanced installation in the kitchen and living room we started working our way down the hallway and into the bathroom.

The tiles continued to fall into place and fit well in the bathroom but did not flow into the bedroom quite the way we wanted.  We may have to offset a grout line as we transition from the hallway to the bedroom but were otherwise satisfied with our dry fitting.  We returned to the front of the coach and placed every full tile that we could.  We then started trimming tiles to fill in smaller pieces.  We limited ourselves to pieces that had one or two straight cuts and no notches or tabs.

It was 4:30 PM by the time we got to the door of the bathroom and bedroom threshold, where a critical decision would need to be made regarding the offsetting of a grout line.  We have learned that the end of the work day is not a good time to make critical decisions.  With company coming in a couple of hours we quit working and got cleaned up.

I sat in the living room and worked on this post.  Kate sent a text message at 5:30 PM that she was leaving Wayne RESA and heading our way.  We figured she would get here at 6:30 and that is when she arrived.  She brought a dip that she made from cannelloni beans, garlic, and lemon juice, some baby carrots, and some pretzel chips.  We enjoyed the appetizers with some Bell’s Oberon beer while we chatted about work, travel, and family.  Kate travels every chance she gets, usually with her S.O. Brian but sometimes by herself.  Europe is a favorite destination but she frequently visits family members all across the U.S.A. and sometimes overseas.

After catching up a bit we gave Kate a tour of the bus interior.  She liked the new floor tiles and our choice of seat fabric but was suitably impressed with the pull-out pantry which pleased us.  I turned off the three residential air-conditioners as we exited the bus.  Linda then got busy preparing dinner while I showed Kate the pieces of the custom desk and built-in sofa.  I turned on the A-C in the library (where the desk and sofa pieces are stored) to cool it off and lower the humidity.  It had been off all day since we were running the main house A-C plus the three A-C units in the coach.

Dinner was ready at 8:30 PM, a simple but tasty meal of burgers and fries with a second round of Bell’s Oberon beer.  (Linda bought a real beef patty and got a slice of real cheddar cheese for Kate.)  We had fresh strawberries and Coconut Bliss non-dairy ice cream for dessert and then continued to chat about photography, cameras, travel, and the low power Radio station, AM 1700, that Brian runs in Ypsilanti.  A local blogger does a weekly interview show that Brian then podcasts.  The most recent one was an interview with a professor from U of M Ann Arbor who wrote a book that was recently made into a movie (Diary of a Young Girl).  The podcast was “liked” by Sarah Vowel, who is sometimes featured on “This American Life.”  Very cool.

Kate had to go to work in the morning and left around 10:15 PM.  Linda went straight to bed but I had a couple of things to take care of first.  I had initiated the download of an updated NVidia GeForce driver for my ASUS laptop computer.  I e-mailed several documents to my sister Patty, and then downloaded the final draft of the August/September Bus Conversion Magazine, proofread my two articles, and e-mailed a couple corrections to the publisher.   I installed the driver update and then went to bed.  I wrote for a while and finally turned out the light at midnight and fell asleep.

 

2015/08/18 (T) Walking Grind

We were up at 8 AM and I made a pot of Ethiopian Yirgacheffe half-caff coffee while Linda got breakfast ready.  She made a batch of granola yesterday so we had some with fresh blueberries and unsweetened soy milk.  It’s our standard breakfast, but that’s because we like it so much.  She had an e-mail from Robin at the bakery and had to deal with some issues related to the bakery’s new account, The University of Michigan Ann Arbor.  As I do most mornings I sat in the living room working on my iPad, drinking my coffee, and paying attention to our two cats.

Being Tuesday Linda had a date with Diane to walk at 10 AM and left at 9:30 for Kensington Metropark.  I continued working on my iPad for a while and enjoying my coffee.  At 10:15 AM I called the Livingston County Sheriff and reported the mailbox incident from late Friday evening /early Saturday morning.  Shelby took the call, was very nice, said she was not aware of any other mailbox reports, but would pass the info along to the Desk Sargent.  I checked my e-mail and confirmed with Harvey for Friday at 10 AM to move the old bus refrigerator.  I finally went out to work on the floor of the bus at 11 AM, by which time the outside air temperature was already in the 80’s.

I leave three of the awning style windows in the bus open a few inches so it doesn’t get too hot inside.  I opened all three roof vents, turned on their ceiling fans, and set them to exhaust air rather than draw it in.  I also left the entrance door open to allow more air to flow through the inside of the coach.  I then sanded and vacuumed until about 1 PM.  When I came back in the house I had two missed calls from Michele Henry of Phoenix Paint so I called her back.  I was on the phone with her when Linda got back from her walk.

