Tag Archives: custom walnut desk (H3-40)

2015/11/25 (W) T Minus 2 Days

We both got up at 7:45 AM.  My back felt OK when I went to sleep last night but it was not good by morning.  I don’t know if that is a result of being immobile and supine or just the Ibuprofen wearing off.  As painful as it is to get up it feels better once I do.  We both got dressed to work.  Linda prepared raisin toast and tea for breakfast while I positioned myself on the heater pad.  Linda was busy by a little after 9 AM and I was up and about by 9:30.

The first thing Linda did was take out the trash.  She called yesterday and stopped our pickups starting next week.  It took me an hour to finish organizing tools and supplies in the garage.  At that point I turned off the garage furnace and opened the overhead doors.  I started my car and turned it around with the back end facing the garage.  We moved all of the things that were going in the bus outside the larger door.  We then loaded a lot of the stuff into the car.  This is not a permanent arrangement but was merely for the convenience of getting packed for traveling.

I helped get the recycling tubs into Linda’s car.  Late morning she took them to the recycling center and stopped at two different banks to make club deposits.  I took care of some computer-based tasks while she was gone.  I finally got a reply from DataViz regarding a sync problem with Passwords Plus and sent the tech support person (Colin) a copy of the sync log from my computer.  I also managed to register the Sony flash and accessories I bought a month ago.  When Linda got back she made grilled cheese sandwiches for lunch and served them with fresh apple slices.  The cheese was Tomato Cayenne from Field Roast and it made for a tasty sandwich on rye bread from Metropolitan Baking Company.  I had a couple of Ibuprofen for dessert.

We disassembled the temporary work table in the garage and stored the sawhorses out of the way.  We shook out the floor mats (as best we could) and Linda used the ShopVac to vacuum the floor of the larger bay.  We finally had enough room to store her Honda Civic inside for the winter.  That will be the first time it has been stored inside since she bought it in 2007.

[ Photo 1 of 1 – HC – The large bay of garage ready to accept our Honda Civic for the winter.  This is the first time we have been able to put a car in the garage since we moved in to this house. ]

The large bay of garage ready to accept our Honda Civic for the winter.  This is the first time we have been able to put a car in the garage since we moved in to this house.

The large bay of garage ready to accept our Honda Civic for the winter. This is the first time we have been able to put a car in the garage since we moved in to this house.

We rearranged some things in the front of the smaller garage bay to make room for the large trash container, the wheelbarrow, several 10′ lengths of 1-1/4″ plastic conduit, 10 large paver blocks, and the mower deck for the Cub Cadet lawn tractor.  With those things stowed inside the concrete driveway was now free of objects that Kerry could have hit with his snowplow.

The tractor and 18 cubic foot trailer will remain in the yard alongside the driveway where we park the bus.  The tractor won’t start and we had no interest in pushing it uphill through snow.  We found our large plastic tarp the other day so we unrolled it, covered the tractor and trailer, folded the edges under, and weighed the edges down with landscape blocks.  Hopefully it will stay put through the winter.

With sunny skies and the temperature hovering around 50 degrees F I opened the house electrical bay on the bus.  We loaded the four toolboxes onto a hand truck, two at a time, and rolled them over to the bay where Linda got them stacked and pushed in.  We then loaded the two drill cases in front of the toolboxes and I closed up the bay.

Next we opened the passenger side engine bay door and replaced the main engine air filter.  It did not look that dirty but the new one was obviously very clean by comparison.  This air filter is a bit pricey at $130 plus tax but it is so critical to good engine performance that it does not make sense to try and save a few cents by not replacing it or trying to clean a used one and reuse it.

With the air filter changed we then pulled out the chassis battery tray.  It holds four Group 31 lead acid batteries and is very heavy.  It has a very heavy duty slide out tray but the tray is worn and lets the leading edge drop a little bit as it comes out.  That means we had to lift it as well as push it to get it back in.

We applied a 14″ strip of black Gorilla Tape to the horizontal frame member at the top of the compartment opening to prevent metal tools from coming in contact with the chassis, which is tied to the battery ground.  I got this idea from Chuck when I saw that he had done this to their coach.  There was some fine rust on top of the batteries but the connections were all tight and did not show signs of corrosion.  I should probably have cleaned them anyway but we had too much else to do.  I did notice, however, that one of the batteries was from 2009 and the other three were from 2010 so they may be due to replaced.

I opened the doors on both sides of the front bus bay and climbed in.  Linda carried stuff over from the driveway and the living room (of the house) and I figured out how to fit them into the space.  We have less stuff in the front bay then the last two winters but more stuff in the car.  The problem for the bay is that we have things in open topped cardboard boxes so I could not stack things the way I have in the past.

We were done with this phase of the loading process by 3 PM.  I had turned on the main engine block heater and the Aqua-Hot engine preheat loop at 1 PM.  I started the main engine to air up the suspension, leveled the coach, and then turned on the auxiliary air compressor to maintain it at level.  I was getting ready to pull my car around behind the bus so we could hook it up when I realized I should probably move the bus a little bit first to make sure the brakes were not locked up.  I backed it up a few feet and turn pulled it forward a little farther than where it started.  Linda checked the floor and it was level so I switched the suspension back to Level Low to help minimize leaks and hold the pressure.

I continued to let the bus run on high idle while we hooked up the car.  With all of the connections made I opened the air valve that supplies air to the auxiliary braking system in the car and went to the cockpit to activate the various lights while Linda checked them.  Everything checked out as OK.

With the bus still idling we carried the HP Color LaserJet network printer from my office in the basement upstairs and into the bus.  It was heavy and awkward but we got in into the bus.  I had to remove the center cover from between the desk pedestals and we had to get it into its alcove in the left pedestal from the knee space between the pedestals.  I was pleased, however, that it fit very comfortably in that space as the space was designed to hold this particular printer.

