Tag Archives: Broil King NG outdoor grill

2015/06/16 (T) More Stupid

Linda was scheduled to go to the bakery this morning but rescheduled to tomorrow due to last night’s weather forecast and the possibility of flooded highways in Detroit.  The morning rush hour traffic is bad under the best of conditions and flooded roadways can make it near impossible.  She also did not sleep well and woke up tired.

The Apex roofing crew started showing up just before 8 AM and the Wimsatt truck showed up with the shingles a little after 8 AM.  They brought a conveyor truck this time and were able to get the shingles off the truck and onto the roof without difficulty.  The Apex crew did not waste any time getting to work.  It turned out to be a great day for roofing; clear skies, no rain, moderate temperatures, lower humidity, and some breeze.  Even so, it is work that is done without the benefit of shade and roofs are hot places to work even on the nicest of days.

Wimsatt unloads shingles onto the garage roof.

Wimsatt unloads shingles onto the garage roof.

Linda continued working on the financials for our amateur radio club while I checked my e-mail.  I had a reply from RV Critter Guard telling me what to order and how much it would cost.  I placed the order through their website and used PayPal to complete the transaction.  I tried calling the concrete contractor that Phil recommended (Bid Rite Concrete LLC in Whitmore Lake) but the phone would disconnect after the first ring and revert to a dial tone.  Perhaps the recent storms caused a problem but I e-mailed Phil to see if he had a different number for them.  I called the Henry Ford Medical Center in West Bloomfield and made dermatology appointments for myself and Linda.

With all of that taken care of I turned my attention to the bus.  The toilet is a Microphor LF-210.  It uses pressurized air to operate the waste valve and the water valve and to help push the waste through the drain pipe and into the black tank.  To remove the toilet I had to undo three connections—air, water, and waste—and take out the four screws securing it to the floor.  If only it was as easy as that makes it sound.

The plumbing at the back of the Microphor toilet in our bus.

The plumbing at the back of the Microphor toilet in our bus.

Undoing the air line was easy and undoing the water connection only a little less so.  The waste connection was another matter.  The 1.5″ black plastic drain pipe was routed from the water bay through the floor and into the HVAC chase that runs along the driver’s side of the coach.  The converter, Royale Coach, brought it out through a hole in the wood that covers the chase, making it impossible to take the wood cover off.  The pipe then made two right angle bends, the first one towards the floor and the second one towards the back of the toilet.  The waste pipe was connected to the toilet discharge pipe with a length of rubber hose and a compression sleeve.

The toilet has a large hole in the back for all of these lines to pass through to the inside where they get hooked up.  It should have been a simple matter to slide the toilet away from the wall/chase but the last bend in the drain line was below the top edge of the bottom of the hole, preventing it from coming out.  After wiggling the toilet enough to get the rubber hose loose from the drain pipe I was able to lift the drain pipe just enough to slide the toilet out.  I took pictures for a possible BCM article on our interior remodeling project and then Linda helped me move the toilet out of the bathroom to the front of the coach.

The more I disassemble this coach the more stupid I think the design and construction of its systems are.  I don’t know that coaches from Marathon, Liberty, Vantare, Featherlight, Parliament, Millennium, Custom Coach, or any of a dozen other companies that have come and gone, is any better as I have never tried to disassemble one of them.  These are one-of-kind vehicles that are custom built specifically for the original purchaser and the over-riding factor in every case is the interior design.  Stuff, like toilets, go where the customer wants it, and systems, which are generally buried and hidden from view, get built wherever and however they can be made to fit.  The converter does not expect to have to repair or replace anything during the very short 12 month, 12,000 miles, warranty period and if stuff breaks after that, or someone wants to do a remodel or upgrade sometime later, it will all be time and material.  How difficult it is to do, and how many hours it takes, is someone else’s problem at that point.

The Apex crew hard at work on the back side of the main roof.

The Apex crew hard at work on the back side of the main roof.

