Tag Archives: hummus-onion sandwich (WFPB)

2015/11/07 (S) Measure One, Cut Twice 

We were all up at 7 AM.  I got dressed and left at 7:25 AM for the SLAARC breakfast in South Lyon.  Linda and Madeline had toaster waffles and fresh berries for breakfast at home.  The main reason I went to breakfast was to talk with Larry (K8UT) about a plug-in for WordPress that he recently found and though I might want to use for the SLAARC website.  He purchased a five site license for the full version of a survey plug-in and was willing to donate one use to the ham radio club.

When I got home at 9:30 AM the girls were getting ready to leave.  Linda’s plan for the morning was to take Madeline to the Howell Public Library.  The library has a very nice play area for younger children and a good selection of children’s books.  Apparently they planned to be gone for a while because they had a bag packed with snacks and other things for an extended outing.  I changed into my work close and when they left I resumed working on the bus.

My first objective was to cut the final piece of SurePly underlayment for the entry landing and area under the driver’s seat.  It was a large and complex piece that took me a long time to lay out even using the piece that goes under the driver’s seat as a template.  When I finally had it cut and drilled with the holes for the seat mounting bolts I took it to the bus to see how it fit.  Unfortunately I could not get it in.  It had to go under something on the front and back and also had to fit around curves and angles, and it just was not physically possible to get it in place in one piece.  It was immediately obvious that I would have to cut the piece into two parts but not so obvious how best to do that.

Linda and Madeline returned about this time (12:30 PM) and I was ready for a break.  They brought in their “haul” from the library—eight books and five videos—and laid it out on the living room coffee table.  The play market that Madeline likes so much had been replaced by a play kitchen.  The librarian told Linda they rotate the playsets every three months to keep it interesting for the children.

After going to the library Linda drove to the Brighton Mill Pond so Madeline could play at the Playscape.  Linda reported that Madeline has figured out how to pump a swing and is able to keep it going once someone helps her get started.  As a special treat they went to the ice cream shop nearby and Ms. M got a scoop of ice cream.  She did not tell me what flavor, but she said it had sprinkles on it.

It was going on 1 PM and seemed like a good time to have lunch, so Linda made hummus sandwiches with sliced onion for us and hummus on bread for Madeline.  She washed off a big bunch of grapes and we all enjoyed some of those too.  After lunch I read one of the library books to Madeline and then Linda read her a different one.  At that point I excused myself and went back to work on the bus.

I pondered the situation with the piece of underlayment and finally saw what appeared to be a natural cut line.  After considering where the tile would go, however, I decided against it.  Unlike the tile on the main floor of the bus, which is installed on the bias, the grouted joint lines in the cockpit/entry are going to run straight fore-and-aft and side-to-side.  I was not sure, however, exactly where they would fall.  I needed to avoid having a grout line fall on a joint between two pieces of underlayment so I ended up cutting the piece that covers the landing at an angle.  This gave me a smaller piece that tucked under the center console on the dashboard and a larger piece that tucked under some metal trim behind the driver’s seat.  I was now able to get both pieces in but they did not fit properly.

I had used my last large piece of SurePly to make the original single piece, and it had taken me hours to do, so I did not want to remake it.  I made any trips between the bus and the garage/shop, trimming a little bit at a time and rechecking the fit, until I finally got the piece to fit correctly.  In the process the piece had changed enough that the smaller piece was now too small and could not be trimmed to fit.  I searched through my scrap pieces of SurePly and found one that was almost big enough to remake the smaller piece, but not quite.

It was now 3:30 PM, and I still had some good daylight to work by, so I secured the floor patch under the driver’s seat.  The patch consisted of a 1/4″ thick layer of SurePly with a 3/4″ thick layer of oak veneered plywood on top of it to make a 1″ thick piece.  The SurePly was screwed to the 3/4″ plywood from underneath.  With the patch in place I installed another piece of 1/4″ SurePly that covered the patch and extended out over the old surrounding wood, which was still sound, and filled in the area once occupied by a 1/2″ thick piece of plywood.  I used 1″ self-drilling screws to secure the top layer of SurePly to the underlying wood, slightly countersinking the heads and pulling the underlying patch up tight while pulling the SurePly down tight to the old wood.  I walked on it and it felt secure.  There will be one more layer of SurePly and a layer of tile before the seat base gets re-installed.  Bolting down the base will obviously pull everything down tight to the structure of the bus if it isn’t already.

