Tag Archives: HVAC chases (H3-40)

2015/11/09 (M) Clever Mouse

Madeline coughed quite a bit last night and we were up several times to check on her, so we did not have the best possible night’s sleep.  We got up to stay at 7:30 AM and Madeline got up about 15 minutes later.  I made our morning coffee while Madeline helped her grandma wash blueberries and make vegan blueberry pancakes.  We had a lovely breakfast with orange juice, pancakes with real maple syrup, and blueberries, raspberries, and bananas on the side.

I check the mouse traps in the pantry every morning.  A couple of days ago I found one of them broken with the food gone and some mouse poop left in its place.  The pantry doors had been left open overnight so I figured one of the cats had discovered the trap (we use live traps) and tossed it around until the door fell open and the mouse escaped.  I threw it away since it was broken.  This morning I discovered that the food in the other trap had been replaced by mouse poop but the trap was upright with the door closed and was not broken.  The pantry had been closed all night so I knew the cats had nothing to do with it.  Apparently we have a mouse that has figured out how to defeat the traps.  We are not going to set kill traps so we will have to see what else we can find.

We lingered in the living room for a while enjoying our coffee by the fireplace, listening to Madeline play (with) the organ, and watching her play with some of her toys.  She made her futon into a car and took her two “bunnies” for a ride.  By 9:30 AM I had finished my coffee and changed into my work clothes.  It was just below freezing when we got up this morning, but it was a bright, sunny day with no wind, so it would be a comfortable enough day for working on the bus once I turned up the thermostats and warmed up the interior a bit.

My focus today was to get the SurePly underlayment installed on the floor of the passenger seat platform and maybe the two walls.  I also wanted to get the outside wall panel trimmed off so it will fit around the tile and needed to build a new step with an open front, but I did not expect to get to those tasks today.  First up, however, was getting the small patch I worked on yesterday to fit better and be secure.

I trimmed both ends of the underside of the main patch and recut the side/support panel.  I trimmed the side panel several times before I was satisfied with the fit.  I used heavy-duty double-sided tape to hold the top patch and side panel to the metal structure underneath.  I used a 1-1/2″ stainless steel self-drilling wood screw to secure the top to the vertical piece of 3/4″ plywood that forms the face of the passenger seat platform, and a shorter screw to secure the side panel to the same piece of plywood.  I then attached a temporary plate of SurePly over the side panel to the edge of the top plate to hold the side in alignment with the top.

The metal under this patch is rounded leaving a small space between the top and side pieces where they meet.  The vertical plywood front face is also beveled leaving a void.  I used Door and Window Trim Spray Foam Insulation to fill these areas.  This foam has a lower expansion than most spray foam insulation.  I did not overfill the voids but put enough in that it expanded out past the edge.  I will trim it off flush tomorrow when it is cured.  The foam adheres to anything it touches and is rigid enough to be somewhat structural so it should stabilize and secure the patch.  Once I trim it and cover it with underlayment it should be good as new.

Madeline’s Aunt Meghan, who is also her buddy, came to visit and play with her today.  She arrived at noon and I took a break to visit and have lunch.  After lunch Madeline, Meghan, and Linda went to the Brighton Mill Pond Playscape and I resumed working on the bus.  They were gone for several hours.

Floor patching compound being applied to the co-pilot/navigator platform.

Floor patching compound being applied to the co-pilot/navigator platform.

Before I could put a layer of underlayment on the passenger seat platform I needed to use floor patching compound to fill in some low spots and create a smooth taper from the plywood to some metal edging.  But first I removed all of the screws that secure this edging and counter-bored the holes so the screw heads would be flush.  As often seems to happen when I am working on something like this some of the screws were rusted and I did not have appropriate replacements.  I then have to make a trip to Lowe’s, which is what I did, and bought a small quantity of three different size flathead wood screws.  I stopped at O’Reilly’s Auto Parts to see if they had the large metal or nylon washers that are used with the swivel base for the front chairs.  They didn’t, but once again suggested that I try Howell Hardware in downtown Howell.  I have received that suggestion from people at several different stores so guess I need to check the place out.

