Tag Archives: Frigidaire FFHT1621QB

2015/08/09 (N) Sounds of Silence

Sunday usually means a trip to the Howell Farmers Market if the weather is nice.  The weather was OK but Linda did some major grocery shopping last night and did not need anything from the market so we did not go.  We were both tired from yesterday’s refrigerator swap, physically and emotionally, and wanted to take it easy today.  I brewed a pot of Ethiopian Yirgacheffe half-caff coffee and we enjoyed that while reading in the living room.  We eventually ate breakfast and then got ready for the rest of our day.  For me that meant doing three loads of laundry.

I put the first load of laundry in the washer and then drove to The Home Depot to get two more drawer pulls.  We also wanted to look at wall paper but they do not stock any.  Lowe’s had a very limited selection of wallpapers, but we thought a couple of them might work if we could not find anything else.  One, in particular, was scrubable and another was paintable.  We also found one that we liked in a book of Allen-Roth samples.  This was not something we needed to decide on the spot but it is something we need to get settled sooner rather than later.

When we got home we pulled the new refrigerator out of its alcove and plugged it in.  I set the freezer and fresh food compartment controls to the “normal” mark.  Linda filled containers with water and placed them in both compartments.  I found the remote thermometer for the unit that is still mounted on the wall next to the alcove and set it in the fresh food compartment.  The two thermometers are off by a couple of degrees in opposite directions, but close enough for what I needed to do as it will allow me to monitor the temperature without opening the door.  The new refrigerator was much quieter than the old one, which was one of the improvements we were looking for in a new unit.

New fridge in alcove.  Kitchen drawers removed.  Floor being prepped.

New fridge in alcove. Kitchen drawers removed. Floor being prepped.

When we got home we had a phone message from Jim, N8KUE, regarding motorhomes.  Jim plans to retire from the Ford Research Labs in March.  He and Pam are seriously considering getting a motorhome and are starting to research the market.  We’ve said for a while that we would be glad to meet for coffee and talk motorhomes, bus conversions, and the RV lifestyle.  I called Jim back, suggested that we meet them at the Biggby’s Coffee in South Lyon at 4:30 PM, and they agreed.

Linda tried to pull up the Arcadia Bus Rally website to get the registration form but the domain name appeared to be for sale.  I e-mailed Brenda Phelan to find out what is going on.  She and her husband, Bill, operate the rally.  I then worked on the drawings for the built-in sofa cushions.

We had an early dinner at 3:30 PM and left for South Lyon at 4 PM and got to Biggby’s Coffee just after 4:30 PM.  Jim, Pam, and their son Adam, were already there.  We talked until after 6:30 PM and then drove the short distance to the Witch’s Hat Depot in the South Lyon Historic Village where our South Lyon Area Amateur Radio Club (SLAARC) holds its monthly business meeting and program.  One of the members, John (NU8M), a materials science engineer who works for Bosch, gave a very interesting presentation on the various processes that affect electronics as they age and can ultimately cause them to fail.  It was a pleasant evening, weather-wise, and some of us lingered in conversation for a while after the meeting before heading home.

We arrived home hungry and had some hummus with sourdough pretzel nibblers and pita chips and a small piece of watermelon.  I checked the bus refrigerator and the fresh food compartment was down to 34.4 degrees F indicated.  The remote thermometer is off by about 2 degrees F but I don’t recall in which direction.  I turned the thermostat to a warmer setting and will check it again tomorrow.  We turned in for the night and Linda read while I wrote for a while before turning off the lights.

 

2015/08/08 Fridge Swap Gallery Post

On this date we finally removed the old refrigerator from the bus and put the new one in.  The exchange took place at Chuck Spera’s bus garage and he operated his forklift.  John Rauch and his son John provided the much needed muscle and we had help from Randy, who owns the business in the suite next to Chuck’s shop.  Here are 19 photos that show some of what was involved.

2015/08/08 (S) A New Bus Fridge (Finally)

We overslept and did not get up until 7:15 AM.  The weather has been very pleasant all this past week but we awoke to light rain.  We left for our SLAARC breakfast at 7:25 AM and took a different route than usual to see how it would be for the bus.  I headed north on Hacker to M-59, east to US-23, and south to I-96 east.  The ramp from US-23 south to I-96 east is a left exit, left entrance, with a very short merge lane in the middle of a major construction project.  I decided that was not our best option for the bus.

We arrived at breakfast at 8 AM to find a dozen people already there but at least 10 more showed up after us.  We enjoyed the conversation, as we usually do, but did not linger and were on our way back home by 9:15 AM.  As soon as we arrived we changed into our work clothes and got busy with the final preparations to move the bus to Chuck’s bus garage in Novi.

I pulled the bus out at 10:30 AM and Linda followed in the Element, which had all of the pieces we had removed from the old refrigerator along with tools, blankets, and some 2x4s.  The bus roof was brushed by a few small, low branches getting from our house to N. Hacker Road, reminding me that I need to covertly trim trees and bushes along our street.  I say covertly because they are not on our property.  The last time I took the bus out we went south on Hacker to Grand River Avenue.  This would have been our preferred route today except that the trees are not trimmed up in a few places and one of them, just before Bendix Drive, clunked the stuff on our roof pretty hard last time.  I did not care to repeat that so I went north as we had this morning in the car.

At M-59 I headed west to Latson Road, a trip of some four to five miles in the wrong direction.  The reason is that Latson Road going south has a relatively new, and easy to navigate, intersection with I-96.  From there we had an easy run to the Beck Road exit, a short jog south to Grand River Avenue, an easy left turn, and the final mile to Chuck’s shop where we arrived at 11 AM.

Chuck had already pulled his bus out of the building and parked it out of the way but there were several trucks and a dumpster trailer blocking access to his door.  They belonged to a motley crew that the owner of the building in front of Chuck’s shop had hired to clean up some of the mess left behind by the sunroom company that just moved out of the building.  He had me pull up to the right and position myself to back up and then negotiated with the workers to move their vehicles.  I pulled up the tag axles and waited.  The workers were not happy about it but they did it.