Once I wrapped up the call with Michele we had a light lunch of hummus with pita chips and both black and red grapes.  While we were eating we were entertained by a gray squirrel who had gotten onto the bird feeder and was hanging upside down by its hind legs.  It would curl its body to bring its mouth up to the bottom of the feeder, emancipate some seed, and then uncurl to the more relaxed stretched out position and eat it.  All of this was also being watched with both interest and considerable skepticism by three crows who were hanging around on the ground under the feeder.  They grabbed seeds that the squirrel dropped but seemed very wary of it, which surprised us.  I speculated that perhaps they had never seen a squirrel behave in this way and were, therefore, understandably and appropriately cautious; crows are very smart, after all.

After lunch we took the three wallpaper sample books to the bus to look at them with the woodwork.  Before we could do that, however, we discovered a small bird trapped in the coach and had to deal with it.  I say “trapped” because it was up on the dashboard and obviously confused by the windshields as it kept trying to fly out through them.  It did not realize it could get out the same way it came in, through the open door.

The bird seemed small and I think it was an immature sparrow but I’m not sure.  It was seeking safe shelter in the space between the dashboard cover and the lower driver side windshield.  I used a broom to try to gently encourage it to fly towards the door but it was understandably suspicious of my good intentions.  I put on a pair of canvas work gloves and it allowed me to gently pick it up.  I tried to release it at the door opening and it flew into the door causing Linda to make a comment about why we use the phrase “bird-brained.”  I caught it again, got outside the bus clear of the door, and tossed it gently away from the bus.  It immediately took flight and flew off to the southwest, apparently none the worse for its ordeal.  I can only image the story it told the other birds.

I got a piece of the Armstrong Alterna Luxury Vinyl floor tile from the garage.  Many of the wallpapers that we thought would look good with the floor tile turned out to be too yellow, and most of the ones with good color tone were too dark, but we found a few that we liked.  Those tended to be lighter without a lot of pattern and a neutral, off-white color.  We are, however, far from a final choice as we do not currently have a sample of the Lambright Notion Linen upholstery fabric or the MCD night shade material and the wallpaper has to work with all of these simultaneously.

We measured the areas that need to be repapered and in the process decided that we would leave the old wallpaper on the inner wall of the hallway, at least for now.  (The paper in the bathroom, which is different from the rest of the coach, is generally in good condition and we are not currently planning on replacing it as part of this project.)  The existing wallpaper in most of the coach is a string cloth with a beige base but distinct vertical threads that contain a noticeable amount of grey and a more subtle herringbone pattern.  It looks good with the walnut woodwork and worked well with the old white carpet, black ceramic floor tile, and bone leather upholstery, so we think it will continue to look good with the new floor tile.

If Josh is at his shop tomorrow we will try to stop and pick up the Lambright Notion Linen sample as whatever wallpaper we choose has to work well with the furniture fabric.  On Thursday we will revisit the papers in the three books we currently have with an eye towards something that has some grey in it.

It was another warm, humid day and I was done sanding so I closed up the roof vents, locked up the coach, and went inside.  Linda prepared a pizza using the gluten-free crust recipe she got from Mara.  Yum.

After dinner I went to Lowe’s and bought two bags of TEC Skill Set Universal Floor Patch and Skim Coat, a mixing bucket, two bags of tile spacers, and three 4’x8′ sheets of 1/4″ SurePly underlayment.  I meant to buy a folding metal sawhorse but left it somewhere in the store.  I was going to buy premixed floor leveling compound but they only had 1-quart containers for $10 each and the directions said it would only cover 1.5 square feet.  I have about 80 square feet of floor to patch and level, so that clearly was not a good solution.

The Universal Floor Patch is a powder that has to be mixed with water, but each bag will cover 20 – 25 square feet at 1/8″ thickness and costs $13; much better than the premixed stuff.  I have a few areas to patch that are deeper than 1/8″ but the material can be applied up to 1/2″ thick per coat, and most of the area just needs a much thinner skimcoat.  It can also be sanded within 24 hours which will allow me to make it very smooth and keep the work moving along.  My goal is to have the floor leveled and sanded smooth by bedtime on Saturday so I can install the 1/4″ underlayment on Sunday and start laying tile on Monday or Tuesday next week.

I stopped at Teeko’s Coffee and Teas to get some more of the Cafe Europe half-caff blend.  They had the regular blend but not the decaf blend so I had Roger use the Columbian decaf instead.  He roasted the beans for me while I waited and Jeff showed up along with his wife as I was leaving.  They were married last September and are expecting their first child late next month.  Jeff was wearing his Pepsi delivery shirt, confirming what the woman at the Kahuna Coffee Shop told us last Friday.

