Tag Archives: fresh strawberries

2015/08/02 (N) No Swap Sunday

The forecast for today was for warm, humid weather so we closed up the house and turned on the air-conditioners as soon as we got up.  We left around 9 AM for the Howell Farmers Market so I did not make coffee and we did not have breakfast.  At the market Linda bought a nice assortment of fresh vegetables.  I bought a bag of Kenya AA coffee beans from Teeko’s and some apricot and raspberry Rohlicky from the Czech Bakery.  It turns out they are not vegan so I won’t buy them again.

We decided to see if John and Diane were available for dinner.  We had no sooner made these arrangements when I got a text message from Chuck indicating that the coast was clear at his shop in Novi and we were good to go on the refrigerator swap.  I talked to him shortly thereafter and indicated that we had assumed it would not be today so I had not yet cut the support 2x4s or found the additional help that we would need and, in light of that, had made other plans.  That was fine with him and we agreed to aim for next weekend.

Linda surveyed her inventory of ingredients and decided that the warm Farro with dried cranberries and nuts would be a good dish to have Diane help make.  Diane retired at the end of the school year in June and had asked Linda if she would show her some of the ingredients and prep/cooking methods she uses.  Linda likes working with friends in the kitchen, sharing what she has learned and learning new things herself in the process.  Diane is her longest term, non-family friend.  As an English teacher she had lessons to prepare and papers to grade almost every evening.  As a result John, who has worked most of his adult life as a framing carpenter, took care of preparing their evening meals.  Now that Diane is free of her teaching obligations she would like to learn more about cooking.

Linda wanted some non-dairy ice cream for dessert so I was sent to get it.  I went to the Home Depot in Brighton first where I bought some thin (1/8th inch thick) rubber sheet material, a small tool pouch, and 2-person forearm lift strap.  The rubber material will be for the edges of the plywood in the new built-in sofa, cushioning the seat when it is closed.  The tool pouch is for working on the tower (my carpenter’s tool belt is too big) and the lift strap is to help with the refrigerators and anything else heavy we might need to move.

The only place within a seven mile radius of our house that consistently has the non-diary “ice cream” we like is the Kroger on M-59 at Old US-23, so that’s where I headed next.  In addition to the Coconut Bliss they had a cashew milk based product so I bought some of each.  I bought vanilla and salted caramel in the CB brand and snickerdoodle in the cashew product.  By the time I got home I only had a couple of hours left before John and Diane were due to arrive so I worked in my office and uploaded blog posts for June 16 – 20.

John and Diane arrived right on time at 4 PM.  I opened our bottle of Viva La Roja from Heart of the Desert Winery in Alamogordo, New Mexico and we settled in to easy conversation.  I found this red table wine particularly to my liking; very smooth with a hint of sweetness and no tannin.

Linda and Diane eventually started preparing dinner.  John and took that as an opportunity to go look at the bus project.  The ladies made a mixed greens salad with dried cranberries and other add-ins and put out a choice of dressings and sliced a loaf of Italian bread that they brought, along with a bottle of Pinot Grigio that we opened to have with the meal. The main dish was Farro with dried cranberries, almonds, onions, garlic, and kale.  It was all very tasty and well received.

By the end of the meal it had cooled off enough to sit on the deck comfortably.  Linda served the cashew milk snickerdoodle non-dairy ice cream with fresh sliced strawberries and it was very good.  I showed them what we had done with antennas on the tower and the cable entrance box and then we went back inside.  John still works full-time so they left around 9 PM as it takes at least 30 minutes to get back to their house in Farmington Hills which is about a mile from our old house.

 

2015/07/20 (M) Chuck It

Our morning got busy right away.  We had breakfast and I made coffee while Linda entertained Madeline.  Brad, from Chuck It Junk Removal, dropped off the dumpster trailer at 9 AM.  Keith, from Kish Lawn Care, showed up at 9:30 to cut the grass.  Linda took Madeline to the Mill Pond to use the playscape and Mara started scrapping old caulk and putty from around the base of her refrigerator roof vent.  I tried using another set of tools for removing the stripped screw in the stop block on the bus to no avail.  I even managed to break off two drill bits in the hole I was drilling in the screw.  The more I work on this the worse it gets.

When Linda and Madeline got back Madeline had lunch and then laid down for her nap.  The three adults then had vegan hotdogs for lunch after which I put the finishing touches on my design drawings for the pull-out pantry.  Mara and I then went on an errand run.

Our first stop was the FedEx store in Novi where I made copies of all of the drawings for the desk and the pullout pantry.  We then stopped at General RV to return the refrigerator vent cover as it did not fit the base section on Mara’s roof.  They had a Camco cover that claimed it would work, and looked like it might fit, so she exchanged them and got a small credit.  When we got back at 3:15 PM Brendan and Shawna were already there.  They got Madeline up at 3:20 PM and stayed until about 4 PM.  After they left I got up on Mara’s roof to help with tasks there.

First we checked the refrigerator vent cover.  The mounting holes lined up but the flanges (shields) on the long sides were not wide enough to fit outside the base flanges.  The proper fit requires the upper flanges to be outside the lower flanges by at least 1/4″ so heat can escape and extend below the lower flanges to keep rain from getting into the refrigerator cavity.  I was going to install the 24″ x 24″ piece of thin sheet steel for the magnetic cell phone booster antenna when I discovered that the antenna would stick to the old satellite dish.  We experimented some more with the location of the inside antenna but could not improve on yesterday’s placement.  The performance was as good as with the metal sheet so I decided not to install the metal sheet.  Mara then caulked around the refrigerator vent base and touched up a few other spots around tank vent caps.

Linda grilled a variety of veggies for dinner.  I opened a bottle of Pinot Noir wine and we ate outside.  It was cloudy and 76 degrees F with light winds; very pleasant and bug free.  We had fresh strawberries with the meal and dark chocolate for dessert.  We eventually moved inside to chat but did not stay up late as I needed to be up early in the morning and on my way to Indiana.

