2015/10/20 (T) Pop-X Pickle

It’s a good thing there are still five weeks until we depart for Florida; there are a lot of unfinished items that need to be taken care of on the bus and around the house/property before we go.

When Phil is here my attention tends to be on what he is doing.  He really knows his stuff, and is an excellent contractor to work with, but since he is not working from drawn plans there are inevitably questions and discussions about just exactly what it is I want and whether that is the best idea or even doable.

Phil had ordered a load of sandy soil for delivery first thing this morning and the “train” (double trailer) showed up not long after he did.  The sandy soil he wanted was not available so he got clean sand instead.  The train driver of the backed it over our third culvert and into the part of our yard were Phil wanted the material dumped.  That took a lot of skill and was impressive to watch.  I took a few photographs but video was really required to capture what was happening.  The Sony SLT-a99v does video in several different modes but I am just beginning to learn how to use it as a still camera and did not want to mess around with shooting video.  Besides, I am not a videographer; it’s a completely different way of thinking than being a still photographer.

Phil digs the trench for the electrical conduit from the SW corner of the garage to the far side of the driveway extension where he also dug a hole for the post that will support the RV outlet box.

Phil digs the trench for the electrical conduit from the SW corner of the garage to the far side of the driveway extension where he also dug a hole for the post that will support the RV outlet box.

With the material on site Phil was at the point where he needed to dig the trench for the RV electrical feed.  That meant I had to quickly make some final decisions.  I had an 8 foot 4″x4″ treated post and the PVC conduit pieces I needed to go from the post under the driveway to the other side but not enough to go all the way to the garage.  If I only put conduit under the driveway I could cap it, let Phil bury it, and then dig it up later and finish trenching from there to the garage.  I would not do that by hand, however, so it would mean having Phil come back next year just to dig this little trench.  Although I could have him dig the foundation hole for the ham radio tower at the same time that still did not make any sense to me.  Among other considerations I would have to fill the trench in by hand after I ran the cable.

Another option was to still use conduit just under the driveway but go ahead and run direct burial cable like we did two years ago for the pull-through driveway in front of the house.  I would need three (120VAC) or four (240/120VAC) large wires (or equivalent service entrance cable, each at least 80 feet long to get from the outlet box location in the post to the riser pipe on the garage and through the wall into a circuit breaker box.  Not only would I have to get the wire, which would be expensive, I did not have the outdoor outlet box or other parts I needed, so it would take me quite a while to go buy everything.  I also did not know exactly where/how I would feed the circuit.  (I had some ideas about that but they depended on just what the electricians do tomorrow.)

The most expeditious, and least expensive, option was to get more conduit and additional fittings and run the conduit all the way from the post to the southwest corner of the garage.  I left at 9:30 AM for Lowe’s as Phil started digging the trench and the hole for the post.

At Lowe’s I picked up five more 10′ pieces of 2″ PVC conduit, a 45 degree elbow, another 90 degree elbow, a right angle entry box, and a bag of 2″ conduit clamps.  By the time I got back to the house Phil had the post set in place and most of the trench dug.  I got all of the conduit pieces laid out on the ground and got the PVC cement, a hack saw, and the rope and weight.

Since Phil could not do anything else on the driveway until the conduit was installed he helped me install it (or vice-versa).  We joined 10′ sections to both ends of one of the 90 degree elbows and then dropped the weighted rope through it.  We then set the elbow and one of the straight sections in the trench with the elbow at the base of the post and the other straight section going straight up the post where I secured it with two clamps.  We proceeded to drop the weighted rope through additional straight sections of conduit, applied PVC cement to the ends, and put them together.  The conduit had to be inserted about 3″ into the mating piece and twisted as it went in.  I was glad Phil was there to help with this as I did not have the grip strength to do it by myself.  (I don’t have a lot of physical limitations but the arthritis in the base of my thumbs makes itself known in specific situations.)

When we got near the southwest corner of the garage we measured and cut a section of straight pipe to get us to a turn in the trench.  Because of a decorative grass plant the trench could not go directly to the desired location on the west side of the garage and had to go between the grass plant and a nearby small evergreen bush and then turned towards the garage.  We installed a 45 degree elbow to get around the corner and it ended up in the center of the trench.  When I said Phil knew what he was doing I meant it.  We again measured carefully and cut a short section of straight pipe to get us to a 90 degree elbow that would turn up and bring the conduit out of the trench and up the side of the garage.  I measured and cut the vertical riser section and we cemented it into the elbow.  We now had a complete run with conduit coming out of the trench vertically on both ends.

Phil back fills the trench for the electrical conduit from the corner of the garage to the RV electrical post.

Phil back fills the trench for the electrical conduit from the corner of the garage to the RV electrical post.

While Phil used his excavator to scoop and push dirt back into the trench and tamp it down I closed off both ends of the conduit.  At the garage end I removed the gasketed cover from the entry box, cut a short piece of 2″ conduit, and put it in the fitting hole on the back side.  Next I brought the weighted rope up through the bottom fitting hole of the box and used Gorilla tape to secure it inside the short back pipe.  I put a cap on the other end of the short back pipe and then put the entry box on top of the riser sideway.   I coiled up the extra rope, taped it inside the box, and put the gasketed cover back on.   I did not cement any of these connections.  When permanently installed the gasketed cover will point away from the wall and the hole in the back will have a longer piece of paper 2″ conduit cemented in and going through a hole into the wall of the garage.

At the post I used a Rigid brand pipe cutter, designed specifically for cutting large plastic pipe and conduit, to cut off the vertical riser at a convenient height above the top of the post.  I threaded the rope through a 3/8″ hole in the center of a 4″ disc of 3/4″ plywood and tied a big knot in it.  I modified the 2″ cap by drilling three adjacent holes lengthwise from the bottom up and cutting out material with a hacksaw to make a slot.  With the rope hanging over the edge of the conduit I lined up the slot in the cap with the rope and put the cap over the end of the conduit.

Since I decided to not have Phil build the area leading up to the planned barn location I wanted to pull all of the unneeded yellow plastic stakes out of the yard and put them away.  Re-staking the layout, however, is a time-consuming task so I put 10″ metal (iron) spikes at the locations of the front corners of the barn and the center point for the curved transition into the driveway.  I drove them flush with the soil so Keith would not hit them with his mower but we can find them later with a metal detector.

With the conduit installed and the trench filled and tamped, Phil filled started building the “curbs” for the driveway.  He had excavated parts of the driveway path and filled in other areas to create a base for the construction fabric and road gravel that was eight inches below the finish grade.  The construction fabric is 12’6″ wide and Phil likes to wrap it up on the sides about 8″ so when he staked out the driveway to be 11′ 2″ wide.  Phil used the sand to build up the areas along both sides of the driveway so that it looked like he had cut the driveway out, but that is not, in fact, what he had done.

My main bus project today was cleaning up the kitchen and living room, which mostly involved moving tools back to the garage.  It is a confined workspace and tends to get cluttered over time as we fetch tools for this and that.  I also wanted to be able to see the desk and its Corian countertop.

Two of the three sets of cushions in place on the new built-in custom walnut sofa/storage base.

Two of the three sets of cushions in place on the new built-in custom walnut sofa/storage base.

I called Butch in Quartzsite, AZ regarding the distributor tester.  He suggested that I send him an e-mail requesting Bill’s e-mail address and he would send it in his reply.  We then discussed the refrigerator and he suggested that I set the freezer to a colder setting, leave the fresh compartment setting as is, and monitor it for a while to see if it changes.  I did that and reset the min/max memory for both compartments.

