Tag Archives: Chuck It Junk Removal

2015/07/22 (W) Chucking Junk

After our usual breakfast and coffee we sat for a while in the living room.  This is part of our morning routine and I often use the time to finish up my blog post from the previous day but the last couple of weeks we have been busy and I have not always had time.  We enjoyed the time until about 9 AM and then got serious about loading our “junk” into the Chuck It Junk Removal dump trailer.

Our bus refrigerator with the doors off in preparation for removing it from the coach.

Our bus refrigerator with the doors off in preparation for removing it from the coach.

Mara checked with Cummins Bridgeway and they told her to bring her motorhome in at 11 AM so she broke camp at 10 AM and backed out of the driveway at 10:15 AM.  Cummins Bridgeway put several technicians and mechanics to work on her rig to re-install the genset, install new shock absorbers, and service the transmission (filter and fluid).  She was out in a few hours and stopped at General RV to return the Camco refrigerator vent cover which did not fit her base on the roof.

The Chuck It Junk Removal dumpster trailer with some of our stuff in it.

The Chuck It Junk Removal dumpster trailer with some of our stuff in it.

We took a break from chucking junk and extracted the old refrigerator from its alcove in the bus, which was a 2-person job.  I got some scraps of 1/2″ plywood to set in front of the elevated alcove base as I did not want to walk or slide the unit across the bus sub-floor, especially with the residual thinset mortar.  First we had to walk it out a few inches which was hard because it only had 3/8″ clearance on each side.  Once it was out far enough we were able to open the doors enough to remove all of the shelves and bins, which Linda took into the house and garage.  I then disconnected the water and electric that ran up into the left (freezer) door at the bottom hinge corner for the ice/water dispenser and light.  With those disconnected and pulled out of the bottom of the case we unscrewed the bottom and top hinges and removed the two doors.  Linda collected all of the small loose parts as we went and put them in a plastic container as we knew we would have to reassemble the unit at some point.

The doors had 1/4″ walnut veneer plywood face panels and we wanted to salvage those to use with the new pull-out pantry.  Normally you just remove the handle trim from the edge of the door and slide the panel out.  The fridge door panel would not budge so we removed the trim from all four edges of the door.  The panel had been stuck in place with strips of double-sided tape so we carefully peeled it loose.  The freezer door had two smaller panels, above and below the ice/water dispenser, and they slide out easily after removing the handle trim.  We carried the doors, trim, and panels to the garage and then walked the case completely out of the alcove.

The shelf I built for one of the storage bays on Mara's Fleetwood Bounder.

The shelf I built for one of the storage bays on Mara’s Fleetwood Bounder.

I spent some time pondering what would be required to disassemble the refrigerator enough to get it out through the door of the bus but decided not to do anything until I had talked to Butch.  Just before dinner I had a long chat with Chuck about the refrigerator swap and he reminded me that DTE Energy (the electric power utility for this region) will pick up old refrigerators and freezers and pay you $50 for them.  Linda checked this out online and learned that they have to be plugged in and operating or they won’t take them, so we have a double incentive for getting it out in one, operating piece.

Our revised plan is still to get the case out in one functioning piece through the side window frame but it won’t be this weekend.  The guy with the sunroom business in the building in front of Chuck’s shop is still in the process of moving to his new place and has trucks, cars, people, and junk all over the place making ingress/egress to Chuck’s shop difficult to impossible.  The business is supposed to be gone by the end of the month so we will wait another week and plan for Saturday August 1st assuming I can get the window frame open.  In the meantime I need to get back to work on the bus floor, so I will have to spend part of next week sanding and start installing the 1/4″ underlayment for the new vinyl tile.

Mara in our home kitchen with her wonderful pizza.  This thing was truly good eats.

Mara in our home kitchen with her wonderful pizza. This thing was truly good eats.

Mara and Linda made another pizza for dinner and it was every bit as good as the first one.  Mara has been a wonderful house guest.  We have left the house open to her and she has made herself comfortable in the kitchen and using the hall bathroom and laundry.  It helps that Linda is not possessive about the kitchen.  Whenever we have visitors who want to help in the kitchen Linda welcomes their participation.  It’s been fun for both of them and they have each learned a few knew things and deepened their friendship.

