Tag Archives: hazelnut coffee (Panera)

2015/09/05 (S) Building the Built-in

We set the alarm for 7 AM as we had to return the 100 pound floor roller to The Home Depot by 8:08 AM.  We got the roller out of the bus, reattached the transport wheels, and loaded it into the back of my car.  We positioned it so that Linda could hold on to the handle while I drove.  One-hundred pounds that is designed to roll is not something you want loose in your car.  We got to the store at 7:40 AM but the associate was busy renting a ditch digging machine to someone.  We had to wait 15 minutes but that was OK.  After returning the roller we drove back to the house so Linda could get her car and our iPads and then drove separately to Panera in Brighton.

Linda had her usual Everything bagel and I had my usual Cinnamon Swirl & Raisin bagel, both sliced and toasted with nothing on them.  Two large coffees rounded out the order.  The coffee was hot and did not have grounds in it (for a change).  For some reason we got an extra Everything bagel that we did not order so which we split it.

Linda left at 9 AM to drive to Ann Arbor to pick up grand-daughter Madeline who will be with us until sometime on Monday.  Her mom and dad are attending a wedding on Sunday in Madison, Wisconsin so they are driving over today and driving back on Monday.  I stayed at Panera getting my money’s worth of coffee while finishing yesterday’s blog post and starting on today’s missive.

I left Panera at 9:45 and stopped for gasoline at the Shell station on the way home.  $2.29/gallon.  I would love to see $2/gallon gasoline again.  Better yet, I would love to see $2/gallon diesel fuel.  Linda planned to stop at the grocery store on the way back but I wanted to start a load of laundry and be home when Linda got back to the house with Madeline.

I got the laundry sorted and the first load started and then spent a little time at my desk.  I had to reset a password for someone on the SLAARC website and I logged in I was reminded that WordPress 4.3 was now available.  There were seven other updates available as well; three plug-ins and four themes.  I don’t use any of those themes and should probably delete them, but for now I just updated WP and then updated everything else.  I then logged in to our personal website, the FMCA-GLCC website, and the FMCA Freethinkers website and did the same updates.

While I was in our personal website I cleared out the 104 spam comments that had accumulated since my last house cleaning.  In the Freethinkers website I activated all of the plug-ins except Wordfence.  I have problems with this website and tech support at iPower says it is the Wordfence plug-in that is at fault.  They ask for permission to deactivate it and I give them permission but ask that they only disable that one plug-in.  Instead they disable ALL of them; every time.  I would really like to move this website to QTH.com and I may just do that as an add-on domain to our account.  Unfortunately our e-mail reflectors are set up on through the iPower account and I doubt that the club will want to pay for two different web hosting services.

It was a nicer day than we have had for most of the week, cooler with clearer skies and a nice breeze, so I opened up the windows in the motorcoach and turned on all three ceiling exhaust fans to air out the interior and get rid of the lingering smell from the floor tile adhesive.  (Yes, that is one, long sentence, but since I have added this one, it is now a proper paragraph rather than a single sentence paragraph.)

Linda and Madeline stopped at the Whole Foods Market in Ann Arbor, which is not far from our son and daughter-in-law’s house, and got to our house at 11 AM.  Madeline and I helped Grandma Linda unload the groceries and put them away.  I moved a few things from the front hallway into the library where Linda put most of the bus drawers last night (three of them are in our bedroom).  Madeline wanted her inflatable porta-bed set up so Linda took care of that.  Once her bedroom was arranged we got out her toy box and started playing with things.  She also had a couple of bags of things she brought with her and got a small soccer ball out of one of them.  We had a great time throwing and rolling it around the living room.  It is always wonderful to see the pure joy of a young child at play doing something as simple as this.

By 12:30 PM Madeline was ready for lunch so Linda made a PB&J sandwich and washed some green grapes.  She washed some black organic grapes for us and I had a few pretzels dipped I Sabra Roasted Red Pepper Hummus.  It’s my favorite hummus from them, or pretty much anyone else.

