2015/10/16 (F) Desk Installation

We were up at 8 AM, fed the cats, made coffee, and had breakfast.  Phil showed up around 8:30 AM, unloaded his front loader, dropped his flatbed trailer, and left in his dump truck.  I turned on the fireplace and we enjoyed our coffee while iPading until 10:15 AM.

Our first task today was to cut up several large limbs that I pulled out of the woods last evening to get them out of Phil’s way.  I cut them up with the chain saw and then we stacked them on the disposal pile for Phil to haul away.

Phil returned at 10:30 and moved his Caterpillar 305C excavator into the woods across the street by the culvert.  I went down to chat with him briefly to make sure I understood what he was going to work on.  There were a lot of small trees (3″ diameter), saplings, and bushes scattered around the site.  Some of them had been dead for years and some had just been knocked over by Phil.  I decided to work in that area with my chain saw cutting everything up into five foot lengths so Phil could use his front loader to get them into his dump truck.  I worked at this until 11:30 AM and then turned my attention to the bus.  Linda worked on her needlepoint while I cut wood.

Before getting started on construction tasks I took two pieces of filter material and set them on the wire shelf in the freezer compartment of the new refrigerator, one on top of the other.  I then set the two remote thermometer sensors on the filter material.  Butch had suggested the other night that I set the sensor on a sponge to get it off of the floor of the freezer compartment as it was likely responding to the automatic defroster heat strips when they come on.  I figured the filter material would work just as well and that placing the sensors on the shelf would definitely get them away from the floor.

Linda brought out a bag of ice from the house fridge and put it in the bus freezer.  She also filled several 1/2 gallon juice and milk cartons with water, put the caps on, and put them in the fresh food compartment.  The purpose of all of this was to add thermal mass to the compartments to cause the refrigerator to run less often and reduce large swings in temperature.

Inside the bus our first sub-project was installing the desk, which included putting the front passenger side HVAC duct cover in place even though it is not finished.  It took us quite a while to get everything positioned just right.  With Linda holding things in position I screwed the right pedestal to the wall, adjusted the position of the base and screwed the pedestal to the base.  We then repeated that process for the left pedestal and base.

Linda removes the backing from the double-sided tape on the back side of the air grate in the center connector/cover for the desk.

Linda removes the backing from the double-sided tape on the back side of the air grate in the center connector/cover for the desk.

At this point we had several things to do with, and under, the center connector/cover so I removed it and took it into the garage/shop.  We cut a piece of the decorative brass colored metal grate and secured it to the back of the air opening with small screws every few inches.  Next we cut a piece of black plastic mesh to fit over the grate.  We then cut pieces of 3M Extreme Mounting Tape (double-sided) and attached them to the back side of the grate in between the screws.  Linda peeled off the protective layer and we carefully placed the plastic mesh.  Using one of the scrap pieces of the protective layer I rolled the plastic into the take with our wallpaper seam roller.  Finally, we had a piece of filter material already cut to cover this air intake opening so we set that on top of the mesh, pressed it down to take advantage of the tape, and then secured it with Gorilla Tape on all four edges, rolling it with the seam roller to get good bonding.

A detailed view of one of the homebrewed tongue and groove alignment assemblies made from flat mending plates.

A detailed view of one of the homebrewed tongue and groove alignment assemblies made from flat mending plates.

Back in the coach I had to tie in the outlet strip to the 120VAC power feed.  I shut off the breaker for this circuit and checked with my tester to make sure it was not live.  The hot and neutral wires were accessible but the ground wires were back under the left pedestal where they were not easy to reach and manipulate.  It took a while, certainly longer than it should have, but I got the three ground wires tied together with a grounding clamp.  I connected the hot and neutral wires (three each) relatively easily using wire nuts.  I turned the circuit breaker back on and checked that the outlet strip had power between the correct terminals and did have power between any other terminal pairs.

