2015/09/04 (F) 100 Pounds

We set our alarm for 6 AM, got up, had granola for breakfast, and then went to The Home Depot to rent a 100 pound floor roller.  The roller consists of three steel rollers, each about 4″ wide and 6″ in diameter, on a common axle.  A three foot long handle attaches to the axle between the middle and outside rollers.  A pair of small wheels attach to the crossbar at the base of the handle for transport and can be swung up out of the way or removed.  We rolled the roller out to our car and loaded it into the back.  We then went back inside and purchased up a hard edge grout float, a small offset float, sponges, a bucket, and a bottle of Armstrong Once and Done floor cleaning concentrate.

Bruce rolls the floor tiles in the kitchen with the 100 lb. roller.

Bruce rolls the floor tiles in the kitchen with the 100 lb. roller.

Once we got home we got right to work on the bus.  We had a few pieces of vinyl tile that still needed to be cut and installed at the front of the bus and that took us over an hour.  Once that was done it was time to glue the tiles down.  I got the Armstrong S-288 adhesive and the trowel.  We read the directions on the adhesive bucket and finally figured out that I should probably not spread more adhesive than could apply in about 20 minutes as the product is time sensitive.  The adhesive would then have to set until it was tacky but did not transfer to my finger when touched, which would be 10 to 30 minutes, but we would need to have the tiles set within an hour of when I started spreading the adhesive.  The tiles then needed to be rolled with the 100 pound roller.

We started in the center of the coach and installed the tiles as follows:  1) Remove selected tiles; 2) Spread adhesive; 3) Clean up tools while adhesive cured; 4) Lay tiles carefully back in place; and 5) Roll the freshly set tiles.  It sounds easy and straightforward enough, but each step had its own issues.

For Step 1) we had to agree on how to remove and stack the tiles so they were in the correct order for installation and to remove them so as not to disturb the surrounding tiles.  At Step 2) I had to be careful not get adhesive on anything except the area of the floor I was working on.  I also had to make sure the working area was completely covered but also completely troweled off correctly.  In Step 3) the tools needed to be cleaned before the adhesive set so we could use warm soapy water to clean them.  Once set, the adhesive would have to be cleaned off with mineral spirits.  Step 4) was the most critical.  The tiles get installed once the adhesive has set to the touch, i.e. still pliable but no transfer when touched.  The adhesive effectively acts like a contact cement–it is not possible to slide a tile once it is down–so getting each tile correctly positioned on the first try was critical.  Step 5) was the easiest, once we got the 100 pound floor roller out of the car and into the bus.  The tiles needed to be rolled as soon as they were installed, which was easy except for the limited confines of the bus interior.

We ended up doing this six times in the following order:

  1. Kitchen;
  2. Built-in sofa portion of the living room;
  3. Front passenger side of living room’
  4. Hallway;
  5. Foot and front side of bed;
  6. Rear side of bed; and
  7. Bathroom.

This corresponded roughly to the order in which we had done the dry fit and it was critical that the central tiles get installed in exactly the right locations.  We used plastic spacers at all tile intersections and between tile edges where needed.  (The spacers were 2-sided.  One side was an X for use where four tile corners meet.  The other side had three tabs in line for use between the edges of two adjacent tiles.)  These spacers were removed when we pulled the tiles out and replaced when we installed them.  We also divided the job up to keep the number of tiles being set to a small enough number that we could meet the time requirements of the adhesive and to make sure we did not get trapped in the back of the coach.  We finally installed the last piece (for now) at 9 PM.  We had short breaks for lunch and dinner but each cycle of this process took about 90 minutes.

Bruce spreads Armstrong vinyl floor adhesive in the hallway.

Bruce spreads Armstrong vinyl floor adhesive in the hallway.

My knees were sore by the time we quit.  They have never done well with kneeling due to the boney lumps that resulted from Osgood-Slaughter’s disease in my late pre-teens.  Occasionally kneeling down on one of the spacers, which had pointy centers on one side, did not help.  I probably got down and up at least 100 times throughout the day, maybe more, which was hard enough all by itself.  Although I am in better health and physical shape than I was in my 30’s and 40’s at 63 I am certainly not in the prime of my youth.  At one time Linda and I had a hundred pounds or more to lose between us.  Time, use, and the abuse of being overweight have inevitably taken their toll on our joints.  At the end of the day I was left thinking that flooring work is a young person’s game.  Whether hardwood, carpet, tile, or even continuous sheet vinyl, much of the work is done on your hands and knees, or bent over, and it is tough work.

