Tag Archives: Coach Supply Direct (Edwardsburg MI)

2015/11/13 (F) Road Trip

I set my alarm for 5:30 AM and got up when it went off.  I got dressed quietly, fed the cats, refilled their water fountain, and took my allergy pill and B-12 vitamin.  I used a plastic bag to pack a change of underwear and socks, a basic oral hygiene kit, my iPad, my checkbook, and my phone charger cable.  I loaded my travel bag and walnut pieces into the car and then checked the mousetraps in the pantry.  One of them had two mice in it.  It was still pitch dark outside so I drove to the end of the new driveway, parked with my headlights pointing across the road, took the trap to other side of the road, and released them.  They went scurrying off into the thick undergrowth of the woods and I drove back to the house.  I left the trap on the front porch and went inside to wash my hands.

I finally left on my road trip to Indiana at 6:20 AM.  I needed fuel so I headed south on Hacker Road and stopped at the Shell Station on Grand River Avenue at I-96.  There is a Dunkin Donuts co-located with the station so I got an extra-large coffee and was on my way.  I decided to head east a couple of miles on I-96 and then south on US-23 to Ann Arbor where I picked up I-94 west.  I took I-94 as far as I-69 and then headed south.  Somewhere along this segment I realized I had forgotten the box with the two swivel ring bearings.  That meant I would not be stopping at Coach Supply Direct in Edwardsburg, Michigan to return them, which would save me time but necessitate getting them back to Josh another time and/or another way.

The change in plans would loosen up my schedule a bit but I still had four stops to make and was anxious to make time.  I stayed on I-69 south into Indiana and then took the Indiana Toll Road (I-80/90) west.  Traveling west there is one travel plaza between I-69 and the SR-19 exit.  I stopped there to use the restroom and get another cup of coffee.  Back in my car I called Josh to let him know I would not be stopping by his shop today in Edwardsburg.  I then called Linda to update her on my whereabouts and change in plans.  She said she would take care of getting the box with the swivel ring bearings ready to mail.

The weather was overcast, drizzly, cool, and windy when I left this morning.  The winds were out of the west so I had a crosswind or a headwind for the entire trip down.  By the time I reached Indiana I had driven out from under the cloud cover.  The temperature remained very cool but the sunshine was refreshing.

My first stop was A-1 Upholstery in Elkhart, Indiana.  Much to my surprise Terry had used the exact same fabric for the filler cushion that we had her use for all of the other ones, so it was a perfect match!  I got a call from Josh while I was there and called him back as soon as I left, but got his voice mail.

My next stop was at Pat and Vickie Lintners’ house, about three miles from A-1 Upholstery, to pick up a critical accessory piece for the built-in Nutone multi-function kitchen appliance.  We have a functional power base built in to our kitchen counter in the bus but only had the blender attachment.  Vickie gave us a number of other attachments at a rally back in September but many of them required a right angle tower adapter.  She had found the adapter a few weeks after the rally.

From Pat and Vickie’s I backtracked to the main north-south road, went south back over the St. Joseph River, and headed west on Old US-33 (Lincolnway).  I got a call back from Josh and he said to stay on my current road all the way to the Mishawaka bypass and then head south to US-20.  From there I was on familiar road as I headed west to US-31 south.  Michele Henry from Phoenix Paint had called while I was at Pat and Vickie’s and I let it go to voice mail.  I called her back when I was done talking to Josh.  They had both called me with some recent scuttlebutt about a service facility in Elkhart where friends of ours had some major remodeling work done on their vintage bus, but it was also a chance to catch up on things in general and helped pass the time as I drove.

I stopped in Argos for fuel and called Bill Tharpe with an ETA of 12:30 PM.  I then called Jarel to let him know I would be there by 1:30 PM.  Butch had driven me past Bill’s place once some time ago so I had a fairly good understanding of where it was and what it looked like; not that I needed it.  Given the address my Garmin 465T GPS unit took me right to Bill’s place on Mexico Road south of Mexico and north of Peru.  Sounds like I was in Central America.

Bill was outside waiting for me and we unloaded the antique SUN Electric Distributor Tester from my car and into Butch’s truck, which Bill had for the winter.  He was headed to his building in Wabash, where he has a paint booth, to repaint the truck so we did not chat for very long.  Besides, I still had one more stop and it would take at least a couple of hours.

A couple of miles on down Mexico Road I headed west on US-24 towards Logansport and arrived at Jarel Beatty’s cabinet shop at 1 PM.  Jarel was not expecting me until 1:30 so he was in the middle of cutting dados in side panels for a tall cabinet.  When he finished that task he switched to a regular blade in his table saw to work on my pieces.

