Tag Archives: Bratcher Electric

2015/10/21 (W) Electrifying

In spite of being out later than usual last night Linda was up early and off to the bakery at 6:15 AM.  I got up at the same time and made coffee so Linda could take some with her.  Neither of us slept well as we had larger meals, with richer food, and later at night than usual.  I wasn’t hungry but I like to start my day with coffee and it seems to help keep me regular.  TMI, perhaps, but there it is.  I had to get up anyway to prepare the garage so the electricians from Bratcher Electric could get to the areas they needed to work on.  But first I put a load of laundry in the washing machine.

We had a light but steady rain last night starting around midnight.  Phil was hoping for rain over the next few days as the sand base for the driveway will compact much better if the sand is moist.  We have a 70% chance of more rain during the day today and into the evening but by tomorrow a cold front is supposed to push through with much cooler and drier conditions behind it.  I hope the sand gets wet enough to stay moist until Saturday when Phil returns.

Jeremy and Pete from Bratcher Electric showed up at 9 AM.  I walked them through the job and then left them alone to work except for the occasional photograph and questions.  The questions were for my own understanding of the work.

I needed to mix the “GoLightly” prescription for Linda and get it in the refrigerator to chill.  The instructions said to use lukewarm drinking water.  I drew a large pot of our RO water, heated it on the stove, let it cool to what I judged to be lukewarm, added it to the jug, shook it well to mix, and put it in the fridge.  It should be plenty cold by the time she gets home this afternoon.

I was not going to get involved in my own construction projects while Jeremy and Pete were here.  At some point towards the end of their work they were going to have to turn off the whole house generator and disconnect the main service coming in from the utility pole so they could safely tie in the new disconnect that feeds the panel in the garage.  I went ahead and turned off the HP Color LaserJet printer, the two NAS units, and all of the computers except one that was installing updates, and I shut it down when it was done.

While the electricians worked I did some more photo product research.  Based on what I found on the Quantum Instruments, Inc. website they do not make anything that works with the Sony alpha camera bodies, including the SLT-a99v.  Thus it appears that there is no point in repairing (replacing) one or both of my Quantum Turbo battery packs.  I tested my Sunpak DX-8R ring flash the other day so I know I can trigger it but I do not know if I can control it.  My Metz 45CT-4 can operate off of AA batteries but I have not had time to test it with the a99.  Like the ring flash I expect that the a99 will be able to trigger it but I doubt it can control it through the lens (TTL).  If it can then I would have a reason to repair/replace at least one of my Quantum Turbo battery packs.

What all of this means in the short term is that I am going to have to buy a Sony “on-camera flash” designed specifically to work in an integrated way with the a99 body.  Further research revealed that there are only three choices: the HVL-60AM, the HVL-43M, and the HVL-20 (?)  I downloaded the manuals for the 60 and the 43 models and glanced at them, but they are as long as the manual for the camera body.  The 60 has an optional battery pack, but it just holds six AA batteries in addition to the four in the flash unit.  I looked at reviews on the B&H website and they were mixed for both the 60 and the 43.  The 60 is more powerful but is very large.  The 43 is smaller but less powerful and lacks the connector for an auxiliary battery pack.  The biggest knock on both were the mechanical attachment to the camera and an over temp feature that seems to erroneously shut the unit down after just a few quick flashes.

The small box upper left is the new 100 A main disconnect for the electrical panel in the garage.  The large box upper right is the automatic transfer switch and the large box below it is the 200 A service entrance disconnect.

The small box upper left is the new 100 A main disconnect for the electrical panel in the garage. The large box upper right is the automatic transfer switch and the large box below it is the 200 A service entrance disconnect.

After the electricians were gone I heated up a can of Amy’s Red Lentil soup and had some hummus and pretzel nibblers.  I put another load of laundry in the washer and then went in search of an RV outlet box.

Lowe’s had an Eaton box with either a 30 A or 50 Amp single plug and no disconnect or circuit breaker.  The 50 A version is what I installed three years ago for the pull-through drive in front of the house.  What I had forgotten, apparently, was that the largest opening on the bottom of this box was smaller than 2″ but I could not determine if it was 1-1/4″ or 1-1/2″.  Lowe’s did not have the adapters I needed so I went to The Home Depot.  They did not seem to have what I needed either so I went to City Electric Supply.  CES had a better selection of adapters and also had RV panels with circuit breakers.  The panels were much more expensive so I did not buy one but I had them set up the pieces to adapt from 2″ conduit to 1-1/2″ pipe thread.  I then went back to Lowe’s and bought the 50 A outlet box.

Back at the house I spent some more time in the bus fiddling with the remote temperature sensors in the refrigerator but otherwise did not accomplish much.  Linda got home late in the afternoon but was not able to eat anything because of her colonoscopy tomorrow morning.  I was on my own for dinner but do not recall what I had as I am finishing this post a couple of days later.  Linda had to consume half of the GoLightly (1/2 gallon!) between 6 and 8 PM.  I worked in the garage for a while removing the knockouts from the bottom of the RV box.  That was when I confirmed that the hole was sized for 1-1/4″ conduit, not 1-1/2″.  I worked in my office at my computer for the rest of the evening.  We both went to bed before 10 PM as Linda had to get up at 3 AM and drink the other half gallon of GoLightly between then and 5 AM and I had to be up at 5:45 AM so I could get her to HFHS Columbus Center in Novi by 7:15 AM.  Sometimes the scheduling of medical procedures just leaves me shaking my head.

 

2015/10/09 (F) All Charged Up

We finished the current batch of granola for breakfast and had just finished our meal when Chris, from Bratcher Electric, showed up at 8:45 AM to service the whole house generator.  He let me watch and explained the various steps in the process.  The trickiest part appeared to be replacing the spark plug on the back side of the engine.  Everything else was fairly accessible.  There is a 1/4 turn valve to drain the oil and a rubber tube to get it out to a collection vessel.

Chris had what looked like a small gas can but it was painted blue.  It had a clear plastic tube attached to what would normally be the air vent.  The tube was sized to just fit inside the oil drain hose.  A vacuum pump was threaded on to opening where the pour spout would normally go.  A few pumps of the handle and the device sucked the oil right out of the engine and contained it so he could transport it easily and cleanly.  It was a very clever device, and obviously very handy for someone who does several generator maintenance procedures every day.

He gapped the spark plugs at 0.028″, checked the air filter (it was fine), replaced the oil filter, noting the date on the filter with a permanent marker, and put ~2-1/3 quarts of 5W-30 synthetic oil back in the engine.  He cautioned me to only use the specified filter and pure synthetic oil.  The engine runs hot under load and regular oil can lead to problems.  He checked all of the settings and changed the weekly self-test to run at full speed for the entire time.  He prefers that setting as it gets the engine up to normal operating temperature and helps burn off any moisture in the oil.  He started the unit manually, let it run for a while, and then shut it down and put in back in AUTO mode.

Linda prepared the dry ingredients for her vegan chocolate cupcakes and then put together a grocery list.  She left to go to Meijer’s while Chris was still working.  He finished up around 10:15.  I worked on the bus, using split plastic wire loom to protect the wires that power the fans on the heat exchangers.  I then worked on reconnecting the wires from the front bay electric heater to the supply wires.

A close up view of the fill/bleeder valve assembly for the heat exchangers in the desk bases.

A close up view of the fill/bleeder valve assembly for the heat exchangers in the desk bases.

The supply wires run inside the HVAC duct.  They originally came out of the duct and went through a hole in the floor into the OTR air-conditioning bay and then through the partition wall into the front bay.  I had to cut the cable and pull it through the floor from underneath so I could install the new floor tile.  I could clearly see where the OTR HVAC supply duct came into the distribution duct but when I tried drilling from below I seemed to hit metal.   The bottom of the duct was clearly plywood so I drilled from above with a 1/2″ spade bit.  I got through most of the plywood but again seem to hit metal.  I knew there wasn’t anything in that location, like wires, pipes, or air lines, so I switched to a 1/2″ twist drill and finished the hole.

I dropped a screwdriver through the hole so I could locate it from below.  I then pushed the electrical cable from the heater up through the hole and secured it to a fastener on the forward wall with a cable tie.  Linda got back at this point so I helped get the groceries into the house.  She then mixed a new batch if granola and put it in the oven to bake.  I gathered up my electrical tools, uncapped the feed wires, checked them with a volt meter to make sure they were not energized, connected the feed wires to the load wires, and tucked them back inside the duct.

We had a choice as to what to work on next—fill the heat exchangers and hoses with antifreeze or hang the wallpaper in the hallway—so we had lunch.  Summer has passed, but tofu hotdogs with mustard, onion, and relish, along with some red grapes, was still a tasty lunch.

When we got back to work in the coach we decided to hang the wallpaper.  The pieces were already cut and laid out on the bed.  Hanging them not only got them off the bed, it would allow us to get the wood trim off the bed as well and back on the lower wall.  But not today.  The wallpaper adhesive needs to cure for 24 hours before we work around it and does not achieve its full cure for 5 to 7 days.  We have one piece of wallpaper to hang behind the forward end of the sofa but the wall prep is not finished in that area.  Once that piece is up, and we have the Corian top for the desk, we can complete the installation of the desk and sofa.

Shawna was bringing Madeline at 4:30 PM to spend the night with us.  It was already 2:30 and I needed to get cleaned up and put on non-work clothes before they arrived so we called it a day.  I had once again accumulated quite a few tools in the bus.  I gathered up all of the ones I was done with, returned them to the garage, and locked up the coach.  The UPS truck showed up with my package from B&H Photo which I set aside temporarily while I took a shower and got dressed.

The box looked like it had been treated well in shipment.  I opened the box, carefully removed all of the contents, and compared them to the order/packing list.  Everything was there and appeared to be in pristine condition.  I unwrapped the battery charger and Lithium ion battery, put the battery in the charger, and plugged it in.  The new charger is essentially the same as the one that came with my Sony alpha 100 years ago so I got the old one from the basement.  I bought five additional batteries so I opened one of them and plugged it in to the old charger.  I then found the Instruction Manual and curled up with it on the living room sofa while Juniper (the cat) curled up on me.

The directions with the charger and the batteries indicated that it can take up to 175 minutes to fully recharge a battery and that full charge is not obtained until an hour after the charging light goes out.  So, basically, I need to leave the batteries in the charger for three hours to ensure they are fully charged.  The camera takes one battery, and the vertical grip accessory takes two batteries, so my normal operating configuration will be to have three batteries in the use.  That’s why I have a total of six batteries for this new camera.  I will probably buy another charger so I can charge three batteries simultaneously.

I called Chuck to let him know I got my car back late yesterday but would not be able to move the windshields box until sometime next week.  It turned out that he and Barbara were also busy all weekend.  His daughter, son-in-law, and grandson were in town with more family arriving from Trinidad and Tobago this evening.  Tomorrow is his grandson’s first birthday and Sunday he is being baptized at the church in Ann Arbor where Chuck’s daughter was married.

Shawna showed up just after 4:30 PM.  Madeline had fallen asleep in the car and was slow to wake up, clinging to her mom for quite a while.  Linda brought in the various bags of clothes and toys along with the inflatable bed and got everything situated in the middle bedroom.  When Linda mentioned making cupcakes Madeline finally woke up and became cheerful.  Once her focus was on baking with Grandma Linda Shawna was able to slip away without any drama on Ms. M’s part.

Today was Brendan and Shawna’s friend Jorge’s birthday and the three of them were headed to a new restaurant in Detroit to celebrate.  The restaurant does not take reservations and is apparently very popular at the moment so Shawna was not sure if they would actually get to eat there.

With Linda’s help Madeline mixed the ingredients for the cupcakes and managed to pour most of the batter into the baking tray.  Linda then prepared dinner while I played with Madeline.  We did the ABCs on her placemat, and then colored with crayons.  Dinner was mock chicken tenders, edamame, and steamed carrot rounds with fresh orange segments and sliced strawberries, so it was mostly fresh, whole plant-based foods.

As soon as the cupcakes were cool enough to be frosted Madeline coated each one with the special Halloween orange frosting and the back and orange Halloween sprinkles.  I was summoned to inspect the work and then it was time to eat.  Madeline selected a cupcake for herself and then one for me and one for Linda.  We ate them at the table and they were very good.

After cupcakes we played soccer with two different balls, kicking and throwing them all around the house.  By 8 PM we needed to start winding things down.  Shawna had left her iPad and Madeline selected a Curious George video about Christmas.  Linda and Madeline climbed up in our bed where they could stretch out their legs and watched the first 60% of the cartoon.  I opened two more camera batteries and put them in the chargers and then joined the girls.  We will watch the rest of the cartoon tomorrow morning.

I helped Madeline brush her teeth and Linda got her into her pajamas.  Linda read her several stories and finally got her in bed around 9:15 PM.  During dinner Madeline inquired about having pancakes for breakfast.  (I had made the same inquiry over lunch.)  Linda did not have all of the ingredients she needed so after Madeline went to bed I went to Meijer’s in Howell and bought avocado oil and all-purpose flour.  Linda is trying to use up ingredients rather than stock up on them so I bought a two pound bag of King Arthur organic unbleached enriched all-purpose flour even though I could have bought a 10 pound bag of the Meijer’s brand (bleached and not organic) for only 50 cents more.

Just before going to bed I opened two more batteries and put them in the chargers.  We went to bed at 11 PM but did not turn on the TV to ensure that we did not disturb Madeline’s sleep.  I was basically done with the draft of this post and read some more of the Instruction Manual for my new Sony alpha 99 (SLT-A99V) camera and vertical battery grip (VG-C99AM).  I am really looking forward to using this new equipment but it takes a couple of days to charge batteries, install software, and read manuals enough to be able to configure it for first use.  This class of camera has a lot of adjustable parameters with default settings that may or may not be what any particular user wants.

 

2015/10/08 (R) A Mighty Hose

Linda was up before 6 AM to drive to the bakery ahead of the worst of the morning rush hour traffic.  I was aware of her getting up but fell back asleep.  She is very quiet as she goes about her preparations on such mornings, which I appreciate.

I got up around 8AM, fed the cats, and cleaned their litter tray.  I made half as much coffee as usual and measured out a bowl of granola, probably a little more than usual.  I took my coffee to the living room and turned on the fireplace, expecting to settle in with my cats and work on my iPad, but the iOS 9.0.2 update was available so I started the installation and read the last few pages of Number Theory and Its History by Oystein Ore.  I read from screens more than from paper these days, but I still like to curl up with a printed book.

Jasper used to sit next to me on the sofa in the morning but seems to prefer sleeping on top of one of the back cushions these days.  Juniper, who never used to pay much attention to me, has taken his place.  She has always sought out warm places to curl up but has always preferred Linda’s lap to mine.

My bus project for today was reassembling the plumbing to the two fan-coil heat exchangers that go in the bases under the two desk pedestals.  Yesterday I cut new holes for the supply and return hoses.  My first task was to remove the hoses from the bleeder valves and install barbed plastic plugs in the ends to prevent coolant from coming out.  I then pulled the hoses back and out through the new openings.

The area behind the desk where the heater hoses emerge from the passenger side OTR HVAC duct.

The area behind the desk where the heater hoses emerge from the passenger side OTR HVAC duct.

I worked on the hose for the right hand (rear most) heat exchanger first.  I positioned the base, routed the hose to the lower fitting, and marked where to cut it.  I put a plastic paint tray liner under the hose before I cut it but more coolant came out than I expected.  I got as much of it in the liner as I could and grabbed a bunch of paper shop towels.  I got the liner outside without spilling any antifreeze and poured the used antifreeze in a one gallon jug that I keep for just this purpose.  I used a funnel that is also reserved for use with antifreeze.

I took the cut off piece of heater hose outside, plugged end down, and set the open end in the tray liner.  We already had a bucket of soapy water in the bus as we had planned on hanging wallpaper yesterday.  I wrung out the sponge and then squeezed some of the soapy water on the floor and cleaned it up with paper shop towels.

The left and right desk bases and center cover/spacer set in place.  The heater hoses are not yet connected.

The left and right desk bases and center cover/spacer set in place. The heater hoses are not yet connected.

With the mess cleaned up I slipped two hose clamps over the end of the hose and worked it onto the lower fitting on the heat exchanger.  If only it had been as easy to do as that description!  The 3/4″ i.d. rubber heater hose did not just “slip” over the 3/4″ o.d. copper pipe even with some residual antifreeze lubricating the inside of the hose and the outside of the pipe.  Indeed, it took considerable and simultaneous pushing and twisting to get the hose on.  It was also a lot harder than I expected to work with the heat exchangers installed in the bases, even without the desk pedestals in place.

I was interrupting my work as needed to take photographs and as I finished up the first hose the camera refused to trigger the shutter.  The LCD screen indicated that the compact flash memory card was full so I went to my office to offload the images from the last few days.  My other CF card was empty so I put that in the camera and set it aside.  I had not backed up my photos to the Network Attached Storage units in quite a while so I decided to take the time to do that.  While I was at it I backed up my blog posts from December of 2014 through July of this year along with several issues of The Gypsy Journal.

As long as I was at my computer I checked my e-mail accounts, logged into RVillage, and logged into my account at B&H Photo.  My new Sony alpha 99 and accessories were on their way from New York and due to be delivered by the end of the day tomorrow.  I am excited to finally be getting a new digital camera with a full frame (35mm) sensor that will work correctly with all of my old Minolta A-mount lenses.

By this point it was lunchtime so I cleaned up (antifreeze is definitely NOT good eats) and scrounged around the kitchen for something tasty but easy to fix.  My “go to” meal is usually roasted red pepper hummus and sourdough pretzel nibblers.  We had a little hummus left, which I finished, but I was still hungry so I made a bowl of popcorn.  I would probably not make a good bachelor.

I went back to the coach and contemplated attaching the other hose to the left heat exchanger.  While I was thinking about it Linda called to let me know she was on her way home.  It was 1 PM so I decided to wait for her to get home to help me install the second hose.  I had some phone calls to make and used the time for that.

I called Karen at Bratcher Electric to schedule the upgrading of our 60 Amp sub-panel in the garage to a 100 Amp main panel.  While I had her on the phone I asked if Mike would itemize the quote.  I also mentioned that they had picked up two or three whole house generator customers through my referrals and perhaps Mike could provide some consideration for that in the pricing.  Next I called Ferman Miller at Countertop Plus in Shipshewana, Indiana to check on the Corian desk top and table.  Ferman answered the phone and said he had called Josh this morning to let him know the pieces were ready for pickup.  I then called Josh to see what his plans were.