Once the printer was in we found the replacement black toner cartridge and put it on board.  Linda also carried the smaller APC UPS up from the rec room to the bus and I put it on the connector cover shelf.  I think there will also be room on the shelf for one of the NAS units.  The newer one is physically smaller but has more storage capacity and is faster but my plan us to take the larger/older/slower one.

We were done with this phase of the loading process at 4 PM.  Our next task was to replace the screen insert from the front door of the house with the storm door insert.  Linda turned her attention to preparing food for our family gathering tomorrow and I stripped the bed, took all of the laundry to the laundry room, and started a load of whites.

My back was making me aware that I had worked it harder today than it would have liked so I took a few more Ibuprofen and settled in on the sofa with the heater pad.  Juniper found my lap almost immediately and stayed there until just before 6:30 PM when I had to get up for dinner.

Linda heated up a couple of Amy’s curry and rice frozen dinners and served them with the remaining kale/almond/raisin salad.  After dinner Linda started packing non-refrigerated food items in paper grocery bags for moving to the bus.  I brought all of my photography equipment upstairs to repack but left that for later.  I went downstairs and pulled two additional sets of BCM issues plus extra copies of some of the issues in which I have had articles.  I boxed the sets, labeled them, and brought them upstairs.

By the time I replied to a few e-mails it was after 9 PM.  We could have worked until midnight but we had both had enough for the day.  I settled in on the living room sofa with the heater pad on my back.  In spite of wearing a knee brace Linda’s right knee was bothering her all day so she took some Ibuprofen and we both went to bed.  We watched Weather Nation for a while and then went to sleep.

Tomorrow will be a long day but of a different sort.  In the morning we will finish loading the bus and I will check/adjust the pressures in all of the bus and car tires.  We are due at our daughter’s house at noon for Thanksgiving dinner and will probably stay until 7 PM. That evening, after we get home, we will winterize the plumbing in the house and spend the night on the bus in final preparation for our departure for Florida the following morning.

 

2015/10/12 (M) Countertops Plus

I was up later than usual last night so I did not get up this morning until 8 AM.  I fed the cats but did not have breakfast or make coffee.  I put the ham radio antenna back on my car and reinstalled the control head and microphone.  I then reinstalled the GPS and the cellular booster.  I moved the front passenger seat forward, set the back all the way down, and the moved it back until it touched the passenger side rear seat, which I put down last night.  I got two 2x4s from the garage that were about seven feet long and set them on the reclined seats to serve as full length supports for the desk/counter top I was picking up today from Countertops Plus in Shipshewana, Indiana.

Linda got up at 8:30 AM and got a couple of blankets for me to use to protect the desktop and the tabletop once there were loaded in the car.  I made sure I had my checkbook, sunglasses, wallet, phone as well as the address and phone number for Countertops Plus.  It was a beautiful, clear, cool morning as I backed out of the driveway at 8:45 AM.

The GPS predicted I would arrive at 11:30 AM but tried to take me on a different route than the one I actually followed.  I followed my usual route, heading west on I-96 to Lansing and then south on I-69.  I stopped at the Shell station half way between Lansing and Charlotte but their pumps were all out of order.  (We encountered this same situation at our local Shell station on the way home from our ham radio club meeting last night.  We presumed they were out of fuel.)  I went to the BP station across the street and fueled my car.

I got off I-69 again at the Charlotte exit about 15 miles later and stopped at the Biggby’s coffee shop where I got a toasted bagel and a large coffee to go.  My coffee was 40% Biggby’s best (regular), 40% French roast (decaf), and 20% Michigan cherry (regular).  I was glad I did not use any more Michigan cherry than I did as the flavor is very strong and somewhat unpleasantly artificial.  Biggby’s is definitely not my favorite coffee but the location in Charlotte is about an hour into the trip to Indiana and conveniently located relative to the highway.

I stayed on I-69 as far as Coldwater and then headed west on US-12.  At Sturgis the GPS had me turn south on Centreville Road (M-66).  A few minutes later I crossed into Indiana and passed the Howe Military Academy in Howe.  I went west on IN-120 and then took several county roads before arriving at Countertops Plus at noon.

On the drive down I got a call from our mobile mechanic, Joe Cannarozzi.  He is tentatively coming to our house on Monday, November 1, to service the chassis and engine.

The office at Countertops Plus was unattended so I walked around the side and found owner Ferman Miller working in his shop.  He had me back up to one of the loading doors and helped me get the desk/counter top into the car and onto the pair of 2x4s.  He set the tabletop, which was much smaller, on one of the blankets on the floor in the rear.  I wrote a check for the balance (cash or check only, no credit cards) and got a receipt.  I set the GPS for home and headed back the way I came.

When I got back to Howe I got on the Indiana Toll Road going east and took it toI-69 where I exited and headed north.  I stopped at M-60 to have lunch and then drove across the street to the Shell station.  All of their pumps were also out of service so I drove back towards the highway entrance ramp and stopped at the BP station.  It appeared that whatever was affecting the Shell stations was widespread.  I got back on I-69 north at 1:30 PM and the GPS said I would be home in approximately 90 minutes.

The beautiful blue skies of the morning were becoming more and more obscured by clouds the farther north I traveled.  It had been breezy all day and that continued but with reduced intensity.  It was almost completely overcast by the time I got home.  I did not stop again and pulled in the driveway around 3 PM.  I backed the car in front of the bus and unloaded my personal affects.  We inspected and measured the desktop and table and were satisfied that they were the correct size and shape.  The plywood base was not exactly as I had specified it but the deviations will not prevent the desk from being assembled correctly or be visible.

While I was away Linda had removed the remaining wallpaper in the cockpit of the bus and made a trip to J. C. Penney’s at Twelve Oaks Mall in Novi to look for new privacy curtains for the front of the bus.  I was not in the mood to change into work clothes and needed to work on FMCA Freethinkers chapter roster and financial statements so I went to my office.  After cleaning up my desk and checking e-mail I got down to business.

