Tag Archives: bus windshields (H3-40)

2015/09/29 (T) Bus Windshields

Today was windshield day.  A week or so ago Chuck made appointments for both us to have windshields replaced on our buses by the local Safelite franchise.  Chuck knows Scott, who now has a management position with the company, and arranged the work through him.  The appointment was nominally from 8 AM to noon so Chuck was at his shop before 8.  We figured it would take a while for the crew to do his two lower windshields so I got up around 7 AM but did not have coffee or breakfast.  I finished yesterday’s blog post and then went through my final departure tasks starting at 8:30 AM.  I texted Chuck at 8:45 AM and pulled out of our driveway at 8:50 AM, figuring that was late enough to miss most of the morning traffic headed into the northwest corner of the Detroit metropolitan area.  Chuck texted back that I could take my time as the crew had not shown up yet.

The first raindrops came as I was pulling out of our driveway.  As I pulled out onto Hacker Road I had a clear view of dark clouds to the northwest.  Although my destination was 20+ miles to the southeast I headed north towards M-59.  The shortest route would have been south, and gotten me quickly onto pavement, but there are some low branches before the road ends at Grand River Avenue so I do not go that way.  From Hacker and M-59 the shorter route would have been east to US-23 and then south to I-96 but that interchange is a left exit, left entrance in the middle of an extensive construction zone; not the sort of thing I wanted to deal with in the bus.  So I waited patiently for a break in the traffic and then headed west on M-59 towards the storm clouds.  A guy heading east had to slow down while I pulled out a flipped me off as he went by.  I hope he had a nice day.

I encountered heavier rain as I traveled west for about four miles.  I turned south onto Latson Road and drove away from the rain, reaching I-96 about four miles later.  I headed east on the I-96 and had an easy drive all the way to Beck Road with only an occasional raindrop.  Even at this hour of the morning there were traffic slowdowns along the way but no parking lot traffic jams.  The Beck Road exit was easy to navigate going south and it was equally easy to position myself for the left turn onto Grand River Avenue.  About a mile and a half later I pulled into the parking lot for Chuck’s shop and phoned Chuck to let him known I was there.

I knew in advance how he wanted me to position my motorcoach but there were enough vehicles parked in various places that I wanted him to spot for me.  I lifted the tag axles, pulled up to the building, and then turned hard to the right.  I backed around to the driver’s side to get somewhat parallel to the building and then started angling towards the passenger side.  There is space next to the building in front of Chuck’s shop directly across from his large (bus size) overhead door.  My objective was to back around into that space and then pull forward steering hard to the left to get lined up with the door.  I have done this before and managed to do it again with Chuck’s assistance.  Our Prevost H3-40 VIP conversion is surprisingly maneuverable with the tag axle lifted off the ground.

There were two Safelite vans there when I arrived and Charlie and Eric were already busy working on Chuck’s lower windshields.  Chuck had backed his coach into the shop so I could pull in nose first and get the front end out of the rain if needed.  Since there were only two guys, and the removal and installation of one of these windshields is a two man job, I just parked my bus outside and shut it off.

I called Linda at home but did not get her so I tried her cell phone.  She was at Kensington Metropark walking with Diane.  She said we had heavy rain at home before she left and that it was moving towards the shop.  I could see the dark clouds to the WNW and it eventually rained bucketfuls, albeit for only a brief time.

A couple of years ago Chuck and I went together and bought five lower windshields from Prevost for our H3-40 VIP coaches, two for him and three for me, for the ridiculously low price of $125 each.  They were shipped to his shop in a big triple set of cardboard boxes with foam spacers on a pallet and have been sitting there waiting for us to find someone to install them.  Chuck decided to use both of his, in part because there were stone chips in the current ones, and in part because he is vacating his shop and needed to reduce the amount of stuff that has to be moved and stored.

The existing windshields on Chuck’s coach both cracked rather badly when they were removed, as in multiple dozens of fractures, but did not shatter.  Safety glass is a wonderful thing.  He was not planning on keeping the old ones but it was obvious that removing a windshield in order to install a new gasket with the idea of reinstalling the glass was probably not possible.  Charlie and Eric removed the old gaskets and then cleaned off the frames.  Chuck’s old gaskets had been slit at the corners by a previous installer, probably to make it easier to get the gaskets over the glass, but should not have been altered in that way.

Chuck had new gaskets and spline material so the guys got one of the new gaskets installed on the frame.  It looked like it would be too big but by the time they got it pressed fully into place it was a perfect fit.  They lubricated the gasket and set the new windshield in place.  After working the top of the gasket over the top edge of the glass they slid the windshield from the outside edge all the way towards the center pillar.

