Tag Archives: GLAMARAMA

2014/05/03 (S) Ham It Up

Today started with breakfast out and felt like we were finally starting to get back into the flow.  We drove to South Lyon for the Saturday morning breakfast gathering of our South Lyon Area Amateur Radio Club, as we do almost every Saturday morning when we at the house.  Steve (N8AR) gave me a lead on someone who might be willing to build our pole barn.  After breakfast we returned home and I walked Linda through the project I discussed yesterday with Steve for redoing the rear basement walkout retaining walls, drainage, and yard grading.

I worked on our blog and Linda worked on lunch preparations while we awaited the arrival of our daughter and son-in-law.  They have had Linda’s Honda Civic Hybrid since December and were returning it, so they drove two cars.  Linda got to visit with them in late February / early March, but I had not seen them since mid December.  We had a nice lunch of mixed greens salad and vegan Sloppy Joe’s with sweet gherkin pickles on the side.  Fresh strawberries and carrot cake cookies provided a sweet ending to the meal.  We had a nice visit.

Steve from Village Landscaping Development stopped by with a brochure, business card, and the project proposal written up on a more official estimating form.  We will take a few days to think about, but it’s a very good proposal and I am 99% certain we will hire him to do this work.  It would be nice to get it done in late May to early June, between The SKP Escapade and the GLAMARAMA rallies, but it may not be dry enough by then.  If not, it will have to wait until early July after we return from the installation ceremonies for Linda’s sister who is assuming one of the top leadership positions in the St. Louis Province of the Congregation (Sisters) of St. Joseph.

A little later Phil Jarrel, from Best Precision Grading, came by to take a second look at the site preparation and grading work for the pole barn.  We walked the site and agreed that I could/should change the orientation of the building just a bit from where it is currently staked.  We also discussed how to make sure the barn was located behind the front line of the house and talked through the permitting and construction process.  He did not have any builders to recommend, but he did recommend a concrete contractor for the pit and floor.

We did quite a few construction projects at the previous house over the years but the pole barn involves elements that are new to me, and I now have to deal with a Township for a land use permit and the County for building and grading permits.  I am fairly set on the size, location, and basic design/materials, but we not have settled on a builder or materials supplier.  Consequently, we still do not have an accurate total cost estimate.  Until everything is in place, and the cost is known, nothing can move forward.  Meanwhile, the days keep flipping over on the calendar.

 

2013_07_16 (Tue) New Building Experiences

I was up early as I wanted to post a couple more blog entries while there was less demand for the RV park’s WiFi/Internet connectivity.  I also like to have at least some of my morning coffee well in advance of going to the HFH job site.

Linda L and John filling in the west foundation trench.

Linda L and John filling in the west foundation trench.

We arrived a little before the 7 AM start time agreed to yesterday and some team members wondered why we were starting so early?  (Our team is very cohesive, but is clearly not of one mind when it comes to start times.)  When we were done with circle many team members grabbed shovels and rakes and filled in the trenches around the foundation and smoothed out the soil.

 

The house wrapped in Tyvek.

The house wrapped in Tyvek.

 

All framed up plumb.

All framed up plumb.

 

The NW corner of the roof is “hip”

The NW corner of the roof is “hip”

I worked with Kent installing trusses for the hip roof at the north (rear) end of house.  We got that done just before the lunch break, but it wasn’t easy, and was not something either of us had ever done before.  With help from Lynn, we set the main double truss and then installed the two hip trusses that run out through the corners where the side walls meet the back wall.  We then installed eight smaller half trusses to compete the roof and ceiling structure.

Bruce nailing hip trusses.

Bruce nailing hip trusses.

 

Hurricane clip.

Hurricane clip.

The two Linda’s teamed up to start anchoring all the trusses to the east wall using hurricane clips.  This was a difficult job because of the short nails that are used, the awkward angles at which they must be hammered, and the fact that all of the work must be done on ladders.  They also built and installed a header for a closet opening which required the use of the circular saw.

An all female crew bending the foundation flashing.

An all female crew bending the foundation flashing.

 

Another all female crew painting the siding panels.