 

 

2015/07/08 (W) Custom Desk Design

Linda continued to research Florida RV parks this morning over coffee.  Riverside RV Resort which was fully booked but she found Big Tree RV Resort in Arcadia, Florida.  It is located in a similar part of the state and Arcadia is where the annual Arcadia Bus Rally is held between Christmas and New Year’s.  Big Tree is a Carefree Resort, which means they had a nice, professionally done video on their website.  We checked it out on Google Earth and it looked OK.  Hey, the entrance is right across the street from a Walmart, so the shopping is convenient.

Linda called Big Tree and talked to Pat.  They only had five openings for the 2015/16 winter season so we reserved a spot for January and February 2016 with the understanding that we can probably extend through March if needed.  First, however, we want to see if we can find someplace else to stay in another part of Florida for March and perhaps some of April.  We would like to spend some time in northeast Florida.  Our friends, Pat and Vicki, spend late February and early March at Jetty Park near Cocoa Beach and Cape Canaveral.  Besides their presence there is a lot to see and do in that area, so that is appealing to us.  However, the spring FMCA national rally will be in Perry, Georgia the third week of March, so we are being pulled in several directions.  Such is the RV life; so many places, so little time.

Breakfast was cinnamon raisin toast and fresh melon.  After breakfast I called Chuck It Junk Removal and left a message that we would like to rent their dumpster trailer for starting on Monday 20 July with pickup on Friday 24 July.  Brad called back and said those dates would work for him.

Linda continued to research RV parks in Florida for December and March.  She called Williston Crossings to ask about space for December but the lady on the phone said someone else would have to call us back.  As much as we liked Williston Crossings the winter before last we wanted to spend the heart of the winter farther south in the state.  A more southerly location would afford us a warmer climate and position us to explore a part of the state we did not see last time.  It would also put us closer to many of our friends who winter in southwest Florida.  We really enjoyed the southwest Arizona climate this past winter and have talked about trying a winter in southern Texas and/or southern New Mexico.  I have no doubt we will visit those areas in future years but this year we wanted to return to Florida.

I typed up a short letter to go with the defective Morgan M-302N coaxial cable lightning arrestor and boxed it up for shipping back to Morgan Manufacturing in Martinsville, Indiana.  Linda got a new 90-day prescription for me when she saw the dermatologist yesterday so we also got that ready to mail.  She then left for the library, post office, and grocery store.

My focus for the rest of the morning was on uploading posts to our personal blog but before I even got started I discovered a mouse at the entrance to the utility area in the basement.  It had not survived its encounter with one of our cats, probably Juniper, so I put it in a small zip lock bag and put it in the trash.  I know that food and shelter are powerful attractions for mice but I am surprised that the presence of two cats in the house is apparently not a deterrent for them.  Other than the one mouse we live trapped in the bathroom the mice are not taking the bait so far.  Indeed, it may be that we are luring them out of hiding and Juniper has figured out where to lie in waiting to ambush them.  From what we have seen she is a very skilled, and determined, mouser.

Linda went for a walk as soon as she got back from running her errands.  By the time she returned and prepared tofu hotdogs for lunch I had uploaded eight blog posts covering June 8 through 15.  After lunch I sent an e-mail to a dozen or so folks letting them know where we would be this winter.  I then got to work on the design for the custom desk.  Except for a dinner break I worked on it until 9 PM when I quit for the day and went upstairs to watch the final episode of The First Peoples on PBS.

Butch and Fonda are at the Crosley Automobile Club national gathering in Wauseon, Ohio this week and will be back home on Sunday.  I would like to have the design for the desk and other custom woodwork done by this Sunday so I can drive it down on Monday or Tuesday next week, give it to Jarel Beatty (the cabinet maker), and visit with Butch and Fonda before heading home.  The desk will take some time to build and I would like to take the bus to Butch and Fonda’s in August before they leave for Arizona so Jarel can bring it to their place and help me install it, assuming, of course, that I have the new floor installed by then.

