Tag Archives: GM Construction LLC

20140711 (F) Nice Weather Lately

Steven’s nephew, Spencer, was here a little after 8 AM and spent some time cleaning up the driveway.  He was joined by Tommy, who was only available for the morning.  Tommy got instructions from Steve by phone and they tried working on the retaining walls, but I’m not sure what they accomplished.  One of the large boulders Steve positioned yesterday on the lower west wall had dropped 6 inches and they were unable to re-position it.

It was another pleasant day, so I decided to work outside during the morning.  I cut up some previously trimmed tree limbs and then started pruning our apple tree.  I tried to cut all of the dead limbs and branches I could reach from the ground using our new Fiskar’s ratcheting lopper.  With that material removed I was able to use the pole saw and compound lopper to remove some larger and/or higher limbs.  By noon it was getting warm and I knocked off for the day and had lunch.  Linda made the chickpea (garbanzo bean) salad that we both like so much and served it on a bed of greens with red grapes and sweet Bing cherries on the side.

Tommy had to take off for the afternoon and left Spencer to start moving smaller rocks onto the slope of the east retaining wall.  We would occasionally hear one thud against the foundation and I decided I should check on his progress.  He was doing a fine job of tossing rocks into place, but I did not like the way the earth was pitched as it appeared to slope back towards the house.  I examined the west wall and it appeared to have the same problem.

Since the whole reason for this project was to get water to flow away from the house, I asked Spencer to take a break while I called Steve.  I told him that something just did not look right to me and that I could not see any evidence of a drain tile behind the upper wall on the west side.  He was running the excavator at another job site and wasn’t able to come look at our job so he sent Kyle over to pick up Spencer, who did not have a car.  With a chance of rain in the forecast for Saturday through Monday it is looking more and more like this job will not be done until the end of July.

In the afternoon I continued working on configuring my Windows 8.1 laptop.  My challenge today was getting Outlook 2013 to preview PDF files.  I used the search feature on the Start screen to locate information, some of which indicated I would have to create and/or edit the registry.  In the end the solution only required two steps:  installing Adobe Reader 11 and then setting it as the default program for PDFs.

With that problem solved I edited my blog posts for July 1 through 9 and started uploading them.  I managed to get the posts for the 1st, 2nd, and 3rd uploaded before dinner.  I also got a return call from Darryll at DCM Heating and Cooling and we agreed he would come to the house tomorrow at 10:30 AM to finalize the work we need done and pin down a start date to prep the house for natural gas and install a small HVAC unit for the library and a furnace for the garage.  We also need the main air-conditioner serviced.  Luckily it has been a cool summer so far.  The conversion of appliances will have to wait until the natural gas line is connected to the meter and turned on, which could be as late as early October.

I got a call from Gary at GM Construction sometime in the last few days.  He finally had all of his supplier quotes for our pole barn / bus garage project and had a price for us.  It was higher than I would have liked, but less than the quote from Morton Buildings, which was for a much smaller barn.  Last night I called Phil from Precision Grading to update him on the status of the project and to see if he would swing by and look at the pull-through driveway which the landscapers have torn up more than I expected.  My best guess is that we will get a barn up somehow, but I’m not sure when or how.

For dinner Linda made pan-grilled sliced tofu with onions and Bar-B-Que sauce served on a toasted sandwich bun with a side of lightly oiled and baked potato wedges and a few fresh strawberries.  Of course, that meant ketchup with Tabasco sauce.  We split a can of cold Yuengling beer which was the perfect beverage for this meal.  Sometime in the last two days Linda made a raspberry sauce from frozen raspberries we picked last year.  Earlier today she made a vegan chocolate cake and this evening the cake and raspberry sauce came together for dessert.

 

2014/06/18 (W) Weather Delays

We had some serious thunderstorms overnight which meant that Village Landscape Development would be delayed yet again in starting our front sidewalk/stairs and rear retaining walls drainage projects.  At this point it will very likely be early July before they start, assuming it ever stops raining.

We are expecting company tomorrow, so today was house cleaning and repair day, along with more laundry and some pole barn related work.  Gary from GM Construction finally made it over and we had a long chat about the pole barn project.  He seemed to have a good understanding of what we are trying to accomplish and a good understanding of how to get it done in Oceola Township, Livingston County, where he also lives and works.