Phil is not done with the French drain yet and spent part of the afternoon working on that instead of the driveway.  He made lots of trips back and forth with the front loader to take the topsoil he had removed to create the driveway, spread it out along on top of the pea gravel that fills the drain trench, and grade it off to blend with the undisturbed yard along either side of the drain.  Before he is all done with these two separate, but inter-related projects, he will have to bring in several truckloads of topsoil.  It will be used to fill low spots, especially at the west end of the property, and to cover everything that has been disturbed.  All of the topsoil will be finish graded to blend into the existing contours of the property and then seeded with grass seed.

The view from the living room looking towards the hallway.  The new built-in custom walnut desk has its Corian countertop in place and the new refrigerator is in place next to the built-in custom pull-out pantry.

The view from the living room looking towards the hallway. The new built-in custom walnut desk has its Corian countertop in place and the new refrigerator is in place next to the built-in custom pull-out pantry.

I did not want to get involved in any complex or time-consuming projects so I hung out on the west half of our yard where Phil was working and took lots of pictures with the new camera.  Actually, I had been doing that all day trying to document the work as it progressed.  When I wasn’t taking photos I gathered up broken branches and larger deadfall and carried or dragged it to the brush pile on the west side of the line of large fir trees that separate the east and west halves of our five acres.

Linda called around 3:30 and asked me to see if her wallet was on her desk.  She thought she had it with her but could not find it.  She finally located it in her car where it had been since falling out of her case this morning.  She was on her way home by 3:50 PM.

I had a final chat with Phil, who won’t be back until Saturday, and then closed up the bus and the garage.  We were headed to Ann Arbor this evening and I needed to get cleaned up and put on nicer, more appropriate clothes for our evening out.  I used to wear Oxford shirts and nicer pants every day for work, and sometimes a sport coat and tie or even a suit.  These days it’s mostly polo shirts and blue jeans or sometimes REI ripstop nylon convertible cargo pants.  And this summer it has mostly been my work jeans and work shirts.

We left around 5:15 PM and were parked in Ann Arbor before 6 PM.  We agreed to meet Kate at the Lab Cafe which was just around the corner from the Thompson Street parking garage.  (This garage is behind the former Border’s book store #1 which also housed the company’s corporate headquarters.  Our daughter started with Border’s as a cashier at this store and within four years was a regional manager for their PaperChase product line before the company imploded and went bankrupt.)

Kate was sending Linda text message updates on her travel status and ETA so we ordered a couple of decaf coffees to go.  At $3.75 each they were pricier than we are used to paying for coffee but they were “hand-crafted” and the coffee was very good.  It took the barista at least 10 minutes to make our cups, grinding the beans just before brewing and then slowly pouring hot water through individual filter holders after pre-wetting the filters.  In the time it took to make our coffee I would have been on my second cup at Panera.

Linda (front) and Kate (behind) take in the interior of one of the Pop-X art exhibit sheds.

Linda (front) and Kate (behind) take in the interior of one of the Pop-X art exhibit sheds.

The music was too loud and really awful, a bad combination in our opinion, so we sat outside in spite of the occasional attempt to rain.  When Kate showed up we walked the short distance to Liberty Park to see the Pop-X Art Exhibit.  Organized by the Ann Arbor Art Center, all of the art was displayed in “sheds” designed by an architect, one artist per shed.  The sheds were approximately 10 feet square with steep pitched roofs.  The roofs, and the two sides they pitched down to, were covered in clear wavy plastic panels to let in a lot of natural light.  The back end was solid and the front had a pair of sliding “barn style” doors hung from tracks.  There was a solid floor that was elevated relative to ground level and provision for electrical power.  They were designed to be sold as potting sheds after the exhibit was removed at the end of the week.  Although the light was fading I was still able to get some decent shots with the new Sony a99v DSLT camera.  It has much greater light sensitivity than the Sony alpha 100 it is replacing as my primary camera and this was my first opportunity to take advantage of that since getting it.

Our main reason for coming to Ann Arbor was to have dinner with Kate but Pop-X was a nice bonus.  Ann Arbor has a LOT of dining options; hundreds I would guess just in the very walkable downtown area.  We decided to try the Grizzly Peak Brewing Company after Linda confirmed that they had some things on the menu we could eat.  It was a bit of a walk but the rain held off and it was an otherwise pleasant evening.

Linda had a dark Porter with definite chocolate tones and I had a hard cider with distinct cinnamon/vanilla tones.  It was also supposed to have roasted pecan notes but I did not detect that.  Kate had a red beer that was not hoppy and thought I might have liked it.  I had a sip of Linda’s Porter and it was very agreeable.  We both had small couscous and greens dinner salads, which were very nice, and both had wild mushroom burgers, which were excellent.  Linda said her chips were also very good and my French fries were tasty and generously portioned.  Kate had a burger and all of our meals came with pickles.  Kate does not care for pickles, which I knew, and does not care for vinegar in general, which I did not know, so Linda and I split her pickle rather than have it go to waste.  The waiter was very attentive and a good sport when I asked for a gallon of ketchup for my fries.  He brought two very full bottles for the table and a bottle of Frank’s hot sauce.  We tipped him accordingly.

At 9:30 PM we started a slow stroll back to the parking garage and chatted a while longer by our cars, which coincidentally were parked very close together.  It was 10:40 PM by the time we got home.  I fed the cats and we went straight to bed.  I was up later than I wanted to be trying to outline this post but I had not had much opportunity to work on it throughout the day.

 

2015/09/09 (W) Move In Day

We had a slow start to our morning.  I was up at 7:30 AM, finished loading the dishwasher, and made a cup of organic English Breakfast tea.  I fed the cats and then settled in to continue reading Oystein Ore’s Number Theory and Its History.  Jasper wanted attention and sat on my lap until Linda got up at 8:30 AM.  I made a cup of tea for her and brewed a second cup for me.

Linda developed a sore throat yesterday and did not feel like working last night so we deferred final cleanup of the grout on the new floor tiles in the bus until this morning.  She was obviously still not feeling well and was tired from not having slept well last night but she was willing to help with cleaning the grout reside off of the new tiles.  Before jumping into that task, however, we stripped the bed so I could launder the sheets and pillow cases.  We needed a mop for the floor cleaning so Linda went to Meijer’s and got one and picked up some blue Scotch Brite sponge pads.  While she was gone I went to the garage, smoothed the top surface of the return air shelf for the built-in sofa with 4/0 steel wool, and applied a second coat of polyurethane.  I had just enough to finish it.  I then started preparing for the tile cleaning.

I filled two 5-gallon pails half full of warm water and added 1-1/2 capfuls of Armstrong Once & Done concentrate.  The other pail was clean water for rinsing.  Cleaning the grout residue off of the tiles in the bus involved lightly scrubbing along and across the grout lines as well as the center of each tile.  I then went over the area with the square edged sponge side of the pad.  I went on to the next set of tiles while Linda trailed along behind mopping the area.  It took us a couple of hours to do the entire floor.

Part of the kitchen and living room floor after being cleaned as viewed from the hallway looking towards the built-in sofa.

Part of the kitchen and living room floor after being cleaned as viewed from the hallway looking towards the built-in sofa.

We moved all eight pieces of the built-in sofa into the bus and set them in place.  They all fit nicely and I was especially pleased that the vertical front panel, which is walnut veneered plywood, would not have to be trimmed.

We needed to strip the wallpaper behind the sofa but could do that later.  We also needed to strip the wallpaper behind the desk and really needed to do that before installing the desk.  Ideally we would have the new wallpaper installed too but we do not have it in our possession yet.  Linda also wants/needs to get back to work on cleaning/waxing the woodwork as we wanted that done before we put the drawers back in the cabinets.  She was very tired by this point, however, and took a much needed nap.