The desk is proving to be quite challenging to design but after thinking about it for the last couple of weeks I had several “breakthrough” ideas today.  One was to turn the printer 90 degrees so it faces fore and aft rather than side-to-side.  Another was to leave the front of the printer box open and cover it with a swing up work surface.  But the basic difficulty I am having is figuring out how to draw it.  I finally decided to draw a plan view of the base which really helped me see where the Aqua-Hot fan-coil heat exchangers will go and how the coolant lines will run.  I still have a lot of work to do, and I really wish I had AutoCAD (and knew how to use it), but I went to bed feeling like Sunday was a realistic target date for this piece of the project.

 

2015/06/10 (W) Ron and Mary

Same routine as yesterday; up at 7 AM, open up the house, feed the cats, clean the litter tray, start a load of laundry, make the coffee, and drink the coffee while using our iPads.

Our daughter’s 34th birthday is tomorrow but she is flying to Las Vegas today to meet up with her husband who is there on a company outing.  We will celebrate her birthday when they get back, perhaps in conjunction with Father’s Day and Linda’s birthday, which is at the end of the month.

Linda left at 9 AM for Brighton Honda to have the 12 V battery in her car checked.  The battery light came on the other day so we thought it might need to be replaced.  Around 9:20 AM I heard thunder and a short time later we had a brief, heavy downpour.  Linda called at the same time and said the battery tested OK.  The problem could be the alternator, of course, but presumably the dealer service people know that and checked for that.  If not, we will likely be back there sooner rather than later.

Linda headed on to Meijer’s to do the grocery shopping.  Today was trash pickup day so I took the trash can to the street.  After meeting with Brad from Chuck It Junk Removal the other day we decided we would rent their trailer for 5 days.  For the same price as having them physically handle 1/3 of a truck of junk (5 cu. yd.) we can get rid of a full truck of junk (15 cu. yd.) by loading it ourselves.  Deal.

I got a call from Phil Jarrell regarding my request for pricing to dig a foundation hole for a ham radio tower foundation.  It was a useful conversation in that I had not previously realized that I will need a concrete contractor in addition to the concrete supplier.  The only thing the concrete supplier will do is show up with a cement mixer truck and dump the concrete where they are instructed to.  The concrete contractor will actually place rebar, build forms, provide carts or a pumper, and get the concrete from the truck to the hole.  Phil recommended Mike Fearer of Bid-Rite Concrete as a good guy who would work with me to get this done.

I talked with Chuck about getting a key to his shop so we could have the new refrigerator delivered there and have the old one picked up without having to trouble him to be there.  He agreed and suggested that we contact the guy down the street about removing the old windshield and installing the new one as part of the refrigerator swap.

Rather than dig into our bus interior remodeling project I have used the last couple of days to finalize decisions about various products and order them.  One of the things I have wanted/needed for a while is a cable entrance box that will allow me to route transmission lines and control cables into the basement from outside.  I talked to Chris Perri, KF7P, at the Dayton Hamvention last month and decided that I liked his custom fabricated cable entry boxes.  I got his business card at the Hamvention and exchanged a couple of e-mails with him this week.  I decided this morning how I want the box initially configured and e-mailed my specs to Chris.  I would like to run the cabling for the cell phone booster through this box so I needed to get it on order.  Speaking of which, the cell phone booster system arrived today via UPS so I am feeling more comfortable that all of the stuff I am ordering will actually get delivered to our house.

Wednesday’s and Fridays are when Recycle Livingston is open and the Wednesday hours are 11 AM to 5:30 PM.  We had my car loaded up with recyclables and Linda drove over after lunch to drop them off.  When she got back she made a batch of her yummy granola and I got a couple more loads of laundry done while continuing to work at my computer.

After doing my alternate tile layout for the bus floor yesterday I decided that I liked the way it looked better than the original ad that it would not involve any more cutting than the row/column layout.  I also felt confident that I had an accurate enough tile count to go ahead and order the tiles.  I drove to the Shell station to fill my tank and then drove to Lynch Carpet in Howell.  I ordered 12 boxes of the 16″ x 16″ Armstrong Alterna Luxury Vinyl Tile in the La Plata Creme Fresh pattern, and a gallon each of the vinyl adhesive and Glacier vinyl grout.  There are 14 tiles per box (24.89 sq. ft.) for a total of 168 tiles (just under 300 sq. ft.).  The inside floor area of the bus is around 300 sq. ft. before subtracting out walls and cabinets but we will be using some of the tiles on vertical surfaces in the entry stairwell and cockpit and around the box that supports the bed platform.  My estimate is that I will have 10 extra tiles.  The guy at Lynch Carpet suggested that I use a scrap piece of tile as a spacer when installing the tiles but I may use the little plastic “X” pieces designed for this purpose.