We had a call from Butch updating us on a possible property purchase.  They are waiting for a clear title search before making an offer.  The property includes a house and a sizable barn.  The barn needs a new roof and the house will have to be gutted and the inside rebuilt, but for the right price it will still be a good deal.  They already have a good estimate to replace the barn roof and since they are now retired they have more time to work on the house than they would have a year ago.  They also have family and friends who can help.  Besides, they still have their home/business building in Twelve Mile, Indiana and their bus, which they lived in all this past winter, so they will not be under any pressure to get the inside rebuilt quickly.

Linda started downloading updates from Adobe Creative Cloud, which take a very long time, and then left at 3:30 PM for Ann Arbor.  She agreed to take care of grand-daughter Madeline while Brendan and Shawna attended a reception at the University of Michigan – Ann Arbor for newly tenured and promoted faculty.  I was on my own for dinner and Linda bought an Amy’s pizza so I would have something easy to prepare.

The roofers finished up for the day around 5 PM.  By the time they left most of the trash was in their dumpster trailer and the roof was tarped as a precaution against rain even though the forecast for tonight and tomorrow is for dry weather.  Rain returns to the forecast tomorrow night into Thursday but turns dry again on Friday, so we are optimistic that they will get the job finished this week.  It’s a big job but Apex has a big crew working on it and they got a lot of work done today.  We are very pleased with the look of the Certainteed Landmark Pro Max Def Resawn Shake shingle that we chose.  I took pictures of the work throughout the day as I always try to do with major projects.

After the roofers left I worked for a while in the bus.  I took the mattress into the house along with the electric heating pad controls.  I disconnected the two gas struts that support the plywood bed platform so I could open it far enough to reinstall one of the drawers.  I left them disconnected as I plan to remove the platform to provide better access to the sides of the box and floor.  I also plan to reposition them when I reinstall the platform to provide better access to the storage area underneath.  I then took measurements and made a sketch of the file drawer box for the desk.

Installing soffit baffles and replacing roof decking on the front of the main roof.

Installing soffit baffles and replacing roof decking on the front of the main roof.

I cooked the Amy’s Roasted Vegetable Pizza on the outdoor gas grill, both to avoid heating up the house and to see how it responded to that cooking method.  I used the grilling mat and the result was quite acceptable.  A glass of Franzia Moscato was a nice accompaniment.

After dinner I worked at the drafting board in my office turning my sketch and measurements into a scale drawing.  The two boxes for the desk will be trickier than a standard desk box because of the HVAC chase and because I have to put an Aqua-Hot heat exchanger in the bottom of each one.  I worked until about 9 PM and then came back upstairs.

The air-conditioner worked fine yesterday but was once again unable to bring the temperature in the house below 74 degrees F even though the outside air temperature never rose above 80.  There is clearly something wrong and I am wondering if one of the cold air ducts is open into the attic and/or one of the return air ducts us drawing hot air from the attic.  Either of these conditions would reduce the air flow to the house and overtax the evaporator in the air handling unit.  The more likely cause, however, is lack of refrigerant.  Whatever the case I shut the system off and opened up the house.

I was relaxing in the living room when Linda called at 9:30 PM to let me know she had left her babysitting gig and was stopping at the Whole Foods Market before heading home.  The reception started at 5 PM and lasted until 9 PM.  She was home by 10:15 PM and straight away to bed as she has to go into the bakery tomorrow and wants to leave early enough to be ahead of the morning rush hour traffic.

 

2015/05/01 (F) May Day

Wow, another month gone.

We got up after 8 AM this morning, were having coffee, and had not yet had breakfast when I got a call from Diane at SteelMaster Building Systems.  They are certainly prompt in their follow up as I just submitted an RFQ last night via their website.  I had a very informative conversation with her that left me favorably impressed with the company and inclined towards their products should we decide to build our barn this way.  By the time I finished with her and we spent time studying SteelMaster’s website we sat down to have breakfast at 9:45 AM.

I started a load of laundry and puttered at my desk until Linda had chores for me to do.  She vacuumed the main floor and tidied up the kitchen in advance of tomorrow’s dinner visit with John and Diane and wanted to take the storm door insert out of the front entrance frame and put in the screen.  We like fresh air and have an abundance of it out here in the country.