Chuck and I were both hungry and thirsty.  Since Charlie and Eric were working on his coach I took Chuck’s suburban to Panera for coffee, a muffin (for Chuck) and a bagel (for me).  I made the trip twice.  I was almost there when I realized that I did not have my wallet and went back to get it.

The guys finished installing Chuck’s windshields and went to lunch.  We did not leave as we had no idea how long they would be gone.  It turned out to be about an hour.  When they got back I had Charlie look at my two lower windshields.  The passenger side was cracked and definitely needed to be replaced.  The driver side had two small rock dings but they were not directly in front of the driver’s seat and not near an edge so I decided to only replace the passenger side lower windshield at this time.

I started up the bus, pulled the nose into the shop, and lowered the suspension to make it easier for the guys to work on it from the outside.  I pulled in far enough to make sure the front part of the roof was completely inside the building as it is lower than the rest of the roof and slopes forward.  I lowered the rear more than the front to make sure any rain that hit the portion of the roof that was outside the building ran to the sides and rear rather than forward and down the windshields.

To remove my windshield they removed the spline that locks the glass into the gasket and then managed to get the glass and gasket out as one assembly.  The glass already had a 10″ crack when they started and was fractured in 100 places by the time it came out.  They cleaned off the frame, which had a lot of crud on it, and then put the new gasket on.  The gasket for the lower windshields is reversible and is used on either side.  It is not rectangular, however, with the vertical edge by the center pillar being longer than outside edge where the glass wraps around into the A pillar.

With the gasket in place they installed the windshield by using large suction cups to pick it up, front and back side, and setting the bottom edge into the gasket with the right edge about four inches from the center pillar.  The passenger side mirror was in the way so I had to loosen one of the set screws and swing it out of the way.  They used a hard plastic stick with a rounded tip and edges to get the gasket over the outside of the top edge of the glass.  Using glass cleaner as a lubricant they then slid the glass towards the center and into the gasket channel.  The glass did not slide easily but Charlie and Eric were big, strong guys and it eventually was in place.  They then used the plastic sticks to get the gasket out from behind the glass and over the edge all the way around.  The last step in the installation was to put Sikaflex adhesive caulk between the frame and the gasket and between the gasket and the glass, all from the outside.  They masked off the frame to protect the paint but did not mask off the glass.  Gasketed glass installation was not something I knew anything about so it was informative to be able to watch every detail of this process.

They had our invoices with them but had to have the office redo mine and e-mail it since I only had one windshield replaced instead of the two we originally scheduled.  Chuck and I each wrote them a check.  Eric had us sign on his Note tablet and printed our receipts on a portable wireless printer.  It had been six hours since they arrived and they had spent five of those working pretty hard.  We gave each of them a $20 tip.

Charlie and Eric loaded up our three old broken windshields and left.  I then backed my bus out and parked it.  Charlie wanted it to sit for at least an hour before driving it to let the Sikaflex cure a bit.  Chuck locked up the shop and we went to Panera (again) for a late lunch.  We both had Black Bean Soup and Chuck had a half sandwich.  Barb called as we were finishing our meal and said she was her way to the shop so we headed back.  She arrived at the shop just ahead of us and inspected the new windshields on their coach.  I then showed her the work we have done on the interior of our coach.  We sat around in the shop talking while I waited for the worst of the rush hour traffic to pass before driving the bus back to our house.

I called Linda around 5 PM and then left for the drive home, reversing my route from this morning.  Traffic was heavy but moved along.  Linda heard me pull in the driveway and helped get me positioned.  It’s hard to sneak up on someone with a Detroit Diesel 8V92 engine.  Once I was parked I shut off the accessory air to the engine bay, disconnected the chassis batteries, and plugged in the electrical shorepower line.  Back in the coach I noticed that the refrigerator had come out of the alcove about 12 inches.  It had not budged on the drive to/from Edwardsburg and Elkhart but I will obviously have to secure it after all.

Dinner was reheated chili and Saltine crackers.  When Linda makes chili she always makes extra and freezes it to have on hand for easy heat and serve meals.  It is a one pot meal the way she makes it and is as good, or better, left over as it is fresh.

Ferman had called while I was gone and let Linda know that he had the Sandstone Corian he needed to build the small table for the bus so after dinner I texted Josh to let him know.  I then checked e-mail but did not respond to any.  We watched NCIS and NCISNOLA on the big TV in the basement and then went to bed.