We turned in early as we will be getting up very early tomorrow to drive to Indiana again.  Linda watched an episode of NCIS after which I watched a PBS special on the origins and evolution of the Navy Seals.

 

2015/06/23 (T) Grounded

As I wrote in yesterday’s post we did not turn off the lights last night until almost 1 AM because we were keeping a close eye on the weather moving across the lower portion of Michigan’s Lower Peninsula.  Although strong to severe storms were still forecast from 1 AM to 5 AM they either did materialize at our exact location or we slept through them.  We had the house closed up and the air-conditioning on, so that cut down the sound level of outside noises.

A cold front had pushed through by sun up and we woke to a cool morning with blue skies and noticeably lower humidity.  We did not have any trees, or even big limbs, come down and there was no damage to our brand new roof.  The forecast yesterday was threatening enough, however, that in the morning we took the potted plants, and as much of our outside lawn furniture as we could find room for, inside including our sun umbrella and trash cans.  I planned to be gone most of the day, and Linda was leaving mid-afternoon to go to dinner and a movie with Diane Rauch, so our first chore was to put all the lawn furniture, plants, and other outdoor stuff back outdoors.

This week is mostly being devoted to ham radio with the ARRL Field Day as the crowning event this weekend.  My specific focus for most of the week, however, has been the “communications tower” adjacent to the east wall of our house.  As described in previous posts we installed a cable entry box (CEB), mounted the cellular booster in the basement, mounted the inside cellular antenna, and ran coax cables.  The antennas will (hopefully) be mounted on the existing 40 foot tower tomorrow, cabled into the CEB, and cables run from there to devices inside the house.  With any luck by the end of the day tomorrow we will have decent cellular service inside the whole house, the ability to watch OTA TV programs on two different TV sets, and finally be able to connect one of our radios in the ham shack to an antenna.  Today, however, was planned to mostly address other things.

I had an appointment with our dentist at 10:20 this morning and left at 9 AM.  I planned to stop at Chuck’s bus garage and check that the key he lent me worked, but I needed gas for my car.  I did not have time for both and did not really have a choice; I would have to check the key some other time.  I ordered two cables yesterday from Scott (AC8IL) at Adams Electronics.  Later in the evening I was unsure if I had specified the connectors correctly so I called and left a message.  I called again this morning to make sure the message got through.  It did, and my original connector specifications were correct.

I arrived at the dentist’s office about 10 minutes before my appointment time.  I called Rick Short at Isringhausen USA to make sure he was going to be in before I drove two hours to Galesburg, Michigan after my dentist appointment.  I got his voice mail a left a message.  “ISRI” makes very high tech air suspension driver’s seats that are used as original equipment in motorcoaches, semi-tractors, heavy equipment, and locomotives.  I would really like one for our bus, but it is not proving easy to get.

Dr. Steve and his assistant, Leslie, made molds of my upper and lower teeth and a bite impression.  The molds will be used to make a mouth guard that I can wear while I sleep.  Dr. Steve has a strong suspicion that I am clenching my teeth and the mouth guard will reduce or eliminate the irritation it causes.  I will have to ask if I can wear it during the day too as I am occasionally aware of clenching my teeth while I awake.

I had not heard back from Rick by the end of my appointment so I called the main number at ISRI and talked to the receptionist.  It turned out that Rick was not in today and she transferred me to Jeff Woodworth.  Jeff was willing to meet with me but thought it would be a better use of my time to wait until Rick was available.  My next opportunity to drive to Galesburg will be Thursday and I will likely go as the ISRI seat is holding up our ordering of Flexsteel seats through Coach Supply Direct.

I stopped for coffee and then re-routed for Chuck’s bus garage in Novi.  The key to the garage worked perfectly.  I called Linda to let her know about the change in plans and headed for home.  There is too much to do at the moment to waste much time so I installed the #4 AWG bare copper ground wire I bought yesterday at Lowe’s.  I mounted an offset copper wire lug using the center support stud for the copper back plane in the CEB.  I replaced one of the plastic hole plugs with a rubber plug with a small hole in the center.  The hole I chose in the bottom of the CEB allowed the ground wire to come straight up into the lug.

Another view of the cable entry box on the east end of the house by the 40-foot tower.

Another view of the cable entry box on the east end of the house by the 40-foot tower showing the bare copper ground wire that runs to the ground rod and then to one of the tower legs.

Outside the CEB I routed the ground wire around to the existing ground rod and secured it using the new clamp I bought yesterday.  There was an old ground wire connected from a clamp on the tower to the ground rod.  I removed that wire along with some coax and control wires that I had clipped when we removed the old satellite dish.  I then attached the new ground wire to the clamp on the tower.  While we were at it Linda trimmed back a small bush that was growing between the tower legs and I pulled leaves, grass and other stuff out from around the Day Lilies that we transplanted last year around the tower base.