Another all female crew painting the siding panels.

A crew of men was asked to go help Matt retrieve a variety of materials donated by Wells Fargo Bank, take them to the ReStore, and unload them.  Some of this material had been moved the other day, but large, heavy items remained.  Many of the other women team members finished wrapping the house with Tyvek and then put the first cost of a deep crimson red paint on the loose siding.

After lunch Kent and I worked on truing up the main trusses.  We climbed up, in, around, and through a maze of trusses and spacer bars to un-nail, position, and re-nail bracing to hold the truss peaks plumb with uniform spacing.  In spite of the pleasant temperature and continued cloudiness, by 2:00 PM everyone was ready to call it a day.

Looking back on the day, a lot was accomplished both on and off site, and a lot of it was done on ladders.  I recalled that one of the last safety reminders we got from Steven before he left was that that biggest safety hazard on an HFH build is the use of a ladder.  We did not have any accidents or injuries today, so that along made it a good day.

Back at the rig, Linda prepared a pot of her wonderful vegan chili while I made a phone call to the FMCA offices in Cincinnati, Ohio to complete our registration for the GLAMARAMA rally in Goshen, Indiana in September. FMCA was updating their servers last week when I tried to register online, and our transaction did not compete successfully.

We went to the social at 4:30 PM and stayed until 6:00 PM when most of us returned to our rigs to have dinner and settle in for the evening.  As usual, we went for an evening stroll around the campground and enjoyed the cloudy, cool, breezy conditions.

 

2013_06_23 (Sun) FMCA Comes To A Close

As usual, the exodus from the FMCA 50th Anniversary rally started early, with some motorhomes pulling out as early as 6:00 AM.  It is always an interesting experience to watch the departure process from a major RV rally.  Unlike the arrival process, which is highly organized and managed by the organization running the rally, the departure process is completely asynchronous and self-managed.  It is not, however, chaotic; to the contrary, it is quite orderly.  People leave when they need to and are ready to go, and that just seems to work out well.  They are attentive and considerate, and there’s never any congestion; just a random but steady flow of RVs.

We had considerable rain the past few days, and some of the parking areas developed minor flooding and very muddy soil.  Inevitably, some motorhomes were stuck and had to be pulled out.  We have been in that situation on two previous occasions, but our site this past week was high with good drainage and well-graveled roads.  Except for a few soft spots, notably where people cut corners too tight at intersections, there were no serious problems in Boxelder RV Park.

We had already arranged with the CAM-PLEX office to move to the Windmill RV Park this morning, so after breakfast we drove the car over to scout out a level, 50A full-hookup site.  We left the car there to “hold” a spot, which were first-come, first-served, and walked back to the coach.  We did our usual departure thing of unhooking the utilities, putting up the awnings, and otherwise preparing for the short, slow move.  We had no problems pulling out, and took paved roads over to our new site.  Once we were parked we did our arrival thing and leveled, hooked up, and settled in for the next few days.

We are staying at the CAM-PLEX while we wait for our early entry date on the 27th for The Escapees RV Club Escapade rally, which will also be at the CAM-PLEX June 30 – July 5.  We will extend our stay here until July 7 and then move to Sheridan, Wyoming for two weeks to work on a Habitat For Humanity build.  It appears that we will have to move again on the 27th to a different RV Park here at the CAM-PLEX as the Escapade is not using this one.  But for now we have 50A power, which will allow us to run our air-conditioners.  With some hot days forecast, that’s a good thing.

We decided to deploy our new Zip Dee Awnings, both to shade the coach and to let them dry out.  Much to or surprise, we discovered that we could fully deploy the large patio awning following the directions we had.  (We left our directions at home.  The ones we had came from the Zip Dee booth and did not match our hardware exactly.)  With the upper rafter arms hooked onto the roller tube shaft we could not get the latch pins on the rafter arms to engage.  Our analysis of the problem was that that the fabric was either 2″ too short or the upper rafter support arms were 2″ too long.  I wrote an e-mail to Zip Dee, but fortunately it never got sent.  Further study of the rafter arm revealed that the hook on the free end was attached to a spring-loaded inner tube that was free to slide inside the outer tube.  The available travel was just enough that the hook could be placed over the roller tube shaft AND the latch pin could be engaged.