The built-in sofa with the plywood seat raised to reveal the plenum/support boxes on both ends and the center shelf that forms the air return duct for the OTR HVAC.  The empty space will be used for storage.

The built-in sofa with the plywood seat raised to reveal the plenum/support boxes on both ends and the center shelf that forms the air return duct for the OTR HVAC. The empty space will be used for storage.

I had some electrical things to take care of before we could assembly and secure the desk so I worked on those.  There was a 120V AC duplex outlet in a metal box on the wall where the left desk pedestal will go.  There was also a flexible plastic split loom conduit with 11 wires in it that ran from the panel next to the passenger seat to the four switches in the triangular panel and to the first of two door chimes.  This conduit was originally on the floor behind the furniture where it could not be seen but was now very visible and something needed to be done with it.  I started with the AC outlet.

I shut off the power to the AC outlet, tested it to make sure it was off, unwired the receptacle, unscrewed the box from the wall, and got the wires out of it.  I reenergized the circuit and verified which wire pair was the line (source, supply) and which was the load (power was fed from this box to another outlet by the passenger seat).  I was thinking about where to relocate the box so I would have power available under the center of the desk when I realized I had not made any provision in the design of the desk for getting power to that location.  I sat and thought about that for a while but an obvious solution did not present itself so I worked on the other wiring.

I made a diagram of the connections to the four switches so I could remove the wires and be able to put them back in the right place if needed.  All of the connections were spade lugs, male on the switch and female on the wire ends, so they were easy to remove.  The two switches with the most wiring originally controlled a motorized drawer and a motorized table.  The two DC power supply wires also had spade lugs as did the cabling from the switches to the motor connectors so I was able to remove all of that wiring and set it aside after labeling it to match my diagram.

The two wires from the doorbell switch also ran through the flexible plastic conduit to the first door chime.  Another pair of wires was spliced into the first pair and ran back to the bedroom where a second door chime was installed at the junction of the HVAC duct and dresser cabinet.  I cut all the wires at the splice, labeled the pair from the switch, and wrapped the end of each wire.  I wrapped the wires for the front chime around the box.  I then determined that I could pull the wires for the bedroom chime from the bedroom end, after disconnecting them from the chime, and remove them along with the chime box.  I coiled and taped the wires and set them aside with the box.

I now had all of the extra wires out of the way but still did not have a good solution to my electrical issues.  Two of the four switches were still functional, so the switches needed to be installed somewhere, but it was not obvious to me where they could/should go or how to mount them.  I also had two AC cables to relocate.  I decided to go inside and work at my desk.

When Linda got up she wasn’t feeling any better but she was at least somewhat rested.  We had simple, easy, but tasty meal of vegan riblets and corn-on-the-cob for dinner.  I was anxious to see how the desk was going to fit so we moved the nine pieces from the library into the bus.  It was getting near sunset by this time and we had a few moments of spectacular color before the world turned to gray and faded into night.

I folded the two AC cables down so they would be out of the way temporarily (they were still de-energized).  We set the two bases in approximately the right locations and put the two pedestal boxes on top of them.  I need to install a panel to cover the vertical mirror tiles before permanently installing the desk so I left an appropriate space for now.  I need to make a decision about the panel, however, so I can give Jarel the final dimensions for the HVAC duct / wiring chase cover.  With everything snugged up we put the drawers back in the right pedestal and sat on the sofa contemplating the new look and functionality of our bus.

I was also contemplating how I might “force” the pieces into alignment.  My first thought is to use metal or wood plates attached to the back/underside of the two pedestals to position the knee space connector piece.  I will probably also put a piece of 1×1 or a metal angle bracket on the wall to hold the back edge of the connector shelf as it will have a heavy UPS on it along with a NAS.

The installation of the new custom walnut desk may be temporary in that I may not be able to get the fan-coil heat exchangers for the Aqua-Hot hydronic heating system installed until after the upcoming GLCC rally.  I need to attach some sort of screen material to the back of the air inlet and outlet openings.  I also need to install new pieces of heater hose of the correct length and rig up some things to help get the hoses around tight corners.  This, however, will require draining and then opening some of the coolant lines.

Linda was surprised both by how big the desk is but also by how much extra room she will have in the kitchen.  I think that speaks to the inefficiency/inappropriateness of what was there before.  We were discussing the problem of getting AC electrical power to the wall area between the pedestals when the solution presented itself.  There is space at the inside rear of the right pedestal box so I can bring AC wiring from the chase through the bottom of the box, up the inside the left rear corner, and out through a hole just below the counter top and wire it to an outlet strip.  It will be completely invisible unless you get down on the floor and look up in the knee space of the desk.  It will also be conveniently located just below the notch in the center back of the countertop where power and data cables will drop through.

Linda went off to bed a little earlier than normal as she has to go to the bakery tomorrow.  I went back to my office to deal with computer updates, e-mails, and off-loading photos from my camera to my computer and the NAS units.

 

2015/08/01 (S) Refrigerator Swapping (NOT)

We had a good crowd for our weekly SLAARC breakfast.  We sat across from Mike (W8XH) and had a chance to discuss what to do about the ‘extra’ user accounts on our computers.  We also discussed the release of Windows 10 that occurred on the 29th of July and all came to the conclusion that we would not be upgrading anytime soon.

When we got home I talked to Chuck on the phone.  He said the sun room company was still moving out of the building in front of his shop and that there was still too much stuff in the way to be able to move our buses around.  Given the circumstances we agreed that we would not do the refrigerator swap today and probably not tomorrow.

At breakfast Mike suggested that we look in the Users folder on our computers to see what files were associated with each of these previously unknown users and then delete the User accounts.  It turned out that these users did not exist, or at least had no folders or files associated with them that we could find.  Linda’s computer did, however, have a couple more folders in the Users folder that did not have User accounts associated with them.  When we deleted each of the phantom accounts we were given the option of saving any associated files in a folder on the desktop.  We selected that option each time but no such folders ever got created, confirming (I suppose) that there were no files associated with that account.

Bill, who takes care of the computers and software for the bakery, installed software on our machines when we first got them and Linda speculated as to whether these phantom accounts might have been inadvertently created at that time.  At this point we will probably never know.  We have strong security systems in place and are reasonably careful in how we interact with the online world, but it was a bit unnerving to find these accounts on our machines.

We were on tap for another warm, humid day and I elected not to do any work on the bus or in the garage.  With the phantom User accounts taken care of I transferred the photos that I received of the custom walnut desk from Jarel from my SG3 phone to my laptop computer and edited them for use on our blog.  I copied recent photos from my DSLR camera to my computer and then settled in to copy blog post drafts from e-mails into Word and edit them.

In the course of the day I did a couple of loads of laundry, worked on the sofa design/drawings, chatted on the ham radio, and took time out to have lunch and dinner, which was the left over Pad Thai.  Having sat for a day or two the dish had absorbed the liquid and, although Linda thought the broccoli was now too soft, I liked it better than when it was freshly made.  I also got to add a generous amount of peanuts, which is how I remember Pad Thai being served in restaurants.  After dinner I started reading “Number Theory and Its History” by Oystein Ore.

 

20150730GP H3-40 Custom Desk Build

Here are a few photos of the new desk for our bus in the process of being built.  All photos are courtesy of Jarel Beatty, Jarel Beatty Cabinetry, Logansport, Indiana.

2015/07/15 (W) Prime Wednesday

It was brisk when we got up this morning, with the temperature in the upper 40’s (F), light breezes, lower humidity, and clear, blue skies.  When the weather in Michigan is at its best it is near perfect.