We originally agreed that he would pick them up and bring them to our house on his way to visit relatives in the northeast side of the Detroit metropolitan area.  His plans had changed and he won’t be visiting his relatives anytime soon.  He is leaving on Tuesday for a FMCA area rally in the Carolinas and will be gone for a week.  Before he leaves he needs to get something to a customer in Cleveland in addition to getting our stuff to us or deciding that we will have to drive to Shipshewana to get it ourselves.  One option is that we meet him somewhere on Sunday.  Ann Arbor is a possibility but Toledo or Defiance (Ohio) are more likely rendezvous points.

Linda got home around 2 PM and changed into her work clothes.  With Linda’s help I was able to avoid the mess I had with the first hose.  The second hose was even harder to get on than the first one but we managed to do it.  In part because of the arthritis in the joints at the base of my thumbs I do not have as much grip strength as I would like and often need.  The twisting and pushing was hard on my hands and the confines of the base and proximity of crisp wooden edges resulted in lots of small cuts.  This was not something I anticipated in the design and construction of the bases and the installation of the heat exchangers.

I took a break and drove to Northwest Plumbing Supply to see if they had a bleeder valve like the ones in our bus system.  They did not and had never do seen anything like it before.  The showed me a couple of things they did have but I did not buy anything.  I got a call from Brighton Honda that my car was ready for pickup so I headed home to get Linda.  She drove me to the dealership and then went on to Meijer’s for a few grocery items.

I drove to Lowe’s in Howell and was fortunate to find Lars in the plumbing department.  The store was not very busy and he took an interest in showing me various plumbing options that might allow me to replace the bleeder valve with something that would do the same thing while also giving me a way to add antifreeze to the system.  What I ended up with was 3/4″x3/4″X1/2″ copper sweat T and a 1/2″ sweat ball valve with a waste port.

Bruce works on attaching the heater hoses to the fill/bleeder valve T assembly he built.

Bruce works on attaching the heater hoses to the fill/bleeder valve T assembly he built.  (Photo by Linda.)

Back home I cleaned some 3/4″ and 1/2″ copper pipe with 120 grit plumbers sandpaper.  I cut two pieces of the 3/4″ pipe about 3″ long and one piece of the 1/2″ pipe about 1-1/2″ long.  I brushed the inside of all the fittings and test fit the pieces.  I then applied flux to all of the surfaces to be soldered, inserted the two 3/4″ stubs into the run fittings, inserted the 1/2″ stud into the bull fitting, and put the ball valve on the other end of the 1/2″ pipe.  I used the lever on the ball valve to mount the assembly in my bench vise.  I removed the waste port cap to protect the neoprene seal and opened the ball valve so as not to trap heat inside.  I then heated the T and the end of the valve and applied the solder.

I figured there had to be an easier way to get heater hose onto the heat exchanger and that Butch was the guy who would know what it was.  I called and he said antifreeze can obviously be used and works fairly well but that a small amount of dish soap would also work as a lubricant and not harm the antifreeze or the Aqua-Hot and its components.  As long as we were on the phone I caught up on their activities.

They were still there at the RV Park in Bouse, Arizona but only until the 15th of this month.  The terms and conditions of their employment as managers of the park had not turned out to be as described during the interview process and they are wrapping up after only a month on the job.  They will move their bus back to Quartzsite and spend at least part of the winter at Joe and Connie’s place where we both spent last winter.  I know it was a big disappointment to them that the situation in Bouse did not work out, but their situation in Q will be familiar, comfortable, and inexpensive, as well as convenient to the Quartzsite Gem and Mineral Club which they joined this past winter.

For dinner Linda made a blend of onions, garlic, mushrooms, and power greens and served it over a baked potato topped with Daiya cheese.  It was very yummy, and the potatoes kept the dish warm all the way to the end.  The weather had turned cloudy through the afternoon and we got the first raindrops during dinner.

The fill/bleeder valve T assembly with the heater hoses connected.  The assembly is located between the bases at the floor and will be hidden by the center connector/cover.

The fill/bleeder valve T assembly with the heater hoses connected. The assembly is located between the bases at the floor and will be hidden by the center connector/cover.

I had really hoped to have the hydronic heating system reassembled today so we went back out to bus after dinner to hook up the heater hose that runs between the two heat exchangers.  This was actually two pieces of hose with my homemade bleeder/fill valve half way between the two exchangers.  Even with dish soap the two hoses were very difficult to get onto the heat exchanger fittings and the bleeder/fill stubs, but I got them on.  Linda took pictures while I grunted, groaned, and moaned and I took a few more when I was done.

It was 8:45 PM when we finally quit working, secured the bus, and went inside.  I cleaned my hands as best I could but I could not get all of the black from the rubber hoses to come off.  We sat for a while in the living room and had the last of the frozen chocolate torte that Linda made a couple of weeks ago.  We finally turned in around 10 PM and watched Rick Steve’s Europe, Travel in the Americas, and a couple of cooking shows while I worked on this post.

 

2015/10/07 (W) The Root Cause

We had Linda’s homemade granola for breakfast with fresh blueberries.  Berry season is just about over for the year and they will become more expensive as they have to be transported from farther away.  I made a pot of Sweet Seattle Dreams, the half-caff blend that Jeff makes just for us, and we drank it in the living room.  Linda checked in on the world and pulled up the latest video from NutritionFacts.org while I researched hardwood veneers on Rockler.com.

After breakfast and coffee I called Metro Environmental Services to arrange to have the culvert under the road cleaned out.  They were able to schedule us for this afternoon so I accepted that appointment.  I then called Brighton Honda to check on my car and left a message for Rob, the service advisor who wrote up the repair for the driver side door lock.  I had no sooner left that message than I got a call from Karen at Bratcher Electric.

Mike had worked up the quote to install the 100 Amp disconnect, tie it into the output of the transfer switch, and run a 100 Amp 4-wire service entrance cable to the current sub-panel, making it into a main panel.  They would also disconnect and cap the current sub-panel feed from the basement as part of the work.  At just north of $1,300 it was a good $300 higher than I expected.  My expectation, however, was not based on anything specific other than my own sense of the cost of materials and the amount of labor that might be involved, plus a desire for it to not cost more than $1,000.  🙁

With the phone calls taken care of we worked in the bus for the rest of the morning.  Linda worked on stripping the remnants of wallpaper that remained after we removed the mirrors from the lower outside hallway wall yesterday.  I worked on re-routing the heater hoses for the fan-coil heat exchangers.  She got her job done before I got mine done.  That’s usually the way it is.

To start, I removed one of the old 4″ round plastic grates and used my inspection mirror and a flashlight to examine the inside of the HVAC duct.  What I discovered was that the two heater hoses were secured periodically with plastic cable clamps to the outer wall of the HVAC duct.  I also discovered that the metal part of the duct is just the inner wall and top.  The bottom is the plywood subfloor of the bus and the outer wall is the plywood wall.  As originally built the metal portion of the duct could be removed but when Royale Coach did the conversion they built cabinets around the ducts and put wood wiring chases on top of them in such a way that they can no longer be removed without partially disassembling the coach.

The location of the hoses and wires in the duct was such that I could safely use my 4″ bi-metal hole saw to cut access holes for the hoses.  I determined where the cable clamps were located by measuring inside the duct.  I then marked where the access slots in the bottom back of the bases would be located and determined where I needed the two hoses to emerge from the duct.

The manual sheet metal nibbler used to cut a line between the bottoms of the two holes in the HVAC duct.

The manual sheet metal nibbler used to cut a line between the bottoms of the two holes in the HVAC duct.

There was already a 4″ hole at one of my needed locations so I drilled a second one next to it with an inch in-between.  I used Chuck’s hand powered sheet metal nibbler to connect the holes together to make an opening that looked like the track around a football field.  We vacuumed up the metal chips and I then installed door edge molding all the way around the edge of the opening.  I was able to reach the screws holding the first pair of cable clamps with a #2SR screwdriver and remove them.  This large slot will be behind the left end of the center connecting cover of the desk and the hose for the heat exchanger that goes in the left base will come out of it.

 

Plastic U-channel door edge molding installed around the new heater hose opening.

Plastic U-channel door edge molding installed around the new heater hose opening.

The location of the next pair of cable clamps corresponded, roughly, to where I needed the hose for the right heat exchanger to emerge.  I drilled two 4″ holes, side-by-side, at that location and nibbled out the little bit of metal in-between them to make a second slot.  Again, I installed the door edge molding around the entire edge.  The molding was a tight fit, and I had to use a screwdriver to get it to go on the inner curves, but I got it on.  The U-channel is locked in mechanically and has adhesive in it so it should stay put once it has had a few days in place.  Once the hoses are re-routed I will put screen material, and perhaps some solid plates, over the openings to prevent critters from gaining access to the living area by way of the HVAC PCTS (Prevost Critter Tunnel System).

 

The access holes in the OTR HVAC duct in the area behind where the desk will be installed.

The access holes in the OTR HVAC duct in the area behind where the desk will be installed.

Linda had two medical appointments this afternoon, both routine diagnostic procedures, so she got cleaned up, changed her clothes, and left around 12:30 PM as I was finishing up the second slot.  I went inside and was thinking about making something for lunch when the doorbell rang.  It was our mail carrier, Michelle, with a package that was too big for the mailbox.  A few minutes later the doorbell rang again.  I figured it was Michelle again, but it was one of the guys from Metro Environmental Services.  They were supposed to call first but just showed up.

I put my shoes on and walked them down to the clogged culvert that goes under the road.  I was really hoping they could clean it out from the south side but when we went into the woods we could not see the end of the culvert.  They got a metal detector and located the end of the pipe.  It was almost completely buried and had a massive root running right in front of it from a very large nearby tree.  They got a shovel and dug out around the root, exposing much of it and the end of the pipe.

The tree was probably 30″ in diameter at the base and the root was at least 10″ in diameter.  I got my (new) 18″ chain saw but had trouble getting it started.  It turned out it was out of gasoline.  Once I got it started I tried to cut through the root on either side of the culvert.  I thought I was all the way through on one end (closest to the tree) and most of the way through on the other end, but the root would not budge.  I dulled the teeth on the chain to the point where the saw would no longer cut and did not want to take the time to put a new chain on just to ruin it quickly.  The guys finally agreed to hydrojet the culvert from the north side of the road.

The actual cleaning out of the culvert did not take that long.  The pump produces 2,000 PSI and they used about 300 gallons of water from the onboard tank on their truck.  The head on the end of the hose has one forward facing nozzle and many rear/side facing nozzles.  The forward facing nozzle loosens and cleans out the area directly in front of the head while the other nozzles force the head forward and blast whatever is in the pipe back out towards the entrance.

They started with a small head and ran it in until there was water coming out the other end of the culvert.  They then pulled the hose back and switched to a much larger head and ran that all the way through and back.  When they were done muddy water filled the culvert and the depressions on either end.  On the inlet end the water was only about 3″ deep in the bottom of the culvert but on the outlet end it was near the top.  They billed me for the minimum first hour amount even though I think they were here longer than that.

I called Phil to let him know what we had run into.  He was surprised, to say the least, as he thought he had checked the other end of the culvert.  Obviously not, but that’s water under the road, so to speak.  Besides the problems with the root and the discharge end of the culvert being below the surface, it looked to me like the discharge area was something of a low spot and it was not obvious to me where water would flow from there.  I have learned, however, that I am not very good at judging such things visually.

Cory, our neighbor across the street, had come over to see what was going on.  He offered that the discharge area does, in fact, drain to the south through his property and eventually to Golf Club Road.  Cory has been here for 30 years so I have no reason to doubt the truth of that.  The elevation where Golf Club ends at Hacker and where our street ends at Hacker appears to be about the same.  Our street is fairly level while Golf Club has a little bit of up and down, but it is subtle.  I suggested to Phil that we might have to clear a path into the woods for his small digger and do some trenching to give the water a way out.

While Cory and I were chatting I noticed that the trees along this part of the road were hanging out over the road on both sides and were rather lower than they should be.  This is the very thing I complain about with regards to the way most of our neighbor’s fail to maintain their properties along the road.  I decided I should do something about it so I got our pole saw and spent a couple of hours trimming the low overhanging branches.

Linda went to the Whole Foods Market in West Bloomfield following her medical appointments and got home just as I was finishing up the pruning.  She went for a walk while I called John Palmer of Palmer Energy Systems in Florida.  I bought our Magnum inverter/charger for the bus from John along with various accessories and batteries.  I needed a 4-wire terminal block for our Magnum Battery Monitor Kit (BMK) because I had messed up the one that came with it when I originally installed it.  John confirmed that Magnum Energy had recently been acquired by Sensata, and was in the process of relocating the plant to Minnesota, but that several of the old-timers were still on board.  John needed to talk to Tom anyway and asked me to call him back in a week to see if he was able to get the connector.

I checked with the service department at Brighton Honda again and Rob said he expected to get the new door lock mechanism back from the locksmith tomorrow morning and to have the car ready for me to pick up by the end of the day.  It will be nice to finally have it back.

The cloudy weather finally broke today and we saw some blue sky with brighter light levels than we have had recently.  The day was lovely but a little on the cool side by late afternoon so we both had a cup of hot tea.  Linda took advantage of the light to work on her counted cross-stitch project, a holiday stocking for grand-daughter Madeline, and I went back to the bus to sand off the last traces of the old wallpaper from the outside wall in the hallway.

I used our Porter-Cable 1/4 sheet palm sander with 80, 120, and finally 220 grit sandpaper.  The sander has an integral dust collection bag but it does not capture all of the dust.  I used the vacuum cleaner to pick up as much of the residual dust as I could and then used a tack cloth to wipe down the wall.

For dinner Linda made pan-grilled tofu with caramelized onions in sweet barbecue sauce.  She served it open-faced on rye bread, because that is what we had, and steamed some fresh green beans as a side dish.  Yum.

After dinner I drove to Lowe’s.  I needed something I could use to plug the two heater hoses to keep them from leaking as I pull them back through the HVAC duct and out through the new slots I made for them today.  I ended up buying two 3/4″ barbed plastic plugs.  While I was there I looked to see if they had any bleeder valves but they did not.  They do not sell parts designed specifically for hydronic heating systems and I will have to go to Northwest Plumbing and Supply for such items.

While I was in the plumbing isle I looked to see if I could figure out some combination of parts to make a fill valve for the system but did not see anything that inspired me.  I would love to have one or more high point expansion tanks on this system but I do not have any easily accessible places for them from which I could also run overflow drain lines.  There is a good sized volume of unused space behind the drawers on the passenger side of the bedroom but it would be a very difficult place to install anything.  Perhaps Northwest Plumbing and Supply will have something.

On the way home I stopped at the BP station and topped up the fuel tank in Linda’s car.  I drove home with greater consideration for fuel economy than usual and managed to get the average MPG up to 56.7 before it dropped back to 55.4 as I pulled in the driveway.  It will drop into the upper 40s as soon as Linda starts the engine tomorrow morning but it was fun to get it into the driveway with numbers above 55 MPG.

 

2015/10/06 (T) Trimming & Stripping

We did not get an early start to our day today.  I got up a little after 8 AM and Linda got up 15 minutes later.  Even so, she still had our granola and berries ready before I had the coffee made, but in my defense I had the extra step of transferring the three pounds of coffee we bought yesterday from their paper bags to our metal containers with the air-tight lids.  We were wondering about whether grapes are berries so Linda Googled the topic.  Botanically, grapes are berries but strawberries and raspberries are not.  Also included among the “true” berries are bananas, tomatoes, cucumbers, and eggplants.  That’s right, tomatoes, cucumbers, and eggplants are fruits.

Linda left at 9:30 AM to meet Diane at Kensington Metropark for a 10 AM walk.  Mike from Bratcher Electric showed up at 10:30 to revisit the wiring project I needed his company to do.  They are going to install a 100 Amp disconnect switch next to the transfer switch in the southwest corner of the garage, run power to the disconnect switch from the transfer switch, and then run a 4-wire service entrance cable (SEC) from the disconnect switch through the garage attic to the electrical distribution panel in the closet with the HVAC system for the library.  The electrical panel is currently a 60 A sub-panel of the main distribution panel in the basement and this project will convert it to a 100 A main panel while still allowing it to be powered by the generator if the utility power goes out.

When Mike left I gathered up the two metal cutting tools I borrowed from Chuck, our corded 1/2″ Craftsman drill (which I needed to power one of the nibblers), the small Rigid drill kit, and my telescoping inspection mirror.  My plan was to cut one or two openings in the passenger side HVAC duct for the heater hoses but I decided to do some yard work instead.

We still had some bushes growing out over the drainage ditch by the mailbox and I wanted to get them trimmed up and add the waste material to the timber pile before Phil hauled it away tomorrow (hopefully).  I was still working on this little distraction when Linda got back from her walk so she got a pair of gloves and helped.  The bushes and trees in this area have an extensive system of vines running through them.  I got a lot of the smaller vines cut and pulled free and I managed to trim one bush back enough to create an “entrance” to the inner part of this stand of trees.

Once I was “inside” the grove I found one of the main sources of the vine, a massive thing that looked like something out of a Harry Potter movie.  It was easily 10″ in diameter where it came out of the ground and had 4″ to 6″ pieces branching off in different directions.  I have no idea what kind of vine this but I suspect it is a wild grape vine.  Given its size I surmised that it has been there for a very long time gradually chocking off the trees.  I will have to eventually cut it out, but I would like to find out first just exactly what it is.

Linda helped drag all of the clippings over to the disposal pile where we cut some of them into smaller pieces before adding them to the pile.  We noticed a small tree hanging out into the space above the driveway that Phil is about to build.  We thought the tree was dead and decided to cut it down.  It was 5″ in diameter 6″ above the ground–big enough to require the chain saw–and also had a lot of branches that were large enough to be more expeditiously dispatched with said same machine.

After felling the tree and de-limbing it I was not so sure that it was dead.  We had a half dozen other trees along the northern edge of this stand woods that looked to be similarly dead but I decided not to cut them down.  One in particular had a lot of obviously new, small branches.  We will wait until spring and see which, if any, of these trees develop leaves.  If they are alive I will trim them instead of cutting them down.

We put away the yard tools and took a break to have a light, late lunch of vegan cold cuts sandwiches and black grapes with a glass of beet juice.  I like beets on salads and as a side vegetable.  Beet juice is OK but a bit more of an acquired taste.  We have added it into our daily food plans because of its ability to control blood pressure.  Linda is adding ground flax seed to her granola for the same reason.

Measuring and cutting wallpaper on the dining room table in the house.

Measuring and cutting wallpaper on the dining room table in the house.