With the CEB grounded we looked at how we might get a video cable up to the TV/monitor in our bedroom.  The wall where the TV is mounted has a hot water baseboard radiator that comes almost to the trim on the door wall.  That end of the radiator has a copper pipe that goes through the floor into the basement and it was easy to locate the pipe in the basement.  I determined that there was enough space behind the pipe to safely drill a hole but I had to drill it from the top side at an angle.  A 5/8″ wood boring drill bit created a hole just big enough for the molded F-connector on the end of the cable to pass through.

We fed the video coax cable above the suspended ceiling in the ham shack area to the location of the hole.  I then fed the cable up from the basement as Linda pulled it up into the bedroom.  We adjusted the amount of cable in the bedroom to allow the wall mounted TV set to move through its entire range of motion.  The other end of the cable was then routed into the sump pump room.

By the time we finished pulling this cable it was 3:30 PM and time for Linda to leave to pick up Diane.  They were headed to Royal Oak for dinner and a movie as the movie they wanted to see was only showing at the Royal Oak Main Theater.

While I was out during the morning Lynch Carpet had called to let us know our Armstrong vinyl tile was available for pickup so after Linda left I closed up the house and went to get it.  The 12 boxes of tiles, container of vinyl adhesive, and container of vinyl grout were all neatly arranged on a small pallet and tightly wrapped in shipping plastic.  Rather than break this down and load each thing individually they used a fork lift to set the pallet in the back of my Honda Element.  The rear suspension settled at least two inches when they transferred the full weight of the pallet to the floor of my car.

When I got back to the house I backed the car up to the garage.  I cut the shipping plastic loose and unloaded the tubs and boxes of tiles.  I put the pallet on the garage floor and then neatly stacked the boxes of tiles on it to keep them off the floor.  Each box contained 14 tiles measuring 16″ by 16″ for a total area of 24.89 square feet.  The Armstrong Alterna tiles are a “luxury vinyl” product, and are about 1/8″ thick.  Even so, the boxes were heavier than I expected so I decided to weigh one.  It tipped the scale at just under 42 pounds.  That meant the entire pallet weighed close to 500 pounds, and, ignoring the weight of the cardboard box, that is about 3 pounds per tile.

When I drew out the design I determined that I would need 158 tiles, some of which would be partial.  Figuring conservatively at 150 full tiles equivalent, and ignoring the weight of the underlayment, adhesive, and grout, the floor tiles will weigh about 450 pounds.  I have no idea what the carpet and ceramic tile that I have removed weighed but the tiles were heavy.  I also have no idea what the furniture weighed that we have removed but also have no idea what the new furniture will weigh.  The intent was that the new floor and furniture would weigh less than old stuff but we will see.

I traded phone calls with my dad and we finally got to talk for a half hour starting at 4:30 PM.  He turned 90 this past Sunday.  Mike Fearer from Bid-Rite Concrete called at 6 PM and arrived about 10 minutes later to discuss the foundation for our 70 foot ham radio tower.  I had printed off a page from the Universal Tower website showing their tower base.  I also downloaded and printed their base and tower installation instructions.  I had a set of these to give to Mike so he would have some idea of what the project is about.  We looked at the proposed location for the tower and access for his dump cart.  We also talked about the base, a rebar cage, a form around the top of the hole to allow the concrete to be slightly above ground, and a jig to make sure the base is level and the tower is plumb.

He said he was interested in the job and would work with me and Phil Jarrell (the excavator) to get it done.  Rather than bid the job he would just do it for time and materials.  He also said the current price of concrete was about $100 per cubic yard.  We will need about six (6) cubic yards to fill the required 5′ x 5′ x 6′ (deep) hole.  He thought he might be available the middle of next week but I don’t think I could have everything pulled together that quickly.

After Mike left I went to Lowe’s and picked up five 40 pound bags of topsoil, a 1-in/2-out signal splitter (rated for 5 MHz to 2.4 GHz), and a plastic snap cover channel for hiding the video cable we ran up into the bedroom from the basement for the TV set.  I then went to the Meijer’s supermarket just across Grand River Avenue for soy creamer but they did not have what I was looking for.  As long as I was there I had a salad for dinner at the in-store Subway.

While I was sitting there I called Mike Sharpe (W8XH) to confirm that he was available tomorrow to help with the antenna installations on our 40 foot tower.  I mentioned that the only thing I lacked was a standoff with a pulley at the end of it for hoisting stuff up to me.  He suggested that something like that was essential and I agreed, so I headed back to Lowe’s to see what I could figure out.  What I ended up with was a three foot long 7/16-14 threaded rod, a pulley that had a closed eyelet on top (and was big enough for the 3/8ths rope I bought), some 7/16ths washers, and some 7/16-14 nuts.