To get our bus into Chuck’s shop nose first he had me back parallel to the building and then bring it around to the passenger side into a space adjacent to the front building until I was perpendicular to his door.  I was then able to pull straight in but I did not pull in all the way.  Chuck had me stop with the fixed window frame opposite his forklift which he had already positioned for use.  The on again, off again light rain was not a factor as the window frame we needed to open was well inside his shop.

Linda and I unloaded all of the stuff from the car and brought it inside the shop.  We realized that we forgot to bring the camera so Linda tried to capture the progress of the work with her cell phone camera.  I have put those images in a separate gallery post for this date.

Randy, the owner of the Printology business in the suite adjacent to Chuck’s, came over to see what we were up to and stuck around to help.  With me working from an 8 foot step ladder outside the bus, while Chuck and Linda worked inside, we opened the window frame about 24 inches and propped it with a piece of 2×4.  I then carefully lifted the window higher while Linda sighted along the bottom of the upper cabinet.  When I had the frame high enough to be clear of the cabinet Chuck measured the length of 2×4 we would need to prop it open.

It looked like 52 inches would do the trick.  I had a 56″ piece of 2×4 so I cut it down to 52″ with my 7-1/4″ Rockwell circular saw.  I used the first piece to mark a second piece on an 8 foot 2×4 and cut that.  Linda took both pieces inside the bus where she handled one and Chuck handled the other.  As I lifted the bottom edge of the window from outside the bus the window hinge (at the top) made some unpleasant (and a bit unnerving) sounds but I got it high enough that they could put the two braces in place and the frame did not come unhinged.  We had just finished this task when John Rauch and his son, John, arrived at noon to help move the refrigerators.

The old refrigerator was lying face down in the bus.  The two Johns lifted it as a test and determined that they would not have any difficulty moving it.  Linda fetched one of the blankets and dropped it over the sill of the open window to protect it and the side of the coach.  Chuck had placed the long forks on his forklift about two feet apart and slid a narrow pallet over them.  He raised the forks and brought the forklift forward towards the bus.  We got him to position the top of the pallet even with the top of the sill and about 3″ away from the side of the coach.

John and John are very strong and were able to lift the old refrigerator case and pass it through the window onto the pallet.  With a person on ladders on either side of the pallet we slid the refrigerator all the way out.  Chuck then tilted the forks slightly, slowly backed away, and lowered it down.  John and John got the old refrigerator off the pallet, carried it out of the way, and stood it upright on its base.  They then lifted the new refrigerator onto its back, picked it up, and placed it on the pallet.  They went back inside the bus while Chuck brought the forklift up to the coach and raised the forks until the pallet was at window sill level.  John and John slid it into the bus, stood it up, and rolled it into the alcove.  I then secured it in place with a piece of 1×3 wood screwed to the floor across the front to keep it from rolling out while driving.  There is approximately three inches of space above the fridge but it cannot tilt out very far before the upper back edge catches the ceiling of the alcove.

John, John, and Chuck raised the window frame slightly to remove the 2x4s and close the frame when the top hinge started coming apart.  Linda yelled for me and I scrambled over to get another pair of hands on the frame.  With me and Chuck holding the outside (free) edge and the two Johns holding the hinge edge I was able to see where the hinge was out and direct folks as to what to do.  It took several tries and a few minutes (that seemed like hours) but we got the hinge re-engaged and then closed the window frame.  We took a few minutes to rest and chat and Chuck showed John (the father) his race car.   The heavy lifting was all done so John, John, and Randy took off, but before they did Linda gave John (the son) a gift for their new baby girl, Lucy Violet.

Linda and I put all the shelves and bins in the new refrigerator and then reattached the two doors.  That was a bit of extra work as it came with the hinges on the right side but we needed the door to open on the right side.  With the doors on we took a moment to consider our choice of size and color (black) and felt we had made the right decision.  We started to reassemble the old refrigerator but we were all hungry and decided to go to lunch first.  I started the bus and pulled it all the way into the shop so we could close up.  Chuck then drove us down the street to Panera for lunch.  We took our time and had a nice meal and a nice chat.

Back at the shop we decided to switch the buses around so Chuck would be free to leave.  He wanted a picture of the two buses together so I backed ours out of his shop, swung around to the passenger side, got parallel to his bus, and then backed up so the nose of our bus was about 10 feet behind the nose of his.  He and Linda then both took photos with their cell phones.  When the photo shoot was done I pulled forward to the left and then backed in parallel to the building about four feet from the curb.  That gave Chuck plenty of room to pull up next to me on my passenger side and then back around next to the front building and get lined up to pull straight into his bay just as I had done earlier.

Back in the shop Linda wiped out the inside of the old refrigerator and then we reattached the two doors.  As she cleaned each rack, shelf, and bin I placed it back into the refrigerator.  When it was fully reassembled we plugged it in.  It came on, ran for about 60 seconds and then shut off.  It obviously was not cold yet, and might have been cause for alarm if I had not dealt with this “problem” before.

I knew from prior experience that the defrost timer had probably disconnected the compressor and connected the evaporator defroster.  Chuck pulled out three of his lawn chairs and we sat around waiting for the refrigerator to restart.  The only thing missing was three cold beers.  We knew the unit still had power as the lights were working.  There was an outside chance that the overload protector (fuse?) might have blown, but I did not consider that to be likely.  Our patience was rewarded about 25 minutes later when the compressor came back on.  While we were waiting we gathered up our tools and various materials and loaded everything back into the Honda Element.