When I got back home I finished installing the new screws.  The floor patch compound takes a minimum of three to four hours to dry, sometimes much longer, but after two hours it was dry enough for me to use a sanding sponge to smooth out some ridges and feather some edges that needed it.  It was clear, however, that I wasn’t going to be able to accomplish what I set out to do today.  And so it goes; I need to do the work correctly which means doing all the things that need to be done in the order that they need to occur.  Everything takes time and things that have to dry, set, or cure do so on their own schedule, not mine.

Phil had shown up around 3 PM so I went out to chat briefly with him and then went inside to change clothes.  He had a partial load of topsoil left from a job earlier today and dumped it on the other side of the street by the 3rd driveway culvert.  He used his front loader to place it along the south side of the new pull-through driveway extension and moved the small pile from the west end of the property to the north side of the driveway.

I still had plenty of daylight and wanted to make some good use of my time so I started thinking ahead to the layout of the tile in the cockpit.  I measured various parts of the cockpit and although the number of square feet is small compared to the main floor the layout will be more difficult.  As with all tile layouts it needs to be “balanced” while avoiding small pieces.  Linda and I agreed that the pattern in the cockpit does not need to match the main floor, which is laid out diagonally, so that opens up options for how to lay out the tile.

The main landing is less than two tiles wide (front-to-back) so the best layout for that area is with a grout line dividing it in half, but that might not work well in the driver’s area.  The driver’s area presents the additional problem of a steering column, brake pedal/valve, an accelerator pedal with its electrical cable that goes through the floor.  The “holes” in the tile to accommodate these things have to be created using two notched pieces so they can be installed around the protrusions.  I also need holes for the seat base mounting bolts and power cable for the 6-way power base.  Those can be actual holes but I do not want grout lines to fall at the edges of the base.  I also have to be cognizant of the walls, which are getting tiled.  The distance along the face of the passenger seat platform is close to 65″.  The tiles are 16″ squares so four tiles with three 1/8th” grout spaces is only 64-3/8″.  See, it’s complicated.

The other thing I pondered and measured was the new step between the passenger seat platform and the main floor.  Again there are several parameters:  (1) We want the finished (tiled) height to split the distance from the tiled platform to the tiled main floor exactly in half; (2) we want the finished depth to be half the finished depth of the platform, and; (3) we want an open front so we can store shoes under the step.  The total rise will be just under 14″ so the step rise will be a little less than 7″.  Subtracting about an inch for wood and tile will leave a 6″ high space for shoes.  The platform is 29″ deep so splitting that in half results in two treads of 14-1/2″, plenty deep for shoe storage.  I considered having the step angle across the platform, being deeper by the driver seat and shallower by the passenger seat.  While it would add an element of aesthetic interest it would greatly complicate the construction without adding any practical utility, so I rejected that idea.

As I considered the construction of the new step I was also thinking about the fact that there is a hole in the front end of the passenger side HVAC duct.  The hole opens into the space behind the switch panel on the wall next to the passenger seat and just aft of the entry door but there is nowhere for the air to go from there.  The hole is easy to see but not easy to reach so I estimated it to be three inches in diameter which is approximately seven square inches in area.

One possibility is to install a 4″ diameter circular louvered duct in the switch panel.  It would be large enough in area, could be rotated to direct the flow in any desired direction, and has internal shutters that could be closed down to reduce or cut off the air flow.  The main downside is lack of space behind the panel but I could cut off the tube behind the locking tabs.  Another downside is that the cats sleep under the passenger chair while the bus is moving and the direct airflow might be uncomfortable and/or annoying for them.

Another possibility is to create a narrow duct along the back wall of the platform the same height as the new step and tie it in to the inside of the step, allowing the conditioned air to come out the open front.  That will involve a bit more woodworking and complicate the tile installation, but could be added later, so I will probably opt for the round louvered register for now, if I do anything.