When I got back to the house I unloaded the topsoil near the part of the east yard that needs to be filled in, took the other stuff inside, and then assembled the threaded rod pulley system.  I secured the pulley on one end of the rod using two of the nuts, one on either side of the eyelet.  I threaded a nut onto the other end, put on two washers, two nuts, two more washers, and another nut.  I ran the first two nuts, with two washers between them, part way down the rod.  I left the second pair of nuts, with washers between them, near the end of the rod.

I took the assembly out to the tower and adjusted the position and spacing of the two pairs of nuts and washers so they would bracket two of the horizontal tower members.  In use I will secure the rod to the tower at each pair of nuts/washers using plastic cable ties.  This arrangement will put the pulley at least 18″ from the tower which should be far enough out that we can hoist the DB8e OTA TV antenna to the top of the tower without it banging into the tower or hanging up on something.  This antenna is the largest thing we need to hoist up. The old TV antenna is considerably larger and heavier, but it is coming down via gravity.

There was a message on our answering machine from Linda’s sister, Sr. Marilyn, who lives in St. Louis.  She was listening to the news earlier today about the storms that went through our part of Michigan and wanted to make sure we were all OK.  By the time we finished talking it was dark and I was done working for the day.  Linda called shortly thereafter to let me know she was on her way home and I mentioned the call with Marilyn.

I finally opened the box with the vertical omnidirectional outside antenna for the cellular booster system and discovered that I should have opened it sooner.  The mounting bracket was designed to be mounted to a vertical surface, such as the side of a house, not a tube, such as a tower leg.  I did not want to postpone tomorrow’s tower work so I will have to get up early and figure out a way to adapt the existing bracket so I can mount the antenna to the top of the tower.

My initial thought was that an aluminum U-channel of the correct size might solve the problem very nicely.  I could drill two holes in the bottom of the “U” to match the two holes in the bracket.  I could then drill three pairs of holes through the sides of the channel.  The antenna would be bolted to the bottom of the channel.  With the open part of the channel held against a vertical tube I could secure it with three long plastic cable (zip) ties.  Conceptually it should work and be easy to fabricate, but will take time which I won’t have a lot of in the morning.  We have to get the two coax cables from Scotty (AC8IL), drop off my car at Brighton Honda for its 100,000 mile service, and be back in time to have the mount fabricated and all of the antennas and tools ready to go by 10:30 AM when Mike shows up.

Linda got home at 9:45 PM, earlier than she thought she would when she left.  She and Diane ate at Luigi’s and had a very nice meal.  They also enjoyed the movie.  We had a big day on tap for tomorrow and we asleep by 10:30 PM.

 

2015/06/10 (W) Ron and Mary

Same routine as yesterday; up at 7 AM, open up the house, feed the cats, clean the litter tray, start a load of laundry, make the coffee, and drink the coffee while using our iPads.

Our daughter’s 34th birthday is tomorrow but she is flying to Las Vegas today to meet up with her husband who is there on a company outing.  We will celebrate her birthday when they get back, perhaps in conjunction with Father’s Day and Linda’s birthday, which is at the end of the month.

Linda left at 9 AM for Brighton Honda to have the 12 V battery in her car checked.  The battery light came on the other day so we thought it might need to be replaced.  Around 9:20 AM I heard thunder and a short time later we had a brief, heavy downpour.  Linda called at the same time and said the battery tested OK.  The problem could be the alternator, of course, but presumably the dealer service people know that and checked for that.  If not, we will likely be back there sooner rather than later.

Linda headed on to Meijer’s to do the grocery shopping.  Today was trash pickup day so I took the trash can to the street.  After meeting with Brad from Chuck It Junk Removal the other day we decided we would rent their trailer for 5 days.  For the same price as having them physically handle 1/3 of a truck of junk (5 cu. yd.) we can get rid of a full truck of junk (15 cu. yd.) by loading it ourselves.  Deal.

I got a call from Phil Jarrell regarding my request for pricing to dig a foundation hole for a ham radio tower foundation.  It was a useful conversation in that I had not previously realized that I will need a concrete contractor in addition to the concrete supplier.  The only thing the concrete supplier will do is show up with a cement mixer truck and dump the concrete where they are instructed to.  The concrete contractor will actually place rebar, build forms, provide carts or a pumper, and get the concrete from the truck to the hole.  Phil recommended Mike Fearer of Bid-Rite Concrete as a good guy who would work with me to get this done.