I took a long, hot shower and then Linda took her shower while I checked e-mail.  We had some Coconut Bliss ice cream with fresh strawberries and then turned in.  We watched an episode of Joseph Rosendo’s Travelscope, set the alarm for 7 AM, and went to sleep.

 

2015/09/03 (R) Floored

I turned the lights out at 11:30 PM last night so I was starting to wake up at 6:30 AM this morning and finally got up at 7 AM.  We have had light to moderate fog the last few mornings which always coincides with very still air.  It is a calm, quiet time to gaze out over our own personal “misty moors” and appreciate where we are and the lifetime of work that got us here.

Linda was still sound asleep so I closed the bedroom door to shield her from the noise of the coffee grinder.  That was probably unnecessary as she was sleeping with her good ear down, but I did want to wake her prematurely.  I ground up 8 scoops of the Cafe Europe (reg) / Columbian (decaf) blend which yielded nine scoops of grounds.  I have figured out over time that to make 9 cups of coffee takes about 10 cups of water as that quantity of grounds absorbs and holds almost a cup.  (These are 6 ounce coffee “cups,” of course, not real 8 ounce cups.)  More importantly the strength of the coffee seems to come out right.

Once the coffee was brewing I washed out the grinder reservoir and wiped out the grinder.  It seems to hold coffee grounds as if they were magnetic and being relatively fine particles they get into all of the small nooks and crannies.  Why a coffee grinder has small nooks and crannies is one of those product design questions that suggest the designer(s) never actually used their product for its intended purpose.

My main reason for getting up early was that it was no longer comfortable to stay in bed.  My lower right back has been sore for over a week now and is worse when lying down than when working, much of which has been on my hands and knees.  My secondary reason for arising early was that I wanted to get an earlier start working on the bus today.  We need to finish the dry layout of the vinyl tile floor today so I can apply the adhesive tomorrow, with Linda’s help, before we have Madeline for the weekend starting Saturday sometime.

I assumed my usual position on one of the living room sofas with our male cat, Jasper, at my right side, and quietly enjoyed my coffee while doing some online research and starting this blog post.  Speaking of which, I am now (once again) over six weeks behind in uploading posts to our blog.  By the time we are done working in the evening and have had dinner I need what little time and energy I have left to write the draft post for that day.  Uploading them is a whole different process that also takes time and thought.  I am determined, however, to be caught up before we leave for the winter and to post daily while we are away.  Being behind is not fun for me, and posts that are 4 – 8 weeks old are probably not interesting to anyone who might read the blog.

I need a very specific trowel, an Armstrong S-891, to apply the Armstrong S-288 vinyl tile adhesive.  As I mentioned in yesterday’s post, The Home Depot and Lowe’s do not sell this trowel or one even remotely similar.  Lowe’s did, however, have a plastic spreader that has the correct notch size and spacing.  Someone in the floor department at one of the stores suggested we try Blakely’s Supply in Wixom so I plan to call them this morning.  Don at Lynch Carpet in Howell, where we got the tile and adhesive, mentioned another place so I may have to call them back and get the name of the business.

We’ve had the tile since early July so we could have taken care of this a long time ago but didn’t.  As much as I tried to “work ahead” with respect to the design of the project, procurement of materials, and contracting with the cabinet maker we did not attend to everything in a timely manner.  Exhibit #1 is the wallpaper, which had a 2-week lead time, and exhibit #2 is this trowel.  Overall we have done well keeping things moving along and in retrospect this will look like a well-planned and smoothly executed project, but right now I need something that I don’t have.  🙁

I called Blakely’s at 8:30 AM.  They do not carry Armstrong products but they did have a trowel that matched the specifications of the S-891.  They had one in stock so I asked them to hold for me.  With the Labor Day weekend almost upon us we decided to drive to Wixom and buy the trowel before busying ourselves in the bus.

The round trip would have taken an hour but we went to The Home Depot in Howell before returning to the house and bus.  This particular Home Depot has a tool rental operation and we wanted to see if they had a 100 pound floor roller.  They did.  In fact, they had two of them; $22/day (24 hours).  If I call before they close tonight they will hold one for me to pick up in the morning between 6 – 8 AM.