I went to the garage to get a four foot long piece of 1″X1″ aluminum angle that I bought weeks ago to use as a support bracket for the upper rear edge of the center connector/cover.  I was going to cut off a 26″ long piece and then drill countersunk holes but I noticed a piece of 1/2″X1/2″ light gage angle that was about 26″ long and already had holes in it.  It was long enough to span the space between the pedestals and go under each one about an inch.  That was sufficient to position it correctly so Linda held it there while I secured it to the wall with four round (pan) head screws.  I then put the center connector/cover back in place.

Phil has cleared all of the organic debris from the area where the driveway extension and RV pad will be located.

Phil has cleared all of the organic debris from the area where the driveway extension and RV pad will be located.

Phil starts trenching and placing the plastic drain tile tubing for the French drain.

Phil starts trenching and placing the plastic drain tile tubing for the French drain.

 

 

 

 

 

 

 

 

 

 

 

Phil had long since left in his truck to dump all of the wood debris.  We had a light lunch of Amy’s Lentil Vegetable soup and fresh organic grapes.  While we were eating a group of three deer came to our back yard and eventually ended up eating apples that had fallen from our tree onto the ground.  These same deer, along with two others, were here yesterday at twilight and were very frisky.  We saw them later in our neighbor’s yard across the street.

Another view of Phil’s smaller excavator with the 12” bucket being used to trench the French drain in the southwest portion of our property.

Another view of Phil’s smaller excavator with the 12” bucket being used to trench the French drain in the southwest portion of our property.

Phil returned around 3 PM and started working on the French drain.  He replaced the 30″ wide toothed bucket with the 12″ one and started at the high end if the culvert on this side of the road.

The grand finale was the installation of the Corian desktop, which has been sitting on a blanket in the middle of the living area floor since Tuesday.  I drilled countersunk holes through the four corner plates in each desk pedestal from underneath.  I then inserted 1-1/4″ #8 self-drilling outdoor wood screws into each hole, again from underneath, until they just protruded above the corner blocks and then backed them off until the tips were just below the surface.  We set the desktop across the pedestals and pushed it as tight to the back and right end wall as we could.  Linda put her weight on it and I ran the screws home, pulling the top tight to the pedestals.  We reinstalled the four drawers in the right pedestal, finally getting them off the floor in the hallway where they have been since Tuesday.  We stepped back to admire the desk and agreed it was a thing of beauty and a joy to behold.  Linda also marveled, once again, at how much space she now has to work in the kitchen.

A wider shot showing the excavator and drain tile.  The laser level is at the left edge of the frame.  The main arm of the excavator (with the bucket attached) has a laser sensor on it that tells Phil exactly where the lower edge of the bucket is relative to the laser level.

A wider shot showing the excavator and drain tile. The laser level is at the left edge of the frame. The main arm of the excavator (with the bucket attached) has a laser sensor on it that tells Phil exactly where the lower edge of the bucket is relative to the laser level.

The “denouement” was mounting the outlet strip and adding felt pads to the two fake drawer fronts on the left pedestal and then adjusting the magnetic catches.  I originally had the outlet strip (temporarily) mounted to the wall between the two pedestals with two screws a few inches below the cord notch in the center of the back edge of the desktop.  Rather than put it back there I decided to mount it on the underside of the desktop just in front of the cord notch.

The underside location will work just as well as the wall mount location for regular 2- and 3-prong plugs but probably not as well for small AC adapters.  The added pluses of this location, however, are: 1) it will not interfere with cords coming through the notch, 2) it will be up out of the way of the UPS (uninterruptible power supply) that will sit on the shelf at the top of the center connector/cover, and 3) if liquids are accidentally spilled and run over through the notch they will not run into the outlet strip.  Besides, devices with an AC adapter will probably be plugged into the UPS so this was a better overall approach.

Our next task was to adjust the sofa seat until it was deep enough to be comfortable.  We slide the plywood seat out a couple of inches and then got the seat and back cushions (three each) from the house where they have been stored since September 21st.  We put the cushions in place and sat down.  We pulled the cushions out and pulled the seat board out until it was five inches farther out than originally designed and put the cushions back in.