I talked with Chuck about getting a key to his shop so we could have the new refrigerator delivered there and have the old one picked up without having to trouble him to be there.  He agreed and suggested that we contact the guy down the street about removing the old windshield and installing the new one as part of the refrigerator swap.

Rather than dig into our bus interior remodeling project I have used the last couple of days to finalize decisions about various products and order them.  One of the things I have wanted/needed for a while is a cable entrance box that will allow me to route transmission lines and control cables into the basement from outside.  I talked to Chris Perri, KF7P, at the Dayton Hamvention last month and decided that I liked his custom fabricated cable entry boxes.  I got his business card at the Hamvention and exchanged a couple of e-mails with him this week.  I decided this morning how I want the box initially configured and e-mailed my specs to Chris.  I would like to run the cabling for the cell phone booster through this box so I needed to get it on order.  Speaking of which, the cell phone booster system arrived today via UPS so I am feeling more comfortable that all of the stuff I am ordering will actually get delivered to our house.

Wednesday’s and Fridays are when Recycle Livingston is open and the Wednesday hours are 11 AM to 5:30 PM.  We had my car loaded up with recyclables and Linda drove over after lunch to drop them off.  When she got back she made a batch of her yummy granola and I got a couple more loads of laundry done while continuing to work at my computer.

After doing my alternate tile layout for the bus floor yesterday I decided that I liked the way it looked better than the original ad that it would not involve any more cutting than the row/column layout.  I also felt confident that I had an accurate enough tile count to go ahead and order the tiles.  I drove to the Shell station to fill my tank and then drove to Lynch Carpet in Howell.  I ordered 12 boxes of the 16″ x 16″ Armstrong Alterna Luxury Vinyl Tile in the La Plata Creme Fresh pattern, and a gallon each of the vinyl adhesive and Glacier vinyl grout.  There are 14 tiles per box (24.89 sq. ft.) for a total of 168 tiles (just under 300 sq. ft.).  The inside floor area of the bus is around 300 sq. ft. before subtracting out walls and cabinets but we will be using some of the tiles on vertical surfaces in the entry stairwell and cockpit and around the box that supports the bed platform.  My estimate is that I will have 10 extra tiles.  The guy at Lynch Carpet suggested that I use a scrap piece of tile as a spacer when installing the tiles but I may use the little plastic “X” pieces designed for this purpose.

From Lynch Carpet I drove to Lowe’s in Howell to see if they had a different portable air compressor that might be more appropriate than the 6 gallon Porter Cable we just bought.  The Porter-Cable air compressor has a maximum regulated pressure of 150 PSI but that is also the maximum tank pressure.  I will have to test it on one of the front bus tires to determine if it will get the job done and if not I will return it.

The guy at Lynch Carpet also suggested that I rent a handheld grinder from Abe’s or A-1 Rental, both in Howell.  Abe’s did not have any grinders of any kind and A-1 was closed on Wednesdays.  The gal at Abe’s suggested the tool rental service at the Howell Home Depot, so I stopped there.  They also did not have a handheld grinder but they did have a floor model concrete grinder.  It was so heavy that I doubt if we could have gotten it into the bus and it was too big to maneuver in the tight spaces where I need to work.  They did have a lighter/smaller floor stripper and I may give that a try before I resort to grinding off the thinset with an angle grinder and diamond impregnated wheel and/or a belt sander with a very aggressive belt.

Pat Davidson called from Apex Roofing while I was out so I called him back.  They will be able to start on our roof next week Monday or Tuesday and will deliver the shingles on Friday this week.  I confirmed that we wanted two of the 14″ light tunnels for the living room.  I also indicated that I had scrapped the idea of building a dormer or installing a roof hatch as I simply did not get this taken care of in time.

Linda had closed up the house and turned on the air-conditioning while I was out.  It was pulling moisture out of the air but would not bring the air temperature lower than 78 degrees.  Not good.  This will be our third summer in this house and we have not used the air-conditioning very much.  The first summer we were gone for most of June, all of July, and a few days in August.  We had the unit serviced last year and thought it was working OK but perhaps did not really use it after that.  We did install filters in the return air grills so perhaps they are restricting the airflow too much.  It is also possible that it needs refrigerant.  I will have to check our records from last year and then call TOMTEK to arrange to have it serviced again.

Linda’s brother, Ron, and his wife, Mary, arrived early this evening.  They are on their way to northwest Illinois for a week-long organized bicycle ride.  They have to be there on Saturday and will be spending the next three nights at our house.  Visits from them are usually not more than once a year but we really enjoy their company when they are here.