We selected the most suitable pieces of walnut from among the ones I brought.  He ripped two pieces, one 2″ wide and the other 2-1/16″ wide, and crosscut them to 19-11/16″ long.  He then ran them through his shaper to round off the edges.  He changed the blade on his table saw, reset the depth of cut, and set the fence to cut off the amount of material I had marked with blue painter’s tape on the bump out for the passenger side HVAC duct cover.  With the sawing done he sanded the two new pieces and then sprayed them with a Sherwin-Williams pre-catalyzed lacquer.  He let the first coat dry for 15 minutes and then lightly sanded it with 220 grit paper to knock down tiny bubbles and splatters.  He then applied a second coat.  It was remarkable to see how it changed the appearance of the wood.  Jarel described it as being like “putting water on a rock” and I thought that was an apt description.

After another 15 minutes the pieces were dry enough to be transported without damaging them.  I wrapped things up with Jarel, including finally remembering to get all of my drawings back, and was ready to leave at 3 PM.  The GPS said I would be home by 7 PM, quite a bit earlier than I expected when I left this morning.

I had smooth sailing until I encountered a major traffic jam on I-96 eastbound just east of US-127 on the southeast corner of Lansing, Michigan.  It took 45 minutes to go three miles and I was sitting at about 1/8 tank of fuel.  Ugh.  There turned out to be multi-car accidents in two separate locations about a mile apart plus a car stopped in the right lane that appeared to have run out of fuel.  What a mess.

Once I was clear of the accident area it was clear sailing once again.  I stopped at the Marathon station at the Fowlerville exit (#127) for fuel and checked out the truck pumps.  Although there were lots of semi’s parked there for the night I was disappointed to find that the back lot was in as bad a shape as the Mobil Truck Stop at exit 117.  Still, the round trip from our house would be 20 minutes shorter and it was an alternative place to get fuel.  The closest place to our house where we can fuel the bus is actually the Marathon station on Grand River Avenue at I-96 in Brighton, which has truck pumps around back, but we have some low branches in the southbound lane of Hacker Road just before we get to Grand River Avenue, so we tend to avoid that route and that stretch of Grand River Avenue is often very busy and not someplace I want to be with the bus unless it is later at night.

I checked the mousetrap in the pantry when I got home and we had caught yet another mouse.  I unloaded the car and then took the mouse trap to the end of the new driveway and released it across the road as I had done with the previous four.  As I walked down the driveway it was obvious that Phil had been here with his bulldozer, which Linda confirmed over dinner.

The “parking pad” area is now presumably level but it was definitely not flat as it had deep marks from the bulldozer treads and ridges where the gravel had not been completely smoothed out.  The top inch or so also seemed very loose.  I don’t think Phil is done working on the project as he still needs to spread straw over all of the topsoil that he placed, graded, and seeded the other day.  I suspect that he still needs to compact the gravel one last time with his track loader but I won’t know for sure until I can talk to him.

Dinner was chili and crackers; simple but delicious.  It had been a long day but I had taken care of four things in one trip, three of which were directly related to the bus and two of those of a somewhat critical nature.  We were both off to bed not long after dinner.  Tomorrow was our weekly ham radio breakfast so we would have to be up early to get there on time.

 

2015/09/16 (W) CSD to GLCC

I spent the night in the coach at Coach Supply Direct, in the fenced in parking lot, next to the train tracks that run parallel to M-62 through Edwardsburg, Michigan.  I was up late and went to bed tired.  The trains did not bother me (they run at every hour of the day and night) but aching knees and joints in my hands, especially the base of my thumbs, made for a less than sound sleep.  I had also not leveled the coach when I arrived yesterday but it was slightly low to the front passenger side so it did not bother me as me head was higher than my feet, the head of the bed being on the driver’s side of the bedroom.

I had granola for breakfast, checked my e-mail, and was just settling in to start today’s post using my iPad when Josh showed up at 7:30 AM.  He opened the building and retrieved a small desk/cabinet and loaded it into his car to take back to the cabinet maker.  A portion of the back needed to be finished as it will be exposed when installed.  Having just been through the process of designing built-in RV furniture and interacting with a cabinet maker I understood how a detail like this could easily be missed.  We were fortunate in our choice of Jarel Beatty, as recommended by our friend Butch Williams, to build our pieces.  Jarel’s meticulous attention to the details of how something would be constructed, installed, viewed, and used, resulted in our not having any post-construction issues.

After Josh left I checked the status of the house batteries.  They were at 81% SOC (State Of Charge). Not bad after 11 hours of use.  Extrapolating, it appears that given some reasonable energy management we could go 24 hours without recharging before hitting the 50% SOC level.  I did not, for instance, use the microwave oven.  That is much better than before we replaced the refrigerator so it appears that the new one is clearly more energy efficient than the old one.