Linda called me up to dinner at 6 PM.  We had a nice salad, Amy’s Spanish Rice and Bean soup, crackers with peanut butter and strawberry preserves, and watermelon.  We got a few raindrops on the rear deck while we were eating even though the probability of rain was near zero.  The weather is changing this week from mild and dry to cooler and a little wetter, with our first sub-freezing overnight low temperature forecasted for this coming weekend.  Cooler weather means more soup, which is fine by me.  It also means more mornings with the fireplace on while we enjoy our coffee; also fine by me.

I made progress on the Freethinkers chapter records but did not get done.  We watched a few TV shows on the big TV set in the basement; Big Bang Theory, Scorpion, and NCIS Los Angeles.  I did finalize plans for our visit with Bill, Karen, Mike, and Catherine at the Jellystone RV Park in Frankenmuth on Wednesday.  I also managed to get an e-mail off to Lou letting him know that the new camera had arrived.  We went to bed at 11 PM, put on the Create channel from the Detroit PBS affiliate (WTVS), and watched travel and cooking shows while I worked on this post.  Around midnight I thought I heard it raining but did not get up to check.

 

2015/10/08 (R) A Mighty Hose

Linda was up before 6 AM to drive to the bakery ahead of the worst of the morning rush hour traffic.  I was aware of her getting up but fell back asleep.  She is very quiet as she goes about her preparations on such mornings, which I appreciate.

I got up around 8AM, fed the cats, and cleaned their litter tray.  I made half as much coffee as usual and measured out a bowl of granola, probably a little more than usual.  I took my coffee to the living room and turned on the fireplace, expecting to settle in with my cats and work on my iPad, but the iOS 9.0.2 update was available so I started the installation and read the last few pages of Number Theory and Its History by Oystein Ore.  I read from screens more than from paper these days, but I still like to curl up with a printed book.

Jasper used to sit next to me on the sofa in the morning but seems to prefer sleeping on top of one of the back cushions these days.  Juniper, who never used to pay much attention to me, has taken his place.  She has always sought out warm places to curl up but has always preferred Linda’s lap to mine.

My bus project for today was reassembling the plumbing to the two fan-coil heat exchangers that go in the bases under the two desk pedestals.  Yesterday I cut new holes for the supply and return hoses.  My first task was to remove the hoses from the bleeder valves and install barbed plastic plugs in the ends to prevent coolant from coming out.  I then pulled the hoses back and out through the new openings.

The area behind the desk where the heater hoses emerge from the passenger side OTR HVAC duct.

The area behind the desk where the heater hoses emerge from the passenger side OTR HVAC duct.

I worked on the hose for the right hand (rear most) heat exchanger first.  I positioned the base, routed the hose to the lower fitting, and marked where to cut it.  I put a plastic paint tray liner under the hose before I cut it but more coolant came out than I expected.  I got as much of it in the liner as I could and grabbed a bunch of paper shop towels.  I got the liner outside without spilling any antifreeze and poured the used antifreeze in a one gallon jug that I keep for just this purpose.  I used a funnel that is also reserved for use with antifreeze.

I took the cut off piece of heater hose outside, plugged end down, and set the open end in the tray liner.  We already had a bucket of soapy water in the bus as we had planned on hanging wallpaper yesterday.  I wrung out the sponge and then squeezed some of the soapy water on the floor and cleaned it up with paper shop towels.

The left and right desk bases and center cover/spacer set in place.  The heater hoses are not yet connected.

The left and right desk bases and center cover/spacer set in place. The heater hoses are not yet connected.

With the mess cleaned up I slipped two hose clamps over the end of the hose and worked it onto the lower fitting on the heat exchanger.  If only it had been as easy to do as that description!  The 3/4″ i.d. rubber heater hose did not just “slip” over the 3/4″ o.d. copper pipe even with some residual antifreeze lubricating the inside of the hose and the outside of the pipe.  Indeed, it took considerable and simultaneous pushing and twisting to get the hose on.  It was also a lot harder than I expected to work with the heat exchangers installed in the bases, even without the desk pedestals in place.

I was interrupting my work as needed to take photographs and as I finished up the first hose the camera refused to trigger the shutter.  The LCD screen indicated that the compact flash memory card was full so I went to my office to offload the images from the last few days.  My other CF card was empty so I put that in the camera and set it aside.  I had not backed up my photos to the Network Attached Storage units in quite a while so I decided to take the time to do that.  While I was at it I backed up my blog posts from December of 2014 through July of this year along with several issues of The Gypsy Journal.

As long as I was at my computer I checked my e-mail accounts, logged into RVillage, and logged into my account at B&H Photo.  My new Sony alpha 99 and accessories were on their way from New York and due to be delivered by the end of the day tomorrow.  I am excited to finally be getting a new digital camera with a full frame (35mm) sensor that will work correctly with all of my old Minolta A-mount lenses.

By this point it was lunchtime so I cleaned up (antifreeze is definitely NOT good eats) and scrounged around the kitchen for something tasty but easy to fix.  My “go to” meal is usually roasted red pepper hummus and sourdough pretzel nibblers.  We had a little hummus left, which I finished, but I was still hungry so I made a bowl of popcorn.  I would probably not make a good bachelor.

I went back to the coach and contemplated attaching the other hose to the left heat exchanger.  While I was thinking about it Linda called to let me know she was on her way home.  It was 1 PM so I decided to wait for her to get home to help me install the second hose.  I had some phone calls to make and used the time for that.

I called Karen at Bratcher Electric to schedule the upgrading of our 60 Amp sub-panel in the garage to a 100 Amp main panel.  While I had her on the phone I asked if Mike would itemize the quote.  I also mentioned that they had picked up two or three whole house generator customers through my referrals and perhaps Mike could provide some consideration for that in the pricing.  Next I called Ferman Miller at Countertop Plus in Shipshewana, Indiana to check on the Corian desk top and table.  Ferman answered the phone and said he had called Josh this morning to let him know the pieces were ready for pickup.  I then called Josh to see what his plans were.

