Tag Archives: Ethiopian Yirgacheffe half-caff (Teeko’s)

2015/11/16 (M) Tiling the Cockpit, #3

Linda planned to go to the bakery today but decided yesterday to stay home and help me instead.  Based on the 10-day forecast this looks like our last decent weather day to work on the bus and we wanted/needed to make the most of it.

We had breakfast at 8 AM (granola with blueberries and a banana) and had a cup of Stash China Black tea.  I had a text message from Kristine Gullen regarding getting together with her and Jim on Saturday and replied in the affirmative.  We finished our tea by 8:30 and got to work.

I really wanted to finish tiling the cockpit of the bus, or at least as much of it as we could.  That meant cutting and fitting tiles for the stair treads and risers and the two side walls of the entry steps, gluing them in place, and then grouting all of them.  We needed to mount the table if possible and I also needed to build a new step for the platform.  That was a lot to get done in one day and even before we started I doubted that we would get it all done.

When we opened the bus we were surprised to find that the tiles on the walls of the platform had slipped all the way down to the floor tiles.  Obviously I should not have removed the spacers right after installing the tiles and should have to left them in place for any horizontal grout spaces on vertical surfaces.  Oh well, not much to do about it now.

Keith called to see if he should come and mulch the leaves one last time.  The weather the last few days had been very nice, unseasonably warm and dry.  Today was also a beautiful day but the forecast going forward was for much cooler and wetter conditions, so this was an ideal day for our last lawn mowing of the 2015 season.

We measured and cut the tiles for the face of the platform and out to the door.  At that point I evaluated what I needed to do to complete the job.  Basically, I needed to cut all of the tiles for the entry steps and walls and then install them from the bottom up.  Every piece of tile was going to be smaller than a full 16″x 16″ tile and custom cut so even though the square footage was not that much there would be more pieces than usual and it was obviously going to take quite a bit of time to get all of the pieces ready to install.  I thought we could be ready for adhesive in two hours but Linda figured it would be at least three.  It also meant working with the door open which would make it difficult to keep the interior as warm as we needed.

Phil showed up with his excavator and a dozen bales of straw.  I knew the excavator was for a different job as he did not have anything left to do at our place that required it.  He was here to finish covering the topsoil and grass seed with the straw.  We took a break to go talk to him and confirmed that he was done with the driveway and French drain projects except for the straw.  He staged the bales where he needed them but said he had to leave to dig a perk test hole at 1:30 PM and would be back mid-afternoon to finish spreading the straw around.

Linda suggested that we go ahead a grout all of the tile we had already installed.  I was more emotionally invested in completing the tile work than Linda but had to agree that this was the prudent thing to do.  Until the tile was grouted we could not reinstall the accelerator, the steering column shroud, the seat bases, and the seats, so grouting the tile was clearly a critical path item and that is what we did.  It was after noon by the time we finished so we took a break for lunch.  Phil had taken off by this time to go dig the test pit.

Lunch was grilled vegan Italian sausage on a bun with mustard and relish and black grapes on the side.  Keith finished up mowing the yard while we were enjoying a cup of Rooibos tea.  We paid him and chatted about next year.  I gave him our approximate timeframe for returning home from Florida and asked him to go ahead and start mowing next spring whether or not we were here.  We have had Keith take care of our lawn since we bought our house in the country and he has been very good about doing that when we are away and allowing us to catch up with him when we get back.

By the time we got back to work on the bus it was after 1 PM and I had to concede that we were done working on the tile until next spring except for cleaning them, which had to wait until tomorrow as the grout has to cure for 24 hours before final cleaning.  With that decision made we considered what else needed to be done and in what order.

The first order of business was painting the two front seat bases black.  We spread out painter’s plastic on the driveway and taped it down.  We set the bases there and then masked off the top portion with the swivel bearings and mounting bolt.  We wire brushed the bases to remove rust and then went over them with a sanding sponge.  I used a cleaner/degreaser and water to clean them and then gave them a coat of black rubberized undercoating paint.

The next order of business was getting all of the tools and materials that we no longer needed out of the bus to give us room to work on other things.  On Saturday I re-installed the bump out on the walnut cover for the passenger side HVAC duct.  The duct needed to have two 4″ holes drilled in it to match the holes in the metal duct, so that was the next task.  I measured very carefully and transferred the measurements to the face of the cover with equal care.  Even so, I was off slightly and had to use the sheet metal nibbler to enlarge the bottom of each hole.  At least I had a relatively straightforward way to fix this problem; I am not always so lucky.