 

2015/07/14 (T) Red Chili Wine

Storms moved through the area overnight with more lightning and thunder than rain, or at so it seemed.  The storms were triggered by a cold front, behind which we had a cloudy day with periods of rain.  Linda was up at 7 AM and read quietly until I got up at 8.  I made a full pot of coffee (Cafe Europe half-caff blend from Teeko’s) and then joined her in the living room.

Linda was checking Dr. Michael Gregor’s speaking schedule and saw that he will be at Wayne State University in December and will be one of the keynote speakers for the 2016 Holistic Holiday at Sea vegan cruise.  We have not heard him speak in person, and will not be here in December, so that would be another reason to go on the cruise again.  By 9:45 AM Mara had not emerged from her rig so we went ahead and had breakfast.  Linda then went for a walk and I went to my office and worked on the design of the custom desk for the bus.

Mara finally emerged at 10:30 AM and we chatted for a while until Linda got back.  Our chat was briefly interrupted by a call from Mike (W8XH) on the Novi repeater so Mara got to see ham radio in operation.  My reception was weak and noisy and according to Mike my transmitted signal wasn’t any better.  The only thing that has changed since we tested this late last week is that I got the repaired M-302N VHF/UHF lightning arrestor back from Morgan Manufacturing yesterday and re-installed it.  Mike is going to help me do some more testing, but I am rapidly coming to the conclusion that these units are defective by design and I will have to replace them with something else.  I am disappointed to say the least.

It was another cool, cloudy, rainy day, just the kind of day for staying inside and getting stuff done.  Linda and Mara both had things to do and settled in at the dining room table to work.  Mara has been focused on planning her upcoming travels and spent much of the day making reservations.  Linda worked on the bookkeeping for our GLCC chapter and SLAARC ham radio club (she is treasurer of both).  She also renewed our Coach-Net emergency road service and our Harvest Host membership, which had expired, and probably took care of a lot of other things that I don’t even know about.  Except for an occasional break I worked on the custom desk design until 6:30 PM.  On one of those breaks I needed to measure something in the bus so we gave Mara the inside tour.

When I came upstairs Mara was taking advantage of the unlimited hot water available in our guest bathroom to have a nice long shower.  We know from personal experience what a luxury it is to take such a shower when living in an RV.  Linda had started preparing our dinner so I opened the bottle of Hatch Red Chili wine.  This wine, from St. Claire Winery in Deming, New Mexico is one of the more unusual wines we have ever had but we really like it.  It is a slightly sweet red wine with no tannin, a hint of chili flavor, and heat in the back of the throat on the finish.  We had vegan mock Italian sausages with sautéed onions and red peppers and the wine went well with it.  I had mine on a hotdog bun with mustard.  Mara had another serving of her beef stew, which she is trying to use up, and Linda put out a plate of whole, fresh strawberries.

One of the nice things about having visitors is that meals take longer to eat as we linger at the table in conversation.  Mara returned to her rig around 9 PM to have some quiet time with her cats before going to bed.  Linda decided to watch a couple of TV programs and I went back to work on the desk design.  I called it quits around 10:45 PM and went to bed to work on this post.  The overnight low is forecast to drop into the upper 40’s which should make for excellent sleeping.

 

2015/06/26 (F) Field Day Setup

I was up at 7 AM and ready to leave for breakfast with the other SLAARC members who would be setting up our temporary field site for the ARRL Field Day event.  I called the SLAARC repeater and Steve (N8AR) came back and wanted to know if I had the site use permit from the township?  No, I did not.  Paul, N8BHT, got on the air and said he gave it to Linda so I went back home.  Linda was up but had no recollection of receiving it.  We looked through the materials she got from Paul but could not find it.  I left again for breakfast but after more radio QSO went back a second time to retrieve all of the records and bring them with me to the field day site.  (Our best guess is that he gave the permits to the other Linda (NF8C) who is the club secretary.

SLAARC's Field Day setup begins in earnest when Steve's equipment trailer arrives.

SLAARC’s Field Day setup begins in earnest when Steve’s equipment trailer arrives.

By this time it was too late to make it to breakfast so I stopped for coffee and fueled my car.  Mike (W8XH) also did not go to breakfast with the group in South Lyon so we were the first to arrive at the site.  Another 10 guys showed up shortly thereafter.  John’s Sanitation then arrived and dropped off our rented porta-potty.

We had 12 people for most of the day and 14 total who were there for at least part of the day.  It was a good group and just the right size for the task.  We worked steadily from 9 AM until almost 5 PM except for an early afternoon lunch break.  By the end of the day we had erected two towers and set up six antennas (20m beam and 6m beam co-located on the taller tower, two off-center fed dipoles from the taller tower, a 40m crossed dipole from the shorter tower, and a 40m 1/4 wave vertical with four elevated counterpoise wires).  We also put up three radio tents, a screen room, and the big food tent.

Larry (K8UT) holds the 6m beam while Steve (N8AR) and others attach the 20m beam to the mast of the taller tower.

Larry (K8UT) holds the 6m beam while Steve (N8AR) and others attach the 20m beam to the mast of the taller tower.

The weather was cloudy and dull and not the best for taking photographs but I took pictures anyway.  I had to be deliberate in my shot selections, however, as both of my memory cards were almost full.  All of the work that needed to be done today was finished by 4:30 PM and most of us took off.  Our Field Day chairman, Paul (KD8SNZ), and a new member, Ron, setup their tents as they would be spending the night and keeping an eye on the site.  Steve (N8AR) and Eric (K8ERS) stayed a bit longer to test the antennas using the mobile radio in Steve’s SUV.

Back home I took a nap for an hour before dinner.  Linda grilled Portobello mushrooms and corn on the cob and cut up some fresh strawberries and cantaloupe.  After dinner I went to my office and transferred all of our recent photographs from the Sony alpha 100 DSLR to my computer and then to our older NAS device which we had with us this past winter.  I then started backing up all of the photographs we had taken since December 2014 from the old NAS unit to the new one.  This involved a significant number of images, a lot of gigabytes of data, and took a bit of time.