When I was done pondering the HVAC possibilities I put the seat pedestals back on the landing, locked up the bus, and went inside to change clothes.  Meghan left while I was changing clothes so I did not get to say goodbye.  Apparently Linda thought I was taking a shower and would be a while.  Since we needed to get Madeline back to her house well before her bedtime we decided to head to Ann Arbor and have dinner there.  I deflated and rolled up her portable toddler bed while Linda and Madeline gathered up her clothes, books, toys, and other things.  I loaded the car while Linda got her dressed to travel.  I checked in with Phil to get a status update and let him know we were leaving.  We were on our way at 4:45 PM.

The drive down was OK as the really heavy traffic was headed north out of Ann Arbor.  We tried to keep Madeline awake by reviewing all the fun things she had done since she got to our house late Friday afternoon but we were not successful.  As I exited M-14 eastbound onto US-23 southbound I could see that traffic was stopped not far after the Plymouth Road exit so I left the highway and headed west on Plymouth Road to Huron Parkway.  From there I headed south, paralleling US-23 to the west.  At Washtenaw Avenue I turned east, and after a short distance turned left into the small shopping plaza where Elevation Burger was located.

I order a grilled cheese sandwich and Mandarin oranges for Madeline.  Linda and I had vegan burgers and fries and Linda shared her fries with Ms. M.  Madeline was slow to wake up but perked up when her food arrived.  That girl likes to eat!  🙂  After dinner we made the short trip to Madeline’s house and arrived at 6:30 PM.  Linda got Madeline into her pajamas while I brought all of the stuff in from the car and turned up the thermostat.

Madeline was wide awake and full of energy so she played with her kitchen toys and tools and had Grandma Linda read her four stories.  I dozed off for a little while and then spent some quality time with Gus the cat.  Gus loves people but tends to keep his distance from Madeline who is just a bit too energetic and enthusiastic for him.

Brendan and Shawna’s flight was due in to Metro Airport at 6:50 PM and he texted Linda at 6:51 that they had landed.  They were home before 8 PM and got to spend time with their very awake, excited, and active daughter.  We left at 8:30 and stopped at Biggby Coffee on Washtenaw Avenue.  Rain was moving into our area from the south but had not yet arrived and the drive home was uneventful.  We were home by 9:15 PM and headed straight to bed where we watched Scorpion and NCIS-LA.  Linda came down with a cold while Madeline was here and went to sleep as soon as NCIS was over.  I watched Travelscope on the Create channel and left the TV on while I worked on this post.  It was another long, busy day during which I made forward progress on the bus.

 

2015/05/28 (R) Ice Cold Internet

I was up until after 1 AM last night fussing with my computer but the OS was updated and was running better (I think) when I finally went to bed.  I need my beauty rest so I did not get up until 9 AM this morning.  Linda had already made coffee so I checked the temperature of the refrigerator (41.4 degrees F) and then got out the soy creamer.  41 is better than 45 but given where the thermostat was set the temperature in the fresh food compartment should have been 35 degrees or lower.  We had a very late breakfast of homemade granola and small glasses of orange juice to wash down our vitamins.

Because I did not get to upload any blog posts last night I switched up my routine and spent the morning working at my desk.  The weather was very nice so Linda went for a long walk.  My computer was back to normal and I managed to upload nine posts to my blog (May 10 through 18) by 1 PM.

I had an e-mail back from Ken Schramm yesterday letting me know that his “last day at Wayne RESA” gathering would get underway around 3:30 PM at Ashley’s Beer & a Grill at Westland Mall.  Brendan and Shawna’s celebration is from 5 to 8 PM in Ann Arbor so we will be able to attend both events although we might not make it to Ann Arbor until 6 PM.

Today was our friends’ 44th wedding anniversary.  Butch and Fonda were married the same year we were one day before us.  We did not know each other then but are now friends through our mutual passion for converted highway buses.

Brendan called and talked to Linda.  It turns out that tomorrow is grandparents/special friends Shabbat at Madeline’s daycare center and Brendan thought we might want to attend.  It starts at 10:30 AM and includes lunch.  The food at the daycare center is vegetarian but not vegan so we will see how that works out.  Brendan is going to take care of Linda’s plants so we will take these with us and go to his house when we are done at the daycare center.  I will pick up our electric pressure washer while we are there so I can wash the bus on Saturday.  We were going to buy cards today for Ken, Brendan, and Shawna but decided we would do that tomorrow on our way to Ken’s gathering.