With the holes enlarged we put the cover in place.  The 4″ round plastic registers fit through the wood into the duct but not all the way due to two tabs.  I trimmed the tabs off using the Porter-Cable oscillating saw and trimmed a little bit off of one of the outer mounting flanges to make it fit flush.  I drilled holes through the two mounting holes on each register using the #5-6 self-centering drill bit and secured them with #6-5/8″ SR screws.  We then removed the two temporary black plastic registers from the front of the built in sofa.  I trimmed the tabs off of two new brown ones and installed them using the same procedure as the first two.

In the grand scheme of things getting the cover in place and the four registers installed was a small task but it needed to be done and stood in the way of other things.  The cover has been stored on top of the two front seats, which have been lying on their backs on the kitchen floor of the bus for weeks.  We plan to re-install the seats late tomorrow afternoon.

Two more small, but critical, tasks were securing the pull-out pantry and the refrigerator.  I have assumed for quite a while that we would secure the pantry for travel with some form of sliding latch but had not thought about it in any detail.  We also needed to secure the refrigerator but I had not thought about this in any detail either.  As we pondered the pantry latch it slowly became obvious that we did not have enough wood for a strike plate to receive a pin and we did not have two unobstructed surfaces that were in the same plane, which would be required for the kind of latch I had been thinking about.

As for the refrigerator, one of our bus nut friends secured their unit by running mounting bolts (machine screws) through the floor of the cabinet above the fridge and threading them into the unused tapped holes provided for the upper door hinge (if it was reversed) .  After looking at it for a while we realized that we could attach a section of small angle to the inside of the right alcove wall with the other side just against the face of the fridge case but not over so far as to interfere with the door gasket.  My measurements indicated that a 1/2″x3/4″ angle would be just right.  It looked to me like two 12″ pieces, one by the freezer door and one by the bottom of the fresh food compartment door, would be more than adequate to keep the refrigerator from rolling out as it cannot shift sideways or twist due to the aluminum angle on the left/hinge side at the floor.

About this time Phil returned in a red pickup truck.  He finished distributing the straw and loaded three unused bales into the back of his truck.  He pulled up in the main drive and we invited him into the bus to see what we had been working on all summer.    It is always a pleasure working with Phil.  If/when we build a barn we will have him do all of the site prep and finish grading.  He will figure out the final cost for the driveway extension and French drain and send us an invoice.

Linda prepared an easy but tasty dinner consisting of a nice green salad, mixed frozen vegetables (corn, peas, and carrots) suitably reheated, and mac-n-cheese that was both dairy-free and gluten-free.  After dinner we went to Lowe’s and The Home Depot.  At Lowe’s we bought a 1/16″ thick 1/2″x 3/4″ aluminum angle and three 8 foot lengths of brass colored nose edging but did not find a latch that we liked.  At The Home Depot we bought some screws for securing the handle on the front of the pull-out pantry and a solid brass door stop to keep the pantry in place.  The door stop folds up when not in use and should work to keep the pantry closed while traveling.

Although the new Panera on the southwest corner of Grand River Avenue and Latson Road was finally open for business we stopped at Teeko’s Coffee and Tea on the northeast corner of that intersection.  Jeff was there and took our order for eight pounds of coffee beans.  We got two pounds each of Ethiopian Yirgacheffe, regular and decaffeinated, the Seattle Blend (regular), and the Sweet Dreams blend (decaffeinated).  They will roast the beans and then let them outgas for a few days before vacuum sealing them in half-pound portions.  This allows us to take them with us in the bus and keep them very fresh until we are ready to use them and to change what we are drinking more often.

We got home just after 8 PM and took our iPads downstairs to use while we watched our Monday evening CBS TV programs.  We caught the weather forecast and then headed to bed.  It looks like we will have two more days with unseasonably high temperatures near 60 degrees F but with intermittent rain and then a serious cooling trend with highs this weekend barely above freezing.  Our time for working on the bus and being in Michigan is definitely running out.

