Tag Archives: black grapes (WFPB)

2015/07/28 (T) Mighty Dremel

I got up at 8 AM.  I must have been sleeping soundly as I was unaware until then that had already gotten up.  She had gone for a walk and left me a note.  The high temperature today is forecast to hit 90 degrees F and she wanted to get her walk in early.  I fed the cats and checked the mouse trap in the pantry.  We caught another one overnight so I carried the trap back to the northeast corner of the yard and released it.

I made our morning coffee and had just settled in to work on my iPad while it brewed when Linda returned from her walk at 8:35 AM.  We enjoyed our first cup of coffee and then had breakfast.  She made a batch of her fabulous granola yesterday but we have to finish the previous batch first.

Today was the day to get back to work on the bus.  First I spray lubed the two overhead garage doors, both rollers and section hinges, and ran them up and down and back up.  I needed to open them anyway to get out the ladder and tools and sometimes it’s better to spend an extra minute while you are thinking about something and just take care of it.  Besides, I had no way of knowing if I would accomplish anything else today so at least the doors worked more smoothly.

This is where the "stop block" was located.  The left screw came out but the right one did not.  I had to grind it off.

This is where the “stop block” was located. The left screw came out but the right one did not. I had to grind it off.

In a very real sense our entire bus remodeling project hinges on getting the old refrigerator out and the new refrigerator in.  The refrigerator swap, in turn, hinges on being able to open the fixed window panel on the passenger side of the bus.  That panel is hinged at the top by a pair of rolled channels, one on the top back edge of the window frame and the other on the lower back side of a rail that runs almost the entire length of the bus.  Most of the upper body side panels are hung from these rails and secured at the bottom with latches or other fixed hardware.

The window frame in question has two latches that can be released allowing the frame to swing open and provide an emergency exit, except for the two “stop blocks” in the upper outside corners which are attached to the frame (with two screws) just below the rail.  As the name suggests, these blocks appear to stop the frame from opening more than about 10 inches. That would make emergency escape difficult but it makes it impossible to remove a refrigerator.  We know these frames will open farther as someone posted a photo of an H3 on one of the Prevost bus websites with this same frame open almost 90 degrees (horizontal).

As I have described here before I successfully removed the left block and the left screw from the right block a couple of weeks ago but have been unable to remove the right screw from the right block.  Early in my attempt to remove it I stripped the Philips head and things just got worse from there.  I borrowed an impact screwdriver from Chuck, which successfully extracted the left screw but the right screw would not budge.  I eventually bought and used three different screw extractor sets and broke two drill bits using one of them.

The Dremel with a cutoff wheel installed.  The stop block was unusable by the time I got it of.

The Dremel with a cutoff wheel installed. The stop block was unusable by the time I got it of.

I borrowed a soldering gun and Dremel Kit from Chuck on Saturday and finally got around to using them today.  The idea of the soldering gun was to heat the screw causing it to expand and then contract when it cooled.  This will sometimes cause screw threads to separate from tapped holes.  In this case the block was already turning relative to the shaft of the screw but the screw was not turning so I hoped the heat might free it from the threaded hole in the frame.  To find out, however, I needed to create a slot in the shaft that would accept a flat blade screwdriver, in particular the large bit that is part of Chuck’s impact screwdriver kit.  Enter the Dremel.

In order to create a wide enough slot I put two cutoff wheels on the arbor.  The block is at the top of the window frame so standing at the highest safe step of our 8-foot step ladder I was at a comfortable height for holding the Dremel vertically and cutting a horizontal slot.  The cutoff wheels are about the size of a quarter so the slot extended well beyond the screw head, or what was left of it, into the block.  Using the Dremel was a last resort and I knew that once I made that decision the block was going to get destroyed.