Linda made large green salads with chickpeas for lunch.  We both put on a few pounds over the winter and really want/need to take them off.  After lunch I worked in the bus.  I removed the wood trim along the top of the beveled strip mirrors on the wall in hallway.  The strips were glued directly to the wall so I put the trim back on.  If we do not want to see these mirrors we will have to figure out some way to cover them.

There was a triangular horizontal panel between the upper edges of the J-lounge and the dinette with four switches mounted in it.  Two of those switches no longer control anything but the other two still do.  I secured the panel above the passenger side HVAC chase and blocked it in so it could not move.  I dressed all of the loose wires with cable ties and cable clamps and secured them to the floor.  I cut two grates from a piece of expanded metal and secured them over the two holes in the driver side HVAC chase where the sleeper-sofa was installed.  That sealed up the last of the holes that the cats might get into.  If one of them got into the HVAC system we would have disassemble half the bus to get them out.

I removed all of my tools and miscellaneous parts from the bus and set them on steps leading to the house.  I had put one of our folding chairs inside the bus to sit on and moved it to the location of the passenger chair as a safety barrier after I moved the trash can out yesterday.  I folded it up and put it back in the bay where it is stored.  While Linda vacuumed the inside of the coach with our Shop-Vac I put tools and parts in the garage or back into the appropriate tool boxes.  When she was done we got the Shop-Vac out of the bus and put it in the garage.

There is a maple grab handle on the right side of the entrance stairs (as you enter the bus) attached to a piece of maple trim from the back side.  The finish is worn and the handle is loose.  I wanted to tighten it, which required access to the back of the trim board.  Linda recalled that we had Creative Mobile Interiors (CMI) tighten this handle when we first got the coach so we figured there had to be a way to get to the back of the trim board.

We removed the cockpit HVAC access panel just below the trim board but it did not appear to provide access to the back of the trim board.  I removed the only two screws I could see (at the right end of the trim) but it still would not come loose.  I figured the trim board had to be screwed on somewhere else and the only possible place was under a piece of inset brass finish trim.  This brass trim is used throughout the bus, including around the edges of the Corian counters, and has an adhesive backing.  I have found screws under it in other places so I pried the end up and peeled it out, revealing three screws.

I thought I was on the verge of success until I removed the three screws but still could not get the trim board loose.  I tried prying it at various points with a screwdriver but it would not budge and we finally came to the unhappy conclusion that it was glued on.  Perhaps it is secured from underneath in some manner that we did not see but I will have to return to this when I have more time.  Linda suggested that we cut the handle off and install a new one that can be screwed on from the front.  She’s a clever girl.  As long as the access panel was off we vacuumed out the cockpit HVAC system and then replaced the panel.

About this time a UPS truck went by headed deeper into our neighborhood.  Since we live on a dead end street I knew the truck would be coming back so I waited for it and flagged down the driver.  I explained to the young man that we had two packages delivered to the wrong house in the same week about a month ago and that I had called the 800 number and talked to customer service but I would appreciate it if he would mention it to his colleagues as we will be ordering a lot of stuff starting in the second week of June.  He was very nice and said he would.

Our last bus task for today was the hard one.  We moved the passenger chair from the garage back to the bus using a hand truck so we did not have to carry it.  It is very heavy but with Linda guiding the top and me supporting the base we got it inside and set in position.  We tilted it fore and aft so I could slide the mounting studs into position and line them up with the holes in the base.  I then bolted it down to the support rails by tightening the four nuts.

This was all trickier than it sounds.  The bolts have square flanges that have to engage in the open slot of the channel to keep them from turning while being tightened or loosened.  But that required me to pull up on the studs as the nuts were not going on that easily.  As when I took the nuts off, I had to wedge one of them up with a screwdriver while I got the nut tight enough that the bolt would not spin.  I reconnected the power to the chair and we checked that all of the adjustments still worked, especially the footrest.

With the installation of the passenger seat we were done working on the bus until after GLAMARAMA and have two seats with seatbelts so we can tow the car rather than drive it separately.  This will be much nicer for us and the cats, although I expect the modified interior will freak them out initially.  We will be gone most of Friday but have Saturday to prepare food, reload the coach for the week, and wash the exterior.  Oh the joys of owning a converted coach.