The front edge of the seat cushions were out farther than I liked but we both agreed the sofa was now comfortable to sit on.  The distance from the bottom front edge of the back cushions to the front edge of the seat cushions was originally only 16 inches and that turned out to just be too short.  With the seat board moved out it will now be 21 inches.

In order for the sofa to work correctly, both as a sofa and as a bed, we will need a cushion that is 5″ wide by 6″ high, by ~76″ long to fill in the space behind the seat cushions and below the back cushions.  The height and foam makeup will be such that it is level with the tops of the seat cushions and have the same firmness and feel.  Would that I had designed the sofa for this depth to begin with and had the seat cushions made accordingly, but we were trying to open up the living room by not having the sofa protrude into the aisle any more than absolutely necessary.

Next up was reinstalling the wood trim in hallway.  We have an interesting plan for the lower half of the hallway but in case we do not get it finished before we leave for the winter we wanted the trim off the bed and back on the wall.

The lower outside hallway wall.  There were originally three framed panels of vertical strip mirrors here.  We will replace them with wood panels, probably in a lighter color to contrast with the walnut trim.

The lower outside hallway wall. There were originally three framed panels of vertical strip mirrors here. We will replace them with wood panels, probably in a lighter color to contrast with the walnut trim.

This trim originally framed three panels of vertical strip mirrors.  We were able to remove the mirrors as they were glued to wallpaper.  In the process we discovered that the left and right panels were the same width but the center panel was wider.  The trim consisted of six pieces of wood; a long upper and lower horizontal piece and four vertical pieces.  The six pieces were screwed to the lower half of the outer wall but not attached to each other.  The left and right vertical pieces were tight to adjacent woodwork, but the two intermediate pieces were free to be repositioned.

We reattached the upper horizontal piece first making sure the mounting screws went back in the same holes.  Next we pushed the lower horizontal piece into place but did not screw it to the wall.  We then attached the left and right verticals.  The horizontal distance between the inside edges of the left and right verticals was 75 inches.  The two intermediate verticals were each 4-1/2″ wide so the distance between verticals needed to be 22″ (75 minus 9 = 66 divided by 3 = 22).  We carefully positioned and secured the two intermediate verticals to achieve this spacing.

The trim boards all have rabbited edges on the back side.  I need to measure them carefully, but they are ~3/16″ deep by 3/8″ wide.  Our current plan is to use 3/16″ underlayment or other 3/16″ high quality plywood to make three panels that will fit within these rabbits with a little room to spare.  The panels will either have a hardwood face or we will cover them with a hardwood veneer of a wood that contrasts with the walnut trim.  We can get the veneer from Rockler once we decide what we want.

Linda spread out several towels on the new desktop and we moved tools and supplies from the A-V cabinet, behind the driver’s seat, to the new desk.  I then removed the Corian top of the A-V cabinet and put in on the bed.  We still have a small amount of wallpaper to install in the front of the living room and into the cockpit on the driver side, but it will not be easy to do.

These areas, such as the one behind the A-V cabinet, are small with limited access so most of my sanders cannot be used.  The only one that might work is the Porter-Cable oscillating tool but I did not get it out today.  I got some sanding sponges instead and tried those on the wall under the passenger side window trim next to the co-pilot seat.  When I sanded a dark area about 6″ long by 3″ wide the wood in the center crumbled and I ended up with a hole 3″ long by an inch and a half wide.  I could see one of the stainless steel structural members through the hole.  Given what was obviously water damage I was glad we bought a bus with welded stainless steel as the main structural material.

Based on what I could see, the walls in the bus appear to be 1/2″ plywood although I did not measure the thickness.  This area had obviously gotten very wet over a long period of time and some of the wood has rotted.  It is the only spot we have discovered that is this damaged and we immediately realized that we will not be able to wallpaper this area.  We will probably panel over it, similar to what we plan to do with the veneered panels in the hallway, but today was not the day to figure that out.

