2015/11/12 (R) Unforced Solutions

When I got up at 7 AM Linda had already left for the bakery.  I had granola for breakfast and made a cup of Stash China Black hot tea.  I went to my office and processed the photo that Byron sent me of him and Betty and e-mailed it to Gary and Jorge at Bus Conversion Magazine.  I then replied to an e-mail from Nancy (& Big Bill).  We met them at Suncoast Designers in Hudson, Florida in April 2014.  They are from Ontario but have a place near Ocala, Florida where they spend at least part of the winter.  I also replied to an e-mail from the Mitch in Florida regarding good places for bus service and forwarded my reply to Chuck.  I cleaned the kitty litter tray and finally got to work on the bus.

A piece of scrap SurePly underlayment used as a spacer/guide for the Porter-Cable oscillating saw to undercut he bottom edge of the side wall panel so it can be removed above the floor tile.

A piece of scrap SurePly underlayment used as a spacer/guide for the Porter-Cable oscillating saw to undercut he bottom edge of the side wall panel so it can be removed above the floor tile.

First up was to finish screwing the down the SurePly underlayment on the floor of the passenger seat platform.  With that done I turned my attention to trimming the switch panel next to the passenger seat.  This panel is just 1/4″ walnut veneered plywood but has both AC and DC switches mounted in a row across the entire top portion.  The added thickness of the underlayment and tile on the floor and back wall of the platform required the bottom and back edges of the panel to be trimmed so it could be installed and removed in case I need to get to the wiring behind it.  I used pieces of underlayment as spacers/guides and trimmed off the edges using the Porter-Cable oscillating saw.  This was the perfect tool for this situation where I could not remove the panel and take it to the shop.

With the panel trimmed and the sawdust vacuumed up I turned my attention to the tile.  After test fitting some pieces to see where the edges would land I decided to tidy up the front of the bus so it would be easier to work.  While that was certainly true it was also a tactic of stepping away from the work and letting solutions float into consciousness rather than trying to force them out.  After several trips to bring things inside the house and garage it was noon and time for lunch, which meant more time to relax and let my subconscious work on the tile layout.  Hummus and sourdough pretzel nibblers made a quick, easy, tasty meal and a cup of Constant Comment decaffeinated tea helped wash it down and warm me up while I worked on this post.

Two scrap pieces of the Armstrong Alterna Luxury Vinyl tile used as feeler gauges to make sure the side wall switch panel will clear the floor and rear wall tiles.

Two scrap pieces of the Armstrong Alterna Luxury Vinyl tile used as feeler gauges to make sure the side wall switch panel will clear the floor and rear wall tiles.

As long as I was taking a break I called Pat/Vickie Lintner to let them know I would be coming through Elkhart tomorrow (Friday) and verify that they would be home in the morning.  That sounded fine to Pat.  I will be picking up an accessory for a Nutone power base unit from them.  We have one of the power bases installed in the kitchen counter of the bus but the blender was the only accessory that came with the bus when we bought it.  Pat and Vickie had a power base in their bus but it broke years ago.  They never replaced it, and don’t plan to, so they no longer needed the accessories and were willing to give them to us.  We got most of the pieces from them at the GLCC Surplus and Salvage Rally back in September but we were missing a critical piece which Vickie thought she still had and eventually found.

After my break I reinstalled the large front trim board on the driver side vertical wiring/plumbing chase that is located on the outside wall next to the back of the driver’s chair.  I don’t recall how I got it out but I could not get it back in.  I ended up trimming off a small protrusion on the lower end and then it went into position without any further difficulty.  It was a small thing, but it needed to be done and it was good to get it checked off my (mental) “to do” list.  When I cannot solve the problem I am trying to solve (tile layout) I try to keep moving and get other small tasks completed.

I took a few more minutes to carefully measure the adjustment needed to the bump out on the passenger side HVAC duct cover and the dimensions for the two new pieces of walnut that will go on either side of the sofa seat.  I brought the old pieces in the house and found the leftover walnut in the garage as I have to take some of it with me tomorrow to Jarel’s cabinet shop in Logansport, Indiana.  I think an hour of my day disappeared between these small, simple tasks.