For dinner Linda served the last of the whole wheat capellini with Portobello mushrooms and asparagus and steamed some broccoli.  A piece of whole wheat bread and a small glass of Leelanau Cellars Winter White wine completed the meal.  We had watermelon for dessert later.

I returned to my office after dinner and updated our Rand-McNally RVND 7710 GPS.  I then continued uploading blog posts.  By the time I quit working around 10 PM I had uploaded nine more posts and was caught up!  I think 18 posts in one day may be my all time record.  I did not get to work on articles for BCM, or copy files between our NAS units, but I was satisfied with what we had accomplished today.

 

2015/05/26 (T) Reflections

I decided to put off doing the laundry until later in the week.  Linda made a grocery shopping list while we had our morning coffee.  I called Pat Davidson at Apex Roofing to discuss the installation of a roof access hatch.  We did some online research for pest control companies in the Brighton-Hartland-Howell area and decided to call Best Pest Control LLC.  I talked to the owner, Ryan, about his perimeter defense package, and decided to give his company a try.  They will spray outside the house for ants, spiders, hornets, wasps, and yellow jackets.  I called Phil Jarrell from Precision Grading and left him a voice message regarding some additional driveway work, a French drain for the west end if the property, and a hole for a ham radio tower foundation.

I showed Linda the pullout pantry slide hardware I found last night on the Rockler website, a German made top-bottom pair specifically designed for this application and able to support up to 450 pounds.  It’s pricey, but it looks like the right stuff for the job.  We also found some assembled pullout pantries online, including some that were 5″ wide, but they were not deep enough and getting just the right height looked tricky.  We really want to maximize the use of our available cubic inches.

Keith showed up around 10 AM with his new Scag riding lawn mower.  He is still going to have the Hustler repaired as a backup, but the Scag is a nicer/better machine.  It is fuel injected, which should be more reliable, and it is faster, which makes more efficient use of Keith’s time.  It also has a seat that can be adjusted from soft to firm, making for a more comfortable operator experience over the course of a long day.

As much as I need to work at my computer and drafting table I need to work even more in the bus right now.  I started by reassembling the inside of the cabinet above the refrigerator, except for the liner carpet, and reinstalled the fluorescent light fixture on the ceiling.  I am keeping the carpet pieces for now, but mostly to use as templates for new material.  I would have preferred white Formica interior surfaces, as they are brighter and easier to keep clean, but the bus has a lot of curves and carpet is a very conformable and forgiving material.

The interior of the bus deconstructed in preparation for a new floor, seating, and custom desk.

The interior of the bus deconstructed in preparation for a new floor, seating, and custom desk.

My next task was cleaning out and securing the area under the bed platform.  I removed the half box covers, the flexible ducts, and the floor-mounted cleats.  I threw the ducts away and stored the other pieces in the garage.  I then reattached the strip light on the top edge of the forward side of the base, reinstalled the two circular HVAC registers (so the cats could not try to get under the bed through the holes), put the cover plates back on the two duplex AC outlets and reinstalled the outlet expanders which also have dual USB charging ports.  I need to put some sort of temporary netting over the port holes in the section of the HVAC chase under the bed, but I need to find a suitable material for that.  The long term plan is to seal those holes and install registers in the sections of chase outside the bed base.  I thought about disconnecting the lift struts for the bed platform so I could raise it higher and reinstall a drawer onto its glides, but decided to leave that for another day.

While I was working in the bus Ryan from Best Pest Control called me back and said he had a crew that could fit us in within the hour so I said “sure.”  I closed up the house as they would be spraying around all of the windows, doors, and doorwalls.  Two guys showed up a little while later and I walked them through the job, wrote a check, signed the work order, and they got busy.  They found two hornet nests by the east end of our deck and destroyed them.  I hate to kill even a hornet but they have been buzzing around our windows and doors, poking at voids in the mortar on the face brick, and occasionally getting into the house and we need to put a stop to their use of our residence as a place to build their homes.