From Lynch Carpet I drove to Lowe’s in Howell to see if they had a different portable air compressor that might be more appropriate than the 6 gallon Porter Cable we just bought.  The Porter-Cable air compressor has a maximum regulated pressure of 150 PSI but that is also the maximum tank pressure.  I will have to test it on one of the front bus tires to determine if it will get the job done and if not I will return it.

The guy at Lynch Carpet also suggested that I rent a handheld grinder from Abe’s or A-1 Rental, both in Howell.  Abe’s did not have any grinders of any kind and A-1 was closed on Wednesdays.  The gal at Abe’s suggested the tool rental service at the Howell Home Depot, so I stopped there.  They also did not have a handheld grinder but they did have a floor model concrete grinder.  It was so heavy that I doubt if we could have gotten it into the bus and it was too big to maneuver in the tight spaces where I need to work.  They did have a lighter/smaller floor stripper and I may give that a try before I resort to grinding off the thinset with an angle grinder and diamond impregnated wheel and/or a belt sander with a very aggressive belt.

Pat Davidson called from Apex Roofing while I was out so I called him back.  They will be able to start on our roof next week Monday or Tuesday and will deliver the shingles on Friday this week.  I confirmed that we wanted two of the 14″ light tunnels for the living room.  I also indicated that I had scrapped the idea of building a dormer or installing a roof hatch as I simply did not get this taken care of in time.

Linda had closed up the house and turned on the air-conditioning while I was out.  It was pulling moisture out of the air but would not bring the air temperature lower than 78 degrees.  Not good.  This will be our third summer in this house and we have not used the air-conditioning very much.  The first summer we were gone for most of June, all of July, and a few days in August.  We had the unit serviced last year and thought it was working OK but perhaps did not really use it after that.  We did install filters in the return air grills so perhaps they are restricting the airflow too much.  It is also possible that it needs refrigerant.  I will have to check our records from last year and then call TOMTEK to arrange to have it serviced again.

Linda’s brother, Ron, and his wife, Mary, arrived early this evening.  They are on their way to northwest Illinois for a week-long organized bicycle ride.  They have to be there on Saturday and will be spending the next three nights at our house.  Visits from them are usually not more than once a year but we really enjoy their company when they are here.

For dinner Linda made a nice green salad and then made whole wheat angel hair pasta with onions, garlic, and mushrooms lightly sautéed in olive oil.  Ron does not imbibe but Linda, Mary, and I had a glass (or two) of Moscato.  We moved to the deck after dinner and had fresh strawberries for dessert.  It cooled off as darkness set in and we eventually moved back inside.  The other three were in the kitchen and I was sitting on the sofa when Juniper suddenly caught a mouse in the middle of the living room, or at least that is where I noticed that she had it.  She took it downstairs and I got her to drop it in the bathroom sink but I was unable to get it into a container to take it outside and it escaped into my office.  I closed the doors but I have no doubt it can go wherever it wants in the house from there.  When I returned upstairs we chatted until 11 PM and then all turned in for the evening.

 

2015/06/08 (M) Home for a While

It rained until well after midnight last night.  The rain was not steady but more in the form of heavy downpours associated with thunderstorms.  The gutter along the rear of our house was not able to handle the volume of water and it was spilling over onto our deck making a sound that we are not used to.  I noted that I should check the gutters for clogs at the downspouts today.  My phone chirped, which meant I had an e-mail, and I presumed it was from our whole house generator.  When I got up this morning the clocks on the microwave and range were flashing “2:06”, so my first thought was that we must have taken a power hit then, but the messages on my phone indicated that utility power had been lost and restored around 3:45 AM; at least that was the date/time stamp on the e-mails.  I got up just before 6 AM and finally figured out that the clocks probably reset to 00:00 when the power blipped (3:45 AM + 2:06 elapsed time = 5:51 AM).

