Tag Archives: Fusion Technology (Yaesu)

2015/09/23 (W) Autumnal Equinox

We were up at 8 AM, had granola for breakfast, and enjoyed our coffee in the living room by the fireplace.  I like cool mornings.

I spent some time yesterday morning, and again this morning, considering my full-frame DSLR options.  The only 50 MP “35mm” DSLR camera body on the market at this time is the Canon 5Ds/R and there is no indication that Sony plans to introduce a successor to the A99 anytime soon.  The A99 is still available, as is the vertical battery pack/grip and I am at the point where I will probably order one.  It has a 24 MP full-frame CMOS sensor, which is double the resolution of my alpha 100.  More importantly, it will accept all of my old 35mm Minolta A-mount lenses and they will work as designed.

Linda left at 9:40 AM to meet Diane at Kensington Metropark.  I gathered up the laundry, sorted it, and started the first load.  I then settled in at my desk for a while.

I e-mailed Mike (W8XH) to see if he could assist me on Saturday and/or Monday with climbing the tower to do some more antenna work.  I then e-mailed Bill Gerrie to see if he and Karen were in Michigan yet.  I pulled up the initial mockup of the October 2015 issue of Bus Conversion Magazine and proofread my article on replacing the speedometer.  Jorge had done a good job of laying it out.  I e-mailed back four minor corrections, one slightly larger one, and a general comment about the lack of space following periods.  I had an e-mail from Steve Smith (N8AR) with contact information for Yaesu Fusion technical support.

The washing machine beeped so I transferred that load to the dryer and started another one.  I noticed that it was after 11:30 AM so I cleaned the cats’ litter tray, grabbed the garbage from under the kitchen island sink, put it in the trash can, and got it to the street.  Alchin’s normally comes “around noon” but I had a feeling they had already driven by.  They were still in our subdivision, however, and stopped on the way out to empty our can.

I had another cup of coffee and updated this post.  By noon Linda had not called yet let me know she was on her way home so I headed to Lowe’s for a roll of plumber’s sandpaper.  I also picked up the paste we need to hang the new wallpaper.  On the way back to the house I stopped at Teeko’s Coffee and Tea to order some Cafe Europe half-caff blend.  Linda was home when I got back and we had a light lunch.  We have both finally taken off some of the weight we put on this past winter.  Long, hard work days with little or no lunch seem to help.

By the time we got back to work on the bus projects it was 3 PM.  It’s hard to make progress when the workday starts in the afternoon.  Today is the autumnal equinox, so it gets dark much earlier in the evening than it did in late May, June, July and even most of August.  Still, as anxious as I am to get the heat exchangers re-installed we have to deal with the wallpaper in that part of the bus first.  Linda helped me assemble the right desk base, repeating what we did yesterday with the left base.

The left pedestal base with the Aqua-Hot fan-coil heat exchanger mounted inside.

The left pedestal base with the Aqua-Hot fan-coil heat exchanger mounted inside.

We installed the metal grates on the air openings (from the inside) and then used doubled-sided tape to affix the plastic mesh to the metal grate.  We put a 1/2″ plywood spacer in the bottom and marked the locations of the mounting bracket holes and the heat exchanger.  We took the exchanger and spacer out, punched the starter holes, and drilled.  Linda cleaned the heat exchanger and used a pair of tweezers to straighten the bent radiator fins, of which there were quite a few.  We cleaned off the two copper pipe stubs that provide the inlet and outlet for the antifreeze and then attached the self-stick 3/8″ X 1/4″ dense foam weather-stripping around the front of the housing.  We mounted the exchanger to the spacer with approximately 1/8″ of the foam weather-stripping beyond the front edge of the spacer.  We put the spacer/exchanger assembly back in the base and I secured it with screws while Linda pulled it into position, compressing the weather-stripping.

Linda cleans and straightens the fins on one of the fan-coil heat exchangers.

Linda cleans and straightens the fins on one of the fan-coil heat exchangers.

I took a few photographs as we worked and took some more of the finished assemblies.  While we were working we got a call from Philip Jarrell of Precision Paving.  Phil was calling to see if we still wanted the French Drain and driveway work done.  He has been busy all summer and even more so coming into fall when folks decide they need stuff done before winter.  He had given us a quote (estimate) back in the spring but could not do the work then because the soil was way too moist.  The property has dried out nicely over the last seven weeks and he wanted to make sure he did the work yet this year if we were still interested.  I told him “yes” and he said he would call “Miss Dig” right away to get the utilities marked and then get started.