The pest control guys were already gone and Keith was driving away as Linda returned from the supermarket.  I helped get the groceries into the kitchen.  After they were put away we had a light lunch around 1 PM of fresh baby carrots, mini bell peppers, sourdough pretzel nibblers, hummus, and red grapes.

The dinette seat used to fit in this corner The strip mirrors have been removed from the outside wall next to the window.

The dinette seat used to fit in this corner The strip mirrors have been removed from the outside wall next to the window.

I have been taking a lot of short breaks while working on the bus.  It was warm and humid again today and warmer still in the coach even with windows open and the roof vent fans exhausting air.  But the breaks are not just to rest, they are also to ponder the details of how the interior will get rebuilt and what additional deconstruction still needs to take place.

In the front of the coach there was a 120 VAC electrical cable coming out of an access hole in the passenger side HVAC chase, passing through a 4″ flexible duct adapter, and disappearing through a hole in the floor.  I originally thought the cable came from the duplex outlet on the wall just above the access hole but I discovered that it did not.  It was routed through the chase from somewhere farther back in the bus.  I determined that that the hole in the floor appeared to go into the OTR HVAC bay and sure enough, when I opened the bay there was the cable coming through the ceiling.  It turned towards the center of the bus and then went through the wall into the bay to the front.  It was then easy to determine that it was the power feed for the electric heater mounted on the rear wall of the front bay.

The storage area under the end platform with the 4" flexible ducts and cover boxes removed.

The storage area under the end platform with the 4″ flexible ducts and cover boxes removed.

At that point I knew which circuit breaker to turn off and was able to cut the cable in the living room without risking an electrical shock.  I slipped the 4″ duct adapter off and set it aside.  We don’t generally use the electric heater in the front bay, and certainly do not need it this time of year, so I wire-nutted the ends of the hot and neutral wires, coiled them up, and stowed them in the HVAC chase for the time being.  I coiled the end of the wire coming out of the floor around one of the Aqua-Hot coolant hoses so it would not drop into the bay below.

The area of the bus that was the outside rear corner of the dinette kept drawing my attention.  That corner was decorated with vertical strip mirrors with beveled edges.  There are also strip mirrors used as wainscoting on the lower portion of the outside wall of the hallway and at the end of the hallway opposite the bathroom door.  The strip mirrors are the one thing in this bus we have never liked but they did not bother us enough to not buy the coach.  Now that we are involved in a major interior remodeling, however, we are looking for ways to remove them or cover them up.  We really do not like them.

In the case of the former dinette mirrors, I had previously determined that the ones against the wall of the coach were mounted (glued) onto a sheet of plywood that appeared to be mounted to a pair of cleats along the two vertical edges.  I tried prying under the bottom of the first strip but it cracked and chipped.  It quickly became apparent that removing these strip mirrors from whatever they are glued to was probably not a viable option.

The beveled strip mirrors in the hallway of our bus.  We really do not like these things.

The beveled strip mirrors in the hallway of our bus. We really do not like these things.

[p4 R]  After removing a 1-1/4″ wide piece of thin trim wood I was able to loosen the left (forward) edge at the bottom.  The walnut trim around the fixed window just forward of the mirrors, however, prevented me from pulling it out any farther.  I had a reasonably good idea how the window trim was attached but first I had to remove another piece of 1-1/4″ thin trim that covered the gap between the window trim I needed to remove and the trim for the next window forward.  With Linda’s help I removed eight screws and the 3-sided window trim came right off.  We set it carefully aside and returned to the mirrors.

With the window trim removed we were able to pull the left (forward) edge of the plywood mirror backing out enough to see behind it.  Our lucky “break” (no pun intended but, whoops, there it is) was that the screws holding the plywood to the left cleat pulled out of the cleat.  I say lucky because the screw heads were under the glass mirror strips and none of the mirror strips broke.  We kept working it out until the upper edge bumped into the return air grill trim on the underside of the upper cabinet.  We removed the grill and set it aside.  We were then finally able to pull the left edge out far enough that I could remove a couple of screws that were holding the right cleat to the panel that forms one of the back walks of the pantry.  Something was still holding it and when I changed position I saw that there was another screw near the top.  I removed that screw and the whole panel came out with the right cleat still attached.  Three more screws and the left cleat was also out.  We reattached the return air grill to the underside of the upper cabinet and then reattached the window trim.