I continued to ponder the tile layout for quite some time, taking and retaking measurements as I tried to figure out an arrangement that would allow the joints to fall in reasonable places while making sure I could notch around things that go through the floor and avoid having any small pieces.  That is a lot of constraints.  The arrangement I finally came up with had three full 16×16 tiles centered on the landing and into the driver area.  There will be pieces about six inches wide along the fore and aft edges, and the first full tile will also be about six inches back from the edge of the landing (by the entry stairs).  The joints (grout lines) resulting from this placement will continue up the front of the passenger seat platform and result in tile placements on the platform that should work out well.

Linda called at 4:15 PM to let me know she was on her way home from the bakery and was stopping at Kathi’s on the way.  I was done working in the bus for the day so I adjusted the thermostats on the heaters and checked the house battery bank status.  The battery bank voltage was at 25.0 VDC, just slightly down from the 25.2 V level of a fully charged and rested “24 V” lead acid battery (2.1 V per cell x 12 cells in series).  The State Of Charge (SOC) was at 84% and I decided to leave the charger off until Saturday morning after breakfast.  I did have the shorepower turned off for a few hours Wednesday so the refrigerator was running on the inverter for a while but there are no DC loads operating in the coach at the moment and the Magnum remote is showing zero current coming out of the battery bank.  There must be some loads, however, as the battery SOC wound not drop that much that quickly due to self-discharge.  I locked up the bus, went in the house for the evening, and turned on the outside lights for Linda.  Given when she left the office I knew it would be dark by the time she got home.

I took a few pictures throughout the day so I went to my office and off-loaded them onto my computer.  I had an e-mail from Gary at BCM with the latest markup of the PDF for the December 2015 issue.  I proofread my article and highlighted a half dozen things that needed to be changed, using the sticky note feature for the first time to indicate the corrections, and e-mailed it back to Gary and Jorge.

Linda got home about the time I clicked ‘send’ so I wrapped up my desk work and went upstairs.  She had not been grocery shopping this week and wasn’t sure what to fix for dinner so I suggested vegan pancakes.  Fifteen minutes later we were enjoying flapjacks with real maple syrup and cups of hot tea.  Breakfast for dinner is always a treat.  We spent a little time in the living room by the fireplace and then went to the rec room to watch a few TV programs while we doodled on our iPads.  We have been trying to break the habit of watching TV in bed but we finished watching the last show in bed and then turned out the lights.  In a reversal of our recent usual morning routine I have to be up early and Linda does not, but she still fell asleep before I did.

 

2015/11/09 (M) Clever Mouse

Madeline coughed quite a bit last night and we were up several times to check on her, so we did not have the best possible night’s sleep.  We got up to stay at 7:30 AM and Madeline got up about 15 minutes later.  I made our morning coffee while Madeline helped her grandma wash blueberries and make vegan blueberry pancakes.  We had a lovely breakfast with orange juice, pancakes with real maple syrup, and blueberries, raspberries, and bananas on the side.

I check the mouse traps in the pantry every morning.  A couple of days ago I found one of them broken with the food gone and some mouse poop left in its place.  The pantry doors had been left open overnight so I figured one of the cats had discovered the trap (we use live traps) and tossed it around until the door fell open and the mouse escaped.  I threw it away since it was broken.  This morning I discovered that the food in the other trap had been replaced by mouse poop but the trap was upright with the door closed and was not broken.  The pantry had been closed all night so I knew the cats had nothing to do with it.  Apparently we have a mouse that has figured out how to defeat the traps.  We are not going to set kill traps so we will have to see what else we can find.

We lingered in the living room for a while enjoying our coffee by the fireplace, listening to Madeline play (with) the organ, and watching her play with some of her toys.  She made her futon into a car and took her two “bunnies” for a ride.  By 9:30 AM I had finished my coffee and changed into my work clothes.  It was just below freezing when we got up this morning, but it was a bright, sunny day with no wind, so it would be a comfortable enough day for working on the bus once I turned up the thermostats and warmed up the interior a bit.

