Tag Archives: kitty tent

2014/09/02 (T) No More Painting

After breakfast Linda worked on the financial and membership records for our GLCC RV chapter and I took care of a couple of e-mails.  Keith showed up to cut the grass, which he managed to do in spite of the wet conditions from yesterday’s heavy rains.  After chatting with Keith for a few minutes I started to resume work on “the project” but decided to look for the tub of grass seed and fertilizer we brought from the old house.  I found it rather quickly and we still had a partial bag of grass seed, so I spread it around the front yard by hand filling in the bare and thin spots, of which there were plenty.  Our flock of wild turkeys was back today.  I think they like the grass seed I put out for them.

Wild turkeys gather in and around the fire pit.  No...we do plan to cook them.

Wild turkeys gather in and around the fire pit. No…we do not plan to cook them.

I sanded the drywall compound in the library and applied another thin layer.  I’ve been applying non-overlapping horizontal strips of mud, letting them dry, sanding them smooth while feathering the edges, then repeating the process for the areas in-between, or outside, the previous strips.  I will eventually turn this 90 degrees and apply the strips vertically.  The last set of steps will be to fill around the outside of the opening, feathering everything back to the existing wall surface and sanding it smooth with the central part of the patch.  We don’t want it to be obvious that there was ever a hole in the wall.  Once the drywall patching is done I have to prime the new compound and then paint the entire wall.

The paint on the east wall of the garage and the outside of the utility closet looked good and the paint on the inside of the utility closet looked good enough; it is, after all, the inside of a furnace closet.  I was done painting, at least for now, which should have felt like a big deal, but it just meant I could wrap up a couple of things and move on to the next thing.

The first thing was to mount the electrical box on the wall to the left of the library HVAC unit, make all the wiring connections, screw the switch into the box, and put on the cover plate.  I routed the thermostat wire alongside, and zip-tied it to, the armored AC power cable.  The second thing was preparing the mounting holes for the garage furnace thermostat on the outside of the utility closet wall.  I then cut the thermostat cable to the correct length beyond the wall, removed the outer sheath, stripped the ends of the wires, and secured the cable with a zip tie to prevent it from slipping back into the wall.  I did not actually mount the thermostat, however, since I was going to wait for Darryll to connect the wires.

Three adults and three young.  They are large and impressive birds.

Three adults and three young. They are large and impressive birds.

By then it was time for lunch, after which Linda left for her dentist appointment in Dearborn.  I wanted something easy to do, so I assembled the three plastic shelving units I bought at Lowe’s yesterday.  They went together easily, but one was missing the feet, top caps, and wall brackets and another one had a defective top cap.  I put them against the east wall of the garage and the floor was flat enough that they lined up well, so I don’t necessarily need the feet.  But the top caps are important, and it bugs me that I did not get everything I paid for.

The next thing I decided to tackle was the wood box in the utility closet that will enclose the electrical sub-panel and make it appear to be recessed and hide all of the electrical cables.  I cleared off the table we have been using to work on sheets of drywall and stood the scrap pieces of drywall against the back wall.  I got the two 8-foot 1×10’s I bought yesterday, put them on the table, made careful measurements and then marked them.  The two side pieces needed to be 52″ long x 7-1/4″ wide, with notches to create clearance for the top plate, horizontal blocking, and electrical cables passing through holes in studs.  I cut them to length with the Rockwell circular saw, and then ripped them to width using the Craftsman band saw.  The band saw had not been used in years but it had no problem ripping each board.  The notches were made with our Porter-Cable saber saw.  This kind of work is a pleasure when you have the right tools.

I screwed the two side pieces into place and then measured and cut a bottom cross member, and a trim strip to go below it, and installed those with screws.  I then cut a top cross member and a backing strip to go behind it between the two side pieces.  When I was done I had a box that would support a 48″ high by 33″ wide 1/4″ thick plywood panel with the outside face flush with the front edge of the sub-panel once I cut a rectangular opening in the plywood to allow it to fit around the box.  The plywood panel will be secured around the edges with a few screws and the sub-panel cover plate will overlap and cover any gap between the panel box and the opening in the plywood.  I will finish the plywood panel tomorrow or Thursday depending on when Darryll returns and how much I have to work with him to get the power connected to the new A-C compressor.

Jasper the cat in the kitty tent on the deck.  He spends a lot time looking around and sniffing the air when he is out here.

Jasper the cat in the kitty tent on the deck. He spends a lot time looking around and sniffing the air when he is out here.

That was the end of my project work for the day so I took a shower and put on some clean clothes.  Linda poured a couple glasses of wine and we sat on the deck and enjoyed an absolutely beautiful late summer Michigan evening.  We brought the kitty tent out so Jasper could sit outside with us.  Linda threw a green salad together, followed by the leftovers of the penne pasta dish and Italian bread she made for dinner on Saturday.  As twilight set in we moved inside and I decided to go to Lowe’s for some grass seed.  I figured if the soil was still moist first thing tomorrow morning I would spread it around the bare and thin areas in the back and on the west side of the garage, of which there are plenty. Otherwise I will wait until just after the next rain.

I started reading Big Lake Scandal last night and continued with it this evening.  It’s the 5th and latest book in the Big Lake murder mystery series by full-time RVer Nick Russell.  Nick is a good writer, but he and his wife, Terry, are personal acquaintances, which makes reading his books that much more fun.