At 2 PM we decided to hang the wallpaper in the hallway of the bus so we gathered all of our tools and took them to the coach.  I measured the wall and determined the lengths (30″) and widths of the four pieces; two full width (26.5″) and two partial width (15.5″), one for the left end and one for the right end.  We cut the four pieces on the dining room table in the house where we could unroll over six feet of wallpaper, measure more accurately, and cut more easily.  We cut the two full pieces out of the end of the first double roll and cut the two partial pieces out of the beginning of a new double roll.

Linda took the pieces to the bus and laid them out on the bed.  I was getting ready to pour some GH-95 paste into the tray and roll it onto the wall when I decided to remove the trim board that separates the upper wall from the vertical mirror strips on the lower wall.  My intent was to avoid having to trim the bottom edge of the wallpaper by tucking it behind this board.  What I discovered was that the strip mirrors on the lower portion of the wall were glued to the wallpaper and some of them were loose.

The fact that the mirrors were glued to wallpaper and not to the plywood wall surface meant that they could be removed.  I unscrewed the four vertical pieces of wood trim that framed the mirrors in three panels and then removed the bottom trim piece.  I carefully removed each mirror by prying the underlying wallpaper loose from the wall using a large screwdriver and working from the top down.  When the entire strip was loose I cut the wallpaper to release it.  I handed them to Linda and she stored them carefully inside the built-in sofa.  I managed to get all of them off except one which fractured in several places.  We taped it up and vacuumed up the few glass fragments that were created when it broke.

At this point we were clearly not going to hang the four pieces of wallpaper we just cut as we needed to finish stripping the base layer of the old wallpaper first.  We also had to take a little time to decide how to finish the lower wall.  One option would be to wallpaper the entire wall and not put the wood trim back.  We probably have enough wallpaper to do that, even after cutting the four smaller pieces for the upper wall, but we did not think the wall would look right if we did that.

Another option would be to install wood panels to replace the mirror strips.  In this case we would use a light wood with a natural finish to provide an intentional contrast with all of the walnut trim.  The mirror strips are slightly beveled on their long edges and measure 3/16″ thick at those edges.  That means a 3/16″ hardwood veneered plywood should be a perfect fit, allowing all of the wood trim to go back in place.  Maple or Birch with a natural finish are the most likely choices.

The wood panels is the option we will almost certainly pursue and we do not have to resolve exactly what panels to use in order to finish wallpapering the upper part of the wall.  All told this will push our finish date back a couple of days, but we don’t really have a finish date anyway, and we will like the final result a lot better.  We really do not like the strip mirrors and wish we could remove or cover all of them.

It was only 4:30 PM when we quit working in the bus for the day but we had both had a relatively physical day and were ready to quit.  The lighting in the hallway was also a little dim due to the continuing heavy cloud cover which was having the added effect of lowering our energy level and enthusiasm a bit.

My last couple of e-mails to Lou Petkus of the SKP Photographers BoF had gone unanswered so I called Lou to make sure everything was OK.  It was; he and Val have just been very busy.  We know about busy.  We had a nice chat about cameras and RVing plans for the upcoming winter.

Linda always puts nice dinner meals on the table and tonight was no different.  She halved and cored a white acorn squash and baked it in the oven with a little vegan butter and brown sugar.  She had a few Brussels sprouts left over and some baby carrots so she added onions and sautéed them to make a very good vegetable medley.  Finally, she heated a package of mock chicken in orange sauce.  The trio of dishes was not only tasty but lifted my spirits; not that either of us are down, but the weather has been heavily overcast for several days and had a slightly depressing effect on our moods.

I got a call from Phil after dinner updating me on his availability to work on our driveway and French drain project.  The 2-day job he started yesterday morning is probably going to take him the entire week to finish so there is very little chance we will see him back at work on our project before next Monday.  He did, however, find time to call a company that can hydrojet the culvert under our road and find out their pricing.  He gave me the name and phone number and I will call them tomorrow and try to set something up.  The other upside is that we have more time to pull dead trees out of the woods in front of our house, cut them up, and add them to the disposal pile, if we so choose.

Linda’s favorite TV shows are concentrated on Sunday, Monday, and Tuesday evenings so we watched NCIS and NCISNOLA followed by an episode of LIMITLESS, just to see what it was like.  I watched Two and a Half Men, which I happen to find very amusing, and then went to sleep.

 

2015/10/01 (R) New Month, Same Project

For various reasons we have not worked on the bus the last two days.  For one, Linda is still recovering from a cold and/or seasonal allergies that may have been triggered by some weeding she did over the weekend.  August and September are the time of year for ragweed in Michigan.  For another, I was tied up most of Tuesday with the bus windshield replacement and yesterday we both had our annual physical exams, mine in the morning and Linda’s in the afternoon.  Throw in an unexpected problem with the driver door lock on my car and a lawn tractor that wouldn’t start and that took care of most of the day.  Since I wasn’t working on the bus I used some of my time to edit drafts of blog posts and started selecting and processing a few photos to go with them.

I got a call from Philip Jarrell around 8 PM last night letting me know that a last minute project came up that required his attention today.  If all goes well he plans to start on our French drain and driveway extension project tomorrow.  Our project is a relatively small job for Phil and I accept that he has to fit it in around larger projects for long-term customers who give him a lot of repeat business.  Still, I think he likes working with us and does his best to fit us in.

I had hoped to get back to work on the bus today, specifically working on priming the walls and hanging the new wallpaper, but Linda had another annual medical appointment this afternoon.  Neither of us likes to get into our work clothes and get involved in physical tasks for just a small portion of the day so after breakfast, and a leisurely morning in the living room enjoying coffee to the glow and warmth of our fireplace, she settled in to work at her desk for a while before going on a walk.

Our whole house generator threw a code 34 on Tuesday afternoon indicating that it required maintenance but would still operate if needed.  I called Bratcher Electric to see what was needed and spoke with Karen.  I think she and Mike own the business, but it’s possible she is Mike’s daughter.  Whichever, I’m certain that she is family.  Our generator was last serviced one year ago on the same date (29th) and the 34 was the total number of hours it has run since being installed in May 2013.  I set up the service appointment for Friday October 9th.

While I had Karen on the phone I asked about the project Mike had come out to look at a year ago.  I need his electricians to run a 4-wire, 100 Amp service entrance cable (SEC) from the transfer switch in the southwest corner of the garage, through the garage attic, and into the secondary distribution panel in the HVAC closet in the northeast corner of the garage, making it a main panel instead of subpanel.  Karen said she would leave a note for Mike to follow up with me.

It was going on noon when I finally got back to work on the bus.  It is a gorgeous fall day, chilly and breezy but with abundant sunshine, and I just could not let it slip away without getting something done on our interior remodeling project.  I was at least 60% done with rebuilding the landing where the stepwell slide cover used to be and that seemed like the logical thing to get finished.  It was 52 degrees F in the bus so I turned on the front electric toe-kick heater and set up the small Broan portable electric heater in the kitchen blowing forward towards the cockpit.  I also noticed that the refrigerator thermometer indicated 43.5 degrees F.  We do not have any food in the fridge but we do have freezer packs and containers of water for mass.  43.5 is warmer than I want so I checked the freezer reading and it was 28 degrees F.  Yikes!  That was way too warm.

Frame and center support for the new landing platform. Air lines crimped and secured.

Frame and center support for the new landing platform. Air lines crimped and secured.

The 31″ X 27.5″ piece of 3/4″ thick plywood for the landing platform flexed slightly when I stepped in the middle.  I’m not sure anyone would notice it when stepping on it but we do not want the tile that will be on there to crack from the deflection.  My solution was to cut an appropriate length of the 2.5″ wide 3/4″ thick poplar and install it on edge running long ways to support the middle of the plywood.  I had to use an angle bracket at the back edge (by the driver’s seat) and place shins under it at several places to get it to fit just right.

About this time Linda came out to let me know lunch was ready.  We each had a half sandwich of hummus and raw onion on rye bread and some black grapes.  She left for her doctor’s appointment and I made a big cup of Constant Comment decaffeinated tea.  I called Chuck to see if he knew where his powered metal shears (nibbler) were and if I could borrow it.  The answers were ‘yes’ and ‘yes.’  I decided to take his suggestion of cutting two new access openings in the passenger side HVAC duct to allow the two existing heater hoses to come out and go directly to the fan-coil heat exchangers with minimal bending.  It will simplify the installation, eliminate soldered copper parts and connections that would restrict flow and be a potential leakage point.  Since my car is in the shop for the next several days I will have meet up with him when Linda’s car is available.

Back in the bus I checked the refrigerator and the fresh food compartment was at 39 degrees F and the freezer was At 6 degrees F.  Those are the sort of temperatures I expect to see.  I had the freezer set to cycle between about 0 and 10 but occasionally saw it go as high as 17.  I figured it had something to do with an automatic defrost cycle, but anything over 20 is troubling.  Linda had suggested earlier that perhaps we need to replace the batteries in the remote sensors and the base unit.  She may well be right and it won’t hurt to do that anyway.

When I got back to work on the landing I folded over the ends of the two air lines and put cable ties on them to close them off.  The air supply for the solenoid valve that controls these two lines has a shut off valve which I intend to keep closed, but if it gets opened accidentally it could drain the auxiliary air tank through one or the other line if they were not crimped closed.  I may eventually disconnect the supply line at the valve and cap it, but for now this will at least prevent an open line leak.

New landing platform structure with sound/thermal insulation.

New landing platform structure with sound/thermal insulation.

After screwing down and cutting off the shims I plugged the hole where the air lines come through the floor with steel wool and secured the lines to the floor with cable clamps.  I then cut fiberglass insulation to fit the two spaces in the floor.  I used the same John’s Manville Sound & Thermal insulation that we used in my office and ham shack as I had some left.  I put the plywood floor piece in place, evened it up along the front edge, and screwed it down but ran out of screws before I had it completely secured.  Projects are like that.

I was walking towards the garage when I saw a car coming very slowly from west of our house headed east.  The drive pulled past our third drive and stopped but I could not see what the driver was doing.  The car eventually continued on, followed closely by a second vehicle and I thought the flashed me a somewhat dirty look, but they did not stop and were too far away to be sue.  Still, I thought that was odd.  I did not give any further thought to it until I went out to get the mail and noticed a lot of debris in the road and a large, dead tree in the ditch.  It had been windy all morning and at one point I thought I heard the crack of a falling tree but it sounded farther away than where this one lay.  The driver had obviously stopped to move it and was probably a little bit annoyed that they had to do that because I had not taken care of it.  Hey, I didn’t know!

I moved it a little more and then got a metal toothed rake and pulled all of the small debris out of the road.  There were limbs on the other side of the road that were 1″ to 2″ in diameter so the tree had obviously fallen all the way across the road.  The property on the other side of the road is part of our yard but I would have cleaned up the branches regardless since the tree clearly fell from our yard.

Linda stopped for groceries on the way back from her doctor appointment and did not get home until almost 4 PM.  We got a pruning saw and cutter and she helped me cut up some of the upper part of the tree and get the pieces farther from the road.  We noticed another dead tree in the same area that looked like it would eventually fall over across the road.  I can cut it down safely but will need the chain saw to do so.  I was not in the humor to get it out and try to get it started at that exact moment but noted to myself that I needed to do this sooner rather than later.

We were not going to start any messy bus work at that hour so I changed into nicer clothes to go out to dinner.  Before we left I texted Josh at Coach Supply Direct to clarify an earlier e-mail and let him know that two of the MCD shades were not staying attached to one of their clips.  We left at 5 PM for the La Marsa in Brighton and stopped at the bank on the way.  For dinner we split an order of Moussaka and got two salads as our sides along with the warm pocket bread and garlic spread.  The food was good and we had a tasty, filling meal for under $14 plus tip.  It is our best/favorite restaurant option within reasonable driving distance of our house.

After dinner we stopped at The Home Depot in Brighton but they did not have the screws I wanted.  When we came back out I noticed that the tires on Linda’s car were under-inflated and on closer inspection that the side walls were badly checked.  We drove to Discount Tire in Howell but they were closed.  We stopped at Lowe’s and bought the screws I needed, some furnace filter material, and Lithium batteries (AA and AAA) for our TempMinder base/remote thermometers as we keep the two remotes in the bus freezer and fresh food compartment and the base station on the bus kitchen counter.

Back at the house I worked in my office for a while selecting/processing photos to go with blog posts but I did not feel like putting in a long, sustained effort on the task.  I got a call from Phil at Precision Grading.  His other job did not get finished today and he will have to return to that job site tomorrow.  He hopes to start our French drain and driveway work on Monday but that may not happen.  I am anxious for him to get started but I have no control over that.  I appreciate, however, that he keeps me informed as it allows me to plan my own time.

We watched The Woodwright’s Shop, Rick Steves’ Europe, and Travel in the Americas on DPTV (WTVS) and then went to sleep.

 

2015/06/13 (S) On to Illinois

It has turned out to be a wet June so far and we had more heavy rain last night.  In spite of waking up during the night I was up at 7:30 AM and made coffee.  Everyone else got up as suited their level of rest and we sat around chatting for a while.  Ron put a load of laundry in the washing machine and then we sat down to a light breakfast.

Ron and Mary spent most of the rest of the morning repacking all of their stuff for the drive to northwest Illinois and their week-long bicycle ride.  FedEx Home Delivery delivered the Cyclo 5-Pro Mark II Dual Head Orbital Polisher I ordered along with all of the foam pads and detailing chemicals.

Ron retrieved their laundry from the dryer and after they finished packing we had a light lunch.  By 1 PM they were ready to load up the car so we helped get their bags out.  After a brief “farewell and safe travels” they were on their way.  They had a five hour drive but would gain an hour as they entered the Central Time Zone so they would be at their motel by 5 PM local time with plenty of daylight and time to eat dinner.

Linda took a short nap and then went for a walk.  I read through the manual for our SureCall Fusion5s cell phone booster and was part way through the manual for the Cyclo 5 when I decided to take a nap.  Linda returned from her walk and a little while later a USPS mail carrier delivered the OTA TV antenna I ordered from Antennas Direct.  All I am waiting for now is the cable entrance box I ordered from KF7P Metalwerks.

Once the cable entrance box arrives I will have a bit of a project.  First I will need to drill two 2″ holes through the east wall of the house and into the sump pump closet in the northeast corner of the basement, mount the box to the wall, and ground it to the outside ground rod by the tower.  I may also need to install additional ground rods.  I will then need to climb the tower by the house and do the following:

  1. take down the old OTA TV antenna and rotator;
  2. mount the new OTA TV antenna and aim it;
  3. mount the amplifier for the OTA TV antenna;
  4. attach a short piece of 75 Ohm co-ax from the antenna output to the amplifier input and weatherproof the connections;
  5. attach a longer piece of 75 Ohm co-ax to the output of the amplifier and weatherproof the connection;
  6. mount the outside antenna for the cell phone booster system;
  7. attach one end of a 50′ piece of LMR-400 or RG-213 co-ax to the cell phone antenna and weatherproof it;
  8. unmount our Diamond SG7900 2m/70cm ham radio base station antenna and remount it at the top of the tower;
  9. attach a 50-to-60 foot length of LMR-400 or RG-213 co-ax to the ham radio antenna;
  10. dress and secure all of the coaxial cables with plastic cable ties (zip ties).

Once I am done with tower work I will need to do the following to complete the installation:

  1. install the lightning arrestors in the cable entrance box for the cell phone booster and OTA TV (?) co-ax cables;
  2. route each of the co-ax cables into the bottom of the cable entrance box and attach them to appropriate lighting arrestors;
  3. attach additional co-ax cables to the lightning arrestors and feed them through the 2″ holes into the basement;
  4. mount the Surecall Fusion5s in the sump pump room and connect the co-ax for the outside antenna and the power supply;
  5. run a 50′ length of LMR-400 from the sump pump room across the basement ceiling and up through an old vertical furnace exhaust chase to the attic;
  6. drill a hole in the ceiling of the main floor hallway near the chase;
  7. mount the inside done antenna for the cell phone booster system to the ceiling with the co-ax dongle in the attic;
  8. connect the antenna dongle to the co-ax coming up from the basement;
  9. run additional co-ax from the sump pump room to the ham shack;
  10. run additional co-ax from the sump pump room to the video distribution point in the laundry room (or directly to the locations of the two TV sets);
  11. turn on the Fusion5s booster (transceiver), adjust the gain (if needed) and test it with our phones and Mi-Fi;
  12. test the TV sets (and hopefully not have to go back up the tower to reposition the antenna);
  13. connect our Icom IC-7000 amateur radio and test the antenna connection.

As I wrote out this list it occurred to me that I need to make a list of all of the co-ax types/lengths/connectors I need and that, at a minimum, I probably need to order a length of LMR-400 orRG-213 co-ax cable and the proper N-connectors to complete the ham radio antenna connections.  It also occurred to me that I might be able to do some of the inside wiring while I am waiting for the cable entrance box to arrive.  Also, once the TVs are connected Linda can scan for channels and communicate with me with our HT ham radios if I need to change the aim of the antennas on the tower.

All of this reminded me that I need to follow-up with a Bratcher Electric on running a new 100 Amp main feed from the transfer switch to the panel in the furnace room in the garage.  I also need to order some new split foam fillers from Critter-Guard and new electrical hardware for connecting the bus to the toad from EZ-Connector in California.

I must have been sleeping lightly and dreamed all of these details because I got up from my nap around 5:30 PM, finished reading the manual for the Cyclo 5, and then took a shower and got dressed for dinner.  Barb Spera had called Linda yesterday to see if we were available for dinner this evening.  They had really enjoyed our meal at La Marsa in Brighton a couple of weeks ago and wanted to go again so we agreed to meet them there at 7 PM.  We did not have to wait for a table and our waiter, Najheem (Naa-gheem), was delightful.  Barbara had the Koshary again, and Chuck had the Chicken Shwarma with tabbouleh salad, while we split an order of spicy vegetarian ghallabah with rice and a salad.  I had a mango smoothie and we all enjoyed the swarm pocket bread and garlic spread.

It was after 9 PM when we got home and we headed off to bed at 10.  We knew Ron and Mary had arrived at their destination because Ron played a Scrabble word.  Linda had also checked that our daughter and son-in-law were on their way back from Las Vegas.

 

2015/02/19-23 (R-M) Solo in Q

2015/02/19 (R) Over-Cranked

I have been busy cleaning/waxing the outside of the bus and writing articles so I have not been able to spend much time writing my blog posts or uploading them to our website.  A couple of weeks ago I uploaded the posts through the end of December 2014 but then we got busy and I have not uploaded anything since then.

Here is how my day went.  I Got up at 7:30 AM and had granola with fresh blueberries for breakfast.  It was cloudy and cool most of the morning, so I tried to focus on the bus cleaning/waxing and was able to clean and wax the passenger side of the bus from the front to the back edge of the dinette fixed window.