The pole barn is proving to be a difficult and discouraging project.  Conceptually it is a relatively simple building.  In practice it is a medium-large building with very high side walls.  The trusses have to span 32 feet with 2 foot overhangs, so they will be 36 feet long and 6 feet high from the bottom cord to the ridge.  Building 16 foot high walls requires scissor lifts to do it efficiently and safely.  Getting the trusses on top of walls that high requires a crane, while securing them to the walls requires a scissor lift on each end.  I got a quote from Chelsea Lumber for the building materials and it was 80% of what we hoped to spend on the whole project.  I already have the site prep and finish grading quote and it’s a third of what we hoped to spend on the whole project.  I don’t even have prices yet for concrete, electrical, or spray foam insulation.  What this is adding up to is a project that may cost 150 – 200% of what we were prepared to spend, and I’m not sure we are prepared to do that.  That’s money I would rather put into the bus, yet the fact remains that one of main reasons for moving was to have property on which we could build a pole barn for the bus, not just to get it out of sight, but to get it out of the weather where I could work on it.  Ugh.

 

20140605 (R) Apple Roku

Linda had to go into the bakery today which left me to catch up on phone calls and errands.  I made more phone calls to contractors this morning and had better luck than yesterday reaching people or at least leaving messages.  I rescheduled with Gary from GM Construction to come discuss the pole barn project.  I also got hold of Bratcher Electric and determined that the annual maintenance on the whole house generator could wait until we are ready to do the conversion from propane to natural gas, which they can handle.  In talking to Mike Bratcher I also determined that we can install a main panel in the garage just after the transfer switch and then run power directly from there to the pole barn rather than from the main panel in the basement.  While we are at it, we could redo the sub-panel in the garage, feeding it directly from the new main panel rather than the main panel in the basement.  The basement panel is very crowded and we have wires carrying electricity back and forth unnecessarily.

I got a call from Butch with an update on the negotiations of the sale of the major portion of their business assets.  Linda has been advising them relative to valuation, accounting, and tax issues and we have been helping them with purchase agreement language.  It looks like they are in the final stages leading up to a closing of the deal.  Their big annual event is coming up in early July and they will likely be busy with the transfer of inventory and training of the buyer during and after that event.  I need to get our bus down to their place to work on some projects and help Butch work on getting their bus conversion done enough that they can live in it this winter in the southwest.  Based on things going on at both ends, it looks like the window for that work will be mid-September to sometime in November, weather permitting.

Our converted coach friends, Pat and Vickie, have some older Motorola GMRS handheld radios that they like but the charger bases have disappeared.  My ham radio friend Scott (AC8IL) is in the commercial mobile communications business so I checked with him to see if chargers were still available.  They were and he had a couple of the drop-in style charger/bases in stock!  Scotty is just that kind of guy.  I picked them up this morning and will deliver them to Pat and Vickie at the GLAMARAMA rally.

Apple Roku sounds like an interesting dessert, but it’s not.  It might be an either/or situation, but it could be a both/and.  John Dewey was a both/and kind of guy, so I favor that approach.  We were intrigued by Steve and Karen’s Roku Internet TV streaming device last night so I stopped at Best Buy today on my way home from running my errand to see if they had them in stock and if so at what price.  Not only did they have them, they had three different models.  The “stick” was $50, the Roku 2 was $70, and the Roku 3 was $100.  (The Roku 3 does not have A/V connectors like the Roku 2, only HDMI, but it has a five times faster processor.)  But that was not all, oh no.  They also had the Apple TV device for $100 and two other similar products, one of which looked like an Amazon/Kindle thing and the other one a WD thing, whatever that is.

The Roku units (2 and 3) have access to a lot of content on a free, subscription, and pay-per-view basis.  The Apple TV unit has access to content on the same basis but the selection may not be as extensive; it’s hard to say for sure as the devices are not easy to compare directly.  The Apple TV unit, however, has one huge, unique feature; it can mirror anything on an iOS device, such as our iPads, to a TV/monitor.  The iPad can also be used as a control panel for the Apple TV device.

We do not have to choose between a Roku and an Apple TV unit, of course, we can get and use both if we want; it’s just a matter of money.  Between the two TVs in the house and the two in the bus it could be a lot of money if we wanted dedicated units of both types on all four TV/monitors.  We always have the option of moving things back and forth, but in general I prefer not to do that.  To the extent we can afford it I prefer to have the house and the bus set up so that the only things we move between them are the things we have to, such as ourselves, our food, our laundry, our computers, our cats, and some of our ham radio gear (at least for now).  The best solution, however, may be to get one of each device and move them around as needed.  That would give us the best cost/benefit ratio, but not the most convenience.

When Linda got home from her day at the bakery we finished the Egri Merlot we had opened the other night and caught up on the day’s events.  We decided to try the Apple TV device first and see how it worked in our situation.  Linda made an onion, mushroom, tomato Ragu, and served it over the leftover power grains.  It was very tasty.  After dinner I went to Best Buy to get the Apple TV device while Linda prepared fresh strawberries for dessert.  Fresh strawberries are a favorite treat of ours.  She served them with small pieces of Dandelion Small Batch Chocolate made from 70% Ambanja Madagascar 2013 Harvest beans.  The chocolate was excellent and unique.  It was a thank you gift from our son and daughter-in-law for Linda’s babysitting services while they were in San Francisco, California.