Perhaps it is part of still being new to extended-time RVing, but the awning episode was yet another example of the emotional roller-coaster that sometimes comes with this lifestyle.  First comes the surprise and then the disappointment of discovering (yet another) problem.  This is followed by the frustration and annoyance of not being able to figure out what’s wrong and/or fix it.  Then a certain sense of helplessness arises at not being able to get assistance or parts (things always seem to break on Sunday, so it’s rarely a “day of rest”).  Next is the dread brought on by considering the possible dire consequences of continuing the journey with the problem unresolved.  A sense of resignation settles over you as you accept that the problem will remain unfixed for the time being and will probably require a change of plans and added expense somewhere down the road.  Then the “ah-ha” that comes from food, release from anxiety, and time for further thought.  And finally, the satisfaction and sense of accomplishment that comes from having figured it out and fixed it, even if only temporarily.

Along the same line, we were discussing our broken searchlight over lunch and decided that it would be better to seal it up with Rescue Tape and not use it than try to repair it.  The wires inside the base go through a hole in the roof that is not sealed.  Removing the base opens up the possibility of water getting in through that hole if I am not able to get it resealed.  As we rarely need/use the searchlight, that was too big a risk for too little benefit.

As we were finishing up our encampment routine, we had motorhomes pull in on either side of us; Peter & Sybil on the passenger side and Rick on the driver side.  Peter & Sybil had purchased a Progressive Industries portable 50A EMS from Lawrence RV Accessories during the FMCA rally.  It had been working fine, even through the big storm, but quit working when they moved to Windmill RV Park and hooked up.  I looked at the unit and noticed moisture in the LCD display (where it should not be).

I shook the unit and thought heard a sloshing sound, indicating that water had probably gotten in to the unit and shorted something out.  I checked the outlet with my multi-meter to make sure the power supply was properly wired and providing the correct voltages so they could at least plug in and have power.  Sybil called Daryl Lawrence and he answered the phone even though it was Sunday!  They were still at the CAM-PLEX and came right over.  Daryl examined the unit, came to the same conclusion I had, and swapped it out for a new one.  The PI EMS units are generally very reliable, and the company stands behind them and the vendors who sell them.  Peter & Sybil were leaving the next day for North Dakota, so this was truly great service for a great product from a great RV vendor.  (We got our Progressive Industries EMS-50 from Daryl a year or so ago and rely on it to protect our coach’s electrical systems from problems arising outside the coach.)

As long as I am on the subject of PI EMS units, when we changed campsites and plugged in I followed the maintenance recommendation I received a few days earlier from the owner regarding the buzzing coming from the unit.  Immediately after applying power, during the 2′ 16″ time delay before power switches through, I quickly cycled the contactor by moving the override switch back and forth.  Sure enough, the buzz disappeared.  (Technical note:  Although the unit is sealed, it is designed to have the cover removed so wiring connections can be made.  Dust can and will build up on the contactor contacts which results in a degraded electrical connection and the resultant buzzing.  The contacts arc slightly when they close and open, and cycling them quickly and repeatedly cleans them.)

Fixing the "ET" searchlight

Fixing the “ET” searchlight in Windmill RV Park

In the afternoon we got the Little Giant ladder out and configured it as a 14′ extension ladder.  I climbed up and attached the searchlight head to the base using some of the rescue tape we bought from a vendor at FMCA.  The light can still be turned on and tilted up/down, but cannot be turned side-to-side.  This is a temporary fix until we can get the bus inside at Phoenix Paint and do a proper repair with Michele Henry’s help.  This will probably be in conjunction with the GLAMARAMA rally in Goshen, IN September 18 -22.  What is unknown at this point is how well it will hold up to travel at highway speeds.  That test comes in a couple of weeks.