It was going on 5 PM and we decided we were done for the day.  I turned off all of the electric heaters, turned on the Aqua-Hot, turned on all three thermostats, and set the temperature to 20 degrees C.  The refrigerator was also indicating much colder freezer temperatures than it had been before I moved/isolated the remote sensors so I reset the freezer and fresh food controls to their “normal” center positions.  Tomorrow we will replace the alkaline batteries with the Lithium batteries we bought specifically for the TempMinder thermometer system, reset the min/max data, and monitor it for a few days.

I walked down to see what Phil was doing.  He was making good progress with the French drain but did not have enough of the plastic drain tile to finish it today.  He plans to work tomorrow and will have the additional tile he needs to finish the drain.  I left him to his work and took photos of the fall colors in our yard as I worked my way back to the house.

I spent an hour at my computer dealing with e-mail and transferring photos from the Sony a100 to my laptop.  Linda called me to dinner at 7 PM.  It was a simple meal of vegan Coney dogs with mustard, onion, and beans served open-faced on a whole wheat hotdog bun.  As a side dish Linda steamed Opo squash.  It was the first time either of us had this particular squash.  It was very mild with a hint of cucumber.  It is available all over the world and widely consumed as it is relatively inexpensive.  It was OK, but I thought it might work better as an ingredient rather than a stand-alone side dish.

I exchanged a couple of text messages with Chuck and confirmed that we would be at his shop tomorrow after breakfast to retrieve our two bus windshields.  The rest of the evening was spent in the living room by the fireplace reading and writing on our iPads before turning in and watching episodes of Rick Steeves’ Europe and Joseph Rezendo’s Travelscope on Detroit PBS (WTVS).

 

2015/08/26 (W) Delux Delay

We were a bit sore last night, and needed a good night’s sleep, so we both took some Advil PM right before going to bed.  As a result we did not wake up until almost 8 AM this morning.  The Advil, combined with the very cool temperatures, made for good sleeping.

Our son had called yesterday to see if Linda could watch Madeline today while he did some work on the rental property that he and Shawna own.  It was Shawna’s house before they got married, and is a nice little place, but with Madeline on the way they wanted a slightly larger place.  They also wanted to be on the other side of Stadium Boulevard in the attendance area for Burns Park Elementary School and walking distance to both the school and adjacent Burns Park without having to cross any major streets.

Ann Arbor is a major rental housing market because of the University of Michigan and the local government is very involved in this market.  Rental properties must be inspected at least every 30 months and meet code requirements.  The rental house was scheduled for inspection on Friday and needed some minor repairs, so Brendan set aside today to take care of things.  What I find interesting about this inspection requirement is that most of the rental houses our son and daughter lived in while at U of M looked to me like they had not been inspected in over a decade.

Linda was due at Brendan and Shawna’s house around 10:30 AM so she left our house at 9:15.  She took the three books of wallpaper samples with her and went directly to Delux Drapery and Shades in Ann Arbor to return them and placed the order for four bolts (double roll packs) of Sellers and Josephson Just Textures Lamar paper.  Not long after she left Delux I got a call at home from the store.  They were looking for Linda to let her know the wallpaper was back ordered until September 11.  (I’m not the least bit superstitious but September 11.  Really.)  To cancel the order we would have to let them know today but I told them to let it ride.  I then texted Linda to let her know and she agreed with my decision.

I had a feeling this might happen and it’s what we get for waiting so long to look for, select, and finally order a wall covering.  But it is what it is and we were not going to settle for something that wasn’t “right” for our interior just because it was available more quickly.  If the paper actually comes in on the 11th we will have the 12th and 13th to at least install it in a few critical areas before the new seating goes in.  If it doesn’t arrive by then we will deal with it when it does.  Either way the only big issue is that we wanted to paper the wall behind where the desk will go before the desk is installed.  As things stand we will either uninstall/reinstall the desk or paper around it.

The pantry supported by plywood and 2x4s.

The pantry supported by plywood and 2x4s.