We connected the Apple TV box to one of our HD TV/monitors and went through the setup procedure.  We decided to test it on some PBS content, which required us to set up an account with PBS and enter a validation code that the Apple TV box provided.  We also downloaded an app onto Linda’s iPad2 that allowed it to mirror whatever was on its screen to the Apple TV.

We used the mirroring feature to watch Season 1, Episode 5 of Doc Martin, but it proved to be unusable.  The image was fine on the iPad2 but the Apple TV could not keep up.  I found that to be odd as our home WiFi network should have more than enough bandwidth to deliver the data stream between the devices, but maybe not.  I presumed that the limiting factor in our network was the data rate coming into our DSL gateway from our AT&T landline, but that was obviously fast enough to deliver the content from the gateway to the iPad without buffering hesitation.

We turned off the mirroring and finished watching the episode on the iPad.  Still, the content delivered directly from the gateway to the Apple TV looked great, and the mirroring will be useful for showing photos and anything else on our iPads.  We may reconfigure the Apple TV to use one of our other wireless networks and see if that helps.

 

2014/05/30 (F) Outlook Contacts

I have had a Palm PDA for most of the last 13 years, and for most of that time it has been a Palm Tungsten T3.  While I was still working at Wayne RESA it was synced to their GroupWise e-mail and calendar system but also synced to the Palm Desktop software on my laptop for Contacts and Tasks and my Passwords Plus program.  I did not use the Tasks list much, but I did keep all of my personal contacts, and some of my business contacts, on the Palm along with all of my encrypted passwords.  Linda also had a Palm PDA for a while and had it synced to Outlook on her office computer.  Her PDA quit working years ago and never got replaced.  Once she was settled in at the bakery she did not have a need for a PDA.

When I retired I reverted back to using the Palm calendar, which I always liked.  I even installed a new Lithium Ion battery, which was no easy job, to prolong the unit’s life.  But three things have converged to finally spell the end of the Palm era for me: 1) the unrecoverable failure of the Passwords Plus app on the Tungsten T3;  2) the porting of our home Outlook Express information into Outlook 2007 after the loss of our twmi.rr.com e-mail address, and;  3) getting a new laptop computer due to the end of support for Windows XP.

Over the winter we were able to purchase an updated version of Passwords Plus (CS 2.0) that synced through the cloud.  Versions were available that ran on our iPads, Linda’s Samsung laptop, and my then current Win XP Dell laptop.  It is also available for Android (I think) but so far we have not installed it on our phones.  The new PWP apps allowed us to successfully migrate all of our passwords from the old Palm version and make them available on four devices with back-up and synchronization via the DataViz cloud servers.  Just this past week I installed PWP CS 2.0 on my new Win 8.1 machine and got it synced with the other four.  When the passwords are available and secure, life is good.

When we moved from the previous house to the current house last year we lost our long-time home e-mail address.  I took that as an opportunity to export our home address book and all of our personal e-mails from Outlook Express and import them into Outlook 2007 on my Win XP Dell laptop.  Since that time I have continued to build out the address book with contact information, but I still have and use my Palm Contacts.  Yesterday I learned that I could export my Palm contacts in a vCard (.vcf) format.  Further research suggested that I could convert the file to a comma separated value  (.csv) format and then import it into Outlook 2013 on my new laptop.  It would be a lot more work than it sounds as the vcf –> csv conversion would require me to review each entry, but it would still be a lot less work than re-entering everything by hand.

I figured I would need the better part of a long day to accomplish this task, so before rushing into it I decided to do more research.  Today I discovered that there are add-ins available for Outlook that will take my single .vcf Palm output file and import it into Outlook directly, as long as I am willing to pony up the $$.  The idea of spending $20 -$25 for a program I will use once does not sit well with me, but the idea of sitting all day reviewing entries one at a time does not sit well with me either.  If I want to clean up duplicates, I can do that semi-automatically for another $25.  I’m thinking about it.

The calendar is another matter.  The Palm calendar can be “archived” but not exported.  My Palm calendar goes back at least a decade, and this history may just have to remain in the Palm Desktop on the old laptop.  On the upside, once I start using the Outlook calendar I may be able to set it up so I can access the address book and calendar on my Android phone.  That would be nice; I have long enjoyed having my contacts and calendar information “in my pocket,” or “on my belt,” depending on my clothing choices that day.