The wallpaper behind this panel was in very good shape except for the screw holes where the cleats were attached.  We plan to put shelves in this corner to utilize the space and they may get used for some ham radio equipment.  Regardless of what ends up there having the mirrors out gives us more room for the shelves and will just plain look better.

A view from the kitchen of the dinette corner and hallway.  A custom desk will go where the dinette seating used to be and double as work surface for the kitchen.

A view from the kitchen of the dinette corner and hallway. A custom desk will go where the dinette seating used to be and double as work surface for the kitchen.

The mirrors on the other wall of this corner are glued directly to the walnut panel that forms one of the backs of the pantry.  I tried loosening the bottom edge of the one in the corner and it cracked.  That area will be concealed by the desk, but we will cover all of the mirror strips with some sort of thin panel.  We have the same problem with the mirror strips across from the bathroom door and may just have to live with those as I have not come up with an attractive way to cover them.  I need to investigate the strip mirrors in the hallway.  There is a good chance that they are glued to plywood panels that are screwed to the wall at locations covered buy wood trim.  If we are lucky removing the trim will allow us to unscrew and remove the mirror panels.  If not, we will just put the trim back on.

I have had the idea for a while that we could make another low pantry or shallow storage area along the hallway wall above the HVAC chase where the strip mirrors are currently located.  Linda does not like the idea as she is concerned it will make the hallway to narrow.  The storage would not be any deeper than the HVAC chase is now, and would not be any higher than the wood trim along the top of the strip mirrors, which serve as a kind of wainscoting.

By this point it was 5:30 PM.  Linda headed inside to fix dinner while I got trash and materials out of the coach and carried them to the garage.  Linda let me know that a severe thunderstorm watch had been issued effective until 10 PM.  It rained lightly off and on until we sat down to eat and then the downpour came but we did not have anything severe, just heavy rain for a while.  She made a dish using garbanzo beans, garlic, kale, salt, pepper, and fresh lemon juice.  It was delicious and the fresh lemon juice really made it sparkle.  She also served the last of the risotto she made for dinner when Steve and Karen were here on Saturday.  We had strawberries with Lotus brand Biscoff cookies for dessert.  I worked on this post on my iPad, took a shower, and went to bed.  I never did make it to my office today.

 

2015/05/20 (W) Duraclean

Today was carpet cleaning day.  Linda had been picking up the house for the last week getting ready but we still had a lot of last minute stuff to move, including the cats.  We put them in the library along with their food, water, and litter tray.  We also moved their cat “tree” out there.  They were confused and unhappy about the arrangement but we figured it would be less stressful for them than constantly trying to find new places to hide as Jack moved about the house with his big, noisy carpet cleaning machine.

Jack Hoskins runs a one-man carpet and upholstery cleaning business named Duraclean.  Located in Farmington Hills near our previous house, Jack took care of our cleaning needs for the last years we were there.  When we bought the house in Oceola Township we had him clean all of carpets after the painters were done but before we moved anything into the house.  We did not have him clean the carpets in 2014 but had him out today to do all of them, including my office / ham shack, which was under construction when he was here in 2013.  Jack arrived right on time at 8:30 AM, walked through the job with both of us, and then spent most of the rest of the day cleaning.  Jack works hard and always does a nice job.

Once Jack was squared away we bagged up the pieces of carpet and pad from the bus that would not fit in the trash container and took the container and the bags to the curb.”  (We live on a dirt road and don’t really have curbs, but it doesn’t sound right to say we took the trash to the edge of the street.)  We then unloaded the box from my car with the garden trailer I bought at Lowe’s yesterday, opened it, removed all of the parts, and assembled it.  Linda broke down the cardboard packaging, gathered up some other cardboard and our usual recyclables, and we loaded them into my car to take to Recycle Livingston later.