After our usual coffee and granola we spent a little time browsing Amazon.com looking at their “Prime Wednesday” sale.  Neither of us are compulsive shoppers or impulse buyers and scrolling through thousands of items on a slow Internet connection looking for something we can’t live without at a price we can’t pass up is not our idea of fun.  I have things I need to order, like the multiple monitor mounting system for the ham shack, but it quickly became obvious that I was not going to find those items for sale as part of Amazon’s special July 15 Prime Sale.

Mara was up and took her garbage to our trash to can and returned to her rig.  Linda then took our garbage out and moved the can to the street.  By 10:30 AM Mara had not yet emerged from her rig, so I went to my basement office and resumed work on the custom desk design for our bus.  I still need to design the pull-out pantry but I finally ordered the Fulterer top/bottom slide mount from Rockler and had it shipped directly to Jarel in Logansport, Indiana.  It is a serious piece of hardware that will support 450 pounds, so it should be more than adequate for the task.

Mara eventually emerged from her rig and the ladies left for 12 Oaks Mall and Mara’s first ever appointment with Renee in the J. C. Penney’s Salon.  They were gone quite a while, tacking on several stops at pet and food stores before returning home.

I received a second quote for a wall-mounted monitor mounting system from AFC Industries.  It included itemized pricing and an offer of a 15% discount but was still way too expensive.  Though more expensive than a desk-mounted pole system I decided I to order the ZioTek wall-mounted monitor mounting system from CyberGuys.  Being wall-mounted it will get my monitors completely off the desks, leaving room for ham radio equipment to slide underneath and all the way to the back edge of the desk (and beyond).  It will also isolate the monitors from the desk so they won’t move if the desks are bumped.  Another bonus is that I can move the desks to get to the cables at the back of the radios without having to move the monitors.

The monitor mounting system is a significant purchase so I wanted to make sure the components would work the way I need them to.  I measured the three monitors that will initially be mounted using the system and then made a scale drawing to see how they would fit.  I added all of the items to the shopping cart and was getting ready to complete the purchase when I noticed that a 5% discount was available if I joined their e-mail club.  I signed up, received an e-mail, and confirmed my intention to join but the 5% discount did not show up in my shopping cart.  I called the 800 number and was told it would take 24 hours for the discount to be available so I cleared all of the items out of the cart and will re-enter them tomorrow.

I finally settled in to my design work but took several breaks to talk to friends on the Novi and South Lyon repeaters.  The Morgan Manufacturing VHF/UHF lightning arrestor was once again degrading my signal to an unusable level/quality so I once again disconnected the antenna and radio coax and joined them together with an N-female to N-female barrel adapter.  Once I did that I was able to transmit and receive to/from both repeaters full-quieting.

I exchanged a couple of e-mail updates with Jarel Beatty, the cabinet maker in Logansport, and finally quit working around 5 PM.  I came upstairs and found that the weBoost cellular booster systems had arrived from Amazon so I unpacked the shipping box and opened them.  I had not realized when we ordered them that they were designed for use in a car with an inside antenna that requires the phone or other cellular device to be 18 – 36 inches away.  That is not very far and it is a fairly small range.  As the name implies, however, it is designed for use while in motion which is what both we and Mara need/want.  I decided to temporarily install one of them in Linda’s car to test it.

Sitting in the driveway in a relatively bad location my phone was in 3G mode with a weak, but usable, signal that hovered around -115 to -118 dBm.  With the booster turned on my phone switched to 4G-LTE and the signal strength improved to anywhere between -103 to -94 dBm.  (The less negative the signal strength in dBm the stronger the signal.)  That may not appear impressive on the surface, and it was certainly not the 50 dBm gain that is claimed for this device, but it was actually a significant improvement.

“dB” is the abbreviation for “decibels” which is a logarithmic scale.  Logarithmic scales are useful for representing quantities that vary over a large range, like cellular signal strengths.  A change of 3 dB represents a factor of two, i.e., a doubling or halving of the quantity.  Thus a change from -118 dBm to -115 dBm (decibels to a millivolt) represents a doubling of the received power.  It is still a weak signal, but it is twice as strong.  Going from -118 to -103 is a change of +15 dBm and is five doublings (-118 to -115 to -112 to -109 to -106 to -103) which is an increase of 2x2x2x2x2 = 32 times.  Continuing from -103 to -94 is another +9 dB change representing three more doublings (-103 to -100 to -97 to -94) for a total gain of 32x2x2x2 = 32×8 = 256 times.  Starting from a signal in the -118 to -127 dBm range that is potentially the difference between useable and not useable.  (BTW:  a change of 10 dB is a factor of 10, so going from -115 dBm to -105 dBm and then to -95 dBm represents an increase of 100 times.)

We had decided at dinner last night that we wanted to go to The Blue Nile restaurant while Mara was here.  The best time to go turned out to be this evening, so Linda made an online reservation for 7:30 PM at the Ann Arbor location (there is also one in Ferndale).  We tested the weBoost Drive 4G-X cellular booster on the drive to/from Ann Arbor and it definitely made a difference in the signal strength we saw on our phones.

It wasn’t until we got part way down Main Street that we realized that today was the opening day of the Ann Arbor Art Fair.  The last place I wanted to be driving, parking, or walking was at the Ann Arbor Art Fair, not because I dislike art (we love art), and not because I dislike art fairs, but because I dislike congested traffic and crowds, which the AAAF has in abundance.  Surprisingly, we were able to park in one of the parking structures a couple of blocks from the restaurant.  After fighting our way through the pedestrian traffic I was even more surprised to find the restaurant essentially empty.  The Blue Nile is slightly outside the portion of Main Street where the AAAF takes place and streets to either side that are closed off to vehicles during the AAAF.  All of the restaurants and the beer/burger joints in and around the AAAF venue were doing a brisk business, especially if they had outside seating (it was a very pleasant evening), but the restaurant was open and the host was very gracious.

The Blue Nile serves Ethiopian cuisine.  Some of the tables are upside down rope baskets with four chairs and two side tables.  We always ask to be seated at one of these because we always order the Vegetarian Feast which is, in fact, vegan.  The Feast comes on a large round tray covered with a layer of Ethiopian sponge bread (made from teff flour) with small piles of the seven different vegetable-based dishes on the menu surrounding a pile of (optional) salad in the center.  Beverages and platters of rolled up sponge bread are placed on the two side tables (we had water and Ethiopian spiced tea).  The meal is eaten by tearing off suitable sized pieces of sponge bread and picking up the eight different selections from the tray.  Before the food was brought to the table we were given hot, moist towels to wash our hands.  Nice touch.

The food was amazing and the experience somewhat more communal than sitting at a standard American table and eating with utensils.  The waitstaff was gracious and attentive and it was a wonderful experience for all three of us.  Mara asked one of the waitstaff to take a picture of the three of us, which they gladly did.  She then uploaded it to her Facebook page along with a brief description of her visit and meal.  One the drive home she already had 12 “likes.”  This is the side of Facebook, and other social media, that is fun.

It was getting dark by the time we got back to the house but we took the time to unload Mara’s kayak from its special mount on the rear of her motorhome that is installed in the tow receiver.  The kayak mounts diagonally from the lower driver side up past the roof on the passenger side and the tip is about 13′ 2″ above the ground.  She was leaving at 6:30 AM the next morning to drive to Cummins Bridgeway to have her main engine and genset serviced and would be traveling south on Hacker Road to Grand River Avenue.  The last time we did this we clipped a branch in the southbound lane on Hacker just north of Bendix Drive not far from Grand River Avenue.  I was concerned that she would catch the same branch and damage her kayak which is why we took it off the rig.

Once the kayak was off the back of her rig and sitting in our yard we said a quick “good night” and all trundled off to bed as 6 AM would come all too soon.  I wrote for a while in bed but was too tired, and full of food, to stay awake.