Chuck had a message from his wife, Barbara, with her ETA so we decided to settle back into the lawn chairs and kibbutz until Barb arrived.  She showed up a little while later and Chuck got out a fourth chair and we sat in the shop listening to the sound of the functioning refrigerator and debriefing the events of the day.  As a result of the window frame hinge coming loose I am now of the opinion that I did not need to remove the two stop blocks.  I suspect they are there to “stop” the hinge from coming apart and I should not have removed them.  Chuck is also thinking about replacing the refrigerator in their bus and is going to check with Prevost regarding these blocks.  As much as anything I was annoyed with myself for the amount of time I wasted removing these blocks but what is done is done and I now need to reinstall the one block that came off undamaged and get a replacement for the other one, even though I can only attach it with one machine screw.  Butch thinks he can make one for me, otherwise I will have to get one from Prevost.

Our local electrical utility, DTE Energy, will pick up used appliances.  In the case of a refrigerator it has to be plugged in and running, which I presume means it is functioning and cooling the interior.  If so, they will take it away and send us a check for $50.  From our end that’s a good deal as we don’t have to pay someone to haul it away.  Because of the R-12 Freon there are very few places that will deal with it.  My guess is that DTE has a sub-contractor who will recover, clean, and recycle the R-12, which is no longer being made and has become very expensive.  They may also recycle the copper tubing and electrical wire, and possibly the metal case and other materials.  Even with the labor to do this work the unit must be worth more than $50 to them.

We all needed to get some dinner so we wrapped up our visit and started up our bus.  I pulled out onto westbound Grand River Avenue followed by Linda in the car.  At Beck Road we turned north and then got on I-96 westbound.  The bus was at 3/8ths of a tank of fuel so I decided to stay on I-96 and go to the Mobil truck stop at M-52, a run of about 30 miles that would allow the engine and transmission to come up to normal operating temperature.  Linda exited at Latson Road and stopped at Meijer’s to do some grocery shopping.

The Mobil truck stop is run down with a very poor, pot-holed apron and parking area, but there are usually several tractor-trailers fueling here when we pull in as it is one of only two places that a semi can refuel between Detroit and Lansing.  There weren’t any trucks getting fuel when I pulled in but it was 7:30 PM on a Saturday evening and there were a half dozen tractor-trailers settled in the parking area for the night.  I poured two bottles of Stanadyne diesel fuel additive into the fuel tank followed by two ounces of Racor Biocide.  I then added 125 gallons of diesel fuel to the tank, which took about 11 minutes.  By the time I paid for the fuel and was ready to pull out it was 8 PM.

I called Linda to let her know I was on my way and then reset the trip odometer.  I drove east on I-96 for 10 miles to the M-59 / Burkhardt Road exit and got on M-59, which only goes east from there.  Eleven miles later I made the turn south onto N. Hacker Road and completed the drive to our house.  Linda heard me idling in the street, where I stopped to lift the tag axles before making the tight right turn into our pull-through driveway, and came out to help get me parked.  Once I was positioned correctly I put the tag axle back down, let the engine low idle for a minute to let the turbo spin down and let the heads cool off and the temperature to equalize, switched the Level Low system out of drive mode, and shut off the engine.  I shut off the air supply to the engine accessories, shut off the chassis batteries, connected the shore power cord, locked everything up, and went in for the evening.

It had been a long day and we were glad to have it behind us.  I had been anticipating the refrigerator exchange, with some dread, for well over a month.  The concern was that we would not be able to move the units out/in through the window frame, requiring us to remove and replace the lower passenger-side windshield, or that something would go wrong, like the hinge, and turn out to be an expensive and difficult problem to fix.  With each passing day it was also becoming a bottleneck in our remodeling project, at least psychologically if not physically.  But it was finally done and ended well.  We will plug in the new refrigerator tomorrow to make sure it works.  We tested it in Chuck’s shop when it was delivered so we expect it to work now.  There is a lot of work to do but now we can get on with it and I expect it to go well.

In spite of being tired we stayed up and watched the PBS broadcast of the Simon and Garfunkel reunion concert they did live in New York City’s Central Park 10 years after they split up as a duo.  Their music remains among my most favorite from my youth and it has lost nothing with the passing of many years.

 

2015/07/03 (F) 4th Anniversary

Several SLAARC members were gathering at 10:30 AM this morning to unload the Field Day equipment from Steve’s trailer and store it in the South Lyon water tower.  I was going to join them but decided last night to stay home and work on the design for the desk and HVAC chase covers for our motorcoach.  Having played ham radio for much of the last week and a half I needed to refocus my time and attention on the interior remodeling of our bus.  Besides, Brendan was bringing Madeline to our house sometime mid-to-late morning and I wanted to be home when they arrived.  Today was Brendan and Shawna’s 4th wedding anniversary and they asked Linda if we would take care of Madeline for a couple of nights so they could have some time together without the constant demands of child care.  Of course Linda said ‘yes.’

I had a call last night from XPO Delivery Services letting me know the new refrigerator for the bus would be delivered to Chuck Spera’s shop in Novi today between 6 and 8 PM.  That meant I would have to be at the shop by 5 PM just in case they arrived early and could be there past 8 PM if they arrived late.  At 7:45 AM this morning I got a call from the Lowe’s in Howell asking if XPO could deliver the refrigerator in about an hour.  Sure, why not; I was still in bed but about to get up anyway and having the refrigerator delivered early would actually open up my entire day.  I hurried the process along, had Linda get the receipt, grabbed my iPad, and headed for Chuck’s shop in Novi.  Linda was getting ready to go for a walk as I left.

One never knows what the traffic will be like on I-96 headed into the Detroit metro area from the northwest but on this Friday, at the start of a major holiday weekend, the traffic was very light and I was able to get to Novi in the minimum legal time.  Traffic headed westbound actually appeared to be heavier than the inbound traffic.  I stopped at the Tim Horton’s on Beck Road just north of Grand River Avenue and got coffee which I had not taken the time to make at home before I left.

I texted Chuck to let him know that the refrigerator was being delivered this morning.  He called me back to clarify where to have them set it.  This would be a great weekend to do the swap as all of the other businesses around his shop building will be closed for the holiday, making it easy to get our bus in and out.  But his daughter arrived last night from New York and will be visiting for a week so the refrigerator replacement will have to wait, probably until at least next weekend.