By the time we got home we were finally a little bit hungry and had our usual breakfast of homemade granola with fresh blueberries and banana.  Thunderstorms were forecast for today so we brought the saber saw into the bus so we would not have to walk outside to the garage to use it.

We resumed working in the bathroom and got all of the tiles for that space measured, cut, and fitted into place.  We then continued from the hallway into the bedroom and up the front side of the bed towards the driver’s side of the coach.  It seems that our pace has slowed yesterday and today but that’s not really the case.  What has happened is that all of the pieces have to be cut, some of them along four or five lines that cannot all be scored and snapped, and we are working in a much more confined space that makes it difficult to make accurate measurements.

By 3:30 PM we were part way down the foot of the bed and decided to take a lunch break.  Linda made sandwiches on toasted rye bread with vegan deli slices, onion, tomato, and lots of power greens.  She chatted briefly with our son about arrangements for this weekend and then we got back to work at 4:30 PM.

The rain that had been forecasted for most of the day finally arrived but did not affect our work as we had everything inside that we needed.  We worked until 7 PM and finished the floor tiles in the bedroom.  That left five or six pieces to be cut at the front where the main floor and cockpit meet.  My sister called and I said I would call her back when we were done.  We figured it would take at least an hour to finish these pieces.  We were tired and hungry and decided to defer this work until first thing tomorrow morning.  We shut off the air-conditioners, turned off the lights, and locked the bus.

While Linda prepared dinner I cleaned the cat’s litter tray, checked my e-mail, and replied to one from BCM.  Dinner was fresh steamed broccoli, whole grain bread, and mock chicken with orange sauce.  Another Gardein product, the “chicken” was very tasty.

I called my sister back after dinner and we had a long chat which wrapped up just before 10 PM.  Linda and I went to bed and settled in.  I was finishing up this post around 11 PM when it started raining.  From the sound it was quite a downpour but it did not last even 15 minutes.

 

2015/06/18 (R) Chiseled Bikinis

The light rain that started late yesterday afternoon continued off-and-on through the overnight hours.  We awoke to heavily overcast skies but a forecast that called for dry conditions until the early afternoon.  We were up at 7:15 AM and had our usual granola breakfast.  I took some more Ibuprofen in advance of working in the bus.  We were just getting ready to have our morning coffee when I noticed several cars in the driveway.  It was 7:45 AM and the roofers were arriving.  Pat Davidson was among them so I went outside to chat briefly with him.

We had our morning coffee and then got to work, Linda at her desk and me in the bus. I spent another two hours using the Makita 11 pound power chisel.  By 11 AM I had removed as much material from the floor as I felt was worth the effort.  Linda brought the camera out and took a few photographs of me at work after which I packed up the equipment, closed up the bus, and went to Home Depot in Howell to return it to their rental department.

I stopped at Lowe’s on the way home and ordered the new Frigidaire refrigerator for the bus, an FFHT1621QB (16.3 cu. ft., top freezer, black, no ice maker or water).  I scheduled delivery for Friday July 3rd to Chuck’s shop in Novi.  I will arrange with Chuck to take the bus their sometime after that when he is available to operate his fork lift and I can get Brendan or some friends to give us a hand.

Me using the Makita 11 lb power chisel to remove thinset and mastic from the floor of our H3-40.  (Photo by Linda)

Me using the Makita 11 lb power chisel to remove thinset and mastic from the floor of our H3-40. (Photo by Linda)

Work continued on the roof through the morning and then the crew tarped off the roof and left in a few of their vehicles for a long lunch.  As forecast it started to sprinkle around 2 PM as they returned from their lunch break.  It never rained hard and they kept on working but always with the tarps at the ready in case they were suddenly needed.  One of the guys finished installing our two Velux Sun Tunnel skylights which required a tall step ladder in our living room.  They looked very nice when he was done.

I had a chat with Jarel Beatty in Logansport, Indiana about the custom desk he is going to build for the bus.  I sent him a follow-up e-mail describing the pullout pantry we also need him to build.  I then spent an hour working on drawings before I had to quit and change clothes.