 

2015/07/11 (S) Impactful Tools

We had a small crowd for our SLAARC breakfast this morning but good conversation.  After breakfast we drove to Chuck’s house and picked up the manual impact screwdriver.  Barb was up in the thumb visiting her brother-in-law who recently lost his wife (Barb’s sister).  We lingered for a while and then left for home, stopping for gas on the way.

Back at the house I started a load of laundry and then went to work on the stop block screws.  Linda helped steady the ladder and pass tools and parts back and forth.  I got three of the four screws out of the two stop blocks but the head stripped on the forth one so I was only able to remove the aft stop block.  I tried different bits and even tried drilling a small hole in the center of the head to allow the bits to go in farther but it did not work.  The next approach will be a screw extractor, but first I have to go buy one.

We had soy yogurt for lunch with red grapes and I had a few pretzels with roasted red pepper hummus.  I kept trying to get to the basement to work on the desk design but kept getting detoured.  Once I finally reached my office I found that the mouse trap that I had placed under one of my desks was out in front of it.  The food was gone but there was no mouse, only mouse poop.  I realized that the trap was upside down which allowed the door to swing open.  Our best guess is that a mouse was trapped and the cats pulled the trap out from under the desk and accidentally turned it over while pawing at it trying to get the mouse.  Since there was no sign of a mouse having been caught by one of the cats my best guess is that it escaped, for now.

I checked e-mails and found the one with the credentials and instructions for the QTH.com web-hosting of SLAARC.com so I shared those with the other members of the SLAARC website team and then logged in to check out the log file I had created the other day as a test.

I decided to reconnect the Yaesu FTM-400 radio to the Diamond X-50 antenna on the tower so I could monitor the Novi and South Lyon repeaters while I worked in my office.  I had quite a mess on the ham shack desks and decided the best way to deal with it was to install Mike’s Icom IC-2820H in my car in place of our Icom V-8000 2m rig.  At least that would get the 2820 off the desk.  I checked that the mounting brackets and they were identical so I removed the V-8000 but left the mounting bracket installed in the car.

Mike had modified the power cord on his radio by cutting off the T-connector and replacing it with Andersen PowerPoles so I had to modify the power cable in my car to match as I could not modify Mike’s radio.  I removed the fuse from the positive (+12VDC) lead and then cut off the T-connector, leaving about 6″ of wire so I can add PowerPoles and make it into an adapter cable.  I brought my Hakko soldering station up from the basement, set it up on the floor behind the center console, ran an extension cord from the garage, and used it to solder PowerPole contacts to the two wires.  I then inserted them into the black/red housing pair and snapped them in place.

I mounted the IC-2820H, connected the power cable and connected the coax from the antenna.  I reinstalled the fuse in the positive lead, started the engine, and turned the radio on.  A couple of hams were chatting on the Novi repeater, one of whom I knew (Jim, KB8TAV).  When they finished I gave Jim a call and he came back to me, the first time I have been able to use the Novi 440 repeater from my car.  Jim signed off and I switched to the South Lyon 2m repeater and gave a general call.  Steve (N8AR) came back to me and we had a short QSO that verified the radio/antenna was also working on 2m.  As we were wrapping up Linda started fixing dinner.

Linda fixed a simple salad and Dr. Praeger’s vegan hamburgers with Daiya non-dairy cheese.  These patties were also squishy rather than firm and, like the ones at Zingerman’s Roadhouse the other night, where not very satisfying.  They tasted OK, and we ate them because we are not inclined to waste food, but there is a lot more to what makes food satisfying than just taste.  Sight, smell, and texture (mouth feel) are also important.

Linda had several TXT messages from Mara letting us know that she would be arriving tomorrow sometime before 2 PM as she wanted to watch the Wimbledon finals at that time.  Linda and I considered how best to accommodate Mara’s motorhome and finally decided to just pull our bus straight forward until the nose was at the edge of the concrete driveway.  That created more than enough space on the level part of the pull-through driveway for her to park and plug in to our 50 amp service.  The only loads we have in the bus at the moment are battery chargers so we used our 15 amp cord to plug it into a garage outlet.  Since I had to start it to move I switched it to high idle once I had it positioned, leveled it, turned on the OTR air-conditioning to put a load on the engine, and let it run for 30 minutes.

I returned to my office after dinner and work on the desk design for a while but by this point I was tired and not really in the mood.  The last time I updated the BCM page on our website was after the February 2015 issue came out.  I have had articles in the March, April, and May issues and will have articles in the June and July issues.  I captured the covers from March, April, and May and updated the page.

I exchanged e-mails with several people and spent some time looking at dual and triple monitor stands on EBay.  We rarely use EBay and the site made me change our password before it would let me log in.  There was a large selection of products but none of them were exactly what I am looking for.  There wasn’t any rush so I decided to revisit this tomorrow.

 

2015/07/08 (W) Custom Desk Design

Linda continued to research Florida RV parks this morning over coffee.  Riverside RV Resort which was fully booked but she found Big Tree RV Resort in Arcadia, Florida.  It is located in a similar part of the state and Arcadia is where the annual Arcadia Bus Rally is held between Christmas and New Year’s.  Big Tree is a Carefree Resort, which means they had a nice, professionally done video on their website.  We checked it out on Google Earth and it looked OK.  Hey, the entrance is right across the street from a Walmart, so the shopping is convenient.

Linda called Big Tree and talked to Pat.  They only had five openings for the 2015/16 winter season so we reserved a spot for January and February 2016 with the understanding that we can probably extend through March if needed.  First, however, we want to see if we can find someplace else to stay in another part of Florida for March and perhaps some of April.  We would like to spend some time in northeast Florida.  Our friends, Pat and Vicki, spend late February and early March at Jetty Park near Cocoa Beach and Cape Canaveral.  Besides their presence there is a lot to see and do in that area, so that is appealing to us.  However, the spring FMCA national rally will be in Perry, Georgia the third week of March, so we are being pulled in several directions.  Such is the RV life; so many places, so little time.

Breakfast was cinnamon raisin toast and fresh melon.  After breakfast I called Chuck It Junk Removal and left a message that we would like to rent their dumpster trailer for starting on Monday 20 July with pickup on Friday 24 July.  Brad called back and said those dates would work for him.

Linda continued to research RV parks in Florida for December and March.  She called Williston Crossings to ask about space for December but the lady on the phone said someone else would have to call us back.  As much as we liked Williston Crossings the winter before last we wanted to spend the heart of the winter farther south in the state.  A more southerly location would afford us a warmer climate and position us to explore a part of the state we did not see last time.  It would also put us closer to many of our friends who winter in southwest Florida.  We really enjoyed the southwest Arizona climate this past winter and have talked about trying a winter in southern Texas and/or southern New Mexico.  I have no doubt we will visit those areas in future years but this year we wanted to return to Florida.

I typed up a short letter to go with the defective Morgan M-302N coaxial cable lightning arrestor and boxed it up for shipping back to Morgan Manufacturing in Martinsville, Indiana.  Linda got a new 90-day prescription for me when she saw the dermatologist yesterday so we also got that ready to mail.  She then left for the library, post office, and grocery store.

My focus for the rest of the morning was on uploading posts to our personal blog but before I even got started I discovered a mouse at the entrance to the utility area in the basement.  It had not survived its encounter with one of our cats, probably Juniper, so I put it in a small zip lock bag and put it in the trash.  I know that food and shelter are powerful attractions for mice but I am surprised that the presence of two cats in the house is apparently not a deterrent for them.  Other than the one mouse we live trapped in the bathroom the mice are not taking the bait so far.  Indeed, it may be that we are luring them out of hiding and Juniper has figured out where to lie in waiting to ambush them.  From what we have seen she is a very skilled, and determined, mouser.