 

2015/09/01 (T) Tiling Kate

We both slept until 8 AM this morning and even then got up slowly and reluctantly.  We probably need a day off to rest, relax, and catch up on some not-so-physical tasks, but now is not the time.  There is too much to do and time is slipping by.  The fact that hot weather, muggy weather is forecast for the rest of the week probably had some effect on our enthusiasm for getting back to work.  We should probably get up at 6 AM and quit working by early afternoon, but I am not on a sleep schedule that accommodates those hours.

We had our usual homemade granola with blueberries, split a banana, and had OJ/GFJ to wash down our vitamins.  I made Ethiopian Yirgacheffe half-caff coffee, but not as much as usual.  We enjoyed our coffee in the living room with our cats and finally got back to work at 10 AM.

Dry fit of Armstrong Alterna floor tiles.  The starting point was where the kitchen was where the kitchen transitions into the hallway.

Dry fit of Armstrong Alterna floor tiles.  The starting point was where the kitchen was where the kitchen transitions into the hallway.

Today was one of the milestone days we have been working towards all summer; we (finally) started laying out (dry fitting) the new floor tiles.  I had done two layouts on 1/4″ grid paper back in early June; one with the sides of the tiles parallel and perpendicular to the centerline of the bus floor, the other with the sides turned 45 degrees.  We both liked the turned layout better so I used it to estimate the number of tiles we needed and placed the order back in mid-June.  They took a few weeks to arrive but they have been sitting flat in their boxes since early July waiting to be installed.

My original drawing has tiles lined up with opposite corners on the centerline of the floor, although it looks good on paper there was no way I could draw it at a scale that allowed me to accurately account for the 1/8″ grout spacing.  The drawing was just a “proof of concept” and a starting point for the actual layout.

We laid tiles out according to the plan from a starting point in front of the refrigerator that would allow one of the grout lines to go down the center of the hallway in front of the pantry.  Unfortunately that did not allow the tiles to reach the front edge of the floor by the cockpit or work out well for the toe kick space under the kitchen base cabinets or hallway running back to the bathroom and bedroom.

A famous problem in mathematics is finding convex polygons that can “tile the plane.” What this means is that the polygon can fit together with itself perfectly so that there are no gaps.  Some of Escher’s artwork was based on the use of such polygons and that is the context in which most people would be familiar with this concept.  Among “regular” polygons, which are equilateral and equiangular, triangles, squares, and pentagons can tile the plane.  So can right triangles and parallelograms, which includes the rhombus.  Beyond that it gets a bit tricky and someone just recently discovered a previously unknown irregular pentagon using a computer program to systematically examine a very large number of possibilities.

What does that have to do with our bus remodeling project?  Not much, really, beyond the obvious fact that the new vinyl floor tiles for our motorcoach are squares with an edge length of 16 inches.  Floor tiles are almost universally square in shape because they are easy to manufacture and can be laid out on a floor in several different ways. Finding a way that fits a particular space in a balanced way is the tricky part, however, and more so in this case because the tiles need to form a continuous pattern of grout lines (if possible) while working their way down the hall and into the bathroom and bedroom.

We shifted the string of tiles running down the centerline towards the kitchen cabinets on the driver’s side of the bus so the corners just reached the recessed base.  We then shifted them towards the rear of the coach to get reasonable size pieces at the front edge by the cockpit.  We filled in some tiles to either side of the main fore-aft string to make sure they would make it to the edges with reasonable size pieces.  When it was clear that this positioning was going to provide a balanced installation in the kitchen and living room we started working our way down the hallway and into the bathroom.

The tiles continued to fall into place and fit well in the bathroom but did not flow into the bedroom quite the way we wanted.  We may have to offset a grout line as we transition from the hallway to the bedroom but were otherwise satisfied with our dry fitting.  We returned to the front of the coach and placed every full tile that we could.  We then started trimming tiles to fill in smaller pieces.  We limited ourselves to pieces that had one or two straight cuts and no notches or tabs.

It was 4:30 PM by the time we got to the door of the bathroom and bedroom threshold, where a critical decision would need to be made regarding the offsetting of a grout line.  We have learned that the end of the work day is not a good time to make critical decisions.  With company coming in a couple of hours we quit working and got cleaned up.