There were several small tasks that I could have worked today but the thing that needed to be done was the installation of the pull-out pantry, so that is what I did.  The pantry was already in the coach, which was a good start.  I got two of the small leftover pieces of 3/4″ oak veneered plywood and set them in front of the alcove base.  I then set a 5′ length of 2×4 on the flat in the space where the pantry goes and extending out beyond the alcove by more than the depth of the pantry.  I then set the pantry on the 2×4, pushed it snug to the side of the alcove, and slid it towards the back of the alcove until the front was approximately one inch behind the vertical front edge of the left side panel.

There were two main reasons for using the 2×4.  First, the lowest slide attached to the pantry box extends below the box so the bottom of the box needed to sit on something that was thicker than the amount by which the slide hung down.  Second, a 2×4 on the flat is 1.5″ thick and that turned out to be a good thickness for positioning the pantry vertically in the alcove.

The reveal between the front of the pantry and the front edge of the alcove side panel was wider at the top than the bottom so I placed two wood shims side-by-side under the back end of the 2×4 to raise it slightly and tilt the top of the front out.  I fussed with this for quite a while and each time I adjusted the shims I had to pick the pantry up, set it aside, and put it back.  I eventually got the reveal to be the same along the entire length (height) of the front.

Once I knew where I wanted the pantry to be when it was closed I had to figure out how to mount the slides to the side panel of the alcove.  I pondered this for quite a while.  If nothing else, I have learned that when it is not clear how to proceed the best course of action is to do nothing.  I have also learned that if I ponder long enough I will eventually see a way forward.  Sometimes that takes days or weeks of conscious and subconscious thinking, but luckily the solution came to me relatively quickly.

The pantry box is 27″ deep.  The full extension slides are 26″ deep and they are mounted so they are flush with the front of the pantry box when they are fully closed.  I wanted a 1″ reveal along the front, so I needed to place the back edge of the slides 27″ back from the front edge of the alcove side panel.  With the pantry box out of the alcove I used a metal ruler to measure back at three points and make very fine scratch marks.  I then used the metal ruler to draw a fine pencil line through the three scratch marks.

I returned the pantry to the alcove, pushed it tight to the alcove side panel, and then pulled it out about three inches.  Measuring on the back side outside the alcove I made final adjustments to the shims to get a consistent reveal.  I then pulled each of the nine slides back, carefully aligned the back edge of the slide to the reference line, drilled a hole with a self-centering VIX bit, and secured it with a #6-3/4″ SR (square recessed) screw.  (I was not able to initially secure the bottom slide as the 2×4 was in the way.)  I pulled the pantry out a little farther until the next mounting hole in the top slide was visible and then drilled that hole on all eight slides and secured it with a screw.  I proceeded in this way until all but the bottom slide were attached to the alcove side panel through every available mounting hole; 88 screws in all (11 screws for each slide x 8 slides).

The pantry with the installation boards removed from underneath it.

The pantry with the installation boards removed from underneath it.

To secure the bottom slide I needed to get the 2×4 out from under the pantry.  I slid the pantry all the way in, slid the two pieces of 3/4″ plywood out from under the 2×4, and tried to slide the 2×4 out.  Unfortunately I used a 2×4 that was too long to just slide out as part of the original pantry cabinet is directly across from the pull-out pantry.  So I got my circular saw and cut about 4″ off the end of the 2×4.  Close, but not quite, so I cut off another 2″ and was finally able to slide it out.

With the pantry all the way out I was able to drill and secure the mounting holes for the back half of the bottom slide.  The holes for the front half were a bit tedious as I had to move the box to reveal each one.  To avoid going back and forth between the drill and the screw driver bit I drilled all of the holes first and then put in the screws.  I should also mention that I used the Shop Vac to vacuum up any debris that got in the slides as a result of the drilling.  I also wiped the slides out (carefully, they have sharp edges) with a paper towel.