I also checked the coolant levels in the Aqua-Hot and generator expansion tanks.  The Aqua-Hot tank was still above max cold but the unit was also still a bit warm to the touch.  The level in the generator tank yesterday was very low with the engine fully warmed up and operating under load so I added antifreeze up to the “hot” mark.  If was slightly above that level this morning although I expected it to be lower as the system cooled off and drew the coolant back in.

Tyler showed up at 8:15 AM and knocked on the door.  He had stopped at McDonald’s and bought me a large coffee, half regular half decaf.  He had asked about this before leaving yesterday and remembered it this morning.  I was impressed with both his memory and thoughtfulness.  He got right to work on the cockpit seats, starting with the driver’s seat.  Before installing it, however, I had him repair the swivel plate.

That plate has always wobbled which was an uncomfortable and annoying sensation while driving.  Now that I had a clear view of the top of the plate it was “obvious” that there was once a washer under the retaining nut but it was no longer there.  Tyler removed the retaining nut, found a large washer with the correct hole size, put it on the threaded shaft, replaced the retaining nut, and tightened it.  No more wobble.

I am always trying to deconstruct the details of how this coach was built or serviced.  My best guess is that old seat was removed when CMI installed the tile floor in the cockpit area right after we bought the bus.  The installer probably removed the seat from the swivel plate in order to have better access to the pedestal and the area around it to lay the tile and either did not replace the washer or failed to recognize that it was missing and needed to be replaced.  I will never know for sure, but that’s my best guess.

Tyler bolts the new Flexsteel driver’s seat to the existing pedestal swivel base.  There is not a lot of room to work around the base of this seat.

Tyler bolts the new Flexsteel driver’s seat to the existing pedestal swivel base. There is not a lot of room to work around the base of this seat.

I connected the chassis batteries so Tyler could connect the 12V DC power to the seat and reposition it.  The outside rear mounting bolt was particularly difficult to reach but with the power on he was able to slide the seat forward and swivel the front to the left creating better access to the left rear.  Once it was bolted down he had me sit in it and make sure all of the adjustments worked.  They did!  The seat is comfortable, fits better in the available space, and has a range of adjustment that should allow either of us to position it comfortably.  It is still a little tight on the left side, but not like the old chair, and the only control there is a manual level for adjusting the back tilt that I can reach it without difficulty and generally do not change once I have it adjusted.

When Josh returned at 10 AM with the parts for the living room slider bases he and Tyler got busy prepping them.  Linda texted me around 10:20 for a status update and I suggested that she not leave before 1 PM.  There was more custom work required to get the chairs assembled and mounted than I thought there would be, but as I was able to watch every step of the process, and talk to Josh and Tyler as they worked, I could clearly see what the problems were and what they were doing to solve them.  They were on task and focused on getting it done correctly.

One of the new Flexsteel 529 captain’ chairs with the new swivel/slide pedestal base attached.  Note the handle for the swivel release.

One of the new Flexsteel 529 captain’ chairs with the new swivel/slide pedestal base attached. Note the handle for the swivel release.

The problem this morning was getting the swivel release cables on the cockpit seats to stay in place when the swivel tang was released from the detent in the base.  The reason for the problem is that we are reusing the old swivel bases because they have base plates that match the mounting bolt locations in the floor.  The way the swivel release cable is retained on these bases, however, is different from the attachments on the ends of the new cables.  Tyler was able to figure out a solution but it took a little time.  I don’t mind paying for that kind of experience and problem-solving.

I texted Jarel to give him a status update and indicated that we could come down Thursday, Friday, or Saturday to pick stuff up.  He texted back that any of those days would work.  I checked the Magnum remote and the SOC status had gone back to “Think’n”.  Nuts.  This has happened before with the Battery Monitor Kit and I think it has to do with the 4-pin connector that plugs into the bottom of it.  Whatever the case I need to investigate and fix it if I can.

The two class C captain’s chairs installed on the passenger side of the living room.

The two class C captain’s chairs installed on the passenger side of the living room.

With the driver’s seat installed I sat and tested its various adjustments and found a position that I liked.  Next came the two class C captain’s chairs for the passenger side of the living room.  Tyler and I worked for quite a while using a base with no chair on it to determine the correct location for the bases.  The seats needed to be far enough from the passenger side wall, the desk, and the co-pilot seat to swivel without interference but no farther as we did not want them to encroach into the center isle one inch more than necessary.  We also ran them through their full range of slide and swivel motions to make sure we could pull them up to the table.