My focus today was to get the SurePly underlayment installed on the floor of the passenger seat platform and maybe the two walls.  I also wanted to get the outside wall panel trimmed off so it will fit around the tile and needed to build a new step with an open front, but I did not expect to get to those tasks today.  First up, however, was getting the small patch I worked on yesterday to fit better and be secure.

I trimmed both ends of the underside of the main patch and recut the side/support panel.  I trimmed the side panel several times before I was satisfied with the fit.  I used heavy-duty double-sided tape to hold the top patch and side panel to the metal structure underneath.  I used a 1-1/2″ stainless steel self-drilling wood screw to secure the top to the vertical piece of 3/4″ plywood that forms the face of the passenger seat platform, and a shorter screw to secure the side panel to the same piece of plywood.  I then attached a temporary plate of SurePly over the side panel to the edge of the top plate to hold the side in alignment with the top.

The metal under this patch is rounded leaving a small space between the top and side pieces where they meet.  The vertical plywood front face is also beveled leaving a void.  I used Door and Window Trim Spray Foam Insulation to fill these areas.  This foam has a lower expansion than most spray foam insulation.  I did not overfill the voids but put enough in that it expanded out past the edge.  I will trim it off flush tomorrow when it is cured.  The foam adheres to anything it touches and is rigid enough to be somewhat structural so it should stabilize and secure the patch.  Once I trim it and cover it with underlayment it should be good as new.

Madeline’s Aunt Meghan, who is also her buddy, came to visit and play with her today.  She arrived at noon and I took a break to visit and have lunch.  After lunch Madeline, Meghan, and Linda went to the Brighton Mill Pond Playscape and I resumed working on the bus.  They were gone for several hours.

Floor patching compound being applied to the co-pilot/navigator platform.

Floor patching compound being applied to the co-pilot/navigator platform.

Before I could put a layer of underlayment on the passenger seat platform I needed to use floor patching compound to fill in some low spots and create a smooth taper from the plywood to some metal edging.  But first I removed all of the screws that secure this edging and counter-bored the holes so the screw heads would be flush.  As often seems to happen when I am working on something like this some of the screws were rusted and I did not have appropriate replacements.  I then have to make a trip to Lowe’s, which is what I did, and bought a small quantity of three different size flathead wood screws.  I stopped at O’Reilly’s Auto Parts to see if they had the large metal or nylon washers that are used with the swivel base for the front chairs.  They didn’t, but once again suggested that I try Howell Hardware in downtown Howell.  I have received that suggestion from people at several different stores so guess I need to check the place out.

When I got back home I finished installing the new screws.  The floor patch compound takes a minimum of three to four hours to dry, sometimes much longer, but after two hours it was dry enough for me to use a sanding sponge to smooth out some ridges and feather some edges that needed it.  It was clear, however, that I wasn’t going to be able to accomplish what I set out to do today.  And so it goes; I need to do the work correctly which means doing all the things that need to be done in the order that they need to occur.  Everything takes time and things that have to dry, set, or cure do so on their own schedule, not mine.

Phil had shown up around 3 PM so I went out to chat briefly with him and then went inside to change clothes.  He had a partial load of topsoil left from a job earlier today and dumped it on the other side of the street by the 3rd driveway culvert.  He used his front loader to place it along the south side of the new pull-through driveway extension and moved the small pile from the west end of the property to the north side of the driveway.

I still had plenty of daylight and wanted to make some good use of my time so I started thinking ahead to the layout of the tile in the cockpit.  I measured various parts of the cockpit and although the number of square feet is small compared to the main floor the layout will be more difficult.  As with all tile layouts it needs to be “balanced” while avoiding small pieces.  Linda and I agreed that the pattern in the cockpit does not need to match the main floor, which is laid out diagonally, so that opens up options for how to lay out the tile.

The main landing is less than two tiles wide (front-to-back) so the best layout for that area is with a grout line dividing it in half, but that might not work well in the driver’s area.  The driver’s area presents the additional problem of a steering column, brake pedal/valve, an accelerator pedal with its electrical cable that goes through the floor.  The “holes” in the tile to accommodate these things have to be created using two notched pieces so they can be installed around the protrusions.  I also need holes for the seat base mounting bolts and power cable for the 6-way power base.  Those can be actual holes but I do not want grout lines to fall at the edges of the base.  I also have to be cognizant of the walls, which are getting tiled.  The distance along the face of the passenger seat platform is close to 65″.  The tiles are 16″ squares so four tiles with three 1/8th” grout spaces is only 64-3/8″.  See, it’s complicated.