Rather than sit around waiting for file transfers to finish I decided to turn on the Icom IC-7000 ham radio and see if I could figure out why I could not hear the Novi 440 repeater on Wednesday when we tested the antenna and coax installation.  I checked the Nifty guide for the Icom IC-7000 and, as Mike had suspected, I did not have the Tone Squelch frequency set correctly for the Novi repeater.  I changed the mode on the 440 MHz band from ‘Tone’ to ‘TSQL’ and then caIled Mike (W8XH) on the phone to see if he could help me do a radio check.  We spent about an hour going back and forth between the Novi and South Lyon repeaters.

With the correct settings I was able to work both repeaters although I had a lot of background noise (static).  I played with the noise reduction (NR) and pre-amplifier functions and both seemed to help.  Mike tried various combinations of power and simplex operation and we determined that the basic problem seemed to be a weak signal in both directions.  I am still suspicious of the fact that I do not have the Go Box grounded as I vaguely recall from three years ago having noise problems with this setup until I grounded the box, which is tied to the radio ground.

Field Day is an "all hands on deck (antenna)" event for our SLAARC group.

Field Day is an “all hands on deck (antenna)” event for our SLAARC group.

Mike was suspicious of the coax I used to go from the lightning arrestor to the radio but looked up the specifications on my Diamond X-50N antenna and suggested that an antenna with more gain might be in order.  We also discussed the location where I placed the antenna on the tower.  Although most of the antenna is above the tower it is on the northwest leg.  The two repeaters lie to the southeast so the tower may be ‘blocking’ some of the signal although that does not seem likely to me.  Of more concern to me is that I mounted the base of the antenna so that two of the three counterpoise (ground plane) rods are even with, and parallel to, two of the three topmost crossbars.  If anything is being blocked it is likely those as the crossbars are between the rods and the repeater locations.

Ed (KD8OSM) jumped in briefly to let us know that I also had a ‘hum’ that sounded like the 60 Hz power line frequency only higher pitched.  I have a small fan installed in the back of the Go Box so I hummed the same pitch as it was producing into the microphone and both Ed and Mike confirmed that this was the tone they were hearing.  The fan is audible, but not that loud, and was two feet behind the microphone so I would be surprised if it was picking up the fan noise.  It is possible that the fan is inducing the hum electrically, but I believe it is a DC fan, so that seems unlikely.  I do not have an AC line filter installed on the fan, or anywhere in the box, so that may be a next step.

The larger of the two towers is up and secured.  It has a 6m beam antenna on top of 20m beam antenna on a common mast with a rotator.  We also attached one end of an off-center-fed dipole to this tower.

At the SLAARC Field Day site atop the Lyon Township Atchison Memorial Park the larger of the two towers is up and secured. It has a 6m beam antenna on top of 20m beam antenna on a common mast with a rotator. We also attached one end of an off-center-fed dipole to this tower.  Tents are being erected to house the various operating stations.  The weather was overcast and forecast to get much worse before Field Day as over on Sunday.

Mike and I wrapped up our QSO and I shut the radio off.  I checked my e-mail and saw that the May 2015 issue of Bus Conversion Magazine was available.  I logged in to the website and downloaded both the standard and high definition versions of the April and May digital editions.  By the time I got to bed it was well after 11PM.  I finished up yesterday’s blog post draft and outlined as much of today’s post as I could before I lost the sequence and details of the day’s events.

 

2015/06/14 (N) WordPressing

We had yet more rain overnight.  I heard the rain around 6 AM and checked the Wundermap app on my iPad but did not get up.  Linda did not need to go to the Howell Farmers Market today as the refrigerator is quite full and the rainy weather made the prospect less appealing.  We finally got up at 9 AM and I made coffee.  Linda checked the weather forecast.  It called for a 100% chance of rain between noon and 3 PM with thunderstorms and up to 2″ of rain.  By 10:15 AM it was raining steadily again.

We deferred by one more day getting back to work on the bus.  The monthly meeting of our South Lyon Area Amateur Radio Club (SLAARC) was this evening and we did not want to get involved in physical work today.  I wanted to do a load of laundry but deferred that as the high humidity makes it harder to get the clothes dry.

I opened the three boxes that made up the OTA TV antenna shipment from AntennasDirect.com and laid all the parts out on the floor.  As I wrote yesterday I need to determine exactly what types/lengths/connectors I need to get everything hooked up and make sure I have it on hand before I climb the 40 foot tower next to the house.  After I laid all of the parts out this morning Linda asked how I was going to get all of that stuff up the tower.

Our new Antennas Direct DB8e Over-The-Air TV antenna.

Our new Antennas Direct DB8e Over-The-Air TV antenna.

My plan is to preassemble as much stuff as possible.  I will then take a 100 foot rope with me when I climb the tower, loop it over one of the crossbars, and drop it back down to the ground where Linda can tie it to a bracket, or directly to some part, and pull it up to me.  As I describe this it occurs to me that I should probably rig up a pulley.  We also figured out that we should run the TV co-ax inside the house before I climb the tower.  That will allow Linda to scan for signals and talk to me on our portable ham radios while I am on the tower if the antennas need to be aimed.  I called Mike (W8XH) to see if he would bring his climbing harness to our ham radio club meeting this evening and he agreed.

For breakfast I had some of the Pepperidge Farm cinnamon chocolate chip bread Linda bought and we both had fresh grapefruit.  After breakfast I got cleaned up and dressed and then partially assembled the OTA TV antenna.  I then went to my office and settled in at my desk to upload blog posts.  I had not been in my e-mail for a few days so there were some things I had to respond to before working on our blog.

I got my blog posts uploaded for May 29 through June 7 and then decided to update the other three WordPress websites I work on.  Much to my dismay I was not able to log in to the FMCA Freethinkers website.  I got an error message instead and the contents looked to me like the site might have been hacked.  I notified the President of the chapter and indicated that I would contact the ISP technical support folks and see what they can tell me.  I have never opened that site up to the members of the chapter because I never quite finished it but I intended to and I have a lot of time and effort invested in its development.  Still, if the site is totally corrupted I may just delete it and abandon the whole project.