After Madeline laid down for her afternoon nap at 1 PM Linda and I both got busy with chores.  As much as I would like to have taken today off, at least from hands and knees work, we only had eight days left to get some significant tasks accomplished on the bus.  In terms of a critical path view of the overall project the critical task is grouting the floor tile that we finished installing at 9 PM last night.  Not only will it take some time to do but once it is done it cannot be walked on for 24 hours.  As much as it needed to be done, however, I needed a day of not being on my hands and knees.  If I get it done on Sunday I can resume work inside the coach on Monday.

While Linda made a batch of granola I worked on assembling some of the pieces for the built-in sofa.  My plan was to fully assemble the two plenum boxes that will support the ends of the plywood seat, and I intended to do that by gluing and screwing the four pieces together for each.  In order to do that I needed screws of the appropriate type (#6 SR) and length (1-1/4″) so I went to Lowe’s to get them.  While I was there I looked at continuous hinges and angle brackets but did not buy any.  I need a 72″ hinge but all they had were 48″, 30″, and 12″.  I may be able to use two 30″ and one 12″ but I need to check the actual dimension.  I also needed a #6 drill but with an integral countersink but Lowe’s did not seem to have what I needed so I went to The Home Depot and found something there.

I think this marking scribe belonged to my mother’s father.

I think this marking scribe belonged to my mother’s father and is at least 100 years old.

Back home I was getting all of my tools and supplies ready when I realized that I would not be able to attach the plenum/support boxes to the adjacent cabinets if they were fully assembled.  This was an example of incomplete design; either I have forgotten how I planned to anchor these boxes, changed my thinking about this in the time since I did the design work, or never figured out this detail in the first place.

Ideally I could anchor them in a way that does not destroy the cabinets or the floor.  One way to accomplish that would be to attach them to the HVAC plenum at the back and the vertical front support board using angle brackets, and to the top of the wiring chase above the HVAC plenum via the two filler strips on either side of the seat.  If I do that I can fully assemble the two plenum/support boxes before installing them.

For now I only assembled half-boxes with one side piece attached to the bottom piece and the other side piece attached to the top piece.  I built one of them for the left end and the other one for the right end. What this leaves open as an option is screwing the side/bottom assembly to its adjacent cabinet and then screwing the other assembly to the first one without using any glue.  The dry assembly would allow everything to be disassembled later if needed.

Madeline was up by this time and helped Grandma Linda put the new seed block in the bird feeder.  They then walked around to the front of the garage to see what Grandpa Bruce was doing.  I showed them my tools and the pieces of wood and explained how everything was going to work and fit together.

Two pieces of one of the plenum boxes held at right angles for gluing and screwing.

Two pieces of one of the plenum boxes held at right angles for gluing and screwing.

I aligned the pieces being joined, which are all 3/4″ cabinet grade 13 ply plywood, using two corner clamps.  I then scribed a line 3/8″ from the edge of the piece that was sitting on the edge of the other piece.  I marked screw locations every two inches with the spacing centered along the line.  I drilled pilot holes with countersinking to ensure the screw heads would be below the surface of the wood.  I disassembled the two pieces, leaving the piece that the screws would go in first in the clamps, and sanded off any rough edges.  I ran screws part way into each hole so the tips protruded just enough to put the two pieces back into alignment when they were rejoined.  I applied Titebond II wood glue to the edge piece spread it out, and wiped off my finger with a wet cloth.  I inserted the edge piece back into the clamps, used the screws to make sure it was aligned, tightened the clamps, and ran the screws most of the way down.  I then loosened the clamps holding the edge piece and drew it up tight by running the screws all the way down.  I used a wet towel to wipe off the excess glue that was squeezed from the joint and set it aside to dry.  I took a lot of pictures too.

The center portion of the storage space under the seat will have an elevated platform with closed ends to create a plenum for the OTR HVAC return air.  I assembled the two end pieces to the ends of the platform using the same method I used for the plenum/support boxes.  There is also a support piece for the middle of the platform but I cannot use the clamps to hold it in position relative to the platform so I will have to do something else.  I was thinking that I did not feel like tackling that task when Linda and Madeline came back to the garage to let me know it was almost time for dinner.  Saved by the food bell, I closed up the garage and went inside to eat.