 

2014/08/11 (M) SLAARC/WordPress

Some of the members of SLAARC are former Detroit Edison employees (now DTE Energy) and one of them (Bruce, W8RA) currently works for Intercontinental Transmission Company (ITC).  Bruce was curious what size transformer we had and said that there were likely numbers on it that I could read with a pair of binoculars.  I went out this morning to check, but the only info on the transformer can is a metal plate that is too small and illegible to read from the ground even with our fairly good binoculars.

Darryll (DCM Heating & Cooling) had not shown up or called by 10:30 AM.  His work doesn’t make a mess of our yard or house, at least it hasn’t yet, so it is less of a concern that he is not here working today than it was with the landscaping.  When he left Thursday he had a short list of parts he needed to get and perhaps could not do that until this morning.  Or he may have gotten emergency service requests, which take priority over new installations.  Still, we would like to have the new HVAC work completed in the next week or so to make sure it is done ahead of the natural gas hookup.

As part of that work I have to complete some of the electrical pieces, finish dry-walling the utility closet, and continue cleaning, repairing, and organizing the garage while we have the storage pod.  I then need to get to work on a long list of bus projects.  I also have a lot of desk/computer work to do and I prefer to do that when I know I can settle in for a long stretch.  I tend not to be in the right frame of mind for desk work when I do not know if/when contractors are going to show up.  It’s turned out to be a busy, and in some ways complicated, summer that way.  Darryll called late morning to say they would be back first thing Wednesday morning.  That information allowed me to adjust my expectations and settle in for a long day and evening at my computer.

My main focus was working on the page content for the new SLAARC WordPress website, which occupied me until dinnertime with some e-mail mixed in.  After dinner I started uploading blog posts beginning with the one for July 7th.  I decided that I would not select and upload photos for most of the posts in July and early August and instead create more extensive gallery posts for the landscaping work and the garage/HVAC project.

One of the things I have noticed in the past week is that our Internet connection seems to be faster, or at least my e-mail processes much quicker than it used to.  That could be the result of the AT&T repair on the 4th, which ended up moving us to entirely new wire pairs, or a change that AT&T made to our DSL service back on the 3rd (when it kept going off temporarily), or it could be that QTH upgraded their e-mail server system, or some combination of these.  Whatever the case, it seems to be an improvement.

Phil from Precision Grading called at noon to see if he could stop by sometime after 3 PM today.  It was raining gently at the time but when he called back a little after 3 PM the rain had finally opened up into a sustained downpour.  He had an 8 AM appointment in Hell (Michigan) and we agreed that tomorrow morning after his appointment would probably be a much better time for him to stop by.

We ordered a “cat tent” the other day and it showed up this afternoon.  We opened it and set up in the living room with the “door” tied open so the cats could explore the inside.  They were wary, but did go in briefly.  It’s kind of like a back-packing tent but all the fabric, including the floor, is mesh.  We thought the floor would be a solid material, but it’s not.  It will be OK for use on our deck at home, but seems less suitable for use on the ground when we are RVing.  We intended to use it for both so we are not sure if we are going to keep it.

For dinner Linda made a tomato-onion-mushroom ragu and served it over a three rice blend with a dark mixed greens salad on the side.  Later she served fresh strawberries with Lotus brand cookies and dark chocolate with bits of almond and sea salt.  Seriously, what’s not to like about that?

 

2014/08/08 (F) Decked Out

Today was the first day in over a month that we did not have contractors at the house, were not wondering why we did not have contractors at the house, or were not working on projects getting ready to have contractors at the house.  I like working on projects, but today was a deep breath day for both of us.  The weather was near perfect so we both spent much of the day on the rear deck where we made great use of our table and sun shade umbrella.

We had breakfast, lunch, and dinner on the deck, a first since we moved here.  Linda read there, and I worked at my computer there during the afternoon and early evening.  At one point our male cat, Jasper, was sitting by the dining room doorwall crying for us to come in and pay attention to him.  Instead, Linda put him in his carrier and put it on the table.  I don’t think he was comfortable at first, but he was near us and seemed to like being “outside” and able to look around.  At least he stopped crying.  Linda got online, found a “kitty tent” on Amazon that we liked, and ordered it.  It’s a 5′ x 6′ tent that folds up and stores like a backpacking tent.  All of the sides and the floor are nylon screen mesh.  It has a zipper door.  It should be here on Monday.

I worked at my desk all morning and finished up the test items I was writing for the Lectora version of the Michigan Assessment Consortium professional development series on Common Assessment Development.  I got the items e-mailed off to the MAC and to Bill at Wayne RESA and e-mailed an invoice to the Kathy, the president of the MAC.  Linda spent some time cleaning part of the house; she’s been doing a little bit each day.

The high point of the day was a low altitude flyover by five World War Two vintage aircraft from the Yankee Air Force based at Willow Run Airport in Ypsilanti about 40 miles SSE of our house.  They came directly over our house in a V-formation banking to the left and heading south.  A B-17 bomber (4-engine) was at the point with a P-38 and a P-51 fighter on either side and two additional fighters at the tips that I could not identify.  We heard them coming from some distance away and the sound was as impressive as the sight as they passed overhead.  Linda checked online and discovered there was a major air show tomorrow at Willow Run Airport so we surmised they were on a practice flight.

For dinner, Linda made sweet potatoes topped with a mixture of black beans, tomatoes, onions, and several spices.