We ended up with the edge of the front seat 16″ from the front edge of the main floor and 16″ from the HVAC duct.  We checked it for square and marked the holes.  Tyler drilled pilot holes using nuts to limit the depth.  We set the chair in position and secured it with four lag screws.  We measured 36.5″ to the front edge of the second base and positioned the base 16″ from the HVAC duct.  We made sure it looked right and then Tyler marked the hole locations and we removed the temporary base.  He drilled the pilot holes, we set the chair in place, and lag screwed them into floor.

The new navigator (L) and pilot (R) seats installed in the cockpit.  The navigator seat has a powered footrest.  We reused the old 6-way power bases for both seats.

The new navigator (L) and pilot (R) seats installed in the cockpit. The navigator seat has a powered footrest. We reused the old 6-way power bases for both seats.

With the captain’s chairs installed in the living room Tyler installed the co-pilot seat.  Once that was done the job was finished except for the cleanup and paperwork.  Josh and I chatted some more about the Corian desk top.  He had inquiries out to three suppliers but was having trouble getting replies from them.  We needed a temporary desk surface, so Tyler cleaned off the 4’x8′ piece of 1/2″ plywood that had served as the workbench for integrating the seating components. He marked and cut a 72″ long x 24.5″ deep piece.  I notched the center of the back edge 18″ wide by 3″ deep.  Tyler and I installed it while Josh totaled up the bill.  I wrote him a check for the balance due, prepared the coach for departure, and left a little after 2 PM.

I could have titled this post “Edwardsburg to Elkhart” but I like to keep my titles short.  The trip from Coach Supply Direct in Edwardsburg, Michigan to Elkhart Campground in Elkhart, Indiana was a short trip of approximately 15 miles that took about 25 minutes.  Upon arrival I parked the coach to the side of the entrance road and went in to the office to register.

We have been to this campground many times before but I managed to miss the turn for the row with our assigned site so I had to go all the way around a second time.  Once I had the bus in the site I leveled it and then shut it down.  I texted Linda our site number and then chatted with other GLCC chapter members who were already there and parked.

While I helped set up tables in the meeting room Linda arrived and got the cats, litter tray, etc. on board our coach.  After settling in for a few minutes I called Terry at A-1 Upholstery.  She was there so we drove over to pick up the sofa cushions, wrote her a check for the balance, and drove back to camp.  We were unloading the cushions when Dan stopped by.  He had retired at the end of July and bought a converted GM4104 a couple of weeks later.  His wife Kathy and son James had made the trip up from Huntsville, Alabama just for this rally.  They planned to join FMCA and GLCC but wanted to check us out first.

Linda had cleared the sofa earlier and put stuff away under the bed.  By the time I came in she had the new sofa cushions in place.  They were a tight fit but they looked nice.  We might make a small adjustment to the depth of the plywood seat but I think they are going to work out OK.

Linda went to the meeting room to help prep dinner and heat our vegan chili.  I took a short nap and joined her at 6 PM to eat.  We went back to the coach and gave Ed Roelle the tour and chatted for a while.  We then went back to the club house, met up with Vickie, and went for a walk.  When we got back to our coach I opened the box of Franzia Moscato and poured two glasses of wine.  We took two lawn chairs over to Scott and Tami’s bus to sit and chat.  Scott Crosby of www.busgreasemonkey.com was also there.  He arrived after I did in his 1948 GM 3751 “Silverside” bus.  It eventually got chilly so we went inside and went to bed where I worked on blog posts for a while on my iPad.

 

2015/09/15 (T) Coach Supply Direct

We were awake at 6 AM and I planned to be on the road in the bus at 7 AM but it did not work out exactly that way.  For starters, I needed to take a shower.  Next, I really needed a haircut, which Linda does for me.  Along the same lines I needed to shave.  Another factor was that it was still darker at 7 AM than I wanted to drive in.  We also had last minute things to assemble and load such as toiletries, technology, shoes, hats, sunglasses, baskets and bags full of essential incidentals, as well as design drawings for the custom woodworking in the coach.  We were close to being ready for me to pull out at 8 AM but I still needed to check the tree limbs that hang out over the road near our house.  Good thing I did; many of them had grown down and were less than 13’6″.  How did we know?  We set the extension handle on the pole saw so that the length from the bottom of the handle to the tip of the saw blade was 13’6″.  Anything that touched the blade got trimmed.

I finally connected the chassis batteries, turned on the engine air accessories valve, and fired up the bus engine at 8:15 AM.  Linda helped me check the exterior lights, all of which were OK.  I pulled out at 8:25 AM and worked my way slowly down our street and was able to maneuver so as not to scratch the sides.  I had not driven north on Hacker in some time.  The road was in very bad condition and I thought the glass tubes in the new light fixtures would not survive the first, short leg of the trip.  Two of the kitchen cabinet drawers came open, which they do not normally do.  Linda had taped the refrigerator doors closed so they stayed that way.  The new pull-out pantry stayed closed and so did all of the drawers on the new desk.