The Dremel cutoff wheels cut through the block, which is aluminum, very easily and did not have any trouble with screw or the broken drill bits.  The drill bits eventually loosened to where I was able to extract them with pliers.  I tried several different screwdrivers in my newly created slot but to no avail.  I sprayed WD-40 around the block and screw using paper towels to catch the overspray and clean up any runs.  I kept cutting the block until I was able to pry it off of what remained of the screw.  With less than a quarter inch of the shaft left I cut a slot in the end and tried to unscrew it but the tangs just broke off.  I tried unscrewing it with pliers but it would not budge.  The protruding stub would interfere with opening the frame 90 degrees so I used the Dremel with a cutoff wheel to grind the shaft down flush with the frame.

All the "stuff" I used to attack 25 cents worth of aluminum because of corrosion.

Some of the “stuff” I used to attack 25 cents worth of aluminum because of corrosion.

Linda came out to help at this point.  I repositioned the ladder and then we unlatched the frame on the inside.  Linda pushed it out while I supported it from outside.  It opened farther than it had before but we did not try to raise it to a horizontal position.  The frame/glass is very heavy and we did not want to risk having it come loose at the hinge. We closed the frame and latched it.  I took a few pictures and then put all of the tools away.  The weather was very warm and humid and that was enough outside work for today.

We had hummus, pita chips, and black grapes for lunch.  After lunch I spent a few minutes in my office checking e-mail and then typed up the minutes from our July SLAARC meeting.  I then started working on the design/drawings for the built-in sofa.

I have a very long list of things to do but the furniture design remains a priority as I need to make sure Jarel has all the information he needs to keep moving forward on the custom cabinetry.  Although I will be assembling the sofa Jarel will be cutting all of the pieces.  I will be using a long rip of a full sheet of plywood and a long piece of 3/4 x 3/4 walnut hardwood as an edge band for the horizontal platform.  In order to give Jarel a cut sheet I needed to design the unit.  I also needed to design it so I knew it would fit when assembled.

I took an occasional break to chat with friends on the two local ham radio repeaters that we tend to use but otherwise stayed on task until late afternoon.  I had pulled a book on cryptology from our personal library and started reading it.  I took a nap before dinner and continued reading afterwards.  Fascinating stuff, cryptology.

 

2015/07/25 (S) Monitoring

We started our day with our weekly ham radio breakfast in South Lyon.  As we were leaving breakfast I called Chuck to see if he was at his shop.  He wasn’t but said he could be there between 11 and 11:30 AM.  We drove home, loaded up my car with the accumulated recyclables, headed over to Recycle Livingston, and then headed to Chuck’s shop in Novi.  We arrived before he did and let ourselves in.  I got his Dremel tool kit and pistol style soldering gun and we chatted for a while.  He had a noon appointment with someone at a commercial building he owns in Livonia, and we had a long list of project tasks to take care of, so it was a shorter chat than usual.  We stopped at the Lowe’s in New Hudson and bought a can of garage door spray lube and then headed home, stopping for fuel at the Brighton Shell station on Grand River Avenue at I-96.

At our ham radio breakfast Linda had rye toast and I had an English muffin for breakfast (our usual meals) so we were hungry by the time we got home.  We had roll up sandwiches of hummus, Vidalia onions, and greens with a drizzle of olive in a whole wheat pita.  Very tasty.  We then got to work installing the wall-mounted track for the ZioTek monitor mounting system I bought from CyberGuys.

The north wall of the ham shack.  Critical points for the mounting of the ZioTek track system are marked with green tape.

The north wall of the ham shack. Critical points for the mounting of the ZioTek track system are marked with green tape.

Conceptually the installation was simple but it took all afternoon.  There is a kind of alcove at the north end of my office that serves as our amateur radio (ham) shack.  The purpose of the ZioTek system is to support up to four monitors on the north wall above the two desks located there so that they are not attached to the desks or using up any of the desktop real estate.  The walls in the office are 7/16ths inch thick T-111 exterior plywood with 1/2″ grooves on 4″ centers running the length of the plywood sheets.  The sheets are installed vertically so the groves run vertically giving the appearance of vertically installed 4″ wide rough sawn boards.  We finished the photo studio/office at the old house with this material so we knew we liked the way it looks.  Being plywood it has once major advantage and one major disadvantage compared to drywall; you can screw relatively heavy things to it, but holes are essentially impossible to repair.  What that meant for us was that we only had one chance to get the track in the correct location.