Linda set out some carrot slivers, diced peaches, and home grown cherry tomatoes.  She cooked some mock chicken patties and heated up some vegan gravy to go with them as a main course.  For sides she heated black beans, edamame, and vegan Mac-n-cheese.  We all enjoyed our meal.

Madeline really enjoys the swings at the Brighton Mill Pond Imagination Station Playscape.

Madeline really enjoys the swings at the Brighton Mill Pond Imagination Station Playscape.

Our son let Linda know that Madeline had not been sleeping through the night recently and had developed a sensitivity to noises.  Linda figured Madeline might sleep better if she engaged in some vigorous play after dinner and suggested that we go to the Brighton Mill Pond Imagination Station Playscape.  Ms. M liked the idea but wanted to make sure I was coming too.  I found a reasonably good parking spot and pushed her over in the stroller because she does not like to walk for the sake of walking.  But once we got to the playscape she was in “go mode.”  As the sun set and the light faded we strollered her over to Jack’s for a scoop of vanilla ice cream with sprinklers.  We then strollered her back to the car and drove home.

Linda had promised Madeline that she could watch a video before she went to bed.  She had selected an episode of Daniel Tiger, an animated children’s program based on the Daniel Striped Tiger character from the old Mr. Rogers TV program.  We had Shawna’s iPad with access to her Netflix account but the program was downloading slower than molasses poured on a cold day.  We had problems with video, then audio, but eventually got it to work after I turned off the Wi-Fi transceiver on my smartphone.  Linda got Madeline ready for bed while fiddled with the technology.

After the video Grandma Linda carried Ms. M around to look at all her favorite artwork, a bedtime ritual that goes back to the first time she ever stayed at our house overnight.

 

2015/05/27 (W) The Root of all Things

Yesterday I used up the last of the coffee beans that Jeff at Teeko’s shipped to us in Quartzsite in late February so this morning I transferred the beans we had roasted last week into our airtight containers and started using them.  Grinding our own custom roasted coffee beans is how my mornings usually start and is just another small thing I like about being retired.

We rarely made coffee at home in the morning when we were employed outside the house.  It took too much time and made a mess that had to be cleaned up later, including the travel mug that we had to remember to rinse out at work and then bring home.  Besides, Linda got free unlimited coffee and tea at the office and I found it easier to stop at Panera and get a large coffee to go; half hazelnut and half decaf.  It was part of my morning routine that I found comforting and the cup was disposable when I was done.

I had a follow-up appointment and evaluation at the endodontist today, so I did not work in the bus this morning other than to take a few pictures of the old dinette corner, where I removed the mirrors yesterday, and the area under the bed, which I also worked on yesterday.

After morning coffee and breakfast I went to my office to work at my computer.  I off-loaded the pictures I just took, selected a few, processed them, and copied them to the folder for this blog.  I then downloaded and installed Adobe FlashPlayer in order to view the Gilbreath Upholstery Service website.  The download also installed a McAfee virus checker that I did not ask for or want and I don’t recall being given an option to opt-out.  I really dislike it when programs do things like that.  In fact, I think it should be illegal and companies who do it should be subject to heavy fines.  I tried to download the PDF catalog but Adobe Reader said it had an unrecoverable error.  Arrrgh!  I e-mailed them to request one that worked.  We will see if that results in anything.

I was responding to a few e-mails when Butch called.  He was trying to figure out the best way to connect up the eight L-16 6 VDC batteries he bought in Quartzsite to make a 24 VDC battery bank with a 12 VDC center tap.  Working only from verbal descriptions we finally ended up with the same diagram of a series-parallel interconnection scheme with equal electrical path lengths through all of the batteries.  The difference between series-parallel and parallel-series is not important when the batteries are operating correctly but each connection scheme is vulnerable to a different battery failure mode.  I happen to prefer the series-parallel scheme as I think it results in better battery charging, but that’s an often debated subject.  The equal path lengths through the batteries, however, is something that is worth accomplishing if at all possible.