The other thing I pondered and measured was the new step between the passenger seat platform and the main floor.  Again there are several parameters:  (1) We want the finished (tiled) height to split the distance from the tiled platform to the tiled main floor exactly in half; (2) we want the finished depth to be half the finished depth of the platform, and; (3) we want an open front so we can store shoes under the step.  The total rise will be just under 14″ so the step rise will be a little less than 7″.  Subtracting about an inch for wood and tile will leave a 6″ high space for shoes.  The platform is 29″ deep so splitting that in half results in two treads of 14-1/2″, plenty deep for shoe storage.  I considered having the step angle across the platform, being deeper by the driver seat and shallower by the passenger seat.  While it would add an element of aesthetic interest it would greatly complicate the construction without adding any practical utility, so I rejected that idea.

As I considered the construction of the new step I was also thinking about the fact that there is a hole in the front end of the passenger side HVAC duct.  The hole opens into the space behind the switch panel on the wall next to the passenger seat and just aft of the entry door but there is nowhere for the air to go from there.  The hole is easy to see but not easy to reach so I estimated it to be three inches in diameter which is approximately seven square inches in area.

One possibility is to install a 4″ diameter circular louvered duct in the switch panel.  It would be large enough in area, could be rotated to direct the flow in any desired direction, and has internal shutters that could be closed down to reduce or cut off the air flow.  The main downside is lack of space behind the panel but I could cut off the tube behind the locking tabs.  Another downside is that the cats sleep under the passenger chair while the bus is moving and the direct airflow might be uncomfortable and/or annoying for them.

Another possibility is to create a narrow duct along the back wall of the platform the same height as the new step and tie it in to the inside of the step, allowing the conditioned air to come out the open front.  That will involve a bit more woodworking and complicate the tile installation, but could be added later, so I will probably opt for the round louvered register for now, if I do anything.

When I was done pondering the HVAC possibilities I put the seat pedestals back on the landing, locked up the bus, and went inside to change clothes.  Meghan left while I was changing clothes so I did not get to say goodbye.  Apparently Linda thought I was taking a shower and would be a while.  Since we needed to get Madeline back to her house well before her bedtime we decided to head to Ann Arbor and have dinner there.  I deflated and rolled up her portable toddler bed while Linda and Madeline gathered up her clothes, books, toys, and other things.  I loaded the car while Linda got her dressed to travel.  I checked in with Phil to get a status update and let him know we were leaving.  We were on our way at 4:45 PM.

The drive down was OK as the really heavy traffic was headed north out of Ann Arbor.  We tried to keep Madeline awake by reviewing all the fun things she had done since she got to our house late Friday afternoon but we were not successful.  As I exited M-14 eastbound onto US-23 southbound I could see that traffic was stopped not far after the Plymouth Road exit so I left the highway and headed west on Plymouth Road to Huron Parkway.  From there I headed south, paralleling US-23 to the west.  At Washtenaw Avenue I turned east, and after a short distance turned left into the small shopping plaza where Elevation Burger was located.

I order a grilled cheese sandwich and Mandarin oranges for Madeline.  Linda and I had vegan burgers and fries and Linda shared her fries with Ms. M.  Madeline was slow to wake up but perked up when her food arrived.  That girl likes to eat!  🙂  After dinner we made the short trip to Madeline’s house and arrived at 6:30 PM.  Linda got Madeline into her pajamas while I brought all of the stuff in from the car and turned up the thermostat.

Madeline was wide awake and full of energy so she played with her kitchen toys and tools and had Grandma Linda read her four stories.  I dozed off for a little while and then spent some quality time with Gus the cat.  Gus loves people but tends to keep his distance from Madeline who is just a bit too energetic and enthusiastic for him.