In this case “correct” meant:  at the right height and horizontal location to be able to position the monitors exactly where we wanted them while making sure the track was level.  To accomplish this I bought a 1″x6″-8′ poplar board to use as a mounting plate for the two track sections.  (All of the trim in the ham shack/office is poplar.)  We used pieces of tape to mark the locations of the corners of the three monitors on the wall and marked the centers of the VESA 100×100 mounting plates.  When we knew where the horizontal centerline of the tracks needed to be we determined the horizontal location of the tracks relative to the right end of the poplar board, which would be installed flush to the vertical trim in the northeast corner of the alcove.

The ZioTek tracks will mount to the horizontal poplar board which will be mounted to the wall at the studs.

The ZioTek tracks will mount to the horizontal poplar board which will be mounted to the wall at the studs.

We set the poplar board in the utility hallway and positioned the two tracks on it.  I butted the tracks together and slid one of the mounting plates so it saddled both tracks and kept them aligned.  The tracks are 4.5″ wide and the board was 5.5″ wide so I very carefully positioned the tracks for a 1/2″ reveal along both edges.  I then marked the eight mounting holes (four in each track) and removed the tracks.  Using a brad point wood bit that was slightly smaller than the central shaft of a #14 wood screw I drilled holes that were as carefully centered as I could make them.

We held the board in position against the wall and used a 1.5″ #6 finishing nail through the right mounting hole to hold that end of the board.  We then used a 4-foot level on the top edge of the board and secured the left end with a second nail through one of the mounting holes.  We positioned the chair where it will be when in use and made sure we liked the height of the board.  It looked and felt right so we proceeded to secure it to the wall.

The ZioTek tracks mounted to the poplar board mounted to the wall.  Linda is vacuuming up sawdust from drilling.

The ZioTek tracks mounted to the poplar board mounted to the wall. Linda is vacuuming up sawdust from drilling.

Using a small carpenter’s square I marked locations for mounting screws one inch in from each edge of the board in vertical alignment with the small heads of the nails that secure the T-111 to the studs.  The 8-foot long board spanned six studs so I had 12 holes to drill.  I used a standard drill bit that was slightly smaller than the shaft of a #14 wood screw and drilled through the poplar board, through the T-111, and into the studs.   I used a countersink bit to create recessed pockets for the flathead wood screws.  We then secured the board using 3″ long #14 flathead wood screws.  We applied a little soap to the screw threads to help them go in.

I pulled the two small nails out of the track mounting holes.  Using the same drill bit I finished drilling out the mounting holes all the way through the T-111.  We positioned and partially installed one track using 2″ long #14 flathead wood screws in the two end mounting holes.  We then did the same thing with the other track.  I slid one of the mounts so that half of it was in each track and partially installed the remaining four screws.  I gently snugged up all eight screws, checking the track alignment as I went, and then torqued them down.  The heads stick up above the inside surface of the track but the shuttle mounts are raised on the underside so they slide right over the screw heads without interference.

The first of three monitors to get mounted.  This one is on the left end of the tracks.

The first of three monitors to get mounted. This one is on the left end of the tracks.

With the track mounted to the wall we turned our attention to installing the monitor mounting arms and monitors.  We used one of the long arms on the left, the short arm in the center, and the medium arm on the right.  The other long arm will eventually end up on the far right or get swapped for the medium arm, but for now I only wanted to mount three monitors.  We installed the nice Dell monitor that goes with my older Dell Precision laptop in the center and installed the two ASUS monitors to either side of it.

By the time we got the third monitor mounted the office was in more disarray than usual and we did not have time to clean up tools and put things back in order.  Linda did manage, however, to run the vacuum cleaner and get most of the sawdust and wood chips sucked up.  Our son had called during the afternoon with a last minute request for babysitting services from Linda and I decided to go too.

A view of the mounts for the left and center monitors.  This is a substantial system.

A view of the mounts for the left and center monitors. This is a substantial system.