Kate had secured tickets through her cousin, Michaela, for this evening’s performance of The Bikinis at the Meadow Brooke Theatre at Oakland University in Rochester Hills.  Kate suggested O’Conner’s Public House (Irish Pub) in Rochester for dinner.  The roofers had been working in the living room installing the Velux Sun Tunnel skylights but were done by 3:45 PM.  That allowed us to get cleaned up, dressed for the theatre, and out the door at 4:30 PM even though the roofers were still working up on the roof.

We got to the pub at 6 PM.  Kate got there shortly before us and had ordered a soft pretzel appetizer before the happy hour prices expired at 6 PM.  Conveniently there were three large sticks so we each got one.  Kate got the cheesy dipping sauce and we split the spicy horseradish mustard, which really had a kick to it.  Linda and Kate each had a Smithwicks ale and I had a pineapple ale.  To paraphrase “the world’s most interesting man”:  I don’t always drink beer, but when I do, I prefer a fruit beer.  Not as mysterious as Dos Equis, or as authentic as Guinness, but it’s what I like.  Kate had a regular (beef) burger and we both had black bean burgers on soft pretzel buns with fresh hand-cut French fries.  The burgers and fries were both really good and the pretzel buns, which had been toasted on a grill, did not get soggy.

The musical was a lot of fun with a wonderful performance by the cast of four women.  All four of them were on stage singing and dancing with a lot of energy for most of the performance.  Their singing was excellent, each voice having its own unique quality but blending well, and they carried 4-part harmonies in tune with one another and the small 4-pieces band.  Two of them, Bambi Jones and Jeanne Tinker, were also in the Meshuggah Nuns musical we saw a month or so ago at the Meadow Brooke Theatre.

The Bikinis is the last production that Kate’s cousin Michaela will work on at the MBT.  The production run ends on Sunday and one week later she leaves for a summer stock gig in New England.  Meadow Brooke Theatre is a wonderful venue but not convenient to where we live, even less convenient to where Kate works, and very inconvenient to where she lives.  All of which is to say, I doubt that the three of us will be going there very often now that Michaela is moving on.  That is too bad in a way as we have all enjoyed the shows we have seen.  The fact that Michaela, as a cast/crew member, was able to get us tickets did not hurt.

Michaela met us in the lobby where Kate gave her a nice assortment of flowers.  She then gave us a behind the scenes tour of the wardrobe area where she has spent the past year working on costuming.  We walked out to our cars and by the time we all drove off it was 11 PM.  Even with light traffic it took us almost an hour to get home but we arrived while it was still Thursday, albeit just barely.

 

2015/06/17 (W) Bakery Scraper

Linda was up at 5:45 AM and out the door by 6:15 AM to beat the morning rush hour traffic headed into the northwest corner of the Detroit metroplex.  I got up about an hour later, tended to my morning cat chores, made coffee, had some granola for breakfast, gathered up the trash, and took the big trash can to the street.

The Apex roofing crew started showing up just before 8 AM.  After everything was squared away with Apex I went to The Home Depot in Howell to rent the small power floor scraper.  The scraper took some of the thinset off but was not as effective as I had hoped it would be.  The tool is designed for stripping linoleum floors, so I had no reason to complain that it did not do what I needed it to do.  I returned it within four hours and paid the 4-hour rental fee rather than the day (24-hour) fee.  The guy in the tool rental department suggested I try a different machine which they had not mentioned to me previously.  It was a Makita 11 pound power chisel.  I rented it with three chisels.

The roofers were at the point where they needed to install the two Velux Sun Tunnel skylights in the roof of the living room.  I showed them where I wanted them installed, if possible, and they tarped off the furniture and floor in the living room.  Apex is very good about protecting the yard from damage and capturing the mess that is associated with a roof project.  That same care and attention carried over to the inside work, which I appreciated.

Our bus looking forward from the the hallway by the refrigerator and pantry.

Our bus looking forward from the the hallway by the refrigerator and pantry.

After a break for lunch I spent most of the afternoon using the power chisel to strip the area of the floor in the bus where the ceramic tile was installed.  I was not able to strip it down to the plywood subfloor, but I was able to knock down most of the ridges of thinset and adhesive that remained after I chiseled out the tiles.

I had a brief chat with Chuck around lunchtime regarding the refrigerator.  Butch called mid-afternoon to fill me in on why he was not able to answer the phone last night.  Linda called around 2:30 PM to let me know she was leaving the bakery.  She pulled in the driveway an hour later and came in the bus to see what I was up to and let me know it was starting to rain.  I had made good progress but was not done and decided I would keep the power chisel until tomorrow and pay the 1-day (24-hour) rate.