The two desk bases with the fan-coil heat exchangers installed view from above and behind.

The two desk bases with the fan-coil heat exchangers installed view from above and behind.

I think this annoyed Linda as it will be another significant expenditure, but it’s something I think needs to be done and it is not easy to get a slice of Phil’s time.  (Actually, we have done a lot of difficult work together on the bus this summer and I think she was already annoyed from working with me on the right base.)  Not taking advantage of Phil’s availability would likely mean a two-year delay in getting this work done.

This project is actually a combination of two different projects that happened to make more sense to do at the same than at separate times.  The French drain is intended to dry out the far west end of our property which has standing water in the spring and after heavy rains, and stays moist/soft for the first half of the summer.  There are a lot of trees in that area and we have lost some and are losing others.  The driveway work will give us additional parking for people visiting in their RVs and create the main approach to the location for the bus barn that I hope to eventually build.  The topsoil that Phil pulls out from the driveway will be used to fill in low spots on the west end of the property, further improving the drainage in that area.

The right desk base viewed from above/behind showing the fans mounted on the back side of the heat-exchanger.

The right desk base viewed from above/behind showing the fans mounted on the back side of the heat-exchanger.

Linda returned to stripping wallpaper in the bus while I folded the laundry and put it away.  For dinner we had a salad and more of the soup that Linda made yesterday.  After dinner Linda researched wallpaper installation while I worked at my computer and uploaded eight blog posts from the third week of July.  About the time I finished the last one Brendan called so I went upstairs and Linda put the call on speaker.  He is a couple of weeks into his position at Eastern Michigan University teaching Art History and gave us a status report on how it is going, along with news of how Madeline is doing in her new daycare program University of Michigan.

We watched Dr. Michael Greger’s 2015 nutrition research summary on Linda’s iPad.  This is an annual presentation that he does at the vegan Summerfest in Pennsylvania.  His theme this year was the top health concerns of Americans, based on a major survey that was done by one of the national survey organizations, and what nutrition research has to offer with respect to these.  As we already know, many different diseases, one common answer; whole-food, plant-based, nutrition with no animal products.  We really are what we eat, and Americans are now some of the least healthy people on the planet.  We went to sleep reaffirmed in our dietary choices.

 

2015/09/13 (N) Club Business

Linda is still fighting her cold and I was up way too late last night so we slept until 9 AM this morning.  Because we were getting a late start, and neither of us was hungry, I made coffee but we skipped breakfast.

It was 51 degrees F in the bus so I turned on all three electric toe kick heaters and put on my zip front sweatshirt that I use to work in cool situations.  We took all of the freezer packs out of the house refrigerator freezer compartment and moved them to the freezer compartment in the bus fridge.  Linda also filled four large containers with water and snapped the lids on.  We put those in the refrigerator compartment on the bus, turned on the power, and put the wireless remote thermometer in the freezer compartment.

I was going to raise the front of the refrigerator until the top hinge for the freezer door just touched the ceiling of the alcove but our relatively inexpensive model apparently lacks that adjustment.  Linda was also concerned about how we will latch the doors for travel.  She remembered seeing a very clever latch for a fridge with doors like ours at the GLAMARAMA rally in early June and found a picture of it on her phone.  It is actually fairly simple and if custom made could be installed using the holes for the center hinge (between the doors) on the handle side (right side) of the fridge.

(I still like Scott Bruner’s solution best.  He devised an electromagnet system that is activated by turning the ignition on but has an override switch.  He and Tami have a cafe door, bottom freezer drawer unit.  One electromagnet holds plates on top of the cafe doors where they meet at the center of the fridge.  A second electromagnet is mounted on the right side of the lower case and holds a plate on the side edge of the freezer drawer front.  Very clever, and very fail safe.)

Bruce installs the fixed side of the piano hinge to the top of the wiring chase above the OTR HVAC duct.

Bruce installs the fixed side of the piano hinge to the top of the wiring chase above the OTR HVAC duct.

Our first construction task for today was to finish installing the built-in sofa.  This was a semi-permanent installation with everything in its final place and screwed in.  We will have to disassemble it once to finish cutting it and screening off the openings in the OTR HVAC duct and to drill the 4″ diameter holes in the vertical front panel for the circular registers.  We also need to find a pair of suitable length lifts to support the seat in the open position.  Finally, we need to find and mount some 12V DC LED lights and replace the momentary contact switches in the aft end cabinet with on-off versions.