We originally agreed that he would pick them up and bring them to our house on his way to visit relatives in the northeast side of the Detroit metropolitan area.  His plans had changed and he won’t be visiting his relatives anytime soon.  He is leaving on Tuesday for a FMCA area rally in the Carolinas and will be gone for a week.  Before he leaves he needs to get something to a customer in Cleveland in addition to getting our stuff to us or deciding that we will have to drive to Shipshewana to get it ourselves.  One option is that we meet him somewhere on Sunday.  Ann Arbor is a possibility but Toledo or Defiance (Ohio) are more likely rendezvous points.

Linda got home around 2 PM and changed into her work clothes.  With Linda’s help I was able to avoid the mess I had with the first hose.  The second hose was even harder to get on than the first one but we managed to do it.  In part because of the arthritis in the joints at the base of my thumbs I do not have as much grip strength as I would like and often need.  The twisting and pushing was hard on my hands and the confines of the base and proximity of crisp wooden edges resulted in lots of small cuts.  This was not something I anticipated in the design and construction of the bases and the installation of the heat exchangers.

I took a break and drove to Northwest Plumbing Supply to see if they had a bleeder valve like the ones in our bus system.  They did not and had never do seen anything like it before.  The showed me a couple of things they did have but I did not buy anything.  I got a call from Brighton Honda that my car was ready for pickup so I headed home to get Linda.  She drove me to the dealership and then went on to Meijer’s for a few grocery items.

I drove to Lowe’s in Howell and was fortunate to find Lars in the plumbing department.  The store was not very busy and he took an interest in showing me various plumbing options that might allow me to replace the bleeder valve with something that would do the same thing while also giving me a way to add antifreeze to the system.  What I ended up with was 3/4″x3/4″X1/2″ copper sweat T and a 1/2″ sweat ball valve with a waste port.

Bruce works on attaching the heater hoses to the fill/bleeder valve T assembly he built.

Bruce works on attaching the heater hoses to the fill/bleeder valve T assembly he built.  (Photo by Linda.)

Back home I cleaned some 3/4″ and 1/2″ copper pipe with 120 grit plumbers sandpaper.  I cut two pieces of the 3/4″ pipe about 3″ long and one piece of the 1/2″ pipe about 1-1/2″ long.  I brushed the inside of all the fittings and test fit the pieces.  I then applied flux to all of the surfaces to be soldered, inserted the two 3/4″ stubs into the run fittings, inserted the 1/2″ stud into the bull fitting, and put the ball valve on the other end of the 1/2″ pipe.  I used the lever on the ball valve to mount the assembly in my bench vise.  I removed the waste port cap to protect the neoprene seal and opened the ball valve so as not to trap heat inside.  I then heated the T and the end of the valve and applied the solder.

I figured there had to be an easier way to get heater hose onto the heat exchanger and that Butch was the guy who would know what it was.  I called and he said antifreeze can obviously be used and works fairly well but that a small amount of dish soap would also work as a lubricant and not harm the antifreeze or the Aqua-Hot and its components.  As long as we were on the phone I caught up on their activities.

They were still there at the RV Park in Bouse, Arizona but only until the 15th of this month.  The terms and conditions of their employment as managers of the park had not turned out to be as described during the interview process and they are wrapping up after only a month on the job.  They will move their bus back to Quartzsite and spend at least part of the winter at Joe and Connie’s place where we both spent last winter.  I know it was a big disappointment to them that the situation in Bouse did not work out, but their situation in Q will be familiar, comfortable, and inexpensive, as well as convenient to the Quartzsite Gem and Mineral Club which they joined this past winter.

For dinner Linda made a blend of onions, garlic, mushrooms, and power greens and served it over a baked potato topped with Daiya cheese.  It was very yummy, and the potatoes kept the dish warm all the way to the end.  The weather had turned cloudy through the afternoon and we got the first raindrops during dinner.

The fill/bleeder valve T assembly with the heater hoses connected.  The assembly is located between the bases at the floor and will be hidden by the center connector/cover.

The fill/bleeder valve T assembly with the heater hoses connected. The assembly is located between the bases at the floor and will be hidden by the center connector/cover.

I had really hoped to have the hydronic heating system reassembled today so we went back out to bus after dinner to hook up the heater hose that runs between the two heat exchangers.  This was actually two pieces of hose with my homemade bleeder/fill valve half way between the two exchangers.  Even with dish soap the two hoses were very difficult to get onto the heat exchanger fittings and the bleeder/fill stubs, but I got them on.  Linda took pictures while I grunted, groaned, and moaned and I took a few more when I was done.

It was 8:45 PM when we finally quit working, secured the bus, and went inside.  I cleaned my hands as best I could but I could not get all of the black from the rubber hoses to come off.  We sat for a while in the living room and had the last of the frozen chocolate torte that Linda made a couple of weeks ago.  We finally turned in around 10 PM and watched Rick Steve’s Europe, Travel in the Americas, and a couple of cooking shows while I worked on this post.

 

2015/09/28 (M) Connected

I was up at 8 AM, got dressed to work, gathered up the laundry, and started a load in the washer.  I was getting ready to grind the beans for our morning coffee when Linda got up.  She did not look at all well, having come down with what appeared to be a bad cold late last night.  But she’s a trooper and washed our breakfast berries, as she does most mornings, and got our granola ready.

Bus work notwithstanding my first task this morning was to figure out what had gone wrong with the thermostat in the main floor hallway of the house.  This is our “main” thermostat; it controls the heat to the living room, entry foyer, hallway, and kitchen/dining room.  It also controls the air-conditioning for the entire main floor of the house.  There is no air supply or return from the basement and the library has its own HVAC system.

