Tag Archives: egg rock

2014/08/01 (F) Schmoo Returns

(Note:  I have posted two photo galleries dated August 1, 2014, one for the front sidewalk and stairs project and one for the rear retaining walls and drain lines project.)

We took a break from personal construction projects today to get ready for another 2-night sleepover by our grand-daughter Madeline.  Her folks (our son and daughter-in-law) needed to do some painting on their rental house over the weekend and the most efficient use of their time was for Brendan to bring Madeline to our house late this morning.  That allowed him to return to Ann Arbor to work on their front porch this afternoon and will let them get an early start on Saturday morning and work as late as they want/need to.  It will also give them the option to work on Sunday morning if needed before coming to our house for dinner and to retrieve their daughter.  Brendan and Shawna both have birthdays in early August, and Brendan’s happens to be on Sunday.  Our daughter (Meghan) and her husband (Chris) will join the celebration gathering.

The landscapers were here early for what they hoped would be their last day on this job.  Linda left early to do some grocery shopping and was back well before Brendan and Madeline arrived or I had to leave for my dermatology appointment.  I got back on my computer for the first time since Monday, checked e-mails, off-loaded photographs from our digital SLR, and installed updates on four WordPress websites.

Today was also the first day to log in to edX and start the free Introduction to Linux course, but I did not have time to deal with that.  The course is self-paced and should take 40 – 60 hours to complete.  I would like to spend two hours each day on this and have it completed by September 1st.  The timing has turned out not to be that good, but I am under no obligation to take/finish the course; it’s simply a free opportunity that I would like to take advantage of while it is available.

I left for my doctor’s appointment with time to spare and ended up needing it.  There is a lot of road and utility construction going on in our area and I did not have a good way out.  I still made it on time, but not by much.  I did not have to wait very long to see Elizabeth, the dermatology PA.  I got a thorough looking over and a clean bill of health.

On the return trip from the clinic I stopped at Teeko’s to get some coffee.  Jeff had the Ethiopian Yirgacheffe in both regular and decaffeinated, so I got our usual 50/50 blend.  He was out of Sweet Dreams (a decaf blend) that I have him mix 50/50 with his Seattle Blend to make Sweet Seattle Dreams.  He did, however, have the Seattle Blend in decaf so I got a 50/50 regular/decaf mix.

Madeline was still napping when I got home.  Linda said she fell asleep a little later than normal so she let her sleep until 4:30 PM.  Once awake, she was go go go right through dinner until bedtime.

Steve (Village Landscape Development) worked on the front sidewalk in the morning, laying rectangular brick pavers in a herringbone pattern and then cutting it all the way around for border bricks.  He finished placing boulders on either side of the top steps by the front porch and had one of his crew mix up a small batch of concrete and place it along the two long/free edges.  Another crew member finished grading out the soil on either side of the sidewalk, spread grass seed, and covered it with straw.

Steve, Linda, and I did a walk-around, and the project has come together very nicely except for the leaking drain line(s).  Steve spent much of afternoon digging in very muddy conditions and ultimately unearthed about 30 feet of plastic drain line that was punctured or completely crushed.  He replaced what he believed was all of the damaged line, but until we put water down them we won’t really know.  They were not able to finish the grading because the clay soil was so wet that it was unworkable, so they will be back next Tuesday (or later) weather permitting.  They had to come back anyway as they needed a bit more egg rock to finish a bed that we added at the last minute.  As a result of the walk-around we added another bed of egg rock at the east end of the deck to tie in with rock under the deck, and two more downspout drain lines, all of which they will do the next time they are here.

 

 

2014/07 – Retaining Walls & Drains

Panorama of retaining wall project drain lines (looking N from deck).

Panorama of retaining wall project drain lines (looking N from deck).

Village Landscape Development of Fenton, Michigan was at our house (off and on) for the entire month of July working on two projects.  The larger project was tearing out two stacked block retaining walls by the basement walkout and replacing them with boulder retaining walls.  This involved significant regrading of the area and the installation of drain lines for the downspouts from the roof and the sump pump.  This gallery post contains a selection of photos that show the highlights of the work from beginning to end.