For dinner Linda made a nice green salad and then made whole wheat angel hair pasta with onions, garlic, and mushrooms lightly sautéed in olive oil.  Ron does not imbibe but Linda, Mary, and I had a glass (or two) of Moscato.  We moved to the deck after dinner and had fresh strawberries for dessert.  It cooled off as darkness set in and we eventually moved back inside.  The other three were in the kitchen and I was sitting on the sofa when Juniper suddenly caught a mouse in the middle of the living room, or at least that is where I noticed that she had it.  She took it downstairs and I got her to drop it in the bathroom sink but I was unable to get it into a container to take it outside and it escaped into my office.  I closed the doors but I have no doubt it can go wherever it wants in the house from there.  When I returned upstairs we chatted until 11 PM and then all turned in for the evening.

 

2015/05/12 (T) Dealing with the County

I finally paid a visit this morning to the Oceola Township offices and talked to the assessor and zoning administrator.  I had a satellite image of our property on which I had drawn the proposed barn and driveway.  All they need in order to issue a land use permit is for me to show the size of the building and the setbacks on the image.  I also visited the Livingston County Building Department.  I talked to one of the counter clerks who had me talk to Rick, who is one of the inspectors.  He had just built a large pole barn and used 6×6 posts set in 26″ diameter holes back filled with concrete.  The bottom of the posts need to be at least 48″ below grade to get below the frost line so I will figure on posts four feet longer than my exterior wall height.

Based on my preliminary online research and visits the land use, building and electrical permits are the only other ones I will need in order to put up a bus barn.  The clerk gave me a check sheet of the documentation I will need to provide.  I would have to file some additional paperwork with the County Health Department, but would not need permits from them or from the Drain or Road Commissions.

I drove to the Township offices on Latson Road by way of Hacker and M-59.  Hacker was so bad the last few days due, in part, to heavy rains that it was more pothole than road and many of them were larger and deeper than normal.  The road grader was repairing the road and it was digging deep.  The grader was still working when I returned home but the road was already much better.  The road needs to be rebuilt with a substantial amount of road gravel and with proper drainage ditches along both sides.  Or paved.  Paved would be good.  Linda read something last fall that indicated Oceola and Hartland Townships had agreed to pave Hacker Road from M-59 south to Golf Club.  We checked when we got home this spring but could not find any reference to such a project.

Back at the house I settled in to create a scale drawing of the floor plan of our bus and then draw in the 16″x16″ floor tiles.  I added up the various areas yesterday and added 25% for waste, but that turned out to be a low estimate.  By drawing the tiles I was able to count how many I would actually need.  I called Lynch Carpet in Howell and talked to Clint to get a rough price estimate for the materials.  The 16×16 Armstrong Alterna Luxury Vinyl Tiles are packed 14 to a box and can only be ordered by the box.  We need 190 tiles for the project so we will have to buy 14 boxes (196 tiles).  That turned out to be 50 square feet more than my original estimate, but would leave us with only six full tiles as spares, assuming I do not ruin any during the installation.  Fortunately, the vinyl adhesive and vinyl grout were less expensive than I expected, so even with a freight charge the bottom line was similar to my first estimate.  Using these tiles it will be approximately a $2,000 project.

My layout has the tiles in a standard pattern with the grout lines lined up in two directions, one running parallel to the long axis of the bus and the other perpendicular to that.  I presumed that this would take less tile and require less cutting but after seeing the layout I am not so sure.  I will probably make a second drawing with the tiles turned 45 degrees and see if it makes more efficient use of the tiles.  We plan to use a grout that is very similar in color to the base color of the tiles so the grout lines will tend to blend in rather than standout as a design feature, and perhaps make the orientation of the tiles less important visually.

Later in the afternoon I called Pat at Apex Roofing to let him know our shingle selection.  I left the information in a voice message and Pat called back later to confirm.  We are going to use the Certainteed Max Def Resawn Shake shingle.  We are still thinking about the skylight tubes.  We talked about putting one or two in the living room and possibly one between the kitchen/dining rooms and one in the hallway.  I realized that the air-conditioner would probably be in the way of the one for the kitchen/dining area, so we will not do that one.

Linda made granola today and made baked/stuffed acorn squash for dinner along with an asparagus, carrot, green bean sauté and fresh sweet Bing cherries.  I took care of some e-mail and then we had slices of the Mother’s Day vegan cake.  I called my sister to check on how our grand-niece was doing.  She called me back later and we had a long chat.  Linda and I then watched season 2, Episode 2 of Sherlock.

After Linda fell asleep I was still up (writing) when a noise started and did not stop.  I suspected it was the water sanitizer recharging, as the water softener had recently recharged, but I got up to make sure that’s what it was and not something else like a sump pump that was stuck in the on position.  It was the sanitizer, so I closed the laundry room door to reduce the noise and went back to bed.  I really need to soundproof the laundry room and reprogram the softener and sanitizer to come on at better times.