It was yet another beautiful day today; when Michigan weather is nice, it’s the best.  Linda decided to do some weeding in the front planting beds and I decided to install the new rear-view mirror on the bus.  You just can’t let a day like this go by without doing something outside.  After a little break we decided to work in the back yard.  We had several large pine trees that had large limbs broken over the winter.  I used our pole saw to cut those loose and dragged them over near an old burn pile.  I cut the small branches off, cut up the larger central limbs, and made a pile.  We gathered up some of the dried grass clippings from Tuesday and stuffed them under the limbs and twigs.  We added a few old, large logs to the pile that were laying around in the yard and soaked everything in diesel fuel.  Forget gasoline and charcoal starter fluid; let the diesel fuel soak in (it does not evaporate like gasoline) and put a match to it.  You will get a sustained fire.

After the fire had burned down to a smolder we moved some of the blocks from the rear retaining walls and laid them around the burn pile.  We’ve decided to use some of them to build a fire pit and wanted to see how many it would take to make a circle of the appropriate size.  We plan to build the pit 2 or 3 courses high on the low side.

Kimber, from GM Construction LLC (GM Decks), called to let me know that Gary had taken ill and would not make it out to the house late this afternoon to discuss our pole barn project.  We will try again next week.  Village Landscape Development also did not show up or call today.  I will give Steve a call tomorrow and suggest that we set a firm start date for Monday June 16.

The afternoon mail brought a Jury Summons for Linda for a two week commitment for U. S. District Court in Flint, Michigan starting Monday, June 30.  That interferes with some travel plans we have and will now likely have to adjust.  She won’t be able to find out if she needs to report on the 30th until 5 PM on Friday the 27th.

 

2014/05/21 (W) A Twilight Zone

Linda has been ill since last Thursday with a cold and/or allergies.  Until yesterday I had managed to avoid her symptoms, but in the morning I started sneezing and in afternoon I developed a cough.  It wasn’t a response to a tickle in my throat from post-nasal drip, it was the deep raspy cough that comes from the lungs and makes them hurt.  By evening the cough had become productive.  I have not been sick in a very long time and the one thing I try to avoid getting is pneumonia, which I have had three times in the same spot of the same lung.  The scar tissue there makes me more susceptible to re-infection, and I take my nasal spray and allergy pill every day to avoid sinus problems which can settle into my lungs.  Until Tuesday this had been very successful.

We both had a very poor night’s sleep last night and got out of bed feeling like we were in a twilight zone.  Instead of coffee I had a big cup of Tazo Ginger Spice tea.  The warmth and ginger taste were soothing and I figured it could not hurt to stay hydrated.  I put a load of laundry in the washer (I only have two loads to go) and then had a large glass of orange/grapefruit juice.  Linda also had some tea and then gathered up clothes for the next five days.  She will be watching grand-daughter Madeline around the clock until Sunday when her parents return from San Francisco, California.

I checked on my new laptop and the Adobe Creative Cloud Desktop (ACCD) app showed that Photoshop had been successfully installed; at least it showed that in one place, but in another place it said I had no apps installed.  Hummm?  I did not see the icons at the bottom of the screen but the one thing I have learned about Windows 8/8.1 is that I can go to the Start (Metro) screen and start typing and I usually get directed to what I am looking for.  I noticed a little arrow in the lower left corner of the screen that said “4 new apps.”  I clicked on that and it took me to the screen where all if the installed programs are listed and there they were!  I opened Lightroom and registered it and then opened Photoshop; twice.  It appears that I have a 32-bit version and a 64-bit version.  I’m not sure why, as my new laptop has a 64-bit processor, but they are both listed.

I got out my iPad2 but did not have the energy or interest to even play a game and lay down on the couch to take a nap.  Linda had a couple of hours before she had to leave for Ann Arbor, and made a batch of her super special granola.  I got a call from Kimber at GM Construction letting me know that Gary would not be able to stop by the house today to look at our pole barn project.  He had to go up north for family reasons.  Given how I felt it was for the better.  He will stop by on Friday or sometime next week.

I didn’t feel like sitting up but I was tired of lying down, so I had some granola, sans soy milk, and worked at my iPad2.  I have been keeping up with writing my blog posts, but not with posting them.  I want to select a few photos from the Escapade to include in the posts but have not felt like going through them.  I shot over 2,000 images during the event.  Linda keeps suggesting that I only write weekly posts when we are home.  It seems like that would be easier, but I have tried that and it’s not.  For one I lose track of details, and sometimes even the day/date something happened.  I also found that the weekly posts just ended up being very long.  What I really need to do is focus on writing shorter posts.  But as a weblog, the blog is first and foremost an online diary, so the details I include are there because they are important to me at the time.

Although I did not feel like doing it, I forced myself to select a dozen photos from the 15th and 16th and post process them.  I have everything I need to upload my posts for the last week except the energy and desire.  UPS showed up around 5 PM with the mirror from Prevost.  I spent most of the day lying down on the couch and finally went to bed around 9 PM.