I used my VOM to check the voltage at the secondary of the transformer on the furnace, at the input to each of the five motorized valves, and the voltage coming out and going to the five thermostats (four for space heating zones and one for domestic hot water).  Everything looked OK.  I pulled the main thermostat off of the base to check the wiring there.  I also got out the installation manual to make sure I knew what I was checking.

The wiring of the base plate matched the diagram for a 1H/1C-2T system, i.e., one heating system, one cooling system, and TWO transformers.  The manual was also very clear that the common wire had to come from the cooling system transformer.  The voltage from Rc to C was just under 15 volts when I expected it to be ~26V.  All of this pointed towards the air-handler.  I shut off the circuit breaker for the air-handler and reset it but that did not fix anything.  The evidence was confirming my suspicion that something happened while Rebecca was in the attic on Friday.  That meant I was going to have to go in the attic to figure out what it was.

Getting into the attic meant I had to empty the hall coat closet of all of its hanging contents and most of the stuff sitting on the floor and remove the wooden hanging rod, which fortunately lifts up and out easily.  I then had to lean a 6-foot step ladder against the back wall, climb up, and unscrew the 1/2″ piece of foam insulation that we use as a temporary cover until I can fabricate something more permanent (hopefully something that involves a self-storing ladder and hinged, spring-loaded door).

With the cover removed I was able to get my waist to about ceiling height, set my flashlight where I could reach it, and hoist myself up into the attic.  I do not have any permanent/switched lighting in the attic, but I plan to install some at some point.  What I should do is install a hatch in the hallway so I do not have to empty the closet to get into the attic, but that probably won’t happen.  I did this in our previous house and it made working in the attic much more convenient.  Flashlight in hand I crawled the 15+ feet over to the air-handler on plywood set across the roof trusses on a slope.  I was reminded than another attic project will be to rig up a walkway (crawlway) that is level and does not compress the insulation.  The insulation in this attic is a mess and needs to be straightened out, so that is another project for our “to do” list.  But I digress.

When I got to the air-handler I saw a surface mounted switch box on top of the unit partially obscured by one of the flexible ducts.  The switch was in the “Off” position so I flipped it to the “On” position.  I did not see a transformer so I presumed it was inside the enclosure.  I also presumed that Rebecca had either accidental moved the switch while checking/measuring the unit or had turned it off as a safety precaution and forgot to turn it back on.  It did not really matter as the result was the same either way.

I worked my way back to the hatch in the closet ceiling, lowered myself down onto the top of the step ladder, and climbed down.  The thermostat, which is on the wall across from the closet, now had information showing on the display.  The upside to all if this was that I now knew something about our HVAC system and Wi-Fi thermostat that I did not previously know, so at least I learned something in the process.

This thermostat is 7-day programmable model so I set the day and time and then went through the programmed values but could only access the settings for the cooling mode.  I activated the setup menu and walked through all of the settings, changing only one that had nothing to do with the programming.  I finally got out the user manual and saw that I had to select a mode in order to program its schedule.  I manually set temperatures for heating and cooling that would not cause those systems to come on and then programmed the times and temperature set points, four per day for each mode, for all seven days.

Keith showed up late morning while I was working.  We agreed to let the grass go for another week.  It has been dry and a little warm during the day for the last week and the grass has not grown much.  There is, however, a real possibility of rain latter today and into tomorrow.  Also, Phil is supposed to start tomorrow on the French drain and driveway work and with a little luck in the weather department may be done by next Monday.

With the thermostat issue resolved I turned my attention to the bus.  I thought about priming the walls but decided against it.  I would need to move the desk pedestals and bases, unscrew the sofa seat platform and move it on top of the pedestals, and then mask everything with painter’s plastic.  All of that was work that was much more easily and quickly accomplished with two people and Linda was sound asleep taking a nap that she obviously needed.

The other reason for not getting into the priming was that I have to take the bus to Chuck’s shop in Novi tomorrow morning to have the two lower windshields replaced.  That meant the bus had to be ready to move before the end of today and there were two things I had to do in that regard.  One was to reattach the desk pedestals to their bases and to the wall.  The other was to connect the loose ends of the two Aqua-Hot heater hoses together.  It had only just occurred to me that once I start the main engine the Aqua-Hot will heat up and the coolant will expand.  If these hoses are not connected the supply line will have coolant coming out of it and the return line will suck air into the system, neither of which would be good things.

I took care of the desk first.  I reattached each pedestal to its corresponding base using the existing screw holes.  I set the two assemblies in place with the connecting cover and then reattached each pedestal to the wall using the existing screw hole.  I thought about trimming down the temporary plywood top and reinstalling it but decided there was no point in doing that.  I cleaned up the rest of the interior making sure there were no loose items on counters or elsewhere that could fly around while the coach was moving.

The two bleeder valves were still clamped inside an old piece of heater hose that originally connected the two front heat-exchangers together with short stubs of hose on the other ends.  Working in the garage on our temporary workbench I unclamped and removed the hoses.  One of the valves was very badly corroded on one end and was not reusable.  The other one needed to be cleaned up but appeared to otherwise be serviceable.  Some of the inside of the hose was stuck to the metal of one of the pipe ends and was surprisingly difficult to remove.

I washed my hands, which were filthy, checked my e-mail, sent a message to Bill Gerrie, replied to an e-mail from Butch, took the dried laundry upstairs, folded it, and put it away.  Linda woke up while I was finishing the laundry and heated up some Amy’s mock chicken noodle soup for our lunch, which we had with sourdough pretzel nibblers and roasted red pepper hummus.  It was 2:30 PM by the time we finished lunch.  I called Josh Leach at Coach Supply Direct to see if he had followed up with Ferman Miller at Countertops Plus regarding our Corian tabletop.  I got his voice mail and left a message.  It felt like the day was slipping away and I had not done much but I had, in fact, accomplished quite a bit and all of it was stuff that needed doing.