Keith Kish (Kish Lawn Care) showed up mid-morning to finish cutting our grass.  His Hustler zero-turn riding mower was not repaired yet but he borrowed an articulated stand-behind mower from his son.  Something failed in the hydraulic pump on his Hustler and blew a 1 inch hole in it.  The cost to replace the pump and put the mower back in service will be significant but his business is primarily based on that machine.

I mostly puttered in the bus while Jack worked in the house and Keith worked in the yard.  Linda eventually went to the recycling center and then stopped at Lowe’s to buy some plants, pots, and potting soil.  She is going to try growing some tomatoes, which are one of her favorite summer things, and some herbs.  She moved the hummingbird feeder away from our deck and hung it on a stand in the shade of a tree we can see from our outdoor table.

I boxed up the ceramic tile pieces that were still spread out on the floor of the bus and moved the box to the garage.  That stuff is heavy!  I turned on the chassis batteries so I could move the driver’s seat forward to get access to the seatbelt attachment bolts.  I unbolted the two seatbelt straps and removed them so I could remove the last pieces of the old white carpet from behind and next to the seat.  I then reattached the seatbelts, moved the driver’s chair back, and turned off the chassis batteries.  Refinishing the area around the driver’s seat will be its own special challenge and may not get done with tile as I may need something more flexible.  It will not, however, be heavy carpet intended for use on floors.

My next task was to remove the flexible duct adapters from the HVAC chases.  One of them has an AC electrical cable passing through it, so I will have to undo the cable from a nearby outlet box to get the adapter free.  While I was working on these relatively minor tasks I was also thinking about furniture options.  It finally dawned on me that we did not have buy an expensive custom made sofa-bed or use chairs instead and try to figure out how to finish that area.  I could build a simple but very effective sofa out of wood and have a bottom and back cushion made to the exact dimensions we need using a fabric of our choice.  That opened up the possibility of the fabric matching whatever we get on the chairs.  The seat cushion could double as a bed for one person, with the back cushion removed, and the seat could hinge up to reveal a large storage area rather than dealing with the complexity of a drawer on suspension glides.  The HVAC supply and return could also be easily be accommodated and I would not have to figure out how to finish the chase or conceal all of the wires that run along the floor in front of the chase.  I discussed the idea with Linda and she liked it.

I moved the dinette table up front and we considered its size and placement relative to the seating we would like to use on the passenger side of the coach across from the sofa. We agreed that one of the things we would do while we are at the GLAMARAMA rally is visit Lambright Furniture in Shipshewana and Bradd & Hall in Elkhart.  We also discussed buying a carpet remnant and trimming it to fit in the front part of the bus while we attend the GLAMARAMA rally.

I called Butch to see how his cataract surgery went on Monday.  Apparently it went well, at least his world is suddenly brighter and more colorful.  We talked through various bus projects, including approaches I might take to get a flat, level underlayment for the floor tile.

Keith wrapped up his work, collected his payment, and moved on to Sean’s yard just north of ours.  I suggested that he come every week instead of every other week as long as the grass is growing as quickly as it has the last two weeks and he agreed.  Keith normally does a nice job with our lawn but was now a couple of days behind schedule and trying to catch up using equipment that was not his.  He did not want to drive the stand-behind mower over or near gravel, so some areas along the pull-through driveway did not get cut.  He was also not able to work around obstructions as tightly as he can with his zero-turn mower, and appeared to not overlap some rows.

Jack wrapped up his work not long after Keith and took off for another short job before calling it a day.  I let the cats back into the house and then decided to get out our self-propelled Honda walk-behind mower and trim up the yard in front of the house and some of the areas Keith had missed.  It took a while to get the mower started but I eventually did.

Linda made a nice salad and baked an Amy’s pizza for dinner.  It was 6:30 PM by the time we finished eating.  Linda gathered up the plastic wine glasses and toilet paper holders she bought yesterday at IKEA and we drove to the store in Canton to return them.  The glasses were too tall to fit in our wine glass display case in the bus and the toilet paper holders did not fit in the places we needed them to go in the house.  While we were at the store we looked at their selection of refrigerators, none of which will fit through the entrance door on the bus, and just wandered through looking for ideas.  We were not up that long after we got home, it having been a long but productive day.