Linda and Madeline spent part of the afternoon baking vegan cupcakes.  Linda usually makes chocolate ones but I requested white/vanilla ones this time.  She found a recipe that looked promising and used it.  They needed frosting to finish the cupcakes so they bundled up and went to Meijer’s.  They got back a little before 4 PM, frosting and sprinkles in hand.

I needed more SurePly to continue working, not that I was eager to; I had spent most of the day trying to make one stupid piece of wood and still wasn’t finished.  The temperature had been dropping all afternoon and it was down to 55 in the garage, which was open so I could go back-and-forth to the bus.  I still had the antique SUN distributor tester in my car and determined that I could not get 4’x8′ sheets of material in the car with the machine in there.  Linda and Madeline put on their shoes and coats and came outside so Linda could help me get the tester out of the car.  I then went to Lowe’s.

I had a nice QSO with David (W8DRD) from our ham radio club on the way to Lowe’s.  At the store I was struggling to get the SurePly off of the top of the stack, which was above my head at the limit of my reach.  A customer stopped and helped me which I appreciated.  I needed one sheet to finish the driver/landing area and get the piece I need for the passenger seat platform floor, but I bought two sheets just in case the various scraps I have are not large enough to do the walls of the passenger seat platform.

I was back home by 5 PM and unloaded the two sheets of SurePly.  I put one on the 2x4s across the sawhorses and the other one in the small bay with the other sheet materials.  Linda and Madeline put their shoes and coats on once again and came outside so Linda could help me load the distributor tester back into my car.  Linda said we would eat dinner around 6 PM so I started working on remaking the small piece for the front portion of the landing.

I used the original piece as a pattern for the edges that fit properly but cut it larger than needed for the edge that needed to match the other piece where I cut it into two parts.  After getting it trimmed to fit correctly on three sides I put the larger piece in place overlapping the smaller one and traced the edge on the smaller piece.  I took it back to the garage and used the clamp-on saw guide to get a clean, straight cut.  When I took it back to the bus and set it in place it fit.  Success at last.

By now it was dark and getting close to dinner time.  I decided to leave the securement of this last layer of SurePly until tomorrow when I was refreshed and had better light.  I had hoped to get this landing/driver floor finished today, as well as the floor for the passenger seat platform, but given the difficulties and frustrations of today I felt like I had ended at a good place.  I locked up the bus and closed the garage door on my way in.  I expect tomorrow to be another good day, but then if I didn’t, why would I bother?

I changed out of my work clothes and put on my sweats.  Dinner was vegan cheeseburgers with a vegetable medley on the side and fresh pineapple.  Dessert was vanilla frosted white cupcakes with sprinkles.  After clearing the table I interacted with Madeline while Linda cleaned up a few dishes.  She and Madeline then prepared the baked French toast, which has to sit overnight.  As promised, once all of the stuff was done we went to the basement and watched one of the Daniel Stripped Tiger videos.  When we had seen enough episodes we turned off the TV set and went upstairs.  Madeline got into her pajamas and went to bed.  I put a load of laundry into the washing machine and then settled in to my usual evening routine.  I pulled the laundry out of the dryer at 9:45 PM and we turned in for the night at 10 PM.

 

2015/11/06 (F) MEF3

Rain was forecast for overnight with the highest probability between 4 and 7 AM.  I think we had some light rain starting a little after midnight but around 6:45 AM a front moved through with intense thunderstorms.  The heavy rain lasted at most 15 minutes, but while it was coming down I could not see past the railing on our deck.  The winds were also very intense judging by the sound and movement of the Crimson King Maple Tree next to the deck.

When we finally got up Linda checked the weather.  The storm front had already pushed into Ontario, Canada and it looked like we were done with the rain.  Temperatures will drop during the day and we have some below freezing lows coming up the next few nights, but it’s November so we can’t claim to be surprised and have no basis to complain.

Linda left around 9:45 AM to go to the supermarket.  While she was gone I worked on my iPad finishing my posts from Wednesday and yesterday.  I made a few phone calls and sent several e-mails before getting to work on the bus.

One call was to SLOAN’s in Linden to see about having the lawn tractor repaired.  The service tech said the normal turnaround this time of year is about two weeks depending what is needed and whether they have the parts on hand.  He said that if I brought it in soon and they did not get it finished before Thanksgiving they would store it for us until spring.  Given the limited space in our garage and the need to get Linda’s car in there for the winter having them store it would be a real bonus but would require the better part of day to borrow Mike’s trailer, haul the lawn tractor up there, and return the trailer to Mike.