We drove to the Sears Outlet at Fountain Walk in Novi to buy a box spring mattress foundation.  They were already discounted and also on sale.  The shipping was 50% of the sale price but we could not get it home in our car so that was our only choice.  It was still a bargain and we will have it next Tuesday.  We have been using the heavy, elaborate foundation that came with our Sleep Comfort mattress years ago, but it is broken and needed to be replaced.

We stopped at Lowe’s on the drive back to look at vinyl floor tiles and bought some Oxygenics shower spray heads and soap.  We took a drive up Latson to see if we could find a metal arch garage that Phil Jarrell had recently spotted.  We think we caught a glimpse of it on the west side of the road as we headed north towards M-59.  Heading east on M-59 we took a detour up Argentine Road to see if we could find Phil’s place but never saw anything we felt confident was his.  We headed east on Clyde Road and took Old US-23 back to M-59 where we stopped at Kroger for a few things before returning home.  To Linda’s surprise and delight, the Kroger has some of the mock dairy vegan products, like Daiya cheeses, that she occasionally uses and cannot get at Meijer’s.

Linda had an agenda for today and next up was putting the umbrella in the outdoor table.  Once that was taken care of we sat outside enjoying blue skies, bright sunshine, an air temperature of 71 degrees, and a slight breeze, none of which required the umbrella, but the point was to get it off the floor in the library where it was stored all winter.  Next we moved the natural gas grill from the garage to the lower rear deck, reassembled it, and connected it to the gas supply (it has a quick connect and shutoff valve).  I then busied myself removing the three shower heads and replacing them with the removable spray heads we bought at Lowe’s.  If I did not do that right away they would still be sitting around in their boxes months from now.

Linda used the grill to make dinner.  She grilled seasoned Brussels sprouts, tofu hot dogs, and bananas sliced in half the long way.  This will be the first summer in a long time that we have had a grill.  Linda is excited to have it as it expands her cooking options and provides a way to not heat up the kitchen in the warmest weather.  I am looking forward new dimensions in our meals.

I had planned on reviewing an article for BCM but ended up involved in two phone calls after dinner.  One was with Pat Lintner from GLAMA and our GLCC chapter and the other was with Lou Petkus from the SKP Photographers BOF.  That left just enough time to watch Season 1, Episode 1 of Sherlock on DVD before turning in for the night.

 

2014/09/16 (T) Boiled Over

Our son (Brendan) texted Linda early this morning to see if we would like to have grand-daughter Madeline spend the night while Marilyn is here next week.  It turns out that next week Thursday and Friday are Jewish holidays, and Madeline attends a Jewish run day care facility.  Of course we said “yes.”

Linda worked at her desk on our personal finances in the morning, worked on her counted cross-stitch project for a while in the afternoon, went on a couple of long walks, and managed to get breakfast, lunch, and dinner on the table.  But as days go, it was fairly low key even for her.

I called Country Squire Fireplace and Lighting in Howell and asked for Bob as I had been instructed to do.  It was Bob’s day off but I got to talk to Mark.  Mark told me that they can get a 12′ hose with a 3/8″ flare fitting on one end and quick disconnect on the other end.  The QD includes the male fitting attached to the hose and the female fitting that gets threaded onto the supply pipe.  We already have a female QD fitting (Marshall Brass BC0102-0600) but it may not be compatible.  I had measured before I called and knew that we needed at least an 8′ hose, so 12′ will work just fine, especially since two feet of it has to go up through the base from the back and then out the top of the base and attach to the grill.  Mark asked me to call back tomorrow and talk to Bob to order it, so that is what I will do.

I double checked online that the range we had ordered was indeed a natural gas model.  It was, so there was no need to call the appliance store to confirm that.  I had a call back from Darryll at DCM Heating & Cooling.  He thought he would be able to come back on Friday or Saturday to hook up the gas from the meter to the house and the new black iron pipe and start up the two new furnaces.  All of the other gas conversion work we need done is dependent on Darryll getting his piece done first and I asked him if it would be possible to come on Wednesday.  He said he would check his schedule and see what he could do.  Darryll has been great to work with, and I try not to be demanding, but I cannot schedule other contractors until there is gas to the house.