While I was on the roof I inspected the skylights and vent fan domes for damage from the recent hail storm, but they all appeared to be fine.  I then made a temporary installation of the WiFi Ranger Mobile Titanium (WFR-MT) by zip-tying it to the weatherhead cable entrance on the front roof.  I fed the cable through the weatherhead while Linda pulled it into the former ceiling mounted TV cabinet directly below.  (This cabinet originally housed a 19″ CRT TV.  That TV was removed and a door made by Jaral Beatty of Logansport, Indiana to cover the opening.  The door is walnut veneered plywood with solid walnut edging and Jaral managed to match the existing wood finish very well.  Because this was a former TV cabinet, AC power was already available inside.

With power to the WFR-MT, we were able to connect to the local/secure network and reconfigure it.  We were then able to select one of the public/open WiFi signals that were still available at the CAM-PLEX and connect through to the Internet.  The signals were very strong and the connection steady and reasonably fast.

After dinner we went for a walk and watched another beautiful sunset.  As dusk turned to night we witnessed the rising of a “super moon”, which appeared 14% larger than normal due to a slightly closer lunar orbit.  (The 14% is something Linda read online, we did not measure it.)

When we got back to the coach, Linda decided to watch Inspector Lewis on her iPad via our free WiFi connection.  We were able to stream the entire episode without hesitations due to frame-buffering.  That’s a pretty good WiFi connection!  A lot of RVs had left the CAM-PLEX by this time, so competition for the bandwidth was obviously less than during the FMCA rally, but it was still impressive.

Since we appeared to be on a technological roll, I decided to (finally) hookup the front over-the-air (OTA) TV Antenna, rotor controller, and TV set (monitor).  What’s this about going online to get an Access Code to enable ATSC scanning on the TV set???  Yup, our Westinghouse 22″ LCD/LED TVs require an activation code that can be obtained online, by text message, or by phone.  Fortunately, we had all three methods available to us so we got the code, entered it into the set, and away it went.  Ta-da; we have PBS and Create!  Now it feels like home.  🙂

 

2013_06_21 (Fri) FMCA Day 3

We went to bed last night with a 20% chance of rain in the overnight weather forecast.  We are not sure when the rain started, but around 5:00 AM the skies opened up and it rained hard for an hour.  We are camped on somewhat higher ground with good grass sites and red rock roads, so the water drained away and we did not have flooding or muddy site/road issues.  This was not the case in other CAM-PLEX RV parks, as I discovered while walking to the 9:45 AM International Area (INTO) meeting.  My timing was bad, and I walked the 3/4 mile to the Wyoming Center in a downpour that included pea-size hail.  My raincoat and small umbrella were no match for the rain, and there was not a golf cart or shuttle (school) bus to be found anywhere.  In the end it was just water, and clothes eventually dry out.  Always looking for the learning experience in any situation, I resolved that we would purchase serious wet weather gear when we had the chance.

Linda remained in the coach to make sandwiches for lunch as we planned to meet up with Louise Stuart and Craig Davis after the 11:30 seminars.  We went to the Nostalgic Look Back at the Early Coaches of FMCA, moderated by Mike Middaugh, F3456.  Mike is yet another member of the Great Lakes Converted Coaches chapter that we also belong to.  Mike was joined by several other vintage converted coach owners who shared photographs of buses from the 1940’s, 50’s, and 60’s, some of them buses they had owned.

We then walked over to Louise and Craig’s motorhome, a very nice 38′ Monaco Dynasty.  We had our respective lunches and a great chat as we got to know fellow members of our FMCA Freethinkers Associate Chapter.  The service tech from HWH showed up around 2 PM to fix their slideout, so we took that as our cue to return to the vendor area in search of more knowledge and solutions to problems.

After some further discussion with the folks from A-1 Water Treatment we decided to purchase one of their water softeners with attached pre-filter.  It was both heavy enough and bulky enough that we arranged to have them deliver it to our coach after the vendor area closed today.