Once I was on M-59 the trip was much smoother but not without some bumpy road sections along the way.  I-69S between Lansing and I-94 in particular is a surprisingly rough road.  I thought about stopping at the rest area on I-96 westbound just before Lansing but was anxious to make up for the late start.  The bus rolled along easily at 68 MPH without the car attached.  The difference between towing and not towing is subtle but I am aware of it.  The bus alone accelerates a little faster and stops a little easier.  It is also 20 feet shorter than the bus/car combination which makes it easier to pass and merge.

I stopped at the rest area on I-69 southbound just north of I-94, as that would be my last convenient opportunity to do so, and called Josh at Coach Supply Direct to update him on my travels.  I continued south on I-69 intending to exit at Coldwater and head west on US-12.  I was paying attention to the truck in front of me and realized a few seconds too late that I had missed the exit.  I drove three more miles to the Fenn Road exit and headed back north towards Coldwater.

Once I was on US-12 westbound, a road I have driven many times, the trip was uneventful until I got west of Sturgis.  MDOT was rebuilding several miles of the highway between Sturgis and White Pigeon and had the road down to one lane.  I was the first vehicle to arrive at the flagger so I figured I was in for a wait.  I did not check the time but the delay was at least 20 minutes.  I called Josh and updated him on my location and ETA.  Bring first in line made the wait easier as I could see what was, and wasn’t, happening.  Eventually it was our turn to go and I got to lead the parade except for a truck hauling dirt who they let go ahead of me.  That was just as well; he was in a big hurry and quickly disappeared from site, traveling at what I considered to be much too high a speed for the conditions.  All traffic was being routed on the eastbound lane and shoulder and I had to drive straddling the rumble strips to keep from knocking my fillings loose.

I finally made it to Coach Supply Direct in Edwardsburg just after noon.  I had talked to Josh on Sunday about how best to get the bus into his place.  Following his advice I continued past M-62 to Cass Street and turned left.  Cass merged into Elkhart Road and shortly thereafter I turned left into the fenced property where his business is located.  Josh had described where other motorhomes were parked and where he wanted me relative to them so I was able to get the bus situated without assistance, another advantage to not having the car attached to the back of the bus as I could back up as needed.  Josh came out of the building as I was shutting down the engine.

Josh has several guys working with him at the moment; Jim, Tyler, and Tim.  The first task was removing the remaining pleated shades from the side windows and installing the new MCD shades.  Jim is very knowledgeable about MCD shades and was the lead installer.  The shades are very nice and will be more functional than the old ones.  The automatic retract speed was still a little fast on some of them and might need to be adjusted but that is a minor thing.

While the guys worked on the shades Josh and I looked at the new seats and discussed the larger set of tasks that needed to be accomplished.  I was very pleased with our choice of fabric and how the seats turned out.  The only apparent glitch was that the slide rails for the two captain’s chairs for the living room had come without the actuator handles.  Josh made some phone calls and arranged to pick up the needed parts first thing tomorrow morning.  We also measured for the Corian desk top and contacted his supplier regarding that.

I needed something to eat and drink and since the coach was being worked on I walked across the street in search of nutritional sustenance.  I walked past the Taco Bell and had my sights set on the McDonald’s (French fries and a diet Coke) when I spotted the Subway, which was closer and offered better food options for me.  I had a Veggie Delight Chopped Salad, chips, and a diet Coke.  I dined in, refilled my drink, and then walked back.

A view of the cockpit of our bus with the old Villa pilot and co-pilot/navigator seats removed.  This shot is from the living room looking forward.

A view of the cockpit of our bus with the old Villa pilot and co-pilot/navigator seats removed. This shot is from the living room looking forward.

Tyler is an experienced automotive technician and was the main guy responsible for removing the two Villa chairs from the cockpit area.  He unbolted the 6-way power mechanism from the swivel pedestal but left it attached to the seat.  With the seats out of the bus he removed the 6-way power base from each one and installed it on the corresponding new Flexsteel seat.  There was more to this mounting than just tightening a few bolts and he was not quite done by the time he had to quit for the day.  The controls still had to be mounted, the wiring connected, and the seats installed in the bus.

 Josh (R) confers with Tyler (L) as he is working on getting the new Flexsteel pilot and navigator seats ready to install.

Josh (R) confers with Tyler (L) as he is working on getting the new Flexsteel pilot and navigator seats ready to install.