I wrapped up my work just in time for dinner.  Linda reheated the two leftover vegan cheeseburgers and served them with the remaining vegan potato salad and fresh nectarines.

Linda spent a little time during the afternoon getting the treasurer’s report ready for our SLAARC meeting.  We left at 6 PM and were at the Witch’s Hat Depot in South Lyon by 6:30 PM.  We have changed the meeting format to have social time from 6:30 to 7:00 PM, followed by a business meeting, and then a program.  I got the climbing harness from Mike (W8XH) as soon as we arrived and put it in the car.  I then had a brief chat with Scotty (AC8IL) regarding Universal Towers in Clinton Township, Michigan and LMR-400 co-ax.  Scotty stocks LMR-400 but also stocks RG-213 which he thinks is better for outdoor use.  His opinion is based on a Motorola white paper that discusses potential problems with the aluminum foil wrapped copper braid outer conductor in LMR-400 in the presence of moisture.

Tonight’s business meeting was a discussion about preparations for the upcoming ARRL Field Day lead by this year’s club field day chair Paul (KD8SNZ).  The program was a presentation by Larry (K8UT) on the N1MM Logger+ contest logging program that we will be using to log contacts on four different networked computers.  Larry is a member of the N1MM development team.  I asked Larry if I could send him the URL for my broken WordPress website and he said he would look at it.  We left at 8:45 PM.

When we got home Juniper was hunched over something in the living room and I could see immediately that she had caught another mouse.  It was very small, like the last one, and for all I know it was the same mouse.  I got her to drop the last one and it escaped into my office.  Linda grabbed one of the antenna boxes and pulled out the shipping paper that was stuffed inside.  I managed to get Juniper to drop the mouse in the box, from which it was not going to be able to escape, and then took the box outside and set it free.  If it has any sense it won’t come back in the house and it will tell all if its little mouse friends to steer clear of this place.  Juniper is a very skilled hunter and will catch anything in that house that moves that is smaller than she is.

Linda prepared some fresh strawberries and served them with some non-dairy ice cream.  She logged in to Amazon.com and ordered six live traps and a new cover for my iPad, both eligible for Amazon Prime.  We then spent a little more time reading and writing and checking the weather.  The 10-day forecast is for continued rain almost every day.  We are still expecting the new roof shingles to be delivered tomorrow but we won’t be surprised if they are not.  We are also expecting that Apex will have to push the start date of our project back due to all of the recent rain delaying other jobs that are ahead of ours.  We turned in for the night at 10:30 PM; late for Linda and early for me.  She was asleep fairly quickly but I stayed up writing and played a few games on my iPad as I do most nights.

 

2015/06/10 (W) Ron and Mary

Same routine as yesterday; up at 7 AM, open up the house, feed the cats, clean the litter tray, start a load of laundry, make the coffee, and drink the coffee while using our iPads.

Our daughter’s 34th birthday is tomorrow but she is flying to Las Vegas today to meet up with her husband who is there on a company outing.  We will celebrate her birthday when they get back, perhaps in conjunction with Father’s Day and Linda’s birthday, which is at the end of the month.

Linda left at 9 AM for Brighton Honda to have the 12 V battery in her car checked.  The battery light came on the other day so we thought it might need to be replaced.  Around 9:20 AM I heard thunder and a short time later we had a brief, heavy downpour.  Linda called at the same time and said the battery tested OK.  The problem could be the alternator, of course, but presumably the dealer service people know that and checked for that.  If not, we will likely be back there sooner rather than later.

Linda headed on to Meijer’s to do the grocery shopping.  Today was trash pickup day so I took the trash can to the street.  After meeting with Brad from Chuck It Junk Removal the other day we decided we would rent their trailer for 5 days.  For the same price as having them physically handle 1/3 of a truck of junk (5 cu. yd.) we can get rid of a full truck of junk (15 cu. yd.) by loading it ourselves.  Deal.

I got a call from Phil Jarrell regarding my request for pricing to dig a foundation hole for a ham radio tower foundation.  It was a useful conversation in that I had not previously realized that I will need a concrete contractor in addition to the concrete supplier.  The only thing the concrete supplier will do is show up with a cement mixer truck and dump the concrete where they are instructed to.  The concrete contractor will actually place rebar, build forms, provide carts or a pumper, and get the concrete from the truck to the hole.  Phil recommended Mike Fearer of Bid-Rite Concrete as a good guy who would work with me to get this done.

I talked with Chuck about getting a key to his shop so we could have the new refrigerator delivered there and have the old one picked up without having to trouble him to be there.  He agreed and suggested that we contact the guy down the street about removing the old windshield and installing the new one as part of the refrigerator swap.

Rather than dig into our bus interior remodeling project I have used the last couple of days to finalize decisions about various products and order them.  One of the things I have wanted/needed for a while is a cable entrance box that will allow me to route transmission lines and control cables into the basement from outside.  I talked to Chris Perri, KF7P, at the Dayton Hamvention last month and decided that I liked his custom fabricated cable entry boxes.  I got his business card at the Hamvention and exchanged a couple of e-mails with him this week.  I decided this morning how I want the box initially configured and e-mailed my specs to Chris.  I would like to run the cabling for the cell phone booster through this box so I needed to get it on order.  Speaking of which, the cell phone booster system arrived today via UPS so I am feeling more comfortable that all of the stuff I am ordering will actually get delivered to our house.

Wednesday’s and Fridays are when Recycle Livingston is open and the Wednesday hours are 11 AM to 5:30 PM.  We had my car loaded up with recyclables and Linda drove over after lunch to drop them off.  When she got back she made a batch of her yummy granola and I got a couple more loads of laundry done while continuing to work at my computer.