By 9:30 AM XPO had not arrived so I called Lowe’s in Howell and talked to Erica in scheduling.  She said she would call the driver and see what was going on.  I texted a status update to Linda and continued to wait.  By 10 AM there was still no truck and no call back from Erica.  At 10:20 I was dialing Lowe’s again when an Enterprise rental truck drove past the building headed east and a few minutes later went by headed west and pulled into a parking lot.  Moments later my phone rang.  It was the XPO truck driver.  I explained where the driveway was and flagged them in.  When I ordered the fridge I gave detailed special instructions on how to find the building but the driver did not bother reading them and did not bother calling me until he had failed to find the delivery location for the second time.

They backed the truck into the area in front of Chuck’s garage door, lowered the refrigerator down on their lift gate, slid a pair of lift straps under it, picked it up, and carried it into the shop.  I looked it over as best I could and then signed for it.  Only later did I notice a small dent towards the bottom of the door.  I had an automated call later asking if I was satisfied with the delivery and indicated ‘no’, noting the arrival delay and the small ding.  The message said I would hear back from someone within an hour but no one ever called.  We do not plan to make an issue of the ding as we will be lucky to get it into the bus and into its alcove with no further damage.  Still, it should have arrived in perfect condition and did not.

I called Linda to let her know the refrigerator had arrived and that I was getting ready to head home.  She said Brendan had just arrived with Madeline.  As I started to back out of my parking spot Chuck arrived so I spent about 30 minutes talking with him about the timing and approach of the refrigerator swap.  I will almost certainly take our bus to his garage on a weekend.  Only later did I find out that Brendan will not be available to help for the next two or three weekends.  Ugh.  Chuck called a friend (golf buddy) who has narrow pallets (24″) to see if he could get a 5’ long section.  With the long forks set close together on his forklift we can slide the pallet over the forks and have a much more secure platform form for raising and lowering refrigerators, probably laying on their backs.

Linda called back and asked me to stop on the way home for some toddler toothpaste and a toddler toothbrush.  I did not know they made such things but I found them at the CVS in Brighton.  Not long after I got home Linda had lunch on the table.  She heated some veggie nuggets and set them out along with baby carrots, grapes, pretzels, hummus, vegan deli slices, bread, lettuce, and onion.  We all had a good lunch with lots of variety.  Brendan got Madeline down for her nap at 1 PM and hung around long enough to make sure she was asleep.  I took a few minutes to show him the new Yaesu radio before he headed back to Ann Arbor.

I was very tired and took a nap on the living room sofa which is especially comfortable for this purpose, better actually than for sitting on.  Madeline slept until almost 4 PM.  When she woke up she wanted her mommy and daddy and was a little weepy but Grandma Linda got her quickly engaged in doing things.  Linda took her for a walk to see the chickens while I went downstairs to check e-mails.  I responded to ones having to do with the transfer of the SLAARC website and domain name registration from GoDaddy.com to QTH.com and made mental note of others.  When they got back from their walk Linda brought Madeline downstairs to see Grandpa Bruce at work in his office and ham radio shack.  We told her we would help her become an amateur radio operator when she was older.

Linda decided that baking a vegan chocolate cake would be an excellent activity to do with Madeline and give us a nice treat for later.  Madeline helped pour and stir ingredients.  She ended up with chocolate cake batter on her face and clothes but it was worth it as she got to lick one of the spoons.  (Without any animal products, especially raw eggs, vegan cake batter is perfectly safe to eat.)  Linda had previously found a small baking set for Madeline that included a small bunt cake pan.  Some of the batter went in there to make a little cake just for Madeline and the rest was used to make 11 cupcakes.

After the cupcakes were cooked and taken out of the oven to cool Linda made dinner.  We had mock chicken strips (vegan), fresh sautéed green beans, vegan refried beans, and fresh berries leftover from earlier.  When the cakes were cool enough Linda got out the powdered sugar and sifter and we dusted them.  Madeline enjoyed the decorating but somehow ended up with powdered sugar in her hair, on her dress, and all over her face.  I took pictures and then Linda cleaned her up while I cleaned the floor.

After dinner and dessert we played and read a bit.  Linda had gotten three Sesame Street Workshop DVDs from the Howell Public Library so we all climbed up into the bed in our bedroom and watched one of them.  We played along with the various activities and games and encouraged Madeline to do the same.  The program ended at 8 PM which is Madeline’s bedtime.  Linda helped her in the bathroom, got her into her pajamas, and helped her brush her teeth.  She laid down without a fuss and drifted off to sleep. We stayed up until the last chime of the grandfather clock at 9:45 PM and then turned in for the night.  We are always satisfyingly tired after a full day of Madeline.

 

2015/07/02 (R) 100,000 Radios

We were tired and did not get up until almost 8 AM.  Linda prepared a tofu scramble for breakfast, as we were almost out of her homemade granola, and served it with some cinnamon raisin toast and fresh grapefruit.  It’s the closest thing we eat to scrambled eggs and she serves it as an occasional change of pace from our standard granola breakfast.

I had my annual appointment with my dermatologist this morning at 11 AM.  I needed to pick up a cable from Scott (AC8IL) at Adams Electronics, which was on my way to the Henry Ford Health System (HFHS) clinic, so I left the house a little after 9:30 AM.  The drive was fine initially and I had a nice QSO (chat) with Steve (N8AR) on the South Lyon 2m repeater.  As I was approaching Wixom Road, however, all lanes of eastbound I-96 were stopped.  I was able to exit at Wixom Road and headed north a short distance to West Road which I took east over to Beck Road where Scotty’s business is located a little north of West Road.  I had a brief chat with Scott about the antennas on my tower before I left.