I sat in the living room and worked on this post.  Kate sent a text message at 5:30 PM that she was leaving Wayne RESA and heading our way.  We figured she would get here at 6:30 and that is when she arrived.  She brought a dip that she made from cannelloni beans, garlic, and lemon juice, some baby carrots, and some pretzel chips.  We enjoyed the appetizers with some Bell’s Oberon beer while we chatted about work, travel, and family.  Kate travels every chance she gets, usually with her S.O. Brian but sometimes by herself.  Europe is a favorite destination but she frequently visits family members all across the U.S.A. and sometimes overseas.

After catching up a bit we gave Kate a tour of the bus interior.  She liked the new floor tiles and our choice of seat fabric but was suitably impressed with the pull-out pantry which pleased us.  I turned off the three residential air-conditioners as we exited the bus.  Linda then got busy preparing dinner while I showed Kate the pieces of the custom desk and built-in sofa.  I turned on the A-C in the library (where the desk and sofa pieces are stored) to cool it off and lower the humidity.  It had been off all day since we were running the main house A-C plus the three A-C units in the coach.

Dinner was ready at 8:30 PM, a simple but tasty meal of burgers and fries with a second round of Bell’s Oberon beer.  (Linda bought a real beef patty and got a slice of real cheddar cheese for Kate.)  We had fresh strawberries and Coconut Bliss non-dairy ice cream for dessert and then continued to chat about photography, cameras, travel, and the low power Radio station, AM 1700, that Brian runs in Ypsilanti.  A local blogger does a weekly interview show that Brian then podcasts.  The most recent one was an interview with a professor from U of M Ann Arbor who wrote a book that was recently made into a movie (Diary of a Young Girl).  The podcast was “liked” by Sarah Vowel, who is sometimes featured on “This American Life.”  Very cool.

Kate had to go to work in the morning and left around 10:15 PM.  Linda went straight to bed but I had a couple of things to take care of first.  I had initiated the download of an updated NVidia GeForce driver for my ASUS laptop computer.  I e-mailed several documents to my sister Patty, and then downloaded the final draft of the August/September Bus Conversion Magazine, proofread my two articles, and e-mailed a couple corrections to the publisher.   I installed the driver update and then went to bed.  I wrote for a while and finally turned out the light at midnight and fell asleep.

 

2015/08/18 (T) Walking Grind

We were up at 8 AM and I made a pot of Ethiopian Yirgacheffe half-caff coffee while Linda got breakfast ready.  She made a batch of granola yesterday so we had some with fresh blueberries and unsweetened soy milk.  It’s our standard breakfast, but that’s because we like it so much.  She had an e-mail from Robin at the bakery and had to deal with some issues related to the bakery’s new account, The University of Michigan Ann Arbor.  As I do most mornings I sat in the living room working on my iPad, drinking my coffee, and paying attention to our two cats.

Being Tuesday Linda had a date with Diane to walk at 10 AM and left at 9:30 for Kensington Metropark.  I continued working on my iPad for a while and enjoying my coffee.  At 10:15 AM I called the Livingston County Sheriff and reported the mailbox incident from late Friday evening /early Saturday morning.  Shelby took the call, was very nice, said she was not aware of any other mailbox reports, but would pass the info along to the Desk Sargent.  I checked my e-mail and confirmed with Harvey for Friday at 10 AM to move the old bus refrigerator.  I finally went out to work on the floor of the bus at 11 AM, by which time the outside air temperature was already in the 80’s.

I leave three of the awning style windows in the bus open a few inches so it doesn’t get too hot inside.  I opened all three roof vents, turned on their ceiling fans, and set them to exhaust air rather than draw it in.  I also left the entrance door open to allow more air to flow through the inside of the coach.  I then sanded and vacuumed until about 1 PM.  When I came back in the house I had two missed calls from Michele Henry of Phoenix Paint so I called her back.  I was on the phone with her when Linda got back from her walk.

Once I wrapped up the call with Michele we had a light lunch of hummus with pita chips and both black and red grapes.  While we were eating we were entertained by a gray squirrel who had gotten onto the bird feeder and was hanging upside down by its hind legs.  It would curl its body to bring its mouth up to the bottom of the feeder, emancipate some seed, and then uncurl to the more relaxed stretched out position and eat it.  All of this was also being watched with both interest and considerable skepticism by three crows who were hanging around on the ground under the feeder.  They grabbed seeds that the squirrel dropped but seemed very wary of it, which surprised us.  I speculated that perhaps they had never seen a squirrel behave in this way and were, therefore, understandably and appropriately cautious; crows are very smart, after all.