Since all of the seat prep work was being done on a work surface in the building I took advantage of the access I had to the cockpit area.  I borrowed a scraper and scrapped off small fragments of carpet.  I borrowed a spray bottle of Spic-n-Span and cleaned the swivel pedestals.  I discovered a small piece of paper blocking the lower left HVAC nozzle and removed it.  I also discovered that the fresh air damper was not buried deep in the front end of the coach like I thought it was.  The lever by the driver’s left knee, which has been so difficult to operate, actuated a short cable that controls a damper just to the left of the steering column below the dash.  I was able to use two cable ties to secure some wire bundles out of the way of the damper allowing it to open wider and to open/close more easily.  I finished by borrowing a small shop vac and vacuuming up all of the loose material I had created.

The old 6-way power bases being attached to the new Flexsteel pilot and navigator captains seats. The new seats came with new controls that Tyler had to mount and wire.  Both seats also included lumbar support air bladders with their own air pump as part of the seat.

The old 6-way power bases being attached to the new Flexsteel pilot and navigator captains seats. The new seats came with new controls that Tyler had to mount and wire. Both seats also included lumbar support air bladders with their own air pump as part of the seat.

I borrowed a piece of 3/4″ plywood about four feet long and put it across the two pedestals of the desk to make a temporary work surface.  I got the folding chair out from under the bed, along with my computer and iPad, and got the “desk” set up to use my computer.  I tried to get photos with my camera of the different aspects of the project throughout the day.  I also took seven pictures with my smartphone and sent them to Linda’s smartphone so she could see the progress.  Josh’s wife stopped by to check on his schedule and I gave her a tour of the remodeling project.

A view of the bottom of the two new Flexsteel “class C” captain’s chairs for the passenger side of the of the living room with one of the slide/swivel bases and its seatbelt attachment bar.

A view of the bottom of the two new Flexsteel “class C” captain’s chairs for the passenger side of the of the living room with one of the slide/swivel bases and its seatbelt attachment bar.

I got our Verizon Mi-Fi online, connected my iPad to the Wi-Fi Ranger, connected the WFR to the Mi-Fi, and then started my computer and connected it to the WFR.  I checked my e-mail and there was one from RVillage regarding a new group feature, group home page feeds, and asking that group owners post to their group home page feeds and create an announcement for the group that would notify everyone in the group of the new feature.

As long as I was in RVillage I created a new private, non-searchable group called RVIG (for RVillage Investors Group) and invited Curtis, the founder/CEO of RVillage, to join.  He accepted and I private messaged him, which prompted a phone call that resulted in me transferring ownership of the group to him.  He wanted to change “Investors” to “stakeholders,” which I agreed was a better term.  It also turns out that an a priori “friend” connection is needed to invite someone to join a group and Curtis was the only person who would have such a connection with all of the RVillage stakeholders.  I always thought that Curtis should create and manage this group but he has so much on his plate that sometimes it’s easier if someone else initiates something and then hands it off to him.  I was glad to be the catalyst in this case.

It was another long day but I spent a relatively small percentage of it on my hands and knees, or on my back looking under the dashboard, which I have not been physically able to do in until today because of the very confined space in front of the driver’s seat.  I brought one of our folding Zip Dee chairs inside and set it up on the passenger side of the living room so I had someplace comfortable to sit and use my iPad.  I spent several hours finishing yesterday’s post and writing today’s post.  All four of the seats are supposed to be installed tomorrow morning and I should be on my way to Elkhart Campground by noon.  Linda plans to leave between 11AM drive down in the Element with the cats.  She should arrive about 3-1/2 hours after she departs from the house by which time I should have the bus parked and hooked up.

 

2015/08/19 (W) If It’s Wednesday This Must Be Indiana

 

As we did last Wednesday we were up earlier than usual to drive to Indiana.  We wanted to be at Bontrager’s Surplus when they opened at 9 AM to pick up some battery terminal covers for Butch, and possibly ourselves, so we pulled out of our driveway at 6:16 AM.

We took our usual route west on M-59 to I-96W to Lansing Road south.  Rather than get on I-69S we stayed on Lansing Road all the way to Charlotte where we stopped at the Biggby’s Coffee to use the restroom and get coffee and bagels.  From there we then took I-69S to Coldwater and headed west on US-12 since Bontrager’s Surplus is located on US-12 in White Pigeon, Michigan.

We arrived at Bontrager’s Surplus just after 9 AM.  We looked around briefly but did not spot the battery terminal covers so we asked one of the employees where they might be and he took us directly to them.  We bought 36 (18 red and 18 black), 10 of each for Butch and 8 of each for us.  Bontrager’s is probably the best stocked of the surplus and salvage stores in this area and I could have spent hours here, but we had other places to be and a long day ahead of us.