We left at 6 PM for Ann Arbor and stopped at the Whole Foods Market to pick up a few things for dinner.  We got two different vegan sushi rolls, a cold couscous salad, and some organic black grapes.  When we arrived at Brendan and Shawna’s house a little before 7 PM Madeline was surprised and excited to see us.  Brendan and Shawna left around 7:15 PM for an engagement party and Madeline was fine with the whole thing.  She was still eating her blueberries and strawberries and then wanted Linda to read several books to her.  We went upstairs to see how her crib had been converted to a toddler bed, allowing her to get up during the night to use the bathroom.  Such a big girl.  But not too big for pajamas that featured fairies.

After another couple of stories Madeline went to bed without a fuss.  We then had dinner.  The California rolls were OK but the couscous salad was outstanding and the grapes were very good.  We sat on the couch using our iPads but I could not stay awake so I laid down and drifted off to sleep.  I was awakened about 90 minutes later by the return of Madeline’s parents.  Linda gathered up our leftover food and the roses the kids had gotten her as a “thank you” for babysitting on such short notice which gave me time to fully wake up.  We were on our way by 10:30 PM and back home shortly after 11.

 

2015/07/24 (F) Open and Shut

I was up at 7:30 AM and made coffee but I did not see Mara or Linda until after 9 AM.  Around 9 AM I heard a knock at the front library doorwalls and heard someone saying “hello?,  hello?, David?”  I went out the front door and saw the front end of a red Ford Focus parked in front of our bus.  I had never met this guy but he was not unexpected and I knew he was looking for David LaVoisne, who lived here with his wife, Maria, until we bought the house from them in February 2013.  I knew this guy might stop by as he had once before when we were away and chatted briefly with our lawn care guy, Keith.  I also knew that he had worked with David at the Ford Wixom plant before they retired.

We introduced ourselves and had a nice chat.  I explained that David and Maria had sold the house and their Airstream motorhome, bought a newer motorhome, and were now full-time RVers.  (As I recall they bought a used Foretravel.)  Apparently they did not let all of their friends or former colleagues know what they were doing.  I also mentioned that they had moved the few possessions they did not get rid of to their son’s house somewhere in the region and that they probably visited there occasionally.

Mara emerged about the time our visitor left.  Unfortunately I do not recall his name.  We all had breakfast together after which Mara went about her final departure preparations.  She gave Linda a small fir tree and two small herbs.  Linda transferred the herbs to her herb pots and gave Mara’s small pots back.  She needed to top off her fresh water tank so I helped with that.  The lock on the water fill door stuck in the open position so Mara got her can of dry lube and I sprayed a little in the lock by holding the protective cover open with the tip of the key.  That did the trick, another quick fix to a small but potentially annoying problem.

When her rig was basically ready to go Mara made one last use of the shower, got dressed to travel, unplugged the power cord and stowed it away, and pulled in the slides.  After hugs all around she climbed into the pilot’s seat and fired up the engine and Sabra (one of her two cats) climbed up on the dash just in front of the steering wheel.  I guided her as she backed out onto our road.  She drove down to the court, did a three point turn, and a few minutes later drove past our house in the opposite direction, back on the road again after almost two weeks at our place.  It was noon, but she was only going as far as London, Ontario today.  Linda got a text message later letting us know that she had arrived at the Moose Lodge and the border crossing on the Blue Water Bridge from Port Huron, Michigan to Sarnia, Ontario had only taken 30 minutes.

After Mara was out of sight I gathered up the laundry, sorted it, and started a load of warm whites.  I wrote out a list of parts I needed to finish the garage door opener installation and the monitor mounting system in the ham shack and then drove to Lowe’s in Howell.

I was back home by 1:30 PM and we had hummus and chips along with black grapes for lunch.  We started working on the garage door opener installation when my phone signaled that I had a voice message.  It turned out that I had one on the house phone too.  Both messages were from Jarel.  He had a few questions about dimensions on one of desk drawings so I called him back and we sorted that out.  He retrieved the half sheet of walnut veneer plywood from Butch last night and bought 16 board feet of walnut.