I worked on this post for an hour and then completed the task of connecting the two heater hoses together.  I cut the ends of the old hoses off so I had clean material and square ends.  I slipped two band clamps over each hose and pushed them over the pipe ends of the bleeder valve.  They were very difficult to get on but I got them on far enough to put two clamps on each connection.  I did not turn the Aqua-Hot on as I would rather not refill these hoses with antifreeze at this time but I did start the main engine to air up the chassis and then let it run for 30 minutes to get it up to temperature.  It did not have any noticeable effect on the coolant in the Aqua-Hot in that short amount of time.

While the engine was running I closed the roof vents and made one last check that the interior was secure.  Once I shut the engine off I closed the various air valves, disconnected the batteries, locked up the coach, and was done working on/with the bus for the day.  I changed out of my work clothes and went to my office to edit blog posts from early August and get them ready to upload.

Linda called me up to dinner at 7 PM.  We had vegan cheeseburgers with leftover vegan potato salad and collard greens Cole slaw (inherently vegan).  It was yummy.  I went back to my office to edit more posts but got involved in e-mails from/to Bill Gerrie and Gary Hatt.  Gary sent me the BCM logo he is using for business cards and I spent over an hour trying to use Microsoft Publisher, and then Word, to layout a BCM business card that says “Freelance Author/Photographer.”  I did not care for the result and really want a card with the cover of the February 2013 issue as a full card photo.  The cover of that issue is our bus.

I came upstairs a little after 10 PM and watched the end of NCIS Los Angeles with Linda.  She did some online research and concluded that she did not have a cold but is suffering from an allergic reaction to something.  She went straight to sleep while I played a few games on my iPad before turning out the lights.

 

2015/09/10 (R) Illuminating

Linda had to go to the bakery today so she was up at 5:45 AM and out the door by 6:15.  I was vaguely aware of the activity but fell back asleep and finally woke up a little before 8 AM.  I skipped breakfast save for a glass of juice to wash down my vitamin and allergy pill.  I spent time finishing yesterday’s blog post and thinking about what I absolutely had to get done in next four days.

I was working at the dining room table instead of in the living room so I got to watch a Red squirrel dart back and forth across the deck all morning.  It was gathering walnuts from the tree northeast of our house and taking them somewhere west of our upper deck.  It would run (hop) across the deck with a giant walnut in its mouth and then return by way of the deck railing.  While it was gathering another walnut I moved to our library where I had a good view of our lower deck.  It came down the stairs from the upper deck and disappeared behind the grill.  It may be storing them under the deck or under the cover on the grill, in which case we will have to move them.

The main pieces of the desk set in place but not yet assembled or secured, and without the temporary plywood top or permanent Corian countertop.

The main pieces of the desk set in place but not yet assembled or secured, and without the temporary plywood top or permanent Corian countertop.

Once I was in the bus I continued pondering how to get the desk installed so that everything would line up.  Built-in furniture is just that, and I had not spent a lot of time in advance figuring out how I was going to fasten pieces together and secure them to the coach.  I retrieved the piece of 1/4″ Baltic birch plywood from the garage to use as a spacer at the right end and just slid it in place temporarily.  I decided I would use mending plates attached to the back and underside of the left and right bases and pedestals to align the center cover.  I also decided to use a length of angle against the wall to support and align the pedestals and cover.  Along the same lines I decided to use smaller angle brackets to attach the vertical front panel of the built-in sofa to the two plenum/support boxes and the air return shelf, and to attach the plenum boxes and shelf to the HVAC/wiring chase.

One of the original living room AC light fixtures.  These were no doubt high-end fixtures but no longer worked in our remodeled interior.

One of the original living room AC light fixtures. These were no doubt high-end fixtures but no longer worked in our remodeled interior.

Feeling like I should get something tangible accomplished I decided to re-install the AC light fixture and the three DC reading lights under the overhead cabinets above the desk.  Linda and I agreed last night that we needed to replace the three 120V AC light fixtures in the front of the coach so I turned my attention to that issue.  I removed the fixture on the driver’s side by the kitchen end of the sofa alcove and removed the mounting ring.  I also measured the size of the base and the overall size of the fixture and wrote them down.  Ideally I will find a fixture that has a similar size base but with most of the light fixture above the center point.  One of the problems with the current fixtures is that they hang down far enough that a person sitting on the sofa would bump them with their head and probably break them as they are made of glass rods.

I headed towards The Home Depot in Howell and stopped at McDonald’s first for French fries and a soda beverage.  I looked at all of their wall sconce light fixtures.  They had two different ones that I thought might work but deferred a purchase until I had checked at Lowe’s.  THD had 72″ piano (continuous) hinges, however, so I bought one.  I also looked at PEX plumbing parts as Butch mentioned last night that I could use them to plumb the fan-coil heat exchangers.

Lowe’s had a wall sconce that was a little more to my liking.  I needed three but they only had one in stock, which I bought.  The Associate checked inventory at other stores and indicated that there were two more in stock in New Hudson.  He wrote down the Model number and the phone number for the store and said I could call and they would hold the items for me.  I picked up a couple of 75W GE Reveal light bulbs, the mending plates, angle brackets, and two different pieces of aluminum angle while I was there.  I looked for pieces of felt but all they had were very thick furniture pads which was not what I needed.

The new living room light fixture.  The color, style, and fit are a better match to the remodeled interior.

The new living room light fixture. The color, style, and fit are a better match to the remodeled interior.

I was going to stop at O’Reilly’s Auto Parts to check on heater hose, fittings, and band clamps but decided to skip that stop in favor of getting home and installing the new wall sconce light fixture.  It installed without too much difficulty and I liked the look.  The fixture, however, was rated for a maximum 60W bulb.