The roofers were aware of the rain, which was very light though increasing steadily, but were in the middle of replacing plywood and installing the skylights.  Some of them finished that up as quickly as they could, cleaned up the roof, and spread out the tarps while the others picked up the debris from the yard and got it in the trash trailer.  The trailer was full so they took it with them when the left at 4:40 PM.

We had a snack of pretzels, green grapes and a small glass of Moscato wine.  My thumbs were both bothering me (arthritis) so I took some Ibuprofen and then went back to work in the bus.  I had to close the roof vents because of the rain so it was warmer inside and a bit stuffy as the humidity had come way up.  I worked as long as I could and quit for the day at 6 PM.

For dinner Linda made a simple green salad and then cooked some whole wheat capellini and tossed it with the homemade tomato-based Marinara sauce she made the other day.  After dinner I worked in my office for a while.  I thought I would upload some blog posts but I had an e-mail from Bus Conversion Magazine with the draft of the May 2015 issue.  I proofread part 2 of my 4-part article on the Exterior Makeover of our bus by Phoenix Paint.  I found one thing that needed to be corrected and e-mailed it to the editor.

Linda got a DVD of Wild from the Howell Library the other day but we were too tired to watch it and just went to bed.  I turned my light out at 9:58 PM, the first time since I can’t remember when that I have done that before 10 o’clock in the evening.

 

2015/06/10 (W) Ron and Mary

Same routine as yesterday; up at 7 AM, open up the house, feed the cats, clean the litter tray, start a load of laundry, make the coffee, and drink the coffee while using our iPads.

Our daughter’s 34th birthday is tomorrow but she is flying to Las Vegas today to meet up with her husband who is there on a company outing.  We will celebrate her birthday when they get back, perhaps in conjunction with Father’s Day and Linda’s birthday, which is at the end of the month.

Linda left at 9 AM for Brighton Honda to have the 12 V battery in her car checked.  The battery light came on the other day so we thought it might need to be replaced.  Around 9:20 AM I heard thunder and a short time later we had a brief, heavy downpour.  Linda called at the same time and said the battery tested OK.  The problem could be the alternator, of course, but presumably the dealer service people know that and checked for that.  If not, we will likely be back there sooner rather than later.

Linda headed on to Meijer’s to do the grocery shopping.  Today was trash pickup day so I took the trash can to the street.  After meeting with Brad from Chuck It Junk Removal the other day we decided we would rent their trailer for 5 days.  For the same price as having them physically handle 1/3 of a truck of junk (5 cu. yd.) we can get rid of a full truck of junk (15 cu. yd.) by loading it ourselves.  Deal.

I got a call from Phil Jarrell regarding my request for pricing to dig a foundation hole for a ham radio tower foundation.  It was a useful conversation in that I had not previously realized that I will need a concrete contractor in addition to the concrete supplier.  The only thing the concrete supplier will do is show up with a cement mixer truck and dump the concrete where they are instructed to.  The concrete contractor will actually place rebar, build forms, provide carts or a pumper, and get the concrete from the truck to the hole.  Phil recommended Mike Fearer of Bid-Rite Concrete as a good guy who would work with me to get this done.

I talked with Chuck about getting a key to his shop so we could have the new refrigerator delivered there and have the old one picked up without having to trouble him to be there.  He agreed and suggested that we contact the guy down the street about removing the old windshield and installing the new one as part of the refrigerator swap.

Rather than dig into our bus interior remodeling project I have used the last couple of days to finalize decisions about various products and order them.  One of the things I have wanted/needed for a while is a cable entrance box that will allow me to route transmission lines and control cables into the basement from outside.  I talked to Chris Perri, KF7P, at the Dayton Hamvention last month and decided that I liked his custom fabricated cable entry boxes.  I got his business card at the Hamvention and exchanged a couple of e-mails with him this week.  I decided this morning how I want the box initially configured and e-mailed my specs to Chris.  I would like to run the cabling for the cell phone booster through this box so I needed to get it on order.  Speaking of which, the cell phone booster system arrived today via UPS so I am feeling more comfortable that all of the stuff I am ordering will actually get delivered to our house.