Brendan and Shawna’s flight was due in to Metro Airport at 6:50 PM and he texted Linda at 6:51 that they had landed.  They were home before 8 PM and got to spend time with their very awake, excited, and active daughter.  We left at 8:30 and stopped at Biggby Coffee on Washtenaw Avenue.  Rain was moving into our area from the south but had not yet arrived and the drive home was uneventful.  We were home by 9:15 PM and headed straight to bed where we watched Scorpion and NCIS-LA.  Linda came down with a cold while Madeline was here and went to sleep as soon as NCIS was over.  I watched Travelscope on the Create channel and left the TV on while I worked on this post.  It was another long, busy day during which I made forward progress on the bus.

 

2015/10/27 (T) The Pilot’s Seat

My morning started at 8 AM in its usual fashion.  I fed the cats, made coffee, started a load of laundry, made/ate breakfast (orange/grapefruit juice and granola with fresh blueberries), drank my coffee in the living room with the fireplace on and Jasper at my side, day-dreamed about high quality used Sony alpha lenses, and finally got to work on the bus a little after 10 AM.  Rain is coming tonight and forecast to stick around into Thursday so today would be a good day to do some more trimming, felling, and cutting up of dead trees.  The temperature this morning was still in the 40’s, however, and there is still much to be done in the bus.

A few days ago I installed a new AC outlet on the forward side of the cabinet behind the driver’s seat.  I wired it into the outlet on the aft side of the cabinet and then discovered that the original outlet was cracked.  I had also used an oversized cover plate on the new outlet and it interfered with the Corian cabinet top.  I finally got around to replacing the cracked outlet this morning.  I also switched the cover plates.  The regular size one still interfered slightly with the Corian top so I cut 1/8″ off of the top edge and added strips of felt on the three edges of the cabinet to raise the Corian top slightly and cushion it.  Everything fit nicely.  I turned the circuit breaker on and checked for power.  The outlets were good to go and I checked this mini-project off my (mental) project list.

I took a break and called the Escapees RV Club to register Linda and me as staff for the July 2016 Escapade.  I then called Josh at Coach Supply Direct regarding extra brackets for our MCD shades/brackets, the wiring of the passenger seat switch, and the correct orientation of the swivel bearings.  I learned that the flange, which wraps around the other piece on the inside of the ring, goes down.  (I had puzzled out that it should go the other way so I am glad I asked.)  When I was done with my phone calls I had a quick lunch of Sabra Roasted Red Pepper Hummus and Snyder sourdough pretzel nibblers.

My next task was unbolting the driver seat pedestal base from the floor.  The pedestal is secured by four large carriage bolts that go through holes at the four corners of the base plate and thread into nuts that I presume are welded into the floor structure.  The base had to be removed in order to remove the old vinyl floor tile which was installed under the base.  To get the old tile out I also had to remove a plastic cover around the steering linkage and a floor mounted bracket that retained the bottom if it.  Last, but not least, I had to unscrew the accelerator bracket from the floor by removing three small lag screws.  The accelerator is electrical, with a cable that runs through the floor, but other than limited access it was easy to detach.

Removing the old vinyl tile from the driver’s area of the cockpit was relatively straightforward.  It’s somewhat flexible and wasn’t glued down that tightly.  When Creative Mobile Interiors installed the tile they laid it out in a way that allowed the pieces to be trimmed in reasonable ways to fit around the steering column and brake pedal.  The brake pedal is mechanically linked to a complex multi-port air valve in the compartment under the floor and any finished floor has to be installed around it.

The plywood under the driver’s seat area was depressed directly under the base.  It seemed unlikely that this was the result of the base being bolted down.  It may indicate that this area also got wet like the area under the passenger side seat base.  I plan to install SurePly underlayment on the floor under the passenger seat but not the under the driver’s seat so I will either have to replace this piece or use floor leveling compound to fill the depressed area.  Replacing the plywood is probably the correct, but more involved, solution.