 

2015/09/21 (M) Back to Bus Work

We were up a little after 8 AM.  I showered while Linda prepared our breakfast fruit–blueberries, raspberries, and peaches–to go with our granola.  I made a pot of coffee, using up the Costa Rican half-caff, and then sat down to eat.  After breakfast we sat in the living room enjoying our coffee to the warmth and glow of the fireplace while Linda downloaded and installed iOS 9 on her iPad.  The download was 740 MB so I waited until the installation was done on her machine to start it on mine.

When we finally got to work our first task was to unload all of the wood from the car and store it in the garage.  My next task was to call Ferman Miller at Countertops Plus in Shipshewana, Indiana to make sure he got my message on Friday with the dimensions for the Corian top table.  I got his voice mail again and left another message.  I then called Josh at Coach Supply Direct to bring him up to date, got his voice mail, and left a message.

Linda planned to get a few things at Whole Foods Market as she needed to drive to Ann Arbor anyway to pick up our wallpaper from Delux Draperies and Wallcoverings.  While she took care of that I started figuring out what parts I needed to reconfigure the heating system.  Before making a run to the store I found all of my plumbing tools and supplies.  I got 20 feet of heater hose and 10 band clamps from O’Reilly’s and various copper fittings from Lowe’s.  I also got a drain hose and a clean bucket to catch/hold antifreeze.

Back home I removed the seat and back cushions from the sofa and stacked them on the chairs.  I removed the temporary plywood top from the desk and stored it in the garage.  I then uninstalled the desk pedestals from the wall and from their bases.  There wasn’t much else I could do without Linda’s help, so her return soon thereafter was timely.  We had a light lunch and then moved the pedestals to the sofa.  That left the bases free for me to work with.  I still did not have all of the parts I needed to install the fan-coil heat exchangers in the bases.  I also needed to remove the heater hoses in order to mount the heat exchangers and replace the hoses with different lengths and angled fittings.

As I was contemplating all of that I got a call from Chuck Spera.  He was in the process of setting up an appointment to have the lower windshields replaced on both of our rigs and wanted to make sure I was still interested and check my availability.  He called back a little while later to let me know we were set for next week Tuesday in the morning.

I then got a call from Joe Cannarozzi.  Joe has done a lot of work on our bus over the last five years, especially the chassis.  He called to confirm that I still wanted him to stop at our place on his way back to Chicago around Halloween and discuss what I needed done.  Yes, I did, and what I needed was routine maintenance; lube, oil, filter(s), brakes, and possibly axle hub seals.

When we first started working with Joe he had an active, full-time mobile bus repair business, specializing in Prevost chassis service.  The last couple of years he has worked a regular gig in upstate New York from April through October.  He still services a few buses, like ours, starting in the north in the late fall and working his way to Florida for the winter where he tries to get to the Keys and take 4 to 6 weeks off before working his way back up to New York in the spring.  When we wrapped up the call I texted Chuck to let him know that Joe would be coming this way.

I called Ferman again and this time he answered the phone.  He had gotten my two previous messages and I was correct that there was not enough material in the large sheet of Corian to make the table.  He had not had a chance to check his stock to see if he had any more of the Sandstone.  I mentioned that Josh had another vendor with a 30″ by 40″ piece.  Ferman indicated that if he doesn’t have another piece he would be willing to work with that piece if Josh got it.  I called Josh and he answered this time so I walked him through the current status.  He called the other vendor and called me back.  The piece is 30″ by 48″ and he was willing to sell it for $175.  Josh and I agreed to give Ferman a couple of days to check his stock before pursuing it.

Linda was working at her desk on a proposal for the bakery and preparing a bank deposit for our GLCC chapter.  I went to the garage and began soldering 3/4″ copper plumbing fittings.  I need to route the 3/4″ rubber heater hose around corners that were too sharp to just bend the hose so the copper fittings will take care of that.

Linda called me to dinner at 6 PM.  We had a nice salad, vegan Italian sausage with onions, and Brussels sprouts as a side.  A small glass of Moscato made a nice accompaniment.  After dinner I checked my e-mail and took care of the cats’ liter tray.  I then drove to Lowe’s for two more 45 degree street elbows.  On the drive home I talked to Mike (W8HX) on the South Lyon 2m repeater.  We discussed getting me back up our tower sometime in the next 9 days if my work on the bus progressed to the point where I could afford the time.  We went to bed early enough to watch a few TV programs and then fell asleep.

 

2015/08/24 (M) Skimcoating

For a change of pace we had granola with vegan yogurt for breakfast.  I made seven cups of the Cafe Europe / Columbian decaf blend but Linda only had one mug as she was meeting Diane at Kensington Metropark at 9 AM to walk.  After she left I gathered up the laundry, sorted it, and started the first load.  I then turned my attention to the bus.