2014/07/30 (W) Winter In July

By the time we started breakfast the landscapers were back.  Steve started to dig a trench for a drain line from the end of the lower deck and hit 2×8’s on the flat about 2-3″ below the surface, so he abandoned that work and moved the excavator around front to the trash pile.

The major construction work up in the back is nearing completion and the lads were picking up some of the smaller debris, the larger stuff having been moved around front to the trash pile yesterday.  Steve used the excavator to load some of the trash onto the trailer (normally used to move the excavator), where the crew covered and secured it.  He loaded more of it into the back of his pickup truck.  They are still having tire issues with the trailer so I charged up my 200 psi air compressor (150 psi regulated) and rolled it over so they could fill one of the tires.

Steve moved the excavator to the southeast corner of the house to dig a short (10′) shallow trench for a drain line to get water from the downspout away from the house.  I conferred with him regarding the exact location because the main propane line enters the house at that corner, the electrical service for the RV outlet runs under there, there is a tree about 12 feet southeast of that corner, and that corner is where the new natural gas meter will be installed. There will be a similar short drain line at the southwest corner of the garage, but it will be dug by hand as the main electrical service runs directly under there about 2′ below the surface.

The lads continued to work in the back placing egg rock.  They were about 1/2 cubic yard short and I asked Steve to order a full cubic yard and use the other 1/2 yard on the west end of the north edge of the lower upper deck to match what they had done at the top of the west retaining wall.  Steve gave the crew instructions on how to prep that area, add a piece of edging to define where the rock will go, and install landscape fabric.  He and I then looked at the boards he hit in the back while trenching and it turned out there were only three of them 4-6′ long and they appeared to be old construction material that had possibly been used as a step off of the lower deck.

Linda gathered up household trash and recyclables and headed off around 10:45 AM.  I finally got started on my projects for the day around 11 AM, opening the garage door so I would have light when the power was turned off at the sub-panel main breaker.  My first task was to move the new outlet I installed in the utility closet the other day.  The return air duct will be installed against that wall and would cover the current location.  When we installed the door yesterday we did not put any 2×4’s above the door and up to the ceiling.  Darryll is going to run the supply duct straight out from the furnace above the door and then angle it over against the east wall of the garage.

With the outlet relocated I cut some scrap insulation to fill the lower half of the open wall cavities and then stopped while I pondered getting a ground wire into that space.  Linda got back from running her errands about then so I decided over lunch to call Bratcher Electric to see if they could give me an idea of what it will cost to run a 100 Amp service entrance cable from the transfer switch in the southwest corner of the garage to the garage panel in the northeast corner of the garage.  (I estimated it would take 40′ of cable, but have no idea what the labor will be.)

The earliest I will be able to talk to Mike Bratcher is next Monday so I decided that I really needed to run a ground wire from the sub-panel to the main panel allowing me to disconnect the ground wires from the neutral wires in the sub-panel by removing the bonding screw in the sub-panel and giving us a code-compliant, and much safer, sub-panel until such time as it gets re-wired as a main panel.

Linda and I determined that I needed about 40′ of #10 copper wire to get from the sub-panel to the main panel.  Pondering sometimes leads to good things.  I really did not want to stop working to go get wire when I remembered that I had a length of green insulated copper wire I had used for grounding a ham radio and antenna mast at the old house.  It was coiled up on the floor in garage and when we uncoiled it we discovered it was … 40′ long!  I love it when that happens.  I checked the gage and it was #8, so it was actually larger than required for the 60A cable that feeds power from the main panel in the basement to the sub-panel in the garage.

I checked the approximate location for drilling a hole and then drilled a 1/2″ hole from the inside of the garage just above the base plate and out through the siding.  I fed the ground wire through the hole from outside the garage, pulled it up into the sub-panel, and secured it to one of the ground bars.  I dressed it and fastened it to the side of a stud and coiled up the extra outside on the lower upper deck.  I will complete the run to the main panel another day.