After doing my alternate tile layout for the bus floor yesterday I decided that I liked the way it looked better than the original ad that it would not involve any more cutting than the row/column layout.  I also felt confident that I had an accurate enough tile count to go ahead and order the tiles.  I drove to the Shell station to fill my tank and then drove to Lynch Carpet in Howell.  I ordered 12 boxes of the 16″ x 16″ Armstrong Alterna Luxury Vinyl Tile in the La Plata Creme Fresh pattern, and a gallon each of the vinyl adhesive and Glacier vinyl grout.  There are 14 tiles per box (24.89 sq. ft.) for a total of 168 tiles (just under 300 sq. ft.).  The inside floor area of the bus is around 300 sq. ft. before subtracting out walls and cabinets but we will be using some of the tiles on vertical surfaces in the entry stairwell and cockpit and around the box that supports the bed platform.  My estimate is that I will have 10 extra tiles.  The guy at Lynch Carpet suggested that I use a scrap piece of tile as a spacer when installing the tiles but I may use the little plastic “X” pieces designed for this purpose.

From Lynch Carpet I drove to Lowe’s in Howell to see if they had a different portable air compressor that might be more appropriate than the 6 gallon Porter Cable we just bought.  The Porter-Cable air compressor has a maximum regulated pressure of 150 PSI but that is also the maximum tank pressure.  I will have to test it on one of the front bus tires to determine if it will get the job done and if not I will return it.

The guy at Lynch Carpet also suggested that I rent a handheld grinder from Abe’s or A-1 Rental, both in Howell.  Abe’s did not have any grinders of any kind and A-1 was closed on Wednesdays.  The gal at Abe’s suggested the tool rental service at the Howell Home Depot, so I stopped there.  They also did not have a handheld grinder but they did have a floor model concrete grinder.  It was so heavy that I doubt if we could have gotten it into the bus and it was too big to maneuver in the tight spaces where I need to work.  They did have a lighter/smaller floor stripper and I may give that a try before I resort to grinding off the thinset with an angle grinder and diamond impregnated wheel and/or a belt sander with a very aggressive belt.

Pat Davidson called from Apex Roofing while I was out so I called him back.  They will be able to start on our roof next week Monday or Tuesday and will deliver the shingles on Friday this week.  I confirmed that we wanted two of the 14″ light tunnels for the living room.  I also indicated that I had scrapped the idea of building a dormer or installing a roof hatch as I simply did not get this taken care of in time.

Linda had closed up the house and turned on the air-conditioning while I was out.  It was pulling moisture out of the air but would not bring the air temperature lower than 78 degrees.  Not good.  This will be our third summer in this house and we have not used the air-conditioning very much.  The first summer we were gone for most of June, all of July, and a few days in August.  We had the unit serviced last year and thought it was working OK but perhaps did not really use it after that.  We did install filters in the return air grills so perhaps they are restricting the airflow too much.  It is also possible that it needs refrigerant.  I will have to check our records from last year and then call TOMTEK to arrange to have it serviced again.

Linda’s brother, Ron, and his wife, Mary, arrived early this evening.  They are on their way to northwest Illinois for a week-long organized bicycle ride.  They have to be there on Saturday and will be spending the next three nights at our house.  Visits from them are usually not more than once a year but we really enjoy their company when they are here.

For dinner Linda made a nice green salad and then made whole wheat angel hair pasta with onions, garlic, and mushrooms lightly sautéed in olive oil.  Ron does not imbibe but Linda, Mary, and I had a glass (or two) of Moscato.  We moved to the deck after dinner and had fresh strawberries for dessert.  It cooled off as darkness set in and we eventually moved back inside.  The other three were in the kitchen and I was sitting on the sofa when Juniper suddenly caught a mouse in the middle of the living room, or at least that is where I noticed that she had it.  She took it downstairs and I got her to drop it in the bathroom sink but I was unable to get it into a container to take it outside and it escaped into my office.  I closed the doors but I have no doubt it can go wherever it wants in the house from there.  When I returned upstairs we chatted until 11 PM and then all turned in for the evening.

 

2015/05/26 (T) Reflections

I decided to put off doing the laundry until later in the week.  Linda made a grocery shopping list while we had our morning coffee.  I called Pat Davidson at Apex Roofing to discuss the installation of a roof access hatch.  We did some online research for pest control companies in the Brighton-Hartland-Howell area and decided to call Best Pest Control LLC.  I talked to the owner, Ryan, about his perimeter defense package, and decided to give his company a try.  They will spray outside the house for ants, spiders, hornets, wasps, and yellow jackets.  I called Phil Jarrell from Precision Grading and left him a voice message regarding some additional driveway work, a French drain for the west end if the property, and a hole for a ham radio tower foundation.

I showed Linda the pullout pantry slide hardware I found last night on the Rockler website, a German made top-bottom pair specifically designed for this application and able to support up to 450 pounds.  It’s pricey, but it looks like the right stuff for the job.  We also found some assembled pullout pantries online, including some that were 5″ wide, but they were not deep enough and getting just the right height looked tricky.  We really want to maximize the use of our available cubic inches.

Keith showed up around 10 AM with his new Scag riding lawn mower.  He is still going to have the Hustler repaired as a backup, but the Scag is a nicer/better machine.  It is fuel injected, which should be more reliable, and it is faster, which makes more efficient use of Keith’s time.  It also has a seat that can be adjusted from soft to firm, making for a more comfortable operator experience over the course of a long day.

As much as I need to work at my computer and drafting table I need to work even more in the bus right now.  I started by reassembling the inside of the cabinet above the refrigerator, except for the liner carpet, and reinstalled the fluorescent light fixture on the ceiling.  I am keeping the carpet pieces for now, but mostly to use as templates for new material.  I would have preferred white Formica interior surfaces, as they are brighter and easier to keep clean, but the bus has a lot of curves and carpet is a very conformable and forgiving material.

The interior of the bus deconstructed in preparation for a new floor, seating, and custom desk.

The interior of the bus deconstructed in preparation for a new floor, seating, and custom desk.