Another dramatic sunset reflected off the recently waxed driver's side of our coach.

Another dramatic sunset reflected off the recently waxed driver’s side of our coach.

The whole house generator at home runs a self-test every Thursday at 11 AM (EST) and e-mails its status to us.  Instead of getting a message at 9 AM I got one at 9:10 AM (MST).  The message was an Over Crank fault indicating that the Genset had failed to start, had dropped out of Auto mode, and would not attempt to restart until the controller was reset to clear the fault.  I did not assume that Linda had paid any attention to the details of the message so I called her.  She called Bratcher Electric and they told her how to reset the controller.  They also said they had received similar notifications/calls from other customers.  Sure, the temperatures have been below negative 10 degrees F, but the whole reason we have the generator is to protect us against power loss which usually occurs under the worst weather conditions.  The service technician is coming out on Wednesday to check the unit, which is still under warranty.

I took a lunch break at 2PM and had a jumbo tofu hot dog and some hummus with a few Fritos corn chips.  For most of the rest of the day I worked at my laptop selecting and editing photos for my Quartzsite 2015 BCM article.  I made a quick trip to the Road Runner market for some 26 ounce containers of salt and stopped at Herb’s Hardware store looking for a clear filter housing, but they did not have any.

I made a nice, large salad for dinner and finished up the box of Franzia Refreshing White wine.  I continued to process photos for my article late into the evening, taking an occasional break to check e-mail and check out the SteelMasters website.  They sell steel Quonset hut style building kits and this might be a more economical way to build our bus barn, and easier as a do-it-ourselves project.

2015/02/20 (F) Touch of Oranges

I was up late last night so I slept in until 8 AM this morning.  I awoke to cloudy skies and cool temperatures so I skipped breakfast and got right to work cleaning/waxing the passenger side of the bus, which faces south and gets a lot of sun.  I have been working front to back but decided to reverse direction.  The reason was to do as much of the side aft of the patio awning as possible while it was cloudy.  The area under the patio awning is shaded (by the awning) so I can work there anytime I feel like it.

Butch was working on their new VDO electronic speedometer and needed to borrow my air-over-hydraulic bottle jack so I dug it out of the front bay for him.  Mid-morning Lou and Donna Rice stopped by to say “hi.”  They were in town looking for newspapers that Lou could use to mask off their motorhome so he could spray some paint.  It just so happened that there was a large box of newspapers over by the trash container and they were able to get all that they needed at our campsite.

The sunset in Q backlights Saguaro cactus, a palm, and a Palo Verde tree.

The sunset in Q backlights Saguaro cactus, a palm, and a Palo Verde tree.

I quit cleaning/waxing around 11:45 AM and turned my attention to the water softener.  I have regenerated it twice this week, first with solar salt and then with non-iodized table salt, but the water coming out of it is still testing in the 3 – 7 gpg range.  A reading of 7 is considered ‘hard’ so at this point I am not very happy with our water softener.

I filled the filter housing with yet another 26 ounces of finely ground non-iodized table salt and started the regen process for the third time this week.  This time I ran the water more vigorously for a short time and then slowly (two minutes per gallon) and checked for salty water from the outlet of the softener.  When I got very salty water I shut off the flow and let it sit for an hour.  I repeated this a couple more times.  When I took the filter housing off there was very little salt left in the bottom.  I rinsed it out, reinstalled it, and ran water through the unit at the rate of four minutes per gallon for one hour, figuring 15 gallons of filtered water should be enough to flush the saltiness out of the softener.  I tested the discharge water from the softener and it measured somewhere between zero and 1.5 gpg TH.  It should have been zero, but I do not know if the test strips are sensitive to residual salinity.  This process took all afternoon, intermixed with my computer and bus waxing work.

I had granola with fresh blueberries for lunch and then finished yesterday’s post and started this one.  I settled in to work on photographs for my article with periodic breaks to check the water softener.  It was more sunny than cloudy from noon to 2 PM at which point the clouds thickened and filled in.  The air was warm but not hot and the conditions were ideal for cleaning/waxing the “sunny” side of the bus.  That is what I did until 5:45 PM, with a short break to talk to Linda on the phone.  I should be able to finish the waxing tomorrow, put a second coat of Carnu-B Coconut Creme on the passenger side tires, and put a first coat on the driver side tires.

I cleaned up all of my supplies and materials, washed up, and had a few corn chips and hummus as an appetizer.  I washed some red grapes for later and got out an orange.  I have a lot of grapefruit and oranges on board at the moment and try to at least one of each every day.

This was a very dramatic sunset.

This was a very dramatic sunset.

Speaking of oranges, Barb has been using a pair of products from Touch of Oranges; Touch of Oranges Wood Cleaner & Re-conditioner, and Touch of Beeswax Wood Preserver; http://www.TouchOfOranges.com.  I went to their motorhome yesterday to see how it works and the results were quite impressive.  I thought about ordering some but decided not to for several reasons.  For one, we already have Murphy’s Oil Soap Wood Cleaner on board.  It has orange oil in it and I would like to do a side-by-side test.  For another, we are getting too close to our departure date to risk a delayed delivery.  Finally, we don’t have time to use it before we get home anyway.  I might order some in May if I like the way it works better than the Murphy’s product.

I made a fancy salad for dinner.  We bought a large container of mixed salad greens on Monday and I need to have salad every day in order to use it up before it goes bad.  I found carrots and mushrooms in the fridge that needed to be used, so those went on the salad along with dried fruits, peanuts, Daiya pepper jack “cheese” and other yummies.

I continued processing photos after dinner.  By 10:30 PM I was too tired to concentrate and went to bed.

2015/02/21 (S) Facetime with Madeline

I was awake off and on starting at 6 AM and finally got up at 7:15 AM.  The Yuma Hamfest started yesterday and runs through tomorrow but I have too much to do here to spend three hours driving just to window shop.  Besides, Butch had to leave early this morning for a rock and mineral swap meet to try selling some of the equipment they have purchased and decided not to keep.

I did not have coffee yesterday so that was my second task this morning.  My first task was getting the cats their food and water and cleaning their litter tray.  I had granola with raisins and fresh blueberries for breakfast and then sat and enjoyed my coffee while Jasper sat beside me on the couch and groomed himself.

The sunsets in Q were usually good but this one was better than usual.

The sunsets in Q were usually good but this one was better than usual.

It was cool again this morning with a thin cloud layer so as soon as I finished my coffee and checked my e-mail I got to work on the outside of the bus.  That was at 9:15 AM.  It took me until 11:45 AM to finish the passenger side of the bus and apply a coat of Carnu-B Coconut Creme to the driver side tires.

I finished the hummus for lunch with the help of a few Fritos corn chips.  Afterwards I called Jeff to check on our coffee order.  He said it was in the mail but went out a few days later than expected.  He said he expedited the shipping because of that and was supposed to e-mail the USPS tracking number to me.  I then went over to Jim and Barb’s rig and asked if I could test their Touch of Oranges products.  Barb lent me both the wood cleaner/restorer and the beeswax wood preserver along with pieces of terry cloth for each and a piece of 0000 steel wool.  I set those aside and worked on my Quartzsite 2015 article for a while.

I took a break from working at my computer to test the cleaning products.  Following the directions, I sprayed the left side of the kitchen base cabinets with the cleaner/restorer, waited two minutes, rubbed it with steel wool (with the grain), and wiped it off.  I then applied the beeswax preserver with a piece of terry cloth and let it sit for one hour.  While the beeswax product was soaking in I went over and visited with Butch and Fonda.  While I was doing that I got a TXT message from Linda asking if I wanted to Facetime. That meant she was back at the house and had grand-daughter Madeline with her.  I indicated that a little bit later would be better.

My one hour wait was up so I excused myself, went back to my coach, and wiped down the left side of the cabinet.  I then used the Murphy’s Oil Soap Wood Cleaner (with orange oil) on the right side of the cabinet.  The results did not compare favorably with the Touch of Oranges products which definitely improved the appearance of the wood.

I turned on our Verizon MiFi, switched my iPad to it, and then called Linda to set up the Facetime session.  Either I never configured the Facetime app or failed to reconfigure it but it would not let me log in.  Once I got the correct e-mail address and password set up it worked fine.  I called Linda’s iPad and when she answered I got to see Madeline.  When Linda picked her up earlier today Madeline said she was going to grandma and grandpa’s house to see grandma and grandpa.  Linda explained that I wasn’t at the house but Madeline could still see me in the bus using the iPad.  It is a fabulous technology, and fascinating to see how completely natural it is for a 2-year old.

I have enjoyed creating panorama images this winter using MS-ICE.

I have enjoyed creating panorama images this winter using MS-ICE.

Bill Stewart from our FMCA Freethinkers Chapter had requested to see some photos from the recent gathering at the Peg Leg boondocking area near Borrego Springs, California.  Last night I selected seven images, re-sized and processed them, uploaded them to the Freethinkers folder in my Dropbox, generated the “share” link, and e-mailed it to our open forum e-mail reflector.  While I was working on that it occurred to me that Lou Petkus is always looking for images for the SKP Photographers BOF newsletter and member album and I had not sent him anything in a while.  I was too tired by then to do the work so I put that on my “to do” list for today.

I spent most of the rest of the afternoon and evening working on my article and the photos that go with it except for a break to photograph a beautiful sunset.  Linda called around 6 PM (8 PM at home) to chat.  She suggested that we wait to see if someone at Escapade is selling the Touch of Oranges products.  She also suggested that I check to see if Carnu-B is going to be at any car shows near us as they sell the product for a lot less at shows than they do online.

I took a break for dinner and microwaved a jumbo tofu hotdog and a potato.  The potato had started sprouting so I figured I needed to eat it or plant it.  I had been accumulating dishes and utensils for the last few days so I washed, rinsed, and dried all of them.  By the time I finished my chores, played a few games on my iPad, and finished this post it was midnight.  Completing the waxing of the bus was an important milestone, and although I have a lot more to get done on the bus this coming week I plan to take it easy tomorrow and try to wrap up my Quartzsite 2015 article and perhaps some other writing.  The most I may do to the bus is apply some more Carnu-B Coconut Creme to the tires.

2015/02/22 (N) Q 2015

I did not use up the second package of blueberries fast enough and they started to go bad.  I picked out the bad ones, rinsed off the rest, and had some granola with my blueberries for breakfast.  I worked for a little while finishing up yesterday’s blog post and then got to work at my computer.  It was cloudy and windy when I got up and the winds continued to strengthen during the day.  I had closed the vent fan domes last night so I would not have to listen to them rattle.  The patio awning was flapping more than I liked so I got Butch to hold the strap while I released the rafters and then rolled it up and latched it.  I was able to retract the small passenger side bedroom awning by myself.  In the light of day I discovered that I had not wiped the Carnu-B wax off of the body as completely as I thought.  That, however, will be a task for another day.

I wanted to make a sandwich for lunch but I was out of onion so I went to the Road Runner Market to get one.  I also wanted pretzels and hummus.  They did not have any hummus and they did not have the kind of pretzels I like but I was able to get two large sweet onions.  Sourdough bread with Tofurkey brand mock deli slices, Daiya cheddar “cheese” slices, veganaise, honey mustard, fresh onion, and salad greens made a tasty treat.

I finally finished my Quartzsite 2015 article for Bus Conversion Magazine, including the 95 photos and captions, and uploaded it to my Dropbox for proofreading.  I had an e-mail back from Gary indicating that they would probably use it for the February issue, so very late this evening I uploaded all of the photo files.

A panorama created using MS-ICE from handheld images.

A panorama created using MS-ICE from handheld images.

About the time I needed to take a break Fonda left for church and I saw Butch sitting outside with his camera.  Another beautiful Quartzsite sunset was taking form so I grabbed my camera and shirt jacket and went out to join him.  It had been cloudy and windy all day and was rather brisk.  We both worked the sunset until it was played out and got some nice photos considering that they were all handheld in low-light conditions.

For dinner I made a Thai Kitchen Noodle Bowl and added some honey roasted peanuts.  I closed all of the bus windows to a crack and made some hot tea.  Tea is still my beverage of choice with any type of Asian cuisine and was very satisfying on a chilly evening.

With the Quartzsite 2015 article done (except for corrections) I started pulling together the “featured bus” article on Byron Pigg’s 1985 Model 15 Eagle bus conversion.  I went through the photos I took last month of his coach at the Eagles International Bus Rally and was pleased that I had a good variety with good technical quality to choose from.  I made my selections, post-processed all of them, and inserted the small versions into the Word doc.  The article narrative itself was less than one page in length as I do not know very much about Byron and his wife Betty or their bus.  The Word doc template I use for featured bus articles includes two “Specifications” pages, one for the bus and one for the conversion, so the article was three pages.  I e-mailed the Word doc (with embedded photos) to Byron and cc:d Gary at BCM.  In order to complete the article I need Byron to fill in a lot of the details about his bus and conversion.

2015/02/23 (M) Seizure

Toast with apricot preserves is as close as I get anymore to the Danish pastries that were once one of my favorite treats, but I am OK with that.  I am absolutely enjoying retirement more as a result of being much healthier and more active, both of which are a direct consequence of eating better, weighing less, and not having to take a cocktail of drugs every day.  Toast, coffee, and a little fruit juice makes a very agreeable breakfast.

I finished up yesterday’s blog post after breakfast and then got into my computer-based work.  I had planned to work on the photos of Larry and Carol Hall’s GM PD4106 bus conversion and write a brief narrative, similar to the one I did on Byron and Betty’s Eagle bus, but other things kept interfering with the work.  Except for lunch and dinner breaks, and brief chats with Barb, Butch, and Fonda, I sat on my butt most of the day working away at my computer on a template for featured bus articles but had very little to show for it at the end of the day.

I have learned over the years to stick with sunsets until it is dark.

I have learned over the years to stick with sunsets until it is dark.  Panorama stitched together with MS-ICE.

For lunch I had the last jumbo vegan hotdog in the open pack.  They microwave nicely, so they are quick and easy to fix, and are so yummy with honey mustard, pickle relish, and chopped sweet onion.

I had not yet seen the e-mail from Jeff at Teeko’s Coffee and Tea in Howell, Michigan with the USPS tracking number for my coffee order so I call them at noon (2 PM EST) and Mary gave the number to me over the phone.  It only occurred to me much later that the e-mail may have gotten trapped by our spam filter.  I direct all of the notifications from the spam filter to a special inbox and I have not made a habit of checking that inbox or going into the filter to release or delete the e-mails that are being held.

Butch and Fonda drove over to Bouse this morning to talk with the General Manager and park managers of an RV Park about working there next season.  They stopped at our shared P. O. Box on their way back and then went to the main office downtown.  When they got back to camp they had my coffee shipment and an envelope from Dan Fregin, the treasurer of our FMCA Freethinkers chapter.

At one point in the afternoon I looked out the picture window by the dinette, where I sit and work at my computer, and Roho was lying on the ground with Jim and Barb and Jim L. gathered around him.  He appeared to be twitching and Barb confirmed that he was having a seizure and typically has one once a month like clockwork.  We had a dog with Epilepsy (Scout) and it did not turn out well.  The standard treatment at the time (18 years ago?) was phenobarbital, the same drug used to control the condition in humans.  Scout did not respond to small doses and the amount we had to give him eventually destroyed his liver.  But we had no choice; he went into a grand mall seizure one night and would not come out of it.  We had to take him to an emergency veterinary clinic at 2 AM and they had to inject him with phenobarbital and something else to get the seizure to stop.

We had just started him on an experimental treatment using potassium bromide (KBr) dissolved in flavored pancake syrup when his liver failed and he died.  I told Barb about this but I did not know if the KBr treatment had become standard practice or not.  The apparent effect of the KBr was to mediate the uptake of the phenobarbital, allowing much smaller doses to be much more effective.  I searched online later and found that KBr has, indeed, become part of the standard treatment arsenal for canine and feline seizures.

For dinner I made a big green salad.  While pulling ingredients out of the refrigerator I found a bunch of asparagus that was spoiled so I threw it out.  That was too bad because I really like asparagus and this bunch probably came from the farmers market where we have bought very good produce.  I also had to throw away some blueberries and carrots this week but managed to salvage some of each.  I did, however, finish up the mushrooms in my salad.

Atmospheric conditions make all the difference in sunrise and sunset photography.  Panorama stitched with MS-ICE.

Atmospheric conditions make all the difference in sunrise and sunset photography. Panorama stitched with MS-ICE.

Linda called around 7 PM (my time) and we brought each other up to date on how our days went.  Around 8 PM I prepped the remaining strawberries for later and then heated an Amy’s vegan tamale with Mexican rice.

I finally put aside the featured bus article template I worked on much of the day and started selecting and processing the photos for the article on the Hall’s bus.  By that point, however, I was tired and frustrated and making mistakes so I went to bed.  The southerly winds that brought the rain had shifted to the northwest bringing cool, clear air with them.  It had cooled off enough in the bus that I turned on the electric heating pad for the first time in quite a while.

 

2014/09/29 (M) Full Converted (Not)

Linda was up at 5:45 AM.  Hey, it’s just a number.  I mean, who needs daylight?  She quietly got dressed and slipped out of the house to drive to the bakery.  This is how it’s going to be on days when she has to be physically present at the facility.  Unless I am away working on the bus.  In that case she probably does not worry about being quiet.

I got up around 7 AM and had a nice breakfast of homemade granola, orange/grapefruit juice, and coffee and then spent some time catching up on blogs that I follow.  Keith showed up around 9:30 AM to cut the grass.  Butch had called last night to ask Linda a question and asked that I call him when I had a chance.  Our company did not leave until after 9 PM last night, which was great, but too late to call Butch back so I called him this morning around 10:30 AM.

Butch had used a stop leak additive product to try to plug a leak in his Aqua-Hot main coolant loop but it did not work.  The Aqua-Hot is a Webasto-based diesel-fired hydronic heating system.  Rather than repair the Aqua-Hot, or replace it with another one, he decided to order an Oasis Combi unit from International Thermal Research.  The Combi has a lower BTU rating than the Aqua-Hot but is smaller, simpler, and uses stainless steel for some of the components.  It should be more than adequate for their bus, which is very well insulated, and give them years of trouble free service.

Butch and Fonda’s Aqua-Hot is a very similar model to ours and I will probably buy it from them as a source of spare parts.  His burner is fully functional, which ours is not at the moment, and the short term fix for our unit may be to just swap the burners.  I can then repair the defective burner at my leisure and have it available to swap back should the replacement ever develop a problem.