After lunch we took the three wallpaper sample books to the bus to look at them with the woodwork.  Before we could do that, however, we discovered a small bird trapped in the coach and had to deal with it.  I say “trapped” because it was up on the dashboard and obviously confused by the windshields as it kept trying to fly out through them.  It did not realize it could get out the same way it came in, through the open door.

The bird seemed small and I think it was an immature sparrow but I’m not sure.  It was seeking safe shelter in the space between the dashboard cover and the lower driver side windshield.  I used a broom to try to gently encourage it to fly towards the door but it was understandably suspicious of my good intentions.  I put on a pair of canvas work gloves and it allowed me to gently pick it up.  I tried to release it at the door opening and it flew into the door causing Linda to make a comment about why we use the phrase “bird-brained.”  I caught it again, got outside the bus clear of the door, and tossed it gently away from the bus.  It immediately took flight and flew off to the southwest, apparently none the worse for its ordeal.  I can only image the story it told the other birds.

I got a piece of the Armstrong Alterna Luxury Vinyl floor tile from the garage.  Many of the wallpapers that we thought would look good with the floor tile turned out to be too yellow, and most of the ones with good color tone were too dark, but we found a few that we liked.  Those tended to be lighter without a lot of pattern and a neutral, off-white color.  We are, however, far from a final choice as we do not currently have a sample of the Lambright Notion Linen upholstery fabric or the MCD night shade material and the wallpaper has to work with all of these simultaneously.

We measured the areas that need to be repapered and in the process decided that we would leave the old wallpaper on the inner wall of the hallway, at least for now.  (The paper in the bathroom, which is different from the rest of the coach, is generally in good condition and we are not currently planning on replacing it as part of this project.)  The existing wallpaper in most of the coach is a string cloth with a beige base but distinct vertical threads that contain a noticeable amount of grey and a more subtle herringbone pattern.  It looks good with the walnut woodwork and worked well with the old white carpet, black ceramic floor tile, and bone leather upholstery, so we think it will continue to look good with the new floor tile.

If Josh is at his shop tomorrow we will try to stop and pick up the Lambright Notion Linen sample as whatever wallpaper we choose has to work well with the furniture fabric.  On Thursday we will revisit the papers in the three books we currently have with an eye towards something that has some grey in it.

It was another warm, humid day and I was done sanding so I closed up the roof vents, locked up the coach, and went inside.  Linda prepared a pizza using the gluten-free crust recipe she got from Mara.  Yum.

After dinner I went to Lowe’s and bought two bags of TEC Skill Set Universal Floor Patch and Skim Coat, a mixing bucket, two bags of tile spacers, and three 4’x8′ sheets of 1/4″ SurePly underlayment.  I meant to buy a folding metal sawhorse but left it somewhere in the store.  I was going to buy premixed floor leveling compound but they only had 1-quart containers for $10 each and the directions said it would only cover 1.5 square feet.  I have about 80 square feet of floor to patch and level, so that clearly was not a good solution.

The Universal Floor Patch is a powder that has to be mixed with water, but each bag will cover 20 – 25 square feet at 1/8″ thickness and costs $13; much better than the premixed stuff.  I have a few areas to patch that are deeper than 1/8″ but the material can be applied up to 1/2″ thick per coat, and most of the area just needs a much thinner skimcoat.  It can also be sanded within 24 hours which will allow me to make it very smooth and keep the work moving along.  My goal is to have the floor leveled and sanded smooth by bedtime on Saturday so I can install the 1/4″ underlayment on Sunday and start laying tile on Monday or Tuesday next week.

I stopped at Teeko’s Coffee and Teas to get some more of the Cafe Europe half-caff blend.  They had the regular blend but not the decaf blend so I had Roger use the Columbian decaf instead.  He roasted the beans for me while I waited and Jeff showed up along with his wife as I was leaving.  They were married last September and are expecting their first child late next month.  Jeff was wearing his Pepsi delivery shirt, confirming what the woman at the Kahuna Coffee Shop told us last Friday.

We turned in early as we will be getting up very early tomorrow to drive to Indiana again.  Linda watched an episode of NCIS after which I watched a PBS special on the origins and evolution of the Navy Seals.