Two miles north of Scott’s shop I turned east on Maple Road (15 Mile Road).  The HFHS has many clinics around the greater Metro Detroit area and my dermatologist is located at the intersection of Maple and Farmington Roads in West Bloomfield.  That should have been an easy trip but there was construction on Maple Road that had the road down to one lane with flaggers.  There were signs advising motorists to seek other routes but I did not heed the warning.  I patiently worked my way through and arrived for my appointment about seven minutes ahead of time.  Good thing I left as early as I did.

My exam was fairly routine and Dr. Nydorf wrote out a prescription for Doxycycline.  I will try taking it (again) three times a week and see if it helps.  I headed straight for home after my appointment but took a different route.  Once I was back at the house Linda went for a walk.  While she was walking I removed the license plate from her car, took the protective (anti-theft) cover off, and cleaned everything.  When it was dry I put the new registration sticker in the corner, reassembled the cover, and installed the plate back onto the car.  I then started working with the various pieces of the new Yaesu FTM-400DR/DE mobile radio.  When she got back from her walk she heated up a couple of tofu hotdogs for lunch.  These are such simple fare but so tasty (with mustard, onions, and relish) and so appropriate for a summertime lunch.  They are also a really easy lunch to get on the table.

After lunch Linda took her car to the Howell library to get some books and children’s DVDs and then stop at the Meijer’s supermarket to pick up a few grocery items for Madeline’s visit this weekend.  While she was running errands I assembled our new Diamond X-300NA antenna.  Once it was assembled it was over 10 feet long so I stored it by mounting it to the side of the tower.  I put it up as high as I could reach from the ground to get the three counterpoise (elevated ground plane) rods above eye level.  Moving it to the top of the tower as a replacement for the Diamond X-50NA will have to wait until next week or later.  The exact timing will depend on the weather, Mike’s (W8XH) availability, and whether I have acquired appropriate standoffs by then for the X-300 antenna and/or the cellular booster omnidirectional antenna.

With the antenna taken care of (for now) I disconnected the coaxial cable for the X-50 from the radio side of the lightning arrestor and positioned it so I could pull it back into the sump pump room.  From there I fed it into the ham shack, disconnected it from the radio, and coiled it up.  I uncoiled the new 20′ LMR-400 cable with the N-male connector end positioned so I could feed it through the corner of the ceiling in the ham shack (by the ground wire) and into the sump pump room.  From there I fed it through one of the 2″ conduits into the cable entry box.  Back outside I shaped the cable (LMR-400 cable is double shielded and stiff) and connected it to the radio side of the Morgan VHF/UHF lightning arrestor and closed the lid on the box.

Back in the ham shack I attached the PL-259 connector to the SO-239 socket on the back of the Icom IC-7000 GoBox.  I could have gotten away with a 16′ cable but the 20′ length gives me more flexibility with respect to equipment placement.  I turned on the IC-7000 but did not hear anyone on either the South Lyon 2m or the Novi 70cm repeaters so I turned it off.

I disconnected Mike’s Icom IC-2820H and set it aside to make space for the new Yaesu FTM-400DR/DE dual band mobile transceiver.  I moved the new coax to the new radio, powered it up, spent a few minutes configuring some basic things, and then listened to the South Lyon and Novi repeaters.  I tried calling them but was not triggering them so I knew the PL Tone was not set correctly.  I called Mike for assistance and left him a voice message.

Linda was back by this time so she came down to see the new radio.  We then went out to the bus to make our final decisions about upholstery fabric and window shade materials.  In the end we chose the Lambright Notion Linen fabric for all four chairs and the MCD B50 material for the dark out shades.  We brought all the samples back in the house and I e-mailed our choices to Josh at Coach Supply Direct.

I had an e-mail from Scott Neader (KA9FOX) at QTH.com requesting an admin login for the SLAARC WordPress website so I set that up and e-mailed him back.  I had the new radio on and was listening to a conversation on the Novi repeater.  It had just concluded when Mike returned my call.  He walked me through how to set up the PL Tone and Squelch Tone for both of the repeaters on the FTM-400.  We were then able to verify that the radio was working on both bands.

For dinner Linda made a salad and pan-grilled tofu with caramelized onions and barbecue sauce which she served open-faced on hamburger buns.  We had watermelon for dessert, which we have been doing a lot this summer.  I did not care for watermelon as a child but it has become a favorite summertime treat.  I had dropped a small lock washer while mounting the new antenna to the tower earlier so I went to Lowe’s to get a replacement and some spares.  On the drive there I got a call from XPO Delivery Service letting me know that the new refrigerator for the bus would be delivered to Chuck’s shop in Novi tomorrow between 6 and 8 PM.

At Lowe’s I picked up some 6mm x 1.0 Nylok nuts in addition to the lock washers.  I also got some grass seed patching mix, a few more bags of decorative broken brick pieces, and a hummingbird feeder with a red reservoir so Linda can use sugar water without red food coloring.  When I got home the odometer on my car read 100000 so I took a picture of it with my phone.  I then spread the patching mix over the bare dirt I had used to fill a hole and troughs left by the installation of the natural gas line to our house last September.  The rest of the evening Linda read and I worked on completing drafts of blog posts.

 

 

2015/06/18 (R) Chiseled Bikinis

The light rain that started late yesterday afternoon continued off-and-on through the overnight hours.  We awoke to heavily overcast skies but a forecast that called for dry conditions until the early afternoon.  We were up at 7:15 AM and had our usual granola breakfast.  I took some more Ibuprofen in advance of working in the bus.  We were just getting ready to have our morning coffee when I noticed several cars in the driveway.  It was 7:45 AM and the roofers were arriving.  Pat Davidson was among them so I went outside to chat briefly with him.

We had our morning coffee and then got to work, Linda at her desk and me in the bus. I spent another two hours using the Makita 11 pound power chisel.  By 11 AM I had removed as much material from the floor as I felt was worth the effort.  Linda brought the camera out and took a few photographs of me at work after which I packed up the equipment, closed up the bus, and went to Home Depot in Howell to return it to their rental department.