The second call was to A-1 Upholstery in Elkhart, Indiana.  Terry said the fabric was sewn for our spacer cushion and she was expecting the foam today or Monday.  Once the foam was stuffed into the fabric she would have to stitch the seam closed.  She figured it should be ready by Wednesday.

My last call was to Pat Lintner from our FMCA Great Lakes Converted Coaches (GLCC) chapter.  He and Vickie live just outside of Elkhart, Indiana and found several pieces for an old Nutone kitchen counter mounted multi-function appliance.  We have a Nutone power base in our bus that works and got a few accessories from Pat and Vickie at the GLCC Surplus and Salvage Rally back in September.  They subsequently found more, and were going to bring them to Florida, but I let them know I would very likely be passing through Elkhart late next week and could pick them up.  Pat offered me the use of the guest room, as he always does, and I may take him up on it this time.  Given the number of places I have to stop it will likely be a very long day.

One of my e-mails was to our cabinet maker, Jarel Beatty, to update him on when I might be coming to Logansport and to see if he could/would get a 60″x60″ sheet of Baltic Birch plywood and cut it into four 30″x 30″ pieces for me.  I then e-mailed Bill Tharpe to let him know I would be in his part of Indiana late next week and would drop off the antique SUN Distributor Tester at his place in Mexico, Indiana.

Bus floor under the driver’s seat.  Black tray to rear (upper left) has been sprayed with rubber undercoating.  Seat mounting rails (center) are visible.  Open area is the bay below the driver’s seat.

Bus floor under the driver’s seat. Black tray to rear (upper left) has been sprayed with rubber undercoating. Seat mounting rails (center) are visible. Open area is the bay below the driver’s seat.

Linda got back around 11 AM and we finally got to work on bus-related projects at 11:15.  The POR-15 and black spray-on rubberized undercoating paint seemed to have dried adequately overnight but the wood I treated with Thompson’s Water Seal was still tacky.  The directions said it took 48 hours to dry but we don’t have that kind of time to wait.

We removed all of the painter’s plastic and painter’s tape from the cockpit of the bus and put it in a trash bag.  I then drilled a 1/4″ drain hole in the bottom of each tray area where water had accumulated.  The one under the passenger seat opened into a dark space but I was fairly certain it was outside the body behind the plastic wheel well trim.  I could see the driveway gravel through the driver side hole so I knew it was outside the body.

The next task was putting spray foam insulation in a few critical spots.  We did not need much for the bus so I sealed two holes in the floor of the bedroom in our house (under a couple of the baseboard radiators) and then added some around the back door frame of the garage.  Once I start using a can of this spray foam insulation I find it best to use it up.

Cutting and fitting the new plywood to patch the area under the driver’s seat in the bus.

Cutting and fitting the new plywood to patch the area under the driver’s seat in the bus.

Patching the floor under the passenger seat involved three pieces of wood.  The tray area under the plywood floor between the seat mounting channels is slightly raised along the inside edges of the channels.  I had cut a piece of 3/16″ SurePly to fit between the raised edges and slide under the existing floor towards the center of the bus.  I set it in place and slid it under the old floor while Linda and I help it up slightly with pry bars.  Because of the geometry of the situation I had to cut about six inches off of the end of this piece towards the outside of the bus.  I had notched this piece to fit around the drain line for the front AC evaporator, so it slipped in behind the first piece just right.  The third part of the patch was a piece of recycled 3/4″ plywood that I had cut yesterday to just fit between the mounting channels.  With that in place I screwed through the old wood into SurePly and screwed through the 3/4″ plywood into the SurePly and pulled it up tight.

By this time it was 1:15 PM and I was ready for lunch.  Linda made hummus and onion sandwiches and served them with tangerine halves.  A simple but delicious mid-day meal.

After lunch we worked on the driver side floor patch.  The driver side was trickier because the patch has to rest on and span structural members.  As with the passenger side I am trying to replace 1″ thick plywood without having access to material of that thickness.  The plywood sold as 3/4″ actually measures from 0.707″ to 0.717 inches in thickness.  As it turned out the combination of so-called 3/4″ plywood with the SurePly underlayment plywood was just thick enough to match the old 1″ stuff.