I closed up the house and bus and drove to the Lowe’s in New Hudson.  They did indeed have two more of the wall sconce light fixtures that I needed so I bought them.  I also picked up three 60W (equivalent, 8.5W actual) 800 lumens dimmable LED warm white light bulbs.  Linda texted me while I was at the store to let me know she was leaving the bakery and heading home.

I stopped at Michael’s Arts and Crafts in Brighton and bought a 36″ x 36″ piece of walnut brown felt.  I plan to use the felt underneath all of the pieces of the desk and sofa that contact the floor, and possibly in some other areas as well, to keep the wood from marring the tile.

When I got home I called Elkhart Campground to make a reservation for the GLCC rally next week.  I also called A-1 Upholstery in Elkhart, Indiana to check on our sofa cushions.  Terry said they were almost done and we could pick them up on Monday.  I then sent several text messages to Jarel with photos attached of the desk and sofa in place on the bus and indicated I had some questions and would call him later.

I was getting ready to install the other two light fixtures when Linda got home.  The timing was good as she got to see the first one and approve it before I installed the other two.  We discussed the covering up of the mirror strips in the corner and decided we would leave them for now.  We can cover them up later if desired.  Linda went in the house to fix dinner.  I got the second sconce installed and went inside.

I had a few minutes until dinner was ready and used it to send an e-mail to Jarel.  Dinner was couscous on power greens and small slices of bread from a baguette Linda bought the other day.  I also had the leftover corn on the cob.

After dinner I called Jarel.  We had a long chat and it was 8 PM by the time we finished.  Linda headed to bed and I went back to the bus to install the third/final light fixture.  I also installed four small frosted bulbs in the light fixture under the overhead cabinets above the desk, replacing the clear bulbs that were there.  This light fixture is part of the same collection as the ones I removed from the living room walls but its design and location do interfere with anything.  We might replace it someday, if we find something we like better for use over the desk that is the right size and shape, but for now it will remain in place.  I locked up the bus, closed up the garage, and headed to my office.

I dealt with some BCM-related e-mail and then off-loaded today’s photos from the Sony a-100 DSLR.  I went through all of the photos from September, selected about a dozen, and processed them into 300×200 pixel size images so I could share them with friends and family via e-mail.  I have written extensive blog posts everyday but last posted to the website in mid-July.  I don’t like being that far behind but getting the posts uploaded is just not as important as other things I have to do at this time.

I was heading to bed when I decided to replace the two light bulbs in our home kitchen that were burned out.  I had the two 75W GE Reveal bulbs that I could not use in the bus, so I installed them in the kitchen downlights, and that really brightened things up.

I got to bed just before midnight.  It had been a beautiful day, weather wise, and a cool night was in store portending good sleep.  But first I had to capture the details of today’s work for this post.

 

2015/08/12 (W) Back to Indiana (Again)

Today was early arrival day for the annual Back-to-the-Bricks converted bus rally in Clio, Michigan.  This joint rally of the Converted Coach Owners (CCO) and the FMCA Great Lakes Converted Coaches (GLCC) chapter has become an annual event that typically draws 20 to 30 rigs.  Most of them are converted highway buses and many of those were converted or re-modeled by the owners.  Many of them are works in progress but such is the nature of the bus conversion hobby and the true bus nut.  But that is not where we were headed today.  Our bus is unusable at the moment as the toilet is disconnected, the bed platform has been removed, and all of the cabinet drawers have been taken out.  But the main reason was that we had multiple commitments in Indiana today.

Our first appointment was with Josh Leach of Coach Supply Direct.  Although CSD is located in Edwardsburg, Michigan we had arranged to meet him in the parking lot of the Martin’s Supermarket at SR-19 (IN) and CR-4 on the north side of Elkhart, Indiana at 9:30 AM to take delivery of 15 yards of upholstery fabric.  We picked that location, rather than his shop in Edwardsburg, for several reasons.  He had to be at the Forest River Owners Group (FROG) rally at the Elkhart County 4-H Fairgrounds at 10 AM so that location got him half way to his destination at a good time of day.  For us, Elkhart is a 3-1/2 hour drive.  That meant we had to be up at 5:00 AM and on the road not later than 5:45 AM to be there on time, allowing for coffee, fuel, and bathroom stops.  Had we met him at his shop we would have had to be there by 9 AM requiring us to get up even earlier.  You have to draw a line somewhere.

I took the wheel for the start of the trip.  It was still dark but the faint glow of the impending sunrise was visible as we pulled out onto Hacker Road facing a rising crescent moon.  At M-59 we headed west to I-96.  I reset one of the trip odometers before we left and verified that it was 13 miles from our driveway to the end of the entrance ramp from M-59 onto I-96W.  We skirted the southern edge of Lansing on I-96 and took Lansing Road to I-69 south.

Nineteen miles south of Lansing, and about an hour into our trip, we stopped at the Biggby’s Coffee in Charlotte for coffee and bagels.  Biggby’s is not my favorite coffee but this particular store is in just the right location.  Linda checked the M-DOT website and it appeared that the bridge work on M-60 in Mendon was completed, so we exited I-69S and headed west on M-60.  Unfortunately the bridge was still closed so we had to follow the detour to the south toward Sturgis.  Unlike our previous trip in early July, when we continued on to Sturgis, we followed the complete detour through Nottawa and Centreville and back to M-60 in Three Rivers.  We had never driven through Nottawa or Centreville before so that provided some new scenery for the trip.

As we have done many times before we continued our trip on M-60 as far as Jones where we stopped at the Shell station for fuel.  We then took M-40 south to US-12.  This seven mile stretch of M-40 traverses steeply rolling hills and is both beautiful and fun to drive.  We took US-12, running west just north of the Michigan-Indiana border, and eventually exited onto Old 205 (M-205?) which turns 90 degrees to the left a mile later and drops straight south into Indiana where it becomes SR-19.  A few miles later we arrived at the Martin’s Supermarket at CR-4 just after 9 AM.