 

2015/05/04 (M) Moving Things Along

I had a list of things I wanted to accomplish today but did not get most of them completed.  I am trying to make purchasing decisions and get products and materials ordered so I can get some projects done and checked off my list.  It wasn’t a wasted day, as I gathered additional information, but it was frustrating to not get orders placed for things that I thought we settled items.

Based on a recommendation from bus buddy Butch I had decided to order a Cyclo 5 dual head orbital polisher.  I had looked at them before on Amazon but on closer inspection discovered that there is a Cyclo 5-Pro and now a Cyclo 5 Mark II and Cyclo 5-Pro Mark II.  The Mark II models are the current ones but much of what is for sale on Amazon are the previous generation.  Not only that, any one of them comes in three different configurations, two of which appear to duplicate one another.  I finally figured out that the Pro version has a variable speed motor.  The configurations have to do with the style of buffing pads and how they attach to the tool.  It turns out that whatever I get I can order the other parts if needed, so which one to order comes down to which pad attachment method I think best suits my needs.  That means more research before I place an order somewhere.

I have also decided to finally install a cellular booster system at the house and identified the TopSignal 5-band system as the one I probably wanted.  I have always been partial to Wilson Electronics, but the company has changed ownership in the last year and rebranded everything for the consumer market as WeBoost.  The redesigned “consumer” website is less informative than the old one and the company has been slower than other companies to bring products to market.  The model I would want is listed as “available soon.”

I called Cellular Solutions and talked to Paul.  They sell the WeBoost and TopSignal products but he steered me towards the SureCall Fusion5s, which is similarly priced to the TopSignal and more expensive than the WeBoost.  It is also a 5-band/multi-mode (3G/4G/LTE, etc.) transceiver so it will cover almost all cellular carriers including Verizon, without locking us into any specific carrier.  I was also going to call PowerfulSignal, who sells most of the same products, but there was no price difference based on the information I had and Cellular Solutions is a Michigan-based company.

We also need an Over-The-Air TV antenna so I started revisiting the website for AntennasDirect.com.  I spent some time looking at their website while we were in Quartzsite, Arizona but never ordered one.  One of the links on their website is to AntennaPoint.com.  This website shows the direction and distance to OTA TV towers based on your ZIP code.  It turns out that we have broadcast antennas in all directions but most of them are at ~104 degrees (Detroit) and ~270 degrees, plus or minus (East Lansing, Kalamazoo, and Battle Creek).  The ground rises to the west from our house so the Detroit metro stations will still be our primary ones.  Even so, the closest tower in any direction is 27 miles away and the farthest is 58, so we will need a serious antenna to pull these in.  (Antenna point.com only display towers up to 60 miles away but that covers everything we would care about.)

I have been trying to catch up and dispatch these kinds of lingering projects so I can work on plans for the bus barn and get started on our bus projects.  At this point I am no longer confident, however, that we will ever build a barn.  No matter what approach we take it is just going to cost more than we want to spend and it looks like dealing with the permitting process may be a hassle.  Added into this mix are several major projects on the bus, the need for a new roof on the house, and the need (desire) for a new car.  Ugh.

One of the bus projects is the remodeling of the seating in the front half of the coach.  As part of that project we want to remove the old carpet from the front and the bedroom and the black ceramic tile from the kitchen and hall, and probably the bathroom.  We did some online research and liked the look and quality of Armstrong Alterna Luxury Vinyl Tiles.  These tiles come in a 16″x16″ and a 12″x12″ size and a few of them come in 8″x8″.  From the website I determined there was a dealer, Lynch Carpet, close to us with an excellent selection of Alterna samples.

We made an errand run, stopping at the Howell Library to return a DVD, do some car research in Consumer Reports, and check out a few children’s books for Madeline’s visit tomorrow.  We stopped at the Howell branch of First Merit Bank to make a SLAARC deposit, and then drove to Lynch Carpet.  Clint worked with us and we took four samples to look at in the bus.  Once we saw them with our cabinetry the one we liked best was the La Plata Crème Fresh.  It has a faux stone, low luster, textured surface that is mostly off-white but has distinct milk chocolate brown veining.  I was thinking we would install the tile diagonally (as diamonds instead of squares) but that would probably result in more cutting of tiles, so more work, more time, more waste, and more cost.  The more I thought about that the more I liked the idea of a simpler layout, but that decision is far from made.

The rest of the day was filled with the usual things; a load of laundry, working at our desks, fixing/eating dinner, reading, games, and online research, the last three typically done on our iPads while curled up on the living room couches.