Linda went for a walk as soon as she got back from running her errands.  By the time she returned and prepared tofu hotdogs for lunch I had uploaded eight blog posts covering June 8 through 15.  After lunch I sent an e-mail to a dozen or so folks letting them know where we would be this winter.  I then got to work on the design for the custom desk.  Except for a dinner break I worked on it until 9 PM when I quit for the day and went upstairs to watch the final episode of The First Peoples on PBS.

Butch and Fonda are at the Crosley Automobile Club national gathering in Wauseon, Ohio this week and will be back home on Sunday.  I would like to have the design for the desk and other custom woodwork done by this Sunday so I can drive it down on Monday or Tuesday next week, give it to Jarel Beatty (the cabinet maker), and visit with Butch and Fonda before heading home.  The desk will take some time to build and I would like to take the bus to Butch and Fonda’s in August before they leave for Arizona so Jarel can bring it to their place and help me install it, assuming, of course, that I have the new floor installed by then.

The desk is proving to be quite challenging to design but after thinking about it for the last couple of weeks I had several “breakthrough” ideas today.  One was to turn the printer 90 degrees so it faces fore and aft rather than side-to-side.  Another was to leave the front of the printer box open and cover it with a swing up work surface.  But the basic difficulty I am having is figuring out how to draw it.  I finally decided to draw a plan view of the base which really helped me see where the Aqua-Hot fan-coil heat exchangers will go and how the coolant lines will run.  I still have a lot of work to do, and I really wish I had AutoCAD (and knew how to use it), but I went to bed feeling like Sunday was a realistic target date for this piece of the project.

 

2015/07/03 (F) 4th Anniversary

Several SLAARC members were gathering at 10:30 AM this morning to unload the Field Day equipment from Steve’s trailer and store it in the South Lyon water tower.  I was going to join them but decided last night to stay home and work on the design for the desk and HVAC chase covers for our motorcoach.  Having played ham radio for much of the last week and a half I needed to refocus my time and attention on the interior remodeling of our bus.  Besides, Brendan was bringing Madeline to our house sometime mid-to-late morning and I wanted to be home when they arrived.  Today was Brendan and Shawna’s 4th wedding anniversary and they asked Linda if we would take care of Madeline for a couple of nights so they could have some time together without the constant demands of child care.  Of course Linda said ‘yes.’

I had a call last night from XPO Delivery Services letting me know the new refrigerator for the bus would be delivered to Chuck Spera’s shop in Novi today between 6 and 8 PM.  That meant I would have to be at the shop by 5 PM just in case they arrived early and could be there past 8 PM if they arrived late.  At 7:45 AM this morning I got a call from the Lowe’s in Howell asking if XPO could deliver the refrigerator in about an hour.  Sure, why not; I was still in bed but about to get up anyway and having the refrigerator delivered early would actually open up my entire day.  I hurried the process along, had Linda get the receipt, grabbed my iPad, and headed for Chuck’s shop in Novi.  Linda was getting ready to go for a walk as I left.

One never knows what the traffic will be like on I-96 headed into the Detroit metro area from the northwest but on this Friday, at the start of a major holiday weekend, the traffic was very light and I was able to get to Novi in the minimum legal time.  Traffic headed westbound actually appeared to be heavier than the inbound traffic.  I stopped at the Tim Horton’s on Beck Road just north of Grand River Avenue and got coffee which I had not taken the time to make at home before I left.

I texted Chuck to let him know that the refrigerator was being delivered this morning.  He called me back to clarify where to have them set it.  This would be a great weekend to do the swap as all of the other businesses around his shop building will be closed for the holiday, making it easy to get our bus in and out.  But his daughter arrived last night from New York and will be visiting for a week so the refrigerator replacement will have to wait, probably until at least next weekend.

By 9:30 AM XPO had not arrived so I called Lowe’s in Howell and talked to Erica in scheduling.  She said she would call the driver and see what was going on.  I texted a status update to Linda and continued to wait.  By 10 AM there was still no truck and no call back from Erica.  At 10:20 I was dialing Lowe’s again when an Enterprise rental truck drove past the building headed east and a few minutes later went by headed west and pulled into a parking lot.  Moments later my phone rang.  It was the XPO truck driver.  I explained where the driveway was and flagged them in.  When I ordered the fridge I gave detailed special instructions on how to find the building but the driver did not bother reading them and did not bother calling me until he had failed to find the delivery location for the second time.

They backed the truck into the area in front of Chuck’s garage door, lowered the refrigerator down on their lift gate, slid a pair of lift straps under it, picked it up, and carried it into the shop.  I looked it over as best I could and then signed for it.  Only later did I notice a small dent towards the bottom of the door.  I had an automated call later asking if I was satisfied with the delivery and indicated ‘no’, noting the arrival delay and the small ding.  The message said I would hear back from someone within an hour but no one ever called.  We do not plan to make an issue of the ding as we will be lucky to get it into the bus and into its alcove with no further damage.  Still, it should have arrived in perfect condition and did not.

I called Linda to let her know the refrigerator had arrived and that I was getting ready to head home.  She said Brendan had just arrived with Madeline.  As I started to back out of my parking spot Chuck arrived so I spent about 30 minutes talking with him about the timing and approach of the refrigerator swap.  I will almost certainly take our bus to his garage on a weekend.  Only later did I find out that Brendan will not be available to help for the next two or three weekends.  Ugh.  Chuck called a friend (golf buddy) who has narrow pallets (24″) to see if he could get a 5’ long section.  With the long forks set close together on his forklift we can slide the pallet over the forks and have a much more secure platform form for raising and lowering refrigerators, probably laying on their backs.

Linda called back and asked me to stop on the way home for some toddler toothpaste and a toddler toothbrush.  I did not know they made such things but I found them at the CVS in Brighton.  Not long after I got home Linda had lunch on the table.  She heated some veggie nuggets and set them out along with baby carrots, grapes, pretzels, hummus, vegan deli slices, bread, lettuce, and onion.  We all had a good lunch with lots of variety.  Brendan got Madeline down for her nap at 1 PM and hung around long enough to make sure she was asleep.  I took a few minutes to show him the new Yaesu radio before he headed back to Ann Arbor.

I was very tired and took a nap on the living room sofa which is especially comfortable for this purpose, better actually than for sitting on.  Madeline slept until almost 4 PM.  When she woke up she wanted her mommy and daddy and was a little weepy but Grandma Linda got her quickly engaged in doing things.  Linda took her for a walk to see the chickens while I went downstairs to check e-mails.  I responded to ones having to do with the transfer of the SLAARC website and domain name registration from GoDaddy.com to QTH.com and made mental note of others.  When they got back from their walk Linda brought Madeline downstairs to see Grandpa Bruce at work in his office and ham radio shack.  We told her we would help her become an amateur radio operator when she was older.

Linda decided that baking a vegan chocolate cake would be an excellent activity to do with Madeline and give us a nice treat for later.  Madeline helped pour and stir ingredients.  She ended up with chocolate cake batter on her face and clothes but it was worth it as she got to lick one of the spoons.  (Without any animal products, especially raw eggs, vegan cake batter is perfectly safe to eat.)  Linda had previously found a small baking set for Madeline that included a small bunt cake pan.  Some of the batter went in there to make a little cake just for Madeline and the rest was used to make 11 cupcakes.

After the cupcakes were cooked and taken out of the oven to cool Linda made dinner.  We had mock chicken strips (vegan), fresh sautéed green beans, vegan refried beans, and fresh berries leftover from earlier.  When the cakes were cool enough Linda got out the powdered sugar and sifter and we dusted them.  Madeline enjoyed the decorating but somehow ended up with powdered sugar in her hair, on her dress, and all over her face.  I took pictures and then Linda cleaned her up while I cleaned the floor.