My next task was cleaning out and securing the area under the bed platform.  I removed the half box covers, the flexible ducts, and the floor-mounted cleats.  I threw the ducts away and stored the other pieces in the garage.  I then reattached the strip light on the top edge of the forward side of the base, reinstalled the two circular HVAC registers (so the cats could not try to get under the bed through the holes), put the cover plates back on the two duplex AC outlets and reinstalled the outlet expanders which also have dual USB charging ports.  I need to put some sort of temporary netting over the port holes in the section of the HVAC chase under the bed, but I need to find a suitable material for that.  The long term plan is to seal those holes and install registers in the sections of chase outside the bed base.  I thought about disconnecting the lift struts for the bed platform so I could raise it higher and reinstall a drawer onto its glides, but decided to leave that for another day.

While I was working in the bus Ryan from Best Pest Control called me back and said he had a crew that could fit us in within the hour so I said “sure.”  I closed up the house as they would be spraying around all of the windows, doors, and doorwalls.  Two guys showed up a little while later and I walked them through the job, wrote a check, signed the work order, and they got busy.  They found two hornet nests by the east end of our deck and destroyed them.  I hate to kill even a hornet but they have been buzzing around our windows and doors, poking at voids in the mortar on the face brick, and occasionally getting into the house and we need to put a stop to their use of our residence as a place to build their homes.

The pest control guys were already gone and Keith was driving away as Linda returned from the supermarket.  I helped get the groceries into the kitchen.  After they were put away we had a light lunch around 1 PM of fresh baby carrots, mini bell peppers, sourdough pretzel nibblers, hummus, and red grapes.

The dinette seat used to fit in this corner The strip mirrors have been removed from the outside wall next to the window.

The dinette seat used to fit in this corner The strip mirrors have been removed from the outside wall next to the window.

I have been taking a lot of short breaks while working on the bus.  It was warm and humid again today and warmer still in the coach even with windows open and the roof vent fans exhausting air.  But the breaks are not just to rest, they are also to ponder the details of how the interior will get rebuilt and what additional deconstruction still needs to take place.

In the front of the coach there was a 120 VAC electrical cable coming out of an access hole in the passenger side HVAC chase, passing through a 4″ flexible duct adapter, and disappearing through a hole in the floor.  I originally thought the cable came from the duplex outlet on the wall just above the access hole but I discovered that it did not.  It was routed through the chase from somewhere farther back in the bus.  I determined that that the hole in the floor appeared to go into the OTR HVAC bay and sure enough, when I opened the bay there was the cable coming through the ceiling.  It turned towards the center of the bus and then went through the wall into the bay to the front.  It was then easy to determine that it was the power feed for the electric heater mounted on the rear wall of the front bay.

The storage area under the end platform with the 4" flexible ducts and cover boxes removed.

The storage area under the end platform with the 4″ flexible ducts and cover boxes removed.

At that point I knew which circuit breaker to turn off and was able to cut the cable in the living room without risking an electrical shock.  I slipped the 4″ duct adapter off and set it aside.  We don’t generally use the electric heater in the front bay, and certainly do not need it this time of year, so I wire-nutted the ends of the hot and neutral wires, coiled them up, and stowed them in the HVAC chase for the time being.  I coiled the end of the wire coming out of the floor around one of the Aqua-Hot coolant hoses so it would not drop into the bay below.

The area of the bus that was the outside rear corner of the dinette kept drawing my attention.  That corner was decorated with vertical strip mirrors with beveled edges.  There are also strip mirrors used as wainscoting on the lower portion of the outside wall of the hallway and at the end of the hallway opposite the bathroom door.  The strip mirrors are the one thing in this bus we have never liked but they did not bother us enough to not buy the coach.  Now that we are involved in a major interior remodeling, however, we are looking for ways to remove them or cover them up.  We really do not like them.

In the case of the former dinette mirrors, I had previously determined that the ones against the wall of the coach were mounted (glued) onto a sheet of plywood that appeared to be mounted to a pair of cleats along the two vertical edges.  I tried prying under the bottom of the first strip but it cracked and chipped.  It quickly became apparent that removing these strip mirrors from whatever they are glued to was probably not a viable option.

The beveled strip mirrors in the hallway of our bus.  We really do not like these things.

The beveled strip mirrors in the hallway of our bus. We really do not like these things.

[p4 R]  After removing a 1-1/4″ wide piece of thin trim wood I was able to loosen the left (forward) edge at the bottom.  The walnut trim around the fixed window just forward of the mirrors, however, prevented me from pulling it out any farther.  I had a reasonably good idea how the window trim was attached but first I had to remove another piece of 1-1/4″ thin trim that covered the gap between the window trim I needed to remove and the trim for the next window forward.  With Linda’s help I removed eight screws and the 3-sided window trim came right off.  We set it carefully aside and returned to the mirrors.

With the window trim removed we were able to pull the left (forward) edge of the plywood mirror backing out enough to see behind it.  Our lucky “break” (no pun intended but, whoops, there it is) was that the screws holding the plywood to the left cleat pulled out of the cleat.  I say lucky because the screw heads were under the glass mirror strips and none of the mirror strips broke.  We kept working it out until the upper edge bumped into the return air grill trim on the underside of the upper cabinet.  We removed the grill and set it aside.  We were then finally able to pull the left edge out far enough that I could remove a couple of screws that were holding the right cleat to the panel that forms one of the back walks of the pantry.  Something was still holding it and when I changed position I saw that there was another screw near the top.  I removed that screw and the whole panel came out with the right cleat still attached.  Three more screws and the left cleat was also out.  We reattached the return air grill to the underside of the upper cabinet and then reattached the window trim.

The wallpaper behind this panel was in very good shape except for the screw holes where the cleats were attached.  We plan to put shelves in this corner to utilize the space and they may get used for some ham radio equipment.  Regardless of what ends up there having the mirrors out gives us more room for the shelves and will just plain look better.

A view from the kitchen of the dinette corner and hallway.  A custom desk will go where the dinette seating used to be and double as work surface for the kitchen.

A view from the kitchen of the dinette corner and hallway. A custom desk will go where the dinette seating used to be and double as work surface for the kitchen.