By the time we were done talking I needed to leave for my endodontist appointment.  Dr. McWatters said the root canal they did on my upper right rear (tooth #4) last September looked good.  They tested the upper rear teeth on my left side but did not find any indication of a problem.  That would normally be good news, except that I had an intermittent problem in that area all winter so I know something is wrong and will eventually require attention, most likely when it is least convenient for me (middle of the night on a weekend).  But for now there is nothing more to do.

hen I got home I had a few pretzels and hummus and some red grapes and then got back to work at my desk.  I copied my blog post drafts for the 17th through the 26th from e-mails to Word and started editing them.  I took a break to have some tea and write while Linda cooked dinner.  She grilled two veggie burgers along with the rest of the asparagus we bought on Sunday and served the potato salad she made earlier in the day.  Most of the asparagus was mushy except for the tips which I attributed to the plants not the cook.  These were very large purple stalks, not the usual somewhat thinner green ones so maybe that had something to do with it.

After dinner I returned to my desk and finished editing all of my blog posts for May 10 through 26.  Somewhere in the middle of that work Phil Jarrell returned my phone call from yesterday.  We agreed that I will call him back after the GLAMARAMA Rally and he will bring his laser level and we will shoot some elevations.  With a little luck and a bit of perseverance we may get a gravel driveway connecting the 3rd (westernmost) culvert to our concrete driveway with a level spot for one or two guest RVs to boondock. We will also get a dozen tree stumps removed, get a French drain installed to remove water from the western end of the property, and get a hole dug for a ham radio tower foundation.  That last bit of digging will also require a rebar cage, hinged tower base, and coordination with a supplier that can pump concrete immediately after the hole is dug.

When I was done editing my blog posts I logged into our WordPress site, deleted 181 spam comments, and installed an update for our Fast Secure Contact Form plugin.  I started creating the post for May 10 but half way through the Chrome browser became non-responsive indicating that it might be out of memory.  That seemed unlikely, but I closed all of the program’s I had open, shut down my computer, and restarted it.  When I logged back in nothing was responding so I sat and waited until I was eventually able to do things.  The first thing I did was uninstall the McAfee Security Scan app that got installed along with the Adobe FlashPlayer earlier today.  I then proceeded to download three updates for Windows and MS Office, or tried to.

The three updates were only 27 MB total, but after 35 minutes they were only 53% done.  My guess was that the data rate on our AT&T “High Speed Internet” (DSL) connection had slowed to a barely usable trickle, perhaps because of all the rain we had the last few days, but whatever the cause it was almost midnight so I left it to finish at its own pace and went to bed.  I worked on this post and played a few games by which time it 12:45 AM so I got up, put on my robe, and went back to my office.  The download had finished and two of the three updates had installed.  The third one reported an error but Windows Update needed the computer to be restarted to finish the installation so that’s what I did.

Windows updates normally install during shutdown and finish installing on startup and that is precisely what happened this time as well.  I let the system startup completely (until the hard drive light was not on) and then downloaded, installed, and ran the latest version of CCleaner.  It downloaded much faster so maybe it was the Microsoft update server that was slow, or perhaps the McAfee app was causing the problem.

We had rain yesterday and more rain today, including some thunder.  The lights flickered a few times both days but the generator never came on.  If out Internet performance is still sluggish in the morning I will reset the AT&T gateway and see if that helps.  I also noticed that our home refrigerator was suddenly showing 45 degrees F instead of 40.  Linda had loaded it up with food yesterday, and added the potato salad today, but the temperature should not have changed by that much and should have returned to the 40 degree set point within a few hours.  Even adjusting the thermostat down did not rectify the problem over the course of the day so perhaps something else has changed, such as a blocked vent.  I will have to check for that tomorrow.  Hopefully the power blips did not blip some control circuit.  I think I will pull the fridge away from the wall and cycle the power.  We can vacuum off the back while it is out.  If it still won’t hold the temperature we want Linda might get a new refrigerator for the house sooner than expected, although a call to AAA Appliance Service Network in Howell might a more prudent first response.