After dinner and dessert we played and read a bit.  Linda had gotten three Sesame Street Workshop DVDs from the Howell Public Library so we all climbed up into the bed in our bedroom and watched one of them.  We played along with the various activities and games and encouraged Madeline to do the same.  The program ended at 8 PM which is Madeline’s bedtime.  Linda helped her in the bathroom, got her into her pajamas, and helped her brush her teeth.  She laid down without a fuss and drifted off to sleep. We stayed up until the last chime of the grandfather clock at 9:45 PM and then turned in for the night.  We are always satisfyingly tired after a full day of Madeline.

 

2015/06/16 (T) More Stupid

Linda was scheduled to go to the bakery this morning but rescheduled to tomorrow due to last night’s weather forecast and the possibility of flooded highways in Detroit.  The morning rush hour traffic is bad under the best of conditions and flooded roadways can make it near impossible.  She also did not sleep well and woke up tired.

The Apex roofing crew started showing up just before 8 AM and the Wimsatt truck showed up with the shingles a little after 8 AM.  They brought a conveyor truck this time and were able to get the shingles off the truck and onto the roof without difficulty.  The Apex crew did not waste any time getting to work.  It turned out to be a great day for roofing; clear skies, no rain, moderate temperatures, lower humidity, and some breeze.  Even so, it is work that is done without the benefit of shade and roofs are hot places to work even on the nicest of days.

Wimsatt unloads shingles onto the garage roof.

Wimsatt unloads shingles onto the garage roof.

Linda continued working on the financials for our amateur radio club while I checked my e-mail.  I had a reply from RV Critter Guard telling me what to order and how much it would cost.  I placed the order through their website and used PayPal to complete the transaction.  I tried calling the concrete contractor that Phil recommended (Bid Rite Concrete LLC in Whitmore Lake) but the phone would disconnect after the first ring and revert to a dial tone.  Perhaps the recent storms caused a problem but I e-mailed Phil to see if he had a different number for them.  I called the Henry Ford Medical Center in West Bloomfield and made dermatology appointments for myself and Linda.

With all of that taken care of I turned my attention to the bus.  The toilet is a Microphor LF-210.  It uses pressurized air to operate the waste valve and the water valve and to help push the waste through the drain pipe and into the black tank.  To remove the toilet I had to undo three connections—air, water, and waste—and take out the four screws securing it to the floor.  If only it was as easy as that makes it sound.

The plumbing at the back of the Microphor toilet in our bus.

The plumbing at the back of the Microphor toilet in our bus.

Undoing the air line was easy and undoing the water connection only a little less so.  The waste connection was another matter.  The 1.5″ black plastic drain pipe was routed from the water bay through the floor and into the HVAC chase that runs along the driver’s side of the coach.  The converter, Royale Coach, brought it out through a hole in the wood that covers the chase, making it impossible to take the wood cover off.  The pipe then made two right angle bends, the first one towards the floor and the second one towards the back of the toilet.  The waste pipe was connected to the toilet discharge pipe with a length of rubber hose and a compression sleeve.

The toilet has a large hole in the back for all of these lines to pass through to the inside where they get hooked up.  It should have been a simple matter to slide the toilet away from the wall/chase but the last bend in the drain line was below the top edge of the bottom of the hole, preventing it from coming out.  After wiggling the toilet enough to get the rubber hose loose from the drain pipe I was able to lift the drain pipe just enough to slide the toilet out.  I took pictures for a possible BCM article on our interior remodeling project and then Linda helped me move the toilet out of the bathroom to the front of the coach.

The more I disassemble this coach the more stupid I think the design and construction of its systems are.  I don’t know that coaches from Marathon, Liberty, Vantare, Featherlight, Parliament, Millennium, Custom Coach, or any of a dozen other companies that have come and gone, is any better as I have never tried to disassemble one of them.  These are one-of-kind vehicles that are custom built specifically for the original purchaser and the over-riding factor in every case is the interior design.  Stuff, like toilets, go where the customer wants it, and systems, which are generally buried and hidden from view, get built wherever and however they can be made to fit.  The converter does not expect to have to repair or replace anything during the very short 12 month, 12,000 miles, warranty period and if stuff breaks after that, or someone wants to do a remodel or upgrade sometime later, it will all be time and material.  How difficult it is to do, and how many hours it takes, is someone else’s problem at that point.

The Apex crew hard at work on the back side of the main roof.

The Apex crew hard at work on the back side of the main roof.

We had a call from Butch updating us on a possible property purchase.  They are waiting for a clear title search before making an offer.  The property includes a house and a sizable barn.  The barn needs a new roof and the house will have to be gutted and the inside rebuilt, but for the right price it will still be a good deal.  They already have a good estimate to replace the barn roof and since they are now retired they have more time to work on the house than they would have a year ago.  They also have family and friends who can help.  Besides, they still have their home/business building in Twelve Mile, Indiana and their bus, which they lived in all this past winter, so they will not be under any pressure to get the inside rebuilt quickly.

Linda started downloading updates from Adobe Creative Cloud, which take a very long time, and then left at 3:30 PM for Ann Arbor.  She agreed to take care of grand-daughter Madeline while Brendan and Shawna attended a reception at the University of Michigan – Ann Arbor for newly tenured and promoted faculty.  I was on my own for dinner and Linda bought an Amy’s pizza so I would have something easy to prepare.

The roofers finished up for the day around 5 PM.  By the time they left most of the trash was in their dumpster trailer and the roof was tarped as a precaution against rain even though the forecast for tonight and tomorrow is for dry weather.  Rain returns to the forecast tomorrow night into Thursday but turns dry again on Friday, so we are optimistic that they will get the job finished this week.  It’s a big job but Apex has a big crew working on it and they got a lot of work done today.  We are very pleased with the look of the Certainteed Landmark Pro Max Def Resawn Shake shingle that we chose.  I took pictures of the work throughout the day as I always try to do with major projects.

After the roofers left I worked for a while in the bus.  I took the mattress into the house along with the electric heating pad controls.  I disconnected the two gas struts that support the plywood bed platform so I could open it far enough to reinstall one of the drawers.  I left them disconnected as I plan to remove the platform to provide better access to the sides of the box and floor.  I also plan to reposition them when I reinstall the platform to provide better access to the storage area underneath.  I then took measurements and made a sketch of the file drawer box for the desk.

Installing soffit baffles and replacing roof decking on the front of the main roof.

Installing soffit baffles and replacing roof decking on the front of the main roof.

I cooked the Amy’s Roasted Vegetable Pizza on the outdoor gas grill, both to avoid heating up the house and to see how it responded to that cooking method.  I used the grilling mat and the result was quite acceptable.  A glass of Franzia Moscato was a nice accompaniment.

After dinner I worked at the drafting board in my office turning my sketch and measurements into a scale drawing.  The two boxes for the desk will be trickier than a standard desk box because of the HVAC chase and because I have to put an Aqua-Hot heat exchanger in the bottom of each one.  I worked until about 9 PM and then came back upstairs.

The air-conditioner worked fine yesterday but was once again unable to bring the temperature in the house below 74 degrees F even though the outside air temperature never rose above 80.  There is clearly something wrong and I am wondering if one of the cold air ducts is open into the attic and/or one of the return air ducts us drawing hot air from the attic.  Either of these conditions would reduce the air flow to the house and overtax the evaporator in the air handling unit.  The more likely cause, however, is lack of refrigerant.  Whatever the case I shut the system off and opened up the house.