In spite of the 85 degree temperature and what felt like high humidity, even though it was only 41%, we worked for about three hours and finished installing the opener on the small garage door.  It was quite an involved process but it worked when we were done.  The new opener has automatic reverse if it encounters an obstruction and an infrared sensor beam about 6″ off the floor.

At 5:30 PM we loaded the old garage door opener into the dump trailer.  We then loaded the old OTA TV antenna pieces.  Brad is picking up the trailer in the morning so we will not fill it but it we put the junk in it that we needed to get out of the garage and a few other things as well.

We took a break around 6 PM to have some water and get off our feet for a while.  At 6:45 PM Linda made salads and cooked up some vegan Italian sausages.  After dinner we planned to work for a while in the ham shack on the installation of the wall-mounted track system but we were too tired to start a project that was going to require decisions and careful attention to detail.  We sat in the living room instead and used our iPads for the usual things.  It was great having Mara here and we look forward to her return someday.  But for now she is off on the next leg of her open-ended adventure and we have a lot of work yet to do to get our bus ready for the 2015-16 winter season.

 

2014/07/24 (R) Back To Work

We were up earlier than normal.  Linda went into the bakery today and likes to be on the road ahead of the worst of the morning traffic rush.  Since she was working I figured it was a good day for me to also do some paid work (plus a couple of loads of laundry).  Earlier in the summer I agreed to write assessment items for some of the modules in the Michigan Assessment Consortium professional development series on Common Assessment Development.  The items are needed for use with the Lectora platform, which Bill Heldmyer at Wayne RESA is using to re-package the modules.  These are modules that other team members developed, so I have to spend some time with the content before I can write the items.

I did some work on this in June and then got busy with contractors and out-of-town trips.  I am still tied up with construction, contractors, and other projects but a timely completion for this work would be early August so I spent much of today working on it.  I already had one module done and hoped to finish the other six but only managed to complete three of them.  I am anxious to get back to work on the HVAC prep in the garage but I plan to continue working on the assessment items tomorrow as I would like to e-mail them to the team for feedback before the end of the day.

I have a lot going on at the moment.  I like being busy, but this is starting to feel like “work.”  I have a growing list of “must do” bus projects that I have yet to start:  1) fogged window replacement; 2) auxiliary air filter / water separator replacement; 3) Aqua-Hot expansion reservoir replacement; 4) Aqua-Hot exhaust leak repair; 5) motorized windshield shade repair; 6) finishing the installation of the ZENA power generator (for charging the house battery bank while driving), and; 7) redoing the water bay (that’s a big one).  I have an optional project to replace the rear view camera system.

Butch is building new ride height linkages for his bus and wants to build some for me as well, so that makes nine “bus projects” I would like to accomplish before the weather turns too cold to work outside.  Some of these are projects I can do with the bus in front of the house once I can move it back into its normal parking spot.  The rest are things I will work on once I get it down to Butch and Fonda’s place in Twelve Mile, Indiana, probably this September.

The FMCA education committee work is ramping up and I have three websites I am trying to launch, one of which has an August 11 target date, plus our own website/blog to maintain (as of this writing I am over two weeks behind on blog posts).  I am also supposed to be writing a “featured bus” article for Bus Conversion Magazine on Marty and Pat Caverly’s MCI MC-5B conversion “Scooby Doo & Bookworm.”  It’s a great conversion that has taken 20 + years to build and will be the cover/centerfold story when it is published.  I have 1,500 photos from Marty and the only way I will make sense of the project is to sit down with Marty, select images, and make notes.  Once I have a sense of the chronology of the work, and the images to illustrate it, I can weave the words together to tell the story.

Kyle and Spencer were here working on the landscaping for most of the day.  Steve stopped by in the morning to go over the work from yesterday and outline the work for today.  It’s coming along, albeit much more slowly than I think it should.  For a job that requires a lot of manual labor we normally only have two guys on site, sometimes three and sometimes only one.  And, sad to say, they simply do not work as hard and as persistently when Steve is not here.

Linda got home ahead of the afternoon traffic.  We had leftover potato and lentil curry and naan for dinner and both the dish and the bread were still excellent.  A few black grapes and dark, sweet cherries for desert and we were off to bed early.