It took us until 12:25 PM to finish the sofa (for now).  We took a brief break and had an apple for a snack.  Our next task was to put the plywood bed platform back in the coach.  That sounds simple enough but we knew from taking it out that it would be difficult to put back in.  The platform is the size of a queen size mattress, in two sections joined by a piano hinge.  It’s big, bulky, and very heavy, with no good handholds but we managed to get it into the bedroom and setting flat on the storage box base.

The physically hard part was behind us but now we had to get the fixed part of the platform screwed back down to the base, requiring us to put 18 screws back in the holes they came out of.  I rewired the aisle lights before we did that as I was easier to get to the wires.  We used two screws to index the location, checked the reveal along the length of each side, and screwed it down.  I then reconnected the two gas springs while Linda held the platform up.  I also connected the wiring for the two cargo lights but they did not come on.  I will have to change the bulbs and see if that’s the problem but for now we had more pressing tasks.

A view from near the co-pilot/navigator seat of the built-in sofa with the hinged seat base lifted up to reveal internal pieces and storage space.

A view from near the co-pilot/navigator seat of the built-in sofa with the hinged seat base lifted up to reveal internal pieces and storage space.

We went inside, each had an apple, and then returned to the bus.  I had planned to temporarily mount two 12V DC switches but did not have time to fabricate a temporary mounting plate.  We needed the switches hooked up so I just reconnected the female spade connectors on the cable to the spade lugs on the switches and draped the wires over the arm of the passenger chair.

Our next task was to temporarily install the desk.  The installation was only temporary in the sense that we would need to disassemble it to get the Aqua-Hot fan-coil heat exchangers installed in the bases.  My preference was to get the heating system configured as part of the desk installation but we ran out of time before our appointment at Coach Supply Direct.

Our first sub-task was to cut the 1/4″ Baltic birch plywood spacer to fit on the right side of the right pedestal/base.  I cut it to be shorter than the desk and not as deep as the base, which is recessed at the front to create a toe kick space.  I cut the lower back corner out so the space would fit around the HVAC duct / wiring chase.  We peeled off some clear tape from the mirrors in the right rear corner down below the level of the top of the desk and set the spacer in place.

Our next task was to redo some AC wiring to get power to the space between the pedestals and reconnect the passenger side front duplex outlet.  To get power to the interpedestal space I decided to run 2C+G (Romex) cable from the wiring chase through a hole in the bottom of the pedestal, up the inside rear left, and out through a hole in the upper rear left side.  This hole and cable will not be visible unless someone crawls under the center of the desk.

In order to get the cover/shelf in the foot well aligned with the left and right pedestal/base components I decided to use mending plates attached to the back side of the bases and pedestals.  We started with the right hand components.  I attached a plate to the back side of the left rear base projection and one to the underside of the left end of the upper bottom section of the pedestal.  We set the base in place, put the pedestal on top of it, and set the cover/shelf in place.

We carefully shifted the components until we had them aligned the way we wanted.  I then secured the pedestal to the wall (which is 5/8” or 3/4″ plywood not sure which) with a single screw through the back panel centered from side-to-side and a couple of inches down from the top edge.  We double-checked the alignment of the pieces and then secured the pedestal to the base with three screws.  The base is not screwed to the floor or anything else except the pedestal.

We set the left base and pedestal in place and fussed with the alignment for but it was already 4:15 PM.  We had planned to quit working at 4 PM to get cleaned up for our SLAARC meeting and have dinner.  We still have a lot to do tomorrow for me to be ready to leave on Tuesday morning, but it should be manageable.

We went to Panera in Brighton for dinner and both had the Edamame Soba Noodle Bowl.  It was a generous serving that was tasty and filling even though it was only 390 calories.  It was very high in sodium, a common but unfortunate problem with most of Panera’s food, so not something we would eat often.

We arrived at the South Lyon Witches Hat Depot Freight House at 6:30 PM for the monthly meeting of the South Lyon Area Amateur Radio Club (SLAARC).  We had a larger group than usual, at least 30 people.  The business meeting was brief and followed by a program by Steve (N8AR) on the Yaesu Fusion technology.  Steve and several other club members brought different radios to demonstrate and let the attendees try.

We left in time to get home by 9 PM and watch an episode of Sherlock on Detroit PBS, followed by Rick Steve’s Europe and then Music Voyager.  We’ve been working long, hard hours and it was nice to take an evening to relax and do something other than work on the bus.