I was relaxing in the living room when Linda called at 9:30 PM to let me know she had left her babysitting gig and was stopping at the Whole Foods Market before heading home.  The reception started at 5 PM and lasted until 9 PM.  She was home by 10:15 PM and straight away to bed as she has to go into the bakery tomorrow and wants to leave early enough to be ahead of the morning rush hour traffic.

 

2015/05/14 (R) Deconstructing the Bus

The entry stairwell and passenger seat area of our H3-40.  Note the two mounting channels for the passenger seat

The entry stairwell and passenger seat area of our H3-40. Note the two mounting channels for the passenger seat

I spent most of the day continuing to disassemble the inside front half of our motorcoach while Linda split her time between working in the yard and helping me.  But before we got started on that work I made a follow-up appointment with the endodontist who did my root canal last fall.  I also indicated that I had been having some issues with my teeth in that area and they scheduled me for an evaluation as well.  I got my weekly follow up call from Diane at SteelMaster.  She was not very happy when I told her I wanted to consider an arched metal roof for a pole barn type structure and started to argue with me about foundations and poles.

Driver side sleeper sofa unscrewed from the floor and laying on its back.  Both end panels are off and the drawer and slides have been removed.

Driver side sleeper sofa unscrewed from the floor and laying on its back. Both end panels are off and the drawer and slides have been removed.

Wrong move.  If you are not going to give me the information I need to make a decision then you are not going to sell me any of your products.  She did admit, however, that I could purchase the stamped engineered design drawings without putting a deposit on a materials order.  The drawings would cost about $500 which I think is still unreasonable.  If the County denies my building permit SteelMaster will not take the drawings back and give me a refund.  It makes me wonder how they have ever sell a single building.  It’s not like I can take their drawings to another company and have them fabricate the materials at lower cost.  I can understand charging something, perhaps $200, just to keep people who are not serious from wasting their time, but $500 seems excessive to me.

 

 

 

Driver side sleeper-sofa with everything removed so I can disassemble it to get it out of the bus.

Driver side sleeper-sofa with everything removed so I can disassemble it to get it out of the bus.

Diane passed me off to Greg who handles the arched steel roof systems.  He has not dealt with me before so he was not frustrated with me.  For a 25′ wide x 50′ long building with a 25″ snow load he figured the roof system would be $10k to $13k.  The roof profile would be similar to their “Q” style building, which is shaped more like a Quonset hut, and attached to the top of the wall with plates that are similar to the base plates they use for their metal buildings.  The stamped drawings only would be $575, so if we decide to pursue this we will just have to spend that money to get these and hope the County Building Department approves the plans.  Of course, Diane was willing to sell Chuck and me two complete S Model buildings 32’ x 56’ without end walls for $20,400 total, so $10K – $13K for a roof seems expensive by comparison.

Passenger side of the bus looking towards the rear from the cockpit.  All of the furniture is out.

Passenger side of the bus looking towards the rear from the cockpit. All of the furniture is out.

We needed the space in garage where the lawn tractor is parked to store the furniture from the bus until we can dispose of it.  The tractor hasn’t been started since last fall (or summer?) so I hooked up the battery charger and let it charge while we worked.

 

This motor (center) was used to drive two geared pullies via flexible drive shafts (green) to open/close the drawer under the sleeper-sofa.  (One of the pullies is visible upper left.)

This motor (center) was used to drive two geared pullies via flexible drive shafts (green) to open/close the drawer under the sleeper-sofa. (One of the pullies is visible upper left.)

By the time we quit working around 6 PM we had disassembled the sleeper-sofa and unbolted the passenger chair.  We got the chair, both parts of the sleeper sofa, and both parts of the J-lounge out of the bus and into the driveway.  I started the lawn tractor and moved it out of the garage and parked it outside behind a thick grove of large trees and dense undergrowth so it was mostly hidden from view.  Once we got everything into the garage I removed the flexible HVAC ducts and threw them away.  I then started pulling up the old carpet and padding from the living room floor and steps, and removing the carpet from the walls in the entry stairwell and cockpit areas.

 

The base of the passenger side J-lounge.  This was a complicated piece of custom furniture.

The base of the passenger side J-lounge. This was a complicated piece of custom furniture.

[p6 R] I got all of the old material out and into the trash or garage and then removed one of the two filler panels from passenger side front floor and took that to the garage.  I could not remove the other filler panel because it had a hole drilled in it with an electrical wire running through it.  I will have to cut a slot to get it out and eventually shut off the power to that circuit and reroute the wire as it also passes through one of the HVAC 4” flexible duct adapters and into the HVAC chase.  A never cease to be amazed by the things that bus converters do in places they think you will never look.

The upper portion of the passenger side J-lounge sitting in the driveway waiting go in the garage.

The upper portion of the passenger side J-lounge sitting in the driveway waiting go in the garage.

We spent some time in the bus considering our remodeling plans.  With all of the furniture out we were finally able to see what we had to work with and some new possibilities emerged.  The wall paper is badly stained behind the sleeper-sofa area and the wall behind the J-lounge/dinette is unfinished as it was never visible or intended to be.  A lot of the woodwork needs to be cleaned and reconditioned.  We will do that with the Touch of Oranges Wood Cleaner and steel wool, after which we will apply a nice coat of Touch of Beeswax.

Passenger chair and drawers waiting to go into the garage.

Passenger chair and drawers waiting to go into the garage.

We have assumed from the beginning that we would replace the sleeper sofa with a new one custom designed and built to fit the available space, including a notch for the HVAC chase that would allow it to go all the way to the wall and fit under the window trim.  The only way we would be likely to get such a sofa is from Villa and their furniture is very expensive and takes an unreasonably long time to get.  Most of the furniture we removed from the bus was Villa, but it was all worn out.  We are now considering putting two barrel chairs where the sleeper-sofa was located, perhaps with a small cabinet between them.  We need to cut cardboard or heavy paper to match the footprint of possible chairs, cabinets, and the custom desk and set them in the bus to see how they will fit.

 

 

The "living room" of the bus looking forward from the kitchen.  All of the seating has been removed.  Note the black ceramic tile at te bottom of the frame.

The “living room” of the bus looking forward from the kitchen. All of the seating has been removed. Note the black ceramic tile at te bottom of the frame.

Sooner rather than later we will have to make some final decisions so I can draw up final plans for the desk and floor cabinets and get them to Jaral Beaty in Logansport, Indiana to build.  We are also going to have to settle on chairs and fabrics and get them on order.  Besides the floor we are going to replace the driver and passenger seats, and the refrigerator, so this is a major remodeling project.  I also have to rebuild the water bay, but that’s a different project for a different day and blog post.

Driver side alcove where the sleeper-sofa was installed.  Note the HVAC chase and flexible ducts used to get air out through the front of the sofa.

Driver side alcove where the sleeper-sofa was installed. Note the HVAC chase and flexible ducts used to get air out through the front of the sofa.

It was a very physical day with a few bumps and scrapes but no serious damage to us or the bus.  I went to the gas station to top up my fuel tank while Linda fixed dinner.  She had some left over white rice and ended up adding it to barley, lentils, split peas, carrots, mushrooms, red onions, garlic, greens, soy sauce, salt and pepper.  Everything except the greens was sautéed.  The greens were cooked separately and added at the end.  It was a delicious and complex combination of flavored and textures.  We watched Season 3 Episode 1 of Sherlock and turned in early as we needed to be up very early tomorrow and on the road to the Dayton Hamvention in Dayton, Ohio.

Passenger side HVAC chase with AC cable passing through 4" flexible duct adapter and then through the floor.  Really?  Really.

Passenger side HVAC chase with AC cable passing through 4″ flexible duct adapter and then through the floor. Really? Really.