The pantry slides all the way in and out but is a little tight the closer it gets to being fully closed.  I know that Jarel was very meticulous in attaching the slides to the pantry box so they were all parallel.  My working hypothesis is that either I did not get them attached to the alcove exactly parallel (entirely likely) and/or there is more drag on them because of the one-sided installation (probably, but no way for me to quantify) than there would be if they were installed on both sides of a drawer.

All of the slides are on the same side, which is not how they are normally used.  A pair of these slides is rated to support 100 pounds when used on both sides of a drawer, so four and a half pairs would, conservatively, support 400 to 450 pounds in a normal application.  Even if they will only support 1/3 that much weight in a single-sided application that is still 133 to 150 pounds for our nine slides.  I think the box weighs about 30 pounds so that leaves at least 100 pounds for stored items and I doubt that we could get 100 pounds of stuff in the pantry even if we loaded it with canned goods.  Because the pantry is narrow and tall with lots of slides I suspect most of the load on the slides is vertical, which is what they are designed for, rather than sideways, which would tend to pull them apart, so I suspect that it can safely carry considerably more than 100 pounds of staples.

The piece of aluminum angle that will prevent the refrigerator from sliding sideways into the pantry.  It is not installed yet as the plywood refrigerator base is not stained yet.

The piece of aluminum angle that will prevent the refrigerator from sliding sideways into the pantry. It is not installed yet as the plywood refrigerator base is not stained yet.

I had just finished installing the pantry and was cleaning up my tools and materials when Linda got home around 3 PM.  I had skipped lunch and she had a PB&J sandwich while she was out so we agreed to have dinner at 5:30 PM.  Linda picked up where she left off yesterday cleaning and waxing the drawer fronts and the woodwork in the bedroom.  I decided that the oak veneered plywood base in the alcove needed to be painted or stained and then sealed so I went to Lowe’s and got a small can of Rustoleum American Walnut stain, a small can of Rustoleum satin finish polyurethane, and two foam brushes.

I brushed the stain on liberally, working in sections, let it sit for two minutes per the instructions, and then wiped it off with a lint-free cloth.  The stain required mineral spirits for cleanup so I threw the brush and cloth away.  The instructions said to wait one hour before applying a finish.  It was 5 O’clock by then so I went to my office to check e-mail while Linda prepared dinner.

She made a nice salad and grilled a couple of vegan burgers and added some vegan cheese.  Mustard, ketchup, pickles, onions, and lettuce on a nice bun made for a tasty sandwich.  Two deer, a doe and her young fawn, came to our deer block while we were eating and a ruby-throated hummingbird stopped at our plants and feeders.  For dessert we had half of a small, very sweet watermelon.

By the time we were done with dinner it was 6:30 PM so I went back out to the bus and applied the polyurethane.  The directions said to apply it sparingly so that is what I tried to do.  They also said that it could take 48 hours to be usably dry and seven days for a full cure.  Drying time was dependent, however, on temperature and humidity, with higher temps and lower relative humidity promoting quicker drying.

I had run the Aqua-Hot earlier in the day and determined that there was still a little too much coolant in the system as the expansion reservoir overflowed into my catch bottle.  I closed the three windows that were open, leaving them just slightly ajar, turned on the Aqua-Hot, turned on all three thermostats, and set them for about 72 degrees Fahrenheit.  I will not be applying a second coat of polyurethane and cannot spare 48 hours for this one to dry.

I had thought that we might get the first sheet of underlayment installed this evening but decided we had done enough for one day.  It will be the only full 4’x8′ sheet we install but it needs a notch cut out of it before it goes in.  I thought it would require several cuts but then realized I had some floor leveling compound that I had not removed.  I got my chisel and mini-sledgehammer and knocked off the big chunks.  I then used the oscillating sander with 50 grit sandpaper to smooth everything out.  It was 7:45 PM and I was done working on the bus for today.

I went to my office and spent a couple of hours dealing with e-mails.  Linda was still up when I turned in at 10 PM but drifted off to sleep as I finished up this post.  She has to go to the bakery tomorrow which means she will be up very early.