I stopped at Lowe’s on the way home and ordered the new Frigidaire refrigerator for the bus, an FFHT1621QB (16.3 cu. ft., top freezer, black, no ice maker or water).  I scheduled delivery for Friday July 3rd to Chuck’s shop in Novi.  I will arrange with Chuck to take the bus their sometime after that when he is available to operate his fork lift and I can get Brendan or some friends to give us a hand.

Me using the Makita 11 lb power chisel to remove thinset and mastic from the floor of our H3-40.  (Photo by Linda)

Me using the Makita 11 lb power chisel to remove thinset and mastic from the floor of our H3-40. (Photo by Linda)

Work continued on the roof through the morning and then the crew tarped off the roof and left in a few of their vehicles for a long lunch.  As forecast it started to sprinkle around 2 PM as they returned from their lunch break.  It never rained hard and they kept on working but always with the tarps at the ready in case they were suddenly needed.  One of the guys finished installing our two Velux Sun Tunnel skylights which required a tall step ladder in our living room.  They looked very nice when he was done.

I had a chat with Jarel Beatty in Logansport, Indiana about the custom desk he is going to build for the bus.  I sent him a follow-up e-mail describing the pullout pantry we also need him to build.  I then spent an hour working on drawings before I had to quit and change clothes.

Kate had secured tickets through her cousin, Michaela, for this evening’s performance of The Bikinis at the Meadow Brooke Theatre at Oakland University in Rochester Hills.  Kate suggested O’Conner’s Public House (Irish Pub) in Rochester for dinner.  The roofers had been working in the living room installing the Velux Sun Tunnel skylights but were done by 3:45 PM.  That allowed us to get cleaned up, dressed for the theatre, and out the door at 4:30 PM even though the roofers were still working up on the roof.

We got to the pub at 6 PM.  Kate got there shortly before us and had ordered a soft pretzel appetizer before the happy hour prices expired at 6 PM.  Conveniently there were three large sticks so we each got one.  Kate got the cheesy dipping sauce and we split the spicy horseradish mustard, which really had a kick to it.  Linda and Kate each had a Smithwicks ale and I had a pineapple ale.  To paraphrase “the world’s most interesting man”:  I don’t always drink beer, but when I do, I prefer a fruit beer.  Not as mysterious as Dos Equis, or as authentic as Guinness, but it’s what I like.  Kate had a regular (beef) burger and we both had black bean burgers on soft pretzel buns with fresh hand-cut French fries.  The burgers and fries were both really good and the pretzel buns, which had been toasted on a grill, did not get soggy.

The musical was a lot of fun with a wonderful performance by the cast of four women.  All four of them were on stage singing and dancing with a lot of energy for most of the performance.  Their singing was excellent, each voice having its own unique quality but blending well, and they carried 4-part harmonies in tune with one another and the small 4-pieces band.  Two of them, Bambi Jones and Jeanne Tinker, were also in the Meshuggah Nuns musical we saw a month or so ago at the Meadow Brooke Theatre.

The Bikinis is the last production that Kate’s cousin Michaela will work on at the MBT.  The production run ends on Sunday and one week later she leaves for a summer stock gig in New England.  Meadow Brooke Theatre is a wonderful venue but not convenient to where we live, even less convenient to where Kate works, and very inconvenient to where she lives.  All of which is to say, I doubt that the three of us will be going there very often now that Michaela is moving on.  That is too bad in a way as we have all enjoyed the shows we have seen.  The fact that Michaela, as a cast/crew member, was able to get us tickets did not hurt.

Michaela met us in the lobby where Kate gave her a nice assortment of flowers.  She then gave us a behind the scenes tour of the wardrobe area where she has spent the past year working on costuming.  We walked out to our cars and by the time we all drove off it was 11 PM.  Even with light traffic it took us almost an hour to get home but we arrived while it was still Thursday, albeit just barely.

 

2015/06/02 (T) GLAMARAMA 2015 (Day 0)

We were up at 7 AM and had cinnamon toast for breakfast but did not have coffee.  We checked various routes to the Elkhart County 4-H Fairgrounds (EC4HFG) and searched online for information about any possible road construction problem areas but did not find anything that looked problematic.  By 8 AM we had started preparing the bus and car for travel.  Linda walked over to Curtis’s coach to say “so long for now” but all the shades were down so she sent him a text message that we were on our way.  We pulled out of our site at 8:15 AM.  I pulled up clear of other RVs and stopped to wipe off the passenger side mirror which was obscured with dew.  I am always surprised that I don’t notice things like that before we start to move.

We took CR-4 west to SR-19 and went south, crossing over the Indiana Toll Road, to CR-6.  There are times of the day that this intersection would be very busy but traffic was light this morning and I had no trouble getting into the correct turn lane and completing the turn.  CR-6 is a 4-lane road and moved along nicely all the way to CR-17 except for a short lane closure for local maintenance.  We turned south on CR-17, took it down to US-20, and headed east.  As I expected, this stretch of US-20 was still very much under construction with only one lane open in each direction and no wide loads over 11 feet permitted.  Traffic was more congested and slower but it moved along.  When we got to SR-15 we turned south and ran along nicely until we got to a construction zone that had the road down to one lane with flaggers.  We waited patiently and eventually got through the bottleneck.  We were routed through a short detour and then finally entered Goshen.  We followed the SR-15/US-33 Truck Route and found ourselves in another one lane construction zone with flaggers, and a train thrown in for good measure, but we eventually made it to our turn onto eastbound CR-34 (Monroe Street) and drove the final mile to Gate 5 of the EC4HFG.

We were directed to the staging area where we unhooked our car.  We were then led to the area reserved for our Great Lakes Converted Coaches Chapter and backed into our site.  The Laughing Raven Touring Co. bus was already parked in our area.  We saw this bus at Elkhart Campground while walking but did not realize it was headed to the rally.  The owner, Mark Lovegreen, is not a member of our chapter but wanted to park with other buses and we were glad to have him.  I reserved 12 parking spaces, the parking crew gave us 13, and I had a least one coach that was not going to show up so we had the space.  Also, Pat and Vicki Lintner got parked on hard surface nearby as the ground in our area was very soft when they arrived on Sunday.  In addition to being our chapters National Director Pat is the Senior VP of GLAMA would normally be parked elsewhere except that he likes to park with the chapter.