As a result of our conversation I decided that I will take our bus to their place tomorrow, leaving around noon and arriving between 4:30 and 5:00 PM.  In preparation for that trip I needed to gather up and organize parts, materials, and documentation for my initial set of projects.  I also needed to do laundry and select clothes for the trip.  I may also need to do some grocery shopping this evening unless Linda already has food in the house that I can take.  Tuesday morning I will have to load clothes and toiletries, hook up the car, check and adjust tire pressures, load computers and other last minute items, and get the bus ready for travel.

My main focus for Wed, Thu, and Fri will be the Aqua-Hot (no burn and leaky exhaust).  If we have time I would also like to finish installing the Zena 24 VDC power generating system and get it operational.  I will return on Friday afternoon/evening in the car as Butch and Fonda have plans for the weekend and I still have lots of things to take care of back at the house.

Keith finished up with the lawn a little before noon.  He will be back at least two more times, once in mid-October and again towards the end of the month.  Whether he cuts the grass in November or calls it quits for the season will depend on the weather between now and then.  His basic grass mowing season is April 1 through October 31 and he has his business insured for that range of dates, but he said he would come back in November if needed.  The grass should be dormant by then, but there may be a few leaves that still need to be mulched.  There could also be a foot of snow on the ground, so it will all depend on the conditions prevailing at the time.  During the mowing season he spends the work week living at their trailer/cabin at Haas Lake RV Park, which maybe 20 miles from our house, but by November 1 he is looking to move himself and his equipment back home to Milan for the winter.  Milan is at least 60 miles from our house, maybe a bit farther.

I spent a little time at my desk and decided to re-install WordPress 4.0 on the SLAARC, FMCA Freethinker, and FMCA Great Lakes Converted Coaches websites.  I re-installed it a couple of days ago on this (our personal) website, but I have not tried creating or editing image galleries since then so I do not know if the broken drag-n-drop feature has magically been repaired or not.  I suspect not, but Linda says I’m a pessimist.

I had a quick bite of lunch and then read a few more blog entries while I waited upstairs for Brandon from Bratcher Electric to show up and convert the whole house generator from propane to natural gas and do the annual maintenance and multi-point inspection.  He arrived at 2:15 PM and was here for about an hour.  I had him show me how to disable the generator as it has to be turned off anytime I want to shut off the power coming into the main distribution panel in the basement.  He did not have the correct length of flexible gas line and will come back on Friday to do the LP to NG conversion.  Besides disconnecting the propane and connecting the natural gas the conversion involves attaching two wires to a pair of corresponding terminals on the gas valve inside the unit and changing a setting in the controller.

While Brandon was working on the generator I started gathering things from the garage that I needed for tomorrow and loading them in the car and the bus.  We already have quite a few things staged to take to the Surplus and Salvage Rally next week, but I will take those things with me when I return to Butch and Fonda’s early next week.

Linda called at 4:35 PM to let me know she was on the way home.  I drained the water out of the fresh water tank on the bus as it had been sitting in there since June.  (Yuck.)  The fresh water hoses needed to be cleaned before I used them so I filled their storage tub half full of softened water and added some bleach.  I coiled them up, hooked the ends together, let them soak for a while, and then wiped them off with clean paper shop towels.  Much better looking, and probably and lot more sanitary.

Linda got home at 5:30 PM, a very quick trip for that time of day.  Butch had called just as she was getting home to let me know that he had spoken to someone who has two RV spots in Quartzite we can rent for a very reasonable price this winter.  Linda and I need to discuss it, and would like a few more details, but that probably makes more sense than trying to boondock our first time out there, especially as we do not yet have solar panel on the roof of our coach.

Linda made a nice green salad and heated up some of the lasagna from yesterday.  Italian bread with garlic “butter” and a glass of the 2009 Egri Merlot completed the meal.  We talked about our respective days, reminiscent of when we both worked outside the home.

After dinner I finished cleaning the fresh water hoses, filled the fresh water tank, and then drained and stored the hoses.  While I did that Linda gathered food items, bedding, and towels and put them aboard the bus.  It will still take me a few hours to get ready to leave tomorrow, but I should not be rushed getting everything done.

Linda heated up some of the apple/pear crisp for dessert after which we sat on the sofa and looked at highway maps on her iPad.  The map app on the iPad said the trip from our house to Quartzite, Arizona was about 2,100 miles and would take “1 day, 9 hours.”  That’s non-stop, of course; i.e., 24 + 9 = 33 driving hours.  That time works out to just under 64 MPH.  I typically drive the bus at 60 to 63 MPH on Interstate highways, but we do all of our trip planning based on 50 MPH.  That usually works out well at taking into account for fuel stops, rest stops, and non-Interstate roads.  This means our travel time will be more like 42 hours.  Our preference is to only travel 200 to 300 miles per day, or 4 to 6 hours a day, so the actual number of travel days will be between 10 and 7.  We like to spend more than one night at each stop, depending on what there is to see and do in the area, so the number of days it will take us to get to Quartzite will 2 to 3 times the number of driving days.  A lot of the details of our trip will be last minute decisions based on weather, but our “plan” is to leave December 1st and arrive in Quartzite by December 21st, more or less.

 

2014/09/28 (N) Oh Canada

Today was all about company—getting ready for company and having company—and this time our company was from Ontario, Canada.  Okay, they actually drove down from Frankenmuth, Michigan where they are staying at an RV Park, but they are Canadian citizens who reside in Canada when they are not traveling in their motorhomes.  Bill and Karen are fellow converted bus owners and members of both the FMCA Great Lakes Converted Coaches chapter and the Converted Coach Owners group.  Mike and Kathy have a purpose built class C motorhome and often travel with Bill and Karen.  Kathy is Bill’s sister.

Linda spent the morning preparing vegan lasagna and apple/pear crisp for baking later in the day while I worked at my desk on secretarial and financial duties for our FMCA Freethinkers Associate Chapter.

Company arrived a little after 1 PM.  Linda took the ladies on a tour of the house while I took the guys on a tour of the property and then showed them around the house.  We had guys’ chat and gals’ chat for a while and then we all gathered around the table on the deck for some grapes and pretzels.  Linda put the lasagna in the oven at 3 PM and prepared a salad.  When the lasagna was done she put the apple/pear crisp in the oven to bake while we ate.  We sat down at 4 PM for dinner and had a very nice meal that included Italian bread and olive oil seasoned with pepper.  We opened a bottle of our 2009 Egri Merlot (it may have been our last one) and four of us had a small glass with dinner.

We continued our conversation on the deck after dinner and had our dessert out there. It was an absolutely perfect late September day.  When the sun got low in the sky we moved inside as it cools off quickly and the mosquitos come out.  We sat in the living room and talked until 9 PM.  By then it was dark and they still had a one hour drive back to their RV Park.  Kathy had rinsed off the dinner dishes, so Linda loaded the dishwasher and started it.  Linda packed her computer and gathered up all of the things she needed for tomorrow so she could get an early start for the bakery.  I will be home all day waiting for Bratcher Electric to show up and convert the whole house generator.  They are supposed to be here between 1 and 3 PM.  Karen took a few photos but I did take any, so I do not have any images to post from today.

 

2014/09/26 (F) Hope Is Not A Strategy

Linda was up at 7:00 AM, I was up at 7:15 AM, and Madeline was up at 7:45 AM.  Marilyn got up later.  Given a choice she’s not a morning/breakfast person.  Linda got up first to prepare the batter for her fabulous vegan blueberry pancakes which she planned to serve with fresh fruit and real maple syrup.

I powered up my iPad2 and discovered that Apple had released iOS 8.0.2.  Apparently I was not the only person having some issues with the release, like sluggish response and a Bluetooth keyboard that quit working properly and then quit working altogether.  I tested the keyboard with my laptop computer last night and it worked fine, so I knew there wasn’t anything wrong with it.  I downloaded the iOS update and everything was back to normal (once I figured out how to re-pair the keyboard).  With any luck perhaps WordPress will also issue a maintenance release today and fix the completely broken drag-n-drop feature of the media gallery.  As Deb Wahlstrom said once in a workshop, “hope is not a strategy,” but when things are completely beyond your control hope is sometimes all you have.

Linda tried to use the griddle that fits over the oblong center burner of the new G. E. kitchen range to cook the pancakes but forgot to turn it down from the preheat setting, which produces a LOT of heat.  It burned the first pancakes firmly to the griddle.  Madeline was already in her high chair waiting for her breakfast, so Linda grabbed a non-stick frying pan and cooked the pancakes in that.  The fact that the griddle and the preheat feature are both new and that there was a certain pressure to get Madeline her breakfast was not an ideal combination for a first attempt at using the griddle.  I doubt that she will make that mistake again, and the frying-pan-cakes were still very good.  The fresh fruit turned out to be bananas, but that was OK; we all like bananas.

After breakfast I played with Madeline while Linda cleaned up from breakfast.  Karen called from Bratcher Electric to let us know that Brandon had called in sick and she needed to reschedule our generator conversion and service for Monday between 1 and 3 PM if that would work for us.  It was not ideal from my perspective as I was thinking about taking the bus to Butch and Fonda’s on Monday, but that could obviously wait until Tuesday or later.  If necessary I could delay taking it until after the GLCC Surplus and Salvage Rally.

I waited until Marilyn got up at 9:15 AM to make the coffee; we all like our morning coffee.  Linda was busy with Madeline by that point so Marilyn cooked her own breakfast.  There was enough batter left for two pancakes.  She’s always very helpful that way when she comes to visit.  We often have to insist that she just sit, relax, be our guest, and let us take care of things.  It’s really not a bother; we like having company and we do not expect them to work while they are here.  Of course, if they insist on helping with the dishes, who are we to deny them the joy of being of service?

Marilyn started packing at 10:45 AM while Linda gathered up Madeline’s things.  When it was time to load the car for the trip to Ann Arbor my job was to hold Madeline’s hand (actually, she held my finger) and get her out the front door, down the new steps/sidewalk, and over to the car.  (Hey, grandpa-ing is serious work.)  Although she understood that she was returning to her house where daddy and mommy would feed and play with her, she wasn’t quite ready to leave.  She and I “marched” up and down the driveway several times before she was ready/willing to let Grandma Linda put her in her car seat.  She is now big enough that the seat gets installed facing forward, which is a very big deal as she can now see where she’s going in life instead of where she has been.  Marilyn rode in the back to keep her entertained on the drive down.

The weather this week has been spectacular; a classic late September in Michigan with lows around 50, highs around 75, clear blue skies and light breezes.  I shut off the various thermostats and opened up the house.  I spent the early afternoon editing blog posts from the last couple of weeks and then off-loaded photos from our Sony alpha 100 SLR, organized them, and backed them up.  I stopped for a bite of lunch and then decided to have another go at the lawnmower.  If I cannot get it started I will have to take it somewhere and have it repaired.  🙁

I had already installed the new spark plug last night and that did not fix the problem.  I dumped the gas tank out into an open tub and put some of the fresh gas I bought last night into the tank.  I took the tub to some of our woods a good distance from our drinking water well and spread it around on some leaves.  Most of it will evaporate rather than soak in.  Not the most environmentally sound thing to do, but a lot safer than an open tub of gasoline.

Before I tried to start the engine I checked the back discharge chute, out of habit, to make sure the mulching insert was in place.  It was but there was a lot of dried grass as well and it had obviously not been cleaned out the last time it was used.  There was also a lot of fuzzy material mixed in with the grass, a sure sign that a mouse had taken up residence there at one time.  I removed the insert and shook it off into the tub and discovered that it still had a mouse in it.  The mouse was quite dead and very stiff but did not have any obvious injuries and did not emit any odor.  It was in surprisingly good conditions, so perhaps being encased in the dried grass and fuzz helped preserve it.  It was not trapped so it is a mystery why it stayed in there and died.  The mower was in our garage all winter, and although it got very cold (-20 F) the mouse would not have been trapped in the garage either; there are gaps around the doors that would easily allow a field mouse to come and go.  (Now that we have the garage furnace, sealing the doors is on my project list.)

With the discharge chute cleaned up the mower started on the first pull !!!  (This is something Honda has bragged about in the advertising in the past.)  I let it run for a while on high throttle to warm it up and make sure it had fresh gas all the way through the fuel system.  I then brought the throttle back to idle to let it cool off and stabilize and then shut it off.  I did not think it was going to start so I was not wearing my safety goggles or gloves.  I usually wear hearing protectors as well, but I could not find them.  (I realized later they were probably in the construction equipment tub we took with us last summer.  I will look there tomorrow.)  I topped off the tank with fresh fuel and it started on the first pull again.  The new spark plug is a more aggressive design that is supposed to spark more easily and that may have helped.  Whatever the reason, I like how easily it now starts.

I spent an hour cutting the grass in the immediate vicinity of the house.  I focused in particular on the areas that Keith does not get with his riding mower and areas that were disturbed (destroyed) and re-seeded as part of the landscaping work and re-seeded again by me (twice).  The new grass is coming in fairly well at this point although there are still a few thin spots.  And even though Keith mowed most of this new grass on his last visit it was getting tall again.  I was surprised how moist much of the grass was, especially in areas that are now mostly shaded throughout the day, as we have not had any rain in the last week.  Keith had mentioned the last time he was here that the grass was very moist; “…more like April/spring grass than September/fall grass.”  I did not get everything mowed.  I still have to do the two slopes by the retaining walls in the back, which are steep and physically demanding even with a self-propelled mower, and most of the west end of the house.  It will take me at least another hour to finish but I had done enough for today and wanted to relax for a little while before Linda got home.  Besides, it will be there tomorrow, and it should be a nice day to work outside.

Linda called around 4:35 PM and left messages letting me know that she had dropped Marilyn at the airport and was starting for home.  That drive would take close to an hour in light traffic, so I figured I would not see her before 6 PM.  She pulled in the driveway at 6:10 PM.

We had three left over salads for dinner: chickpea; Farro with cranberries, and; wild rice with apples and raisins.  Easy and delightful.  Marilyn texted Linda several times to let us know her travel status.  Her flight was delayed almost an hour but eventually took off and got her safely back to St. Louis, Missouri.  We were both tired and turned in early, but I got my second wind after I located a service manual online for a model of Aqua-Hot that is very similar to the one in our bus and started reading about how to diagnose what might be wrong with our unit.  Based on the symptoms my current best guess is a stuck fuel valve or defective fuel valve solenoid.

 

2014/09/22 (M) Hot Water

Linda was up early to beat the morning traffic heading into Detroit from our part of S. E. Michigan.  On days when she has to go to the bakery she likes to get up and go and does not have breakfast at home.  Not that she doesn’t get something to eat; she’s spending the day working at a bakery after all.

I tend to stay up later at night than she does, so I also tend not to spring out of bed at oh-dark-thirty unless I have someplace I have to be at daybreak.  My job is to hear the alarms (we set several) and make sure Linda wakes up.  I am then free to pursue the rest of my day on my own timeline.  Today, however, I wanted to make sure I was up and dressed not later than 8 AM as there was a possibility that TOMTEK would be here to convert the hot-water base-board heating system boiler from propane to natural gas and/or that D. R. Electric Appliance would deliver and install our new natural gas kitchen range.  I did not, however, know if/when either of those things would happen so I was “stuck” at the house all day either waiting for phone calls.

I was dealing with e-mail when Tom called at 9:15 AM to let me know they had the part for our boiler and that he could be at our house around 10 AM if that was OK.   “Absolutely!”  I decided to bleed out whatever propane might be left in the 1/2″ line that feeds the kitchen and outdoor grill connector.  The pipe into the house was open to the outside for a while so I did not know how much propane, if any, even remained in the line.  I opened the shutoff valve in the laundry room for that line and then opened the outside valve for the gas grill.  Nothing.

It turns out that the quick-disconnect is a self-sealing device.  When the mating part is not plugged in, no gas can get out.  I should have known that, and it’s obvious that it should work that way, but I hadn’t really thought about it until that moment.  I closed the outside valve and then closed the shutoff valve in the basement and figured I (or the installer) would deal with that branch of the piping when the new range shows up.  I did not concern myself with the pipe to the furnace, which has its own shutoff valve, as I figured Tom would bleed the line before he started the unit.

Tom arrived about 10:20 AM.  He had the right part and he knew how to replace it.  The part (an orifice plate) was just a thin piece of metal, probably aluminum, with a hole about the size of a quarter in the center of it (the orifice) and several other holes for screws to pass through or other purposes.  I’m always trying to understand our technology and he let me observe and ask questions while he worked.  Tom disconnected a small vacuum hose, removed three or four screws, lowered the blower housing, slid the old propane orifice plate out, slid the new natural gas orifice plate in, reattached the blower housing, and our boiler was converted to natural gas.  Just like that.

Once he had the new natural gas orifice plate installed and everything reassembled he put gas to the furnace and turned on the electrical power.  It took a few seconds to purge the air and residual propane from the gas pipe but the burner lit and stayed lit on the first try.  He checked for gas leaks as it warmed up.  (He used an electronic sniffer rather than soapy water.)  He did not find any gas leaks but I noticed some condensation dripping from the flue pipe onto the top of the unit.  He shut the furnace off and let it cool down enough to handle the flue pipe and found that a joint between two sections was leaking.  He pulled it apart, applied a sealant, and put it back together nice and tight.  He turned the furnace on again and the leak did not reappear.  We did notice, however, that there was a similar leak at the next joint downstream.  I moved a spare macerator pump from under that joint and put a bucket there to catch any drips, although stains on the underside of the flue pipe indicated that this leak had existed for a while and that condensation leaking at that point had run back downhill towards the boiler along the underside of the pipe.  We may need to eventually have all of the joints resealed all the way to the outside.

I turned all of the thermostats on and set the temperatures a few degrees above ambient so they would call for heat and Tom monitored the temperature and pressure of the coolant as the unit heated up.  At 140 degrees F the pressure was between 35 and 40 PSI.  Tom said it should be closer to 20 PSI at that temperature, so he drained some of the coolant out of the system into a bucket.  As water trickled into the bucket the pressure dropped accordingly. The system eventually heated up to just under 180 degrees F, which is where it normally operates, and the pressure stayed below 25 PSI.  He put the covers back on the unit and gathered up his tools while I wrote a check and paid him for the service call. After he left I took a nice hot shower, the first one since last Wednesday morning.  ;-0

While I was doing chores around the house I got a call from Marilyn in the AT&T billing department.  She called to let me know that they were crediting our bill to compensate for the lack of usable service in August.  I got a call later from Shelley from the Office of the President (of AT&T) following up on our MPSC complaint.  I told her that the POTS and DSL had been working just fine since Bill was here to repair our service.  She had requested the billing credit and said she would report back to the commission that everything was repaired to our satisfaction.  I told her I would confirm that if contacted by the MPSC.