I checked the label on our Weil-McLain “boiler” that provides heat for our hot-water baseboard heating system and domestic hot water.  It’s a GV-5, Series 1.  That allowed me to hone in on the right manuals on the W-M website from which I was able to identify the part number for the LP –> NG conversion kit.  It’s a 510-811-630 and consists of an orifice plate and an adhesive label that has to go on the unit.  The unit is a discontinued model, but service parts appear to still be available.  I found the conversion kit at the first online supplier I checked for under $31 (plus S&H) but delivery looked to be 2 – 3 weeks.  Ugh.  I placed a call to TOMTEK HVAC in Howell to see if Tom had checked on this yet.  He hadn’t so I gave him the model and serial number of our unit and mentioned that I had found the orifice plate online.

I worked at my desk for a while uploading blog posts from the last third of August, but it was such a beautiful day that I decided to work upstairs on my iPad2.  I called Bratcher Electric around 4 PM just to give them a “heads up” that we had a meter with natural gas.  Karen gave me Mike’s cell phone number and a time window during which I would likely be able to reach him.  He has been very busy doing estimates for storm damage repairs and has not been in the shop much the last month.  I got hold of him to let him know that we might be ready for them as early as next Monday, but anytime in the next couple of weeks after that would be OK.  Again, I try not to be unreasonably demanding, and I try to be truthful with folks.  Sometimes, however, that just results in us being put at the back of a long line of people who are unreasonably demanding.

Linda made maple baked lentils with sweet potato and apple for dinner.  It really hit the spot on a cool evening.  After dinner I continued working on selecting and editing photos for a gallery post on the natural gas pipeline work.  My cell phone cannot receive calls in the basement but it can receive txt messages and notifications.  Tom had called back from TOMTEK regarding the boiler conversion.  He can get the parts locally in about four days and wants $250 to do the conversion plus $59 for the service call.  A total bill of $310 to install a $30 part (retail) sounded excessive to me, so I may make a few inquiries first thing in the morning before I call him back.

We watched Season 5 Episode 5 of Doc Martin.  It was nice to see it on the TV rather than the iPad with a large screen, better sound, a DVD quality image, and no buffering.

 

2014/09/14 (N) Family Ham

No, we did not serve ham for brunch.  We are vegans, after all, and we don’t serve animal products in our house regardless of who is coming to visit.  We’ve got some folks in the family who are pretty funny, including Marilyn, but this is not a reference to the family joker.  No, today was about family and ham radio, but not mixed together.

Linda was up at 7 AM to finish preparing the various brunch dishes.  She made:

  • mini crustless tofu quiches;
  • rice and raisin breakfast pudding;
  • soft and chewy baked granola bars;
  • mixed fresh berries, and;
  • sliced fresh melon.

She also bought some gluten-free cinnamon raisin bread.  Our daughter is still experimenting carefully with foods trying to figure out what upsets her system and gluten is currently a no-no along with soy, dairy, and corn.

Shawna (mom), Madeline (center of attention), Grandma Linda, Great Aunt Marilyn, and Uncle Chris.

Shawna (mom), Madeline (center of attention), Grandma Linda, Great Aunt Marilyn, and Uncle Chris.

Brendan, Shawna, and Madeline arrived around 10 AM followed soon after by Meghan and Chris.  Everyone had a good visit and enjoyed the brunch.  Madeline was naturally the center of attention, but there were enough adults to keep her engaged and still have adult conversations.  Madeline normally naps from 1 – 3 PM, so her parents took her home a little past noon.  Meghan and Chris left shortly thereafter.  They are very big into sports, especially fantasy football, and the fall sports season is in full swing.

Aunt Meghan and Brendan (dad) looking towards Madeline (center of attention).

Aunt Meghan and Brendan (dad) looking towards Madeline (center of attention).