While Linda set up the interior and made coffee I hooked up the electrical power.  Our main 50 A circuit breaker did not want to set.  I finally pushed the lever hard enough to move it but did not like the way it sounded and did not get power to the coach.  I have indicator lights that told me there was power at the coach end of the shorepower cord but I verified that using my VOM.  I removed the cover from the disconnect box in our coach and verified that there was voltage present on both the L1and L2 bus but no voltage present on the output lugs of the circuit breaker.  Bummer.

Linda turned off the 30A supply circuit breaker and unplugged the cord.  I checked with the VOM that there was not voltage present and then unclamped the L1 and L2 load wires, removed them from the circuit breaker, and then removed the breaker from the box.  I tested it for continuity and with the lever in the “ON” position and one leg showed a short but the other leg showed an open.  That meant I should have had voltage coming through to our Progressive Industries EMS on one leg but I never did.  Regardless, we needed a new breaker as at least the one side had clearly failed.

The circuit breaker was a Square D QO style 2-pole 50A model.  I knew that Lowe’s carried QO breakers so Linda searched for the nearest store using her phone.  There was one on US-33 back towards Elkhart so Linda fixed a “to go” cup of coffee for me and I headed there.  They had a good selection of QO breakers including the 50A one that needed.  I looked briefly at refrigerators and noted that they had the Frigidaire model we are considering in white, black, and stainless steel.  Maybe we will drive up later to look at them.

I took a different route through Goshen to avoid the one lane construction zone.  Back at the coach I refilled my coffee and got to work.  As bus repairs go this one was pretty straightforward.  Getting the two load wires into the circuit breaker clamps was a bit tricky but I got them in.  The QO breakers snap onto a mounting rail at the bottom and then the contact fingers snap over two blades at the top.  All of that took a bit of pushing but I got it in.  I put the cover plate back on, reconnected the shorepower cord, turned on the supply breaker, and turned on the coach breaker.  We had power to the coach but it shut off.  I reset the breakers (turned them full off and then back on) and everything appeared to be fine and the power did not trip out after that.

With our power problem averted Linda walked over and got us registered and signed up for one of the few remaining time slots to work in the rally office.  She had volunteered to work registration but most of the time slots were already filled and the only thing left was Saturday morning.  Shortly after she returned to our parking area three more buses showed up:  Bill and Karen Gerrie, Mike and Kathy Dickson, and Joe and Mia Temples.  Next in were John and Paulette Lingafelter followed by Don and Sandra Moyer.  Late in the afternoon Scott and Tami Bruner arrived.  That only left a couple of coaches arriving tomorrow.

I borrowed a sledge hammer from Joe Temples and pounded three pieces of rebar into the ground to serve as supports for the clubs three flag holders.  A number of RVs around the rally site had the same design and I suspect that there was an article in the magazine, or something online, about how to build these.  They are very simple and inexpensive, can be taken apart for transporting, and rotate with changes in wind direction.  Our club as a USA flag, a Canadian flag, and a Chapter flag.

We all stood around in small, shifting groups talking about this and that.  I laid down around 2 PM and napped for about 90 minutes.  We are conveniently located to one of the bathroom/shower facilities so Linda took a shower there so as to not use up the good water in our tank.  By 6 PM most of our group had left to go out to dinner.  We ate around 6:30 PM, having a nice, light supper of cold chickpea salad on a bed of power greens.

A little before 7 PM we drove back to Lowe’s to look at refrigerators.  It turned out that the ones I saw were the 18 cu. ft. models not the 16 cu. ft. one we need/want.  The 18 cu. ft. model would fit in our alcove but take up the entire width leaving no space for a pull out pantry.  We looked at solar powered spotlights for illuminating the flags at night but at $18 each decided not to buy any as we needed at least three and would ultimately need the approval of the club to buy them.  We stopped at the Martin’s market on US-33 and picked up a deli tray brochure and a few grocery items.

Back at the rig there were lots of folks gathered in conversation.  Linda and Vicki went for a walk while I chatted with Mark (from Alaska) and Scott.  Scott and Tami recently had a new Whirlpool residential refrigerator installed in their bus so I went to see it.  It’s a very nice French door fridge with lower freezer drawer but is too tall for our alcove.  This is the style refrigerator Linda wanted but we could not find one sized to fit our space.  Bill Gerrie helped me get the U.S. and Canadian flags off of the holders.  Linda and Vicki returned just in time to help fold them properly.  With darkness came much cooler temperatures and everyone retreated to the warmth and comfort of their coaches.

Someone reminded us that Paul’s Seating in Elkhart was a good place to shop for furniture so Linda Googled it and found the website.  There were pictures of lots of chairs, including a barrel chair, but no information about dimensions, fabric options, or prices.  We will likely go to Martin’s in the morning and place a food order and then drive in to Elkhart and find Paul’s.  The critical path for our interior remodeling project goes directly through the selection of furniture and then through the refrigerator replacement so we are starting to feel some pressure about getting decisions made and orders placed.

 

2015/05/25 (M) Memorial Day

We spent the morning lounging around drinking coffee and enjoying the holiday.  Hey, even retired people need a day off.  Actually, we continued to research refrigerator, seating, and upholstery options for the bus, taking a break to have a tofu scramble and toast for breakfast.

We stumbled upon the Yale Appliance blog which proved to be very informative.  Yale is a very large appliance store in the Boston area and maintains a blog about appliances.  After reading what they had to say in some fairly recent postings we realized that we should probably not be looking for a “counter depth” refrigerator.  It also appeared that our best bet in terms of case dimensions and interior volume might be a standard top freezer design and our best bet in terms of both price and reliability might be a Frigidaire.