Our shopping done we continued on to Coach Supply Direct in Edwardsburg, Michigan where we found Josh Leach hard at work on some interior remodeling of a Fleetwood Revolution.  He removed the Notion Linen sample from his Lambright Comfort Chairs book and we chatted for a while.

I reflected on fact that one of the nicest Class A motorhomes we ever saw was a Fleetwood Revolution.  The interior was a (faux) cherry wood with satin finish nickel hardware.  It had modern, clean cabinetry and light grey wall treatments and a light tile floor with nickel colored inserts, as best I can recall.  We eventually toured the American Coach factory in Decatur, Indiana where the Revolution was made and after seeing some of the construction methods we were less enamored with it.  Like all of the American Coach products it was out of our price range as a new unit but it was very much to our taste.

Before continuing our Journey Linda pulled up Jarel’s address in our GPS.  I then texted Jarel to give him a revised, and more accurate ETA.  We headed southwest out of Edwardsburg on M-62 which becomes IN-23 through Granger.  We turned onto IN-331 which bypasses most of Mishawaka east of town and delivered us to US-20 where we headed west.  We stopped at the Meijer’s, which has a filling station, fueled the car, and switched drivers.  We exited US-20 just south of South Bend, Indiana and headed south on US-31.  We exited US-31 at Rochester and took IN-25 south to Logansport.  I texted Jarel an updated ETA enroute.

We arrived at Jarel Beatty Cabinetry at 11:45 AM and pulled around back.  I texted Jarel to let him know we were there and he came out of the shop to meet us.  We chatted for a while, loaded up the pantry, the slides, the three pieces for the built-in sofa that we forgot last week, a piece of walnut trim for the pantry face, and a leftover  piece of 1/4″ Baltic birch plywood.  Linda wrote a check for the balance we owed.  The only thing left for Jarel to build is the HVAC/wiring chase cover but he cannot do that until I give him the length, which I cannot do him until the desk is installed in the bus.

We left the cabinet shop at 1 PM and stopped at the Martin’s supermarket in Logansport for lunch.  This particular Martin’s did not have a salad bar but they did have pre-made salads.  We each had one along with a bread roll.  I called Butch to let them know we were on our way, and headed for Twelve Mile, Indiana.

I gave Butch the battery terminal covers.  He and I figured their cost ($1.25 each) covered the cost of the 12 fiberglass pole mast sections ($2.00 each) we took last week and called it even.

I brought the small window frame stop block from our bus to see if Butch could make one.  He had some aluminum bar stock that looked like it would work.  We decided to make it longer than the original to accommodate three machine screws and cut it to size using a band saw.  Butch then marked three points to drill holes using the old block as a template.  Two holes were drilled through and one end hike was blind.  The blind hole will fit over the shaft of the old screw that would not come out in case any of it is still protruding above the surface.  The middle hole will line up with other existing hole and I will have to drill and tap a hole in the frame to match the third hole.  But first I need to get some brown spray paint, put some sacrificial screws in the holes, and paint the piece.

While we were working on the stop block I noticed that Butch had a torque multiplier sitting out.  He commented that it was available to a good home for a good price; hint, hint.  These torque multipliers are used to break the lug nuts loose on bus and truck wheels and I have had one on my mental wish list since I first became aware of them five years ago.  I had not pursued getting one as they tend to be expensive even used on Ebay.  Butch wanted $75 for it so I wrote a check and put it in the car.  It has three different lug nut sockets so I hope one of them first the ones on our bus.  I also hoped they would fit the very large torque wrench I bought from Butch last fall but they are 1″ square drive sockets and the torque wrench has a 3/4″ square stud.  I’m not sure I have a correct socket for the torque wrench so that’s another thing I still need to get.

Butch and Fonda bought a compact stacked clothes washer/dryer for their bus and asked if we would help them get it into their rig.  Of course we said yes.  We got it on a dolly and wheeled it out to the entrance door and then pondered the situation.  We have some recent experience getting things out of and into a bus entrance door and this did not look promising.  Butch handed me a tape measure and I determined that the maximum width that would fit through the step well was 23.5 inches due to the door hinges.  The washer/dryer is 24″ wide and 28″ deep with a recessed back on the washer (lower unit).  It is also tall, being a stacked unit, and we all agreed that the only way it was going in was on its back, through a window, using a forklift.  It was Deja vu all over again; been there, done that, didn’t even get a T-shirt.  That approach required more preparation than Butch cared to tackle today, and more time than we had to spare, so we moved the unit back under the overhang and left it covered with a blanket.