Today was shaping up to be a very good day.  It was sunny outside with light winds, puffy clouds, and afternoon high temperatures in the low 60’s; a little brisk, perhaps, but cheerful and very refreshing.  Earlier in the day I noticed the road grader going up and down our street smoothing out the bumps and filling in the holes.  With a forecast of no rain and high temperatures in the mid-to-upper 70’s for the next week the road should be decent to drive on for a while.

Some of the difficulty we have had this summer getting contractors to show up reminded me of a joke that Steven Wright told years ago on an HBO comedy show.  It went something like this:  “I walked up to the deli entrance and the sign said ‘Open 24 Hours’ so I tried the door but it was locked.  While I was standing there the owner walked up and unlocked the door.  I said to him ‘Your sign says ‘Open 24 Hours’.’  He just looked at me and said ‘We are, but not in a row’.”

I’m starting to wonder if the kitchen range is going to turn out to be another example of “tell the customer whatever you think they need to hear to get them to make the purchase.”  The difference in this case is that we have not given D. R. Electric Appliance a deposit or a credit card number, so if delivery is delayed much longer we can walk away from the deal with nothing to lose except time.  We probably won’t, as that would just further delay getting a new NG range, but it’s nice to know that we at least have that option if this drags on any longer.  We were told “three days” and based our decision to order from them in part on that information.

With respect to the conversion or our generator from propane to natural gas, our new NG fireplace logs, and our new NG outdoor grill, our hands are basically tied.  We either have parts on order, for which we have already paid, don’t have a choice of contractor, or have made the choice not to look for another contractor as that would simply involve more delay and the uncertainty of working with someone we have not worked with before.  Still, it’s a little frustrating that we can’t get this stuff taken care of.  The real issue for me is that I need to take our bus to Butch and Fonda’s place to work on it, and I cannot do that until all of the natural gas related work is done.  The other issue is that we do not want to contact Consumer’s Energy (natural gas) and AmeriGas (propane) until all of our gas appliances are switched over.  Consumer’s Energy “requires” us to accomplish this within 30 days of hanging the meter, which occurred one week ago today, so we do not have an unlimited amount of time to get this stuff taken care of.

Interestingly, I learned at breakfast on Saturday that two of our ham radio club members had contacted Bratcher Electric based on my recommendation.  Mike had already been to one of their houses, quoted them a whole house generator installation, gotten a signed contract and a deposit, and given them an installation date.  The other guy had a scheduled appointment for Mike to come out and give him a quote.  Mike looked at our job five weeks ago and I don’t have a price or a service date scheduled yet.  What’s up with that?!  I did not want to spoil today’s winning streak, however, so I chose not to make follow up phone calls today.  Tomorrow morning, however…

We were both tired and turned in early to watch episode 2 of Ken Burns “The Roosevelts: An Intimate Portrait.”  I was putting the finishing touches on this post afterwards and noted the occurrence of the autumnal equinox at 10:39 PM EDT.

 

2014/09/16 (T) Boiled Over

Our son (Brendan) texted Linda early this morning to see if we would like to have grand-daughter Madeline spend the night while Marilyn is here next week.  It turns out that next week Thursday and Friday are Jewish holidays, and Madeline attends a Jewish run day care facility.  Of course we said “yes.”

Linda worked at her desk on our personal finances in the morning, worked on her counted cross-stitch project for a while in the afternoon, went on a couple of long walks, and managed to get breakfast, lunch, and dinner on the table.  But as days go, it was fairly low key even for her.

I called Country Squire Fireplace and Lighting in Howell and asked for Bob as I had been instructed to do.  It was Bob’s day off but I got to talk to Mark.  Mark told me that they can get a 12′ hose with a 3/8″ flare fitting on one end and quick disconnect on the other end.  The QD includes the male fitting attached to the hose and the female fitting that gets threaded onto the supply pipe.  We already have a female QD fitting (Marshall Brass BC0102-0600) but it may not be compatible.  I had measured before I called and knew that we needed at least an 8′ hose, so 12′ will work just fine, especially since two feet of it has to go up through the base from the back and then out the top of the base and attach to the grill.  Mark asked me to call back tomorrow and talk to Bob to order it, so that is what I will do.

I double checked online that the range we had ordered was indeed a natural gas model.  It was, so there was no need to call the appliance store to confirm that.  I had a call back from Darryll at DCM Heating & Cooling.  He thought he would be able to come back on Friday or Saturday to hook up the gas from the meter to the house and the new black iron pipe and start up the two new furnaces.  All of the other gas conversion work we need done is dependent on Darryll getting his piece done first and I asked him if it would be possible to come on Wednesday.  He said he would check his schedule and see what he could do.  Darryll has been great to work with, and I try not to be demanding, but I cannot schedule other contractors until there is gas to the house.

I checked the label on our Weil-McLain “boiler” that provides heat for our hot-water baseboard heating system and domestic hot water.  It’s a GV-5, Series 1.  That allowed me to hone in on the right manuals on the W-M website from which I was able to identify the part number for the LP –> NG conversion kit.  It’s a 510-811-630 and consists of an orifice plate and an adhesive label that has to go on the unit.  The unit is a discontinued model, but service parts appear to still be available.  I found the conversion kit at the first online supplier I checked for under $31 (plus S&H) but delivery looked to be 2 – 3 weeks.  Ugh.  I placed a call to TOMTEK HVAC in Howell to see if Tom had checked on this yet.  He hadn’t so I gave him the model and serial number of our unit and mentioned that I had found the orifice plate online.

I worked at my desk for a while uploading blog posts from the last third of August, but it was such a beautiful day that I decided to work upstairs on my iPad2.  I called Bratcher Electric around 4 PM just to give them a “heads up” that we had a meter with natural gas.  Karen gave me Mike’s cell phone number and a time window during which I would likely be able to reach him.  He has been very busy doing estimates for storm damage repairs and has not been in the shop much the last month.  I got hold of him to let him know that we might be ready for them as early as next Monday, but anytime in the next couple of weeks after that would be OK.  Again, I try not to be unreasonably demanding, and I try to be truthful with folks.  Sometimes, however, that just results in us being put at the back of a long line of people who are unreasonably demanding.

Linda made maple baked lentils with sweet potato and apple for dinner.  It really hit the spot on a cool evening.  After dinner I continued working on selecting and editing photos for a gallery post on the natural gas pipeline work.  My cell phone cannot receive calls in the basement but it can receive txt messages and notifications.  Tom had called back from TOMTEK regarding the boiler conversion.  He can get the parts locally in about four days and wants $250 to do the conversion plus $59 for the service call.  A total bill of $310 to install a $30 part (retail) sounded excessive to me, so I may make a few inquiries first thing in the morning before I call him back.

We watched Season 5 Episode 5 of Doc Martin.  It was nice to see it on the TV rather than the iPad with a large screen, better sound, a DVD quality image, and no buffering.

 

2014/09/15 (M) Congratulations, You Have Gas

As I reported in the blog post for this past Saturday a natural gas hookup crew was at our house in the early morning but it was the wrong crew (trench/plow) installing the wrong size gas line (1/2″ id).  The correct crew (directional boring) showed up today around 9 AM and started boring the line for our neighbor’s yard across the street.  I chatted with the crew briefly and they said we were next.  They had placed a large role of the proper size gas line (1″ id) in our yard, so I knew they knew what they were doing.

Ed, who had stopped by on Friday and runs the hookup crew, was not sure whether they would hang the meter and connect the line at both ends today, but if not, tomorrow for sure.  Their presence on site, however, meant that I would need to be in contact with three contractors fairly soon to follow up on arrangements to get them out here ASAP, and in the following order:

  • DCM Heating and Cooling, to disconnect the propane from the house and tie the new 2″ black iron pipe together with the pipe into the house and connect them to the consumer side of the gas meter.  Also, to start up the new library and garage furnaces.
  • TOMTEK HVAC to convert the hot water base-board heating system to natural gas.  Tom was going to check today with Weil-McLain on the parts needed for the conversion and let me know.  Our own research suggested that a natural gas orifice plate was the only part needed, but a number of steps were involved in the installation and I doubt that W-M would sell me the part directly.  (I did find it later online for $31 plus S&H, so I could buy it if I wanted to.)
  • Bratcher Electric; to convert the whole house generator, do the annual maintenance, and run the new service entrance cable for the garage panel.

Mike Bratcher was here a month ago to look at the job but had not gotten a price to us yet for the work.  They have been slammed with repair jobs as a result of late summer storms.  The generator is the least critical component at the moment as it is on its own propane tank, but we want to get it switched in a timely fashion so we can call AmeriGas and have both tanks removed at the same time.

(Ed told me later in the day that Consumer’s Energy requires us to be switched over to natural gas within 30 days of having gas to our meter.  He also said that a recent Michigan law (last year) made it illegal to have multiple fuel sources to a house.  Since the generator is on its own propane tank and that tank is not connected to, or provide propane to, the house or anything in the house, technically we would not have two different fuels going to the house even if we left it hooked up.  Still, we are not looking to create a “situation” with Consumer’s Energy.  Presumably the multi-fuel prohibition does not include electricity and wood.)

Keith showed up around 9 AM to cut the grass.  I chatted with him briefly about cutting the new grass, which had gotten long enough in many spots that I thought it was probably time for the first cutting.  I picked up some small tree branches that were scattered about the yard from recent storms, and warned him about the trench at the southeast corner of the house.  I chatted with him some more as he was finishing up with the string trimmer.  He said the grass was “April grass, not September grass.”  The grass itself (internally) was very moist, not just the soil.

This is how Keith cuts over 4 acres of grass in a few hours.

This is how Keith cuts over 4 acres of grass in a few hours.

Linda had reserved Doc Martin, Season 5, at the Howell Library and had an e-mail that it was available and needed to be picked up by the end of today or we would go to the end of the waiting list.  She needed to be at the bakery by 11 AM so she left around 9:45 AM to be at the library when it opened at 10 AM.  I would have gone to get it but I was “stuck” at the house as long as contractors were, or might be, working here.  I also needed to be here to pay Keith when he finished cutting the grass.

Linda met with the folks at the bakery (where she was the Controller and Treasurer for the 10 years before she retired) on Friday regarding a major software conversion project that she is going to do for them and was finally feeling like we could afford a new range.  She is a very good accountant/CPA and has always worked hard for what she earned, but has always been reluctant to spend money.  We grew up in very different circumstances and that reluctance on her part has provided a good balance over the years as I tend to be less concerned about what things cost and more focused on making sure we have what we need and are getting good functionality and quality for what we spend.  One component of my formal education and work experience was engineering, and that developed a certain way of thinking about things that has stayed with me ever since.  Need is, of course, relative.

We had been deferring a decision about the new kitchen range but decided on Friday evening that, with the natural gas hookup imminent, we would get a new one rather than convert our old one.  We decided on the model we wanted, a G.E. JGB870DEFWW, and knew the price, delivery time, and installation charge from Lowe’s.  I also talked to Curt at D. R. Appliance, a local family owned appliance store, on Saturday and expected to hear back from him today with pricing and availability.  That call came late morning and their price, while a little higher than Lowe’s, was close enough to be worth the possible end-of-week delivery and installation so I told them to go ahead and order it.

By 3:30 PM the gas line to our house was in the ground and the meter was mounted on the side of the house but a crew was still digging out by the street trying to clear access to the main line so the fuser could tie our line and our neighbor’s line into the 2” main line.  My camera battery went dead while they were installing the meter so I grabbed a few shots on my cell phone while the camera battery recharged.  Linda got home around this time and got to see some of the final steps in the process.

I followed the process closely all day and tried to get photos of most of the details, especially as they hung the meter, tied the line in, and pressure tested it.  All was good, so they tapped the main line and we finally had gas in our branch line.  They purged the line, reconnected it to the meter inlet, tested the meter and connections for leaks, and then verified gas availability to the outlet connection.  At 5:30 PM they plugged the outlet, put the hang tags on, and handed me the door knocker tag that said “Congratulations, you have gas.”

We always seem to have interesting things in our yard.

We always seem to have interesting things in our yard.

Linda took a call from Bob at Country Squire Fireplace and Lighting regarding our quick disconnect for the Broil King outdoor grill.  She indicated that I was busy with the gas crew and would call them back tomorrow.

Late last week we received an invitation to a political fund-raiser for Brian Robb, an incumbent councilman in Ypsilanti, Michigan.  We do not live or vote there, but Brian is Kate de Fuccio’s significant other, and Kate is a former co-worker of mine and continues to be a very good friend of ours.  I called DCM Heating & Cooling and left a message for Darryll that we had gas to the meter.  We left around 6 PM and arrived at the Tower Inn Cafe around 7 PM.  We made a donation to Brian’s campaign and Kate ordered a small vegan pizza for us.  We visited for about an hour and then took our leave.

When we got home we relaxed in the living room thinking about how nice it will be to have our natural gas fire logs while we had some fresh strawberries and nectarines for dessert.  I also had a mug of hot apple cider which put me in the mood to go to bed.

 

2014/09/13 (S) Overnight Guest

Linda’s sister, Sister Marilyn, called a couple of days ago to let us know she would be in the Detroit area on business this weekend.  She wanted to know if we could fetch her this afternoon and if she could spend the night at our house?  The answer was “of course,” of course.  Her flight out wasn’t until Sunday evening, so Linda put the gears in motion and arranged a brunch with the local family for 10 AM tomorrow.

Being Saturday, we went to our ham radio club breakfast in South Lyon.  Before leaving our neighborhood we drove to the other end of the street (dead end with turn-around) to see where the gas hookup crew left off yesterday.  We knew they were working down there today because we saw the trucks leave sometime between 5:30 and 6:00 PM last night.  There’s a chance they will be back today and we wanted to see how close they were to connecting our house to the main line.  It looked like they had quite a few houses to do ahead of ours, so we went to breakfast.

We got home around 10:30 AM to find a crew working in our yard trenching in the branch line to our house.  I was told yesterday they were going to bore it in, so something obviously did not get communicated.  Not only that, they were running a 5/8″ line, which was way too small for the 425 meter we are supposed to get.  I stopped the crew and the guy in charge pulled out his paperwork.  It had “425” written on it big letters, but the drawing showed a 5/8″ line.  He agreed that the 5/8″ line was way too small for that meter and that we should have 1.25″ line.  They pulled the little bit of line they had already run out of the ground, raked out some of the dirt they had already trenched, and moved their machine across the street to trench our neighbors yard.

We were lucky we got home when we did.  They had already cut through some tree roots that did not need to be disturbed and would have torn up a lot more of our yard unnecessarily if I had not interrupted their work.  They were nice about it, but I still found it troublesome that I had spoken to two different supervisors face-to-face about this, one as recently as yesterday, but this crew showed up and did something different than what I had been told, and agreed, would be done.

I was finally going to try to remove the fogged window from the bus today, but we had a lot of rain overnight and woke to overcast skies, temperatures in the upper 40’s, and a forecast high of 57 degrees F with a strong chance of rain through mid-afternoon.  That was not the sort of weather for removing a window from a vehicle parked outside.  Besides, with Marilyn arriving mid-late afternoon I did not want to work on anything messy and then have to get cleaned up.

Linda looked up the kitchen ranges we had been considering.  The GE 30″ 5-burner double-oven convention model (JGB870DEFWW) was on sale again at Lowe’s for $180 off MSRP and we would get another 5% off the sale price by using our Lowe’s credit card.  If we ordered it today delivery would be September 27, longer than I would like, but it is what it is.  We have to order this range because Linda wants a white one to match all of the other appliances in the kitchen and the appliance stores do not tend to stock white ranges with the features we want.  I called our local Lowe’s store and confirmed the free delivery and take away of our current range.  Installation is $20 plus a new flex gas line for $30.

I called TOMTEK HVAC and got hold of Tom.  He seemed put off by the fact that I have someone else doing HVAC work at the house and will have the natural gas already tied in when he comes to convert the main house furnace from propane to natural gas, but he said he would check with Weil-McLain on Monday about what parts he needs to do the conversion.  While on the phone with Tom he suggested that we try D. R. Electric Appliance Sales and Service in Howell for our new gas range.  We looked them up on the web and got their (incorrect) phone number and hours.  I got the correct number from 411 before I realized that it was also on their website.  They closed at 2 PM on Saturdays, so we didn’t make it there today, but I called and got an answering machine, left my name, number, and the reason for the call.  Curt called me back a short time later.  I gave him the model number and he said he would call G.E. on Monday.  He said he had been holding off ordering G.E. appliances waiting for Columbus Day sale pricing.  He figured he would have the range three days from ordering and could probably install it at the end of the week or early next.  They charge $25 for installation and haul away, and $25 for the new flex gas line if we need one, so it’s the same $50 as Lowe’s.  (Lowe’s assured me that they were REQUIRED to install a new flexible gas line.)  That all sounded good depending on the price of the range.  Getting it sooner has some dollar value to us, we’re just not sure how much.

I stayed home while Linda went to Meijer’s for groceries.  Finding the crew in our yard this morning doing work they were no supposed to be doing spooked me enough to not want to leave the house unattended the rest of the day.  As long as I was stuck at home, I called Bratcher Electric to give them a heads up that the gas connection to the house was imminent.  Being Saturday I got their answering machine and left a message.  I also called Darryll at DCM Heating & Cooling and left a message regarding the gas connection.  Once the meter is hung and connected everything else depends on Darryll getting his piece done first.

We checked the website for Country Squire Fireplace and Lighting in Howell and saw a 10% off coupon, so I printed that.  I wanted to go there today and buy a set of high-efficiency vent-free natural gas fire logs but it will probably be tomorrow afternoon instead.  These logs are more efficient than a typical kitchen range and are designed to be used with the fireplace flue closed, throwing most of the heat they produce into the room instead of up the chimney.  Darryll said he would hook it up for us and add a shutoff valve when he came back to tie in to the gas meter, so we need to have it here before he comes back next week.

Marilyn called and said their flights were running a little behind schedule and that Linda should pick her up around 3 PM rather than 2:30 PM as originally planned.  She called back again and said 3:15 PM would be better.  Linda got back from the grocery store and we had a quick lunch of leftover Sloppy Joe’s.

With overnight lows in the 40’s, highs only in the mid-50’s, and the connection of our natural gas somewhat imminent, we decided we could afford to use propane to heat the house.  We have been conscious of our propane use because we did not want to get in a position where we needed to have either of the tanks filled.  I turned the furnace on and set all the thermostats a few degrees above ambient to take the chill off.

While Linda drove over to Lake Orion, Michigan to fetch Marilyn I decided to work at my desk selecting photos for gallery posts on the garage/HVAC project and natural gas work, and worked a little bit on the websites for the FMCA Great Lakes Converted Coaches and Freethinkers chapters.  I really need to have the GLCC site usable in the next three weeks and the FTH site within a month of that. That sounds ambitious even as I write it down and I suspect it won’t happen.