My first task was to cut one of the 8″x8″ sheets of #80 sandpaper in half, put it on the orbital pad sander, and go over all of the Universal Patch and Skimcoat (UPS) that I applied yesterday.  The 80 grit worked well and I only needed the one half sheet.  I swept the floor clean of loose debris and then assembled my tools and materials to patch a few gouges I missed yesterday and then skimcoat the entire portion of the floor that used to have ceramic tile on it.  I mixed 24 ounces (by volume) with 12 ounces of water (by volume), half as much UPS as I did yesterday.  I tried to work more quickly and got most of it applied.  I cleaned up my tools and let them dry while the compound cured.  That also gave me an opportunity to move laundry from the washer to the dryer and start another load in the washing machine.

I had a call from Chuck so I took a break to chat with him.  He and Barbara spent the weekend racing at the old Air Force base in Oscoda, Michigan.  Their bus and race car both ran well and he turned in some very good times.  He had installed a new turbo boost gauge in the bus and based on my experience had selected a 0 to 15, PSI VDO unit.  Apparently 15 PSI is not high enough for his engine.  I have seen the boost on my gauge, which is a 0 to 30 PSI model, go as high as 17, but not often.  For most of our trip to Arizona and back this past winter it did not go over 15 PSI.

The only issue they have with their coach at the moment is their old Amana residential refrigerator.  The freezer is apparently not keeping things as cold as it should and the ice maker is not working.  They use a lot of ice and generally have the freezer stocked, so those are problems.  They bought a bag of ice for the weekend but it appeared to get warm enough to develop surface moisture and then refroze into large chunks, inconvenient at best.  I think they have decided to replace it and want to do so before they leave for the winter and while they still have the shop and the forklift.

Chuck is also going to contact the glass installer and see if he would be willing to install bus windshields.  Both of his lower windshields need to be replaced as do both of ours.  We have five replacements at his shop, two for him and three for me.  I also have new gaskets but he needs to get two sets.  We discussed late September as the best time for me and he will see if the windshield guy will do all four of them on the same day.

I mixed the remaining USP, about 12 ounces (by volume) with 6 ounces of water (by volume) and finished the skimcoating of the bus floor.  I used the last little bit of compound to patch some screw holes and small gouges in the living room floor where carpet had been installed.  There may be a few more but instead of opening another bag of UPS I will probably return it and buy a quart of the premixed compound.  I then cleaned up my tools again and left them in the sun to dry.

Linda got home about this time.  It was just after noon, so we had a light lunch of vegan deli slices with lettuce, onion, and Daiya non-dairy cheese, on thin buns.  A pluot provided a nice, sweet finish to lunch.

We measured for wallpaper the other day so I took the notes and created an Excel spreadsheet to figure out how many rolls of wallpaper to order.  While I did that Linda worked on cleaning and reconditioning drawer fronts with Touch of Oranges and Touch of Beeswax.  After examining the wallpaper in the bathroom (of the bus) I think we need to replace it too.  We took a few minutes to get those measurements and I added them to the spreadsheet.

The wallpaper we have selected is the Lamar (#699-3377R) from the Just Textures collection of Sellars and Josephson.  It is an off-white color with a small texture pattern designed for reverse hang, random match installation.  It is only sold in 2-roll bolts 27″ wide and 4.5 yards long.  We will need more than six rolls to replace all of the wallpaper so we will have to order eight rolls even though we may defer doing part of the hallway and the bathroom for a while.  Fortunately it is not too expensive (as wallpapers go) and is scrubable, which was one of our requirements for use in the bus.  Linda will return the sample books to Delux Drapery and Shade Company in Ann Arbor on Wednesday morning and place the order.

Linda reheated the leftover fajita veggies from last night and fixed some white rice to go with them.  We had fresh strawberries and a little Coconut Bliss non-dairy ice cream for dessert.  Coconut Bliss ice creams are not too coconuty, and are appropriately named.  They are as good as I remember Hagan-Daas being.

I took a little time to add lines to my floor tile layout drawing showing the location of the underlayment sheets.  It looks like I may need at least eight sheets.  I have four sheets in the garage and will install those before buying more.  I spent the rest of the evening working on the article for Bus Conversion Magazine about Larry and Carol Hall’s GM4106 bus conversion and finished it around 10 PM.  I spent another 1.5 hours catching up on e-mail and checking in on the status of Technomadia’s bus renovation project at MasterTech in Elkhart, Indiana.  The weather has turned cool and should be perfect for working on the bus tomorrow.  We need to have long, productive days, so I had a snack and got to bed at midnight, played a few games, and went to sleep.