Wednesday’s and Fridays are when Recycle Livingston is open and the Wednesday hours are 11 AM to 5:30 PM.  We had my car loaded up with recyclables and Linda drove over after lunch to drop them off.  When she got back she made a batch of her yummy granola and I got a couple more loads of laundry done while continuing to work at my computer.

After doing my alternate tile layout for the bus floor yesterday I decided that I liked the way it looked better than the original ad that it would not involve any more cutting than the row/column layout.  I also felt confident that I had an accurate enough tile count to go ahead and order the tiles.  I drove to the Shell station to fill my tank and then drove to Lynch Carpet in Howell.  I ordered 12 boxes of the 16″ x 16″ Armstrong Alterna Luxury Vinyl Tile in the La Plata Creme Fresh pattern, and a gallon each of the vinyl adhesive and Glacier vinyl grout.  There are 14 tiles per box (24.89 sq. ft.) for a total of 168 tiles (just under 300 sq. ft.).  The inside floor area of the bus is around 300 sq. ft. before subtracting out walls and cabinets but we will be using some of the tiles on vertical surfaces in the entry stairwell and cockpit and around the box that supports the bed platform.  My estimate is that I will have 10 extra tiles.  The guy at Lynch Carpet suggested that I use a scrap piece of tile as a spacer when installing the tiles but I may use the little plastic “X” pieces designed for this purpose.

From Lynch Carpet I drove to Lowe’s in Howell to see if they had a different portable air compressor that might be more appropriate than the 6 gallon Porter Cable we just bought.  The Porter-Cable air compressor has a maximum regulated pressure of 150 PSI but that is also the maximum tank pressure.  I will have to test it on one of the front bus tires to determine if it will get the job done and if not I will return it.

The guy at Lynch Carpet also suggested that I rent a handheld grinder from Abe’s or A-1 Rental, both in Howell.  Abe’s did not have any grinders of any kind and A-1 was closed on Wednesdays.  The gal at Abe’s suggested the tool rental service at the Howell Home Depot, so I stopped there.  They also did not have a handheld grinder but they did have a floor model concrete grinder.  It was so heavy that I doubt if we could have gotten it into the bus and it was too big to maneuver in the tight spaces where I need to work.  They did have a lighter/smaller floor stripper and I may give that a try before I resort to grinding off the thinset with an angle grinder and diamond impregnated wheel and/or a belt sander with a very aggressive belt.

Pat Davidson called from Apex Roofing while I was out so I called him back.  They will be able to start on our roof next week Monday or Tuesday and will deliver the shingles on Friday this week.  I confirmed that we wanted two of the 14″ light tunnels for the living room.  I also indicated that I had scrapped the idea of building a dormer or installing a roof hatch as I simply did not get this taken care of in time.

Linda had closed up the house and turned on the air-conditioning while I was out.  It was pulling moisture out of the air but would not bring the air temperature lower than 78 degrees.  Not good.  This will be our third summer in this house and we have not used the air-conditioning very much.  The first summer we were gone for most of June, all of July, and a few days in August.  We had the unit serviced last year and thought it was working OK but perhaps did not really use it after that.  We did install filters in the return air grills so perhaps they are restricting the airflow too much.  It is also possible that it needs refrigerant.  I will have to check our records from last year and then call TOMTEK to arrange to have it serviced again.

Linda’s brother, Ron, and his wife, Mary, arrived early this evening.  They are on their way to northwest Illinois for a week-long organized bicycle ride.  They have to be there on Saturday and will be spending the next three nights at our house.  Visits from them are usually not more than once a year but we really enjoy their company when they are here.

For dinner Linda made a nice green salad and then made whole wheat angel hair pasta with onions, garlic, and mushrooms lightly sautéed in olive oil.  Ron does not imbibe but Linda, Mary, and I had a glass (or two) of Moscato.  We moved to the deck after dinner and had fresh strawberries for dessert.  It cooled off as darkness set in and we eventually moved back inside.  The other three were in the kitchen and I was sitting on the sofa when Juniper suddenly caught a mouse in the middle of the living room, or at least that is where I noticed that she had it.  She took it downstairs and I got her to drop it in the bathroom sink but I was unable to get it into a container to take it outside and it escaped into my office.  I closed the doors but I have no doubt it can go wherever it wants in the house from there.  When I returned upstairs we chatted until 11 PM and then all turned in for the evening.