It had shaped up to be a very nice day so we drove to downtown Howell and parked near the Farmers Market area.  The Market was still open so we wandered through and bought some locally made apple cider to take home.  We then walked to Country Squire Fireplace and Lighting where we bought a natural gas outdoor grill and ordered a natural gas fireplace log set.  We drove back to the house and then I drove back to Country Squire to pick up the grill.  I did not realize when we bought the grill that we were buying the display model, but it was in perfect condition and I do not have to assemble it.  The store employees partially disassembled it and helped me carefully load it in the Honda Element.  We also bought a cover and quick disconnect for it, neither of which they had in stock.  The cover had to be ordered and they needed to check with another employee about the quick disconnect before ordering it, so I will pick those parts up later.

The fireplace logs also had to be ordered and will take two to four weeks to arrive.  Unfortunately that means they will not be here in time for Darryll to install them.  Country Squire has a subcontracted installer who will install them for $125.  That seemed excessive to me, but I did know how involved the installation might be.  If it involves unpacking, assembling, connecting, and adjusting the unit then it might be worth it.

We spent what remained of the afternoon visiting with Marilyn and just giving her the space to relax and recover from her new and very demanding job as the executive director of the St. Louis Province of the Congregation of St. Joseph – Carondelet (CSJ or Sisters of St. Joseph of Carondelet).  She assumed this role on July 1st and has been going non-stop since.  It’s a 5-year commitment.

The job involves a lot of meetings and a lot of travel as the St. Louis Province has sisters all across the United States as well as in Peru and currently has a couple of sisters doing mission work in Gulu (Africa).  Although Marilyn has been a dedicated member of this community for almost 50 years she is still very close to Linda and her brother Ron, and values being able to relax and spend time with them and their families.  Our homes have often been a holiday haven where she could escape from the very demanding jobs she has held over the years.

We had leftovers for dinner and then printed Marilyn’s boarding pass.  She had a 7:45 PM flight back to St. Louis, Missouri, so she and Linda left around 5 PM for Detroit Metropolitan Airport which is about an hour’s drive from our house.  I left around 5:45 PM for the monthly meeting of the South Lyon Area Amateur Radio Club, which started at 6:30 PM.  Our program this evening was a presentation by Gary (WA8TJA) on the technology and process he uses to make his own printed circuit boards.

Gary (WA8TJA) explains to the members of SLAARC the process and technology he uses to design and make his own printed circuit boards.

Gary (WA8TJA) explains to the members of SLAARC the process and technology he uses to design and make his own printed circuit boards.

I got a call during the meeting from Joe Cannarozzi, the mechanic who has serviced our bus for the last four years, and called him back on my drive home.  He has relocated to the Myrtle Beach, South Carolina area and is working as an RV technician and mechanic for an established business that currently services towables.  He is still servicing buses, Prevost units specifically, but the business would like to expand to servicing diesel pushers.  They are also opening a dealership for KZ RVs and he will be selling those in addition to his tech work.  He called me from Shipshewana, Indiana where he will spend the week at KZ getting dealer orientation and training.

It was a busy weekend and as much as I enjoyed all of the activity and company it was nice to come home to a quiet house.  I had been pondering the $125 installation fee for the natural gas fireplace logs so Linda Googled the model and found the Installation and Owner’s Manual on the American Hearth website.  I went there and downloaded it to my iPad2.  (This is one of the things I love about having a tablet; the ability to have lots of manuals, product spec sheets, instructions, and other documents at my fingertips.)  Although it covered several versions of our model it was none-the-less 36 pages long.  I looked through it enough to determine that $125 was probably a fair installation fee IF the installer started with a factory sealed box and then did everything that is specified in the manual.  We purchased a “millivolt” model and I saw some reference to wiring.  I was momentarily concerned that we needed to supply AC power to the unit, but more careful reading confirmed that this was not the case.

We had eaten dinner early and as I was reading and typing I realized I was a little hungry.  I should have gone to bed but instead had a couple pieces of toasted gluten-free bread with vegan margarine and a cup of hot apple cider.  I’m glad I did; toast is simple but satisfying food, and there’s nothing better than a warm beverage on a cool evening just before bedtime.