Yet another layer of plywood to fill in and even up the floor under the driver’s seat in the bus.

Yet another layer of plywood to fill in and even up the floor under the driver’s seat in the bus.

I had to trim the piece of SurePly several times and drill holes for the seat mounting bolts.  The holes were not quite in the right place but I was able to trim it to my satisfaction and it was generally a good fit.  We then used it as a template for laying out the same shape on a piece of 3/4″ oak veneered plywood.

Hardwood veneered plywood is more expensive than regular fir plywood but it has more layers and is dimensionally more stable.  I had a piece that was flat and big enough to cut out the part we needed so I used it.  After some minor trimming it fit properly and lined up with the SurePly layer.  I turned them upside down, aligned them carefully, and screwed the SurePly to the underside of the 3/4″ piece.  I then installed them back into the open area.

We now needed another piece of SurePly, but it needed to be larger and a different shape.  It would be one of two pieces that would replace the 1/2″ thick top layer of plywood.  I removed the old piece from the bus after feeding two wires back through a hole.  We used the old piece as a template to outline the new piece and mark the four holes for the mounting bolts and the one for the wires.  I cut out the new piece and drilled the holes and then put it in place.  I was surprised by how much it was off.  It needed to be wider and longer and the holes were not as well aligned with the holes in the plywood below it as they needed to be.

All of the patch pieces in place in the driver’s compartment.  The four holes are for the mounting bolts for the seat pedestal base.

All of the patch pieces in place in the driver’s compartment. The four holes are for the mounting bolts for the seat pedestal base.

SurePly is not expensive but it’s not free either.  It is relatively easy to work with, however, so making a second piece was not a big deal.  What was a big deal was the cloud cover, dropping temperature, wind, and diminishing light, all of which were making outside work more difficult and less enjoyable with each passing minute.  But we took our time and got it cut, and after some minor trimming it fit very nicely.  I did not, however, secure it, or the 1″ plywood sandwich under it, as I needed the top piece to use as a template for the final piece.  This last piece will not only cover the area under the driver’s seat, it will extend out towards the door and cover the landing.  Once I have that cut correctly I will secure the bottom sandwich and then use floor leveling compound to fill in gaps.  I will then install the last two layers of SurePly.  At that point I will need to go to Lowe’s for another sheet of SurePly to finish the passenger seat platform and will probably get two sheets just to make sure I have enough.  As much as I like going to Lowe’s and The Home Depot, each trip takes time away from actually working on the bus.

We quit working at 4:30 PM to get the tools put away before Brendan and Madeline arrived.  They got here at 5:15 PM and she was very excited to see us and be at our house.  Linda and Brendan got all of Ms. M’s stuff from the car to the house and Brendan transferred the car seat to Linda’s car.  Brendan entertained Madeline while Linda got the inflatable toddler bed set up.  Madeline went immediately for the cabinet under the sink in the hall bathroom where we keep the bandages and found one to put on.  She likes cartoon character bandages.

Brendan hung around until 6 PM and left just as Linda put dinner on the table.  He and Shawna are headed to Ajo, Arizona this weekend for a wedding.  Their flight to Phoenix leaves tomorrow morning so Madeline will be with us until Monday afternoon when Linda takes her back to her house in Ann Arbor.  Her parents’ flight is due in at 7 PM so Linda won’t be home before 9 PM that evening.

For dinner Linda made roasted potatoes and mock chicken tenders.  She and Ms. M had broccoli and peas but she was kind enough to only serve me broccoli.  I don’t think I will ever develop a taste for green peas.

By the time we finished dinner Madeline was a little tired and had a brief crying episode when I told her she could not use our bed as a trampoline.  Linda offered to let her watch an episode of Daniel Stripped Tiger and that seemed to ease her distress at having been told ‘no’ which is a very traumatic experience for her at this age.  She wanted to put on her pajamas and brush her teeth first, so Linda helped her with that.  The two of them climbed into our bed and watched the video on Shawna’s iPad while I stayed in the living room and wrote this blog post.

When the video was over Madeline wished me ‘good night’ and went quietly off to bed.  Linda and I lingered in the living room and I texted Chuck to inquire about their travels yesterday and today.  I then went to my office for a while where I updated our WordPress site, off-loaded photos from today’s work, logged in to RVillage and checked the forums of various groups, and dealt with a few e-mails.  I came back upstairs at 9:45 PM and we were in bed by 10 PM where I finished the draft of this post.