We went to the Frigidaire website and found that the FFHT1621QB might fit our needs perfectly.  It is a 16.3 cu. ft. top freezer design available in black, white, or stainless steel with doors that can be hinged left or right.  (We need a fridge with doors the hinge on the left.)  It is 28″ W x 30-1/8″ D x 64-3/8″ H and only needs 3/8″ clearance on the top and sides and 1″ in the rear.  The depth includes the doors and handles; the depth of the case alone is only is 26-5/8″.  Our refrigerator alcove is 33-3/4″ W x 29-1/2″ D x 66-3/4″ H so it will fit easily, recessing a bit more than our current 22.6 cu. ft. Jenn-Air and leaving 5″ to its left for a pull out pantry.  The pantry will have be custom built and measure approximately 5″ W x 28″ D x 66″ H including top and bottom mounted slides/guides.  Also of importance, we will not have to modify the cabinet above the refrigerator alcove.

In terms of seating we checked out Gilbreath Upholstery’s website but then concentrated on the Bradd & Hall website.  Bradd & Hall is a well-known RV (& marine) furniture supplier in Elkhart, Indiana.  They handle the Flexsteel RV and marine product lines and also sell the Lambright Comfort Chair product line, although the latter is available directly from Lambright in Shipshewana, Indiana.  We have sat in the Lambright Lazy Relaxor Lite swivel recliner (wall hugger) at RV rallies and found it nicely sized and very comfortable for us.  It is 24″ W x 33″ D x 38″ H and needs 2.4″ clearance from the wall.  It is normally a free-standing chair so we are unclear whether it can be secured to the floor or be used with seat belts.  We plan to visit Bradd & Hall on Monday, June 1 before we check into the GLAMARAMA rally and this is one of the things we will ask about.

Bradd & Hall also sells a Flexsteel Barrel Chair with a bolt down pedestal base that locks in different positions and includes a bar for attaching seat belts.  It is 26″ W x 30″ D x 34″ high and might be a better fit for our bus and what we are trying to accomplish with our remodeling project.  Last, but not least, they sell Flexsteel Captain’s Chairs (which Flexsteel calls “bucket seats” on its website).  We need a chair of this type to replace the oversized front passenger chair and possibly to replace the driver’s chair.  My hope, however, is to get an ISRI 6800 seat for the driver’s position.  These are the seats that are normally installed on tour buses.

An advantage to getting everything from Bradd & Hall, except for the ISRI driver’s seat, is that we can get the same fabric on the passenger Captain’s chair and living room chairs and buy additional materials to have the seat and back cushions made for the sofa that I will build (with storage underneath).  We will probably find a folding chair for the desk and can have the seat recovered in the same material so that everything is coordinated.

Linda called the J. C. Penney’s salon to see if Renee was working and had openings.  She was, and she did, so Linda booked a time, grabbed her car keys, and headed to Twelve Oaks Mall.  That seemed like an opportune time for me to head to the bus to double check measurements and ponder design solutions.  I checked the dimensions of our refrigerator alcove and the Frigidaire FFHT1621QB will definitely fit very nicely.  The front part of the passenger side of the bus has 13′ 3″ of flat floor space available for a desk and two chairs with a small dining table between them.  On the driver side of the bus the aft end of the sofa nook is 7′ 2″ from the entrance step.  If I can fit both chairs and the table in the first 7′ 2″ on the passenger side we will have room for a 6′ long desk that is 26-1/2″ deep.  That’s long enough to have a file drawer on one end and a printer shelf on the other end with plenty of room in between for a chair.

We have been planning on reusing the Corian top from the old dinette table so I decided to disassemble the top from its base.  I had never really looked at the construction before now and discovered that the Corian is glued to a wood panel that is secured to the two massive posts that are screwed to the base.  I was able to disconnect the base from the posts easily enough but there did not appear to be any way to separate the Corian from the support structure.  I took a few whacks at it with a pry bar and small sledge hammer and it was clearly not going to come loose.

The good news is that we can now select a new table top in whatever size, shape, and material suits us and use the same material for the desk top, which will double as additional kitchen counter space.  Our assumption has been that we will use Corian, but Corian is heavy so we will consider other options before making a final decision.  We discussed extending the desk top all the way down the wall to the front of the living room, although it would only be about 6″ deep at most, and building shallow cabinetry to go under it and fill in the space above the HVAC chase and below the window trim.  That space will essentially be wasted otherwise, and have to be finished in some way, so building small storage spaces is worth considering with or without the extended desk top.

What all of this comes down to is that we have to select the two chairs we want to use in conjunction with figuring out the table size and support system, and then finalize the design of the desk.  We plan to recondition all of the woodwork (with Touch of Oranges and Touch of Beeswax) and replace the refrigerator before we install the new floor, which has to go in before the furniture.  That’s the order in which decisions have to be made and the work has to be done.  Chairs and custom woodwork are potentially long lead items so we need to get them finalized and ordered, but they are the last things to get installed, so it should work out OK in the end.

It rained hard for a brief time mid-afternoon, after which Linda went for a long walk.  She was walking almost daily this winter in Quartzsite, Arizona but has not walked much since we got home.  That gave me time to work on this blog post.

Earlier in the day we snacked on nuts instead of having lunch.  Linda made whole wheat capellini for dinner using the Portobello mushrooms and some of the asparagus we bought yesterday at the Howell Farmers Market.  It was delicious.

I had intended to work at my computer most of the day but that obviously did not happen.  When I finally went to my office after dinner I had a long chat on the phone with Butch about hardware for the slide out pantry and other bus-related things and then checked a few websites that he suggested as good sources of specialized hardware.  I then e-mailed GLCC members about parking with the chapter and took care of some other e-mail.  In addition to computer-based work I need to keep working on the bus but I am also at the point where I need to order some things and then settle in and work on drawings for the desk, pantry, and sofa.