Linda and Marilyn got to the house around 4:30 PM and after we got Marilyn settled in her bedroom we just sat and relaxed and talked for a while.  We thought she might appreciate a good home-cooked meal but we ended up taking her to LaMarsa for dinner.  She had the Koshary, which we had last night, and we split an order of garlic almond vegetable Ghallaba with green salad and crushed lentil soup.  We all ate way too much pita bread with garlic spread and were uncomfortably full by the time we finished our meal, but it was delicious and we did not have to prepare it or clean up afterwards.

These days twilight now comes around 7 PM and it was dark by the time we got home at 8 PM.  I made a pot of decaf coffee and we settled in the living room for a long chat.  I set the thermostats back before we turned in for the evening as all three of us prefer to sleep in a cool room.

 

2014/09/12 (F) Posted

Linda was up very early to try and beat the morning rush inbound to Detroit from the northwest.  I took an Ibuprofen and went back to bed, finally getting up at 7 AM.  1-800-PACK-RAT was scheduled to pick up the 16 foot long storage container we have had in our driveway for the last two months and I wanted to be up and dressed when they arrived.  I did not have any problems with my teeth overnight.  They felt OK this morning but the upper right was still a bit sensitive to biting pressure.  I had a nice soft banana for breakfast and decided to keep taking the Ibuprofen and Tylenol.

I put a load of laundry in the washer and then ran out to take care of errands.  I stopped at Dunkin Donuts for coffee, Lowe’s for solar salt for the water softener, and then Teeko’s for coffee beans.  Jeff still did not have the Sweet Dreams decaf blend even though he orders it every week.  I got a pound of the Seattle Blend 50/50 regular/decaffeinated, and a pound of regular Brazilian Serra Negra to blend with the decaffeinated beans we already had at home.

Heather, from Root Canal Specialty Associates, called around 9 AM to check on me.  I mentioned the sensitivity and she said that was normal and to keep taking the Ibuprofen/Tylenol through the weekend to counteract any inflammation and/or discomfort.  She wanted to know if I thought the temporary filing was high and making contact before the other teeth.  I wasn’t sure, but she said if it was to call them Monday morning and they would get me in to adjust my bite.

Since I was on the phone anyway I called Bratcher Electric to see about the quote/estimate for the generator service / fuel changeover and the service entrance feed from the transfer switch to the sub-panel to change it into a main panel.  They have been very busy with repairing damage caused by the storms of the last few weeks.  We did not suffer any damage beyond some dead branches breaking off from trees, but south of us folks were hit much harder.  That kind of work always takes priority.

The day was overcast and dreary with morning temps in the mid-40’s and a high of 54, but that was OK; it was a perfect day for sitting at a desk and working on a computer, undistracted by either bad or gorgeous weather.  I did, however, bring my computer upstairs and work at Linda’s desk.  My office is very nice but it is in the basement and it is a bit of a cave.  Sometimes I like that, and sometimes I don’t.  I worked on our blog until early-midafternoon and finally uploaded posts from Aug 2 through Aug 20.

My only interruption was a visit from one of Roese Construction’s field supervisors who was checking on where the runs will go to connect the houses in our neighborhood to the natural gas main.  After looking at our situation he agreed with me and Mel who had looked at this a few weeks ago, that staying to the east of the east entrance to our pull-through driveway made the most sense even through it required them to bore at an angle relative to the main line.  That conversation confirmed that they will be horizontal boring the branch line rather than trenching it in.  He did not give me a firm date, but it sounded like it could be as early as tomorrow (Saturday) and likely by Tuesday next week.

My computer battery was down to under 1 hour of charge remaining, so I took it downstairs and plugged it back in to its power supply.  While I was down there I put another load of laundry in the washing machine.  Back upstairs I made a PB&J sandwich for lunch, along with some green tea.  I got back on the RVillage Mobile development site, played with a few more features, and provided some additional feedback to the development team.  I then worked on this post using my new Logitech Bluetooth keyboard.  The Wacom Bamboo stylus is nice, but the keyboard is the way to go when creating extended text.

Juniper, our female cat, was getting into something in the library so I went to investigate.  She had cornered a yellow jacket and was trying to figure out what to do with it.  I solved the problem for her by capturing it and putting it outside.  I don’t think she was pleased with my solution, but not 20 minutes later she was at it again, and it was another yellow jacket.  We have a nest in the soffit near the library that we need to get rid of, but we have not had a problem with them getting into the house until very recently.  Hopefully that has not changed but I will have to investigate the situation.  It may be that with the onset of cooler temperatures they are finding their way into the library through the recessed ceiling downlight cans.  If so, there’s really no good way to seal those.  Fortunately we can close of the house from the library with a kitchen door and a living room doorwall that includes a screen door.

It started raining very lightly around 4 PM, but never developed into anything.  Linda got home from the bakery at 5:30 PM.  The storage container had not been picked up yet so we called the 1-800 number and left a message with our callback number.  I got a call around 6 PM from the local (Plymouth, MI) office verifying the pickup and address.  The driver arrived around 7:20 PM and had the unit loaded by 7:30 PM.  After he left we headed to dinner at LaMarsa where we had crushed lentil soup and split an order of Koshary and salad.  Even splitting the dish we both ate too much, aided by the fresh-baked pocket bread and garlic spread.   The food and service were both excellent, as always, and the garlic spread was “…the gift that keeps on giving.”

We got back from dinner a little before 9 PM, too late to start any in-depth computer work, but early enough for me to finish this post and for Linda to do some recipe research for Sunday’s brunch.  It seems like only yesterday it was still light at 10 PM at night, but we are approaching the autumnal equinox, and there are noticeably fewer hours of daylight now.

 

2014/09/05 (F) WordPress 4.0

We awoke to temperatures in the low 70’s this morning and by noon it was forecast to be 85 degrees F with rapidly rising humidity.  We turned our A-C on yesterday and left in on overnight and through the day today.

WordPress 4.0 was released yesterday and just before midnight I updated the four websites I manage, including this one.  I was looking forward to working with the new version today, but first things first.  Darryll called at 8:15 AM to make sure it was OK to come over.  We finished breakfast and then opened the garage and moved a few things that might be in his way. Although we would have liked to continue working in the garage during the morning, before it got really hot and humid, we were glad to have Darryll here working on the HVAC installation.

Instead of working on organizing the garage Linda worked at her desk and baked a loaf of bread while I assisted Darryll.  He wired up the library thermostat and showed me how the wires were connected.  He installed the return air grill, which required some minor drywall trimming, and installed a 6″ combustion air duct in the ceiling of the utility closet.  The duct had a screen on one end with a hood, like a dryer vent, and was open on the other end.  He installed it from the attic side with the hood in the attic and the open end sticking down through the ceiling into the closet.  I may decide to caulk or apply drywall compound to fill that gap between the duct and the hole Darryll made in the ceiling.

Darryll’s main focus, however, was hooking up the four pieces of duct, two rigid and two flexible, that will carry conditioned air into the library and installing the two ceiling registers.  That involved working in the attic which was very hot.  The flexible duct for the two ceiling registers was the same kind of product that was used in the main house; a pre-insulated flexible accordion tubing with an 8″ inside diameter that comes in 25′ lengths compressed to about 3′ for shipping.  To feed the two registers on the lower part of the west wall of the library he cut lengths of 8″ diameter (circular cross section) metal duct and assembled them.  He attached them to the supply air duct (plenum) with flange connectors.  He then slide insulation blankets (tubes) around them and connected the bottom ends of the duct into the back of the register ducts using several elbows to bring the duct around and close to the wall.  Finally, he slid the insulation down and secured it.

While Darryll was doing all of that I finished connecting the AC power to the condenser/compressor. That involved the following:

  • removing the terminal cover panel from the inside of the fused disconnect box
  • knocking out access holes on the right side and bottom
  • mounting the fused disconnect box to the side if the house
  • cutting a piece of 3/4″ plastic conduit for the cable from the soffit to the box
  • running the NM cable through the conduit
  • installing a watertight 90 degree elbow into the conduit
  • attaching the elbow to the side of the box
  • cutting, stripping, and connecting the line wires
  • cutting the plastic armor on the hookup cable to the right length
  • installing a straight screw-in watertight connector on the box end of the armor
  • installing a screw-in 90 degree elbow watertight connector on the condenser end
  • cutting, stripping, and connecting the load wires in the box
  • cutting, stripping, and connecting the load wires in the compressor.

I had Darryll check my work and then installed the fuses in the pull-out disconnect but was not able to get it to plug all the way in.  Darryll bent the blades slightly and got it to seat fully.  (I need to get two different fuses.  All he had were 30A fuses but 20A would be sufficient.  Also, the fuses he had in his truck were notched on one end.  I think fuses with full barrels on both ends would be better as they would have more contact surface than the notched ones.)  I reinstalled the terminal cover panel and closed the box.  I then re-installed the cover panel on the A-C compressor that Darryll had removed earlier.

With the power connected and most of the ducts run, we turned on the 120VAC/15A circuit breaker (for the unit in the utility closet) and the 240VAC/20A circuit breaker (for the compressor/condenser).  Darryll turned the thermostat mode switch to “cool” and the fan switch to auto and the A-C came to life.  Hooray!  I love it when that happens.

While Darryll finished installing the ducts and the registers I connected and mounted the thermostat for the garage furnace and then connected the wires on the other end of the cable to the terminals on the back of the unit according to Darryll’s instructions.  I removed the end panel from the Reznor ceiling-mounted garage furnace, removed the documentation packet from the inside, checked that the gas valve was in the “on” position, and put the end panel back on.  I also removed the protective plastic film from the bottom of the unit.

Darryll gathered up his tools, extra parts, and unused materials and loaded them in his truck. He then pressurized his portable air compressor and used it to pressurize the black iron gas pipe.  It has not been holding pressure, so he pumped it up to 15 PSI and we went in search of leaks with a spray bottle of soapy water.  We used my inspection mirror to see behind and under connections and found three leaks.  One was in a 2″ pipe fitting behind the garage, one was in a 2″ pipe fitting near the end of the run by the generator, and one was at an elbow in the 1/2″ pipe where it exits the utility closet on its way to the garage furnace.

Darryll was checking air temperature readings at the registers and in the main plenum of the library HVAC unit.  The library was 89 degrees F when he first turned the A-C on, and the attic was a lot hotter than that.  He connected his gauges to the compressor/condenser and said the readings were close enough to correct that he did not want to add or remove any refrigerant until the room had cooled down and stabilized at the requested temperature.

I was hoping he would get the job finished today but he needed some equipment, which he did not have with him, to work on the iron pipe and he was obviously tired from a long day working in the high heat and humidity.  He may be back tomorrow; if not, Monday or Tuesday. Whenever he returns, I have complete confidence that he will get it done before the gas meter is hung and that it will all work correctly for many years with very little attention other than changing a filter once or twice a year.

We deferred lunch until Darryll left.  We had chickpea salad on a slice of the bread Linda had baked earlier, corn-on-the-cob, and the last of some fresh pineapple.  Nothing says “summer” like organic, non-GMO corn-on-the-cob.

After lunch I called Bratcher Electric to check on the status of the estimate/quote that Mike was putting together to service our generator, convert it to natural gas, and run a 100A Service Entrance Cable from the transfer switch to the garage panel, converting it from a sub-panel to a main panel.  Karen said they have been really busy but he would work on it over the weekend.

I also called 1-800-Pack-Rat to arrange pickup of the storage container on Friday September 12th.  Steven was not able to schedule the pick-up during the call and said he would contact the local office and get back to me.  I made it clear that we did not want to roll over into another billing cycle and I was calling one week ahead of time as we had been instructed.  He assured me that it would not be a problem.  About an hour later we got a return call and follow up e-mail confirming pickup for Friday, September 12.

Late afternoon I checked on the library A-C to make sure it was not freezing up.  Everything looked OK.  The thermostat was set to 76 degrees F and the temperature was down to 77, so I bumped the setting up to 78 to let it cycle off and on.  Although Darryll did all of the heavy lifting on this project (literally) I spent my fair share of time in the attic on warm days installing the pull-down folding ladder and working on electrical wiring and attic lights.  It was very gratifying to see that all of this work—his, mine, and Linda’s—finally result in something that operated correctly.

We were relaxing and reading when severe weather watches and warnings for our area started arriving on our iPads.  Naturally we went outside to see what was going on.  We were both born and raised in the Midwest, the St. Louis, Missouri area, to be exact, and as kids in the 1950’s, threatening weather was a form of summertime entertainment.  Not that we were stupid; we learned from the adults around us when the show was over and it was time to head to the basement.  When I was about 5 years old we lost a plum tree in our backyard to a close encounter with a tornado.

The gathering storm.  The clouds were very dramatic in all directions.

The gathering storm. The clouds were very dramatic in all directions.

The clouds were very dramatic but eventually gave way to a formless mass of gray with swirling winds and a few raindrops.  We checked the Weather Channel app and the Weather Underground Wundermap app on our iPads.  The radar returns showed that we were likely in for some rain, and we got some, but as often happens the worst of it passed north and south of us.  The rain we did get was very welcomed.  We had heavy rain on Monday (Labor Day), Keith mowed the grass on Tuesday, I spread grass seed around on Tuesday and Wednesday, and a flock of six wild turkeys feasted on the grass seed on Wednesday and Thursday. We needed a nice light rain to help the seeds germinate and take root rather than be eaten or washed away in a thunderstorm.

Storm clouds looking east.

Storm clouds looking east.

Around 7:30 PM our power flickered several times and we received e-mail messages from our generator letting us know that utility power had been lost and then quickly regained.  We decided to check the Kohler OnCue software to see what the generator was doing.  We thought sure we had installed the software on Linda’s computer, so we could monitor it from her desk in the kitchen/dining area, but it wasn’t there.  After much searching and head scratching we checked my old laptop and there it was!  When we thought about it we realized that the generator had been installed about a week before Linda started configuring her new Samsung laptop, so there was no way we had put the software on her machine.  We’ve been very, very busy the last 20 months, so it was not surprising to us that we had forgotten the exact sequence of events.

20140905-08295

Approaching from the southwest the clouds got more ominous.

The severe warnings expired at 8 PM and the severe watches at 9 PM, but that did not mean the rain was done.  A big fetch of moisture was located south of Chicago, Illinois and moving through southwest Michigan in our general direction.  The rain was forecast to continue into the early hours of tomorrow but be done before sunrise.  When the rains finally came it rained hard for a while.  Tomorrow is forecast to be a perfect Michigan day and I plan to buy another bag of grass seed to spot seed the areas that got washed away, again.

 

2014/08/29 (F) Sand Mud Press

Before breakfast this morning I tried to start the Aqua-Hot (hydronic heating system) in our converted coach, but the burner would not ignite.  We had the same problem back on June 9th when Darin Hathaway of Hydronic Heating Specialists serviced the unit while we were at Elkhart Campground waiting to go to the GLAMARAMA rally in Goshen.  Darin suspected a bad coil but managed to jiggle a few wires and got it to work.  It started several times in a row, so we decided not to spend the money for a new coil at that time.  I hoped then the decision wasn’t a mistake, but it looks like perhaps it was.  I will try to find some time over the next few days to jiggle some more wires and see if anything comes of it.  I recall Darin saying the ignition coils were expensive, so I don’t want to replace ours if it is not actually broken.

For breakfast we had some of the vegan muffins that Linda made yesterday.  They were yummy.  We took a little time to revisit our options for a white, free-standing, double oven, 5-burner, gas range with a convection feature in at least one of the ovens but did not come to any decision regarding purchasing a new one.  Linda made a grocery list and then went to the Howell library to see what Consumer’s Reports had to say about gas ranges before stopping at Meijer’s.

While Linda was gone I placed follow-up calls to Heights Tower Systems and Bratcher Electric to check on the status of their pending quotes and then e-mailed Darin about the Aqua-Hot.  I then got to work in the garage and library working on the drywall.  I sanded all the drywall compound (mud) I had applied yesterday and added the next layer to the places that needed it.  Patching the library side of the opening where the window A-C was installed has proven to be particularly challenging, or at least tedious.  The new piece of drywall is recessed slightly compared to the original wall surface surrounding it, so I have been building up layers of drywall compound to “fill the hole.”  It has taken many passes so far and it is going to take quite a few more before it’s done.

I finished up for the day, cleaned up the tools, and changed out of my work clothes.  Rather than spend a lot of time at the library, Linda photographed the relevant pages of recent issues of Consumer’s Reports with her iPad so we could study them at home.  What we got from the reviews was that LG, GE, Electrolux, and Samsung are making good gas ranges while Kitchen Aide, and Jenn-Air are best avoided.  Lowe’s, Home Depot, and Best Buy all carry LG, GE, and Samsung appliances, so we have a choice of local dealers.  While we were pondering all of this over lunch a group of wild turkeys came through the back yard several times foraging for food.  There were three large adults and three much smaller birds, obviously this year’s brood.

I spent most of the rest of the day working at my desk getting the SLAARC WordPress website to the point where I was comfortable creating user accounts.  I had hoped to have user accounts set up by August 13th, but that did not happen.  One reason for the delay was that I was trying to find a way to automatically e-mail each user as I created their account.  It took me a while, but I figured out how to do this with the WP-Members plug-in.  I also found a plug-in that hides the WordPress Toolbar from users based on their WordPress user role.  In this case I was only concerned about users with the Subscriber role but the plug-in allows me to control all defined user roles.  I did a final edit of the User’s Guide, uploaded it to the private Members Only Area of the website, and e-mailed Mike (W8XH) and Larry (K8UT) that the site was ready to go.  Our DSL connection was pretty good most of the day but got flaky for a while during the evening.  The phone continued to be unusable with loud noise masking weak audio.  So far AT&T’s response to our MPSC complaint has been a phone call and e-mail from someone in the “Office of the President.”  Impressed?  I’m not.

 

2014/08/05 (T) Primary Elections

The rain started early today with a pre-dawn thunderstorm and continued off and on the rest of the day and evening.  The area beyond the basement walkout deck is a muddy mess, but Village Landscape Development has not finished grading it.  They need it to be dry, so it may be awhile before they can finish it.

Our first construction task today was to pull electrical cable up into the garage attic for three more circuits.  I wanted to get this done early in the day while it was cool and Linda’s knee was feeling better.  I had been mulling this work over last night and realized that I had probably made an incorrect assumption about the location of the 240V/20A service for the new library air-conditioner, so I put a call in to Darryll right after breakfast.  We got a call from Karen at Bratcher Electric around 9 AM to  see if it would be OK for Mike to stop by around 11 AM to look at some electrical work we need done.  He wanted to see the job in person in order to prepare a quote.