With the ground wire installed I was able to install the insulation I had cut earlier and secure it with our staple gun, which I had managed to locate in the tub of tools we took with us out west last summer.  With Linda’s assistance I cut and installed two pieces of drywall from an old scrap piece we had.  I then taped the seams and mudded the screw dimples.  By the time I finished it was 4 PM.  Spencer came to the garage to let me know that they would all be leaving around 4:30 PM due to a severe thunderstorm that was on course to hit our area around 5 PM.

By 4:45 PM we were hearing thunder and I decided to stop work temporarily and help Linda close up the house.  The storm came, a cold wind blew, and it rained hard, but only for a few minutes and we did not get any of the hail that was reported prior to the storm’s arrival at our location.  An hour later we had a lovely summer evening with blue skies.  Linda made roasted winter vegetables for dinner.  It’s the end of July, but we had overnight lows in the mid-40’s two nights ago.  The first six months of this year have been the coldest in 21 years, so winter vegetables were appropriate for dinner even though it is the end of July.

I had planned to do a lot of other electrical work today, but it was a full day and everything that got done was something that needed to get done.  It was also work that had to get done in the order in which it was accomplished.  My original plans were obviously too ambitious, and today’s work involved details that required time to figure out and execute.

 

2014/07/23 (R) My Platform

The primary elections are just around the corner but my platform has nothing to do with politics.  My platform is a 46″ x 40″ surface 12″ above the floor in the northeast corner of the garage, or will be once I build it.  This platform will be the base for the new HVAC unit for the library and I need to have it built before the equipment gets here and Darryll shows up to install it.  Once the unit is installed I need to enclose it to isolate it from the garage to prevent explosive vapors or noxious fumes from entering the combustion chamber or fresh air circulation.  That will require the construction of two walls one of which will have an exterior grade door.

John’s chop saw, which I borrowed the other night, allows me to make more accurate cuts (clean and square) than I can with my circular saw.  In the meantime I have some work to do removing/installing a few studs in the north wall of the garage and running some new electrical wire.  I need to run 120V 15A circuits for the furnace portion of the library unit and for the ceiling mounted garage furnace and a 240V 20A circuit for the library air-conditioner.  Eventually I will have a 240V 30A outlet for our radial arm saw, which would be great for the woodworking aspects of this project, but that’s a project for another day.

Three landscapers showed up a little before 8 AM (Tommy, Matt, and Spencer).  Tommy was on the phone with Steve getting their instructions for the day and then they got to work building an additional section of the west retaining wall with medium size boulders and preparing the area under the east end of the deck for a layer of egg rock.  They took off around 9:45 AM for some unknown reason, but the sound of their truck reminded us to put the trash out at the street for pickup.  They were back in a little while, worked until noon, and took their lunch break.  By 3:30 PM they had the boulder wall built, the egg rock placed, a strip of edging set into a small trench, and small boulders placed on the eastern slope below the large boulders.  That certainly looked like progress.

Linda worked at her desk until mid-afternoon and then started working on dinner.  Although simple in presentation at the table, she put a lot of time into our meal.  She made a potato and lentil curry that was very good with deep, complex flavors, and garlic naan bread.  Both were as good as anything I have ever had at an Indian restaurant and the naan was vegan, made with unsweetened soy milk in place of dairy milk and olive oil in place of dairy butter.

I spent most of the day taking the measurements I needed to turn my mental concept for the utility closet into a set of design drawings from which I could produce a material list.  By supper time I had a good set of drawings to guide the carpentry work but was still puzzling over some electrical issues.  By the time Linda had dinner ready I was ready to set thus project aside for the night.

It was after 7 PM by the time we finished eating and cleaned up, but that left us plenty of time to sit on the deck and enjoy a cool northwest breeze and the muted light of scattered clouds.  It eventually got too cool to stay outside so I worked at my computer until bedtime.