The mirrors on the other wall of this corner are glued directly to the walnut panel that forms one of the backs of the pantry.  I tried loosening the bottom edge of the one in the corner and it cracked.  That area will be concealed by the desk, but we will cover all of the mirror strips with some sort of thin panel.  We have the same problem with the mirror strips across from the bathroom door and may just have to live with those as I have not come up with an attractive way to cover them.  I need to investigate the strip mirrors in the hallway.  There is a good chance that they are glued to plywood panels that are screwed to the wall at locations covered buy wood trim.  If we are lucky removing the trim will allow us to unscrew and remove the mirror panels.  If not, we will just put the trim back on.

I have had the idea for a while that we could make another low pantry or shallow storage area along the hallway wall above the HVAC chase where the strip mirrors are currently located.  Linda does not like the idea as she is concerned it will make the hallway to narrow.  The storage would not be any deeper than the HVAC chase is now, and would not be any higher than the wood trim along the top of the strip mirrors, which serve as a kind of wainscoting.

By this point it was 5:30 PM.  Linda headed inside to fix dinner while I got trash and materials out of the coach and carried them to the garage.  Linda let me know that a severe thunderstorm watch had been issued effective until 10 PM.  It rained lightly off and on until we sat down to eat and then the downpour came but we did not have anything severe, just heavy rain for a while.  She made a dish using garbanzo beans, garlic, kale, salt, pepper, and fresh lemon juice.  It was delicious and the fresh lemon juice really made it sparkle.  She also served the last of the risotto she made for dinner when Steve and Karen were here on Saturday.  We had strawberries with Lotus brand Biscoff cookies for dessert.  I worked on this post on my iPad, took a shower, and went to bed.  I never did make it to my office today.

 

2015/05/16 (S) Trucks and Buses

To paraphrase, “If it’s Saturday we must be in South Lyon” and that was, indeed, the case.  Most of the regulars were missing from our weekly breakfast gathering of the South Lyon Area Amateur Radio Club (SLAARC), but six of us showed up and had a great conversation.  By the time we headed towards home it was starting to rain lightly.

We stopped at Brighton Honda to get some information on the Honda Ridgeline pickup truck.  The salesman was very nice, but unfortunately Honda has stopped making the Ridgeline.  They are reintroducing it in the fall of 2016, but we will likely make a decision about a new car/truck sooner than that.  There are still a few in stock around the country but we already have an orphaned Honda Element.  We like the car, but would be happier if they were still being made.  In this case, however, it was a moot point as the Ridgeline is not towable four wheels down.

We drove next door to Brighton Ford to look at F-150 pickup trucks.  We were assisted by Frank Stapleton and he was easy to work with.  He insisted that we meet his new car sales manager, Eric Wilkinson, before we left.  We felt that was unnecessary at this stage in the process, but he also seemed like a nice enough guy.  The entry level XL 2-door may be reasonably priced (not really, but what car is?), but the slightly nicer XLT 4-door short bed with 4-wheel drive, towing package, and off-road package looks like it would price out at $45,000 give or take three grand.  Without X -Plan pricing that is simply not going to happen, and even with X-Plan pricing it is not a sure thing.  Frank really wanted us to test drive one but given the rainy weather we were not in the humor to do that today.

The F-150 is a nice truck, nicer in fact than many cars, and perhaps nicer than a pickup truck needs to be or should be.  On the plus side it certainly has ground clearance, but on the negative side (for us) it is also BIG.  The back seat room in the four door body style is cavernous, made larger by fold up seats, and that would be very useful for us when traveling in the bus.  Between the back seat and the bed we could store a LOT of stuff.  It has well-placed handles by all four doors, and it is a god thing as we both needed them, along with the running boards, to get in and out.  There are several engine options including the 2.7 L and 3.5 L Eco-Boost models, both of which feature twin turbochargers.  These are high-tech engines, with incredible power and torque and decent fuel economy. I liked the sound of that, but unfortunately that technology comes at a significant price premium.  Interestingly, Ford is using an aluminum body and the truck weighs in at about 4,700 pounds.  Our Honda Element weighs over 4,000 pounds and it is not nearly as big as the F-150.  How well the aluminum will hold up is unknown.

We were almost home when we decided to keep driving and visit LaFontaine Nissan.  While not as convenient as the Brighton dealerships, it is only 15 miles from our house, 13 of those headed east on M-59.  Linda checked their hours on her phone and they were open until 4 PM.  The purpose of our visit was to look at the Nissan Frontier pickup truck and the Nissan Xterra SUV, both of which Edmonds.com suggested were viable off-road alternatives to a Jeep Wrangler while Consumer Reports indicated they were more reliable and more practical than a Jeep Wrangler.  Bobby Lundwall, the Commercial Manager, assisted us and we met the General Sales Manager, Don Poley, before we left.  Bobby was very helpful and brought a Frontier and Xterra around front for us to see.  Again, we were not interested in test driving one at this stage, especially in the rain.

The Nissan Frontier pickup has an available 4-door, 4-wheel drive, short bed model.  It is considered a mid-size truck and is noticeably smaller than a Ford F-150 in every way.  The Pro-4X off-road version has 10.1 inches of ground clearance at the differential, which should be adequate for our needs.  It has a transfer case but is only towable four wheels down with the 6-speed manual transmission.  We looked at the Xterra but found it harder to get in and out of, especially the back seat.  It is taller than the Frontier and after due consideration we agreed that we were not really in the market for an SUV.

The Frontier does not have the bewildering array of options that the F-150 has and would be more suitable for the 95% of our driving that is on local paved and dirt roads.  It would be perfectly adequate for hauling materials from Lowe’s to the house and has an available tent option for camping.  We presume that aftermarket bed covers, canopies, and even small truck campers are available but we would check on that before buying one.  Ditto for Blue Ox base plates and the ability to install an SMI Air Force One auxiliary braking system.