We all went back in the house and visited for a while longer.  Butch had found his 4″ pneumatic body sander and loaned it to me along with three boxes of AA50 sanding discs.  While not quite as aggressive as the #36 ceramic grit belts I have been using on the 4″ portable belt sander, this tool will allow me to get under the cabinet toe kicks where the belt sander won’t reach.

As much as we would have liked to stay and go out to dinner again, we did not want to be getting home at midnight.  We wished them a safe journey, again, but this time it really is unlikely that we will see them again before they leave for Arizona.  We left for home at 4:45 PM with Linda at the wheel.  From SR-16W (CR-700N) we took CR-700 (Meridian) north to its northernmost point and headed west into Fulton on W750S where we picked up IN-25 and headed north.  At Rochester we left IN-25 and took US-31N to US-20W.  We exited US-20 at SR-19 and drove north through Elkhart, finally arriving at the Martin’s supermarket at CR-4 around 6:15 PM.  This Martin’s has an excellent salad bar and a nice dining area with an upstairs, which is where we chose to sit and eat our dinner.

Linda continued to drive after dinner.  There is an entrance to the Indiana Toll Road (I-80/90) on SR-19 just south of CR-4 so we got on going east.  The toll road is a few extra miles compared to US-12 through Michigan, but it is posted 70 MPH (max) with no stops, compared to 55 MPH with six towns that have reduced speed limits and stops.

We exited the toll road, paid our $2.90 toll, and headed north on I-69.  A few miles later we were back in Michigan.  We left the Interstate at M-60 (exit 25) to refuel at the Shell station, use the restrooms, and switch drivers.  It was about 8 PM and still light, but it was cloudy to the west and the light was fading.  I find night driving easier than Linda does and I had been able rest while she drove so I was good to go.

I followed our usual route, leaving I-69N and using the Lansing Road cutoff to get to I-96E.  We passed mile marker 100 on the south side of Lansing, which meant we had 33 miles to the M-59 exit.  From there it was 11 miles to Hacker Road and then the final 2.5 miles to our house.

We arrived home at 10 PM, five hours and 15 minutes after we left Twelve Mile and just over 16 hours from when we left home this morning.  The trip odometer indicated 534.8 miles traveled today.  We unloaded the camera, phones, wallets, etc. from the car but decided to wait until tomorrow to unload the cabinetry, tools, and parts.  We headed off to bed and watched part 3 of a PBS program The Mystery of Matter:  The Search for the Elements.  Interesting stuff.  We both find programs that inform and educate to be entertaining.

 

2015/08/03 (M) Happy 37

Today is our son’s 37th birthday anniversary.  Happy birthday Brendan.  Linda sent him a happy birthday text and his reply confirmed that they are at Tahquamenon Falls in Michigan’s Upper Peninsula.

My main task today was to finish the design of the built-in sofa for the bus and get the drawings in the mail to Jarel Beatty, the cabinet maker in Logansport, Indiana.  I dovetailed that work with breakfast, lunch, and a long chat with Pat Lintner from our FMCA Great Lakes Converted Coaches (GLCC) chapter, but by 2 PM the two 17″ x 22″ sheets were ready.

I was not satisfied with the quality of the copies I got from The FedEx Office store in Brighton so I drove to the store in Novi where their large sheet scanner/printer does a really nice job.  Copies in hand I drove to the post office in Brighton, bought a Ready Post mailing tube, addressed it, put the copies inside, and sent it on its way.  Back home I sent Jarel an e-mail letting him know the sofa drawings were on their way and explaining them a bit.  I then settled in to continue uploading blog posts to our website.

Later in the evening I got a text message from Jarel with three more photos of the custom walnut desk.  He had sprayed all of the pieces and was letting them dry.  He planned to work on something else tomorrow but thought he would have the drawer slides and drawers installed by the end of the week.  He will probably start on the pull-out pantry but wasn’t sure he would get it done before he leaves for a vacation trip on the 21st.  It is unlikely that the built-in sofa pieces will be done by then and the HVAC chase cover needs to wait until after the desk is installed in order to get a final, accurate measurement for its length.

I will probably drive down and get the various desk pieces from him before he goes on vacation so I can install them as soon as the new floor is installed.  I have to install the two fan-coil heat exchangers in the bases and redo the hoses before I can put the pedestals in place so it will be easier for me to do this at home.  As part of the same trip I will stop at Coach Supply Direct in Edwardsburg, Michigan and pick up the fabric we ordered for sofa cushions.  If we decide to use A-1 Upholstery in Elkhart I will drop the fabric off there along with drawings of the cushions we need made.

For my evening relaxation I read a little more of “Number Theory and Its History” by Oystein Ore and then went to bed.