I started thinking about installing the new tile so I laid out all of the old tiles on the floor in the garage, kind of like putting a simple jigsaw puzzle back together.  I plan to use them as a pattern to cut the new tiles.  With a clear view of the whole driver’s area I became intrigued by the lower sidewall counsel next to the driver’s seat.  The more I looked at it the clearer it became that Royale Coach had cut the top off of a bumped out area, removed the upper three inches of the wall of the bump out, replaced the top piece, and tried to fill in the three inch gap in the side wall.  They had also cut out an access plate and then screwed it back in.  It eventually became obvious to me that they had done this to create horizontal space for the wide Villa driver’s seat that was in the coach when we bought it.  Had Royale Coach left the ISRI seat in place these modifications would not have been needed.  They were originally hidden under carpet but once the carpet was removed the really poor quality of the workmanship in this area was all too apparent.

I probably should have applied adhesive remover to the stairs and walls around the cockpit but it has to sit for 1 to 3 hours and the timing wasn’t right.  The weather was still decent and I needed to finish working on the trees at the west end of our property.  The adhesive remover can be left on for up the 24 hours so applying it at 5 PM with the intent of removing it the next morning might be ideal.  The weather forecast for overnight, through tomorrow, and into Thursday, however, is for rain and colder temperatures, so they will not be good mornings for working with the door of the bus open.

Around 3:30 PM I had a banana nut muffin and then called Phil at Precision Grading.  I got his voice mail and left him a message.  I was getting ready to use the chainsaw to cut down a small dead tree at the west end of the property when Linda texted that she was leaving the bakery.  A few minutes later Chuck called.  He had some carpet remnants for us and was nearby so he came over.  He could not stay long but took the time to look at what I was working on in the bus before he left.  It would still be awhile before Linda got home so I took the chainsaw to the west end of the yard, cut down the tree, de-limbed it, and cut it up into manageable size pieces.  I then cut up another tree of similar size that has been on the ground for a while and cut up some of the larger branches that I trimmed off the trees yesterday.

Linda got home while I was finishing the tree work and started fixing squash and a lentil/quinoa pilaf for dinner, both of which would take some time.  After cleaning the saw and putting it away I took one of the carriage boots from the bus driver’s seat and went to Lowe’s to see if I could find slightly longer replacements.  The old ones were somewhat rusted and some of the threads were in less than ideal condition.  The new Armstrong vinyl tiles are also a bit thicker than the old ones and I wanted to make sure I had bolts that were long enough to completely thread into the retained nuts.  It turned out that the bolts are metric, specifically M12-1.75×80.  Lowe’s had Grade 8 M12-1.75×90 bolts (10 mm longer than the 80s) so I bought four.  I also bought some thick M12 fender washers that were larger than the old ones.  While I was there I picked up a role of red electrical tape.

Dinner was excellent.  The squash was baked without butter (vegan) or brown sugar but was very tasty.  The pilaf had onions, garlic, and mixed greens and was very good.  We finished the Witch’s Brew wine from Leelanau Cellars that Linda used to poach the pears on Saturday.  The squash did not look that big, but neither of us was able to finish our half so we saved it for tomorrow’s lunch.

I checked e-mail after dinner and then we settled in to watch our Tuesday night TV programs.  We caught the weather report at 11 PM and then turned off the television and lights.  I turned down the brightness on my iPad display and worked for another 30 minutes before going to sleep.  I did not hear back from Phil this evening but I already knew he would not be here on Wednesday if the rain came as forecast as he had another job to work on that was better suited to working in rainy conditions than ours.

 

2015/08/24 (M) Skimcoating

For a change of pace we had granola with vegan yogurt for breakfast.  I made seven cups of the Cafe Europe / Columbian decaf blend but Linda only had one mug as she was meeting Diane at Kensington Metropark at 9 AM to walk.  After she left I gathered up the laundry, sorted it, and started the first load.  I then turned my attention to the bus.

My first task was to cut one of the 8″x8″ sheets of #80 sandpaper in half, put it on the orbital pad sander, and go over all of the Universal Patch and Skimcoat (UPS) that I applied yesterday.  The 80 grit worked well and I only needed the one half sheet.  I swept the floor clean of loose debris and then assembled my tools and materials to patch a few gouges I missed yesterday and then skimcoat the entire portion of the floor that used to have ceramic tile on it.  I mixed 24 ounces (by volume) with 12 ounces of water (by volume), half as much UPS as I did yesterday.  I tried to work more quickly and got most of it applied.  I cleaned up my tools and let them dry while the compound cured.  That also gave me an opportunity to move laundry from the washer to the dryer and start another load in the washing machine.