Josh was not there yet so we went inside to use the restrooms and get some coffee.  This particular Martin’s has a nice salad bar with a beverage station, a Starbucks Coffee outlet, and a seating area with Wi-Fi.  Josh showed up right on time and parked next to us.  I met him outside and we transferred the roll of upholstery fabric from his car to ours and then went inside to visit for a few minutes before he had to leave for Goshen.

When we left Linda took over the driving.  Our next planned stop was A1-Upholstery in Elkhart to order the cushions for our built-in sofa.  Continuing south on SR-19 we stopped at Factory RV Surplus to look for battery cable end covers but the ones they had were too expensive.  I think they now sell more retail-packaged merchandise than they do true surplus material, and even less salvaged parts.

Lou (mom) and Terry (daughter) own and operate A-1 Upholstery and were recommended to us by Josh.  We discussed the project with Terry, who I had previously spoken to on the phone.  We reviewed my dimensioned scale drawings, which were on one sheet of 11″x17″ 1/4″ grid-square paper, and agreed on how the cushions would be made.  Terry thought she would have them done by the end of the month but noted on the order form that we needed them by September 14th.  We noticed that she had a lot of sample books from which we could have selected a fabric but we like the Lambright Notion Linen, and Terry thought it was a very good fabric that should look good and wear well in our application.  We left the fabric and drawing with her and wrote a check for the deposit.

All of our stops were important today, but our primary reason for the trip was to pick up the pieces of the custom desk and built-in sofa for our bus from Jarel Beatty Cabinetry in Logansport, Indiana.  We continued our trip south on SR-19 to US-20, took that west to US-31, and went south, exiting at Rochester onto IN-25 for the final 22 miles to Logansport.  This is a route I have driven many times but Linda had the wheel this time so I provided some occasional guidance.  I called Jarel to let him know we were making better time than we had anticipated and would be there between noon and 12:25 PM.  I then called Butch to give him a status update.

This was the first time Linda and Jarel had met and so it was also the first time Linda had met Mya, Jarel and Georgette’s sweet little dog.  Mya came up to me, sat, stared up at me like we were long lost friends, and waited patiently for me to give her the attention she was seeking.  I was happy to oblige.

Jarel Beatty Cabinetry, Logansport, IN

Jarel Beatty Cabinetry, Logansport, IN.  Panorama taken from the entrance door.

Jarel Beatty Cabinetry, Logansport, IN.

Jarel Beatty Cabinetry, Logansport, IN.  Panorama from the center of the shop.  Entrance door is far left.

As I have previously described in this blog, the desk consists of nine pieces (if you count the four drawers as separate parts):  two pedestals with separate bases, a cover that goes between them, and four drawers.  The left pedestal has a fold up work surface with two support wings, and a fold down fake drawer front, so technically those are four more pieces, but they are attached to the pedestal with hinges so I am not counting them as separate parts.  The bottoms of each pedestal have been cut out to provide access to the fan-coil heat exchangers that will be installed in the bases, so those are really two separate pieces now, put I am not counting them as such.  I am also ignoring screws, drawer slides, blocking, and other assembly items in my parts count as they are all “installed components.”  With the drawers installed we only had five major pieces to load plus the two access plates.  Jarel also had the pieces ready for the built-in sofa so we loaded those as well.  I took pictures of his shop and the pull-out pantry, which was mostly assembled but not quite finished.

The installed desk will have more pieces than just described but these are the pieces that Jarel made.  The finished desk will have five grills that we have to cut and install, at least four drawer pulls that we have to install, a plywood top that will span the two pedestals and leg space, and a Sandstone Corian countertop that will go on top of the plywood.  While not actually part of the desk there will also be a large cover for the passenger-side living room HVAC duct and wiring chase and a small hose cover at the desk end both of which align with the left end of the desk and will look like they are part of it.  Jarel will make the chase cover later after the desk is installed and we can get a final, accurate measurement for its length.

As long as we were in the neighborhood we naturally stopped to visit with our friends, Butch and Fonda, in Twelve Mile, Indiana.  While we were at their house we loaded a dozen 4-foot army surplus fiberglass mast sections in the car.  Butch had bought these at a swap for me some time ago.  We will use them for ham radio antenna projects.  Butch gave me his old, non-functioning, Vanner battery equalizer to see if I can figure out how it does what it does.  He also lent me his air-powered brad nailer which can also drive 1/4″ crown staples and gave me a box of 5,000 staples to go with it.  Fonda found a scrap piece of resilient underlayment designed for free-floating wood floors.  Butch though it might work well under the 1/4″ plywood underlayment to fill in the gaps and irregularities so we took it with us.

When we were done loading stuff into our car we went to see their new property on SR-25.  They have already had a new roof put on the barn and new doors put in the house.  They have bought themselves a BIG project, but it will be a much more appropriate and manageable place for them going forward than the building complex in Twelve Mile that has housed their business operations for the last 20 years.  It’s an old GM dealership from the 1940s and they have approximately 11,000 feet under roof including a 2-bay service garage with a functioning in-ground lift.

We drove to Rochester and had dinner at Pizza Hut.  Linda and I split a medium specialty veggie pizza and had the salad bar with it.  We might have had a few more restaurant choices in Logansport, but Rochester was 22 miles closer to home.  With the 19 hours we were gone today, and over 525 miles we had to travel, 22 miles and 30 minutes was significant for us.

We got back on the road at 6:30 PM with Linda at the wheel and headed back up US-31N to US-20 and headed east.  We decided to stay on US-20 all the way to I-69, stopping in Lagrange to use the restroom at the Marathon complex.  We stopped again at the Shell station on M-60 in Michigan for fuel.  It was getting dark and I had been able to rest while Linda drove, so I took over the driving duties.  From this point on we were just reversing our route from this morning.  We got home at 10:30 PM, unloaded everything from the car, and then went straight to bed.