The new cable for the outlets on the west and northwest wall was already in the garage attic but I had to crawl into the low northeast corner to reach it and get it routed in the right direction.  I then had to crawl into the same corner from a different direction to pull it to the junction box I installed last week.  I secured it with cable staples and connected it to the old cable.

Next we pulled a 14-2+g NM cable from the sub-panel to the approximate location where the garage furnace will hang from the ceiling to provide a dedicated 120/15A circuit but did not install an outlet box pending a final location from Darryll.  We then pulled another 14-2+g NM cable from the sub-panel to the north end of the new west utility closet wall.  This cable will provide a dedicated 120V/15A circuit for the new library furnace.  Again, I did not install an outlet box pending a final location from Darryll.

Darryll called back and confirmed that the new 240V/20A dedicated circuit for the new library air-conditioner had to be routed to the location of the condenser/compressor on the outside of the west wall of the garage and there had to be a weatherproof disconnect within three feet of the unit.  That meant another trip to Lowe’s, but not until much later in the day.

Mike Bratcher showed up on time and I walked him through the project.  I want to re-wire the garage sub-panel as a 100A main panel by running service entrance cable from the transfer switch in the southwest corner of the garage to the sub-panel in the northeast corner of the garage.  We may also want to run power to the bus barn if/when it gets built.  Mike suggested that they go ahead and “stub out” the barn service at the same time with an appropriate disconnect.  The plan is to have them do this work at the same time they convert the Kohler whole house generator to natural gas and do the annual maintenance.  Mike also confirmed that they can take care of the natural gas connection to the generator as long as the pipe is located near the back of the unit, has a shutoff valve, and is capped.

By the time Mike left it was after noon so we had lunch.  While we ate we ordered a dual outlet phone/ADSL filter wall plate and a few other things on our Amazon Prime account and researched candidates and proposals for the primary election.  We then went to our polling station, located about two miles from our house, and voted.

This was the first election we participated in since moving to Livingston County.  As Democrats (and liberal ones at that) in this part of Livingston County voting in the primary is an exercise.  The real contest is on the Republican ticket; whoever wins the Republican primary for any given seat will almost surely win the general election in the fall.  Still, we always exercise our right to vote and there were statewide candidates and issues.

The last cable we installed today was another 14-2+g NM to provide 120V to a junction box on the utility closet ceiling.  I mounted a round white plastic junction box approximately 8″ from the east utility closet wall in line with, and slightly in front of, the sub-panel.  I installed a plastic bare-bulb light fixture with a pull chain and 3-prong outlet to the junction box.

I did not tie any of the new circuits into the sub-panel today as we have one more circuit to pull and I want all of the cables at the panel before I cut the power and remove the cover.  We were done with electrical work for today so I turned my attention to drywall surface preparation while Linda retreated to her desk to work on tax returns.  I sanded the drywall compound as smooth as I could and wiped everything down to get rid of the dust.  I then primed all of the new and old drywall on the northeast garage wall along with the plywood platform and exposed 2×12 on the front of the base.

By the time I was done and cleaned up it was approaching 5 PM, we were both tired, and we needed to go to Lowe’s, so we decided to dine out.  We went to Lowe’s first and bought a weatherproof plastic disconnect box, a couple of watertight fittings, a 10′ length of 3/4″ plastic conduit, and a 50′ role of 12-2+g NM cable.  All of this will be used to run the new dedicated circuit for the new library air-conditioner.  We then drove to the Panera in Brighton and used one of our gift cards to have a light dinner.

We were back home a little after 7 PM.  The primer was dry so I decided to paint all of the surfaces I had primed before dinner.  While I painted Linda made a batch of her incredibly yummy granola.  We had a small glass of wine and played a few games on our iPads while the granola cooled and then turned in for the night.

 

2014/07/30 (W) Winter In July

By the time we started breakfast the landscapers were back.  Steve started to dig a trench for a drain line from the end of the lower deck and hit 2×8’s on the flat about 2-3″ below the surface, so he abandoned that work and moved the excavator around front to the trash pile.

The major construction work up in the back is nearing completion and the lads were picking up some of the smaller debris, the larger stuff having been moved around front to the trash pile yesterday.  Steve used the excavator to load some of the trash onto the trailer (normally used to move the excavator), where the crew covered and secured it.  He loaded more of it into the back of his pickup truck.  They are still having tire issues with the trailer so I charged up my 200 psi air compressor (150 psi regulated) and rolled it over so they could fill one of the tires.

Steve moved the excavator to the southeast corner of the house to dig a short (10′) shallow trench for a drain line to get water from the downspout away from the house.  I conferred with him regarding the exact location because the main propane line enters the house at that corner, the electrical service for the RV outlet runs under there, there is a tree about 12 feet southeast of that corner, and that corner is where the new natural gas meter will be installed. There will be a similar short drain line at the southwest corner of the garage, but it will be dug by hand as the main electrical service runs directly under there about 2′ below the surface.

The lads continued to work in the back placing egg rock.  They were about 1/2 cubic yard short and I asked Steve to order a full cubic yard and use the other 1/2 yard on the west end of the north edge of the lower upper deck to match what they had done at the top of the west retaining wall.  Steve gave the crew instructions on how to prep that area, add a piece of edging to define where the rock will go, and install landscape fabric.  He and I then looked at the boards he hit in the back while trenching and it turned out there were only three of them 4-6′ long and they appeared to be old construction material that had possibly been used as a step off of the lower deck.

Linda gathered up household trash and recyclables and headed off around 10:45 AM.  I finally got started on my projects for the day around 11 AM, opening the garage door so I would have light when the power was turned off at the sub-panel main breaker.  My first task was to move the new outlet I installed in the utility closet the other day.  The return air duct will be installed against that wall and would cover the current location.  When we installed the door yesterday we did not put any 2×4’s above the door and up to the ceiling.  Darryll is going to run the supply duct straight out from the furnace above the door and then angle it over against the east wall of the garage.

With the outlet relocated I cut some scrap insulation to fill the lower half of the open wall cavities and then stopped while I pondered getting a ground wire into that space.  Linda got back from running her errands about then so I decided over lunch to call Bratcher Electric to see if they could give me an idea of what it will cost to run a 100 Amp service entrance cable from the transfer switch in the southwest corner of the garage to the garage panel in the northeast corner of the garage.  (I estimated it would take 40′ of cable, but have no idea what the labor will be.)

The earliest I will be able to talk to Mike Bratcher is next Monday so I decided that I really needed to run a ground wire from the sub-panel to the main panel allowing me to disconnect the ground wires from the neutral wires in the sub-panel by removing the bonding screw in the sub-panel and giving us a code-compliant, and much safer, sub-panel until such time as it gets re-wired as a main panel.

Linda and I determined that I needed about 40′ of #10 copper wire to get from the sub-panel to the main panel.  Pondering sometimes leads to good things.  I really did not want to stop working to go get wire when I remembered that I had a length of green insulated copper wire I had used for grounding a ham radio and antenna mast at the old house.  It was coiled up on the floor in garage and when we uncoiled it we discovered it was … 40′ long!  I love it when that happens.  I checked the gage and it was #8, so it was actually larger than required for the 60A cable that feeds power from the main panel in the basement to the sub-panel in the garage.

I checked the approximate location for drilling a hole and then drilled a 1/2″ hole from the inside of the garage just above the base plate and out through the siding.  I fed the ground wire through the hole from outside the garage, pulled it up into the sub-panel, and secured it to one of the ground bars.  I dressed it and fastened it to the side of a stud and coiled up the extra outside on the lower upper deck.  I will complete the run to the main panel another day.

With the ground wire installed I was able to install the insulation I had cut earlier and secure it with our staple gun, which I had managed to locate in the tub of tools we took with us out west last summer.  With Linda’s assistance I cut and installed two pieces of drywall from an old scrap piece we had.  I then taped the seams and mudded the screw dimples.  By the time I finished it was 4 PM.  Spencer came to the garage to let me know that they would all be leaving around 4:30 PM due to a severe thunderstorm that was on course to hit our area around 5 PM.

By 4:45 PM we were hearing thunder and I decided to stop work temporarily and help Linda close up the house.  The storm came, a cold wind blew, and it rained hard, but only for a few minutes and we did not get any of the hail that was reported prior to the storm’s arrival at our location.  An hour later we had a lovely summer evening with blue skies.  Linda made roasted winter vegetables for dinner.  It’s the end of July, but we had overnight lows in the mid-40’s two nights ago.  The first six months of this year have been the coldest in 21 years, so winter vegetables were appropriate for dinner even though it is the end of July.

I had planned to do a lot of other electrical work today, but it was a full day and everything that got done was something that needed to get done.  It was also work that had to get done in the order in which it was accomplished.  My original plans were obviously too ambitious, and today’s work involved details that required time to figure out and execute.

 

2104/07/12 (S) Natural Gas

You might think that this would be a reference to the natural by-product of having breakfast with our ham radio friends in South Lyon this morning at the Senate Coney Island, but that is not the case.  We had a 10:30 AM appointment at the house this morning with Darryll Mech of DCM Heating and Cooling to finalize the work that needs to be done to get the house ready for conversion to natural gas.  The natural gas contractor for Consumer’s Energy (Roese Construction) started installing the main lines in our area a couple of weeks ago and they expect to have the project completed by September 26 (of this year).  That means we will have natural gas to the house sometime between now and then and we need to have everything as ready as we can before they hang the meter so the final conversion will be minimal and quick once the natural gas is turned on.

The work at our house breaks down into three pieces.  The first piece is running black pipe on the outside of the house from the southeast corner down the east side, across the back, under the upper and lower decks, along the back of the garage, and up the west side of the garage.  The gas meter will be installed at the southeast corner of the house where the propane currently enters the house.  The existing house piping will be used to supply natural gas to the house furnace, kitchen range, and outside grill connector.  The whole house generator is by the southwest corner of the garage and is currently on its own propane tank.  After the natural gas is hooked up everything needs to be on a single natural gas service/meter.

As the gas pipe runs along the back side of the garage there will be a T to supply gas into the garage.  That has to do with the second piece of the work.  We are having a ceiling mounted garage heater installed and a small furnace/air-conditioner for the library.  The HVAC unit will allow us to heat the library in the winter without cycling the main hot-water baseboard heating system, which is at the end of a long run through unheated attic space and is not particularly efficient or effective.  More importantly, it will allow us to control the humidity on humid summer days (it’s a library, after all, so it contains a lot of books and other humidity sensitive paper materials).  As part of that work we need to remove a propane space heater that is mounted in the wall abutting the garage and cap the line.  We also need to remove a window mount air-conditioner in that same wall.  Yes, that’s right, the current A-C for that room exhausts into the garage.

The third piece of the puzzle will be disconnecting the propane and converting the appliances that currently run on propane; the kitchen range, the main furnace, and the generator.  We will have Darryll take care of disconnecting the propane from the house and connecting the natural gas to the existing house piping and start up the two new furnaces once the gas is available.  We will then have TOMTEK convert the main furnace since they already service it for us.  Depending on timing we may be without our main furnace and domestic hot water until TOMTEK can complete their work.  I may convert the range, have Darryll do it, or have TOMTEK do it.  Regardless of who does the conversion I will need to get the conversion kit.  Bratcher Electric will connect the gas line and convert the whole house generator and do the annual service at the same time.

While Bratcher Electric is here we are going to have them run a 100 Amp, 4-wire cable from the outlet of the transfer switch in the southwest corner of the garage to the panel in the northeast corner of the garage.  The existing setup has the 200 A main panel in the basement of the house with a 60 A / 240 V breaker supplying the cable that feeds the sub-panel in the garage.  That means the power to the sub-panel goes from the garage all the way to the house and then all the back to the garage.  That’s a lot of unnecessary forth and back.  In part because of that, and in part because of the electrical needs of the new garage furnace and library HVAC unit, I am going to replace the sub-panel in the garage with a 100 Amp main breaker panel in advance of all of this work.

The current sub-panel is a General Electric but the main house panel is a Square D Homeline.  Lowe’s and Home Depot carry both the Homeline and QO product lines from Square D, and Home Depot also carries GE and Siemens.  If I installed a GE main panel in the garage I could potentially reuse the existing breakers and save a little money.  On the other hand, they have been in an unconditioned space for who knows how long, and they are not physically compatible with the Homeline breakers.  Indeed, the four different products are not generally interchangeable.  But the main consideration is selection and availability, and the Square D products win on those criteria.

Once the new furnaces are installed we will still have some work to do.  We will have to repair the walls in the library, insulate the hot air duct in the garage (although Darryll may take care of that), and enclose the library HVAC unit.  Because the library HVAC unit will be installed in the northeast corner of the garage it has to be in its own little sealed room to prevent automotive engine exhaust or other noxious fumes in the garage from being drawn in to the conditioned air or explosive fumes, such as gasoline vapor, from being drawn into the combustion chamber.  The furnace will have its own air intake and exhaust tubes.  The garage heater uses a sealed combustion chamber with a special concentric intake and exhaust tube, so it does not have to be enclosed.

Darryll indicated he could start the last week of July and would need about a week to do all of his initial work.  We have company coming the 20th through the 23rd, so we have the upcoming week to prep (clean out) the garage and library for Darryll.  This is the kind of situation that could give us gas if we weren’t used to it and enjoy it.  There’s nothing like a construction project to get you up and moving first thing in the morning and keep you up late at night.

 

20140605 (R) Apple Roku

Linda had to go into the bakery today which left me to catch up on phone calls and errands.  I made more phone calls to contractors this morning and had better luck than yesterday reaching people or at least leaving messages.  I rescheduled with Gary from GM Construction to come discuss the pole barn project.  I also got hold of Bratcher Electric and determined that the annual maintenance on the whole house generator could wait until we are ready to do the conversion from propane to natural gas, which they can handle.  In talking to Mike Bratcher I also determined that we can install a main panel in the garage just after the transfer switch and then run power directly from there to the pole barn rather than from the main panel in the basement.  While we are at it, we could redo the sub-panel in the garage, feeding it directly from the new main panel rather than the main panel in the basement.  The basement panel is very crowded and we have wires carrying electricity back and forth unnecessarily.

I got a call from Butch with an update on the negotiations of the sale of the major portion of their business assets.  Linda has been advising them relative to valuation, accounting, and tax issues and we have been helping them with purchase agreement language.  It looks like they are in the final stages leading up to a closing of the deal.  Their big annual event is coming up in early July and they will likely be busy with the transfer of inventory and training of the buyer during and after that event.  I need to get our bus down to their place to work on some projects and help Butch work on getting their bus conversion done enough that they can live in it this winter in the southwest.  Based on things going on at both ends, it looks like the window for that work will be mid-September to sometime in November, weather permitting.

Our converted coach friends, Pat and Vickie, have some older Motorola GMRS handheld radios that they like but the charger bases have disappeared.  My ham radio friend Scott (AC8IL) is in the commercial mobile communications business so I checked with him to see if chargers were still available.  They were and he had a couple of the drop-in style charger/bases in stock!  Scotty is just that kind of guy.  I picked them up this morning and will deliver them to Pat and Vickie at the GLAMARAMA rally.

Apple Roku sounds like an interesting dessert, but it’s not.  It might be an either/or situation, but it could be a both/and.  John Dewey was a both/and kind of guy, so I favor that approach.  We were intrigued by Steve and Karen’s Roku Internet TV streaming device last night so I stopped at Best Buy today on my way home from running my errand to see if they had them in stock and if so at what price.  Not only did they have them, they had three different models.  The “stick” was $50, the Roku 2 was $70, and the Roku 3 was $100.  (The Roku 3 does not have A/V connectors like the Roku 2, only HDMI, but it has a five times faster processor.)  But that was not all, oh no.  They also had the Apple TV device for $100 and two other similar products, one of which looked like an Amazon/Kindle thing and the other one a WD thing, whatever that is.

The Roku units (2 and 3) have access to a lot of content on a free, subscription, and pay-per-view basis.  The Apple TV unit has access to content on the same basis but the selection may not be as extensive; it’s hard to say for sure as the devices are not easy to compare directly.  The Apple TV unit, however, has one huge, unique feature; it can mirror anything on an iOS device, such as our iPads, to a TV/monitor.  The iPad can also be used as a control panel for the Apple TV device.

We do not have to choose between a Roku and an Apple TV unit, of course, we can get and use both if we want; it’s just a matter of money.  Between the two TVs in the house and the two in the bus it could be a lot of money if we wanted dedicated units of both types on all four TV/monitors.  We always have the option of moving things back and forth, but in general I prefer not to do that.  To the extent we can afford it I prefer to have the house and the bus set up so that the only things we move between them are the things we have to, such as ourselves, our food, our laundry, our computers, our cats, and some of our ham radio gear (at least for now).  The best solution, however, may be to get one of each device and move them around as needed.  That would give us the best cost/benefit ratio, but not the most convenience.

When Linda got home from her day at the bakery we finished the Egri Merlot we had opened the other night and caught up on the day’s events.  We decided to try the Apple TV device first and see how it worked in our situation.  Linda made an onion, mushroom, tomato Ragu, and served it over the leftover power grains.  It was very tasty.  After dinner I went to Best Buy to get the Apple TV device while Linda prepared fresh strawberries for dessert.  Fresh strawberries are a favorite treat of ours.  She served them with small pieces of Dandelion Small Batch Chocolate made from 70% Ambanja Madagascar 2013 Harvest beans.  The chocolate was excellent and unique.  It was a thank you gift from our son and daughter-in-law for Linda’s babysitting services while they were in San Francisco, California.

We connected the Apple TV box to one of our HD TV/monitors and went through the setup procedure.  We decided to test it on some PBS content, which required us to set up an account with PBS and enter a validation code that the Apple TV box provided.  We also downloaded an app onto Linda’s iPad2 that allowed it to mirror whatever was on its screen to the Apple TV.

We used the mirroring feature to watch Season 1, Episode 5 of Doc Martin, but it proved to be unusable.  The image was fine on the iPad2 but the Apple TV could not keep up.  I found that to be odd as our home WiFi network should have more than enough bandwidth to deliver the data stream between the devices, but maybe not.  I presumed that the limiting factor in our network was the data rate coming into our DSL gateway from our AT&T landline, but that was obviously fast enough to deliver the content from the gateway to the iPad without buffering hesitation.

We turned off the mirroring and finished watching the episode on the iPad.  Still, the content delivered directly from the gateway to the Apple TV looked great, and the mirroring will be useful for showing photos and anything else on our iPads.  We may reconfigure the Apple TV to use one of our other wireless networks and see if that helps.