I had a call from Chuck so I took a break to chat with him.  He and Barbara spent the weekend racing at the old Air Force base in Oscoda, Michigan.  Their bus and race car both ran well and he turned in some very good times.  He had installed a new turbo boost gauge in the bus and based on my experience had selected a 0 to 15, PSI VDO unit.  Apparently 15 PSI is not high enough for his engine.  I have seen the boost on my gauge, which is a 0 to 30 PSI model, go as high as 17, but not often.  For most of our trip to Arizona and back this past winter it did not go over 15 PSI.

The only issue they have with their coach at the moment is their old Amana residential refrigerator.  The freezer is apparently not keeping things as cold as it should and the ice maker is not working.  They use a lot of ice and generally have the freezer stocked, so those are problems.  They bought a bag of ice for the weekend but it appeared to get warm enough to develop surface moisture and then refroze into large chunks, inconvenient at best.  I think they have decided to replace it and want to do so before they leave for the winter and while they still have the shop and the forklift.

Chuck is also going to contact the glass installer and see if he would be willing to install bus windshields.  Both of his lower windshields need to be replaced as do both of ours.  We have five replacements at his shop, two for him and three for me.  I also have new gaskets but he needs to get two sets.  We discussed late September as the best time for me and he will see if the windshield guy will do all four of them on the same day.

I mixed the remaining USP, about 12 ounces (by volume) with 6 ounces of water (by volume) and finished the skimcoating of the bus floor.  I used the last little bit of compound to patch some screw holes and small gouges in the living room floor where carpet had been installed.  There may be a few more but instead of opening another bag of UPS I will probably return it and buy a quart of the premixed compound.  I then cleaned up my tools again and left them in the sun to dry.

Linda got home about this time.  It was just after noon, so we had a light lunch of vegan deli slices with lettuce, onion, and Daiya non-dairy cheese, on thin buns.  A pluot provided a nice, sweet finish to lunch.

We measured for wallpaper the other day so I took the notes and created an Excel spreadsheet to figure out how many rolls of wallpaper to order.  While I did that Linda worked on cleaning and reconditioning drawer fronts with Touch of Oranges and Touch of Beeswax.  After examining the wallpaper in the bathroom (of the bus) I think we need to replace it too.  We took a few minutes to get those measurements and I added them to the spreadsheet.

The wallpaper we have selected is the Lamar (#699-3377R) from the Just Textures collection of Sellars and Josephson.  It is an off-white color with a small texture pattern designed for reverse hang, random match installation.  It is only sold in 2-roll bolts 27″ wide and 4.5 yards long.  We will need more than six rolls to replace all of the wallpaper so we will have to order eight rolls even though we may defer doing part of the hallway and the bathroom for a while.  Fortunately it is not too expensive (as wallpapers go) and is scrubable, which was one of our requirements for use in the bus.  Linda will return the sample books to Delux Drapery and Shade Company in Ann Arbor on Wednesday morning and place the order.

Linda reheated the leftover fajita veggies from last night and fixed some white rice to go with them.  We had fresh strawberries and a little Coconut Bliss non-dairy ice cream for dessert.  Coconut Bliss ice creams are not too coconuty, and are appropriately named.  They are as good as I remember Hagan-Daas being.

I took a little time to add lines to my floor tile layout drawing showing the location of the underlayment sheets.  It looks like I may need at least eight sheets.  I have four sheets in the garage and will install those before buying more.  I spent the rest of the evening working on the article for Bus Conversion Magazine about Larry and Carol Hall’s GM4106 bus conversion and finished it around 10 PM.  I spent another 1.5 hours catching up on e-mail and checking in on the status of Technomadia’s bus renovation project at MasterTech in Elkhart, Indiana.  The weather has turned cool and should be perfect for working on the bus tomorrow.  We need to have long, productive days, so I had a snack and got to bed at midnight, played a few games, and went to sleep.