We did not test drive one, but it was easy to get in and out of, and comfortable to sit in, at least in the front seats.  It weighs about 4,500 pounds, basically that same as the much larger F-150.  The only negatives at this point are the manual transmission and lack of choice on interior fabric; the Pro-4X only comes with a charcoal interior, either cloth or leather.  The bottom line was that it is probably a better fit for us than a Jeep Wrangler or a Ford F-150 and could be acquired for under $35,000 equipped the way we want it.  Nissan also has zero percent financing available at the monument, although that is often in place of other incentives.  The fact that it requires a manual transmission to be towed four wheels down, however, probably knocks it out of contention.

Storage compartment under the lift-up bed platform.  The two boxes concealed and protectd 4" flexible HVAC ducts.

Storage compartment under the lift-up bed platform. The two boxes concealed and protectd 4″ flexible HVAC ducts.

Once we got home we had a light lunch.  I then changed into my work clothes and got back to work deconstructing the inside of our motorcoach.  (I like the term deconstructing as I think it is more descriptive of what I am doing that demolishing or even disassembling.)  My goal for today was to finish removing all of the carpet and all of the carpet tack strips.  I accomplished all of that except for a piece of carpet on the wall behind the driver’s seat and a piece on the front wall of the entry stairwell.  My first task, however, was to cut a short slot in the 3/8″ plywood filler that was under the dinette in order to free an AC electrical cable that ran through it and then through the floor.

Getting the carpet off of the sides of the bed platform was interesting.  There was a piece of wood trim installed along the top edge of the side of the bed base facing the front of the bus and just under the plywood bed platform.  The trim strip is rabbited on the underside and conceals a 12VDC strip light that is tied in with toekick lights in the bathroom and the floor lights in the hallway.  The power for the lights comes from inside the bed base through a small hole in the plywood and carpet.  The trim strip also appeared to be installed over the carpet and needed to be removed to get the carpet loose along the top.

Under-bed storage compartment with bot HVAC ducts uncovered.

Under-bed storage compartment with bot HVAC ducts uncovered.

There was also an adjustable HVAC louver on each side of the bed.  The louvers were installed from the outside and had flexible heater ducts slipped over them on the inside and secured with screws.  The flexible ducts were in the storage area under the bed and were covered by wood boxes to protect them.  The boxes, in turn, were carpeted to match the rest of the storage compartment.  To disconnect the wiring for the strip light and remove the boxes I had to first empty out all of the stuff stored under the bed so I could get in there to work.  The bed platform is hinged about one foot from the head end and the foot end lifts up, supported by two gas struts, so there was plenty of room to work once I emptied it out.

I have disassembled enough of the bus at this point to have some idea of how the conversion was built.  The cover “boxes” for the flexible ducts were actually half-boxes with a long side and top and one small end.  They were installed into a corner using a cleat screwed to the floor that the bottom edge of the long side was then screwed into.  There was a similar arrangement to catch the free edge of the top and it was screwed to the inside wall of the platform base.  All of these screws were put in through the carpet that covered the boxes and were essentially invisible so I had to find the screw heads by touch and back them out.

The area just forward of the bed base with the bed platform raised and facing the driver side of the bus.

The area just forward of the bed base with the bed platform raised and facing the driver side of the bus.

Once I got the protective boxes loose I discovered that the floor and wall were also carpeted.  There was a small bump out in each rear corner that served as wiring chases for AC electrical outlets on each side of the bed, and these bump outs were carpeted.  It seemed clear to me that the HVAC ducts, which are part of the OTR HVAC system, may have originally been installed directly into the HVAC chase outside the bed base and later repositioned to the sides of the bed thus requiring the louvers, flexible ducts, and cover boxes.  They also greatly reduced the available storage space under the bed.

The OTR HVAC chase runs along the floor-wall junctions on both sides of the bus for most of the length of the coach and a 12″ section of it is accessible on either side of the bed.  Removing the two flexible ducts, sealing up the openings, and installing the louvers outside the bed platform will free up additional storage space under the bed which is a good thing as we can always use for storage space.  That’s a nice bonus but adds some additional work to the remodeling project.  Such is the nature of remodeling; you never really know what you have until you have completed the deconstruction phase.

The aft side of the bed base.  There is not a lot of room to work in here so I will remove the bed platform when I install the new tile floor.  I plan to use the same tile on the sides of the bed base.

The aft side of the bed base. There is not a lot of room to work in here so I will remove the bed platform when I install the new tile floor. I plan to use the same tile on the sides of the bed base.

It was overcast all day with humidity near 100% and rained off and on into the evening.  It was also warm so I kept opening the roof vents and running the fans to make it more comfortable in the coach, but every time I did it started raining shortly thereafter.  When I was done working on the bus for the day I moved the ten concrete blocks that had been supporting the propane tank for the whole house generator and pulled up the utility marker flags for the underground gas line to our meter.  Keith will be here to cut the grass this coming week and I want him to be able mow these areas.

Linda spent the afternoon thoroughly cleaning the kitchen.  She also prepared a sugar-water solution, filled the hummingbird feeder we bought at Lowe’s the other day, and hung it off the railing of our rear deck.  A hummingbird found it almost immediately which was very cool.  For dinner Linda made pan-grilled tofu slices with caramelized onions and sweet BBQ sauce served on tortillas.  She also sautéed fresh broccoli and sliced up some fresh strawberries and pineapple.

After dinner Linda went to the Edmonds.com website to see if she could get a better feel for dealer cost and Fair Market Value for the Ford F-150 and Nissan Frontier.  While she was at it she looked up the Chevy Colorado (GMC Canyon), and Toyota Tacoma.  The Chevy Colorado was Motor Trend Magazine’s 2015 Truck of the Year.  Both the Colorad0/Canyon and Tacoma are mid-sized pickup trucks.  Toyota’s full-size pickup is the Tundra.

Brendan called while we out to see if Linda could sit with Madeline tomorrow night while he and Shawna had dinner with their friend Jorge.  Depending how the day goes tomorrow I may go to Ann Arbor with her.  We had two episodes of Sherlock left to watch and the DVDs have to go back to the library on Monday, so we watched both of them this evening.  It was a double feature so I made popcorn in-between episodes.