We then stopped at the WiFiRanger booth and purchased a WiFi Ranger Mobile Titanium (WFR-MT) and optional AC power supply.  (The Titanium version is identical in functionality to the standard version except for a metal case in place of a plastic one, and a 5-year warranty instead of a 1-year warranty.)  The WFR-M/MT device mounts outside the coach and combines a WiFi “booster” (transceiver) and a WiFi router.  The booster communicates with available Wi-Fi signals that can serve as on-ramps to the Internet.  These signals originate somewhere beyond our coach and are paid for, and controlled by, someone other than us. These can be public/open (unsecured) or private/closed (secured).  Use of a secured signal requires the correct authorization (password).  Public/open networks are, by definition, free to use as you do not need a password to connect to them.  Secured networks may be free, such as at some businesses, or there may be a charge, as in airports, and some hotels and campgrounds.  There is an extensive system of public/open WiFi access points available at the CAM-PLEX, sponsored by WiFiRanger.  It has been very good around the Wyoming Center, but varies out in the Boxelder RV Park.  The booster allows us to receive this weak signal, use it, and send a suitably strong signal back.  It does not, however, guarantee on-demand, robust access, as this is also a function of how many other stations are trying to access the system at the same time.

The router section of the WFR-MT generates a secure, local network that we control.  Although it is generated on the outside of the bus, it should be strong enough inside and around the coach to allow us to use our devices wherever we want around our campsite (within reason).  We won’t know this for sure until we hook it up, of course, but the device has been used and well reviewed by other travelers, including Technomadia.  Being a full-fledged router, it not only allows multiple WiFi devices to securely connect to the Internet (via the external WiFi source), but should allow them to securely communicate with each other.  (BTW:  Technomadia has the definitive book on mobile connectivity.  http://www.technomadia.comor Amazon.com)

I plan to mount the WFR to the cable entrance weatherhead with zip ties if it will work.  The device has an Ethernet cable that plugs into a POE (Power Over Ethernet) power supply.  The front cable entrance weatherhead opens into the cabinet behind/above the drivers head where a 19″ CRT TV was once housed.  It comes with a DC power adapter, but we purchased the AC power adapter as there is already AC power in this cabinet that is supplied from the inverter subpanel.

Our Verizon 4G/LTE MiFi 5510L Jetpack device does essentially the same thing as the WiFi-M, except it communicates with Verizon cell phone towers instead of external WiFi sources.  We will be using the Wi-Fi Ranger when possible, and the Verizon 5510L otherwise (assuming it has a usable signal).  This means we could have two different WiFi networks running simultaneously.  The upside to this is that we could have multiple devices accessing the Internet through different pipelines, resulting in faster data transfer.  The downside to this is that devices on one network can’t communicate with devices on the other one.  (We could solve that problem with a WiFi Ranger GO.)  Although interference between the networks is possible, it is unlikely.

We needed an additional length of hose to hook up the new water softener when it arrived, so Linda picked up a 10′ long food grade hose from the Camco booth.  She then returned to the coach to straighten it up for a visit later from Louise & Craig while I went off to the Great Lakes Area Motorcoach Association (GLAMA) gathering at 3:15 PM.

I attended the Great Lakes Area Motorcoach Association (area) meeting in the late afternoon.  The main items of interest at the GLAMA meeting were the upcoming GLAMARAMA in mid-September 2013 and the 2014 GLAMARAMA planned for next June.  Both rallies will be at the Elkhart County Fairgrounds in Goshen, IN.  After that the intention is to move it around through Michigan, Indiana, Ohio, and Ontario (Canada), perhaps doing two consecutive years in each state/province.

On the walk back to the coach I had a long, technical conversation with Michele Henry of Phoenix Paint in Edwardsburg, Michigan regarding how to remove and reinstall the broken searchlight on the front roof while minimizing damage to the paint.  Michele’s shop did the roof repair and repaint on our coach, and she always has a good sense about how to approach something like this.  She talked me through the best way to approach it, and after considering the process carefully, I decided to defer an actual repair until we can get the coach back to her shop.

Louise & Craig came by around 5:30 PM and we continued our conversation over snacks and some Red Ass Wine from the Prairie Berry Winery in the Black Hills of South Dakota.  The new water softener got delivered just as they showed up, so hookup was deferred until later.  We put out the Blue Diamond Wasabi Soy almonds, and I think they caught Louise by surprise.  (Sorry Louise.  We really should warn folks about these.  If you like almonds, and you like spicy, you will find these addictive.)