I sat in the living room writing with my iPad and playing games until a little after 7 AM and then made coffee, which got Linda out of bed.  We had planned to empty out more of the bus today but the weather was gloomy and we were tired from the rally so we had a long, leisurely morning before busying ourselves with inside chores.  Linda worked at her desk and I wasn’t in the humor to work downstairs in my office so I set my computer up on the dining room table.  Other than an occasional trip to the bus or the garage I mostly sat in front of my computer and talked on the phone all day.

Linda called Alchin’s, our regular trash collection company, to see if they would pick up the old RV furniture.  They do not have a special truck they can send and could not take the steel furniture even if they could get it into their garbage truck.  Linda suggested we find a company like “Got Junk” and searched online for one in the area.  We decided to call “Chuck It Junk Removal” as they are located relatively close to our house.  Keith, from Kish Lawn Care, showed up around 11 AM to cut the grass and Brad, from Chuck It Junk Removal, showed up around 12:45 PM to look at the furniture and flooring we pulled out of the bus and give us a quote on the cost to haul it away.  As Keith was finishing mowing the grass dark clouds were rolling in from the west and not long after he left we had more rain, although nothing like last night.

My dentist thinks my current intermittent teeth issues are the result of clenching my teeth at night so I made an appointment to get fitted for a mouth guard to wear while sleeping.  I also got hold of Phil Jarrell and he decided that tomorrow morning at 8 AM would be a good time for him to stop by and take some elevation readings for the driveway extension and a French drain for the far west end of the property.  Besides the obvious economy of having him do both jobs while he is on site, we need a place to put the topsoil he will dig out for the driveway and we need topsoil to fill in low spots on the west end of the yard.

I managed to finally get some orders placed today.  The big one was for a SureCall Fusion5s multi-band cell phone booster (transceiver) system from Cellular Solutions in Mt. Pleasant, Michigan.  The other was for a window seal from Prevost.  This is not the seal that holds the glass in the frame but rather a large rubber part that seals the space between the window frame and the structure of the coach.  We may need to unlatch the large fixed window on the passenger side and use it to get the old refrigerator out and the new one in.  This window frame has not been opened since we bought the bus and may not have been opened for many years before that, possibly not ever since the bus was built.  I want the new seal on hand in case the current one gets damaged trying to open the window frame.

Besides these two purchases I talked to someone at A-1 Upholstery and described our home made sofa plans.  She suggested that we would need ~9 yards of 54″ wide material for the sofa seats and back cushions.  I sent an e-mail to Josh at Coach Supply Direct reminding him of some things we had discussed at the rally last week and Rick Short at Isringhausen with questions about their 6800 series bus driver seats.  I also finally got to talk to Mike at Suburban Seating in New Jersey.  As I suspected we cannot buy the seat directly from ISRI, but I may be able to order it through Suburban Seating and pick it up from ISRI USA in Galesburg, Michigan.  That would be much nicer than having it shipped to our house on a truck from New Jersey.

I called Rupes/Cyclo to try to get answers to a few questions about the Cyclo 5-Pro Mark II Dual Head Orbital Polisher and its various pads but could not figure out how to talk to a real person.  I submitted the online Contact Form with my questions and got a speedy reply from Cory as a result of which I now know what to order.  All I have to do is figure out how many of each thing I need.  The Cyclo 5 is available on Amazon Prime, by itself, but it did not appear to be the Mark II model.  Some of the major distributors claim to give you a set of “free” ProGuard Orbital Backing Plates, but the Rupes/Cyclo website clearly states that the polisher is not sold without one of the three head options.  I prefer not to patronize businesses that misrepresent their offerings and will probably order the polisher, pads, and chemicals directly from Cyclo even if I am paying MSRP.

I got a call from Gary Hatt at Bus Conversion Magazine.  I had not looked at or replied to e-mails in over a week and he wanted to make sure everything was OK.  While we were talking we got a call from Curtis Coleman of RVillage so Linda took that initially until my other call was concluded.  I had e-mailed Curtis earlier in the day and he was responding to that communique.

Somewhere in the middle of all that we had chickpea salad on a bed of greens for lunch.  Linda then went for a walk, met Chris (K8VJ) at Lowe’s to pick up some SLAARC mail, and roasted vegetables for our dinner when she got home.  I sent Chuck Spera a short e-mail inquiring about how to open the latches on our emergency escape window and then called it a night.